resource_code,name,type,category,unit,price_avg,price_min,price_max,price_median,price_variants,currency,avg_cost_per_use,avg_qty_per_use,usage_count,used_in_work_items,parent_category,parent_collection,parent_department,parent_section PU_MEKAKA_KAPUKA,Personnel : 1 personne-heure/machine-heure,Operator,Operators,Heures machine,8.76,8.75,43.74,8.75,4,EUR,87.02,9.9441,30422,24734,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE PU_MEKAKA_KANEKA,Personnel : 1 personne-heure/machine-heure,Operator,Operators,Heures machine,15.25,1.65,540.51,11.75,13,EUR,199.23,15.8395,29418,24257,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE PU_MEKAKA_KASAKA,Personnel : 1 personne-heure/machine-heure,Operator,Operators,Heures machine,11.32,10.05,130.69,10.05,9,EUR,272.77,25.5235,24718,17482,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-MEPU-KARI_KAKAME,"Camions à plateau, capacité de charge jusqu'à 5 tonnes",Equipment,General,Heures machine,15.76,15.76,15.76,15.76,1,EUR,34.49,2.1959,17559,17559,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE DXME-KASA-KASA_KAMESA,"Grues sur châssis automobile, capacité de charge 16 t",Equipment,General,Heures machine,40.59,40.59,40.59,40.59,1,EUR,437.31,10.7846,17260,17260,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE KAME-LI-KATO-KAPU_KAKAKAME,Électricité,Material,General,kWh,0.19,0.19,0.19,0.19,1,EUR,559.45,2970.7277,15624,15624,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MELI-KAPU_RITOTO,"Appareils de soudage pour le soudage à l'arc manuel, courant de soudage jusqu'à 350 A",Equipment,General,Heures machine,0.87,0.87,0.87,0.87,1,EUR,46.43,53.1988,9059,9059,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MELI-KAPU_RITOTO,"Électricité : consommation 3,7 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.47,0.47,0.47,0.47,1,EUR,25.32,53.1988,9059,9059,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-KATO-KAME_KAKAKAME,Eau,Material,General,m3,1.11,1.11,1.11,1.11,1,EUR,117.91,106.0106,7937,7937,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES ME_MEKAKA_PUKA,Charge de travail moyenne 4,Labor,Labor,heures,16.48,16.48,16.48,16.48,1,EUR,4352.89,264.0885,7620,7620,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-TO-KARI-KAVO_KAKAKAME,Oxygène gazeux technique,Material,General,m3,4.06,4.06,4.06,4.06,1,EUR,106.23,26.3442,6539,6539,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KAME-LI-MEME-KALI_KARIRILI,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés UONI 13/45, E42A, diamètre 4-5 mm",Material,General,kg,3.76,3.76,3.76,3.76,1,EUR,248.63,66.1641,5578,5578,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-TO-KARI-KADX_KAKARIRI,Mélange propane-butane technique,Material,Chemicals,kg,1.79,1.79,1.79,1.79,1,EUR,17.41,9.9601,4774,4774,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE PU_MEKAKA_KALIKA,Personnel : 1 personne-heure/machine-heure,Operator,Operators,Heures machine,13.47,12.53,75.2,12.53,5,EUR,498.94,39.065,4659,4214,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE PU_MEKAKA_KATOKA,Personnel : 1 personne-heure/machine-heure,Operator,Operators,Heures machine,7.86,7.77,15.54,7.77,2,EUR,111.65,14.3887,4041,3793,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL DXME-MELI-KAPU_KAPURI,Appareils pour le soudage et le découpage au gaz,Equipment,General,Heures machine,0.14,0.14,0.14,0.14,1,EUR,2.63,18.4995,3819,3819,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KAME-LI-MESA-KATO_KAKAPURI,Boulons avec écrous et rondelles de construction,Material,General,kg,5.28,5.28,5.28,5.28,1,EUR,174.06,33.0324,3400,3400,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE KAME-LI-KATO-KAME_KAKAKARI,Eau du robinet,Material,General,m3,1.13,1.13,1.13,1.13,1,EUR,2447.38,2173.361,3328,3328,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment KAME-LI-MESA-KANE_KAMEMEME,Clous de construction,Material,General,t,2266.35,2266.35,2266.35,2266.35,1,EUR,33.92,0.0312,3190,3190,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE DXME-KANE-KASA_KAMEME,"Chargeuses frontales universelles à godet unique, pneumatiques, capacité nominale du godet principal 2,6 m3, capacité de charge 5 t",Equipment,General,Heures machine,42.12,42.12,42.12,42.12,1,EUR,82.59,1.9765,2921,2921,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D RI_MEKAKA_KAPU,Ouvrier de 4e catégorie,Labor,Labor,heures,16.48,16.48,16.48,16.48,1,EUR,1181.82,71.7006,2918,2914,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-KADX-KARI_KAKAVO,"Wagons basculants, capacité 2,5 m3",Equipment,General,Heures machine,0.29,0.29,0.29,0.29,1,EUR,24.84,84.2565,2892,2892,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" KAME-LI-MEME-KALI_KARITOKA,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés UONI 13/55, E50A, diamètre 4-5 mm",Material,General,kg,3.6,3.6,3.6,3.6,1,EUR,213.9,59.5305,2861,2861,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE ME_MEKAKA_TOKA,"Classe de travail moyenne 3,0",Labor,Labor,heures,14.64,14.64,14.64,14.64,1,EUR,1537.57,105.0412,2694,2694,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE PU_MEKAKA_KASASA,Personnel : 2 personnes-heures/machine-heure,Operator,Operators,Heures machine,23.14,21.8,43.61,21.8,2,EUR,197.91,8.9018,2611,2509,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-KADX-KATO_KATOSA,"Plateformes à voie large, capacité de charge 73 t",Equipment,General,Heures machine,5.5,5.5,5.5,5.5,1,EUR,89.69,16.2964,2608,2608,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES ME_MEKAKA_TOVO,Charge de travail moyenne 3,Labor,Labor,heures,16.11,16.11,16.11,16.11,1,EUR,4558.88,282.9182,2594,2594,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE RI_MEKAKA_KASA,Ouvrier de 5e catégorie,Labor,Labor,heures,18.94,18.94,18.94,18.94,1,EUR,2794.99,147.549,2550,2547,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAVO-ME-KARI-MEME_KAKAKAME,"Pièces forgées à partir de billettes carrées, poids 1,5-4,5 kg",Material,General,t,2063.76,2063.76,2063.76,2063.76,1,EUR,601.95,0.3771,2506,2506,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI DXME-KASA-KANE_KAKALI,"Grues sur chenilles, capacité de charge 25 t",Equipment,General,Heures machine,59.34,59.34,59.34,59.34,1,EUR,1534.29,25.8546,2365,2365,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-TO-KARI-KATO_KAKAKAME,Acétylène gazeux technique,Material,General,m3,15.22,15.22,15.22,15.22,1,EUR,276.82,18.6248,2331,2331,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,COUVERTURE DE LA ZONE D'EXPLOSION POUR LA PROTECTION DES INSTALLATIONS RI_MEKAKA_KARI,Ouvrier de 2e catégorie,Labor,Labor,heures,13.41,13.41,13.41,13.41,1,EUR,522.95,39.0037,2220,2220,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D ME_MEKAKA_TOSA,"Décharge moyenne 3,5",Labor,Labor,heures,15.56,15.56,15.56,15.56,1,EUR,2403.44,154.4608,2210,2210,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-MEVO-KAME_KAKALI,"Compresseurs à vis mobiles avec moteur à combustion interne, pression jusqu'à 0,7 MPa (7 atm), débit jusqu'à 5,4 m3/min",Equipment,General,Heures machine,10.17,10.17,10.17,10.17,1,EUR,308.32,30.3838,2133,2133,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL RI_MEKAKA_KATO,Ouvrier de 3e catégorie,Labor,Labor,heures,14.64,14.64,14.64,14.64,1,EUR,1230.76,84.0812,2130,2130,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D MEPU-PU-KARI-KAPU_KAMEPURI,"Peinture à l'huile MA-0115, momie, minium de fer",Material,General,kg,3.16,3.16,3.16,3.16,1,EUR,7.5,2.3889,2013,2013,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE ME_MEKAKA_TODX,"Débit moyen 3,9",Labor,Labor,heures,16.3,16.3,16.3,16.3,1,EUR,7579.66,465.0566,1933,1933,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-RIKA-KAVO_KAKASAME,Chiffons en coton colorés,Material,General,kg,2.3,2.3,2.3,2.3,1,EUR,3.26,1.468,1881,1881,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE ME_MEKAKA_SAKA,Charge de travail moyenne 5,Labor,Labor,heures,18.94,18.94,18.94,18.94,1,EUR,4708.09,248.542,1829,1829,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX ME_MEKAKA_PURI,"Classe de travail moyenne 4,2",Labor,Labor,heures,16.97,16.97,16.97,16.97,1,EUR,8915.38,525.2102,1798,1798,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,FORMATION DE REMBLAIS À L'AIDE DE BULLDOZERS DXME-KANE-KANE_KAPUVO,"Élévateurs à mât unique, capacité de charge jusqu'à 500 kg, hauteur de levage 45 m",Equipment,General,Heures machine,1.46,1.46,1.46,1.46,1,EUR,1.24,0.8595,1750,1750,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Grenaillage de la surface en béton ME_MEKAKA_TONE,"Décharge moyenne 3,6",Labor,Labor,heures,15.74,15.74,15.74,15.74,1,EUR,4796.19,304.62,1726,1726,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RISA-ME-KAME-KAPU_KAKATOME,"Traverse en bois de conifères, non imprégnée, pour voies ferrées à écartement large, type I",Material,General,pièce,59.57,59.57,59.57,59.57,1,EUR,517.54,8.688,1707,1707,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS DXME-KANE-KATO_KANERI,"Treuils électriques avec une force de traction jusqu'à 31,39 kN (3,2 t)",Equipment,General,Heures machine,0.5,0.5,0.5,0.5,1,EUR,13.49,26.803,1694,1694,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols DXME-KANE-KATO_KANERI,"Électricité : consommation 0,39 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,1.42,26.803,1694,1694,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols PU_MEKAKA_KADXKA,Personnel : 1 personne-heure/machine-heure,Operator,Operators,Heures machine,14.43,14.3,28.59,14.3,2,EUR,612.84,42.8438,1652,1568,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS KAME-LI-KADX-KARI_KAKATOME,"Détonateurs électriques à retardement court, résistants à l'eau ED-KZ",Material,General,1000 pièces,4809.07,4809.07,4809.07,4809.07,1,EUR,774.67,0.1731,1647,1647,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu KAME-LI-MEME-KAPU_KAKASARI,"Fil à souder sans revêtement SV-08G2S, diamètre 2 mm",Material,General,kg,2.8,2.8,2.8,2.8,1,EUR,36.99,13.5551,1616,1616,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse ME_MEKAKA_TOLI,"Décharge moyenne 3,7",Labor,Labor,heures,15.93,15.93,15.93,15.93,1,EUR,3725.36,233.8704,1611,1611,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KANE-KATO_KANEKA,"Treuils électriques avec une force de traction jusqu'à 5,79 kN (0,59 t)",Equipment,General,Heures machine,0.25,0.25,0.25,0.25,1,EUR,0.62,2.1957,1598,1598,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"TRÉPIDES, SILOS, DÉCOMPOSEURS, ÉPAISSISSEURS" KAPU-ME-KARI-KASA,Mélanges de béton lourd,Abstract Material,General,m3,134.93,134.93,134.93,134.93,1,EUR,6867.57,50.899,1589,1589,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL TO_RIKAKA_KAME,Ingénieur de catégorie I,Material,General,personnes-heures,26.45,26.45,26.45,26.45,1,EUR,3580.38,135.3824,1536,1536,TRAVAUX DE MISE EN SERVICE,Appareils électrotechniques,GÉNÉRATEURS SYNCHRONES ET EXCITATEURS,GÉNÉRATEURS PU_MEKAKA_KAVOKA,Personnel : 2 personnes-heures/machine-heure,Operator,Operators,Heures machine,16.73,13.38,80.29,13.38,4,EUR,588.76,29.544,1525,1405,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE ME_MEKAKA_TOME,Charge de travail moyenne 3,Labor,Labor,heures,14.82,14.82,14.82,14.82,1,EUR,2862.42,193.1154,1517,1517,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-MEPU-KASA_KAMERI,"Semi-remorques à usage général, capacité de charge jusqu'à 15 t",Equipment,General,Heures machine,4.23,4.23,4.23,4.23,1,EUR,8.96,2.1166,1515,1515,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE TO_RIKAKA_KARI,Ingénieur de catégorie II,Material,General,personnes-heures,24.11,24.11,24.11,24.11,1,EUR,2541.55,105.4181,1512,1512,TRAVAUX DE MISE EN SERVICE,Appareils électrotechniques,GÉNÉRATEURS SYNCHRONES ET EXCITATEURS,SYSTÈMES D'EXCITATION ME_MEKAKA_PUME,Charge de travail moyenne 4,Labor,Labor,heures,16.73,16.73,16.73,16.73,1,EUR,9964.89,595.6684,1507,1507,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,"AFFLUENTION DES SOLS ROCHEUX À L'AIDE DE CHARGES CHAMBRÉES, EXPLOSION MASSIVE DE",EXPLOSION MASSIVE DE SOLS À L'AIDE DE CHARGES EXPLOSIVES POUR ÉVACUER ET JETER J KALI-RI-KALI-MERI_KAKAKAME,"Structures métalliques auxiliaires, principalement en acier épais ou en profilés laminés, avec ou sans ouvertures",Material,Steel & Metal,t,3886.89,3886.89,3886.89,3886.89,1,EUR,1336.83,0.4245,1498,1498,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEKA-KAME_KAKARI,"Unités de remplissage et de pressage, débit jusqu'à 300 m3/h",Equipment,General,Heures machine,84.11,84.11,84.11,84.11,1,EUR,1027.17,12.2124,1439,1439,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KANE-KATO_KASASA,"Treuils électriques avec une force de traction de 19,62 kN (2 t)",Equipment,General,Heures machine,0.43,0.43,0.43,0.43,1,EUR,17.07,39.7806,1428,1428,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-KANE-KATO_KASASA,"Électricité : consommation 0,39 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,2.04,39.7806,1428,1428,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX ME_MEKAKA_TORI,Charge de travail moyenne 3,Labor,Labor,heures,15.01,15.01,15.01,15.01,1,EUR,2415.01,160.9293,1420,1420,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RI_MEKAKA_KANE,Ouvrier de 6e catégorie,Labor,Labor,heures,22.14,22.14,22.14,22.14,1,EUR,1866.56,84.3031,1405,1405,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS MEME-ME-KARI-KAPU_KAKATOME,"Bois rond de conifères non écorcé, longueur 3-6,5 m, diamètre 14-24 cm, classe II-III",Material,General,m3,182.57,182.57,182.57,182.57,1,EUR,875.38,4.9251,1405,1405,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAVO-ME-KARI-MEME_KAKARITO,"Pièces forgées simples pour la construction (agrafes, attaches, colliers), poids jusqu'à 1,6 kg",Material,General,kg,4.53,4.53,4.53,4.53,1,EUR,195.98,43.3063,1384,1384,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Grenaillage de la surface en béton DXME-KANE-KATO_KASAPU,"Électricité : consommation 0,39 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,4.21,84.7095,1381,1381,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" DXME-KANE-KATO_KASAPU,Treuils de manœuvre pour le déplacement des wagonnets jusqu'au premier dégagement,Equipment,General,Heures machine,1.31,1.31,1.31,1.31,1,EUR,110.69,84.7095,1381,1381,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" DXME-KALI-KAPU_KAKAME,Vibrateurs de fond,Equipment,General,Heures machine,0.34,0.34,0.34,0.34,1,EUR,19.99,58.6705,1380,1380,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-PU-KATO-KAPU_KAKAMEME,"Acier de forage hexagonal creux 55S2, dimension extérieure 22 mm, diamètre intérieur 6,5 mm",Material,General,t,5740.41,5740.41,5740.41,5740.41,1,EUR,195.08,0.0386,1369,1369,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-RIME-MEKA_KAKAME,Marteaux pneumatiques à percussion fonctionnant à partir de stations de compression fixes,Equipment,General,Heures machine,1.66,1.66,1.66,1.66,1,EUR,178.06,107.4084,1367,1367,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES MEME-ME-KATO-KAME_KAKANELI,"Bois équarri de conifères (épicéa, pin), humidité naturelle, longueur 2-6,5 m, largeur 100 mm et plus, épaisseur 100 mm et plus, classe III",Material,General,m3,437.36,437.36,437.36,437.36,1,EUR,461.55,1.1842,1364,1364,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-RIKA-KAVO_KAMERIRI,"Chiffons en coton, dimensions 400 x 400 mm, densité de surface de 105 à 130 g/m2",Material,General,m2,0.65,0.65,0.65,0.65,1,EUR,4.69,7.2439,1359,1359,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES DXME-RIME-RIRI_TOKAME,Supports pour marteaux perforateurs pneumatiques portatifs,Equipment,General,Heures machine,0.13,0.13,0.13,0.13,1,EUR,23.51,184.4683,1339,1339,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS ME_MEKAKA_TOPU,Charge de travail moyenne 3,Labor,Labor,heures,15.38,15.38,15.38,15.38,1,EUR,2064.75,134.2847,1337,1337,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-MEDX-KAPU_KAKATOME,Joints en caoutchouc (plaque technique pressée),Material,General,kg,5.87,5.87,5.87,5.87,1,EUR,65.44,11.1937,1331,1331,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION ME_MEKAKA_PUSA,"Décharge moyenne 4,5",Labor,Labor,heures,17.71,17.71,17.71,17.71,1,EUR,12704.76,717.2658,1313,1313,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION ME_MEKAKA_TOTO,Charge de travail moyenne 3,Labor,Labor,heures,15.19,15.19,15.19,15.19,1,EUR,1854.79,122.0959,1306,1306,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE RIME-RI-KATO-KADX_KAKAKAPU,"Câble PRN, section 2,5 mm2",Material,General,1000 m,704.89,704.89,704.89,704.89,1,EUR,244.97,0.3485,1284,1284,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI DXME-MELI-KAPU_KATOPU,"Groupes de soudage avec moteur à combustion interne pour le soudage à l'arc manuel, courant de soudage jusqu'à 400 A, nombre de postes 1",Equipment,General,Heures machine,2.74,2.74,2.74,2.74,1,EUR,118.76,43.391,1279,1279,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,COUVERTURE DE LA ZONE D'EXPLOSION POUR LA PROTECTION DES INSTALLATIONS KAME-LI-MEME-KALI_KATOMETO,Électrodes de soudage en tungstène pour le soudage d'aciers fortement alliés et refractaires,Material,General,kg,134.99,134.99,134.99,134.99,1,EUR,15.02,0.1554,1246,1246,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES DXME-KANE-KATO_KANETO,"Treuils électriques avec une force de traction jusqu'à 49,05 kN (5 t)",Equipment,General,Heures machine,0.88,0.88,0.88,0.88,1,EUR,51.3,58.4849,1244,1244,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KANE-KATO_KANETO,"Électricité : consommation 0,53 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.07,0.07,0.07,0.07,1,EUR,3.98,58.4849,1244,1244,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS ME_MEKAKA_RIKA,Charge de travail moyenne 2,Labor,Labor,heures,13.41,13.41,13.41,13.41,1,EUR,663.42,49.4808,1242,1242,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE ME_MEKAKA_PUTO,Charge de travail moyenne 4,Labor,Labor,heures,17.22,17.22,17.22,17.22,1,EUR,11806.29,685.5814,1222,1222,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE MEME-ME-KATO-KASA_KAKANESA,"Planches non sciées de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250, épaisseur 30-50 mm, classe III",Material,General,m3,469.47,469.47,469.47,469.47,1,EUR,340.18,0.7572,1214,1214,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEPU-KARI_KAKARI,"Camions à plateau, capacité de charge jusqu'à 8 tonnes",Equipment,General,Heures machine,22.28,22.28,22.28,22.28,1,EUR,119.62,5.3779,1205,1205,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de colonnes en béton armé TO_RIKAKA_KATO,Ingénieur de catégorie III,Material,General,personnes-heures,21.65,21.65,21.65,21.65,1,EUR,2029.09,93.7263,1203,1203,TRAVAUX DE MISE EN SERVICE,Appareils électrotechniques,GÉNÉRATEURS SYNCHRONES ET EXCITATEURS,GÉNÉRATEURS DXME-MEKA-KASA_KAKALI,"Poseurs de tuyaux, capacité de charge nominale 12,5 t",Equipment,General,Heures machine,71.11,71.11,71.11,71.11,1,EUR,1953.33,27.4673,1195,1195,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-MEME-KALI_KAKAPUME,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés É55, diamètre 4 mm",Material,General,t,3826.71,3826.71,3826.71,3826.71,1,EUR,191.5,0.0698,1170,1170,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,COUVERTURE DE LA ZONE D'EXPLOSION POUR LA PROTECTION DES INSTALLATIONS DXME-MELI-KAPU_RITORI,"Électricité : consommation 3,52 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.45,0.45,0.45,0.45,1,EUR,37.24,82.3636,1164,1164,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-MELI-KAPU_RITORI,"Onduleurs de soudage pour soudage à l'arc sous argon triphasé, courant de soudage maximal 500 A",Equipment,General,Heures machine,1.83,1.83,1.83,1.83,1,EUR,151.12,82.3636,1164,1164,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KASA-KAME_KAMELI,"Électricité : consommation 6,83 kWh/machine-heure",Electricity,Electricity,Heures machine,0.88,0.88,0.88,0.88,1,EUR,20.68,23.565,1154,1154,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé DXME-KASA-KAME_KAMELI,"Grues à tour, capacité de charge 8 t",Equipment,General,Heures machine,25.48,25.48,25.48,25.48,1,EUR,599.84,23.565,1154,1154,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé MEPU-SA-KADX-KAME_KAKAKAME,"Acétone technique, catégorie I",Material,General,kg,2.59,2.59,2.59,2.59,1,EUR,13.72,5.3192,1124,1124,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES DXME-KAME-KAME_KATOPU,"Bulldozers, puissance 59 kW (80 ch)",Equipment,Bulldozers,Heures machine,29.71,29.71,29.71,29.71,1,EUR,2119.26,71.3211,1110,1110,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS DXME-MEPU-KAPU_KAKAME,"Tracteurs routiers, charge sur l'attelage jusqu'à 12 t",Equipment,General,Heures machine,26.61,26.61,26.61,26.61,1,EUR,38.77,1.4568,1106,1106,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-KAVO-KAPU_KAKAKATO,Craie naturelle moulue,Material,General,t,133.54,133.54,133.54,133.54,1,EUR,1.17,0.0716,1096,1096,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Finition des poêles DXME-MEPU-KARI_KAKATO,"Camions à plateau, capacité de charge jusqu'à 10 t",Equipment,General,Heures machine,22.63,22.63,22.63,22.63,1,EUR,85.17,3.7674,1086,1086,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KATO-KAVO_KAKATO,"Marteaux perforateurs à colonne pour le forage de trous et de puits, portables, fonctionnant à partir de stations de compression fixes",Equipment,General,Heures machine,10.23,10.23,10.23,10.23,1,EUR,2312.68,226.0747,1086,1086,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES ME_MEKAKA_PUVO,"Débit moyen 4,8",Labor,Labor,heures,18.45,18.45,18.45,18.45,1,EUR,5337.68,289.2908,1074,1074,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE MEME-ME-KARI-KADX_KAKAKATO,"Montants de mine en bois résineux (pin, sapin), longueur 0,9-4 m, diamètre 7-24 cm",Material,General,m3,90.01,90.01,90.01,90.01,1,EUR,1139.75,12.6628,1063,1063,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,"AFFLUENTION DES SOLS ROCHEUX À L'AIDE DE CHARGES CHAMBRÉES, EXPLOSION MASSIVE DE",AFFLANCHEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES MEPU-PU-KARI-KAPU_KAMENERI,"Peinture à l'huile MA-011-0, MA-011-1, MA-011-1N, MA-011-2, MA-011-2N",Material,General,t,3051.14,3051.14,3051.14,3051.14,1,EUR,10.95,0.0184,1042,1042,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment KAME-PU-KAME-KANE,Couronnes,Abstract Material,General,pièce,39.7,39.7,39.7,39.7,1,EUR,60.66,1.6431,1035,982,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu DXME-KADX-KASA_KARIRI,"Locomotives thermiques à voie large pour manœuvres, puissance 550 kW (750 ch)",Equipment,General,Heures machine,173.08,173.08,173.08,173.08,1,EUR,406.74,2.35,1032,1032,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES ME_MEKAKA_PULI,Charge de travail moyenne 4,Labor,Labor,heures,18.2,18.2,18.2,18.2,1,EUR,4881.99,268.1684,1018,1018,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXDXDX_DXDXKAKA,Déchets de construction,Material,General,t,0.0,0.0,0.0,0.0,0,EUR,0.0,4.0361,1016,1016,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,Pose et démontage de passages à niveau avec revêtement en panneaux de caoutchouc ME_MEKAKA_PUPU,"Décharge moyenne 4,4",Labor,Labor,heures,17.47,17.47,17.47,17.47,1,EUR,12475.87,714.2618,1007,1007,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-TO-KARI-KARI_KAKAKARI,"Argon gazeux, qualité supérieure",Material,General,m3,5.55,5.55,5.55,5.55,1,EUR,22.13,4.0311,1002,1002,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES DXME-KANE-KATO_KATOTO,"Électricité : consommation 0,46 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.29,4.6002,982,982,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-KANE-KATO_KATOTO,"Treuils auxiliaires de mine avec une force de traction de 13,73 kN (1,4 t)",Equipment,General,Heures machine,1.42,1.42,1.42,1.42,1,EUR,6.52,4.6002,982,982,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS PU_MEKAKA_KASALI,Personnel : 3 personnes-heures/machine-heures,Operator,Operators,Heures machine,33.72,33.72,33.72,33.72,1,EUR,120.47,3.5723,972,972,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION AVEC DES BANDES POLYMÈRES ET POSE DE CONDUITES DXME-KANE-KATO_KANEME,"Électricité : consommation 0,26 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,2.54,71.8512,966,966,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KANE-KATO_KANEME,"Treuils électriques avec une force de traction allant jusqu'à 12,26 kN (1,25 t)",Equipment,General,Heures machine,0.33,0.33,0.33,0.33,1,EUR,23.78,71.8512,966,966,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KALI-RI-KALI-KAPU_KAKAKALI,Structures métalliques sur mesure en acier laminé,Material,Steel & Metal,t,4264.02,4264.02,4264.02,4264.02,1,EUR,1405.17,0.4382,959,959,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-ME-KARI-KAVO_MEKAPUKA,"Feuille de paronite de marque PMB (PON-A, PON-B), épaisseur de 0,4 à 5 mm",Material,General,kg,3.51,3.51,3.51,3.51,1,EUR,54.64,15.6514,954,954,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" PU_MEKAKA_MEKAKA,Personnel : 1 personne-heure/machine-heure,Operator,Operators,Heures machine,53.74,15.54,170.9,15.54,4,EUR,1151.27,18.1559,952,770,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS,Déblayage et déplacement de terre à l'aide de décapeuses automotrices sur une di DXME-MELI-KARI_KATORI,"Appareils de contrôle par ultrasons, épaisseur du produit contrôlé jusqu'à 6000 mm",Equipment,General,Heures machine,1.83,1.83,1.83,1.83,1,EUR,8.6,4.7077,941,941,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des parois courbes du réacteur des centrales nucléaires équipées de DXME-MEPU-KARI_KAKAPU,"Camions à plateau, capacité de charge jusqu'à 15 t",Equipment,General,Heures machine,34.44,34.44,34.44,34.44,1,EUR,443.6,12.8797,936,936,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment MEPU-SA-KASA-KAME_KAKAMERI,Huile combinée pour diluer les peintures à l'huile épaisses et pour les travaux extérieurs sur les surfaces en bois,Material,General,t,1925.32,1925.32,1925.32,1925.32,1,EUR,6.01,0.0132,927,927,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage en tuyaux d'acier non galvanisés pour le transpor MEME-ME-KATO-KANE_KAKALIDX,"Planches équarries de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 44-50 mm, classe III",Material,General,m3,358.2,358.2,358.2,358.2,1,EUR,966.19,2.7454,922,922,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE TO_TOKAKA_KAME,Ingénieur principal,Material,General,personnes-heures,28.91,28.91,28.91,28.91,1,EUR,3545.72,122.6614,918,918,RÉNOVATION EN PROFONDEUR DES ÉQUIPEMENTS,Réparation capitale et modernisation des ascenseurs,TRAVAUX DE DIAGNOSTIC TECHNIQUE ET D'INSPECTION DES ASCENSEURS,Contrôle technique d'un ascenseur monté (modernisé) avant sa mise en service sur KAME-LI-MEME-KALI_KAMEVOTO,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés UONI 13/55, E50A, diamètre 3 mm",Material,General,t,3356.89,3356.89,3356.89,3356.89,1,EUR,212.79,0.1296,905,905,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Fabrication de structures métalliques ME_MEKAKA_PUDX,"Décharge moyenne 4,9",Labor,Labor,heures,18.7,18.7,18.7,18.7,1,EUR,6588.71,352.3964,905,905,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-MEME-KALI_KAKASAPU,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés ANO-6, E42, diamètre 6 mm",Material,General,t,3583.43,3583.43,3583.43,3583.43,1,EUR,307.74,0.1071,904,904,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,FONDATIONS DE BÂTIMENTS ET D'OUVRAGES,Réalisation de fondations pour tuyaux industriels et hauts fourneaux KAME-LI-MESA-KARI_KAKAVORI,"Boulons en acier à tête hexagonale, diamètre du filetage M8 (M10, M12, M14), longueur 16-160 mm",Material,General,t,3226.07,3226.07,3226.07,3226.07,1,EUR,122.71,0.055,890,890,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire KAME-PU-KAME-KANE_KAKASADX,"Couronne de forage pour perforateurs et machines de forage rotatif à percussion, KDP 40-25",Material,General,pièce,36.34,36.34,36.34,36.34,1,EUR,830.67,22.8555,870,870,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DE PUITS VERTICAUX, DE PUITS DE FORAGE ET DE LEURS EMBRANCHEMENTS" DXME-KASA-KARI_KAKANE,"Électricité : consommation 51,15 kWh/machine-heure",Electricity,Electricity,Heures machine,6.57,6.57,6.57,6.57,1,EUR,24.04,3.6594,846,846,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-KASA-KARI_KAKANE,"Ponts roulants à portique, capacité de charge 50 t",Equipment,General,Heures machine,146.64,146.64,146.64,146.64,1,EUR,536.6,3.6594,846,846,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-MELI-KAPU_MELIME,"Électricité : consommation 7,92 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.02,1.02,1.02,1.02,1,EUR,45.2,44.4428,843,843,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MELI-KAPU_MELIME,"Appareils de soudage pour le soudage à l'arc manuel, courant de soudage jusqu'à 500 A",Equipment,General,Heures machine,1.96,1.96,1.96,1.96,1,EUR,87.14,44.4428,843,843,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-TO-KAME-KALI_KAKAKADX,"Alcool éthylique rectifié technique, catégorie I",Material,General,kg,22.81,22.81,22.81,22.81,1,EUR,28.65,1.3315,828,828,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-KADX-KATO_KAKAKAME,"Fil APRN pour travaux explosifs, marque VP",Material,General,1000 m,87.89,87.89,87.89,87.89,1,EUR,16.72,0.2079,828,828,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu PU_MEKAKA_KANESA,Personnel : 2 personnes-heures/machine-heure,Operator,Operators,Heures machine,27.62,24.28,206.41,24.28,3,EUR,387.85,15.7995,819,752,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-RIME-MEDX_KAMERI,Machines à affûter les outils de forage,Equipment,General,Heures machine,1.33,1.33,1.33,1.33,1,EUR,1.63,1.2229,813,813,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu DXME-MELI-KAPU_KATOTO,"Groupes de soudage pour soudage à l'arc manuel sur tracteur, courant de soudage jusqu'à 250 A, nombre de postes 2, puissance du tracteur 79 kW (108 ch)",Equipment,General,Heures machine,36.69,36.69,36.69,36.69,1,EUR,2471.45,67.3587,806,806,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Montage de supports fixes lors de la pose de canalisations isolées en surface KAVO-TO-KATO-KANE_KAKAKARI,"Fil laminé à chaud en bobines, diamètre 6,3-6,5 mm",Material,General,t,1566.71,1566.71,1566.71,1566.71,1,EUR,55.73,0.0718,806,806,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-TO-KASA-MELI_KAKAKARI,Colophane de pin,Material,General,kg,10.86,10.86,10.86,10.86,1,EUR,6.5,0.7048,800,800,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX KAME-LI-KALI-RIPU_KAKAMEKA,"Révélateur à deux composants pour le traitement du film radiographique, température de la solution pour le traitement manuel/automatisé 22/28 °C, temps de développement 5-8 min, consommation 0,8 l/m2",Material,General,l,13.93,13.93,13.93,13.93,1,EUR,43.63,3.1481,798,798,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" KAME-LI-KANE-KATO_KAKARITO,"Rubans en polyéthylène avec couche adhésive, transparents, largeur 20 mm, épaisseur 0,08 mm",Material,General,kg,27.73,27.73,27.73,27.73,1,EUR,8.19,0.317,796,796,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE PLANCHERS DANS UN COFFRAGE À PETITS PANNEAUX LORS DU BÉTONNAGE DE MU,Érection des planchers dans un coffrage à panneaux fins DXME-KASA-KALI_KAKATO,"Grues sur rails, capacité de charge 25 t",Equipment,General,Heures machine,70.43,70.43,70.43,70.43,1,EUR,552.37,7.8431,788,788,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR ME_MEKAKA_PUNE,Charge de travail moyenne 4,Labor,Labor,heures,17.96,17.96,17.96,17.96,1,EUR,6744.28,375.5378,785,785,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B KAME-LI-KALI-RIPU_KAKARIKA,"Fixateur à deux composants pour le traitement des films radiographiques, température de la solution pour le traitement manuel/automatisé 22/28 °C, temps de fixation 5-10 min, consommation 0,8 l/m2",Material,General,l,16.19,16.19,16.19,16.19,1,EUR,52.23,3.2332,775,775,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" KAME-LI-KARI-KADX_KAKAKARI,"Ficelle en papier, diamètre 2,5 mm",Material,General,kg,4.77,4.77,4.77,4.77,1,EUR,2.2,0.5406,753,753,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-LI-KANE-KASA_KAKAPUME,"Rubans isolants en coton caoutchouté pour travaux d'installation électrique et de réparation, couleur noire, largeur 20 mm, épaisseur 0,35 mm",Material,General,m,0.15,0.15,0.15,0.15,1,EUR,3.32,22.2021,738,738,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au KAME-LI-KANE-KASA_KAKAPURI,"Rubans isolants en PVC pour travaux d'installation et de réparation électriques, couleur noire, largeur 19 mm, épaisseur 0,18 mm",Material,General,m,0.09,0.09,0.09,0.09,1,EUR,6.46,68.8532,734,734,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER KAME-LI-KADX-KARI_KAKAKAME,"Détonite en cartouches, diamètre 28 mm",Material,General,t,5366.65,5366.65,5366.65,5366.65,1,EUR,1534.26,0.2918,728,728,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS KAME-TO-KATO-KALI_KAKAKAME,Acide acétique,Material,Chemicals,kg,3.87,3.87,3.87,3.87,1,EUR,0.92,0.2561,727,727,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES KAME-TO-KAPU-KARI_KAKAKAPU,Huile moteur diesel M-10DM,Material,General,kg,3.79,3.79,3.79,3.79,1,EUR,14.62,3.8563,727,727,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KAME-KAME_KATOSA,"Bulldozers, puissance 79 kW (108 ch)",Equipment,Bulldozers,Heures machine,31.84,31.84,31.84,31.84,1,EUR,178.2,5.5957,719,719,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE ME_MEKAKA_NEKA,Charge de travail moyenne 6,Labor,Labor,heures,22.14,22.14,22.14,22.14,1,EUR,10386.94,469.125,718,718,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Soudage de l'armature par immersion DXME-KASA-KAPU_KAMEKA,"Électricité : consommation 46,7 kW·h/machine-heure",Electricity,Electricity,Heures machine,6.0,6.0,6.0,6.0,1,EUR,401.24,66.9021,709,709,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES À PORTANT ET À CONSOLE À USAGE GÉNÉRAL DXME-KASA-KAPU_KAMEKA,"Ponts roulants électriques, capacité de charge 50 t",Equipment,General,Heures machine,60.18,60.18,60.18,60.18,1,EUR,4026.33,66.9021,709,709,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES À PORTANT ET À CONSOLE À USAGE GÉNÉRAL DXME-MELI-KARI_KARIME,Gamma-détecteurs de défauts avec une épaisseur d'acier radiotransparente jusqu'à 80 mm,Equipment,General,Heures machine,9.35,9.35,9.35,9.35,1,EUR,274.4,29.3338,697,697,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" KAME-PU-KATO-KAPU,Aciers de forage,Abstract Material,General,kg,21.44,4.94,5740.41,4.94,2,EUR,4.45,0.9,695,695,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu KAVO-TO-KASA-KARI_KAKARIME,"Tôles laminées à chaud, nuances d'acier St3sp, St3ps, largeur 1200-3000 mm, épaisseur 1-8 mm",Material,General,t,1328.93,1328.93,1328.93,1328.93,1,EUR,502.99,0.5108,694,694,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-RIME-MEDX_KATONE,"Machines à couper les tubes, diamètre maximal du tube 426 mm",Equipment,General,Heures machine,0.93,0.93,0.93,0.93,1,EUR,70.7,75.7763,691,691,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS DXME-RIME-MEDX_KATONE,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,17.8,75.7763,691,691,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS DXME-MELI-KAME_KAKAPU,"Électricité : consommation 7,92 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.02,1.02,1.02,1.02,1,EUR,196.65,193.3439,688,688,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de la dalle de fondation des bâtiments et structures des centrales DXME-MELI-KAME_KAKAPU,"Redresseurs de soudage, courant de soudage jusqu'à 500 A, nombre de postes 1",Equipment,General,Heures machine,1.82,1.82,1.82,1.82,1,EUR,352.34,193.3439,688,688,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de la dalle de fondation des bâtiments et structures des centrales DXME-RIME-MENE_KAMERI,Presses hydrauliques à entraînement électrique,Equipment,General,Heures machine,0.45,0.45,0.45,0.45,1,EUR,4.02,8.979,686,686,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation électrique interne des bâtiments temporaires à usage industriel et DXME-RIME-MENE_KAMERI,"Électricité : consommation 0,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.32,8.979,686,686,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation électrique interne des bâtiments temporaires à usage industriel et DXME-MESA-KARI_KARIPU,"Tracteurs à chenilles, puissance 79 kW (108 ch)",Equipment,General,Heures machine,24.87,24.87,24.87,24.87,1,EUR,161.35,6.4868,677,677,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KATO-RI-KAME-KAME_KAKAKAME,"Ciment Portland sans additif pour la construction générale CEM 0 32,5N",Material,General,t,208.45,208.45,208.45,208.45,1,EUR,136.17,0.8549,663,663,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL MEME-ME-KATO-KANE,Panneaux en planches,Abstract Material,General,m2,838.58,612.25,910.12,910.12,2,EUR,34800.46,38.4783,662,647,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE ME_MEKAKA_RISA,Charge de travail moyenne 2,Labor,Labor,heures,14.02,14.02,14.02,14.02,1,EUR,996.34,71.0523,661,661,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-KAVO-KAPU_KARIME,"Électricité : consommation 5,94 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.76,0.76,0.76,0.76,1,EUR,3.03,3.9699,657,657,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-TO-KAME-KATO_KAKAKARI,Kérosène à usage technique,Material,General,t,1810.88,1810.88,1810.88,1810.88,1,EUR,54.32,0.0923,657,657,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Imperméabilisation des murs et des fondations DXME-KAVO-KAPU_KARIME,"Chaudières électriques mobiles à bitume avec mélangeur centrifuge, capacité de chargement 400 l",Equipment,General,Heures machine,3.52,3.52,3.52,3.52,1,EUR,13.96,3.9699,657,657,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-MEKA-KASA_KAKADX,"Poseurs de tuyaux, capacité de charge nominale 35 t",Equipment,General,Heures machine,137.39,137.39,137.39,137.39,1,EUR,5763.06,41.9464,654,654,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-KALI-RIDX_KAMEKAME,Ficelle de lin,Material,General,kg,4.74,4.74,4.74,4.74,1,EUR,1.63,0.3523,650,650,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RINE-ME-KAME-KALI,Structures métalliques pour travaux de forage,Abstract Material,Steel & Metal,t,3981.45,103.2,4042.31,4042.31,3,EUR,2363.04,1.2058,647,643,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS KAPU-TO-KAME-KADX,Mortier prêt à l'emploi,Abstract Material,General,m3,129.44,129.44,129.44,129.44,1,EUR,318.27,2.513,642,642,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-ME-KARI-KAPU_KAKAMERI,"Carton d'amiante à usage général, marque KAON-1, épaisseur 4 et 6 mm",Material,General,t,1504.27,1504.27,1504.27,1504.27,1,EUR,39.02,0.0777,640,640,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" KAPU-TO-KAME-KADX_KAKAMEPU,"Mortier prêt à l'emploi pour maçonnerie, à base de ciment, M100",Material,General,m3,127.72,127.72,127.72,127.72,1,EUR,197.03,1.8192,638,638,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Construction des parois et des cloisons des ouvrages MEPU-PU-KARI-KADX_KAPUKARI,Peinture de marquage pour produits électrotechniques,Material,General,kg,264.2,264.2,264.2,264.2,1,EUR,18.2,0.0845,636,636,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES KAME-LI-KALI-RIDX_KAMEMEME,Ouate imprégnée de résine,Material,General,kg,3.43,3.43,3.43,3.43,1,EUR,181.79,52.9749,628,628,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé KAVO-TO-KATO-KAPU_KAKAMERI,"Fil métallique clair, diamètre 1,1 mm",Material,General,t,2308.38,2308.38,2308.38,2308.38,1,EUR,34.55,0.0415,623,623,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,FONDATIONS DE BÂTIMENTS ET D'OUVRAGES,Réalisation d'une préparation en béton et de fondations à usage général KARI-TO-KAME-KARI_MEMEMEVO,"Sable naturel pour travaux de construction, classe II, moyen",Material,General,m3,21.9,21.9,21.9,21.9,1,EUR,148.93,7.2582,620,620,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D MEPU-SA-KADX-MEME_KAMEKARI,White spirit,Material,General,kg,2.32,2.32,2.32,2.32,1,EUR,18.82,8.1235,619,619,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Grenaillage de la surface en béton DXME-RIME-MEKA_KAKARI,Marteaux pneumatiques à percussion fonctionnant à partir de compresseurs mobiles,Equipment,General,Heures machine,0.08,0.08,0.08,0.08,1,EUR,5.37,64.6108,615,615,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL KAME-LI-KADX-KAME_KAKAKAME,"Ammonite 6ZhV sous forme cartouché, diamètre 32 mm",Material,General,t,5860.6,5860.6,5860.6,5860.6,1,EUR,544.81,0.1036,614,614,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu KAME-TO-KAME-KAME_KAKAKAME,Essence aviation B-70,Material,General,t,3602.92,3602.92,3602.92,3602.92,1,EUR,25.08,0.0302,605,605,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-TO-KAPU-KATO_KAKAKATO,Huile industrielle I-20A,Material,General,l,2.58,2.58,2.58,2.58,1,EUR,49.99,19.3854,605,605,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,CHAUDIÈRES DE CHAUFFAGE,Installation de chaudières de chauffage en fonte à sections fonctionnant au comb MEME-ME-KATO-KAME_KAKANETO,"Bois scié de conifères (épicéa, pin), humidité naturelle, longueur 2-6,5 m, largeur 20-90 mm, épaisseur 20-90 mm, classe III",Material,General,m3,433.19,433.19,433.19,433.19,1,EUR,283.17,0.6867,600,600,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KANE-KALI_KAKARI,"Palans électriques à usage général, capacité de charge 0,5 t",Equipment,General,Heures machine,0.18,0.18,0.18,0.18,1,EUR,1.58,8.6304,598,598,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES DXME-KAME-KAME_KATOVO,"Bulldozers, puissance 121 kW (165 ch)",Equipment,Bulldozers,Heures machine,64.45,64.45,64.45,64.45,1,EUR,1673.41,25.9625,597,597,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE BULLDOZERS KAVO-PU-KATO-KATO,Armature,Abstract Material,General,t,1421.44,1421.44,1421.44,1421.44,1,EUR,13351.18,9.4625,596,596,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs en béton armé préfabriqué pour puits de descente DXME-KADX-KAPU_KAKARI,"Draisines à voie large, grues universelles, capacité de charge de la grue 3,5 t",Equipment,General,Heures machine,34.48,34.48,34.48,34.48,1,EUR,80.58,2.3373,593,593,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR DXME-MEKA-KASA_KAKAPU,"Poseurs de tuyaux, capacité de charge nominale 6,3 t",Equipment,General,Heures machine,31.01,31.01,31.01,31.01,1,EUR,765.0,24.7504,593,593,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KALI-RI-KALI-MERI_KAKAMEME,"Structures métalliques de bâtiments et de constructions, principalement composées de profilés cintrés et de tubes ronds",Material,Steel & Metal,t,3886.89,3886.89,3886.89,3886.89,1,EUR,668.67,0.2073,587,587,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE DXME-METO-KAME_KATOVO,"Machines de lavage, capacité du réservoir 6 m3",Equipment,General,Heures machine,35.8,35.8,35.8,35.8,1,EUR,131.53,3.6741,579,579,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KAME-LI-RIKA-KAVO_KAKARIME,Bâche imprégnée d'un produit ignifuge,Material,General,m2,4.46,4.46,4.46,4.46,1,EUR,24.87,5.6006,574,574,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL DXME-KASA-KARI_KAKASA,"Grues à portique, capacité de charge 32 t",Equipment,General,Heures machine,61.44,61.44,61.44,61.44,1,EUR,184.08,2.9962,569,569,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments DXME-KASA-KARI_KAKASA,"Électricité : consommation 36,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.66,4.66,4.66,4.66,1,EUR,13.97,2.9962,569,569,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments KAME-LI-KALI-MEDX_KAKARIME,Poudre à lessive,Material,General,kg,1.52,1.52,1.52,1.52,1,EUR,5.12,3.5945,566,566,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,REMPLACEMENT DES STRUCTURES MÉTALLIQUES DES ÉQUIPEMENTS,Remplacement d'éléments de structures de réservoirs cylindriques verticaux en ac ME_MEKAKA_RIVO,Charge de travail moyenne 2,Labor,Labor,heures,14.39,14.39,14.39,14.39,1,EUR,2399.54,166.7301,560,560,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-KANE-KAME_KAKATO,"Vérins hydrauliques, capacité de charge 63-100 t",Equipment,General,Heures machine,0.07,0.07,0.07,0.07,1,EUR,1.93,26.7191,557,557,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Extraction des tubes du puits MEPU-RI-KANE-KATO_KASARIME,Liquide indicateur,Material,General,l,81.15,81.15,81.15,81.15,1,EUR,46.14,0.5964,555,555,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,REMPLACEMENT DES STRUCTURES MÉTALLIQUES DES ÉQUIPEMENTS,Remplacement d'éléments de structures de réservoirs cylindriques verticaux en ac KAME-TO-KAME-KANE_KAKASAME,Graisse solide à base de graisse Zh,Material,General,kg,2.98,2.98,2.98,2.98,1,EUR,21.92,7.4041,542,542,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE PAR PERCUSSION ET ROTATION DXME-MEDX-KAVO_KAMESA,"Pompes, débit 200 m3/h, pression 25 m, puissance 22 kW",Equipment,General,Heures machine,3.17,3.17,3.17,3.17,1,EUR,52.8,16.6796,541,541,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-MEDX-KAVO_KAMESA,"Électricité : consommation 7,26 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.93,0.93,0.93,0.93,1,EUR,15.55,16.6796,541,541,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS ME_MEKAKA_RIDX,Charge de travail moyenne 2,Labor,Labor,heures,14.51,14.51,14.51,14.51,1,EUR,2175.48,149.8804,540,540,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KAME-LI-KADX-KAME_KAKAMEME,"Ammonite de sécurité étanche dans des cartouches AP-5 ZV, diamètre 36-37 mm",Material,General,t,7016.73,7016.73,7016.73,7016.73,1,EUR,2085.24,0.2967,538,538,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" MEPU-PU-KATO-KATO_KAMEKARI,Vernis bitumineux BT-577,Material,General,t,2787.93,2787.93,2787.93,2787.93,1,EUR,9.03,0.0149,528,528,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces en béton et enduites DXME-MEDX-MERI_KANEME,"Installations de drainage ouvert sur tracteur, débit 700 m3/heure",Equipment,General,Heures machine,34.29,34.29,34.29,34.29,1,EUR,1166.84,34.026,528,528,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-LI-KALI-RIPU_KAKAMEME,Révélateur pour la détection des défauts par couleur,Material,General,l,24.63,24.63,24.63,24.63,1,EUR,34.69,1.4286,523,523,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) ME_MEKAKA_SARI,Charge de travail moyenne 5,Labor,Labor,heures,19.58,19.58,19.58,19.58,1,EUR,10086.85,515.0902,523,523,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-TO-KAME-KARI_KAKAKARI,Vaseline technique,Material,General,kg,7.65,7.65,7.65,7.65,1,EUR,8.03,1.1595,522,522,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" MEME-ME-KATO-KAME_KAKANERI,"Bois équarri de conifères (épicéa, pin), humidité naturelle, longueur 2-6,5 m, largeur 20-90 mm, épaisseur 20-90 mm, classe II",Material,General,m3,433.19,433.19,433.19,433.19,1,EUR,255.92,0.662,522,522,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-KARI-KANE_KAKAMELI,"Carton de construction pour calage, marque B",Material,General,t,5056.03,5056.03,5056.03,5056.03,1,EUR,6.51,0.0157,514,514,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire DXME-KASA-KAPU_KAKANE,"Ponts roulants électriques, capacité de charge 10 t",Equipment,General,Heures machine,8.87,8.87,8.87,8.87,1,EUR,198.56,22.3796,513,513,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-KASA-KAPU_KAKANE,"Électricité : consommation 5,78 kWh/machine-heure",Electricity,Electricity,Heures machine,0.74,0.74,0.74,0.74,1,EUR,16.6,22.3796,513,513,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-KASA-KAPU_KAKASA,"Électricité : consommation 2,97 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.38,0.38,0.38,0.38,1,EUR,6.45,15.5842,510,510,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-KASA-KAPU_KAKASA,"Ponts roulants électriques, capacité de charge 5 t",Equipment,General,Heures machine,5.52,5.52,5.52,5.52,1,EUR,85.99,15.5842,510,510,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de KAME-TO-KAME-KAME_KAKAKARI,"Essence automobile AI-98, AI-95",Material,General,t,1468.11,1468.11,1468.11,1468.11,1,EUR,10.92,0.0492,508,508,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS KAME-LI-KALI-KAVO_KAKAKATO,Savon ménager dur 72 %,Material,General,pièce,0.69,0.69,0.69,0.69,1,EUR,1.34,1.9456,507,507,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-MELI-MEME_KAKAMEME,"Papier abrasif double couche, grain 40-25",Material,General,m2,19.62,19.62,19.62,19.62,1,EUR,94.73,4.8284,503,503,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en panneaux de parquet, en lattes de bois et en panneaux de " DXME-MEPU-KAPU_KAKARI,"Tracteurs à sellette, charge sur le dispositif d'attelage jusqu'à 15 t",Equipment,General,Heures machine,28.3,28.3,28.3,28.3,1,EUR,301.11,10.6383,500,500,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE ME_MEKAKA_SASA,"Décharge moyenne de fonctionnement 5,5",Labor,Labor,heures,20.54,20.54,20.54,20.54,1,EUR,4331.18,210.8444,499,499,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À PERFORATION KAME-LI-MEME-KALI_KAMENESA,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés MP-3, diamètre 3 mm",Material,General,kg,3.56,3.56,3.56,3.56,1,EUR,0.32,0.2472,498,498,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-RIME-MEDX_KATOME,Perceuses,Equipment,General,Heures machine,0.78,0.78,0.78,0.78,1,EUR,9.67,12.3574,498,498,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-RIME-MEDX_KATOME,"Électricité : consommation 0,45 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.84,12.3574,498,498,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature KAME-LI-MESA-KANE_KAMERIME,"Clous en acier pour la construction, diamètre 1,6 mm, longueur 50 mm",Material,General,t,2470.56,2470.56,2470.56,2470.56,1,EUR,4.39,0.0116,498,498,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"DALLES DE SOUS-VITRINES, PORCHES",Construction de porches DXME-KAME-KARI_KAKAPU,"Niveleuses de type moyen, puissance 99 kW (135 ch)",Equipment,General,Heures machine,67.85,67.85,67.85,67.85,1,EUR,221.74,3.2682,495,495,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE KAME-PU-KATO-KANE,Écrou de fixation pour tige filetée tubulaire,Abstract Material,General,pièce,28888.79,91.94,55818.1,5359.58,3,EUR,25946.25,6.2056,485,481,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-MEPU-KASA_KAKARI,"Semi-remorques poids lourds, capacité de charge jusqu'à 40 t",Equipment,General,Heures machine,9.05,9.05,9.05,9.05,1,EUR,137.67,15.2131,482,482,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-KAME-KASA_KAVOPU,"Excavatrices à godet unique diesel sur chenilles, volume du godet 0,4 m3",Equipment,General,Heures machine,31.78,31.78,31.78,31.78,1,EUR,295.86,9.3084,481,481,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE RITO-VO-KATO-MERI,"Pièces moulées en acier soudées, diamètre nominal jusqu'à 800 mm",Abstract Material,General,t,14.55,10.38,27.67,15.63,3,EUR,163.74,6.1501,481,435,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-MELI-KALI_KAKASAPU,"Disque abrasif à profil droit, dimensions 230 x 5 x 22 mm",Material,General,pièce,3.37,3.37,3.37,3.37,1,EUR,81.18,24.0643,477,477,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEKA-KAME_KAKAME,"Unités de remplissage et de pressage, débit jusqu'à 70 m3/h",Equipment,General,Heures machine,45.66,45.66,45.66,45.66,1,EUR,1351.67,29.6035,477,477,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-KAVO_KAKALI,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,0.83,3.5748,474,474,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment DXME-MEDX-KAVO_KAKALI,"Pompes, débit 7,2 m3/h, pression 26 m, puissance 5,5 kW",Equipment,General,Heures machine,0.83,0.83,0.83,0.83,1,EUR,2.98,3.5748,474,474,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment DXME-MEVO-KAME_KAKAPU,"Compresseurs à vis mobiles avec moteur à combustion interne, pression jusqu'à 1 MPa (10 atm), débit jusqu'à 10 m3/min",Equipment,General,Heures machine,20.74,20.74,20.74,20.74,1,EUR,626.72,30.2182,472,472,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu KALI-RI-KALI-METO,Structures en acier à couteau et à joint,Abstract Material,Steel & Metal,t,3801.01,31.95,4557.7,4557.7,3,EUR,5848.89,1.3004,472,462,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KAME-KAME_KATONE,"Bulldozers, puissance 96 kW (130 ch)",Equipment,Bulldozers,Heures machine,38.1,38.1,38.1,38.1,1,EUR,259.67,6.8147,468,468,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE BULLDOZERS KAME-LI-RIKA-KAVO_KAMENERI,"Tissu de sac, largeur 950 mm, densité de surface 190 g/m2",Material,General,10 m2,24.32,24.32,24.32,24.32,1,EUR,109.89,5.0128,466,466,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE RI_MEKAKA_KAME,Ouvrier de 1ère catégorie,Labor,Labor,heures,12.3,12.3,12.3,12.3,1,EUR,51.93,4.2214,464,464,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAPU-TO-KAME-KALI_KAKARISA,"Mortier de plâtre, à la chaux, M100",Material,General,m3,114.66,114.66,114.66,114.66,1,EUR,286.04,2.4946,463,463,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,COLONNES ET CAPITAUX KAVO-PU-KATO-KARI_KAKAKARI,"Acier d'armature laminé à chaud lisse, classe A-I, diamètre 6-22 mm",Material,General,t,1268.83,1268.83,1268.83,1268.83,1,EUR,156.58,0.1835,461,461,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-KANE-KAME_KAKARI,"Crics hydrauliques, capacité de charge 6,3-25 t",Equipment,General,Heures machine,0.02,0.02,0.02,0.02,1,EUR,0.43,18.859,461,461,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-KAME-KASA_KAVONE,"Pelles hydrauliques à godet unique diesel sur chenilles, volume du godet 0,65 m3",Equipment,General,Heures machine,44.87,44.87,44.87,44.87,1,EUR,3745.68,83.477,461,461,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE TO_MEKAKA_KAME,Technicien de catégorie I,Material,General,personnes-heures,17.47,17.47,17.47,17.47,1,EUR,485.39,27.7893,459,459,TRAVAUX DE MISE EN SERVICE,Appareils électrotechniques,DISPOSITIFS DE PROTECTION À RELAIS,PROTECTIONS PHASÉES ET DISTANCES DIFFÉRENTIELLES DXME-KADX-KASA_KARITO,"Locomotives thermiques à voie large pour manœuvres, puissance 880 kW (1200 ch)",Equipment,General,Heures machine,291.07,291.07,291.07,291.07,1,EUR,2675.68,9.1925,458,458,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",REMBLAYAGE DES MARAIS DXME-KAME-KATO_KAKARI,"Électricité : consommation 14,96 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.18,2.18,2.18,2.18,1,EUR,125.86,57.6412,455,455,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" DXME-KAME-KATO_KAKARI,"Complexes à raclettes, capacité du godet jusqu'à 0,5 m3",Equipment,General,Heures machine,17.19,17.19,17.19,17.19,1,EUR,991.11,57.6412,455,455,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" KAME-LI-MELI-KADX,Couronnes diamantées,Abstract Material,General,pièce,133.52,133.52,133.52,133.52,1,EUR,373.52,2.7976,453,428,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-KASA-KALI_KAKARI,"Grues sur rails, capacité de charge 16 t",Equipment,General,Heures machine,60.34,60.34,60.34,60.34,1,EUR,830.12,13.7574,450,450,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KAME-LI-KADX-KARI_KAKATOTO,Détonateurs électriques ED-ZD,Material,General,1000 pièces,849.33,849.33,849.33,849.33,1,EUR,117.59,0.1522,449,449,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-LI-KARI-KALI_KAKAMEME,"Copeaux de bois compressés, marque A",Material,General,kg,7.51,7.51,7.51,7.51,1,EUR,18.3,2.4359,449,449,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES RISA-ME-KASA-KASA,"Rails de chemin de fer à voie large, type P50",Abstract Material,General,m,228.82,228.82,228.82,228.82,1,EUR,142604.49,652.2127,447,433,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR KAME-LI-MEME-KALI_KARIPUNE,"Électrodes de soudage pour le soudage d'aciers austénitiques résistants à la chaleur et d'aciers de construction à haute résistance EA-395, diamètre 2-5 mm",Material,General,kg,38.91,38.91,38.91,38.91,1,EUR,490.46,12.6065,442,442,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES DXME-KASA-KANE_KAKADX,"Grues sur chenilles, capacité de charge 50 t",Equipment,General,Heures machine,67.16,67.16,67.16,67.16,1,EUR,7447.03,110.8906,440,440,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-TO-KARI-KARI_KAKAKAME,"Argon gazeux, catégorie I",Material,General,m3,7.79,7.79,7.79,7.79,1,EUR,282.66,36.2778,438,438,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KARI-RI-KASA-KAPU,Gravier,Abstract Material,General,m3,78.98,78.98,78.98,78.98,1,EUR,4260.9,53.9493,435,398,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-RIME-MEDX_KATOTO,"Électricité : consommation 2,52 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,5.55,16.7867,430,430,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ DXME-RIME-MEDX_KATOTO,Machines à tourner et à fileter,Equipment,General,Heures machine,6.59,6.59,6.59,6.59,1,EUR,110.61,16.7867,430,430,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ MEDX-ME-KAME-MEME,Bouchons pour trappes de mesure,Abstract Material,General,pièce,18.13,7.5,22.97,22.97,2,EUR,15.0,2.0,428,295,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en tôle d'acier galvanisé et en aluminium de classe H (no ME_MEKAKA_RILI,Charge de travail moyenne 2,Labor,Labor,heures,14.27,14.27,14.27,14.27,1,EUR,2838.53,198.9324,427,427,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-LI-MEKA-KASA_KAKAKAME,Coke broyé,Material,General,t,654.51,654.51,654.51,654.51,1,EUR,28.51,0.1641,426,426,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES MEME-ME-KATO-KANE_KAKALIVO,"Planches de bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 44-50 mm, classe II",Material,General,m3,367.01,367.01,367.01,367.01,1,EUR,1221.77,3.4611,419,419,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,"Construction de parois en coffrage glissant, construction de plafonds d'élévateu" KAVO-TO-KALI-KAME_KAKANEKA,"Bandes d'acier laminées à chaud, nuances St3sp, St3ps, dimensions 100 x 10 mm",Material,General,t,1652.12,1652.12,1652.12,1652.12,1,EUR,371.65,0.2811,418,418,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Maçonnerie des poêles et des foyers DXME-KAME-KASA_MEKANE,"Pelles hydrauliques à godet unique diesel sur roues pneumatiques, volume du godet 0,25 m3",Equipment,General,Heures machine,25.39,25.39,25.39,25.39,1,EUR,133.71,5.2669,416,416,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE KATO-ME-KARI-KATO_KAKAMEME,"Chaux vive en morceaux, catégorie I",Material,General,t,216.7,216.7,216.7,216.7,1,EUR,191.6,1.1728,413,413,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé DXME-MENE-KAME_KAKARI,"Centrales électriques mobiles, puissance 4 kW",Equipment,General,Heures machine,3.04,3.04,3.04,3.04,1,EUR,30.95,10.1799,410,410,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",REMBLAYAGE DES MARAIS MEME-ME-KATO-KAME_KAKANENE,"Bois équarri de conifères (épicéa, pin), humidité naturelle, longueur 2-6,5 m, largeur 100 mm et plus, épaisseur 100 mm et plus, classe II",Material,General,m3,437.36,437.36,437.36,437.36,1,EUR,471.63,1.1448,410,410,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE MEPU-PU-KARI-KAPU_KAMEVORI,"Peinture à l'huile MA-15, colorée",Material,General,t,2421.21,2421.21,2421.21,2421.21,1,EUR,14.35,0.0126,404,404,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEME-ME-KATO-KASA_KAKANEPU,"Planches non sciées de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250, épaisseur 30-50 mm, classe II",Material,General,m3,275.0,275.0,275.0,275.0,1,EUR,571.12,2.2565,403,403,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,COLONNES,Construction de colonnes dans un coffrage en bois PU_MEKAKA_KANEPU,Personnel : 7 personnes-heures/machine-heures,Operator,Operators,Heures machine,87.52,60.32,168.89,84.44,3,EUR,1145.49,13.8439,400,400,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION MEPU-PU-KARI-KAPU_KAMEPUTO,"Peinture à l'huile MA-0115, ocre",Material,General,kg,2.41,2.41,2.41,2.41,1,EUR,6.22,2.5847,398,398,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en polymère-ciment KAME-LI-MEME-KALI_KAMEVORI,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés UONI 13/45, E42A, diamètre 3 mm",Material,General,t,3812.16,3812.16,3812.16,3812.16,1,EUR,49.03,0.0297,398,398,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-KANE-KALI_KAKATO,"Palans électriques à usage général, capacité de charge 1 t",Equipment,General,Heures machine,0.2,0.2,0.2,0.2,1,EUR,1.23,6.0038,395,395,RÉNOVATION EN PROFONDEUR DES ÉQUIPEMENTS,Révision des raccords de tuyauterie,ROBINETTERIE À USAGE GÉNÉRAL,Raccords à bride avec ou sans commande manuelle pour conduites d'eau à une press KAME-TO-KAME-KANE_KAKASAKA,Graisse universelle à point de fusion élevé UT (graisse constaline),Material,General,t,7367.88,7367.88,7367.88,7367.88,1,EUR,14.8,0.0154,394,394,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE À PETITS PANNEAUX,Construction de paliers d'escalier monolithiques dans un coffrage à panneaux fin KAME-LI-KALI-RIDX_KAKATOME,Câble,Material,General,t,5909.29,5909.29,5909.29,5909.29,1,EUR,410.98,0.1353,393,393,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols DXME-MEVO-KAME_SAKAVO,"Compresseurs à vis mobiles avec moteur électrique, pression jusqu'à 1 MPa (10 atm), débit jusqu'à 5 m3/min",Equipment,General,Heures machine,4.32,4.32,4.32,4.32,1,EUR,31.05,7.1838,392,392,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p DXME-MEVO-KAME_SAKAVO,"Électricité : consommation 12,21 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.57,1.57,1.57,1.57,1,EUR,11.27,7.1838,392,392,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p KAME-PU-KATO-KANE_KAKARIME,Pic pour marteaux piqueurs,Material,General,pièce,26.39,26.39,26.39,26.39,1,EUR,51.14,1.9378,390,390,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" DXME-KADX-KAME_KAMEME,Automotrices pour le fonctionnement sur un réseau de contact avec une plate-forme de montage isolée et une installation de grue équipée de nacelles amovibles,Equipment,General,Heures machine,97.11,97.11,97.11,97.11,1,EUR,2036.02,20.967,388,388,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT RIKA-ME-KARI-RITO_KAKAVORI,"Traverses flexibles, type PGS-50",Material,General,10 pièces,32.91,32.91,32.91,32.91,1,EUR,5.08,0.1544,386,386,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV DXME-RIKA-KATO_KAKADX,"Remorqueurs diesel utilisés en rade ouverte, puissance 294 kW (400 ch)",Equipment,General,Heures machine,118.29,118.29,118.29,118.29,1,EUR,2150.98,18.1841,386,386,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KADX-MERI_MEKAME,"Électricité : consommation 1,91 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.25,0.25,0.25,0.25,1,EUR,1.11,4.4997,385,385,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-MERI_MEKAME,Machines à couper les rails,Equipment,General,Heures machine,0.63,0.63,0.63,0.63,1,EUR,2.83,4.4997,385,385,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-MERI_MEKARI,"Électricité : consommation 0,38 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.42,8.4096,384,384,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" DXME-KADX-MERI_MEKARI,"Machines à percer les rails, puissance 1,15 kW",Equipment,General,Heures machine,0.35,0.35,0.35,0.35,1,EUR,3.04,8.4096,384,384,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" KAME-PU-KARI-KAPU,Tiges de forage,Abstract Material,General,pièce,1667.56,475.5,3668.23,475.5,2,EUR,3108.03,2.8031,383,316,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLUFFEMENT DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS DES TRANCHÉES E KAME-RI-KATO-KATO,Mastic,Abstract Material,General,t,953.24,5.01,981.35,981.35,2,EUR,2809.96,4.3411,382,382,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale ME_MEKAKA_RITO,Charge de travail moyenne 2,Labor,Labor,heures,13.78,13.78,13.78,13.78,1,EUR,1261.73,91.5845,379,379,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KARI-TO-KAME-KARI,Sable naturel pour travaux de construction,Abstract Material,General,m3,27.05,27.05,27.05,27.05,1,EUR,990.69,36.7542,378,378,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES DXME-RIME-RIKA_KAMETO,"Installations électriques de forage au diamant dans le béton armé, diamètre de forage jusqu'à 250 mm",Equipment,General,Heures machine,0.96,0.96,0.96,0.96,1,EUR,13.22,13.7698,377,377,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,Panneaux de signalisation routière KAVO-TO-KASA-KARI_KAKAKAME,"Tôles laminées à chaud, nuances d'acier St3sp, St3ps, largeur 1200-3000 mm, épaisseur 9-12 mm",Material,General,t,1348.2,1348.2,1348.2,1348.2,1,EUR,200.46,0.1978,377,377,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-RIME-RIKA_KAMETO,"Électricité : consommation 0,87 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.11,0.11,0.11,0.11,1,EUR,1.55,13.7698,377,377,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,Panneaux de signalisation routière DXME-KANE-KATO_KAPULI,"Treuils manuels et à levier avec une force de traction de 31,39 kN (3,2 t)",Equipment,General,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.94,10.6133,376,376,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KANE-KALI_KAKASA,"Palans électriques à usage général, capacité de charge 3,2 t",Equipment,General,Heures machine,0.34,0.34,0.34,0.34,1,EUR,3.89,11.4538,376,376,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement des conduites de gaz et d'air KAME-LI-RIKA-KAVO_KAKAPUME,"Corde tressée à trois brins en fibre de chanvre, diamètre de 6 à 22 mm",Material,General,t,8183.43,8183.43,8183.43,8183.43,1,EUR,33.8,0.0306,372,372,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,EXPLOITATION DES PENTES DES EXCAVATIONS DANS LES SOLS ROCHEUX MEPU-SA-KANE-KARI_KAKAKARI,"Pâte abrasive à base d'oxyde de chrome, n° 1, n° 2, n° 3, n° 4",Material,General,kg,15.48,15.48,15.48,15.48,1,EUR,1.16,0.0751,371,371,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX MEPU-PU-KAME-KAME_KAKAKATO,Apprêt GF-021,Material,General,t,2146.59,2146.59,2146.59,2146.59,1,EUR,9.05,0.0322,369,369,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,"Maçonnerie de murs en pierres de béton léger, remplissage d'ouvertures et de col" PU_MEKAKA_KALILI,Personnel : 3 personnes-heures/machine-heures,Operator,Operators,Heures machine,40.13,39.38,78.76,39.38,2,EUR,90.91,2.2021,368,252,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" MEPU-SA-KADX-KALI_KAKATOKA,Solvant R-4,Material,General,t,3765.68,3765.68,3765.68,3765.68,1,EUR,9.87,0.0212,368,368,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEPU-PU-KATO-KAPU_KAKAKAME,"Vernis à base de charbon, marque A",Material,General,t,1425.56,1425.56,1425.56,1425.56,1,EUR,80.86,0.1453,368,368,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KAME-LI-RIKA-KARI_KAKAKARI,"Feutre technique à poils longs pour isolation, foncé, épaisseur 8-10 mm",Material,General,kg,7.96,7.96,7.96,7.96,1,EUR,254.25,31.9611,367,367,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Installation et démontage du coffrage glissant des tours de puits DXME-KASA-KAPU_KAKADX,"Électricité : consommation 46,2 kW·h/machine-heure",Electricity,Electricity,Heures machine,5.93,5.93,5.93,5.93,1,EUR,462.24,77.8979,364,364,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-KASA-KAPU_KAKADX,"Ponts roulants électriques, capacité de charge 32 t",Equipment,General,Heures machine,45.86,45.86,45.86,45.86,1,EUR,3572.26,77.8979,364,364,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature PU_MEKAKA_KASATO,Personnel : 3 personnes-heures/machine-heures,Operator,Operators,Heures machine,35.06,31.69,73.93,31.69,3,EUR,270.64,7.7151,363,319,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR MEME-ME-KATO-KANE_KAKALIME,"Planches de bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 25 mm, classe III",Material,General,m3,358.2,358.2,358.2,358.2,1,EUR,496.88,1.3988,359,359,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage KAME-LI-MEME-KALI_KAKATODX,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés É50, diamètre 4 mm",Material,General,kg,4.52,4.52,4.52,4.52,1,EUR,917.4,203.446,359,359,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Soudage de l'armature par immersion MEPU-PU-KATO-KANE_KAKAKAME,Vernis électro-isolant ML-92,Material,General,kg,4.99,4.99,4.99,4.99,1,EUR,0.69,0.1522,358,358,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation électrique interne des bâtiments temporaires à usage industriel et KAME-LI-MENE-KAPU,Coffrage d'inventaire (amortissement),Abstract Material,General,compl,1096.71,585.28,3530.1,585.28,2,EUR,13198.58,3.7391,357,357,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé DXME-KASA-KASA_KAMENE,"Grues sur châssis automobile, capacité de charge 25 t",Equipment,General,Heures machine,49.02,49.02,49.02,49.02,1,EUR,993.8,20.2743,356,356,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KATO-KANE_KAPUKA,"Machines de chargement électriques à godet, capacité 1,25 m3/min",Equipment,General,Heures machine,15.71,15.71,15.71,15.71,1,EUR,388.13,24.699,355,355,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES DXME-KATO-KANE_KAPUKA,"Électricité : consommation 7,1 kWh/machine-heure",Electricity,Electricity,Heures machine,0.91,0.91,0.91,0.91,1,EUR,22.51,24.699,355,355,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES KAME-TO-KASA-KALI_KAKAMEME,Borax (tétraborate de sodium),Material,General,kg,5.7,5.7,5.7,5.7,1,EUR,7.55,1.3243,355,355,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,CHAMBRES CLIMATISÉES DXME-KANE-KATO_KASAVO,"Treuils électriques avec une force de traction de 156,96 kN (16 t)",Equipment,General,Heures machine,2.09,2.09,2.09,2.09,1,EUR,20.47,9.8005,354,354,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-KANE-KATO_KASAVO,"Électricité : consommation 0,63 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.08,0.08,0.08,0.08,1,EUR,0.83,9.8005,354,354,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-MEME-KAME_KAMERI,Machines de montage pour la pose et l'installation de câbles sur la base d'un véhicule,Equipment,General,Heures machine,32.1,32.1,32.1,32.1,1,EUR,170.33,5.3071,353,353,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAVO-TO-KAVO-KARI_KAKASAVO,"Cornières en acier laminées à chaud à ailes égales, nuances d'acier St3sp, St3ps, largeur des ailes 35-56 mm, épaisseur des ailes 3-5 mm",Material,General,t,1307.43,1307.43,1307.43,1307.43,1,EUR,321.88,0.3747,350,350,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEKA-TO-KARI-KATO_KAKAMEME,"Soudures à l'étain et au plomb sans antimoine, marque POS30",Material,General,kg,32.66,32.66,32.66,32.66,1,EUR,171.09,5.376,350,350,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX PU_MEKAKA_KADXSA,Personnel : 2 personnes-heures/machine-heure,Operator,Operators,Heures machine,29.83,29.83,29.83,29.83,1,EUR,521.54,17.533,349,206,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE RITO-TO-KATO-KARI_KAKALIKA,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 102 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,36.94,36.94,36.94,36.94,1,EUR,584.66,15.8256,349,349,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS TEMPORAIRES DES PUITS VERTICAUX DE SECTION CIRCULAIRE ET DE LEURS ORIF KAME-LI-MESA-KANE_KAMERIRI,"Clous en acier pour la construction, diamètre 1,8 mm, longueur 50-60 mm",Material,General,t,2453.79,2453.79,2453.79,2453.79,1,EUR,106.06,0.0663,347,347,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,ÉCHAFAUDAGES EXTÉRIEURS ET INTÉRIEURS,Fabrication de pièces en bois pour échafaudages suspendus DXME-KADX-MERI_KATOME,Clés universelles pour voies ferrées,Equipment,General,Heures machine,0.43,0.43,0.43,0.43,1,EUR,7.13,16.4019,347,347,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-MERI_KATOME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,1.1,16.4019,347,347,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-LI-MEDX-KADX_KAKARIME,"Tuyau en caoutchouc et tissu pour une pression d'eau de 1 MPa (10 kgf/cm2), diamètre intérieur 16 mm",Material,General,m,5.65,5.65,5.65,5.65,1,EUR,14.59,2.6443,346,346,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-RIME-MEDX_KATORI,Machines à raboter le métal,Equipment,General,Heures machine,3.18,3.18,3.18,3.18,1,EUR,6.26,1.9704,345,345,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES KAME-TO-KAPU-KAVO_KAKARITO,Huile moteur diesel hivernale M-8DM,Material,General,t,2102.64,2102.64,2102.64,2102.64,1,EUR,41.69,0.0468,345,345,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,TREUILS DXME-RIME-MEDX_KATORI,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,0.49,1.9704,345,345,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES MEPU-PU-KATO-KARI_KAKAMENE,Vernis bakélite LBS-20,Material,General,t,6361.6,6361.6,6361.6,6361.6,1,EUR,20.34,0.01,345,345,INSTALLATION DE L'ÉQUIPEMENT,"Compresseurs, pompes et ventilateurs","COMPRESSEURS ET SURCOMPRESSEURS CENTRIFUGES, À VIS, À ANNEAU D'EAU, À TURBINE À ",COMPRESSEURS ET SURCOMPRESSEURS CENTRIFUGES PU_MEKAKA_KALISA,Personnel : 2 personnes-heures/machine-heure,Operator,Operators,Heures machine,26.37,25.92,103.66,25.92,2,EUR,1524.47,58.2693,344,344,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE KASA-ME-KAVO-MEPU,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,m3,1326.75,1303.45,1364.49,1303.45,2,EUR,108086.7,81.5914,338,338,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MENE-KAME_KAKAPU,"Centrales électriques mobiles, puissance 60 kW",Equipment,General,Heures machine,23.05,23.05,23.05,23.05,1,EUR,1277.38,55.4189,336,336,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation de pieux forés-injectés dans des puits prêts à l'emploi à l'aide de KATO-ME-KAME-KAME_KAKAKARI,Plâtre de construction G-3,Material,General,t,163.55,163.55,163.55,163.55,1,EUR,71.14,0.6993,336,336,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" MEME-ME-KATO-KASA_KAKANENE,"Planches non sciées de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250, épaisseur 30-50 mm, classe IV",Material,General,m3,469.47,469.47,469.47,469.47,1,EUR,828.48,2.0491,335,335,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL TO_MEKAKA_KARI,Technicien de catégorie II,Material,General,personnes-heures,15.74,15.74,15.74,15.74,1,EUR,435.74,27.6749,334,334,TRAVAUX DE MISE EN SERVICE,Appareils électrotechniques,GÉNÉRATEURS SYNCHRONES ET EXCITATEURS,GÉNÉRATEURS MEPU-SA-KADX-KAME_KAKAKATO,"Acétone technique, qualité supérieure",Material,General,kg,2.3,2.3,2.3,2.3,1,EUR,4.39,1.9562,334,334,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées KAME-TO-KASA-RITO_KAMELIME,Soude calcinée (carbonate de sodium) technique,Material,General,t,948.63,948.63,948.63,948.63,1,EUR,6.86,0.0779,333,333,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE MEPU-SA-KASA-KARI_KAKAKAME,Huile de lin naturelle,Material,General,kg,4.23,4.23,4.23,4.23,1,EUR,13.21,3.3748,332,332,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,ÉCHAFAUDAGES EXTÉRIEURS ET INTÉRIEURS,Fabrication de pièces en acier pour échafaudages suspendus RITO-VO-KATO-MEME,Brides en acier,Abstract Material,General,pièce,41.66,20.9,57.25,57.25,2,EUR,726.27,12.8615,331,331,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Installation de raccords à brides sur des conduites en acier MEPU-PU-KAPU-KAVO_KAKAKAME,Émail PF-115,Material,General,t,2694.01,2694.01,2694.01,2694.01,1,EUR,54.5,0.0252,328,328,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées DXME-KANE-KASA_KANEKA,"Chargeuses frontales universelles à godet unique, pneumatiques, capacité nominale du godet principal 0,46 m3, capacité de charge 1 t",Equipment,General,Heures machine,17.47,17.47,17.47,17.47,1,EUR,67.22,3.8604,328,328,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES DXME-KAPU-KAME_KATOTO,"Machines de forage et grues sur tracteur à chenilles d'une puissance de 93 kW (126 ch), profondeur de forage jusqu'à 5 m, diamètre des trous jusqu'à 800 mm",Equipment,General,Heures machine,33.75,33.75,33.75,33.75,1,EUR,34.78,1.0306,327,327,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE KAME-LI-KANE-KATO_KAKAKARI,"Bandes anticorrosion en PVC avec couche adhésive sur une face pour l'isolation des conduites, couleur noire, largeur 450 mm, épaisseur 0,4 mm",Material,General,m2,3.2,3.2,3.2,3.2,1,EUR,2979.41,931.8714,327,327,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale à partir de bandes adhésives p KAME-ME-KARI-KARI_KAKARITO,"Papier électro-isolant en amiante BE, épaisseur 0,4-0,5 mm",Material,General,t,4901.93,4901.93,4901.93,4901.93,1,EUR,47.66,0.0136,326,326,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER KAME-LI-MEDX-KAPU_KAKAKARI,Plaques en caoutchouc vulcanisé en rouleau,Material,General,kg,3.83,3.83,3.83,3.83,1,EUR,143.18,37.414,324,324,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION MEME-ME-KATO-KAME_KAKANEPU,"Bois sciés de conifères (épicéa, pin), humidité naturelle, longueur 2-6,5 m, largeur 20-90 mm, épaisseur 20-90 mm, classe IV",Material,General,m3,310.42,310.42,310.42,310.42,1,EUR,46.75,0.3286,322,322,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-METO-KATO_MEMERI,"Véhicules spéciaux tout-terrain, capacité de charge jusqu'à 1,5 t",Equipment,General,Heures machine,14.37,14.37,14.37,14.37,1,EUR,7.26,0.5053,321,321,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu MEKA-TO-KARI-KATO_KAKAMERI,"Soudures à l'étain et au plomb sans antimoine, marque POS40",Material,General,kg,36.95,36.95,36.95,36.95,1,EUR,7.7,0.2244,320,320,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE TRANSPORT À ACTION CONTINUE,CONVOYEURS SPÉCIAUX DXME-KAPU-KAME_KAPUNE,Marteaux de forage lourds pour travail à partir de stations de compression fixes,Equipment,General,Heures machine,5.83,5.83,5.83,5.83,1,EUR,952.14,163.2061,319,319,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-RIME-MEDX_KATOVO,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.09,0.9021,318,318,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Installation des blocs de charbon et des sections de sole DXME-RIME-MEDX_KATOVO,Fraiseuses à métaux,Equipment,General,Heures machine,1.29,1.29,1.29,1.29,1,EUR,1.16,0.9021,318,318,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Installation des blocs de charbon et des sections de sole KAVO-TO-MEME-KAME_MEMEKANE,"Profilés en acier laminés à chaud, nuances d'acier St3ps, St3sp, n° 40U, n° 40P",Material,General,t,3662.43,3662.43,3662.43,3662.43,1,EUR,65.05,0.0574,317,317,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE KAME-PU-KAME-KATO,Trépans à trois molettes,Abstract Material,General,pièce,1405.94,1405.94,1405.94,1405.94,1,EUR,1476.33,1.051,316,296,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS LES RETRAITS DXME-KANE-KALI_KAKAPU,"Palans électriques à usage général, capacité de charge 2 t",Equipment,General,Heures machine,0.28,0.28,0.28,0.28,1,EUR,3.08,11.0853,316,316,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RIME-ME-KASA-KAME_KAKAMEVO,Câble flexible de puissance avec conducteurs en cuivre H07RN-F 1x50-660,Material,General,1000 m,15235.69,15235.69,15235.69,15235.69,1,EUR,62.62,0.01,313,313,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines KAVO-TO-MEME-KAME_MEMEKARI,"Cales en acier laminées à chaud, marques d'acier St3ps, St3sp, n° 12U-24U, n° 12P-24P",Material,General,t,1648.57,1648.57,1648.57,1648.57,1,EUR,396.55,0.2963,312,312,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KANE-KADX_KAKAME,"Élévateurs télescopiques automoteurs, hauteur de travail 26 m, capacité de charge 250 kg",Equipment,General,Heures machine,56.66,56.66,56.66,56.66,1,EUR,2147.09,37.8971,311,311,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" DXME-MEDX-KAVO_KAMEME,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,1.13,1.7808,310,310,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-MEDX-KAVO_KAMEME,"Pompes, débit 100 m3/h, pression 30 m, puissance 11 kW",Equipment,General,Heures machine,1.98,1.98,1.98,1.98,1,EUR,3.52,1.7808,310,310,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-RI-KATO-KARI,Apprêt bitumineux,Abstract Material,General,t,3664.6,3664.49,3664.6,3664.6,2,EUR,1161.65,0.3172,308,308,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en béton bitumineux KAVO-TO-KALI-KAME_KAKASARI,"Acier laminé à chaud en bandes, nuances St3sp, St3ps, dimensions 50 x 5 mm",Material,General,t,1535.58,1535.58,1535.58,1535.58,1,EUR,517.71,0.6773,308,308,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MERI-ME-KARI-MESA,Matériaux d'étanchéité en rouleaux,Abstract Material,General,m2,10.15,0.88,10.3,10.3,2,EUR,8952.21,871.4353,308,295,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Imperméabilisation des murs et des fondations KAME-LI-KALI-MERI_KAKAMERI,"Film d'emballage en polyéthylène, épaisseur 0,6 mm",Material,General,m2,5.6,5.6,5.6,5.6,1,EUR,1244.75,222.367,307,307,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-KANE-KATO_KASANE,"Treuils électriques avec une force de traction de 78,48 kN (8 t)",Equipment,General,Heures machine,1.55,1.55,1.55,1.55,1,EUR,68.09,43.7896,305,305,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-RIKA-KATO_KAKAME,"Remorqueurs, puissance 110 kW (150 ch)",Equipment,General,Heures machine,56.09,56.09,56.09,56.09,1,EUR,435.68,7.768,305,305,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KANE-KATO_KASANE,"Électricité : consommation 0,53 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.07,0.07,0.07,0.07,1,EUR,3.25,43.7896,305,305,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-MEDX-MELI_KAKATOSA,"Cordon en caoutchouc de section ronde, diamètre de 6,0 à 8,0 mm",Material,General,kg,10.18,10.18,10.18,10.18,1,EUR,0.49,0.5332,304,304,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",REFROIDISSEMENT DES ÉMETTEURS KANE-ME-KAME-KASA,Brique céramique,Abstract Material,General,1000 pièces,617.9,617.9,617.9,617.9,1,EUR,1399.09,2.2911,301,284,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS","Réalisation des fondations, maçonnerie des murs" DXME-KASA-KALI_KAKAPU,"Grues sur rails, capacité de charge 80 t",Equipment,General,Heures machine,199.94,199.94,199.94,199.94,1,EUR,13200.71,66.0231,301,301,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE TRAVERSÉE EN BÉTON ARMÉ DE PONTS POUR UNE VOIE FERROVIAIRE KAME-LI-MEME-KAPU_KAKASAME,"Fil à souder SV-04X19H11M3, diamètre 2 mm",Material,General,kg,13.2,13.2,13.2,13.2,1,EUR,4.84,0.4032,300,300,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES KAME-ME-KARI-KASA_KAMERIRI,"Garnitures sèches en amiante à tissage traversant, rondes, marque AS, diamètre 6-14 mm",Material,General,t,16098.42,16098.42,16098.42,16098.42,1,EUR,23.88,0.0115,299,299,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES DXME-RIME-MEDX_KAMETO,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.14,0.8018,299,299,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier DXME-RIME-MEDX_KAMETO,"Machines à meule abrasive pour le sciage brut de tubes en acier, d'armatures, de profilés et d'autres pièces",Equipment,General,Heures machine,0.27,0.27,0.27,0.27,1,EUR,0.25,0.8018,299,299,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier DXME-MELI-KARI_KAVOME,"Électricité : consommation 0,24 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.63,18.9188,297,297,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES DXME-MELI-KARI_KAVOME,Styloscopes universels,Equipment,General,Heures machine,2.35,2.35,2.35,2.35,1,EUR,44.37,18.9188,297,297,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES MEPU-RI-KARI-KATO_KAKAKAME,"Peinture ignifuge monocomposante à dispersion aqueuse pour augmenter la résistance au feu des structures en acier jusqu'à 90 minutes, de type intumescent, teneur en matières non volatiles d'au moins 67 %, couleur blanche",Material,Steel & Metal,t,13099.95,13099.95,13099.95,13099.95,1,EUR,30.55,0.0133,296,296,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-KASA-KANE_KAKAVO,"Grues sur chenilles, capacité de charge 40 t",Equipment,General,Heures machine,63.3,63.3,63.3,63.3,1,EUR,4436.03,70.0758,296,296,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-ME-KAME-KADX_KAKATOKA,"Cordon en amiante à usage général SHAN, diamètre 18-25 mm",Material,General,t,10551.3,10551.3,10551.3,10551.3,1,EUR,181.52,0.0255,294,294,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Étanchéification des raccords à l'aide de chrysotile-ciment en cordon DXME-KASA-KAME_KAKARI,"Électricité : consommation 14,96 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.92,1.92,1.92,1.92,1,EUR,48.23,25.1026,294,294,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments DXME-KASA-KAME_KAKARI,"Grues à tour, capacité de levage 80 t",Equipment,General,Heures machine,120.69,120.69,120.69,120.69,1,EUR,3029.51,25.1026,294,294,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments KAME-TO-KASA-KATO_KAKATOME,"Chlorure d'ammonium, chimiquement pur",Material,General,t,6592.04,6592.04,6592.04,6592.04,1,EUR,1.04,0.0,293,293,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",DÉTAILS DES TRANSMETTEURS PUISSANTS DXME-MEKA-KASA_KAMEKA,"Poseurs de conduites, capacité de charge nominale 50 t",Equipment,General,Heures machine,170.07,170.07,170.07,170.07,1,EUR,12621.16,74.2124,293,293,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAME-LI-RIKA-KAPU_KAKAKATO,Fil de couture polyester en lavsan staple (brut),Material,General,kg,15.35,15.35,15.35,15.35,1,EUR,2.15,0.1852,293,293,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES DXME-MESA-KARI_KARILI,"Tracteurs à chenilles, puissance 132 kW (180 ch)",Equipment,General,Heures machine,41.76,41.76,41.76,41.76,1,EUR,474.37,11.3595,292,292,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS KAME-LI-MESA-MEKA_KAKASATO,Agrafes métalliques,Material,General,kg,6.28,6.28,6.28,6.28,1,EUR,161.73,25.768,291,291,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,PASSERELLES MEKA-TO-KARI-KATO_KAKATONE,"Soudures à l'étain et au plomb, marque POSSu 30-2",Material,General,kg,36.43,36.43,36.43,36.43,1,EUR,19.57,0.5373,291,291,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE DXME-KADX-MEKA_KASAME,Ressorts électriques,Equipment,General,Heures machine,0.13,0.13,0.13,0.13,1,EUR,3.43,25.8523,290,290,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" KAME-LI-RIKA-KAVO_KAKALIME,"Corde en chanvre torsadée, imprégnée, diamètre 26 mm",Material,General,t,9521.82,9521.82,9521.82,9521.82,1,EUR,86.99,0.1078,290,290,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES DE BÂTIMENTS INDUSTRIELS À UN OU PLUSIEURS ÉTAGES KAME-TO-KARI-KANE_KAKAMEME,Gaz carbonique,Material,General,t,1014.61,1014.61,1014.61,1014.61,1,EUR,55.75,0.0659,289,289,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KATO-KANE_KARIRI,"Machines de chargement sur chenilles pour galeries horizontales d'une section supérieure à 8 m2, pneumatiques",Equipment,General,Heures machine,123.0,123.0,123.0,123.0,1,EUR,2854.01,23.2031,288,288,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-PU-KARI-KARI_KAKAKATO,"Couteau droit plat pour couper les sols, renforcé par un produit de forme G24a-02 de marque VK8V, longueur 95 mm, hauteur 26 mm, épaisseur 13 mm",Material,General,pièce,6.27,6.27,6.27,6.27,1,EUR,37.26,5.9433,287,287,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" RIPU-TO-KAME-KAME_KAKAKASA,"Tube électro-installation en polychlorure de vinyle, épaisseur de paroi 0,6 mm",Material,Pipes & Fittings,kg,6.59,6.59,6.59,6.59,1,EUR,7.74,1.3893,286,286,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e KAME-RI-KATO-KATO_KAMEKALI,Mastic bitume-huile MB-50,Material,General,t,981.35,981.35,981.35,981.35,1,EUR,132.0,0.1847,284,284,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,PASSERELLES KAVO-RI-KARI-MEKA_KAKAPUME,"Câble à double torsion TK sans revêtement, structure 6x37(1+6+12+18)+1x37(1+6+18), marque B, en fil sans revêtement, groupe de marquage 1570-1770 N/mm2, diamètre 6,4 mm",Material,Steel & Metal,10 m,14.46,14.46,14.46,14.46,1,EUR,49.28,3.4079,284,284,INSTALLATION DE L'ÉQUIPEMENT,"Compresseurs, pompes et ventilateurs","COMPRESSEURS, AGRÉGATS ET MACHINES À PISTONS",COMPRESSEURS À MOTEUR À GAZ MEKA-TO-KARI-KATO_KAKAKARI,"Soudures étain-plomb sans antimoine en lingots, marque POS30",Material,General,kg,49.35,49.35,49.35,49.35,1,EUR,3.38,0.0686,283,283,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV MERI-ME-KARI-KANE_MEKAKAVO,Rouleau de toiture RKC-400,Material,General,m2,1.76,1.76,1.76,1.76,1,EUR,3.98,2.2663,283,283,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER DXME-RIME-KAME_KAMERI,"Groupes de peinture à haute pression pour la peinture des surfaces de constructions, puissance 1 kW",Equipment,General,Heures machine,0.16,0.16,0.16,0.16,1,EUR,0.72,4.3293,282,282,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé DXME-RIME-KAME_KAMERI,"Électricité : consommation 0,23 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.14,4.3293,282,282,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé KAME-LI-MEME-KALI_KAKATOKA,"Électrodes de soudage pour le soudage des aciers inoxydables au chrome-nickel et au chrome-nickel-molybdène EA 400/10U, diamètre 3 mm",Material,General,kg,19.93,19.93,19.93,19.93,1,EUR,247.38,12.5002,281,281,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES MEPU-ME-KAME-KAME_KAKAKAME,Colle à base de caséine,Material,General,t,17428.18,17428.18,17428.18,17428.18,1,EUR,2.88,0.0,280,280,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS KAME-ME-KAME-KADX_KAKARIDX,"Cordon en amiante à usage général SHAON, diamètre 15 mm",Material,General,t,8835.52,8835.52,8835.52,8835.52,1,EUR,7.76,0.02,280,280,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER KAME-LI-MESA-KALI_KAKAMEPU,Chevilles d'expansion en polypropylène,Material,General,100 pièces,1.34,1.34,1.34,1.34,1,EUR,0.51,0.3787,280,280,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une fixation mécanique à l'aide de fixateurs lors de la couvertur MEKA-RI-KARI-KANE_KAKAMENE,"Bandes en laiton, laminées à froid, dures, précision normale, marque L63, longueur non mesurée, largeur 40-100 mm, épaisseur 3,0 mm",Material,General,t,30097.97,30097.97,30097.97,30097.97,1,EUR,3.58,0.0,280,280,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES ME_MEKAKA_SAME,"Charge moyenne de travail 5,1",Labor,Labor,heures,19.26,19.26,19.26,19.26,1,EUR,5021.45,260.6838,279,279,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-LI-KATO-KARI_KAKAKAME,Air comprimé,Material,General,100 m3,3.22,3.22,3.22,3.22,1,EUR,35095.09,11352.4015,278,278,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,FOURNITURE ET POSE DE MÉLANGE DE BÉTON DANS LES BLOCS DE CONSTRUCTIONS EN BÉTON DXME-KASA-KAVO_KAKALI,"Grues sur châssis pneumatique, capacité de charge 30 t",Equipment,General,Heures machine,51.31,51.31,51.31,51.31,1,EUR,657.49,12.8154,278,278,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-MESA-KARI_KARISA,"Tracteurs à chenilles, puissance 96 kW (130 ch)",Equipment,General,Heures machine,30.24,30.24,30.24,30.24,1,EUR,238.32,7.8817,278,278,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-LI-MELI-KALI_KAKASATO,"Disque abrasif à profil droit, dimensions 180 x 10 x 22 mm",Material,General,pièce,3.26,3.26,3.26,3.26,1,EUR,55.05,16.8864,278,278,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS PU_MEKAKA_KAVOSA,Personnel : 2 personnes-heures/machine-heure,Operator,Operators,Heures machine,27.68,27.68,27.68,27.68,1,EUR,2748.23,99.2926,277,275,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE KAME-LI-KALI-MELI_KAKAMEME,"Noir de carbone blanc, teneur massique en dioxyde de silicium d'au moins 88 %, teneur massique en humidité d'au plus 6,5 %, surface spécifique d'adsorption du phénol 40±10 m2/g",Material,General,t,2626.91,2626.91,2626.91,2626.91,1,EUR,0.0,0.0,277,277,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER RIME-ME-KANE-KAVO_KAKARINE,Câble électrique à conducteurs en aluminium ASB 3x70(oz)-1000,Material,General,1000 m,17558.82,17558.82,17558.82,17558.82,1,EUR,376.72,0.0231,277,277,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER MEKA-TO-KARI-KAME_KAKAKARI,"Babbitt à l'étain et au plomb en lingots, marque B83",Material,General,t,58876.81,58876.81,58876.81,58876.81,1,EUR,45.07,0.0,277,277,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER KARI-ME-KAME-KAME_KAKAKANE,Sol argileux (argile),Material,General,m3,22.8,22.8,22.8,22.8,1,EUR,47.58,2.1138,276,276,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KAPU-TO-KARI-KAPU,Mélanges de béton prêts à l'emploi,Abstract Material,General,m3,2.79,2.79,2.79,2.79,1,EUR,292.16,104.7473,276,276,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL PU_MEKAKA_KANEVO,Personnel : 6 personnes-heures/machine-heures,Operator,Operators,Heures machine,71.38,49.51,74.26,74.26,2,EUR,1350.6,18.8149,275,275,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS PU_MEKAKA_KAPUSA,Personnel : 2 personnes-heures/machine-heure,Operator,Operators,Heures machine,18.8,18.8,18.8,18.8,1,EUR,156.32,8.3148,272,269,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-KADX-KAME_KAKAKARI,Ammonite 6ZhV sous forme de poudre,Material,General,t,4203.49,4203.49,4203.49,4203.49,1,EUR,350.47,0.1048,271,271,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu KAME-LI-MEKA-MELI_KAMEPUME,Ponce,Material,General,kg,92.58,92.58,92.58,92.58,1,EUR,188.41,2.0351,270,270,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES MEME-ME-KATO-KANE_KAKALISA,"Planches équarries de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 30-40 mm, classe III",Material,General,m3,358.2,358.2,358.2,358.2,1,EUR,337.36,1.0147,270,270,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KALI-KAPU_KAKARI,"Électricité : consommation 0,68 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,1.88,21.5188,268,268,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-KALI-KAPU_KAKARI,Vibrateurs de surface,Equipment,General,Heures machine,0.34,0.34,0.34,0.34,1,EUR,7.26,21.5188,268,268,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-PU-KATO-KAPU_KAKAKAME,Acier de forage hélicoïdal rhombique,Material,General,kg,4.94,4.94,4.94,4.94,1,EUR,13.69,2.7697,267,267,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" KAVO-RI-KARI-MEME_KAKAKALI,"Câble à double torsion TK, structure 6x19(1+6+12)+1 o.s., marque B, en fil galvanisé du groupe Zh, groupe de marquage 1570-1770 N/mm2, diamètre 5,5 mm",Material,Steel & Metal,10 m,6.72,6.72,6.72,6.72,1,EUR,0.24,0.0364,265,265,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES DE BÂTIMENTS INDUSTRIELS À UN OU PLUSIEURS ÉTAGES KAPU-TO-KAME-KADX_KAKAMERI,"Mortier prêt à l'emploi pour maçonnerie, ciment, M50",Material,General,m3,117.85,117.85,117.85,117.85,1,EUR,145.56,1.5595,264,264,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,FONDATIONS ET POUTRES DE FONDATION DXME-KATO-MEDX_KADXME,Clés à chapeau pneumatiques manuelles fonctionnant à partir de stations de compression fixes,Equipment,General,Heures machine,3.06,3.06,3.06,3.06,1,EUR,227.97,74.4208,264,264,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS MERI-ME-KARI-KANE_KAKAMERI,Rouleau de toiture RKK-350,Material,General,m2,1.71,1.71,1.71,1.71,1,EUR,28.35,16.6109,263,263,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé RISA-ME-KATO-KARI_KAKAKAME,"Cales pour voies ferrées à écartement large, section 16 x 16 mm, longueur 165 mm",Material,General,t,3087.24,3087.24,3087.24,3087.24,1,EUR,2203.06,0.8382,261,261,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-KANE-KANE_KAPURI,"Électricité : consommation 1,49 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.19,0.19,0.19,0.19,1,EUR,4.16,21.795,260,260,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment DXME-RIKA-KARI_KAKANE,"Barges non automotrices pour le travail en eaux fermées, capacité de charge 250 t",Equipment,General,Heures machine,18.4,18.4,18.4,18.4,1,EUR,358.11,19.4623,260,260,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KANE-KANE_KAPURI,"Élévateurs hydrauliques, hauteur de levage 10 m",Equipment,General,Heures machine,3.38,3.38,3.38,3.38,1,EUR,73.77,21.795,260,260,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment MEPU-PU-KARI-KAPU,Peintures à l'huile prêtes à l'emploi pour travaux intérieurs,Abstract Material,General,t,2519.21,2.67,2802.46,2802.46,2,EUR,46.1,0.1599,257,257,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'HUILE MEVO-ME-KARI-KAME,Vannes,Abstract Material,General,pièce,1172.89,1031.03,3635.12,1031.03,2,EUR,7691.12,4.8404,257,257,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-KARI_KAMEKA,"Barges non automotrices, capacité de charge 250 t, pour une utilisation en rade ouverte",Equipment,General,Heures machine,23.66,23.66,23.66,23.66,1,EUR,463.03,19.5677,257,257,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-TO-KASA-TOVO_KATOLIME,Acide stéarique technique,Material,Chemicals,kg,2.44,2.44,2.44,2.44,1,EUR,0.08,0.0345,256,256,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE KAME-LI-MELI-KASA_KAKARIME,Carborundum,Material,General,kg,6.29,6.29,6.29,6.29,1,EUR,46.34,7.3655,255,255,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu RIRI-RI-KARI-RITO,Affiches métalliques,Abstract Material,General,pièce,7018.1,11.28,13145.54,13145.54,4,EUR,5263.43,105.7467,254,254,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BÉTON ARMÉ CENTRIFUGÉ VL 35-500 KV KARI-RI-KASA-KAPU_KAKANEME,"Gravier provenant de roches denses pour la couche de ballast de la voie ferrée, fraction de 25 à 60 mm",Material,General,m3,47.38,47.38,47.38,47.38,1,EUR,6807.94,143.6808,252,252,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,BALLASTAGE DES VOIES ET DES AIGUILLAGES KAME-TO-KASA-MEKA_KAKAKANE,"Graphite cristallin de fonderie, marque GL-1",Material,General,kg,3.43,3.43,3.43,3.43,1,EUR,6.15,1.8013,251,251,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES ME_MEKAKA_MEDX,"Charge moyenne de travail 1,9",Labor,Labor,heures,13.3,13.3,13.3,13.3,1,EUR,3471.83,261.1,251,251,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-LI-MEME-KALI_KAMEVOME,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés UONI 13/45, E42A, diamètre 2,5 mm",Material,General,t,5431.7,5431.7,5431.7,5431.7,1,EUR,36.73,0.0213,250,250,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL KARI-RI-KASA-KAPU_RIMEKANE,"Gravier de roches denses pour travaux de construction M 800, fraction 40-80(70) mm",Material,General,m3,63.04,63.04,63.04,63.04,1,EUR,399.99,6.3448,250,250,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR RISA-ME-KAPU-KALI_KAKAKATO,"Vis de voie à tête tétraédrique, diamètre M24, longueur 170 mm",Material,General,t,3163.56,3163.56,3163.56,3163.56,1,EUR,4321.5,1.7712,249,249,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR DXME-MENE-KAME_KAKASA,"Centrales électriques mobiles, puissance 75 kW",Equipment,General,Heures machine,27.4,27.4,27.4,27.4,1,EUR,4021.19,146.7528,249,249,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE MANUEL AVEC ÉLECTRODES À REVÊTEMENT DE BASE MEME-ME-KATO-KAME_KAKANEME,"Bois équarri de conifères (épicéa, pin), humidité naturelle, longueur 2-6,5 m, largeur 20-90 mm, épaisseur 20-90 mm, classe I",Material,General,m3,433.19,433.19,433.19,433.19,1,EUR,17.49,0.1726,248,248,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-PU-KAME-KANE_KAKANEME,"Couronne de forage pour perforateurs et machines de forage rotatif à percussion, KDP 43-25",Material,General,pièce,17.72,17.72,17.72,17.72,1,EUR,277.69,15.6691,248,248,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DE PUITS VERTICAUX, DE PUITS DE FORAGE ET DE LEURS EMBRANCHEMENTS" KASA-ME-KARI-KALI,Poteau en béton armé,Abstract Material,General,m3,1420.6,1377.11,1478.03,1377.11,2,EUR,21393.85,15.2164,246,246,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAME-LI-MELI-MEME_KAKAKARI,Papier abrasif,Material,General,m2,7.63,7.63,7.63,7.63,1,EUR,39.47,5.2386,246,246,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE CIMENT MINÉRAL RE",Installation de plafonds suspendus en plaques minérales-ciment renforcées intern RITO-TO-KATO-KARI,Tubes,Abstract Material,Pipes & Fittings,m,58.63,57.5,80.6,57.5,2,EUR,67090.01,1166.6853,245,236,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Fixation des puits lors du forage rotatif avec des tuyaux à raccords soudés ME_MEKAKA_SALI,Charge de travail moyenne 5,Labor,Labor,heures,21.18,21.18,21.18,21.18,1,EUR,8291.18,391.4318,244,244,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" DXME-KASA-KAPU_KAKALI,"Ponts roulants électriques, capacité de charge 16 t",Equipment,General,Heures machine,21.15,21.15,21.15,21.15,1,EUR,1401.66,66.2596,242,242,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é KAME-LI-MESA-MEPU_KAMENETO,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 3,5 mm, longueur 30-35 mm",Material,General,kg,3.7,3.7,3.7,3.7,1,EUR,6.31,1.7018,242,242,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" DXME-MEVO-KAME_KAMERI,"Compresseurs à vis mobiles avec moteur électrique, pression jusqu'à 0,6 MPa (6 atm), débit jusqu'à 3,5 m3/min",Equipment,General,Heures machine,3.47,3.47,3.47,3.47,1,EUR,143.06,41.2632,242,242,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À PERFORATION DXME-MEVO-KAME_KAMERI,"Électricité : consommation 6,11 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.78,0.78,0.78,0.78,1,EUR,32.36,41.2632,242,242,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À PERFORATION DXME-KASA-KAPU_KAKALI,"Électricité : consommation 7,33 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.94,0.94,0.94,0.94,1,EUR,62.35,66.2596,242,242,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é ME_MEKAKA_SATO,"Classe de travail moyenne 5,3",Labor,Labor,heures,19.9,19.9,19.9,19.9,1,EUR,12688.37,637.5271,241,241,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS PRINCIPAUX DES CENTRALES THERMIQUES,"Installation de traverses, poutres, entretoises" MERI-RI-KATO-MEME_KAKASAPU,"Toiles en verre, densité 100 g/m², épaisseur 0,8 mm",Material,General,10 m2,13.44,13.44,13.44,13.44,1,EUR,1306.91,97.2692,241,241,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-MEKA-MEME_KASAME,Dispositifs pour réparer les bosses sur les tuyaux d'un diamètre de 600 à 1400 mm,Equipment,General,Heures machine,0.55,0.55,0.55,0.55,1,EUR,1.03,1.8512,240,240,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,Soudage de tuyaux de type LST-PAU KAME-LI-KADX-KARI_KAKATORI,Détonateurs électriques à action instantanée ZD-8-Zh,Material,General,1000 pièces,3059.51,3059.51,3059.51,3059.51,1,EUR,561.8,0.1839,240,240,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX DXME-KAPU-KAME_KAPURI,Marteaux de forage légers pour utilisation avec des stations de compression fixes,Equipment,General,Heures machine,4.26,4.26,4.26,4.26,1,EUR,194.66,45.7485,239,239,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-METO-KATO_KAVOME,Ateliers mobiles pour la réparation et la reconstruction des réseaux extérieurs sur la base d'un véhicule,Equipment,General,Heures machine,32.58,32.58,32.58,32.58,1,EUR,487.53,14.9651,237,237,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-RIKA-METO_KAKAME,"Stations de plongée sur bateau autopropulsé, puissance 110 kW (150 ch) avec compresseur",Equipment,General,Heures machine,55.96,55.96,55.96,55.96,1,EUR,1090.07,19.4803,236,236,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS MEME-ME-KARI-KALI_KAKAKARI,"Bois de conifères (pin, sapin), longueur jusqu'à 1,6 m",Material,General,m3,289.08,289.08,289.08,289.08,1,EUR,508.66,1.7596,236,236,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"FIXATIONS TEMPORAIRES DES RACCORDS DES TIGES VERTICALES AUX COURONNES, AUX CHAMB" DXME-RIKA-KATO_KAKAPU,"Remorqueurs diesel pour utilisation en eaux fermées, puissance 221 kW (300 ch)",Equipment,General,Heures machine,75.45,75.45,75.45,75.45,1,EUR,637.42,8.4477,235,235,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KADX-MEKA_KAPUME,Stabilisateurs de voie dynamiques,Equipment,General,Heures machine,244.99,244.99,244.99,244.99,1,EUR,207.53,0.8471,234,234,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" KASA-ME-KAME-METO,Dalles plates préfabriquées en béton armé,Abstract Material,General,m3,852.45,852.45,852.45,852.45,1,EUR,8923.93,10.4685,232,231,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,FONDATIONS POUR ÉQUIPEMENTS,Réalisation de fondations pour équipements de laminoirs à barres DXME-METO-KATO_MEMEME,"Véhicules spéciaux tout-terrain, capacité de charge jusqu'à 8 t",Equipment,General,Heures machine,40.99,40.99,40.99,40.99,1,EUR,539.05,13.1502,231,231,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,POSE SOUTERRAINE DE CONDUITES DXME-RIKA-METO_KAKARI,"Stations de plongée sur bateau autopropulsé avec compresseur pour travail en eaux fermées, puissance 110 kW (150 ch)",Equipment,General,Heures machine,86.73,86.73,86.73,86.73,1,EUR,1830.06,21.0998,231,231,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS DE QUAIS ET DE PILoniers MARITIMES,QUAIS ET PILOTIS EN MAÇONNERIE MASSIVE RITO-SA-KARI-KARI,Tubes en acier,Abstract Material,Pipes & Fittings,m,29.11,23.49,1321.57,23.49,2,EUR,4263.89,181.2196,231,231,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KATO-MEDX_MEKARI,Forets électriques pour travaux miniers,Equipment,General,Heures machine,0.29,0.29,0.29,0.29,1,EUR,14.19,48.3602,230,230,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" DXME-KATO-MEDX_MEKARI,"Électricité : consommation 0,46 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,2.87,48.3602,230,230,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" DXME-MEKA-KADX_KAMEME,"Installations pour essais hydrauliques de conduites, pression de refoulement basse 0,1 MPa (1 kgf/cm2), haute 10 MPa (100 kgf/cm2)",Equipment,General,Heures machine,0.52,0.52,0.52,0.52,1,EUR,2.97,5.7357,229,229,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" DXME-MEKA-KADX_KAMEME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.37,5.7357,229,229,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" RISA-ME-KAME-KASA_KAKAMEME,"Traverse en bois de conifères, imprégnée, pour voies ferrées à écartement large, type I",Material,General,pièce,95.71,95.71,95.71,95.71,1,EUR,42741.15,446.5676,228,228,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR KAME-LI-KANE-KALI_KAKAKARI,"Rubans de montage en plastique pour le cerclage des fils, fixés à l'aide de boutons en plastique, largeur 10 mm",Material,General,10 m,1.55,1.55,1.55,1.55,1,EUR,0.55,0.3535,228,228,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE CONVERSION KAME-LI-RIKA-KAPU_KAKAKASA,Fils à coudre renforcés,Material,General,kg,16.25,16.25,16.25,16.25,1,EUR,0.14,0.0277,228,228,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,DISPOSITIFS DE DÉMARRAGE ET DE RÉGULATION ME_MEKAKA_RINE,"Décharge moyenne 2,6",Labor,Labor,heures,14.15,14.15,14.15,14.15,1,EUR,1571.47,111.091,228,228,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-MELI-KAPU_KARIME,"Unités de soudage de tubes sur châssis de tracteur à chenilles avec groupe électrogène diesel, puissance 125 kW pour 6 postes de soudage (sans équipement de soudage)",Equipment,General,Heures machine,96.43,96.43,96.43,96.43,1,EUR,10565.63,109.5695,227,227,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUDAGE MÉCANISÉ (SEMI-AUTOMATIQUE) DES JOINTS DE TUBES SUR LA TRONÇONNEE DXME-KANE-KATO_KAPUSA,"Treuils manuels et à levier avec une force de traction de 14,72 kN (1,5 t)",Equipment,General,Heures machine,0.05,0.05,0.05,0.05,1,EUR,2.0,38.2197,227,227,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAVO-TO-KAVO-KARI_KAKAKAPU,"Cornière en acier laminée à chaud à ailes égales, marques d'acier St3sp, St3ps, largeur des ailes 180-200 mm, épaisseur des ailes 11-30 mm",Material,General,t,1550.3,1550.3,1550.3,1550.3,1,EUR,291.47,0.214,226,226,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Installation et démontage du coffrage glissant des tours de puits MEKA-RI-KARI-KAVO_KAKAKAME,"Fil de cuivre rond souple pour applications électrotechniques, diamètre 1,0-3,0 mm et plus",Material,General,t,34127.98,34127.98,34127.98,34127.98,1,EUR,33.46,0.0,226,226,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements d'une épaisseur de 10 mm à partir d'un mortier polymè DXME-RIME-KATO_SAKARI,"Appareils de sablage fonctionnant à partir d'installations de compression mobiles, volume jusqu'à 19 l, débit d'air 270-700 l/min",Equipment,General,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.77,22.597,225,225,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-TO-KAME-KAVO_KAKAKAME,Carburant diesel,Material,General,t,1439.03,1439.03,1439.03,1439.03,1,EUR,154.86,0.3805,224,224,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE RÉSEAUX THERMIQUES,Dispositif de canaux infranchissables DXME-KANE-KATO_KASAME,Treuils électriques à poulie 10 t,Equipment,General,Heures machine,32.86,32.86,32.86,32.86,1,EUR,827.39,25.1798,224,224,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de gigantesques réservoirs sur des sites de transport fluvial DXME-KANE-KATO_KASAME,"Électricité : consommation 0,92 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.12,0.12,0.12,0.12,1,EUR,2.96,25.1798,224,224,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de gigantesques réservoirs sur des sites de transport fluvial KALI-RI-KALI-MEME,Supports en acier,Abstract Material,General,t,3543.8,21.3,3948.89,3948.89,2,EUR,10120.36,11.8032,223,223,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE CONDUITES D'EAU ET DE CANALISATIONS,Installation d'une collerette en béton armé sur une canalisation KAME-TO-KAME-KANE_KAKAPUTO,Graisse plastique GOI-54p,Material,General,kg,19.82,19.82,19.82,19.82,1,EUR,1.54,0.0777,223,223,RÉNOVATION EN PROFONDEUR DES ÉQUIPEMENTS,Révision des raccords de tuyauterie,ROBINETTERIE À USAGE GÉNÉRAL,Raccords à bride avec ou sans commande manuelle pour conduites d'eau à une press RITO-SA-KAME-KAVO,Tubes en acier,Abstract Material,Pipes & Fittings,t,962.86,760.86,1122.5,1122.5,2,EUR,453005.8,595.3747,222,218,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KANE-KALI_KAKANE,"Palans électriques à usage général, capacité de charge 5 t",Equipment,General,Heures machine,0.47,0.47,0.47,0.47,1,EUR,7.0,14.8108,221,221,INSTALLATION DE L'ÉQUIPEMENT,Équipements pour le travail des métaux,ÉQUIPEMENT DE FONTE,LIGNES DE MOULAGE AUTOMATIQUES DXME-KANE-KALI_KAKANE,"Électricité : consommation 0,28 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.04,0.04,0.04,0.04,1,EUR,0.53,14.8108,221,221,INSTALLATION DE L'ÉQUIPEMENT,Équipements pour le travail des métaux,ÉQUIPEMENT DE FONTE,LIGNES DE MOULAGE AUTOMATIQUES KAME-LI-MELI-KANE_KAKADXRI,"Disque de coupe plat, dimensions 230 x 3 x 22 mm",Material,General,pièce,1.81,1.81,1.81,1.81,1,EUR,4.18,2.3075,219,219,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-RI-KAME-KARI_KAKATOME,"Bitume pétrolier isolant pour la construction BNI-IV-3, BNI-IV, BNI-V",Material,General,t,734.14,734.14,734.14,734.14,1,EUR,214.07,0.4064,219,219,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KALI-KAVO_KAMEME,"Électricité : consommation 5,94 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.76,0.76,0.76,0.76,1,EUR,15.2,19.925,219,219,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF DXME-KALI-KAVO_KAMEME,"Malaxeurs à argile, capacité 4 m3",Equipment,General,Heures machine,4.64,4.64,4.64,4.64,1,EUR,92.54,19.925,219,219,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF DXME-RIKA-METO_KAKATO,"Stations de plongée sur bateau automoteur avec compresseur pour travail en rade ouverte, puissance 110 kW (150 ch)",Equipment,General,Heures machine,166.01,166.01,166.01,166.01,1,EUR,3568.29,21.4939,218,218,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KADX-KATO_KATOPU,Plateformes à voie étroite,Equipment,General,Heures machine,4.2,4.2,4.2,4.2,1,EUR,355.68,84.6162,217,217,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS PU_MEKAKA_KALIVO,Personnel : 9 personnes-heures/machine-heures,Operator,Operators,Heures machine,69.79,52.85,118.91,52.85,3,EUR,273.49,3.4771,216,196,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS MEPU-SA-KANE-KATO_KAKAKARI,Pâte antiseptique,Material,General,t,3619.62,3619.62,3619.62,3619.62,1,EUR,42.98,0.0276,216,216,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS UTILISANT DES PLAQUES DE CIMENT-COPEAUX,CLOISONS SUR OSSATURE EN BOIS DXME-MESA-KATO_KAMEPU,"Tracteurs à roues pneumatiques, puissance 59 kW (80 ch)",Equipment,General,Heures machine,15.98,15.98,15.98,15.98,1,EUR,57.16,3.5759,215,215,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation d'une bordure en béton monolithique à l'aide d'une finisseuse à bét KAPU-TO-KAME-KADX_KAKAMESA,"Mortier prêt à l'emploi, ciment, M150",Material,General,m3,133.46,133.46,133.46,133.46,1,EUR,145.67,1.102,213,213,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale MEPU-SA-MEME-KAME_KAKAKAME,Mastic à base de colle,Material,General,t,1043.34,1043.34,1043.34,1043.34,1,EUR,16.26,0.0203,213,213,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS UTILISANT DES PLAQUES DE CIMENT-COPEAUX,CLOISONS SUR OSSATURE EN BOIS KAME-LI-MEME-KALI_KAMEVOSA,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés É60A, diamètre 4 mm",Material,General,t,4137.38,4137.38,4137.38,4137.38,1,EUR,1538.81,0.4194,212,212,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE MANUEL AVEC ÉLECTRODES À REVÊTEMENT DE BASE DXME-MELI-KATO_KAPUME,"Installations pour le chauffage de fûts métalliques d'une capacité de 200 l, puissance 3 kW",Equipment,General,Heures machine,0.32,0.32,0.32,0.32,1,EUR,6.83,21.1455,210,210,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de KAVO-TO-KAVO-KARI_KAKAPUSA,"Cornière en acier laminé à chaud à ailes égales, nuance d'acier St3sp, St3ps, largeur des ailes 63-100 mm, épaisseur des ailes 4-16 mm",Material,General,t,1419.89,1419.89,1419.89,1419.89,1,EUR,1104.18,1.1655,210,210,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de la dalle de fondation des bâtiments et structures des centrales DXME-MELI-KATO_KAPUME,"Électricité : consommation 0,99 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.13,0.13,0.13,0.13,1,EUR,2.69,21.1455,210,210,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de MEME-ME-KATO-KANE_KAKAVOTO,"Planches équarries de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 20-22 mm, classe III",Material,General,m3,358.2,358.2,358.2,358.2,1,EUR,242.63,0.746,209,209,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,TUNNELS ET CANALISATIONS,"Construction de murs, de fonds et de plafonds de tunnels et de canaux de passage" TO_PUKAKA_KAME,Technologue en chef,Material,General,personnes-heures,31.37,31.37,31.37,31.37,1,EUR,555.81,17.7199,209,209,TRAVAUX DE MISE EN SERVICE,Installations d'approvisionnement en eau et d'assainissement,INSTALLATIONS D'ALIMENTATION EN EAU,INSTALLATIONS DE PRÉLÈVEMENT D'EAU KATO-ME-KARI-KATO_KAKAMEPU,"Chaux chlorée, catégorie I",Material,General,t,1104.44,1104.44,1104.44,1104.44,1,EUR,87.41,0.1106,208,208,TRAVAUX DE CONSTRUCTION,Forages,INSTALLATION DE FILTRES ET POMPAGE DE L'EAU DU PUITS,Remplissage de gravier ou de sable dans l'espace intertubulaire KAME-LI-KADX-KAME,Ammonite n° 6 ZhV,Abstract Material,General,t,5860.6,5860.6,5860.6,5860.6,1,EUR,652.17,0.113,207,207,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS KAME-LI-KADX-KAME_KAKAMERI,"Ammonite de sécurité imperméable en cartouches T19, diamètre 36-37 mm",Material,General,t,1200.17,1200.17,1200.17,1200.17,1,EUR,113.62,0.0967,207,207,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI DXME-KAME-KASA_KAVOSA,"Pelles hydrauliques à godet unique diesel sur chenilles, volume du godet 0,5 m3",Equipment,General,Heures machine,35.35,35.35,35.35,35.35,1,EUR,1130.05,31.9654,206,206,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE KAME-LI-MESA-KARI_KAKASAME,Boulons d'ancrage,Material,General,t,2694.19,2694.19,2694.19,2694.19,1,EUR,70.35,0.054,206,206,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage RIPU-TO-KATO-METO,Tuyaux en polyéthylène,Abstract Material,General,m,70.35,57.5,278.1,57.5,2,EUR,14950.96,260.0365,206,206,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES EN PLASTIQUE DXME-KATO-MEME_KAKARI,Chariots auxiliaires de transfert,Equipment,General,Heures machine,0.06,0.06,0.06,0.06,1,EUR,3.6,57.535,206,206,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-KASA-KAPU_KAMERI,"Ponts roulants électriques, capacité de charge 100 t",Equipment,General,Heures machine,127.96,127.96,127.96,127.96,1,EUR,16887.48,131.9796,205,205,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES À PORTANT ET À CONSOLE À USAGE GÉNÉRAL DXME-KASA-KAPU_KAMERI,"Électricité : consommation 75,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,9.75,9.75,9.75,9.75,1,EUR,1286.63,131.9796,205,205,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES À PORTANT ET À CONSOLE À USAGE GÉNÉRAL DXME-KAPU-KAME_KATOME,"Machines de forage et grues sur châssis automobile, diamètre de forage jusqu'à 800 mm, profondeur de forage jusqu'à 5 m",Equipment,General,Heures machine,68.97,68.97,68.97,68.97,1,EUR,360.35,5.2247,204,204,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES KAME-LI-MESA-KASA_KAKAMERI,"Écrous hexagonaux en acier, diamètre du filetage M8 (M10)",Material,General,t,3724.75,3724.75,3724.75,3724.75,1,EUR,29.22,0.026,204,204,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire MEME-ME-KATO-KAME_KAKANEVO,"Bois équarri de conifères (épicéa, pin), humidité naturelle, longueur 2-6,5 m, largeur 100 mm et plus, épaisseur 100 mm et plus, classe IV",Material,General,m3,316.83,316.83,316.83,316.83,1,EUR,7.43,0.0421,203,203,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-LI-KALI-MERI_KAKARIPU,"Film polyéthylène, épaisseur 0,15 mm",Material,General,m2,0.37,0.37,0.37,0.37,1,EUR,37.52,100.4276,203,203,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,FONDATIONS DE BÂTIMENTS ET D'OUVRAGES,Réalisation d'une préparation en béton et de fondations à usage général MEKA-TO-KARI-KATO_KAKAMETO,"Soudures sans antimoine à base d'étain et de plomb, marque POS61",Material,General,kg,55.85,55.85,55.85,55.85,1,EUR,12.07,0.2564,203,203,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,TÉLÉPHÉRIQUES,"VOIES DE ROULEMENT À DOUBLE CANAL SUSPENDUES, À ANNEAUX ET À PENDULES" DXME-KAVO-KATO_KAKANE,"Rouleaux tractés pneumatiques statiques, poids 12,5 t",Equipment,General,Heures machine,7.18,7.18,7.18,7.18,1,EUR,4.34,0.6046,202,202,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D KAME-LI-KADX-KATO_KAKAMEME,Cordon détonant,Material,General,1000 m,391.25,391.25,391.25,391.25,1,EUR,44.17,0.1227,202,202,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI DXME-KASA-METO_KAKAME,"Camions à plateau, capacité de charge jusqu'à 6 t, avec grue-manipulateur, capacité de charge 4 t",Equipment,General,Heures machine,26.88,26.88,26.88,26.88,1,EUR,107.74,4.0282,201,201,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-PU-KARI-KATO,Armatures,Abstract Material,General,t,1970.89,1970.89,1970.89,1970.89,1,EUR,1869.09,1.2003,200,200,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KADX-KADX_KAKAME,"Électricité : consommation 11,31 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.45,1.45,1.45,1.45,1,EUR,19.4,13.3604,199,199,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-KADX_KAKAME,"Grues à portique à deux consoles pour le travail dans les bases d'assemblage de maillons, 10 t",Equipment,General,Heures machine,35.32,35.32,35.32,35.32,1,EUR,471.83,13.3604,199,199,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE ME_MEKAKA_RIPU,"Décharge moyenne 2,4",Labor,Labor,heures,13.9,13.9,13.9,13.9,1,EUR,1943.27,139.8074,198,198,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI DXME-KADX-KATO_KATOLI,Plateformes à voie large avec convoyeur à rouleaux,Equipment,General,Heures machine,9.23,9.23,9.23,9.23,1,EUR,618.53,66.9797,198,198,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES ME_MEKAKA_RIRI,Charge de travail moyenne 2,Labor,Labor,heures,13.65,13.65,13.65,13.65,1,EUR,1101.34,80.6629,196,196,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-RI-KATO-KARI_KAKAMEME,"Apprêt bitume-polymère anticorrosion pour la protection des conduites en acier sous bandes isolantes avec couche adhésive à base de caoutchouc, consommation 0,12 l/m2",Material,General,t,3664.6,3664.6,3664.6,3664.6,1,EUR,36.05,0.0196,196,196,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE DXME-KALI-KAVO_KARIME,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,0.92,5.2497,195,195,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Silicatisation et résinisation KAME-LI-MEDX-KAPU_KAKARIPU,"Plaques techniques en caoutchouc TMKSh, épaisseur 2-40 mm",Material,General,kg,2.63,2.63,2.63,2.63,1,EUR,100.1,38.0469,195,195,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes en acier inoxydable à tr KAME-TO-KASA-MEKA_KAKAKAME,Graphite broyé,Material,General,t,2253.38,2253.38,2253.38,2253.38,1,EUR,9.9,0.1217,195,195,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements d'une épaisseur de 10 mm à partir d'un mortier polymè KAME-RI-KATO-KARI_KAKAMERI,"Apprêt bitume-polymère hydrofuge, anticorrosion, pour la protection des structures métalliques, consommation 0,3 kg/m2",Material,Steel & Metal,t,3664.6,3664.6,3664.6,3664.6,1,EUR,308.67,0.1374,195,195,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX DXME-KALI-KAVO_KARIME,"Mélangeurs de mortier fixes pour la préparation de mortiers à base de ciment et d'eau et d'autres mortiers, capacité 350 l",Equipment,General,Heures machine,0.74,0.74,0.74,0.74,1,EUR,3.88,5.2497,195,195,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Silicatisation et résinisation KAVO-ME-KARI-RISA,Éléments de fixation pour la fixation de planchers profilés à des structures porteuses,Abstract Material,Steel & Metal,t,2247.44,3.12,2408.63,2408.63,2,EUR,350.32,1.7624,194,194,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,STRUCTURES DE PROTECTION DE TOITURE KAVO-ME-KARI-MELI,Treillis d'armature,Abstract Material,General,t,4.36,4.11,6.94,4.11,2,EUR,314.76,76.3893,193,193,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Grenaillage de la surface en béton DXME-KAVO-KALI_KAMESA,"Distributeurs de gravats et de gravier montés sur benne basculante, largeur de distribution 3000 mm",Equipment,General,Heures machine,59.12,59.12,59.12,59.12,1,EUR,45.05,0.762,193,193,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B DXME-KALI-KAVO_KARIPU,"Mélangeurs de mortier mobiles, capacité du tambour 65 l",Equipment,General,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.47,3.6051,192,192,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Réalisation d'une isolation latérale des murs et des fondations à l'aide de méla RISA-RI-KAME-KAME_KAKAKAME,Étiquettes de marquage A671,Material,General,100 pièces,16.37,16.37,16.37,16.37,1,EUR,6.55,0.3995,192,192,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-MESA-KATO_KAMERI,"Tracteurs à roues pneumatiques, puissance 29 kW (40 ch)",Equipment,General,Heures machine,8.25,8.25,8.25,8.25,1,EUR,6.42,0.7783,191,191,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B KAPU-ME-KARI-KARI,Mélanges de béton lourd (BST) pour ouvrages hydrauliques,Abstract Material,General,m3,157.95,157.95,157.95,157.95,1,EUR,10643.82,67.3878,191,191,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE KAME-ME-KARI-MEKA_MEKARIRI,"Chrysotile (amiante chrysotile), groupe 6K, marques 6K-45, 6K-30, 6K-20, 6K-5",Material,General,t,550.07,550.07,550.07,550.07,1,EUR,92.81,0.2531,191,191,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Réalisation d'un joint de dilatation pour fondations sous équipement avec rempli KAME-TO-KAPU-KAVO_KAKAMETO,Huile de houille pour l'imprégnation du bois,Material,General,t,997.24,997.24,997.24,997.24,1,EUR,25.36,0.034,191,191,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" KAME-LI-MERI-KASA_KAKASATO,"Géotextile non tissé en polyester, aiguilleté, densité superficielle 200 g/m2",Material,General,m2,0.96,0.96,0.96,0.96,1,EUR,31.86,33.2495,188,188,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,FONDATIONS DE BÂTIMENTS ET D'OUVRAGES,Réalisation de fondations en béton et en béton armé à l'aide d'une pompe à béton MEME-ME-KATO-KANE_KAKALINE,"Planches de bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 30-40 mm, classe IV",Material,General,m3,358.2,358.2,358.2,358.2,1,EUR,215.3,0.6109,187,187,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-MEDX-KAVO_KAKADX,"Électricité : consommation 2,64 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.34,0.34,0.34,0.34,1,EUR,5.46,16.0993,187,187,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF DXME-MELI-KATO_KAMEME,"Chauffages à induction diesel, puissance du générateur 130 kW, puissance du moteur 140 kW (190 ch)",Equipment,General,Heures machine,44.82,44.82,44.82,44.82,1,EUR,200.54,4.4749,187,187,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUDAGE MÉCANISÉ (SEMI-AUTOMATIQUE) DES JOINTS DE TUBES SUR LA TRONÇONNEE DXME-MEDX-KAVO_KAKADX,"Pompes, débit 50 m3/h, pression 32 m, puissance 8 kW",Equipment,General,Heures machine,1.16,1.16,1.16,1.16,1,EUR,18.64,16.0993,187,187,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF ME_MEKAKA_SAPU,"Classe de travail moyenne 5,4",Labor,Labor,heures,20.22,20.22,20.22,20.22,1,EUR,6682.9,330.4722,186,186,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS,Déblayage et déplacement de terre à l'aide de décapeuses automotrices sur une di KAPU-TO-KAME-KADX_KAKAMENE,"Mortier prêt à l'emploi pour maçonnerie, ciment, M200",Material,General,m3,136.34,136.34,136.34,136.34,1,EUR,115.4,0.9365,186,186,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KADX-MEKA_KATOME,Redresseurs hydrauliques,Equipment,General,Heures machine,0.15,0.15,0.15,0.15,1,EUR,1.16,7.8508,186,186,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE MEPU-SA-KADX-KALI_KAKARIRI,Solvant n° 646,Material,General,t,2569.58,2569.58,2569.58,2569.58,1,EUR,31.47,0.0294,185,185,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR RIRI-RI-KARI-KARI_KAKAKAME,"Manchons isolants en polyéthylène, diamètre du conducteur de 1,05 à 1,2 mm, longueur 70 mm, diamètre 7 mm",Material,General,100 pièces,1.59,1.59,1.59,1.59,1,EUR,1.24,0.7808,183,183,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE DXME-MESA-KARI_KAMESA,"Tracteurs à chenilles, puissance 244 kW (330 ch)",Equipment,General,Heures machine,97.31,97.31,97.31,97.31,1,EUR,1844.38,18.9531,183,183,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS DXME-MESA-KATO_KAMESA,"Tracteurs à roues pneumatiques, puissance 158 kW (215 ch)",Equipment,General,Heures machine,40.59,40.59,40.59,40.59,1,EUR,579.29,14.272,182,182,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-RIKA-KAME_KAKAME,"Groupes électrogènes mobiles pour le soudage et le découpage sous-marins des métaux, équipés d'un générateur diesel",Equipment,General,Heures machine,8.45,8.45,8.45,8.45,1,EUR,80.76,9.5609,181,181,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Recouvrement des joints verticaux entre les éléments préfabriqués en béton armé DXME-MESA-KARI_KARIDX,Tracteurs sur chenilles avec treuil 132 kW (180 ch),Equipment,General,Heures machine,45.5,45.5,45.5,45.5,1,EUR,1079.8,23.7313,181,181,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KALI-RI-KALI-MERI,Structures en acier à profil unique,Abstract Material,Steel & Metal,t,4808.4,4808.4,4808.4,4808.4,1,EUR,4420.76,0.9194,180,180,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS PRINCIPAUX DES CENTRALES THERMIQUES,Installation de structures de sols de condensation et de cendres DXME-KADX-KARI_KAKADX,"Wagons basculants, capacité 3,3 m3",Equipment,General,Heures machine,0.51,0.51,0.51,0.51,1,EUR,8.6,16.772,180,180,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,PASSAGE DES PUITS INCLINÉS DXME-MEVO-KAME_KAKAVO,"Compresseurs à vis mobiles avec moteur à combustion interne, pression jusqu'à 0,7 MPa (7 atm), débit jusqu'à 12 m3/min",Equipment,General,Heures machine,21.98,21.98,21.98,21.98,1,EUR,373.9,17.0134,180,180,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À PERFORATION DXME-KATO-KANE_KATOPU,"Machines de chargement électriques sur chenilles pour travaux horizontaux avec organe de travail « pattes racleuses » d'une capacité de 2,5 m3/min",Equipment,General,Heures machine,78.68,78.68,78.68,78.68,1,EUR,510.39,6.4869,178,178,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" DXME-RIME-MEDX_KARILI,"Électricité : consommation 0,96 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.12,0.12,0.12,0.12,1,EUR,15.02,114.5628,178,178,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en dalles de marbre et de granit DXME-RIME-MEDX_KARILI,Machines universelles pour la taille de pierre,Equipment,General,Heures machine,0.71,0.71,0.71,0.71,1,EUR,81.38,114.5628,178,178,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en dalles de marbre et de granit DXME-KATO-KANE_KATOPU,"Électricité : consommation 22,11 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.84,2.84,2.84,2.84,1,EUR,18.42,6.4869,178,178,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" KAME-TO-KAPU-KALI_KAKAKAME,Huile pour turbines,Material,General,kg,1.8,1.8,1.8,1.8,1,EUR,86.66,48.0174,177,177,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES MEME-ME-KARI-KAME_KAKATOME,"Bois rond de feuillus non écorcé, longueur 3-6,5 m, diamètre 14-24 cm, classe II-III",Material,General,m3,391.17,391.17,391.17,391.17,1,EUR,674.12,2.5917,176,176,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE KALI-RI-KALI-MEME_KAKAKARI,"Support fixe en acier pour tuyauteries, fabriqué à partir de profilés laminés à chaud",Material,General,t,3948.89,3948.89,3948.89,3948.89,1,EUR,1916.56,0.4855,176,176,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de canalisations d'alimentation en eau et de chauffage à partir de tuyaux e RISA-RI-KAME-KAME_KAKAMEPU,Étiquettes de marquage en plastique pour câbles U136,Material,General,100 pièces,5.88,5.88,5.88,5.88,1,EUR,13.51,2.2956,176,176,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,COMMUNICATIONS TÉLÉPHONIQUES OPÉRATIONNELLES DXDXDX_DXDXKAME,MATÉRIAUX (voir annexe),Material,General,,0.0,0.0,0.0,0.0,0,EUR,0.0,0.0,175,175,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF KAME-LI-KALI-MERI_KAKARIRI,"Film polyéthylène, épaisseur 0,2-0,5 mm",Material,General,m2,0.43,0.43,0.43,0.43,1,EUR,16.2,37.3734,175,175,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é MEME-ME-KATO-KANE_KAKALIPU,"Planches équarries de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 30-40 mm, classe II",Material,General,m3,367.01,367.01,367.01,367.01,1,EUR,403.5,1.1837,175,175,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KALI-KARI_KAMEME,"Pompes à béton automotrices, débit 65 m3/h",Equipment,General,Heures machine,85.76,85.76,85.76,85.76,1,EUR,1239.56,14.4545,175,175,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-PU-KAME-KANE_KAKAMETO,"Couronne de forage, type BU-52S",Material,General,pièce,12.93,12.93,12.93,12.93,1,EUR,286.56,22.1558,174,174,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DE PUITS VERTICAUX, DE PUITS DE FORAGE ET DE LEURS EMBRANCHEMENTS" DXME-KAVO-KASA_KAVOME,"Pompes à béton pneumatiques, volume du réservoir jusqu'à 1,5 m3",Equipment,General,Heures machine,4.23,4.23,4.23,4.23,1,EUR,192.81,45.6228,174,174,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-KAVO-KASA_KAVOME,"Électricité : consommation 8,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.06,1.06,1.06,1.06,1,EUR,48.35,45.6228,174,174,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION MEME-ME-KATO-KANE_KAKALIKA,"Planches de bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 25 mm, classe II",Material,General,m3,367.01,367.01,367.01,367.01,1,EUR,238.62,0.6656,173,173,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-MENE-KAME_KAKATO,"Centrales électriques mobiles, puissance 30 kW",Equipment,General,Heures machine,13.52,13.52,13.52,13.52,1,EUR,814.46,60.2308,173,173,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-KAME-KAME_KAPUNE,"Bulldozers, puissance 303 kW (410 ch)",Equipment,Bulldozers,Heures machine,143.68,143.68,143.68,143.68,1,EUR,5523.33,38.4427,171,171,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI DXME-KAVO-KATO_KAKATO,"Rouleaux statiques à cames remorqués, poids 8 t",Equipment,General,Heures machine,12.64,12.64,12.64,12.64,1,EUR,11.46,0.9068,170,170,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL DXME-MEVO-KAME_KAMEME,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,2.57,15.0786,169,169,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Tête de colonne de gel DXME-KAME-KATO_KATORI,"Racleurs automoteurs, capacité géométrique du godet 8,0 m3",Equipment,General,Heures machine,78.54,78.54,78.54,78.54,1,EUR,228.37,2.9079,169,169,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS DXME-MEVO-KAME_KAMEME,"Compresseurs à piston mobiles avec moteur électrique, pression jusqu'à 0,6 MPa (6 atm), débit jusqu'à 0,83 m3/min",Equipment,General,Heures machine,0.42,0.42,0.42,0.42,1,EUR,6.37,15.0786,169,169,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Tête de colonne de gel DXME-RIKA-MEKA_KAKAPU,"Plates-formes flottantes démontables, capacité de charge 29 t",Equipment,General,Heures machine,133.28,133.28,133.28,133.28,1,EUR,3032.7,22.754,168,168,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS KAVO-ME-KARI-MELI_KAKAPUME,"Treillis métallique simple en fil de fer galvanisé à mailles carrées, diamètre du fil 3 mm, taille des mailles 50 x 50 mm",Material,General,m2,6.59,6.59,6.59,6.59,1,EUR,174.43,26.6107,167,167,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES STRUCTURES MÉTALLIQUES KAME-TO-KAPU-KAVO_KAKAMERI,Huile anthracénique,Material,General,t,685.28,685.28,685.28,685.28,1,EUR,44.45,0.087,167,167,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage KAME-LI-RIKA-KAVO_KAMEKARI,"Mitkal brut, largeur 920 mm, densité superficielle 70 g/m2",Material,General,10 m,7.61,7.61,7.61,7.61,1,EUR,8.59,1.1274,167,167,TRAVAUX DE CONSTRUCTION,Structures en bois,CLOISONS REVÊTUES DE PLAQUES DE PLÂTRE OU DE PLAQUES DE FIBRE DE PLÂTRE,CLOISONS SUR OSSATURE EN BOIS KAVO-TO-KATO-KAPU_KAKAMEPU,"Fil métallique clair, diamètre 3,0 mm",Material,General,t,2055.38,2055.38,2055.38,2055.38,1,EUR,115.48,0.1227,166,166,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE TRANSPORT À ACTION CONTINUE,CONVOYEURS SPÉCIAUX KAME-LI-MEKA-KATO,Blocs de calcaire,Abstract Material,General,m3,1964.35,1964.35,1964.35,1964.35,1,EUR,179483.1,91.3702,166,166,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,Maçonnerie en gros blocs de calcaire RITO-ME-KARI-KALI,Fixations pour tuyauteries,Abstract Material,General,kg,35.56,35.56,35.56,35.56,1,EUR,1358.16,38.19,166,166,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KAME-LI-MEME-KALI_KAKATONE,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés É46, diamètre 4 mm",Material,General,kg,4.0,4.0,4.0,4.0,1,EUR,73.1,18.2899,165,165,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL KATO-ME-KARI-KATO_KAKAMESA,"Chaux vive chlorée pour la construction, marque A",Material,General,kg,2.44,2.44,2.44,2.44,1,EUR,0.28,0.1457,164,164,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN FONTE,Pose de tuyaux en fonte à embouts évasés dans des tranchées KAME-LI-MEDX-KAPU_KAKAPUKA,"Plaques en caoutchouc 1F-I-MBS-M, épaisseur 1-20 mm",Material,General,kg,36.47,36.47,36.47,36.47,1,EUR,133.57,4.1457,163,163,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) KAME-TO-KARI-KATO_KAKAMERI,"Acétylène dissous technique, marque B",Material,General,t,18606.45,18606.45,18606.45,18606.45,1,EUR,240.6,0.0597,163,163,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE PU_MEKAKA_KARIKA,Personnel : 1 personne-heure/machine-heure,Operator,Operators,Heures machine,7.12,7.12,7.12,7.12,1,EUR,179.45,25.2202,163,162,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-KALI-MESA,Dépoussiéreur,Abstract Material,General,t,2399.85,2399.85,2399.85,2399.85,1,EUR,2049.35,0.854,162,162,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B DXME-KATO-MESA_KAKAME,Installations de forage pneumatiques sur chenilles pour une section de 8 à 25 m² lors de travaux dans des galeries horizontales et inclinées à partir de stations de compression fixes,Equipment,General,Heures machine,44.13,44.13,44.13,44.13,1,EUR,1168.1,26.4672,162,162,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-TO-KATO-KANE_KAKAKATO,Acide chlorhydrique technique,Material,Chemicals,kg,1.61,1.61,1.61,1.61,1,EUR,93.34,58.5792,162,162,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,"Découpe des joints du revêtement avec un mastic chimiquement résistant, thermoco" DXME-KAME-KASA_KAVODX,"Pelles hydrauliques à godet unique diesel sur chenilles, volume du godet 1,25 m3",Equipment,General,Heures machine,51.14,51.14,51.14,51.14,1,EUR,1756.09,34.3395,161,161,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE KAME-PU-KATO-KAME,Poudres de bentonite,Abstract Material,General,t,475.46,378.12,538.03,538.03,2,EUR,40804.86,84.6203,161,161,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE RIRI-RI-KARI-KASA_KAKAKAME,"Anneaux-blocs ouverts pour fils de 4,0 à 5,0 mm de diamètre",Material,General,1000 pièces,210.87,210.87,210.87,210.87,1,EUR,9.65,0.0516,160,160,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE KAME-LI-KALI-RIPU,"Film radiographique en feuilles, dimensions 300 x 400 mm",Abstract Material,General,m2,187.53,182.61,204.47,182.61,2,EUR,2859.18,15.653,160,160,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" KALI-RI-KALI-KARI_KAKAKAME,Conducteur métallique d'inventaire,Material,General,pièce,2252.7,2252.7,2252.7,2252.7,1,EUR,4.12,0.01,159,159,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KANE-KASA_KASATO,"Chargeuses frontales universelles à godet unique sur chenilles, capacité du godet 0,6 m3, capacité de charge 2 t",Equipment,General,Heures machine,35.21,35.21,35.21,35.21,1,EUR,15.71,0.4463,159,159,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B KAME-LI-KALI-KADX_KAKAPUTO,"Garnitures de presse-étoupe en coton imprégnées, marque KhBP",Material,General,kg,10.13,10.13,10.13,10.13,1,EUR,13.58,1.3407,159,159,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES DXME-KADX-KARI_KAKARI,"Chariots basculants, capacité 1,4 m3",Equipment,General,Heures machine,0.2,0.2,0.2,0.2,1,EUR,40.61,199.0448,159,159,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-LI-KASA-KADX_KAKAKATO,"Feuille de textolite A, épaisseur de 2,2 à 4,5 mm",Material,General,kg,10.0,10.0,10.0,10.0,1,EUR,31.02,3.1026,159,159,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",TRANSMETTEURS D'UNE PUISSANCE JUSQU'À 2000 kW KAME-LI-MEME-KAPU_KAKASASA,"Fil à souder SV-08XMFA, diamètre 2 mm",Material,General,kg,7.25,7.25,7.25,7.25,1,EUR,0.47,0.0773,159,159,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES DXME-MENE-KAME_KAKAME,"Centrales électriques mobiles, puissance 2 kW",Equipment,General,Heures machine,2.08,2.08,2.08,2.08,1,EUR,12.2,5.8621,159,159,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,COUVERTURE DE LA ZONE D'EXPLOSION POUR LA PROTECTION DES INSTALLATIONS MEPU-SA-KASA-KAME_KAKAMEME,Huile combinée pour travaux de finition à l'intérieur,Material,General,t,2062.04,2062.04,2062.04,2062.04,1,EUR,8.18,0.0164,159,159,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment DXME-KANE-KATO_KAPUDX,"Treuils manuels et à levier avec une force de traction jusqu'à 9,81 kN (1 t)",Equipment,General,Heures machine,0.05,0.05,0.05,0.05,1,EUR,1.98,43.2396,159,159,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu DXME-KANE-KATO_KASALI,"Treuils électriques avec une force de traction de 122,62 kN (12,5 t)",Equipment,General,Heures machine,1.78,1.78,1.78,1.78,1,EUR,146.58,82.3373,158,158,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-KANE-KATO_KASALI,"Électricité : consommation 0,53 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.07,0.07,0.07,0.07,1,EUR,5.66,82.3373,158,158,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de MEVO-ME-MEKA-KAME,Vannes à bride,Abstract Material,General,pièce,119.25,119.25,119.25,119.25,1,EUR,6022.37,50.5,158,150,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,CONDUITES DANS LES CANALISATIONS ET EN SURFACE DXME-KATO-KANE_KARIME,"Machines de chargement sur rails à roues pour les galeries horizontales d'une section maximale de 8 m2, pneumatiques lorsqu'elles fonctionnent à partir de stations de compression fixes",Equipment,General,Heures machine,28.91,28.91,28.91,28.91,1,EUR,590.94,20.439,158,158,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES KAVO-TO-KAME-KARI_KAKARIVO,"Poutrelles à ailes parallèles, nuance d'acier St3sp, St3ps, n° 20B-60B",Material,General,t,2629.72,2629.72,2629.72,2629.72,1,EUR,940.39,0.4385,157,157,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RISA-ME-KASA-KAME_KAKAKAPU,"Cale de rail à double tête, type 1R50",Material,General,pièce,118.22,118.22,118.22,118.22,1,EUR,6432.88,55.4832,156,156,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR DXME-KADX-MEPU_KALIME,"Composés pour broyeurs, capacité jusqu'à 240 m3",Equipment,General,Heures machine,210.92,210.92,210.92,210.92,1,EUR,2741.25,12.9967,156,156,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES MAILLONS DE LA GRILLE DE RAYONS DXME-KALI-MEKA_KAMEME,"Pompes à mortier avec moteur électrique, débit 4 m3/h, portée horizontale 200 m, portée verticale 60 m",Equipment,General,Heures machine,1.06,1.06,1.06,1.06,1,EUR,35.69,33.7525,155,155,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,CONSTRUCTIONS DE LOCAUX SOUTERRAINS DXME-KALI-MEKA_KAMEME,"Électricité : consommation 2,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,10.73,33.7525,155,155,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,CONSTRUCTIONS DE LOCAUX SOUTERRAINS RISA-ME-KAPU-KAPU_KAKAKATO,"Boulons de voie pour la fixation des rails, diamètre M27, longueur 160 mm, 180 mm, avec écrou de diamètre M27",Material,General,t,3829.44,3829.44,3829.44,3829.44,1,EUR,1150.3,0.3723,155,155,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KAVO-TO-KASA-KASA_KAKATOME,"Tôle de toiture en acier, marque STK-1, épaisseur 0,5 mm",Material,General,t,1597.85,1597.85,1597.85,1597.85,1,EUR,297.17,0.2572,154,154,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" DXME-MEPU-KATO_KAKAME,"Camions à benne basculante, capacité de charge jusqu'à 7 t",Equipment,General,Heures machine,20.81,20.81,20.81,20.81,1,EUR,199.91,9.6073,154,154,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE ME_MEKAKA_RIME,Charge de travail moyenne 2,Labor,Labor,heures,13.53,13.53,13.53,13.53,1,EUR,1706.36,126.1103,153,153,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE MEPU-PU-KATO-KATO_KAKAKARI,Vernis bitumineux BT-123,Material,General,t,2881.2,2881.2,2881.2,2881.2,1,EUR,40.98,0.0507,152,152,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,"Renforcement de la maçonnerie des murs, fixation des voûtes, installation de gri" DXME-KALI-KALI_KAPUME,"Pompes à mortier, débit 1 m3/h",Equipment,General,Heures machine,0.4,0.4,0.4,0.4,1,EUR,1.85,4.5111,152,152,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Réalisation d'une isolation hydrofuge par enduit à l'aide d'un procédé mécanisé DXME-KALI-KALI_KAPUME,"Électricité : consommation 0,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.29,4.5111,152,152,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Réalisation d'une isolation hydrofuge par enduit à l'aide d'un procédé mécanisé RIME-ME-KASA-KATO_KAKAMEME,"Câble électrique de mine avec conducteurs en cuivre KGEZ 3x4+1x2,5-1140",Material,General,1000 m,11958.98,11958.98,11958.98,11958.98,1,EUR,1300.22,0.1095,152,152,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DE PUITS VERTICAUX, DE PUITS DE FORAGE ET DE LEURS EMBRANCHEMENTS" KAME-LI-RIKA-KAVO_KAKATOME,"Toile de coton brute, largeur 1640 mm, densité superficielle 125 g/m2",Material,General,10 m2,15.88,15.88,15.88,15.88,1,EUR,18.23,1.1637,152,152,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KASA-KAME_KAMESA,"Électricité : consommation 13,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.73,1.73,1.73,1.73,1,EUR,33.47,19.3358,152,152,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"TRÉPIDES, SILOS, DÉCOMPOSEURS, ÉPAISSISSEURS" DXME-KASA-KAME_KAMESA,"Grues à tour, capacité de charge 50 t",Equipment,General,Heures machine,95.34,95.34,95.34,95.34,1,EUR,1843.56,19.3358,152,152,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"TRÉPIDES, SILOS, DÉCOMPOSEURS, ÉPAISSISSEURS" RINE-ME-KAME-KARI,Kit de boulons pour tunnels,Abstract Material,General,compl,13.04,7.36,14.43,14.43,3,EUR,836.56,58.0117,151,139,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-MEDX-KANE_KAMEME,"Électricité : consommation 18,15 kWh/machine-heure",Electricity,Electricity,Heures machine,2.33,2.33,2.33,2.33,1,EUR,5.12,2.1947,151,151,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-ME-KARI-KADX_KAKARIME,"Tissu en amiante avec fibre de verre AST-1, épaisseur 1,8 mm",Material,General,t,15759.84,15759.84,15759.84,15759.84,1,EUR,115.66,0.0154,151,151,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES DXME-KANE-KASA_KAMELI,"Chariots élévateurs à fourche, capacité de charge 10 t",Equipment,General,Heures machine,34.72,34.72,34.72,34.72,1,EUR,31.96,0.9204,151,151,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE TRANSPORT À ACTION CONTINUE,CONVOYEURS À BANDE DXME-MEDX-KANE_KAMEME,"Pompes à boue, débit 23,4-65,3 m3/h, pression de refoulement 15,7-5,88 MPa (160-60 kgf/cm2)",Equipment,General,Heures machine,11.18,11.18,11.18,11.18,1,EUR,24.53,2.1947,151,151,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KAME-KASA_KAVOLI,"Pelles hydrauliques à godet unique diesel sur chenilles, volume du godet 1,0 m3",Equipment,General,Heures machine,42.53,42.53,42.53,42.53,1,EUR,2254.73,53.0137,151,151,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE KAME-LI-KARI-KAPU_KAKAKAME,"Papier isolant pour câbles, double couche",Material,General,kg,5.26,5.26,5.26,5.26,1,EUR,0.43,0.0825,150,150,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE DXME-KATO-KANE_KATOSA,"Électricité : consommation 25,91 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.33,3.33,3.33,3.33,1,EUR,49.73,14.9457,150,150,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS KAPU-TO-KAME-MERI,Mortiers ciment-chaux,Abstract Material,General,m3,130.46,130.46,130.46,130.46,1,EUR,77.91,0.5968,150,150,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,Maçonnerie de murs en briques DXME-KATO-KANE_KATOSA,Machines de chargement électriques sur chenilles pour les galeries horizontales avec un organe de travail « pattes racleuses » d'une capacité de 3 m3/min,Equipment,General,Heures machine,100.94,100.94,100.94,100.94,1,EUR,1508.66,14.9457,150,150,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-KAPU-KAME_KALIVO,"Installations de forage sur châssis automobile pour le forage rotatif de puits, profondeur de forage jusqu'à 500 m, capacité de levage du treuil jusqu'à 12,5 t",Equipment,General,Heures machine,71.5,71.5,71.5,71.5,1,EUR,6225.0,87.0691,148,148,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF DXME-MEKA-MEME_KALIME,Machines portatives pour la coupe de tuyaux,Equipment,General,Heures machine,0.54,0.54,0.54,0.54,1,EUR,1.18,2.1902,148,148,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,POSE DE CONDUITES EN SURFACE DANS DES CONDITIONS NORMALES,TRAVAUX D'ASSEMBLAGE ET DE SOUDAGE LORS DE LA POSE DE TUBES DANS UNE ISOLATION E KAVO-TO-KATO-KAPU_KAKAPUTO,"Fil métallique noir, diamètre 1,0-1,1 mm",Material,General,t,2308.38,2308.38,2308.38,2308.38,1,EUR,6.62,0.0162,148,148,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Maçonnerie des poêles et des foyers MEME-ME-KATO-KANE_KAKAVOKA,"Planches de bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 44-50 mm, classe IV",Material,General,m3,358.2,358.2,358.2,358.2,1,EUR,602.26,1.7164,147,147,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Installation d'un puits de forage PU_MEKAKA_KANERI,Personnel : 5 personnes-heures/machine-heures,Operator,Operators,Heures machine,127.65,59.53,250.04,130.97,5,EUR,187.77,2.64,147,136,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KADX-KALI_KAMEME,Machines pour le ballastage des voies ferrées,Equipment,General,Heures machine,360.04,360.04,360.04,360.04,1,EUR,358.69,0.9963,147,147,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR DXME-RIKA-KADX_KAKASA,"Grues flottantes pour le travail en eaux fermées, automotrices, 16 t",Equipment,General,Heures machine,325.76,325.76,325.76,325.76,1,EUR,4870.56,14.9514,146,146,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS RIPU-TO-KASA-KALI,Manchons en polyéthylène avec éléments chauffants électriques intégrés,Abstract Material,General,pièce,11.11,11.11,11.11,11.11,1,EUR,345.77,31.1339,145,145,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE KAPU-TO-KAME-KATO_KAKAKAME,Mortier en chrysotile-ciment,Material,General,m3,92.97,92.97,92.97,92.97,1,EUR,12.28,0.1669,145,145,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT DXME-RIME-RIRI_PUDXME,Cintreuses hydrauliques universelles,Equipment,General,Heures machine,0.88,0.88,0.88,0.88,1,EUR,22.5,25.4642,144,144,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé DXME-RIME-RIRI_PUDXME,"Électricité : consommation 0,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.81,25.4642,144,144,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé RISA-ME-KATO-KANE_KAKATORI,"Rondelles à ressort à une spire, version 1, diamètre du trou M24",Material,General,t,4796.88,4796.88,4796.88,4796.88,1,EUR,54.83,0.0263,144,144,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR DXME-KATO-KANE_KATOME,"Électricité : consommation 11,06 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.42,1.42,1.42,1.42,1,EUR,28.56,20.1127,144,144,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" KAME-ME-KARI-KAVO_KAKAKAME,"Joints en paronite PMB, épaisseur 1 mm, diamètre 50 mm",Material,General,1000 pièces,178.96,178.96,178.96,178.96,1,EUR,2.29,0.0359,144,144,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KATO-KANE_KATOME,"Machines de chargement électriques pour galeries inclinées avec organe de travail « pattes racleuses » d'une capacité de 2,2 m3/min",Equipment,General,Heures machine,90.06,90.06,90.06,90.06,1,EUR,1811.26,20.1127,144,144,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" DXME-RIKA-KADX_KAKADX,"Grues flottantes pour le travail en rade ouverte, automotrices, 16 t",Equipment,General,Heures machine,577.45,577.45,577.45,577.45,1,EUR,8798.46,15.2367,143,143,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-MEKA-KASA_KAKAVO,"Poseurs de tuyaux, capacité de charge nominale 20 t",Equipment,General,Heures machine,89.99,89.99,89.99,89.99,1,EUR,4052.17,45.0292,143,143,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN FONTE KAVO-TO-KASA-KARI_KAMEKARI,"Tôles laminées à chaud, nuances d'acier St3sp, St3ps, largeur 1200-3000 mm, épaisseur 14-24 mm",Material,General,t,1422.62,1422.62,1422.62,1422.62,1,EUR,83.54,0.074,142,142,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS DXME-KADX-MERI_KARIME,Crics de voie,Equipment,General,Heures machine,0.06,0.06,0.06,0.06,1,EUR,74.49,1150.5653,141,141,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",REMBLAYAGE DES MARAIS KAME-LI-MERI-KASA,Géotextile non tissé,Abstract Material,General,m2,2.09,2.09,2.09,2.09,1,EUR,1509.31,721.7166,140,140,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates monocouches en membranes PVC sur une base prête KAME-RI-KAME-KARI_KAKASAPU,Bitume pétrolier de construction BN-90/10,Material,General,t,722.49,722.49,722.49,722.49,1,EUR,58.01,0.107,140,140,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KANE-KADX_KARIME,"Électricité : consommation 0,36 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,2.49,53.469,140,140,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS DXME-KANE-KALI_KAKAME,Palans manuels à levier,Equipment,General,Heures machine,0.03,0.03,0.03,0.03,1,EUR,1.91,62.7381,140,140,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-RIKA-MENE_KAMERI,"Barges autopropulsées à fond ouvrant, à déchargement automatique, capacité de la cale : 2000 m3",Equipment,General,Heures machine,1581.58,1581.58,1581.58,1581.58,1,EUR,4527.72,2.8628,140,140,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-KANE-KADX_KARIME,"Nacelles individuelles auto-élévatrices, capacité de charge 120 kg",Equipment,General,Heures machine,0.37,0.37,0.37,0.37,1,EUR,19.95,53.469,140,140,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS DXME-KATO-KANE_KATOLI,"Électricité : consommation 44,22 kW·h/machine-h",Electricity,Electricity,Heures machine,5.68,5.68,5.68,5.68,1,EUR,47.4,8.346,140,140,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" DXME-KATO-KANE_KATOLI,Machines de chargement électriques sur chenilles pour galeries horizontales avec organe de travail « pattes racleuses » d'une capacité de 5 m3/min,Equipment,General,Heures machine,264.54,264.54,264.54,264.54,1,EUR,2207.85,8.346,140,140,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" MEME-ME-KATO-KAME,Baguettes équarries,Abstract Material,General,m3,437.36,437.36,437.36,437.36,1,EUR,1192.24,2.7869,139,133,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KARI-RI-KASA-KAPU_RIKADXKA,"Gravier de roches denses pour travaux de construction M 800, fraction 20-40 mm",Material,General,m3,63.04,63.04,63.04,63.04,1,EUR,220.39,3.4959,138,138,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE MEPU-PU-KATO-MELI_KAMEKAME,Vernis KF-965,Material,General,t,9796.71,9796.71,9796.71,9796.71,1,EUR,19.1,0.0133,138,138,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CONTACT DU MÉTRO RISA-ME-KANE-KANE_KAKAKAME,"Cales pour chemins de fer à voie étroite, section 12 x 12 mm",Material,General,t,2579.84,2579.84,2579.84,2579.84,1,EUR,2660.04,1.148,137,137,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" KATO-RI-KAME-KAME,Ciments Portland sans additifs,Abstract Material,General,t,214.97,214.97,214.97,214.97,1,EUR,1460.61,7.0203,137,137,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIME-RI-KAME-KARI,Câbles non isolés pour lignes aériennes de transport d'électricité,Abstract Material,General,t,9524.21,9524.21,9524.21,9524.21,1,EUR,0.0,0.0,136,136,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES KAME-LI-MELI-METO,Aiguilles à vapeur,Abstract Material,General,pièce,1596.81,1596.81,1596.81,1596.81,1,EUR,107.28,0.0917,136,136,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS KAME-TO-KAPU-KAVO_KAKAMEPU,Huile créosotée,Material,General,t,998.14,998.14,998.14,998.14,1,EUR,51.45,0.0984,135,135,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KASA-KAPU_KATORI,"Ponts roulants électriques suspendus (ponts roulants), capacité de charge 5 t",Equipment,General,Heures machine,5.66,5.66,5.66,5.66,1,EUR,44.28,7.8196,135,135,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE FOURS À HAUTE TEMPÉRATURE,Maçonnerie de hauts fourneaux DXME-KASA-KAPU_KATORI,"Électricité : consommation 3,33 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.43,0.43,0.43,0.43,1,EUR,3.35,7.8196,135,135,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE FOURS À HAUTE TEMPÉRATURE,Maçonnerie de hauts fourneaux KAPU-TO-KARI-KADX,Mélanges à base de ciment,Abstract Material,General,t,1119.58,1.9,2275.44,126.19,3,EUR,7672.19,538.5371,134,129,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment KATO-RI-KARI-KAVO_KAKAKAME,Ciment gypsique expansif,Material,General,t,1104.74,1104.74,1104.74,1104.74,1,EUR,65.51,0.0785,134,134,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Essai et désinfection des réservoirs KAME-LI-MESA-KATO_KAKAMEPU,"Boulons en acier à tête hexagonale, livrés avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M16, longueur du boulon 25-200 mm",Material,General,t,4397.37,4397.37,4397.37,4397.37,1,EUR,153.23,0.0678,133,133,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE MEDX-TO-KAME-KAME,Vannes papillon dans le tuyau,Abstract Material,General,pièce,34.12,34.12,34.12,34.12,1,EUR,0.0,0.0,133,133,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en tôle d'acier galvanisé et en aluminium de classe H (no KAME-LI-KALI-KADX_KAKAPUME,"Garnitures d'étanchéité, marque AP",Material,General,kg,7.74,7.74,7.74,7.74,1,EUR,15.3,1.9752,133,133,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,ÉQUIPEMENT DE TRAITEMENT DE L'EAU,APPAREILS DE TRAITEMENT CHIMIQUE DE L'EAU ME_MEKAKA_SANE,Charge de travail moyenne 5,Labor,Labor,heures,20.86,20.86,20.86,20.86,1,EUR,8734.8,418.6967,132,132,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements d'une épaisseur de 10 mm à partir d'un mortier polymè KAME-LI-MESA-KATO_KAKAMETO,"Boulons en acier à tête hexagonale, livrés avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M12, longueur du boulon 16-160 mm",Material,General,t,4085.49,4085.49,4085.49,4085.49,1,EUR,19.88,0.0157,132,132,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RISA-ME-KANE-KATO,Signaux ferroviaires et de signalisation,Abstract Material,General,100 pièces,2648.09,2648.09,2648.09,2648.09,1,EUR,46.66,0.0176,132,132,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" RIRI-RI-KAME-KATO,Isolateurs linéaires suspendus à plateau,Abstract Material,General,t,108.73,73.74,110.7,110.7,2,EUR,0.0,0.0,131,131,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,CÂBLES ET CÂBLES DE PROTECTION CONTRE LA FOUDRE VL 35-750 KV KAME-LI-MESA-KAME,"Manchon de raccordement avec revêtement en zinc thermodiffusion, pour tige d'ancrage",Abstract Material,General,pièce,150.85,36.25,2223.16,36.25,5,EUR,3479.77,80.2085,130,115,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p KASA-ME-KASA-MENE,Pieux en béton armé,Abstract Material,General,m3,452.69,444.2,565.87,444.2,2,EUR,3414.78,7.6789,129,129,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-KALI-MERI_KAKAMEME,"Film d'emballage hydroisolant, épaisseur 0,55 mm",Material,General,m2,6.1,6.1,6.1,6.1,1,EUR,232.02,38.0262,129,129,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage KAVO-TO-KAPU-KARI_KAKADXSA,"Acier laminé à chaud rond, nuances St3sp, St3ps, diamètre 14-50 mm",Material,General,t,1451.41,1451.41,1451.41,1451.41,1,EUR,370.95,0.5576,128,128,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES MONOLITHES DE LA PARTIE SUPÉRIEURE DES BÂTIMENTS À L'AIDE,Montage du coffrage des structures monolithiques en béton armé de la partie aéri MEME-ME-KARI-KAME_KAKAMERI,"Bois rond de conifères écorcé, longueur 3-6,5 m, diamètre 14-24 cm, classe I-III",Material,General,m3,224.08,224.08,224.08,224.08,1,EUR,640.29,2.8576,127,127,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTION D'ENTREPRISES DE STOCKAGE ET DE TRANSFORMATION DE CÉRÉALES,Montage de structures pour les installations de stockage et de transformation du DXME-KADX-MEKA_KAKANE,"Machines de redressage, de bourrage et de nivellement d'une capacité allant jusqu'à 2 000 traverses/heure",Equipment,General,Heures machine,677.57,677.57,677.57,677.57,1,EUR,3057.24,4.512,127,127,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,BALLASTAGE DES VOIES ET DES AIGUILLAGES KANE-ME-KAME-KASA_KAKATOSA,"Brique céramique pleine simple, dimensions 250 x 120 x 65 mm, marque M100",Material,General,1000 pièces,519.62,519.62,519.62,519.62,1,EUR,338.8,0.6575,127,127,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" MEME-ME-KARI-KASA_KAKAKARI,"Bois rond de conifères pour transformation, diamètre 20-24 cm, classe I-III",Material,General,m3,251.59,251.59,251.59,251.59,1,EUR,476.65,1.9892,126,126,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-TO-KAME-KAME_KAKAMEKA,Essence-solvant,Material,General,kg,4.96,4.96,4.96,4.96,1,EUR,171.03,34.4899,126,126,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité KAME-LI-KALI-MERI,Film polyéthylène,Abstract Material,General,m2,0.43,0.43,0.43,0.43,1,EUR,298.22,687.7802,126,126,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé RIKA-RI-MEKA-KATO_KAKAKAME,"Embouts de câble en laiton, section de conducteur 2,5 mm2",Material,General,100 pièces,11.89,11.89,11.89,11.89,1,EUR,2.96,0.3293,126,126,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS FILAIRES DXME-KASA-KAME_KARIKA,"Grues à tour, capacité de charge 25 t",Equipment,General,Heures machine,74.23,74.23,74.23,74.23,1,EUR,4778.77,64.3805,125,125,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é DXME-RIME-MERI_KAKARI,"Électricité : consommation 6,11 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.78,0.78,0.78,0.78,1,EUR,1.12,1.4286,125,125,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é DXME-KASA-KAME_KARIKA,"Électricité : consommation 12,24 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.57,1.57,1.57,1.57,1,EUR,101.19,64.3805,125,125,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é KAVO-ME-KARI-MELI_KAMETORI,"Treillis métallique simple en fil de fer non revêtu à mailles carrées, diamètre du fil 1,4 mm, taille des mailles 12 x 12 mm",Material,General,m2,5.78,5.78,5.78,5.78,1,EUR,919.9,159.2313,125,125,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-ME-KARI-KASA_KAKANERI,"Garnitures imprégnées d'amiante à tissage traversant, carrées, marque AP-31, taille 6-14 mm",Material,General,t,12978.72,12978.72,12978.72,12978.72,1,EUR,4.81,0.0,125,125,RÉNOVATION EN PROFONDEUR DES ÉQUIPEMENTS,Révision des raccords de tuyauterie,ROBINETTERIE POUR LE SECTEUR THERMIQUE,VANNES EN FONTE ET EN ACIER POUR UNE PRESSION NOMINALE JUSQU'À 40 MPA DXME-RIME-MERI_KAKARI,Cisailles à tôle à cames guillotines,Equipment,General,Heures machine,5.34,5.34,5.34,5.34,1,EUR,7.63,1.4286,125,125,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é KAVO-TO-KALI-KAME_KAKAPURI,"Bandes d'acier laminées à chaud, nuances St3sp, St3ps, dimensions 40 x 4 mm",Material,General,t,1484.27,1484.27,1484.27,1484.27,1,EUR,31.9,0.0431,125,125,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KATO-MESA_KAKATO,Installations de forage pneumatiques sur chenilles pour une section de 10 à 34 m² lors de travaux dans des galeries horizontales et inclinées,Equipment,General,Heures machine,314.8,314.8,314.8,314.8,1,EUR,6381.49,20.2713,125,125,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KANE-KANE_KAMEPU,"Élévateurs hydrauliques, hauteur de levage 28 m",Equipment,General,Heures machine,35.11,35.11,35.11,35.11,1,EUR,528.15,15.0435,124,124,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BÉTON ARMÉ CENTRIFUGÉ VL 35-500 KV DXME-KADX-KARI_KAKANE,"Wagons basculants, capacité 1 m3",Equipment,General,Heures machine,0.18,0.18,0.18,0.18,1,EUR,7.66,40.351,124,124,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-RI-KAME-KAME,Bitumes pétroliers routiers,Abstract Material,General,t,749.43,749.43,749.43,749.43,1,EUR,2515.78,3.3567,124,124,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RISA-ME-KAME-KAPU_KAKAMERI,"Traverse en bois de conifères, non imprégnée, pour voies ferrées à voie étroite, type II, longueur 1200 mm",Material,General,pièce,23.11,23.11,23.11,23.11,1,EUR,197.99,8.6361,124,124,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,INSTALLATION D'ESCALIERS DXME-MEPU-KANE_KAMESA,"Camions porte-tubes sur châssis automobile, capacité de charge jusqu'à 20 t",Equipment,General,Heures machine,41.68,41.68,41.68,41.68,1,EUR,359.41,8.6238,124,124,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS À USAGE SPÉCIAL,CONSTRUCTIONS POUR L'INDUSTRIE DE L'ALUMINIUM DXME-KAVO-KADX_KARITO,Compacteurs pneumatiques fonctionnant à partir de compresseurs mobiles,Equipment,General,Heures machine,0.07,0.07,0.07,0.07,1,EUR,1.94,25.2531,124,124,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL DXME-KANE-KARI_KAKASA,"Convoyeurs à bande sectionnels, longueur 40 m",Equipment,General,Heures machine,2.06,2.06,2.06,2.06,1,EUR,3.05,1.4789,123,123,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","NIVELLEMENT DES LITS DE PIERRES, DE GRAVIER ET DE SABLE EN MILIEU FLUVIAL (RIVIÈ" DXME-KADX-MEKA_KAKATO,"Machines à redresser, à caler et à aligner pour aiguillages",Equipment,General,Heures machine,950.44,950.44,950.44,950.44,1,EUR,1332.86,1.4024,123,123,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" DXME-KATO-KAVO_KAKAPU,Marteaux perforateurs à colonne pour le forage de trous et de puits télescopiques lors du travail à partir de stations de compression fixes,Equipment,General,Heures machine,4.14,4.14,4.14,4.14,1,EUR,210.64,50.8931,123,123,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KANE-KARI_KAKASA,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,0.94,1.4789,123,123,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","NIVELLEMENT DES LITS DE PIERRES, DE GRAVIER ET DE SABLE EN MILIEU FLUVIAL (RIVIÈ" KAME-LI-MESA-MEKA_KAKASAPU,Agrafes métalliques pour montage,Material,General,kg,6.27,6.27,6.27,6.27,1,EUR,3.05,0.4858,123,123,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES KAVO-TO-KATO-KAPU_MEKAMEKA,"Fil à usage général en acier à faible teneur en carbone, diamètre 1,30-2,50 mm",Material,General,kg,2.77,2.77,2.77,2.77,1,EUR,0.33,0.1429,123,123,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-MEKA-KASA_KAMEME,"Poseurs de tuyaux, capacité de charge nominale 92 t",Equipment,General,Heures machine,308.19,308.19,308.19,308.19,1,EUR,17573.02,57.0192,122,122,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN ACIER RISA-ME-KATO-KAME_KAKAMEME,Bornes PK,Material,General,t,5090.37,5090.37,5090.37,5090.37,1,EUR,11772.08,4.0884,122,122,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR KARI-RI-KATO-KAME,Pierres de taille,Abstract Material,General,m3,59.14,59.14,59.14,59.14,1,EUR,4177.58,70.6353,122,122,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-KANE-KASA_KASANE,"Chargeuses frontales universelles à godet unique, pneumatiques, capacité nominale du godet principal 1,1 m3, capacité de charge 2 t",Equipment,General,Heures machine,21.56,21.56,21.56,21.56,1,EUR,62.04,2.8773,122,122,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-METO-KAME_KATORI,"Machines d'entretien routier (machine de maître d'œuvre routier), puissance du moteur 80 kW (109 ch)",Equipment,General,Heures machine,28.88,28.88,28.88,28.88,1,EUR,140.35,4.8593,121,121,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES FONDATIONS ET REVÊTEMENTS EXISTANTS POUR LES REVÊTEMENTS EN GRAV,DÉMONTAGE DES INSTALLATIONS EXISTANTES RIPU-TO-KAME-KAME_KAKAKAPU,"Tube PVC-305 électro-isolant, diamètre 6-10 mm",Material,Pipes & Fittings,kg,7.32,7.32,7.32,7.32,1,EUR,7.12,1.0145,121,121,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,COMMUNICATIONS TÉLÉPHONIQUES OPÉRATIONNELLES DXME-KANE-KATO_KATOPU,"Treuils auxiliaires de mine avec une force de traction de 24,53 kN (2,5 t)",Equipment,General,Heures machine,1.57,1.57,1.57,1.57,1,EUR,145.53,92.5271,121,121,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ MEPU-PU-KARI-KAPU_KARIKAME,"Peinture à l'huile MA-22, blanc de lithopone",Material,General,kg,2.46,2.46,2.46,2.46,1,EUR,25.09,10.2718,121,121,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX DXME-KANE-KATO_KATOPU,"Électricité : consommation 1,06 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.14,0.14,0.14,0.14,1,EUR,12.88,92.5271,121,121,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ DXME-RIME-MEDX_KAMEPU,Cintreuses de tubes équipées d'un mandrin pour le cintrage à froid de tubes d'un diamètre extérieur de 219 à 530 mm,Equipment,General,Heures machine,159.0,159.0,159.0,159.0,1,EUR,61799.78,388.6759,120,120,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,FABRICATION DE COUDES COURBÉS ET MONTAGE D'ANGLES DE COUDES DE TUYAUTERIES,Fabrication de coudes cintrés à partir de tuyaux d'un diamètre nominal de 200 à DXME-RIME-MEDX_KAMEPU,"Électricité : consommation 7,26 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.93,0.93,0.93,0.93,1,EUR,362.39,388.6759,120,120,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,FABRICATION DE COUDES COURBÉS ET MONTAGE D'ANGLES DE COUDES DE TUYAUTERIES,Fabrication de coudes cintrés à partir de tuyaux d'un diamètre nominal de 200 à KAME-TO-KARI-KADX_KAKAKAME,Gaz de soudage (mélange d'argon et de dioxyde de carbone),Material,General,m3,6.76,6.76,6.76,6.76,1,EUR,2372.31,351.0857,120,120,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE COMBINÉ DES JOINTS DE TUYAUX SUR LA TRONÇON MEME-ME-KATO-KANE_KAKAKARI,"Planches de chêne rabotées, longueur 2-4 m, largeur 100-300 mm, épaisseur 30 mm, classe II",Material,General,m3,1641.4,1641.4,1641.4,1641.4,1,EUR,5.3,0.0109,120,120,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEME-KARI_KATOME,Laboratoires mobiles de mesure et de réglage des lignes de communication à fibres optiques sur la base d'un véhicule tout-terrain,Equipment,General,Heures machine,37.02,37.02,37.02,37.02,1,EUR,308.75,8.3412,120,120,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,ÉQUIPEMENT DE COMPACTAGE DES COMMUNICATIONS INTERSTATIONNAIRES DXME-KASA-KANE_KAMEKA,"Grues sur chenilles, capacité de charge 100 t",Equipment,General,Heures machine,164.51,164.51,164.51,164.51,1,EUR,35698.47,216.9929,119,119,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KAVO-KATO_KAMENE,"Rouleaux vibrants lisses automoteurs, poids 8 t",Equipment,General,Heures machine,49.21,49.21,49.21,49.21,1,EUR,274.26,5.5729,119,119,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL KAME-LI-MEPU-KAME_KAKAKARI,"Mastic polyuréthane (mousse de montage) universel, volume 1000 ml",Material,General,pièce,7.4,7.4,7.4,7.4,1,EUR,278.11,37.5588,119,119,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" DXME-KANE-KATO_KAPUNE,"Treuils manuels et à levier avec une force de traction de 29,43 kN (3 t)",Equipment,General,Heures machine,0.09,0.09,0.09,0.09,1,EUR,3.61,40.5001,119,119,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" KAME-TO-KAME-KASA_KAKAKADX,Paraffine minérale solide T-1,Material,General,t,4169.91,4169.91,4169.91,4169.91,1,EUR,9.32,0.0,119,119,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV RISA-ME-KASA-KAME_KAKAKAME,"Rail à double tête, type 1R65",Material,General,pièce,119.09,119.09,119.09,119.09,1,EUR,9354.2,78.5459,118,118,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Installation et démontage de voies de roulement pour grues à tour à partir d'élé DXME-MEPU-KAME_KAKATO,"Bétonnières automotrices, volume du tambour 6 m3",Equipment,General,Heures machine,27.47,27.47,27.47,27.47,1,EUR,112.27,4.0866,116,116,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEDX-KAME_KAKAME,"Machines à boue, capacité de la citerne pour la boue jusqu'à 7 m3",Equipment,General,Heures machine,34.67,34.67,34.67,34.67,1,EUR,1927.3,55.5966,116,116,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAPU-ME-KARI-KATO,Mélanges de béton lourd pour revêtements routiers et aéroportuaires,Abstract Material,General,m3,158.09,158.09,158.09,158.09,1,EUR,20214.14,127.8621,115,99,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-TO-KASA-TOVO,Réactifs chimiques,Abstract Material,General,t,3770.24,3770.24,3770.24,3770.24,1,EUR,0.0,0.0,114,114,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEPU-ME-KASA-KATO_KAKAMEME,"Colle phénol-polyvinylacétal, marque BF-2N",Material,General,t,17721.45,17721.45,17721.45,17721.45,1,EUR,525.5,0.0407,114,114,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale à partir de bandes adhésives p DXME-MEDX-MERI_KARIME,"Électricité : consommation 2,03 kWh/machine-heure",Electricity,Electricity,Heures machine,0.26,0.26,0.26,0.26,1,EUR,10.72,41.1143,114,114,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF DXME-MEDX-MERI_KARIME,"Pompes à vide 3,6 m3/min",Equipment,General,Heures machine,2.15,2.15,2.15,2.15,1,EUR,88.22,41.1143,114,114,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF DXME-MEKA-KADX_KAMERI,"Installations pour essais hydrauliques de conduites, pression de refoulement basse 0,1 MPa (1 kgf/cm2), haute 10 MPa (100 kgf/cm2) lors du fonctionnement à partir de centrales électriques mobiles",Equipment,General,Heures machine,0.43,0.43,0.43,0.43,1,EUR,24.17,56.4356,114,114,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT MEPU-PU-KAME-KADX_KAPURILI,"Apprêt époxy anticorrosion à base de zinc pour la protection des surfaces métalliques, consommation 0,20-0,39 kg/m2",Material,General,kg,30.1,30.1,30.1,30.1,1,EUR,21.95,0.7418,114,114,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KASA-KAME_KAMEDX,"Électricité : consommation 8,04 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.03,1.03,1.03,1.03,1,EUR,46.58,45.1173,114,114,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é DXME-KASA-KAPU_KAKAVO,"Ponts roulants électriques, capacité de charge 20 t",Equipment,General,Heures machine,31.39,31.39,31.39,31.39,1,EUR,2865.97,91.3078,114,114,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-KASA-KAPU_KAKAVO,"Électricité : consommation 26,73 kWh/machine-heure",Electricity,Electricity,Heures machine,3.43,3.43,3.43,3.43,1,EUR,313.49,91.3078,114,114,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature RISA-ME-KAPU-KARI_KAKAKAME,"Boulons à écrou pour fixations de rails de voie ferrée, diamètre M22, longueur 75 mm, avec écrou de diamètre M22",Material,General,t,3846.28,3846.28,3846.28,3846.28,1,EUR,6022.64,2.8777,114,114,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR KAME-LI-KANE-KATO,Bandes en polyéthylène,Abstract Material,General,t,379.81,3.83,6127.0,3.83,2,EUR,6209.37,1636.3448,114,114,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS DXME-KASA-KAME_KAMEDX,"Grues à tour, capacité de charge 12,5 t",Equipment,General,Heures machine,34.48,34.48,34.48,34.48,1,EUR,1555.49,45.1173,114,114,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é DXME-KADX-KADX_KAKATO,Grues de pose pour rails de 25 m sur traverses en béton armé,Equipment,General,Heures machine,375.28,375.28,375.28,375.28,1,EUR,1495.2,3.9842,113,113,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE MEPU-RI-KAPU-KAME_KAKAKAME,Résine de houille pour la construction routière,Material,General,t,168.9,168.9,168.9,168.9,1,EUR,5.2,0.067,113,113,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" MEPU-SA-KADX-KALI_KAKARISA,Solvant n° 648,Material,General,t,4129.91,4129.91,4129.91,4129.91,1,EUR,1.33,0.0,113,113,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques MEME-ME-KATO-KASA_KAKALITO,"Planches non sciées de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250, épaisseur 20 mm, classe III",Material,General,m3,469.47,469.47,469.47,469.47,1,EUR,40.53,0.0927,113,113,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Installation de caniveaux en béton préfabriqué sur les trottoirs DXME-KALI-KAVO_KATORI,"Malaxeurs mobiles, capacité du tambour 150 l",Equipment,General,Heures machine,0.14,0.14,0.14,0.14,1,EUR,0.09,0.6408,113,113,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",BLOCS DE MURS DE SOUS-SOLS DXME-KALI-KAVO_KATORI,"Électricité : consommation 0,33 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.04,0.04,0.04,0.04,1,EUR,0.03,0.6408,113,113,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",BLOCS DE MURS DE SOUS-SOLS KAME-LI-MESA-KATO_MEKAKARI,"Boulons pour le montage de structures en acier, avec écrous et rondelles, diamètre 24-48 mm, longueur 55-300 mm",Material,Steel & Metal,kg,4.89,4.89,4.89,4.89,1,EUR,801.44,164.0618,112,112,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,Panneaux de signalisation routière DXME-RIKA-MENE_KAMEME,"Barges autopropulsées à fond ouvrant, à déchargement automatique, capacité de la cale : 1 500 m3",Equipment,General,Heures machine,1147.13,1147.13,1147.13,1147.13,1,EUR,3759.42,3.2772,112,112,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES KAVO-RI-KARI-KASA_KAKAPUKA,"Câble à double torsion LK-R, structure 6kh19(1+6+6/6)+1 o.s., marque V, en fil sans revêtement, groupe de marquage 1570-1770 N/mm2, diamètre 12 mm",Material,Steel & Metal,10 m,24.13,24.13,24.13,24.13,1,EUR,298.25,12.3612,111,111,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE DXME-KADX-MEKA_KAKAPU,"Machines de redressage, de battage et d'alignement pour aiguillages, capacité jusqu'à 1 200 traverses/h",Equipment,General,Heures machine,506.13,506.13,506.13,506.13,1,EUR,472.75,0.9341,111,111,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" DXME-MELI-KAPU_METOME,"Mécanismes d'alimentation en fil à quatre rouleaux, vitesse d'alimentation en fil 0,5-25 m/min, diamètre du fil de soudage 0,8-2,4 mm",Equipment,General,Heures machine,0.35,0.35,0.35,0.35,1,EUR,20.84,60.1457,111,111,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUDAGE MÉCANISÉ (SEMI-AUTOMATIQUE) DES JOINTS DE TUBES SUR LA TRONÇONNEE DXME-MESA-KAME_KAKAME,"Remorques tractées, capacité de charge jusqu'à 2 t",Equipment,General,Heures machine,0.38,0.38,0.38,0.38,1,EUR,2.9,7.6268,111,111,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-MEVO-KAME_KAMESA,"Compresseurs à vis mobiles avec moteur à combustion interne, pression 0,8 MPa (8 atm), débit jusqu'à 6,3 m3/min",Equipment,General,Heures machine,13.65,13.65,13.65,13.65,1,EUR,109.77,8.0394,110,110,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX KAME-PU-KATO-KATO,Matériaux pour la stabilisation des puits de forage,Abstract Material,General,t,12329.34,11.21,14739.41,14739.41,2,EUR,213.96,0.0214,110,110,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE RISA-RI-KAME-KAME_KAKAMENE,"Étiquettes de marquage BM en polystyrène, dimensions 50 x 25 mm",Material,General,100 pièces,3.01,3.01,3.01,3.01,1,EUR,1.82,0.6031,110,110,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RISA-ME-KAME-KAPU_KAKATOTO,"Traverse en bois de conifères, non imprégnée, pour voies ferrées à voie large, type III",Material,General,pièce,25.06,25.06,25.06,25.06,1,EUR,589.54,23.5239,109,109,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,RÉALISATION DE TRAVAUX DE FORAGE ET DE MINAGE SUR DES VOIES FERRÉES EN SERVICE RISA-RI-KAME-KANE_KAKAVOME,Pince à corde KS-046-2 (KS-330),Material,General,pièce,7.83,7.83,7.83,7.83,1,EUR,976.57,124.7294,109,109,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-MELI-KARI_KAKARI,Appareils portables à rayons X pulsés pour la radiographie de métaux d'une épaisseur maximale de 30 mm,Equipment,General,Heures machine,2.39,2.39,2.39,2.39,1,EUR,5.77,2.4097,109,109,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONTRÔLE DE LA QUALITÉ DES ASSEMBLAGES SOUDÉS PAR DES MÉTHODES PHYSIQUES,CONTRÔLE RADIOGRAPHIQUE SUR LA BASE DE SOUDAGE DE TUBES DXME-KAVO-KAPU_KARIRI,"Chaudières électriques mobiles à bitume avec agitateur centrifuge, capacité de chargement 1 000 l",Equipment,General,Heures machine,4.43,4.43,4.43,4.43,1,EUR,253.0,57.1569,109,109,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale en bitume-caoutchouc ou bitume DXME-KAVO-KAPU_KARIRI,"Électricité : consommation 8,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.06,1.06,1.06,1.06,1,EUR,60.57,57.1569,109,109,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale en bitume-caoutchouc ou bitume DXME-KANE-KATO_SAMEPU,"Treuils hydrauliques tractés avec moteur à combustion interne pour la rénovation de la surface interne des pipelines, force de traction 100 kN (10 t)",Equipment,General,Heures machine,16.93,16.93,16.93,16.93,1,EUR,691.69,40.8671,109,109,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Nettoyage par sablage de la surface interne de la canalisation DXME-KADX-KALI_KARIME,Niveleuses de ballast,Equipment,General,Heures machine,387.09,387.09,387.09,387.09,1,EUR,1100.23,2.8423,108,108,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,BALLASTAGE DES VOIES ET DES AIGUILLAGES RISA-RI-KAME-RIME_KAKAPURI,Serrures KS-078,Material,General,100 pièces,124.2,124.2,124.2,124.2,1,EUR,11.71,0.0942,108,108,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-ME-KARI-KAVO_KAKAKARI,"Joints en paronite PMB, épaisseur 1 mm, diamètre 100 mm",Material,General,1000 pièces,348.58,348.58,348.58,348.58,1,EUR,3.59,0.026,108,108,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Installation de raccords à brides sur des conduites en acier DXME-MELI-KAPU_KAMEME,"Électricité : consommation 19,31 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.48,2.48,2.48,2.48,1,EUR,47.02,18.9634,108,108,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de la dalle de fondation des bâtiments et structures des centrales DXME-MELI-KAPU_KAMEME,"Appareils de soudage automatiques, courant de soudage jusqu'à 1250 A",Equipment,General,Heures machine,5.32,5.32,5.32,5.32,1,EUR,100.91,18.9634,108,108,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de la dalle de fondation des bâtiments et structures des centrales DXME-KAME-KAME_KATODX,"Bulldozers, puissance 132 kW (180 ch)",Equipment,Bulldozers,Heures machine,73.27,73.27,73.27,73.27,1,EUR,296.06,4.0404,108,108,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE BULLDOZERS DXME-KADX-MEPU_KAPUME,Modules de traction et d'alimentation pour machines non automotrices,Equipment,General,Heures machine,176.44,176.44,176.44,176.44,1,EUR,939.71,5.326,108,108,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES MAILLONS DE LA GRILLE DE RAYONS DXME-KARI-KAME_KAKATO,"Vibrateurs électriques à haute fréquence pour l'enfoncement de pieux jusqu'à 1,5 t, couple excentrique 47 kgm, force centrifuge 450 kN",Equipment,General,Heures machine,18.82,18.82,18.82,18.82,1,EUR,60.16,3.1956,107,107,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KASA-KAPU_KAMETO,"Ponts roulants électriques, capacité de charge 125 t",Equipment,General,Heures machine,147.18,147.18,147.18,147.18,1,EUR,1553.44,10.5547,107,107,INSTALLATION DE L'ÉQUIPEMENT,"Équipements de concassage, de broyage, d'enrichissement et d'agglomération",ÉQUIPEMENT DE BROYAGE ET DE MALTAGE,BROYEURS DXME-MELI-KAPU_KASARI,"Électricité : consommation 1,65 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.21,0.21,0.21,0.21,1,EUR,13.47,63.5499,107,107,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-KARI-KAME_KAKATO,"Électricité : consommation 19,8 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.54,2.54,2.54,2.54,1,EUR,8.13,3.1956,107,107,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-MESA-MEME_KAKARIRI,"Rondelles en acier rondes, diamètre du trou M8-12",Material,General,kg,5.38,5.38,5.38,5.38,1,EUR,2.23,0.4152,107,107,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire DXME-KASA-KAPU_KAMETO,"Électricité : consommation 53,13 kWh/machine-heure",Electricity,Electricity,Heures machine,6.82,6.82,6.82,6.82,1,EUR,72.02,10.5547,107,107,INSTALLATION DE L'ÉQUIPEMENT,"Équipements de concassage, de broyage, d'enrichissement et d'agglomération",ÉQUIPEMENT DE BROYAGE ET DE MALTAGE,BROYEURS DXME-MELI-KAPU_KASARI,"Source de courant de soudage à impulsions pour le soudage semi-automatique, courant de soudage jusqu'à 350 A",Equipment,General,Heures machine,2.69,2.69,2.69,2.69,1,EUR,170.88,63.5499,107,107,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de RIKA-RI-KARI-KAPU_KAKAKANE,Capuchons en polyéthylène K-6,Material,General,100 pièces,34.6,34.6,34.6,34.6,1,EUR,3.84,0.1112,106,106,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR KAVO-TO-KAME-KARI_KAKARIPU,"Poutres en I à flancs parallèles, nuance d'acier St3sp, St3ps, n° 10B-18B",Material,General,t,2626.72,2626.72,2626.72,2626.72,1,EUR,2014.73,0.9058,106,106,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,ÉCHAFAUDAGES EXTÉRIEURS ET INTÉRIEURS,Fabrication de pièces en acier pour échafaudages suspendus KAVO-PU-KAME-KARI,Pièces d'ancrage,Abstract Material,General,t,3890.21,3890.21,3890.21,3890.21,1,EUR,3666.89,1.0371,106,106,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KASA-METO_KAKATO,"Camions à plateau, capacité de charge jusqu'à 6 t, avec grue-manipulateur, capacité de charge 1,5 t",Equipment,General,Heures machine,25.04,25.04,25.04,25.04,1,EUR,56.19,2.2442,106,106,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier KAVO-TO-KATO-KANE_KAKAMERI,Fil d'acier à faible teneur en carbone pour tricotage,Material,General,t,2159.66,2159.66,2159.66,2159.66,1,EUR,30.14,0.0307,106,106,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAVO-TO-KAPU-KARI_KAKAKATO,"Acier laminé à chaud rond, nuances St3sp, St3ps, diamètre 52-70 mm",Material,General,t,1436.56,1436.56,1436.56,1436.56,1,EUR,71.23,0.0789,106,106,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","Poutres, traverses, lisses" KASA-ME-KARI-KAPU,Maillons en béton armé pour conduites d'évacuation des eaux,Abstract Material,General,m3,863.1,863.1,863.1,863.1,1,EUR,863.1,1.0,106,106,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CANALISATIONS D'ÉVACUATION D'EAU SUR DES FONDATIONS PRÊTES (BASES) ET CANIVEAUX ,TUBES D'ÉVACUATION DES EAUX EN BÉTON ARMÉ RONDS SOUS LES REMBLAIS DES VOIES FERR DXME-KAVO-KATO_KAMEVO,"Rouleaux vibrants lisses automoteurs, poids 13 t",Equipment,General,Heures machine,60.97,60.97,60.97,60.97,1,EUR,450.17,7.3829,106,106,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Installation et démontage de voies de roulement pour grues à tour à partir d'élé KAPU-RI-KAME-KAME,Mélanges d'enrobés bitumineux,Abstract Material,General,t,213.95,213.95,213.95,213.95,1,EUR,7525.47,35.1735,105,105,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"DALLES DE SOUS-VITRINES, PORCHES",Construction de porches MEPU-ME-KAPU-KARI_KAKAKAME,"Colle, marque 88-NP",Material,General,kg,14.78,14.78,14.78,14.78,1,EUR,53.76,3.8197,105,105,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" RIME-RI-KARI-KAME_KAKAKATO,"Fil d'antenne MA, section 6 mm2",Material,General,1000 m,2483.32,2483.32,2483.32,2483.32,1,EUR,176.38,0.0702,104,104,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DE PUITS VERTICAUX, DE PUITS DE FORAGE ET DE LEURS EMBRANCHEMENTS" KAVO-TO-KATO-KASA_KAKAMELI,"Fil d'acier à faible teneur en carbone galvanisé à usage divers, diamètre 3,0 mm",Material,General,t,1987.28,1987.28,1987.28,1987.28,1,EUR,148.97,0.2069,104,104,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri KAME-LI-KANE-MEPU_KAKATOVO,"Rubans d'étanchéité à base de tissu coton-polyester imprégné d'une composition bitumineuse, largeur 75 mm, épaisseur 0,8 mm",Material,General,m,0.59,0.59,0.59,0.59,1,EUR,4.22,7.1248,104,104,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE KAME-LI-MEME-KALI_KAKARIME,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés UONI 13/45, E42A, diamètre 2 mm",Material,General,t,4326.99,4326.99,4326.99,4326.99,1,EUR,64.13,0.031,104,104,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE DXME-KASA-KAME_KARIVO,"Électricité : consommation 9,31 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.2,1.2,1.2,1.2,1,EUR,74.39,62.2111,103,103,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,"Construction de parois en coffrage glissant, construction de plafonds d'élévateu" DXME-KASA-KAME_KARIVO,"Grues à tour mobiles, capacité de charge 10 t, hauteur de levage jusqu'à 110 m",Equipment,General,Heures machine,56.16,56.16,56.16,56.16,1,EUR,3493.74,62.2111,103,103,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,"Construction de parois en coffrage glissant, construction de plafonds d'élévateu" KAME-PU-KAME-KAVO,Marteaux pneumatiques à immersion,Abstract Material,General,pièce,479.69,479.69,479.69,479.69,1,EUR,1.69,0.01,103,103,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLUFFEMENT DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS DES TRANCHÉES E MEVO-ME-KADX-KANE,Raccords à manchon,Abstract Material,General,pièce,22.54,22.54,22.54,22.54,1,EUR,81.79,3.6286,103,103,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage en tuyaux d'acier non galvanisés pour le transpor DXME-KADX-MERI_KAVOME,Dégrippeurs hydrauliques,Equipment,General,Heures machine,0.11,0.11,0.11,0.11,1,EUR,1.32,12.3769,103,103,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-RIME-MEDX_KATOSA,"Électricité : consommation 2,62 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.34,0.34,0.34,0.34,1,EUR,6.48,19.2929,102,102,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE DXME-RIME-MEDX_KATOSA,"Machines électromécaniques à fileter les tubes, puissance du moteur jusqu'à 8 kW",Equipment,General,Heures machine,7.01,7.01,7.01,7.01,1,EUR,135.15,19.2929,102,102,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE RISA-ME-KATO-KANE_KAKATOTO,"Rondelles élastiques à une spire, version 1, diamètre du trou M27",Material,General,t,4544.59,4544.59,4544.59,4544.59,1,EUR,209.6,0.0508,101,101,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Installation et démontage de voies de roulement pour grues à tour à partir d'élé DXME-RIME-RIRI_MEKAME,Forges,Equipment,General,Heures machine,0.71,0.71,0.71,0.71,1,EUR,21.02,29.6369,101,101,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES SPÉCIALES À PORTIQUE DXME-RIME-RIRI_MEKAME,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,2.77,29.6369,101,101,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES SPÉCIALES À PORTIQUE DXME-KATO-MEDX_KAVOME,"Électricité : consommation 3,04 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.39,0.39,0.39,0.39,1,EUR,5.2,13.3268,101,101,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-KATO-MEDX_KAVOME,Alimentateurs à plaques,Equipment,General,Heures machine,5.54,5.54,5.54,5.54,1,EUR,73.85,13.3268,101,101,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES KAME-LI-KADX-KAPU,Adaptateur pour perforateur cumulatif,Abstract Material,General,pièce,934.96,127.93,1013.91,1013.91,2,EUR,6405.36,6.3175,101,93,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage MENE-RI-KAME-KARI,Terre végétale,Abstract Material,General,m3,38.95,38.95,38.95,38.95,1,EUR,300.27,7.7099,100,100,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAVO-TO-KATO-KANE_KAKAKAME,Fil à tricoter,Material,General,kg,2.16,2.16,2.16,2.16,1,EUR,24.11,11.1651,100,100,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX MEDX-TO-KARI-KALI,Vannes à guillotine,Abstract Material,General,pièce,86.11,86.11,86.11,86.11,1,EUR,8611.29,100.0,100,100,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en tôle d'acier galvanisé et en aluminium de classe H (no KAME-LI-MEME-KALI_KARITOSA,"Électrodes de soudage pour le soudage d'aciers alliés à haute résistance et résistants à la chaleur TsL-20, diamètre 3 mm",Material,General,kg,5.37,5.37,5.37,5.37,1,EUR,52.18,9.7181,99,99,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES DXME-MELI-KAPU_MENEME,"Électricité : consommation 8,98 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.15,1.15,1.15,1.15,1,EUR,23.85,20.6877,99,99,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL DXME-MELI-KAPU_MENEME,"Appareil de soudage semi-automatique, courant de soudage jusqu'à 500 A, avec mécanisme d'alimentation en fil",Equipment,General,Heures machine,2.64,2.64,2.64,2.64,1,EUR,54.54,20.6877,99,99,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL KAME-LI-MERI-KASA_MEKAMEVO,"Géotextile non tissé en polypropylène, aiguilleté, thermolié, densité superficielle 550 g/m2",Material,General,m2,2.61,2.61,2.61,2.61,1,EUR,175.35,67.1055,99,99,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de fentes de drainage transversales KAME-LI-MEME-KANE_KAKARIVO,Flux FKDT,Material,General,kg,50.57,50.57,50.57,50.57,1,EUR,2.88,0.1013,99,99,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,COMMUNICATIONS TÉLÉPHONIQUES OPÉRATIONNELLES DXME-KADX-MERI_KAPUME,Clés universelles pour voies ferrées fonctionnant à partir d'une centrale électrique mobile,Equipment,General,Heures machine,0.39,0.39,0.39,0.39,1,EUR,51.87,132.1224,98,98,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-RIME-KADX_KAMEME,Marteaux pneumatiques pour rivetage fonctionnant à partir de compresseurs mobiles,Equipment,General,Heures machine,0.09,0.09,0.09,0.09,1,EUR,2.4,27.9615,98,98,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Déplacement transversal des structures en acier des ponts sur une fondation prêt DXME-KADX-KATO_KARIPU,Wagons à voie large 20 t,Equipment,General,Heures machine,1.46,1.46,1.46,1.46,1,EUR,22.04,15.1448,98,98,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAVO-TO-KATO-KASA_KAKARIKA,"Fil d'acier à faible teneur en carbone galvanisé à usage divers, diamètre 6,0 mm",Material,General,t,1903.67,1903.67,1903.67,1903.67,1,EUR,26.97,0.0314,98,98,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de KAPU-ME-KARI-KAPU,Mélanges de béton lourd pour la construction de voies de communication,Abstract Material,General,m3,176.33,176.33,176.33,176.33,1,EUR,8388.87,47.5746,97,97,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de dispositifs de déversement d'eau à partir de la chaussée à l'aid KAME-TO-KASA-RITO_KAMEVOME,Verre caustique sodique liquide,Material,General,t,834.94,834.94,834.94,834.94,1,EUR,167.12,0.2435,97,97,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en béton résistant aux acides et à la chaleur DXME-KANE-KALI_KAKALI,"Palans électriques à usage général, capacité de levage 10 t",Equipment,General,Heures machine,1.08,1.08,1.08,1.08,1,EUR,26.84,24.9649,97,97,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,ÉLÉMENTS D'ANCRAGE D'ÉQUIPEMENTS MÉCANIQUES ET DE STRUCTURES MÉTALLIQUES DXME-KANE-KALI_KAKALI,"Électricité : consommation 0,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.04,0.04,0.04,0.04,1,EUR,0.98,24.9649,97,97,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,ÉLÉMENTS D'ANCRAGE D'ÉQUIPEMENTS MÉCANIQUES ET DE STRUCTURES MÉTALLIQUES KASA-ME-KARI-KAVO,Tuyaux en béton armé,Abstract Material,General,m,286.68,286.68,286.68,286.68,1,EUR,51374.24,179.2031,96,96,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE TUYAUX SANS TRANCHÉE,"Enfoncement de tuyaux en béton armé d'un diamètre de 2,5 m à l'aide de vérins hy" KAME-LI-MELI-KALI,Disques abrasifs,Abstract Material,General,pièce,3.26,3.26,3.26,3.26,1,EUR,3.09,0.95,96,96,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,TRAVAUX CONNEXES DXME-KASA-MERI_KAKARI,"Grues à flèche sur rails, capacité de charge 75-130 t",Equipment,General,Heures machine,374.08,374.08,374.08,374.08,1,EUR,2468.74,6.5993,96,96,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments MENE-TO-KARI-KARI_KAKAKALI,Engrais organo-minéral à base de tourbe et d'ammoniac,Material,General,m3,392.02,392.02,392.02,392.02,1,EUR,205.28,0.5236,96,96,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,PRÉPARATION DES EMPLACEMENTS DE PLANTATION ET PLANTATION D'ARBRES ET D'ARBUSTES DXME-KASA-MERI_KAKARI,"Électricité : consommation 87,3 kWh/machine-heure",Electricity,Electricity,Heures machine,11.21,11.21,11.21,11.21,1,EUR,74.0,6.5993,96,96,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments DXME-KAPU-KAME_KATORI,"Machines de forage et grues sur tracteur à chenilles d'une puissance de 70 kW (95 ch), profondeur de forage jusqu'à 3 m, diamètre des trous jusqu'à 800 mm",Equipment,General,Heures machine,26.19,26.19,26.19,26.19,1,EUR,484.81,18.5111,96,96,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL KAME-LI-MEME-KAPU_KAKADXSA,"Fil à souder SV-08HM, diamètre 2-4 mm",Material,General,kg,9.46,9.46,9.46,9.46,1,EUR,2252.59,238.125,96,96,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,Soudage de tuyaux de type LST-PAU MEME-ME-KATO-KAME_KAKANESA,"Bois équarri de conifères (épicéa, pin), humidité naturelle, longueur 2-6,5 m, largeur 100 mm et plus, épaisseur 100 mm et plus, classe I",Material,General,m3,437.36,437.36,437.36,437.36,1,EUR,887.58,2.2391,96,96,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Bétonnage des parois des chevalements de puits DXME-RIME-MEDX_KARIPU,Machines à couper la céramique,Equipment,General,Heures machine,0.54,0.54,0.54,0.54,1,EUR,0.77,1.4374,95,95,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS MENE-RI-KAME-KARI_KAKAKAME,Terre végétale,Material,General,m3,32.32,32.32,32.32,32.32,1,EUR,647.7,20.0404,95,95,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES RITO-PU-KAME-KATO,Tubes en acier avec isolation en mousse de polyuréthane,Abstract Material,Pipes & Fittings,m,114.68,114.68,114.68,114.68,1,EUR,104915.08,914.8737,95,95,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,CONDUITES DANS LES CANALISATIONS ET EN SURFACE RISA-RI-KAME-MEME_KAKAKASA,Cosses pour fils en cuivre KS-063,Material,General,100 pièces,55.36,55.36,55.36,55.36,1,EUR,229.86,4.1519,95,95,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO KAVO-ME-KARI-RISA_KAMESAKA,"Valve automobile avec base caoutchoutée pour pneus à chambre à air, diamètre de l'orifice de valve 16 mm, hauteur 43 mm",Material,Pipes & Fittings,compl,0.45,0.45,0.45,0.45,1,EUR,1.16,2.5716,95,95,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE KAME-ME-KARI-KAPU_KAKAMEME,"Carton d'amiante à usage général, marque KAON-1, épaisseur 3 mm",Material,General,t,1628.58,1628.58,1628.58,1628.58,1,EUR,102.68,0.1676,95,95,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,CHAUDIÈRES DE CHAUFFAGE,Installation de chaudières de chauffage en fonte à sections fonctionnant au comb KAVO-TO-KANE-KAME_KAKARIPU,"Tôle d'acier ondulée laminée à chaud, nuances d'acier St3sp, St3ps, épaisseur 2-6 mm",Material,General,t,1492.83,1492.83,1492.83,1492.83,1,EUR,38.74,0.0386,95,95,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION KARI-ME-KAME-KARI,Terreau drainant,Abstract Material,General,m3,178.91,178.91,178.91,178.91,1,EUR,117288.11,655.5566,95,95,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-MEPU-KATO_KAKATO,"Camions à benne basculante, capacité de charge jusqu'à 15 t",Equipment,General,Heures machine,29.29,29.29,29.29,29.29,1,EUR,155.81,5.3186,95,95,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B DXME-RIME-MEDX_KARIPU,"Électricité : consommation 0,53 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.07,0.07,0.07,0.07,1,EUR,0.11,1.4374,95,95,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS KAME-ME-KAME-KADX_KAKARINE,"Cordon en amiante à usage général SHAN, diamètre 8-10 mm",Material,General,t,14726.47,14726.47,14726.47,14726.47,1,EUR,24.73,0.0183,94,94,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en tôle d'acier galvanisé et en aluminium de classe H (no RISA-ME-KAME-KARI_KAKAKARI,Poutre en bois résineux imprégné pour aiguillages,Material,General,m3,467.41,467.41,467.41,467.41,1,EUR,1250.23,2.6748,94,94,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" DXME-KAVO-KADX_KARISA,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.11,1.0552,93,93,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-KAVO-KADX_KARISA,Tamponneuses électriques,Equipment,General,Heures machine,0.43,0.43,0.43,0.43,1,EUR,0.45,1.0552,93,93,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-KATO-KANE_KAKARI,Chargeurs à grappin avec treuil pneumatique pour une profondeur finale du puits jusqu'à 300 m,Equipment,General,Heures machine,68.69,68.69,68.69,68.69,1,EUR,2838.3,41.3222,92,92,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-MELI-KAPU_KATOVO,"Groupes de soudage pour le soudage à l'arc manuel sur tracteur, courant de soudage jusqu'à 250 A, nombre de postes 4, puissance du tracteur 132 kW (180 ch)",Equipment,General,Heures machine,53.54,53.54,53.54,53.54,1,EUR,2595.3,48.4723,92,92,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE MANUEL AVEC ÉLECTRODES À REVÊTEMENT DE BASE DXME-MEKA-KAPU_KAMETO,Machines pour le nettoyage et l'apprêtage de tuyaux d'un diamètre de 600 à 800 mm,Equipment,General,Heures machine,29.49,29.49,29.49,29.49,1,EUR,907.98,30.792,91,91,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale en bitume-caoutchouc ou bitume DXME-KAPU-KAME_KASARI,"Machines de forage rotatif non automotrices, profondeur de forage jusqu'à 500 m, diamètre des puits 151-42 mm",Equipment,General,Heures machine,15.92,15.92,15.92,15.92,1,EUR,1382.62,86.834,91,91,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE AU TÉMOIN DXME-MEKA-KAPU_KAMETO,"Électricité : consommation 15,18 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.95,1.95,1.95,1.95,1,EUR,60.04,30.792,91,91,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale en bitume-caoutchouc ou bitume MEKA-PU-KAME-KAME_KAKAKAPU,"Soudures étain-zinc, teneur en zinc 40 %",Material,General,kg,106.18,106.18,106.18,106.18,1,EUR,6.83,0.08,91,91,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE DXME-KAPU-KAME_KASARI,"Électricité : consommation 11,22 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.44,1.44,1.44,1.44,1,EUR,125.14,86.834,91,91,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE AU TÉMOIN DXME-KANE-KASA_KAMERI,"Chariots élévateurs à fourche, capacité de charge 1 t",Equipment,General,Heures machine,11.44,11.44,11.44,11.44,1,EUR,0.78,0.0722,91,91,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation d'un système de joints de dilatation à partir de structures profilé DXME-MEKA-MEKA_KAMERI,Centrateurs hydrauliques internes pour tuyaux de 700 à 800 mm de diamètre,Equipment,General,Heures machine,2.51,2.51,2.51,2.51,1,EUR,89.87,35.8123,90,90,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,Soudage de tuyaux de type LST-PAU DXME-MELI-KAME_KAMERI,"Redresseurs de soudage, courant de soudage jusqu'à 350 A, nombre de postes 1",Equipment,General,Heures machine,0.88,0.88,0.88,0.88,1,EUR,125.19,143.0394,90,90,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MELI-KAME_KAMERI,"Électricité : consommation 3,7 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.47,0.47,0.47,0.47,1,EUR,67.91,143.0394,90,90,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIKA-ME-KARI-KANE_KAKARIME,Pâte à souder sans acide,Material,Chemicals,kg,81.07,81.07,81.07,81.07,1,EUR,0.6,0.0128,90,90,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,COMMUNICATIONS TÉLÉPHONIQUES OPÉRATIONNELLES RIKA-RI-KADX-KARI_MEKATOSA,"Condensateur céramique à bornes K10-17b, tension nominale 50 V, écart admissible 5 %, capacité nominale 10 pF",Material,General,pièce,0.47,0.47,0.47,0.47,1,EUR,7.75,16.6,90,90,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE MERI-RI-KASA-KANE,Isolant,Abstract Material,General,m3,159.95,159.64,168.98,159.64,2,EUR,2668.24,15.9608,89,89,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé KAME-LI-MELI-MERI_KAKAKARI,"Brosse à disque en fil d'acier pour meuleuse d'angle, diamètre 125 mm",Material,General,pièce,6.33,6.33,6.33,6.33,1,EUR,6.96,1.1006,89,89,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE DXME-METO-KATO_KADXRI,"Machines de lavage sur base automobile, débit 50 l/min",Equipment,General,Heures machine,10.65,10.65,10.65,10.65,1,EUR,297.46,27.9346,89,89,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KARI-TO-KAME-KARI_MEMEKAPU,"Sable naturel pour travaux de construction, classe I, moyen",Material,General,m3,22.23,22.23,22.23,22.23,1,EUR,127.51,5.7374,89,89,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEPU-SA-KADX-MEME_KAKAKAME,Nefras C4-150/200,Material,General,t,2236.51,2236.51,2236.51,2236.51,1,EUR,3.94,0.01,89,89,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION DXME-KASA-KAPU_KAMEME,"Ponts roulants électriques, capacité de charge 80 t",Equipment,General,Heures machine,94.33,94.33,94.33,94.33,1,EUR,22285.22,236.2351,89,89,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES À PORTANT ET À CONSOLE À USAGE GÉNÉRAL DXME-KASA-KAPU_KAMEME,"Électricité : consommation 42,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,5.51,5.51,5.51,5.51,1,EUR,1301.7,236.2351,89,89,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES À PORTANT ET À CONSOLE À USAGE GÉNÉRAL DXME-MELI-KAPU_KATODX,"Électricité : consommation 0,44 kWh/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.18,3.1211,89,89,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE RISA-ME-KASA-KARI_KAKAKARI,"Cales pour voies ferrées à écartement large à fixation par crampons, type D-50",Material,General,t,5966.75,5966.75,5966.75,5966.75,1,EUR,13256.96,2.2766,89,89,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR DXME-KADX-KATO_KATOME,Plateformes motorisées pour poseur de voies,Equipment,General,Heures machine,140.23,140.23,140.23,140.23,1,EUR,2847.85,20.309,89,89,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RIKA-ME-KARI-MEPU_KAKAKARI,"Boucle d'oreille Sr-4,5 075",Material,General,pièce,6.0,6.0,6.0,6.0,1,EUR,43.73,7.294,89,89,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MELI-PU-KASA-KAME_KAKASAME,"Argile réfractaire chamottée, marque PGA (PGB)",Material,General,kg,0.43,0.43,0.43,0.43,1,EUR,179.07,419.2571,89,89,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS MEPU-SA-KALI-KAPU,Pigment broyé,Abstract Material,General,kg,2939.64,58.69,4065.01,4065.01,2,EUR,540.48,0.5585,89,89,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" KAME-LI-MESA-KARI_KAKAVOSA,"Boulons en acier à tête hexagonale, diamètre du filetage M16 (M18), longueur 25-200 mm",Material,General,t,2841.53,2841.53,2841.53,2841.53,1,EUR,114.78,0.0557,89,89,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,COUVERTURE DE LA ZONE D'EXPLOSION POUR LA PROTECTION DES INSTALLATIONS DXME-MELI-KAPU_KATODX,Appareils pour le soudage par emboîtement de tuyaux en plastique d'un diamètre allant jusqu'à 200 mm,Equipment,General,Heures machine,0.32,0.32,0.32,0.32,1,EUR,1.0,3.1211,89,89,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE RISA-ME-KAPU-KATO_KAKAMEME,"Boulons de voie pour la fixation des rails, diamètre M16, longueur 72 mm, avec écrou de diamètre M16",Material,General,t,2426.01,2426.01,2426.01,2426.01,1,EUR,904.38,0.4477,89,89,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" DXME-KADX-MEKA_KAKAVO,Machines à niveler les ballasts,Equipment,General,Heures machine,50.88,50.88,50.88,50.88,1,EUR,41.53,0.8163,88,88,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR DXME-KADX-MEKA_KAKALI,Machines pour le repointage des traverses avec des marteaux pneumatiques,Equipment,General,Heures machine,71.68,71.68,71.68,71.68,1,EUR,67.28,0.9387,88,88,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR RINE-ME-KAME-KAPU,Bouchons tubulaires,Abstract Material,General,pièce,23.87,19.71,25.81,25.81,2,EUR,40.5,2.2082,88,88,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-KANE-KANE_KAMEME,"Ponts élévateurs hydrauliques, hauteur de levage 12 m",Equipment,General,Heures machine,13.34,13.34,13.34,13.34,1,EUR,48.69,3.6491,88,88,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-MEME-KALI_KAKANETO,"Électrodes de soudage EPR-1, diamètre 7 mm",Material,General,t,5020.7,5020.7,5020.7,5020.7,1,EUR,53.51,0.052,88,88,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX SOUS-MARINS AVEC DES STRUCTURES MÉTALLIQUES EN MILIEU FLUVIAL (RIVIÈRES," KAME-LI-MESA-KALI_KAKAMERI,"Chevilles en plastique avec vis, diamètre 12 mm, longueur 70 mm, diamètre de la vis 8 mm, longueur de la vis 70 mm",Material,General,100 pièces,31.53,31.53,31.53,31.53,1,EUR,13.24,0.4197,88,88,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-KAVO-KARI_KAKAME,"Autogoudronneurs, capacité du réservoir 3500 l",Equipment,General,Heures machine,25.93,25.93,25.93,25.93,1,EUR,36.32,1.4003,88,88,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS ORGANIQUES DXME-KADX-KATO_KAKAME,"Wagons-bennes (dumpers), capacité de charge 136 t",Equipment,General,Heures machine,27.45,27.45,27.45,27.45,1,EUR,2313.25,84.2862,88,88,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR RIKA-ME-KARI-MEVO_KAKAKATO,"Attaches nylon non ouvrables 3,6 x 250 mm",Material,General,100 pièces,2.34,2.34,2.34,2.34,1,EUR,1.17,0.5032,88,88,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" DXME-KANE-KASA_KAMENE,"Chariots élévateurs à fourche, capacité de charge 5 t",Equipment,General,Heures machine,24.91,24.91,24.91,24.91,1,EUR,22.41,0.8995,88,88,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX PRÉPARATOIRES,Rugosification pour assurer l'adhérence sur des surfaces préalablement apprêtées DXME-KASA-KAME_KAMEVO,"Électricité : consommation 7,84 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.01,1.01,1.01,1.01,1,EUR,39.41,39.1333,87,87,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE À PETITS PANNEAUX,Construction de paliers d'escalier monolithiques dans un coffrage à panneaux fin DXME-KASA-KAME_KAMEVO,"Grues à tour, capacité de charge 10 t",Equipment,General,Heures machine,24.81,24.81,24.81,24.81,1,EUR,970.75,39.1333,87,87,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE À PETITS PANNEAUX,Construction de paliers d'escalier monolithiques dans un coffrage à panneaux fin RIKA-ME-KARI-RITO_KAKAMEME,"Marqueurs permanents noirs, largeur de trait 0,3 mm",Material,General,10 pièces,23.53,23.53,23.53,23.53,1,EUR,0.69,0.0433,87,87,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" RISA-ME-KAPU-KAPU_KAKAKARI,"Boulons de voie pour la fixation des rails, diamètre M24, longueur 140 mm, 160 mm, avec écrou de diamètre M24",Material,General,t,3955.31,3955.31,3955.31,3955.31,1,EUR,774.47,0.23,87,87,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-MELI-KANE,Disques de coupe,Abstract Material,General,pièce,647.44,647.44,647.44,647.44,1,EUR,630.19,1.0419,87,81,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-LI-MESA-KANE_KAKANEPU,"Clous de finition en acier, diamètre 1,6 mm, longueur 25 mm",Material,General,t,2470.56,2470.56,2470.56,2470.56,1,EUR,5.9,0.0233,87,87,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS KAME-LI-MELI-KALI_KAKASARI,"Disque abrasif à profil droit, marque du matériau abrasif 25A, dimensions 150 x 20 x 32 mm",Material,General,pièce,7.36,7.36,7.36,7.36,1,EUR,15.92,2.1616,87,87,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment KAME-RI-KATO-KATO_KAKAMEPU,"Mastic bitumineux chaud pour toiture MBK-G-55, MBK-G-65, MBK-G-75, MBK-G-85, MBK-G-100",Material,General,t,804.94,804.94,804.94,804.94,1,EUR,63.7,0.0993,86,86,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS","Réalisation des fondations, maçonnerie des murs" KAPU-TO-KAME-MERI_KAKAKATO,"Mortier de maçonnerie, ciment-chaux, M50",Material,General,m3,130.46,130.46,130.46,130.46,1,EUR,320.59,2.5788,86,86,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,COLONNES ET CAPITAUX KAME-LI-MESA-KATO_KAKATOME,"Boulons en acier galvanisé à tête hexagonale et écrou hexagonal galvanisé, diamètre du filetage du boulon et de l'écrou M6, longueur du boulon 12-60 mm",Material,General,kg,4.66,4.66,4.66,4.66,1,EUR,1.19,0.2554,85,85,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de toitures en tôle laminée sur une base en panneaux de ciment-sciur KAME-LI-MESA-KARI,Boulons d'ancrage,Abstract Material,General,pièce,3489.04,48.71,3571.94,3571.94,2,EUR,212.17,6.738,85,85,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation des boulons d'ancrage KAME-TO-KAME-KANE_KAKARIRI,Lubrifiant émulsion,Material,General,kg,2.3,2.3,2.3,2.3,1,EUR,135.16,59.458,85,85,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse RISA-RI-KAME-KANE_KAKAKATO,Pince à mandrin KS-086,Material,General,pièce,170.66,170.66,170.66,170.66,1,EUR,1136.38,6.6588,85,85,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-MEPU-KATO_KAKAPU,"Camions à benne basculante, capacité de charge jusqu'à 30 t",Equipment,General,Heures machine,40.04,40.04,40.04,40.04,1,EUR,571.95,14.2856,85,85,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B KAME-TO-KASA-RITO_KAKANEME,"Sodium caustique de marque TD, technique",Material,General,t,4533.38,4533.38,4533.38,4533.38,1,EUR,7.15,0.012,85,85,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,FABRICATION DE MATÉRIAUX D'ÉTANCHÉITÉ MEKA-RI-KARI-KALI_KAMERIRI,"Fil en laiton L68, rond, dur, précision normale, diamètre 1,5 mm",Material,General,t,42795.21,42795.21,42795.21,42795.21,1,EUR,2773.18,0.0651,84,84,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS KAPU-TO-KARI-METO_KAMEKAVO,"Mélanges secs de ciment et de sable pour la maçonnerie, granulométrie maximale de 3,5 mm, classe B7,5 (M100), F50",Material,General,t,140.51,140.51,140.51,140.51,1,EUR,528.01,3.7579,84,84,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",BLOCS DE MURS DE SOUS-SOLS DXME-RIKA-MENE_KAKAPU,"Barges automotrices à déchargement automatique avec système d'ouverture du fond, capacité de la cale 250 m3",Equipment,General,Heures machine,468.57,468.57,468.57,468.57,1,EUR,2337.42,4.9885,84,84,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-RIKA-MENE_KAKAVO,"Barges autopropulsées à fond ouvrant, capacité de la cale : 700 m3",Equipment,General,Heures machine,710.56,710.56,710.56,710.56,1,EUR,2891.98,4.07,84,84,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-RIKA-MENE_KAKANE,"Barges autopropulsées à fond ouvrant, capacité de la cale : 500 m3",Equipment,General,Heures machine,603.0,603.0,603.0,603.0,1,EUR,2578.69,4.2764,84,84,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-RIKA-MENE_KAKASA,"Barges automotrices à déchargement automatique avec système d'ouverture du fond de la coque, capacité de la cale 400 m3",Equipment,General,Heures machine,549.23,549.23,549.23,549.23,1,EUR,2448.13,4.4574,84,84,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-KALI-KAVO_KARISA,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,1.79,27.7389,84,84,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Grenaillage de la surface en béton DXME-KALI-KAVO_KARISA,"Mélangeurs de mortier mobiles, capacité du tambour 250 l",Equipment,General,Heures machine,0.29,0.29,0.29,0.29,1,EUR,8.09,27.7389,84,84,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Grenaillage de la surface en béton DXME-RIME-MEKA_KAKAPU,Marteaux à emboutir fonctionnant à partir d'installations de compression mobiles,Equipment,General,Heures machine,0.12,0.12,0.12,0.12,1,EUR,8.27,69.622,84,84,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-RIKA-MENE_KAKALI,"Barges autopropulsées à fond ouvrant, capacité de la cale à marchandises 600 m3",Equipment,General,Heures machine,656.79,656.79,656.79,656.79,1,EUR,2729.83,4.1563,84,84,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES RISA-RI-KAME-MEME_KAKAKANE,Cosses en polymère,Material,General,1000 pièces,549.48,549.48,549.48,549.48,1,EUR,44.51,0.0849,84,84,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-RIKA-MENE_KAMEKA,"Barges autopropulsées à fond ouvrant, capacité de la cale à marchandises 1000 m3",Equipment,General,Heures machine,871.87,871.87,871.87,871.87,1,EUR,3414.72,3.9165,84,84,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-RIKA-MENE_KAKADX,"Barges autopropulsées à fond ouvrant, capacité de la cale à marchandises 850 m3",Equipment,General,Heures machine,791.2,791.2,791.2,791.2,1,EUR,3148.62,3.9795,84,84,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES KARI-RI-KAPU-KAME,Ballast sableux,Abstract Material,General,m3,49.49,49.49,49.49,49.49,1,EUR,7144.66,144.3726,83,83,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KAPU-KAME_KASATO,"Foreuses rotatives automotrices, profondeur de forage jusqu'à 50 m, diamètre du trou 105 mm",Equipment,General,Heures machine,7.54,7.54,7.54,7.54,1,EUR,353.14,46.8493,83,83,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLUFFEMENT DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS DES TRANCHÉES E MEPU-PU-KARI-KAPU_KARITORI,"Peinture à l'huile MA-22, colorée",Material,General,t,2727.91,2727.91,2727.91,2727.91,1,EUR,3.44,0.0,83,83,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'un système de chauffage dans des bâtiments temporaires à usage ré DXME-KADX-MERI_MEKATO,Machines à percer et à meuler,Equipment,General,Heures machine,0.11,0.11,0.11,0.11,1,EUR,3.3,31.3982,83,83,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KATO-KARI_KAKAME,"Ventilateurs portables pour normaliser l'air dans les espaces confinés, débit jusqu'à 1000 m3/h",Equipment,General,Heures machine,0.21,0.21,0.21,0.21,1,EUR,2.2,10.6002,83,83,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-ME-KARI-KANE,Trappes en fonte,Abstract Material,General,pièce,138.12,124.75,490.21,124.75,2,EUR,1529.82,4.1172,82,80,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE RÉSEAUX THERMIQUES,"Installation de chambres avec parois, supports fixes en forme de panneaux et dal" KAME-TO-KASA-MENE,Réactifs,Abstract Material,General,kg,2795.61,2777.66,4249.68,2777.66,2,EUR,0.0,0.0,82,82,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Silicatisation et résinisation DXME-KALI-KALI_KAMEME,"Pompes à solution, débit 4 m3/h",Equipment,General,Heures machine,0.51,0.51,0.51,0.51,1,EUR,3.72,7.2532,82,82,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Préparation et acheminement d'une solution argileuse dans l'espace entre les par KAME-LI-MESA-KALI_KAKAKANE,Chevilles de montage en acier,Material,General,10 pièces,1.07,1.07,1.07,1.07,1,EUR,4.15,3.8766,82,82,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Réalisation d'une étanchéité des murs et des fondations à l'aide de matériaux d' DXME-KAPU-KAME_KAPUME,Marteaux de forage légers pour utilisation avec des compresseurs mobiles,Equipment,General,Heures machine,0.38,0.38,0.38,0.38,1,EUR,0.91,2.4157,82,82,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AUTRES TRAVAUX,BROYAGE DE MORCEAUX DE TERRE HORS NORME À L'AIDE DE CHARGES EXPLOSIVES DANS LE C DXME-RIME-MERI_KAKAPU,Cisailles électriques,Equipment,General,Heures machine,0.08,0.08,0.08,0.08,1,EUR,0.04,0.4532,82,82,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature KARI-RI-KAPU-KATO,Mélange sable-gravier ou mélange gravier-sable de composition granulométrique optimale,Abstract Material,General,m3,41.33,41.33,41.33,41.33,1,EUR,4044.5,97.8688,82,82,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation et réglage de dispositifs d'arrêt forcé des véhicules automobiles DXME-KALI-KALI_KAMEME,"Électricité : consommation 0,66 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.08,0.08,0.08,0.08,1,EUR,1.32,7.2532,82,82,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Préparation et acheminement d'une solution argileuse dans l'espace entre les par DXME-RIME-MERI_KAKAPU,"Électricité : consommation 0,23 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.02,0.4532,82,82,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-METO-KAME_KASAME,"Tracteurs équipés de balais de voirie, puissance 60 kW (82 ch)",Equipment,General,Heures machine,16.19,16.19,16.19,16.19,1,EUR,10.25,0.633,82,82,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES FONDATIONS ET REVÊTEMENTS EXISTANTS POUR LES REVÊTEMENTS EN GRAV,CORRECTION DU PROFIL DES FONDATIONS DXME-METO-KATO_KAPUME,"Camions-citernes, volume 8 m3",Equipment,General,Heures machine,37.22,37.22,37.22,37.22,1,EUR,93.72,2.5179,82,82,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE MEPU-SA-KARI-KARI_KAMEKARI,Mastic pour fenêtres à base d'huile de lin,Material,General,t,2903.15,2903.15,2903.15,2903.15,1,EUR,125.01,0.0647,81,81,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE VITRERIE,"VITRAGE DES CHÂSSIS DE FENÊTRES EN BOIS, DES CHÂSSIS, DES PANNEAUX DE PORTES ET " KASA-ME-KAVO-KAME,Blocs en béton armé,Abstract Material,General,m3,674.81,530.12,700.08,700.08,3,EUR,14845.23,23.2116,80,80,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-TO-KASA-MENE_KAKAMERI,"Chlorure de calcium technique, catégorie I",Material,General,t,1776.82,1776.82,1776.82,1776.82,1,EUR,359.38,0.3442,80,80,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en polymère-ciment KAME-LI-MESA-KALI_KAMESARI,"Chevilles en plastique avec vis, diamètre 6 mm, longueur 35 mm, diamètre de la vis 3,5 mm, longueur de la vis 50 mm",Material,General,100 pièces,1.86,1.86,1.86,1.86,1,EUR,4.5,2.4133,80,80,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Installation de systèmes de drainage KAME-TO-KASA-RITO_KAMERIDX,"Fluorure de sodium technique, marque A, grade I",Material,General,t,7350.7,7350.7,7350.7,7350.7,1,EUR,27.0,0.016,80,80,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,ÉCHAFAUDAGES EXTÉRIEURS ET INTÉRIEURS,Fabrication de pièces en bois pour échafaudages suspendus KAME-LI-MEME-KAPU_KAKALIRI,"Fil à souder sans revêtement SV-08G2S, diamètre 4 mm",Material,General,t,2959.35,2959.35,2959.35,2959.35,1,EUR,44.41,0.0892,80,80,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",COLONNES MEPU-ME-KAPU-KARI_KAKAMEME,"Colle, marque 88-N",Material,General,kg,10.72,10.72,10.72,10.72,1,EUR,19.83,2.2666,80,80,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Installation de cloisons de 3 m de hauteur en panneaux extrudés en amiante-cimen DXME-MELI-KARI_KASAME,Laboratoires mobiles à haut débit pour le contrôle des assemblages soudés,Equipment,General,Heures machine,93.27,93.27,93.27,93.27,1,EUR,71.47,0.7662,80,80,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONTRÔLE DE LA QUALITÉ DES ASSEMBLAGES SOUDÉS PAR DES MÉTHODES PHYSIQUES,CONTRÔLE RADIOGRAPHIQUE À L'AIDE D'UN COMPLEXE RADIOGRAPHIQUE MOBILE AUTONOME SU DXME-KAPU-KATO_KAMERI,"Électricité : consommation 29,7 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.81,3.81,3.81,3.81,1,EUR,26.19,6.8659,80,80,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KAPU-KATO_KAMERI,"Installations et machines de forage à percussion sur câble sur chenilles, profondeur de forage jusqu'à 300 m, capacité de charge 5 t",Equipment,General,Heures machine,88.98,88.98,88.98,88.98,1,EUR,610.93,6.8659,80,80,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-TO-KAME-KAPU_MEKAKAKA,Mazout de chauffage 100,Material,General,t,732.87,732.87,732.87,732.87,1,EUR,23.64,0.0341,80,80,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS INORGANIQUES METO-ME-KAME-KAME,Mortier décoratif (avec gravillons),Abstract Material,General,m3,124.41,122.87,244.61,122.87,2,EUR,261.49,2.1232,79,78,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif de revêtements mosaïques (« Breccia » et terrazzo) RITO-TO-KANE-KAPU_KAKAMEME,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, légers, diamètre nominal 50 mm, épaisseur de paroi 3 mm",Material,Pipes & Fittings,m,5.78,5.78,5.78,5.78,1,EUR,48.56,8.3978,79,79,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KAME-PU-KAME-KAME,Sabots à colonne pour tubes de cuvelage,Abstract Material,Pipes & Fittings,pièce,717.18,717.18,717.18,717.18,1,EUR,0.0,0.0,79,79,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Fixation du puits lors du forage rotatif avec des tuyaux à raccord à manchon KAVO-PU-KATO-KATO_KAKATOSA,"Acier d'armature laminé à chaud à profil périodique, classe A-III, diamètre 20-22 mm",Material,General,t,1438.08,1438.08,1438.08,1438.08,1,EUR,762.02,0.6859,79,79,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de l'enceinte de confinement du bâtiment réacteur d'une centrale nu MEPU-ME-KAME-KAME_KAKAKATO,Colle à bois sèche,Material,General,kg,3.34,3.34,3.34,3.34,1,EUR,143.65,43.0266,79,79,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS DXME-KANE-KAME_KAKAPU,"Crics hydrauliques, capacité de charge 200 t",Equipment,General,Heures machine,0.21,0.21,0.21,0.21,1,EUR,66.43,319.2487,78,78,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Extraction des tubes du puits KAVO-ME-KARI-MELI_KAMELITO,"Treillis métallique tissé sans revêtement, diamètre du fil 1,6 mm, taille des mailles 5 x 5 mm",Material,General,m2,23.1,23.1,23.1,23.1,1,EUR,460.64,19.9371,78,78,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction d'une dalle de fondation sous les bâtiments du bâtiment réacteur d' KAME-LI-KANE-MERI_KAKAKAPU,"Rubans en tissu de coton serré à armure sergée, largeur 40 mm",Material,General,100 m,10.82,10.82,10.82,10.82,1,EUR,7.49,0.7107,78,78,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE TRANSPORT À ACTION CONTINUE,CONVOYEURS SPÉCIAUX DXME-KAPU-KAME_KAPUTO,Marteaux de forage moyens pour utilisation avec des compresseurs mobiles,Equipment,General,Heures machine,0.43,0.43,0.43,0.43,1,EUR,16.91,39.4422,78,78,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,BRISAGE DE SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,Ameublissement des sols rocheux à l'aide de charges explosives lorsque la hauteu DXME-KATO-MEDX_MEKAME,Forets pneumatiques pour travaux miniers utilisés avec des stations de compression fixes,Equipment,General,Heures machine,3.92,3.92,3.92,3.92,1,EUR,69.14,17.6186,78,78,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DES COUPLAGES DES PUITS VERTICAUX AVEC LES COURES ENTOURANTES, LES CHAMB" RIKA-RI-KARI-KAME_KAKAMEDX,"Douilles isolantes, dimensions 65 x 50 x 18 mm",Material,General,1000 pièces,127.48,127.48,127.48,127.48,1,EUR,329.41,2.8383,78,78,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-LI-KATO-KATO_KAKAKAME,Vapeur,Material,General,kg,0.04,0.04,0.04,0.04,1,EUR,2644.91,72455.3636,77,77,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES DXME-KASA-MEPU_KARISA,"Grues mobiles, capacité de charge 1 t",Equipment,General,Heures machine,1.82,1.82,1.82,1.82,1,EUR,112.58,61.7774,77,77,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL RISA-RI-KAME-KANE_KAKAMERI,Pince d'alimentation KS-053-3,Material,General,pièce,8.32,8.32,8.32,8.32,1,EUR,84.29,10.1271,77,77,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MERI-RI-KATO-MESA,Isolant,Abstract Material,General,m3,28.6,4.33,114.25,4.33,2,EUR,1026.48,113.7315,77,77,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" KAME-LI-MESA-KALI,Fixations,Abstract Material,General,kg,6.62,0.36,19.17,6.43,5,EUR,117.53,207.7993,77,77,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES ME_MEKAKA_MEVO,Charge de travail moyenne 1,Labor,Labor,heures,13.19,13.19,13.19,13.19,1,EUR,956.1,72.5082,77,77,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI RIPU-TO-KAPU-MERI,Tuyaux en autres polymères,Abstract Material,General,m,1164.14,1164.14,1164.14,1164.14,1,EUR,131283.4,112.7729,77,76,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des canalisations internes à l'aide de gaines polymères flexibles DXME-RIKA-KATO_KAKARI,"Remorqueurs, puissance 221 kW (300 ch)",Equipment,General,Heures machine,66.08,66.08,66.08,66.08,1,EUR,240.74,3.6434,77,77,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL PU_MEKAKA_KANETO,Personnel : 3 personnes-heures/machine-heures,Operator,Operators,Heures machine,143.66,35.95,191.76,143.82,4,EUR,79.87,0.8205,77,77,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS DXME-RIKA-KAME_KARIME,Installations hydrauliques pour le lavage et l'aspiration des sols,Equipment,General,Heures machine,21.86,21.86,21.86,21.86,1,EUR,934.06,42.7252,77,77,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS KAME-LI-MEME-KALI_KARIMETO,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés TMU-21U, E50A, diamètre 3-5 mm",Material,General,kg,4.33,4.33,4.33,4.33,1,EUR,77.99,18.0281,77,77,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication d'éléments et assemblage de nœuds de conduites en acier à partir de KAME-LI-RIKA-KATO_KAKAMERI,Toile de jute,Material,General,m2,2.94,2.94,2.94,2.94,1,EUR,49.84,16.9392,76,76,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS MEPU-PU-KATO-MEME_KAKAKASA,Vernis NTs-62,Material,General,t,4932.39,4932.39,4932.39,4932.39,1,EUR,2.05,0.0,76,76,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",DISPOSITIFS DE MICROPROCESSEURS ET DE TECHNIQUES DE CALCUL,DÉCOUPAGE DE CÂBLES ET DE FILS EN CONNECTEURS KAVO-PU-KAME-KAME,Ancrages,Abstract Material,General,pièce,4691.98,4691.98,4691.98,4691.98,1,EUR,13932.29,3.6857,76,76,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-LI-MEME-KALI_KARITONE,"Électrodes de soudage pour le soudage d'aciers alliés à haute résistance et résistants à la chaleur TS-39, diamètre 2,5 mm",Material,General,kg,5.64,5.64,5.64,5.64,1,EUR,14.62,2.8993,76,76,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES DXME-RIME-MEDX_KAMENE,"Électricité : consommation 18,15 kWh/machine-heure",Electricity,Electricity,Heures machine,2.33,2.33,2.33,2.33,1,EUR,47.52,20.3857,76,76,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,FABRICATION DE COUDES COURBÉS ET MONTAGE D'ANGLES DE COUDES DE TUYAUTERIES,Fabrication de coudes cintrés à partir de tuyaux d'un diamètre nominal de 200 à RISA-RI-KAME-MENE_KAKAKALI,Selle simple pour boucle d'oreille KS-008,Material,General,pièce,37.07,37.07,37.07,37.07,1,EUR,259.74,7.0063,76,76,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIRI-RI-KAME-KAPU,Isolateurs à broche,Abstract Material,General,pièce,596.21,596.21,596.21,596.21,1,EUR,368456.73,618.0,76,76,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR DXME-RIME-MEDX_KAMENE,Cintreuses de tubes avec mandrin pour le cintrage à froid de tubes d'un diamètre extérieur de 508 à 1020 mm,Equipment,General,Heures machine,298.13,298.13,298.13,298.13,1,EUR,6077.5,20.3857,76,76,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,FABRICATION DE COUDES COURBÉS ET MONTAGE D'ANGLES DE COUDES DE TUYAUTERIES,Fabrication de coudes cintrés à partir de tuyaux d'un diamètre nominal de 200 à KAME-VO-KARI-KANE,Verre en feuilles,Abstract Material,General,m2,13.32,13.32,13.32,13.32,1,EUR,1271.16,95.44,76,76,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" MEPU-TO-KARI-KAME_KATOLIME,Peinture acrylique à dispersion aqueuse VD-AK-111,Material,General,t,2319.44,2319.44,2319.44,2319.44,1,EUR,7.69,0.0125,76,76,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,Pose de la voie par éléments séparés DXME-MEPU-KAPU_KAKATO,"Tracteurs à sellette, charge sur le dispositif d'attelage jusqu'à 30 t",Equipment,General,Heures machine,63.47,63.47,63.47,63.47,1,EUR,618.86,9.8796,76,76,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEME-TO-KATO-MESA_MEKAMERI,"Fixations en plastique pour la couche de protection de l'armature, forme en étoile, épaisseur de la couche de protection en béton 25 mm",Material,General,100 pièces,2.56,2.56,2.56,2.56,1,EUR,33.58,13.1043,75,75,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,"Poutres, ceintures, linteaux, traverses",Construction de poutres et de linteaux DXME-MEKA-MEME_KAPURI,"Installations pour la coupe de tubes, le chanfreinage extérieur et l'alésage du diamètre intérieur (coupe-tubes démontables) avec station hydraulique, diamètre des tubes 630-820 mm",Equipment,General,Heures machine,12.75,12.75,12.75,12.75,1,EUR,147.5,11.5688,75,75,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE AUTOMATIQUE DES JOINTS DE TUYAUX SUR LA TRONÇONNEE KAME-NE-KAME-KARI,Plaques de plâtre,Abstract Material,General,m2,4.35,4.35,4.35,4.35,1,EUR,1191.66,274.0693,75,75,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAME-TO-KAME-KANE_KAKATOTO,Graisse graphitée à usage général,Material,General,kg,4.51,4.51,4.51,4.51,1,EUR,54.14,12.0108,75,75,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-TO-KAPU-KARI_KAKANETO,"Acier laminé à chaud rond, nuances St3sp, St3ps, diamètre 5-12 mm",Material,General,t,1469.97,1469.97,1469.97,1469.97,1,EUR,100.1,0.0965,75,75,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHES DE LA PARTIE SOUTERRAINE ET DU SOUS-SOL DE,Montage du coffrage des structures monolithiques en béton armé des parties soute RISA-ME-KASA-KARI,Cales pour voies ferrées,Abstract Material,General,t,5383.05,5383.05,5383.05,5383.05,1,EUR,33429.53,6.3804,75,75,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" DXME-RIME-RIRI_NETOVO,"Aspirateurs industriels, puissance jusqu'à 2000 W",Equipment,General,Heures machine,0.26,0.26,0.26,0.26,1,EUR,0.97,3.4965,75,75,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation des boulons d'ancrage DXME-RIME-RIRI_NETOVO,"Électricité : consommation 0,66 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.08,0.08,0.08,0.08,1,EUR,0.34,3.4965,75,75,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation des boulons d'ancrage RISA-ME-KANE-MESA,Aiguillages,Abstract Material,General,compl,74732.29,74732.29,74732.29,74732.29,1,EUR,68952.99,0.9227,75,75,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" RISA-RI-KAME-KANE_KAKAMEVO,Pince d'alimentation de transition KS-069-1,Material,General,pièce,15.66,15.66,15.66,15.66,1,EUR,59.61,3.8068,75,75,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEME-TO-KATO-MESA_MEKARIPU,"Tubes de protection en PVC pour boulons de serrage du coffrage, diamètre 25/22 mm",Material,Pipes & Fittings,m,0.22,0.22,0.22,0.22,1,EUR,17.0,75.6329,75,75,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,"Poutres, ceintures, linteaux, traverses",Construction de poutres et de linteaux DXME-MEKA-MEME_KAPURI,"Électricité : consommation 3,63 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.47,0.47,0.47,0.47,1,EUR,5.39,11.5688,75,75,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE AUTOMATIQUE DES JOINTS DE TUYAUX SUR LA TRONÇONNEE KAME-PU-KAME-KANE_KAMENERI,"Couronne de forage à broche pour marteaux hydrauliques et machines de forage rotatif à percussion, filetage intérieur R32, diamètre 43 mm",Material,General,pièce,43.05,43.05,43.05,43.05,1,EUR,257.62,5.9835,74,74,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-LI-MESA-KALI_KAKAVORI,"Chevilles à clou en polypropylène avec rebord, diamètre 6 mm, longueur 40 mm",Material,General,100 pièces,5.76,5.76,5.76,5.76,1,EUR,12.08,2.0978,74,74,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-MEKA-MEME_KAPUME,Installations de fusion de bitume 8000 l,Equipment,General,Heures machine,50.64,50.64,50.64,50.64,1,EUR,666.02,13.1528,74,74,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX DXME-KARI-KAME_KAKASA,"Vibrateurs électriques à basse fréquence pour l'enfoncement de pieux tubulaires, couple excentrique 124,4 kgm, force centrifuge 604 kN",Equipment,General,Heures machine,47.04,47.04,47.04,47.04,1,EUR,148.38,3.1546,74,74,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-KALI-KAVO_KAKAKAPU,Savon liquide ménager,Material,General,kg,3.4,3.4,3.4,3.4,1,EUR,12.84,3.8274,74,74,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-KARI-KAME_KAKASA,"Électricité : consommation 44,55 kW·h/machine-heure",Electricity,Electricity,Heures machine,5.72,5.72,5.72,5.72,1,EUR,18.05,3.1546,74,74,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MERI-RI-KATO-MERI_KAKAKARI,"Feuille d'aluminium à usage technique, souple, en rouleau, épaisseur 0,1 mm",Material,General,kg,8.85,8.85,8.85,8.85,1,EUR,3.08,0.3488,74,74,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES RITO-VO-KATO-KAME_KAKAKARI,Bouchons métalliques d'inventaire,Material,General,t,6281.78,6281.78,6281.78,6281.78,1,EUR,231.56,0.0671,73,73,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de KAME-LI-KALI-MEKA_KAKAKAME,"Cartouches pour pistolet de construction et de montage, embout rouge, longueur 10-18 mm",Material,General,1000 pièces,130.79,130.79,130.79,130.79,1,EUR,165.15,1.4174,73,73,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé MEME-ME-KATO-KAME_KAKAKAME,"Bois rabotés de conifères (pin, sapin), dimensions 50 x 50 mm, qualité AB",Material,General,m3,1031.07,1031.07,1031.07,1031.07,1,EUR,80.63,0.0858,73,73,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation de poteaux métalliques pour la mise en place de moyens de protectio DXME-MERI-KAVO_KADXME,"Charrues portées, profondeur de labour 0,3 m",Equipment,General,Heures machine,0.55,0.55,0.55,0.55,1,EUR,1.43,2.5706,72,72,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,ENTRETIEN DES CULTURES À HUILES ESSENTIELLES RIRI-RI-KARI-MEPU_KAKAMERI,"Fil d'acier galvanisé pour lignes aériennes de communication, ordinaire, précision normale, classes 1, 2, diamètre 2,0 mm",Material,General,t,3821.03,3821.03,3821.03,3821.03,1,EUR,4.27,0.04,72,72,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES DXME-KADX-KAME_KAKALI,"Automotrices de montage pour le travail sur le réseau de contact avec un bras articulé et un module de positionnement des câbles, hauteur de suspension jusqu'à 10,5 m",Equipment,General,Heures machine,123.89,123.89,123.89,123.89,1,EUR,349.68,2.8225,72,72,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-KAPU-KAME_KALILI,"Installations de forage sur châssis automobile pour le forage rotatif de puits, profondeur de forage jusqu'à 200 m, capacité de levage du treuil jusqu'à 4 t",Equipment,General,Heures machine,38.52,38.52,38.52,38.52,1,EUR,121.1,3.1436,72,72,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-MESA-MEPU_KAMEVOSA,"Vis autotaraudeuses en acier oxydé à tête fraisée et empreinte cruciforme, pointues, diamètre 8 mm, longueur 100 mm",Material,General,t,3378.78,3378.78,3378.78,3378.78,1,EUR,26.65,0.0108,72,72,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé DXME-KATO-MEME_KAKATO,Chariots auxiliaires de gare,Equipment,General,Heures machine,0.12,0.12,0.12,0.12,1,EUR,18.43,149.7246,72,72,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION KAME-LI-MESA-KATO_KAKAMESA,"Boulons en acier à tête hexagonale, avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M20 (M22), longueur du boulon 40-220 mm",Material,General,t,4576.63,4576.63,4576.63,4576.63,1,EUR,883.26,0.2775,72,72,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Tête de colonne de gel MEME-RI-MEME-KAPU_KAMEKAME,"Contreplaqué avec couches extérieures en placage de bouleau, marque FSF, catégorie I/II, poncé, épaisseur 4 mm",Material,General,m3,3010.84,3010.84,3010.84,3010.84,1,EUR,57.3,0.0529,71,71,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES DXME-MEPU-KASA_KASARI,"Citernes remorquées, capacité 5 m3",Equipment,General,Heures machine,0.73,0.73,0.73,0.73,1,EUR,18.0,24.6055,71,71,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX MEKA-RI-KARI-MEKA_KAKAMETO,"Barres rondes en cuivre de marque M3, diamètre 10-30 mm",Material,General,t,17447.36,17447.36,17447.36,17447.36,1,EUR,84.47,0.032,71,71,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES MEDX-ME-KAME-KATO,Conduits d'air métalliques,Abstract Material,General,m2,24.85,24.85,24.85,24.85,1,EUR,2484.86,100.0,71,71,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en tôle d'acier galvanisé et en aluminium de classe P (ét MEPU-PU-KAME-KARI,Apprêts à base d'acrylique,Abstract Material,General,kg,4827.69,15.19,5906.35,5906.35,2,EUR,108.81,2.2231,71,71,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes DXDXDX_DXVODXDX,Déchets de construction et masse de matériaux recyclables,Material,General,t,0.0,0.0,0.0,0.0,0,EUR,0.0,4.6472,71,71,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Cloisons,CLOISONS,Démontage de cloisons en briques en briques individuelles DXME-MELI-KAPU_KASAME,"Électricité : consommation 10,56 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.36,1.36,1.36,1.36,1,EUR,32.99,24.32,71,71,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,FABRICATION DE STRUCTURES MÉTALLIQUES POUR CENTRALES NUCLÉAIRES DXME-MELI-KAPU_KASAME,"Appareils pour le découpage plasma à l'air du métal, épaisseur de coupe jusqu'à 100 mm",Equipment,General,Heures machine,4.79,4.79,4.79,4.79,1,EUR,116.61,24.32,71,71,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,FABRICATION DE STRUCTURES MÉTALLIQUES POUR CENTRALES NUCLÉAIRES DXME-RIKA-KARI_KAKATO,"Barges non automotrices, capacité de charge 300 t",Equipment,General,Heures machine,10.56,10.56,10.56,10.56,1,EUR,149.5,14.1551,71,71,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS KAME-LI-MESA-MEPU_KAMENESA,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 4 mm, longueur 40 mm",Material,General,t,3197.92,3197.92,3197.92,3197.92,1,EUR,1.82,0.0,70,70,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures RISA-ME-KANE-METO_KAKAKAME,"Rail de renfort, type P-18",Material,General,pièce,14.84,14.84,14.84,14.84,1,EUR,44.87,3.1599,70,70,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" KAME-RI-KATO-KALI,Émulsion bitumineuse,Abstract Material,General,t,530.49,9.06,545.83,545.83,2,EUR,1518.67,28.9773,70,70,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KARI-TO-KAME-KALI_KAKAKANE,"Sable de quartz, fraction 0-0,63 mm",Material,General,m3,131.16,131.16,131.16,131.16,1,EUR,83.66,0.8115,70,70,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation de pieux forés-injectés dans des puits prêts à l'emploi à l'aide de RISA-RI-KAME-KANE_KAMEMEME,Pince à collier KS-039,Material,General,pièce,39.56,39.56,39.56,39.56,1,EUR,139.56,3.528,70,70,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-ME-KASA-KAVO,Grille de traverses sur traverses en béton armé,Abstract Material,General,1000 m,21.77,21.77,21.77,21.77,1,EUR,21.77,1.0,70,70,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-MESA-KATO_KAKAPU,"Tracteurs à roues pneumatiques, puissance 108 kW (145 ch)",Equipment,General,Heures machine,34.83,34.83,34.83,34.83,1,EUR,420.21,12.063,70,70,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,"Pose de voies par tronçons de 12,5 m sur des sections droites avec des rails de " KAPU-TO-KARI-METO,Mélanges ciment-sable,Abstract Material,General,m3,61.13,0.78,103.82,103.82,2,EUR,259.44,9.7098,70,70,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS DXME-MELI-KAPU_KAPUKA,"Électricité : consommation 1,43 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.18,0.18,0.18,0.18,1,EUR,2.23,12.178,70,70,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE DXME-KATO-KANE_KAMEME,"Machines de chargement et de transport à moteur électrique sur chenilles pneumatiques, capacité de charge jusqu'à 6 t",Equipment,General,Heures machine,50.6,50.6,50.6,50.6,1,EUR,1682.98,33.262,70,70,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS KAVO-ME-KARI-MELI_KAMENEME,"Grillage tissé en fil métallique non revêtu, diamètre du fil 0,25 mm, taille des mailles 0,5 x 0,5 mm",Material,General,m2,12.6,12.6,12.6,12.6,1,EUR,729.73,57.9359,70,70,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de la dalle de fondation des bâtiments et structures des centrales DXME-RIKA-MENE_SAKADX,"Barges autopropulsées à fond ouvrant, à déchargement automatique, capacité de la cale : 1 800 m3",Equipment,General,Heures machine,1494.7,1494.7,1494.7,1494.7,1,EUR,2161.97,1.4464,70,70,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-KAVO-KATO_KARIDX,"Rouleaux compresseurs automoteurs à pneumatiques statiques, poids 16 t",Equipment,General,Heures machine,76.31,76.31,76.31,76.31,1,EUR,206.06,2.7003,70,70,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS ORGANIQUES DXME-MELI-KAPU_KAPUKA,Appareils pour le soudage par emboîtement de tuyaux en plastique d'un diamètre supérieur à 200 mm et inférieur à 630 mm,Equipment,General,Heures machine,0.64,0.64,0.64,0.64,1,EUR,7.78,12.178,70,70,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE KAME-VO-KAME-KALI_KAKAKAME,Verre liquide potassique,Material,General,t,1930.55,1930.55,1930.55,1930.55,1,EUR,156.83,0.1018,70,70,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS","Réalisation des fondations, maçonnerie des murs" DXME-KATO-KANE_KAMEME,"Électricité : consommation 29,7 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.81,3.81,3.81,3.81,1,EUR,126.89,33.262,70,70,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS KAME-LI-MESA-KAPU_KAKAMEME,"Vis en acier à tête demi-ronde, longueur 50 mm",Material,General,t,4107.57,4107.57,4107.57,4107.57,1,EUR,6.02,0.01,69,69,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-RI-KATO-KATO_KAKANETO,Mastic bitume-caoutchouc isolant MBR-65,Material,General,t,622.22,622.22,622.22,622.22,1,EUR,4.11,0.0391,69,69,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RISA-RI-KAME-KAME_KAKAMEME,Étiquettes en vinyle (anneaux numérotés),Material,General,1000 pièces,12.32,12.32,12.32,12.32,1,EUR,0.01,0.0,69,69,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE DXME-MELI-KAME_KAKAME,"Électricité : consommation 31,68 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.07,4.07,4.07,4.07,1,EUR,382.99,94.1232,69,69,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES DE BÂTIMENTS INDUSTRIELS À UN OU PLUSIEURS ÉTAGES DXME-MELI-KAME_KAKAME,"Redresseurs de soudage, courant de soudage jusqu'à 350 A, nombre de postes 8",Equipment,General,Heures machine,7.13,7.13,7.13,7.13,1,EUR,671.15,94.1232,69,69,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES DE BÂTIMENTS INDUSTRIELS À UN OU PLUSIEURS ÉTAGES DXME-RIKA-KADX_KAKAME,"Grues flottantes non automotrices, 5 t",Equipment,General,Heures machine,113.58,113.58,113.58,113.58,1,EUR,1279.81,11.2681,68,68,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAPU-TO-KAME-MEKA,Solution de tamponnage,Abstract Material,General,m3,65.03,65.03,65.03,65.03,1,EUR,993.69,15.2805,68,68,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KASA-KAPU_KAKAME,Électricité : consommation 66 kWh/machine-heure,Electricity,Electricity,Heures machine,8.48,8.48,8.48,8.48,1,EUR,63.56,7.4976,68,68,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR RISA-RI-KAME-KANE_KAKASAPU,Pince de raccordement KS-055-2 (KS-325-1),Material,General,pièce,8.4,8.4,8.4,8.4,1,EUR,88.04,10.4816,68,68,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-KANE_KAKATOTO,Pince pour câble à ressort et corde oblique KS-048-3 (KS-327),Material,General,pièce,17.35,17.35,17.35,17.35,1,EUR,532.85,30.7091,68,68,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-ME-KATO-KATO_KAKAMEME,"Dispositif antivol à ressort pour rails de chemin de fer, type P-50",Material,General,t,4495.72,4495.72,4495.72,4495.72,1,EUR,1438.57,1.0795,68,68,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR KAME-LI-MEDX-KANE_KAKAMERI,Joints d'étanchéité PRP-60,Material,General,kg,9.16,9.16,9.16,9.16,1,EUR,660.72,72.1152,68,68,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Installation de joints de dilatation dans les réservoirs MEPU-PU-KAME-KARI_KAKAMERI,"Apprêt renforçant, à pénétration profonde, à séchage rapide, perméable à la vapeur",Material,General,kg,2.86,2.86,2.86,2.86,1,EUR,49.18,17.2032,68,68,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim DXME-KASA-KAPU_KAKAME,"Grues à rotation circulaire, capacité de charge 320-160 t, portée 43 m",Equipment,General,Heures machine,789.97,789.97,789.97,789.97,1,EUR,5922.9,7.4976,68,68,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR MEME-ME-KATO-KANE_KAKALIRI,"Planches de bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 25 mm, classe IV",Material,General,m3,358.2,358.2,358.2,358.2,1,EUR,225.04,0.6376,68,68,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE CONDUITES D'EAU ET DE CANALISATIONS,Installation de panneaux muraux et de cloisons pour structures de stockage KASA-ME-KASA-MEME,Pieux-colonnes en béton armé,Abstract Material,General,m3,565.7,565.7,565.7,565.7,1,EUR,574.85,1.0162,68,68,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RINE-ME-KAME-KALI_KAKARIME,"Structures métalliques en acier profilé pour travaux de forage, poids de la structure jusqu'à 0,5 t",Material,Steel & Metal,t,4042.49,4042.49,4042.49,4042.49,1,EUR,6102.97,1.5097,68,68,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS TEMPORAIRES DES PUITS VERTICAUX DE SECTION CIRCULAIRE ET DE LEURS ORIF MEPU-TO-KARI-KAME,Peinture à l'eau,Abstract Material,General,t,2917.18,2917.18,2917.18,2917.18,1,EUR,146.63,0.0512,68,68,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'EAU À L'INTÉRIEUR DES LOCAUX KALI-RI-KALI-KAPU_KAKAKARI,"Structures individuelles en tôle d'acier, épaisseur 3-10 mm",Material,Steel & Metal,t,3886.89,3886.89,3886.89,3886.89,1,EUR,2627.89,0.6763,67,67,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ESCALIERS MÉCANIQUES ET DISPOSITIFS DIVERS,ESCALIERS MÉCANIQUES TUNNEL MEPU-PU-KATO-KARI_KAKAMEME,"Vernis bakélite LBS-1, LBS-2",Material,General,t,6731.18,6731.18,6731.18,6731.18,1,EUR,29.01,0.035,67,67,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES RIPU-RI-KAPU-KARI,Tuyaux de refoulement en fibre de verre,Abstract Material,General,m,1247.55,1247.55,1247.55,1247.55,1,EUR,458736.52,367.7108,66,66,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN FIBRE DE VERRE RIKA-ME-KARI-RITO_MEKARISA,"Douille en cuivre à installer aux extrémités d'un connecteur électrique, diamètre 17 mm, longueur 40 mm, épaisseur de paroi 2 mm",Material,General,pièce,3.44,3.44,3.44,3.44,1,EUR,47.58,13.8359,66,66,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KAME-PU-KARI-KARI,Trépan,Abstract Material,General,pièce,30.82,30.82,30.82,30.82,1,EUR,30.82,1.0,66,66,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AUTRES TRAVAUX,AÉRATION DES SOLS GELÉS RISA-RI-KAME-KANE_MEKAMEKA,"Pince d'alimentation en bronze pour câble porteur, dimensions 65 x 47 x 57 mm",Material,General,pièce,34.91,34.91,34.91,34.91,1,EUR,498.37,14.2748,66,66,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KAVO-TO-MEKA-KARI,Profilés pour pieux à emboîtement,Abstract Material,General,t,2812.12,2812.12,2812.12,2812.12,1,EUR,2840.25,1.01,66,66,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-TO-KARI-KALI_KAKAKAME,Hélium,Material,General,m3,106.88,106.88,106.88,106.88,1,EUR,52.8,0.5094,66,66,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,CONDUITES TECHNOLOGIQUES D'ATELIER,CONDUITES EN TUBES D'ACIER ALLIÉ ET HAUTEMENT ALLIÉ MEME-ME-KATO-KASA_KAKALIPU,"Planches non sciées de conifères, humidité naturelle, longueur 4-6,5 m, largeur 100-250, épaisseur 20 mm, classe IV",Material,General,m3,469.47,469.47,469.47,469.47,1,EUR,214.51,0.4722,66,66,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,FORMATION DE TERRASSEMENT À L'AIDE D'EXCAVATRICES MEPU-PU-KATO-MELI_KAKAKALI,Vernis KhS-567,Material,General,kg,4.36,4.36,4.36,4.36,1,EUR,4.0,0.9774,66,66,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES RISA-ME-KAME-KARI_KAKARIRI,"Bois de feuillus imprégné, pour aiguillages",Material,General,m3,467.41,467.41,467.41,467.41,1,EUR,1932.27,4.1352,66,66,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR RITO-TO-KAME-KAPU,Tubes de cuvelage sans soudure à filetage triangulaire,Abstract Material,Pipes & Fittings,m,370.76,370.76,370.76,370.76,1,EUR,1421.92,3.8352,66,66,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE PAR PERCUSSION ET ROTATION KAME-RI-KATO-KALI_KAKARITO,Émulsion bitumineuse routière,Material,General,t,537.54,537.54,537.54,537.54,1,EUR,727.18,1.5457,66,66,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS ORGANIQUES RISA-RI-KAME-KANE_MEKAKADX,"Pince d'alimentation en bronze pour fil de contact, dimensions 75 x 40 x 47 mm",Material,General,pièce,35.09,35.09,35.09,35.09,1,EUR,211.67,6.0317,66,66,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-MERI-KAVO_MENEME,Pelle-râteau,Equipment,General,Heures machine,0.93,0.93,0.93,0.93,1,EUR,0.9,0.9688,66,66,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" KAME-SA-KAME-KATO,Billes de verre réfléchissantes,Abstract Material,General,kg,642.89,2.32,1354.11,95.43,3,EUR,406.26,176.3357,66,53,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-LI-KALI-RIKA_KAKAKARI,"Talc moulu, catégorie I",Material,General,t,1617.89,1617.89,1617.89,1617.89,1,EUR,10.35,0.045,66,66,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mastic bitumineux à partir de carreaux RIKA-RI-MEKA-KATO_KAKAKARI,Embouts de câbles en cuivre pour installations électrotechniques,Material,General,100 pièces,333.58,333.58,333.58,333.58,1,EUR,60.89,0.182,66,66,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE CONVERSION RITO-TO-KAVO-KAME_KAKARILI,"Tubes en acier électrosoudés carrés, dimensions 40 x 40 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,t,1449.86,1449.86,1449.86,1449.86,1,EUR,29.69,0.0243,66,66,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KADX-KAVO_KAKAME,Compositions pour le transport de blocs d'aiguillages,Equipment,General,Heures machine,287.01,287.01,287.01,287.01,1,EUR,951.77,3.3162,65,65,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" ME_MEKAKA_MELI,Charge de travail moyenne 1,Labor,Labor,heures,13.08,13.08,13.08,13.08,1,EUR,1704.08,130.3243,65,65,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI DXME-MEPU-KASA_KAKATO,"Semi-remorques poids lourds, capacité de charge jusqu'à 60 t",Equipment,General,Heures machine,10.86,10.86,10.86,10.86,1,EUR,262.13,24.1362,65,65,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KAVO-TO-KASA-KARI,"Tôles laminées à chaud au carbone, épaisseur 4-6 mm",Abstract Material,General,t,2061.19,2043.76,2061.46,2061.46,2,EUR,8507.3,4.2043,65,65,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé KAME-LI-MEME-KALI_KARIKANE,"Électrodes de soudage pour le soudage des aciers résistants à la chaleur TML-3U, diamètre 3 mm",Material,General,kg,6.27,6.27,6.27,6.27,1,EUR,77.33,12.3298,65,65,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES MEPU-ME-KARI-KAME_KAKAKARI,"Colle, marque BMK-5k",Material,General,kg,6.41,6.41,6.41,6.41,1,EUR,1.34,0.2095,64,64,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e MERI-ME-KARI-MEKA,Matériaux d'étanchéité en rouleaux,Abstract Material,General,m2,21.41,21.41,21.41,21.41,1,EUR,2844.16,132.8113,64,58,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Réalisation d'une isolation par couche de fondation à l'aide de matériaux en rou ME_MEKAKA_MEKA,"Décharge moyenne 1,0",Labor,Labor,heures,12.3,12.3,12.3,12.3,1,EUR,2355.45,191.4908,64,64,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-LI-MEME-KAPU_KAKAMETO,"Fil métallique sous gaz protecteur pour le soudage mécanisé semi-automatique des aciers au carbone et faiblement alliés, classification E71T-1C, diamètre 1,2 mm",Material,General,t,4657.27,4657.27,4657.27,4657.27,1,EUR,1788.39,0.3839,64,64,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE COMBINÉ DES JOINTS DE TUYAUX SUR LA TRONÇON RISA-ME-KASA-KASA_KAMEMEKA,"Rails de chemin de fer, type P50, catégorie OT350",Material,General,m,227.84,227.84,227.84,227.84,1,EUR,555.03,2.4746,64,64,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,ROBINETS À PORTE MEME-ME-KATO-KANE_KAKAVORI,"Planche équarrie en bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 20-22 mm, classe II",Material,General,m3,367.01,367.01,367.01,367.01,1,EUR,89.23,0.2473,64,64,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS UTILISANT DES PLAQUES DE CIMENT-COPEAUX,CLOISONS SUR OSSATURE EN BOIS DXME-MEVO-KAME_SAMENE,"Compresseurs à vis mobiles avec moteur à combustion interne, pression jusqu'à 0,7 MPa (7 atm), débit jusqu'à 6 m3/min",Equipment,General,Heures machine,14.92,14.92,14.92,14.92,1,EUR,141.78,9.5042,64,64,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Réalisation d'une tranchée à l'aide d'une fraise hydraulique pour la constructio KAVO-PU-KATO-KATO_KAKARINE,"Acier d'armature laminé à chaud à profil périodique, classe A-II, diamètre 25-28 mm",Material,General,t,1419.16,1419.16,1419.16,1419.16,1,EUR,437.86,0.3084,64,64,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p RITO-LI-KARI-KARI,Raccords de tuyauterie,Abstract Material,General,t,15.48,15.48,15.48,15.48,1,EUR,3.38,0.2855,64,64,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites d'alimentation en eau pour la lutte contre l'incendie à partir KAME-LI-MEPU-KAPU_KAKAMEME,Polyéthylène polyamine technique,Material,General,t,15257.85,15257.85,15257.85,15257.85,1,EUR,132.81,0.024,64,64,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR DXME-MELI-KAPU_KALIME,"Systèmes de soudage externes pour le soudage unilatéral à un seul arc, vitesse de soudage jusqu'à 1,15 m/min, courant de soudage nominal jusqu'à 350 A",Equipment,General,Heures machine,15.1,15.1,15.1,15.1,1,EUR,4940.36,327.0747,64,64,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE COMBINÉ DES JOINTS DE TUYAUX SUR LA TRONÇON KAVO-TO-MEME-KAME,Profilés en acier laminés à chaud,Abstract Material,General,t,1765.17,1765.17,1765.17,1765.17,1,EUR,14018.7,7.9421,64,64,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KAVO-KAPU_KARIPU,"Chaudières électriques mobiles à bitume, capacité de chargement 1000 l",Equipment,General,Heures machine,3.79,3.79,3.79,3.79,1,EUR,12.74,3.3605,63,63,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Réalisation d'un joint de dilatation pour fondations sous équipement avec rempli RITO-TO-KATO-KARI_KAMERISA,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 146 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,81.4,81.4,81.4,81.4,1,EUR,267.86,3.2906,63,63,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-MEKA-KAPU_KAMELI,"Électricité : consommation 11,62 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.49,1.49,1.49,1.49,1,EUR,178.28,119.499,63,63,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale à partir de bandes adhésives p KAME-LI-KANE-KAPU_KAKAKALI,"Bandes en papier pour créer des fissures artificielles entre les structures de charpente et les surfaces adjacentes, avec une couche adhésive d'un côté et un revêtement antiadhésif de l'autre, couleur blanche, largeur 65 mm",Material,Steel & Metal,100 m,80.32,80.32,80.32,80.32,1,EUR,99.97,1.2446,63,63,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim KAVO-TO-KAVO-KARI_KAKANEKA,"Cornière en acier laminé à chaud à ailes égales, nuances d'acier St3sp, St3ps, largeur des ailes 20-32 mm, épaisseur des ailes 3-4 mm",Material,General,t,1355.45,1355.45,1355.45,1355.45,1,EUR,138.42,0.1871,63,63,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAME-LI-KANE-KAPU_KAKAKARI,"Bandes de papier perforées de renfort pour améliorer la résistance aux fissures des joints, largeur 52 mm",Material,General,m,0.07,0.07,0.07,0.07,1,EUR,12.04,181.7302,63,63,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim KAME-LI-MEME-KAPU_KAKASANE,"Fil à souder SV-10X5M, diamètre 2 mm",Material,General,kg,13.38,13.38,13.38,13.38,1,EUR,0.99,0.1362,63,63,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations RISA-ME-KATO-KAPU_KAKAMEME,"Agrafes en acier en forme de S pour renforcer les extrémités des traverses contre les fissures, dimensions 155 x 130 x 20 mm",Material,General,1000 pièces,1031.4,1031.4,1031.4,1031.4,1,EUR,1757.46,1.7041,63,63,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-MEKA-KAPU_KAMELI,Machines pour le nettoyage et l'isolation avec des bandes polymères de tuyaux d'un diamètre de 600 à 800 mm,Equipment,General,Heures machine,29.09,29.09,29.09,29.09,1,EUR,3476.72,119.499,63,63,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale à partir de bandes adhésives p DXME-KANE-KADX_MERIME,"Machines auxiliaires multifonctionnelles avec plate-forme hydraulique à ciseaux, capacité de charge de la plate-forme jusqu'à 1500 kg",Equipment,General,Heures machine,132.28,132.28,132.28,132.28,1,EUR,2254.01,17.0392,63,63,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" RISA-ME-KASA-KAPU_KAKAKARI,"Rails ferroviaires, type P18",Material,General,t,4938.38,4938.38,4938.38,4938.38,1,EUR,27401.6,5.5489,63,63,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" DXME-KAVO-KAPU_KARIPU,"Électricité : consommation 8,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.06,1.06,1.06,1.06,1,EUR,3.56,3.3605,63,63,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Réalisation d'un joint de dilatation pour fondations sous équipement avec rempli DXME-KARI-KATO_KARIPU,"Marteaux diesel, poids de la partie frappante 2,5 t",Equipment,General,Heures machine,28.96,28.96,28.96,28.96,1,EUR,39.61,1.3676,63,63,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KATO-MESA_KAKADX,"Installations de forage pneumatiques automotrices sur châssis pneumatique avec 3 foreuses, zone de forage de 9 m de largeur et 7,2 m de hauteur",Equipment,General,Heures machine,371.68,371.68,371.68,371.68,1,EUR,8561.21,23.034,63,63,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-MEDX-KATO_KAKAME,"Stations à huile mobiles, puissance du moteur électrique 15 kW",Equipment,General,Heures machine,4.19,4.19,4.19,4.19,1,EUR,139.95,33.3973,62,62,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX MEME-RI-METO-KANE_KAKAMERI,"Panneaux de plancher, épaisseur 25 mm",Material,General,m2,9.08,9.08,9.08,9.08,1,EUR,27.77,3.0594,62,62,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy DXME-MEDX-KATO_KAKAME,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,21.23,33.3973,62,62,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RIME-RI-KATO-KARI_MERIKAKA,"Tubes en plastique polyvinylchlorure TV-40, qualité supérieure et première qualité, diamètre intérieur 0,50-9,00 mm",Material,Pipes & Fittings,kg,10.81,10.81,10.81,10.81,1,EUR,1.57,0.145,62,62,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE CONVERSION MEKA-RI-KARI-KATO_MEKATORI,"Feuilles de laiton laminées à froid, marque L85, épaisseur de 0,2 à 2,0 mm",Material,General,t,30398.96,30398.96,30398.96,30398.96,1,EUR,1045.14,0.48,62,62,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,JOINTS DE DÉFORMATION KAME-TO-KAME-KANE_KAKARIME,Lubrifiant antifriction polyvalent pour les éléments de frottement et de glissement des mécanismes et machines fonctionnant à des températures élevées,Material,General,t,6047.43,6047.43,6047.43,6047.43,1,EUR,86.38,0.215,62,62,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-RIME-RIRI_KALIME,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,5.44,8.5644,62,62,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-MESA-KANE_KAKARIRI,"Clous en acier pour tôle, diamètre 2-3 mm, longueur 20-40 mm",Material,General,kg,2.35,2.35,2.35,2.35,1,EUR,11.0,4.6752,62,62,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" MEKA-TO-KARI-KATO_KAKARIPU,"Soudures étain-plomb à faible teneur en antimoine, marque POSSu 40-0,5",Material,General,kg,42.42,42.42,42.42,42.42,1,EUR,2.63,0.0619,62,62,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO DXME-RIME-RIRI_KALIME,"Ventilateurs radiaux à usage général, débit jusqu'à 15 000 m3/h",Equipment,General,Heures machine,1.7,1.7,1.7,1.7,1,EUR,14.59,8.5644,62,62,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-KANE-MEME_KAKARIME,"Rubans d'étanchéité à base de fluoroplaste 4D, résistants à la corrosion, avec une couche adhésive sur une face pour l'étanchéification des raccords filetés fixes des tuyauteries, largeur 10 mm, épaisseur 0,1 mm",Material,General,kg,46.45,46.45,46.45,46.45,1,EUR,3.15,0.0812,62,62,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation d'un compteur d'eau dans un appartement KAME-LI-MEME-KASA,Cales métalliques,Abstract Material,General,pièce,317.02,317.02,317.02,317.02,1,EUR,0.0,0.0,62,62,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" KAME-TO-KASA-RITO_KAMEKARI,"Sodium silicofluorure technique, grade I",Material,General,t,3351.93,3351.93,3351.93,3351.93,1,EUR,57.31,0.0365,61,61,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en béton résistant aux acides et à la chaleur MEME-RI-KAPU-KANE,Écrans pour baignoire,Abstract Material,General,pièce,160.52,26.86,162.75,162.75,2,EUR,887.04,11.0167,61,61,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de trappes sanitaires (d'inspection), d'écrans sous baignoire" MEPU-PU-KARI-KAPU_KAMELISA,"Peinture à l'huile MA-15, minium de fer",Material,General,t,2260.53,2260.53,2260.53,2260.53,1,EUR,12.96,0.015,61,61,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KANE-KANE_KAPUNE,"Élévateurs à mât unique, capacité de charge jusqu'à 500 kg, hauteur de levage 25 m",Equipment,General,Heures machine,1.19,1.19,1.19,1.19,1,EUR,0.38,0.3166,61,61,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,ANTISEPTIQUE DES CONSTRUCTIONS KAVO-PU-KATO-KATO_KAKATOLI,"Acier d'armature laminé à chaud à profil périodique, classe A-III, diamètre 32-40 mm",Material,General,t,1483.71,1483.71,1483.71,1483.71,1,EUR,192.23,0.1334,61,61,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments KAME-ME-KARI-KARI_KAKARIME,"Papier électro-isolant en amiante BE, épaisseur 0,2-0,3 mm",Material,General,t,4653.3,4653.3,4653.3,4653.3,1,EUR,66.85,0.0343,61,61,INSTALLATION DE L'ÉQUIPEMENT,"Équipements de concassage, de broyage, d'enrichissement et d'agglomération",ÉQUIPEMENT DE TRI ET D'ENRICHISSEMENT,CYCLONES RIME-RI-KARI-KAME_KAKARITO,"Fil d'antenne MG, section 4 mm2",Material,General,1000 m,1163.45,1163.45,1163.45,1163.45,1,EUR,6.46,0.0104,61,61,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",ÉQUIPEMENT TECHNIQUE ET DE STUDIO DES CENTRES DE TÉLÉVISION ET DES STATIONS DE R MERI-RI-KATO-KANE_KAKAKAME,Plaque de verrouillage en polyéthylène,Material,General,pièce,16.01,16.01,16.01,16.01,1,EUR,32.03,2.0,60,60,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,CONDUITES DANS LES CANALISATIONS ET EN SURFACE DXME-RIKA-KADX_KAKANE,"Grues flottantes fonctionnant dans des eaux fermées, automotrices, 100 tonnes",Equipment,General,Heures machine,376.1,376.1,376.1,376.1,1,EUR,6536.5,17.3798,60,60,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS MERI-RI-KANE-KANE,Coques en mousse de polyuréthane,Abstract Material,General,compl,29.74,29.74,29.74,29.74,1,EUR,59.48,2.0,60,60,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,CONDUITES DANS LES CANALISATIONS ET EN SURFACE KALI-RI-KANE-KATO_KAMEDXSA,"Profilé en acier galvanisé pour montants, dimensions 50 x 50 mm, épaisseur 0,6 mm",Material,General,m,2.65,2.65,2.65,2.65,1,EUR,712.25,268.65,60,60,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CLOISONS,Installation de cloisons en plaques de plâtre et en béton léger KAVO-TO-KATO-KASA_KAKAMEME,"Fil d'acier à faible teneur en carbone galvanisé à usage divers, diamètre 1,1 mm",Material,General,t,3368.97,3368.97,3368.97,3368.97,1,EUR,46.71,0.0214,60,60,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment DXME-MEPU-KALI_KAKAME,"Camions-citernes à bitume, capacité de la citerne 16 m3",Equipment,General,Heures machine,63.31,63.31,63.31,63.31,1,EUR,104.35,1.6483,60,60,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-MELI-KARI_KAKAPU,"Appareils à rayons X portables à potentiel constant, plage de réglage de la tension sur le tube à rayons X 70-180 kV, intensité du courant anodique 1-5 mA, épaisseur radiographique jusqu'à 30 mm sur l'acier",Equipment,General,Heures machine,5.61,5.61,5.61,5.61,1,EUR,14.87,2.6502,60,60,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" PU_MEKAKA_KALIDX,Personnel : 8 personnes-heures/machine-heures,Operator,Operators,Heures machine,106.38,106.38,106.38,106.38,1,EUR,1848.82,17.3798,60,60,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-TO-KARI-KAME_KAKAKATO,Azote liquide technique,Material,General,t,1412.2,1412.2,1412.2,1412.2,1,EUR,120.37,0.0943,60,60,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV RITO-VO-KASA-MESA,Pièces moulées en fonte,Abstract Material,General,pièce,44.65,32.2,46.29,46.29,2,EUR,58.32,1.2598,60,60,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN FONTE,Installation de pièces moulées en fonte sous pression KAVO-TO-KAPU-KARI,Acier rond résistant à la corrosion et à la chaleur,Abstract Material,General,t,5878.5,5878.5,5878.5,5878.5,1,EUR,700.19,0.2045,60,59,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KAME-TO-KAPU-KAVO_KAKARIRI,Huile sous vide,Material,General,kg,7.95,7.95,7.95,7.95,1,EUR,0.38,0.0486,59,59,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,CONDUITES TECHNOLOGIQUES D'ATELIER,CONDUITES EN TUBES D'ACIER ALLIÉ ET HAUTEMENT ALLIÉ KAME-LI-KANE-MERI_KAKAKANE,"Rubans autocollants pour l'étanchéité et l'isolation à base de tissu de verre et de caoutchouc organosilicié pour les travaux d'installation et de réparation électriques, couleur rouge, largeur 26 mm, épaisseur 0,5 mm",Material,General,m,0.95,0.95,0.95,0.95,1,EUR,242.1,255.4532,59,59,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RIPU-TO-KASA-MESA,Pièces moulées et raccords,Abstract Material,General,pièce,15.35,15.35,15.35,15.35,1,EUR,16.94,1.1033,59,59,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites d'alimentation en eau et de chauffage à partir de tuyaux en po KAVO-ME-KARI-RIKA,Poteaux d'amarrage en fonte,Abstract Material,General,t,11494.14,11494.14,11494.14,11494.14,1,EUR,21441.06,1.8656,59,59,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de bornes d'amarrage sur les installations de transport fluvial RIRI-RI-KARI-MEPU,Fil d'acier galvanisé pour lignes aériennes de communication,Abstract Material,General,t,3540.24,3540.24,3540.24,3540.24,1,EUR,0.0,0.0,59,37,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES DXME-KARI-KARI_KAKAME,"Installations de copro sur base tracteur, puissance jusqu'à 110 kW (150 ch)",Equipment,General,Heures machine,41.62,41.62,41.62,41.62,1,EUR,87.99,2.1142,59,59,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEME-KARI_KANEME,Chariots à chenilles,Equipment,General,Heures machine,6.07,6.07,6.07,6.07,1,EUR,8.96,1.4771,59,59,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,CÂBLES ET CÂBLES DE PROTECTION CONTRE LA FOUDRE VL 35-750 KV RIRI-RI-KARI-KADX,Crochets,Abstract Material,General,kg,1303.68,1303.68,1303.68,1303.68,1,EUR,0.0,0.0,59,59,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" RISA-ME-KAME-KAPU_KAKATORI,"Traverse en bois de conifères, non imprégnée, pour voies ferrées à écartement large, type II",Material,General,pièce,54.3,54.3,54.3,54.3,1,EUR,16.68,0.3073,59,59,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-TO-KAME-KANE_KAKATOPU,Graisse cuivre-graphite,Material,General,kg,25.3,25.3,25.3,25.3,1,EUR,39.11,1.6007,59,59,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE RINE-ME-KAME-KASA_KAKAMEME,"Tubages en fonte pour métro, diamètre extérieur de l'anneau de 5,5 m à 10,5 m",Material,General,t,4365.1,4365.1,4365.1,4365.1,1,EUR,249002.56,57.0439,59,59,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS MERI-RI-KATO-KALI,Revêtement isolant thermique liquide,Abstract Material,General,l,33.87,33.87,33.87,33.87,1,EUR,4771.61,140.862,59,59,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS DXME-MELI-KAPU_RIPUME,"Extrudeuses manuelles de soudage, puissance 3,5 kW",Equipment,General,Heures machine,1.14,1.14,1.14,1.14,1,EUR,30.51,26.6629,58,58,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENTS ADHÉSIFS,"Collage de plaques de polyisobutylène d'une épaisseur de 2,5 mm sur une surface " KAME-LI-MEME-KALI_KAKARIDX,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés É55, diamètre 3 mm",Material,General,t,3904.45,3904.45,3904.45,3904.45,1,EUR,50.92,0.06,58,58,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,"Pose de voies par tronçons de 12,5 m sur des sections droites avec des rails de " DXME-KATO-KANE_KAMEPU,"Chariots de manutention à moteur à combustion interne sur roues pneumatiques, version antidéflagrante, capacité de charge jusqu'à 10 t",Equipment,General,Heures machine,175.74,175.74,175.74,175.74,1,EUR,849.65,4.8345,58,58,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" KATO-RI-KAME-KAME_KAKAKATO,"Ciment Portland sans additif pour la construction générale CEM 0 42,5N",Material,General,t,212.14,212.14,212.14,212.14,1,EUR,91.9,0.4831,58,58,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au DXME-KANE-KATO_KAPUVO,"Treuils manuels et à levier avec une force de traction de 49,05 kN (5 t)",Equipment,General,Heures machine,0.18,0.18,0.18,0.18,1,EUR,7.11,38.6857,58,58,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE DXME-MELI-KAPU_RIPUME,"Électricité : consommation 1,16 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.15,0.15,0.15,0.15,1,EUR,3.96,26.6629,58,58,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENTS ADHÉSIFS,"Collage de plaques de polyisobutylène d'une épaisseur de 2,5 mm sur une surface " KAME-LI-MEME-KALI_KAMEVOLI,"Électrodes de soudage pour le soudage des aciers faiblement alliés et au carbone UONI 13/55, E50A, diamètre 2,5 mm",Material,General,t,3384.43,3384.43,3384.43,3384.43,1,EUR,27.89,0.0367,58,58,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Fabrication de structures métalliques KAME-LI-KANE-MEKA_KAKAMEME,"Bandes anticorrosion thermorétractables en polyéthylène avec une couche adhésive sur une face pour l'isolation des tuyauteries, couleur noire, largeur 450 mm, épaisseur 0,7 mm",Material,General,m,6.45,6.45,6.45,6.45,1,EUR,314.08,48.6941,58,58,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,CONDUITES DANS LES CANALISATIONS ET EN SURFACE DXME-MELI-KAPU_KADXME,Brûleurs à gaz à injection,Equipment,General,Heures machine,0.24,0.24,0.24,0.24,1,EUR,22.61,93.9952,58,58,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE MEPU-RI-KAME-KANE_KAKAMERI,"Revêtement émulsion paraffinique filmogène pour travaux routiers, teneur en matières sèches 15-35 %, indice d'hydrogène (pH) 7-9 unités, couleur blanche, jaune",Material,General,t,1718.79,1718.79,1718.79,1718.79,1,EUR,794.93,0.4626,57,57,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS ORGANIQUES MEKA-TO-KARI-KARI_KAKAMETO,"Étain, marque O1PCh",Material,General,kg,43.26,43.26,43.26,43.26,1,EUR,29.53,1.1111,57,57,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES KAME-TO-KAPU-KAVO_KAKARIME,Huile aviation,Material,General,kg,3.0,3.0,3.0,3.0,1,EUR,5.15,1.7165,57,57,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) KALI-RI-KARI-KASA,Selle en acier pour la fixation des supports en bois,Abstract Material,General,pièce,3588.04,5.32,3931.44,3931.44,3,EUR,1355.68,4.325,57,55,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BOIS VL 35-220 KV MELI-ME-KARI-KATO_KAKATOME,Matériau en rouleau en mullite-silice MCRR-130,Material,General,t,4658.49,4658.49,4658.49,4658.49,1,EUR,107.54,0.1025,57,57,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES KAME-TO-KAME-KALI_KAKAKAME,Alcool butylique synthétique,Material,General,t,13192.65,13192.65,13192.65,13192.65,1,EUR,41.36,0.02,57,57,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES DXME-KAME-KARI_KARIRI,Niveleuses tractées de type lourd,Equipment,General,Heures machine,6.07,6.07,6.07,6.07,1,EUR,25.87,4.2612,57,57,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D MERI-ME-KARI-MERI_KAKAKARI,"Pergamine de toiture, groupe de combustibilité G4, résistance à la rupture dans le sens longitudinal 215 N/50 mm, résistance à la chaleur +80 °C, masse 0,19 kg/m2",Material,General,m2,0.41,0.41,0.41,0.41,1,EUR,95.15,234.0343,57,57,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,DALLES DE REVÊTEMENT ET DE PLANCHER KAME-LI-KALI-KATO_KAKAKALI,"Cire polyéthylène, non oxydée",Material,General,kg,7.02,7.02,7.02,7.02,1,EUR,9.36,1.3575,57,57,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS DXME-MERI-KANE_KAMERI,Avertisseurs de collision remorqués (sans tracteur),Equipment,General,Heures machine,1.99,1.99,1.99,1.99,1,EUR,1.51,0.7553,57,57,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES RITO-VO-KATO-KANE_KAKAMETO,"Raccord en acier assemblé avec manchon et contre-écrou, diamètre nominal 65 mm",Material,General,pièce,13.61,13.61,13.61,13.61,1,EUR,10.1,0.7421,57,57,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAME-RI-KATO-KASA,Apprêt,Abstract Material,General,kg,4.98,4.98,4.98,4.98,1,EUR,329.32,66.1077,57,57,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale KAVO-RI-KARI-MEME_KAKARIVO,"Câble à double torsion TK, structure 6x37(1+6+12+18)+1 o.s., marque B, en fil galvanisé du groupe Zh, groupe de marquage 1570-1770 N/mm2, diamètre 5,0 mm",Material,Steel & Metal,10 m,14.98,14.98,14.98,14.98,1,EUR,20.01,1.3358,57,57,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAVO-TO-KARI-KAME_KAKAPUME,"Rubans d'emballage en acier, souples, précision normale en épaisseur et en largeur 0,7 x 20-50 mm",Material,General,t,1945.36,1945.36,1945.36,1945.36,1,EUR,288.68,0.2192,56,56,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'un système de chauffage dans des bâtiments temporaires à usage ré RIPU-TO-KATO-KAME_KARIMEDX,"Tube thermorétractable en polyéthylène coloré, TUT 60/30",Material,Pipes & Fittings,m,4.13,4.13,4.13,4.13,1,EUR,40.11,9.7036,56,56,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DES CENTRALES NUCLÉAIRES ET DES BÂTIME DXME-KANE-KAVO_KAKAPU,"Électricité : consommation 0,26 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.02,0.1427,56,56,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-MEKA-KATO_KAKAME,"Chargeuses à bitume, capacité de charge 4 t",Equipment,General,Heures machine,36.31,36.31,36.31,36.31,1,EUR,167.46,4.612,56,56,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Installation de joints de dilatation dans les réservoirs DXME-RIKA-MEKA_KAKAME,"Plates-formes flottantes démontables, capacité de charge 3,5 t",Equipment,General,Heures machine,16.09,16.09,16.09,16.09,1,EUR,164.47,10.2246,56,56,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS KASA-ME-KATO-MENE,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,1774.98,1774.98,1774.98,1774.98,1,EUR,84843.86,47.8,56,56,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"Poutres, traverses et linteaux" DXME-KANE-KANE_KAPUSA,"Élévateurs à mât unique, capacité de charge jusqu'à 500 kg, hauteur de levage 15 m",Equipment,General,Heures machine,1.06,1.06,1.06,1.06,1,EUR,0.22,0.2153,56,56,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS KAME-LI-KANE-KAPU_KAKAKASA,"Bandes de renfort en fibre de verre avec couche adhésive pour joints de matériaux en feuilles, largeur 50 mm",Material,General,100 m,6.16,6.16,6.16,6.16,1,EUR,22.78,3.7647,56,56,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,"Installation d'un pare-neige, mise en place d'un système de fonte de neige et d'" KAVO-PU-KARI-KASA_MEKAKAKA,"Treillis soudé léger en fil d'armature de classe Vp-1, type 4",Material,General,t,1653.85,1653.85,1653.85,1653.85,1,EUR,227.49,0.1464,56,56,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,DALLES DE REVÊTEMENT ET DE PLANCHER DXME-MEKA-MEKA_KAMETO,Centrateurs hydrauliques internes pour tuyaux de 900 à 1 000 mm de diamètre,Equipment,General,Heures machine,2.84,2.84,2.84,2.84,1,EUR,120.23,42.2714,56,56,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,SOUFFLAGE DE TUBES DE TYPE SST-PAU RIKA-ME-KARI-RITO_MEKARINE,"Câble de soutien en acier inoxydable avec deux cosses et douilles pour la fixation de la tige principale du dispositif de fixation à la tige inclinée de la console isolée, diamètre 6 mm, longueur 1,2 m",Material,General,pièce,21.68,21.68,21.68,21.68,1,EUR,207.48,9.5714,56,56,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KATO-RI-KAME-KASA_KAKAKATO,"Ciment Portland au laitier pour la construction générale CEM III 32,5N",Material,General,t,201.07,201.07,201.07,201.07,1,EUR,4753.12,23.6389,56,56,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs en béton armé préfabriqué pour puits de descente DXME-KANE-KAVO_KAKAPU,"Palans électriques, capacité de charge 3,2 t",Equipment,General,Heures machine,0.36,0.36,0.36,0.36,1,EUR,0.05,0.1427,56,56,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-KADX-MEPU_SAKARI,"Pelles-chargeuses à chenilles combinées avec module pour le remplacement des traverses lors de la construction de la superstructure de la voie, poids de la pelle jusqu'à 20 t, largeur de prise 920 mm",Equipment,General,Heures machine,162.45,162.45,162.45,162.45,1,EUR,248.28,1.5284,56,56,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES ÉLÉMENTS DE LA SUPERSTRUCTURE DE LA VOIE DXME-KAME-KATO_KARIRI,"Racleurs tractés (avec tracteur à chenilles), capacité du godet 7,0 m3",Equipment,General,Heures machine,87.42,87.42,87.42,87.42,1,EUR,1174.62,13.436,55,55,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS DXME-RIKA-KARI_KAKAME,"Barges non motorisées, capacité de charge 100 t",Equipment,General,Heures machine,6.12,6.12,6.12,6.12,1,EUR,106.15,17.3353,55,55,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-METO-KATO_SATONE,"Chargeurs à vide (aspirateurs) sur châssis de voiture, volume du conteneur filtrant jusqu'à 8 m3, débit jusqu'à 20 m3/h",Equipment,General,Heures machine,103.58,103.58,103.58,103.58,1,EUR,734.38,7.0904,55,55,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEME-ME-KAME-MEKA,Encadrements,Abstract Material,General,m,8.29,8.29,8.29,8.29,1,EUR,3650.51,440.2308,55,55,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS RIKA-ME-KARI-RIME_KAKALIRI,"Ensemble en acier galvanisé pour la fixation de la tige principale de la fixation à la tige inclinée de la console d'un diamètre maximal de 70 mm, dimensions de la matrice de fixation 125 x 110 mm",Material,General,pièce,77.35,77.35,77.35,77.35,1,EUR,949.53,12.2749,55,55,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-KAPU-KATO_KAMETO,"Installations et machines de forage à percussion et à câble tractées, profondeur de forage jusqu'à 200 m, capacité de charge 3,2 t",Equipment,General,Heures machine,14.06,14.06,14.06,14.06,1,EUR,2393.0,170.1711,55,55,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE PAR PERCUSSION À CORDAGE DXME-KAPU-KARI_KARIRI,"Électricité : consommation 15,68 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.01,2.01,2.01,2.01,1,EUR,26.39,13.11,55,55,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE DXME-MENE-KAME_KAKALI,"Centrales électriques mobiles, puissance 200 kW",Equipment,General,Heures machine,68.81,68.81,68.81,68.81,1,EUR,4120.87,59.8907,55,55,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-TO-KAME-KANE_KAKATOVO,Graisse protectrice pour réseau électrique,Material,General,kg,12.14,12.14,12.14,12.14,1,EUR,1.57,0.1298,55,55,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" RIPU-TO-KASA-KAVO,Coudes en polymère avec éléments chauffants électriques intégrés,Abstract Material,General,pièce,54.2,54.2,54.2,54.2,1,EUR,98.55,1.8182,55,55,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE RIKA-RI-KADX-KAME_KAKATOME,"Composition pour le remplissage des manchons de câbles, marque MB-70",Material,General,kg,4.21,4.21,4.21,4.21,1,EUR,31.59,7.5005,55,55,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES KAVO-ME-KARI-MENE,"Pieu en acier vissé, diamètre du fût 89 mm",Abstract Material,General,pièce,1416.02,1246.15,1913.51,1246.15,2,EUR,10494.91,5.7171,55,55,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MERI-ME-KARI-KANE_KAKAPURI,Rouleau de toiture RPP-300,Material,General,m2,1.25,1.25,1.25,1.25,1,EUR,110.17,87.8562,55,55,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,CONSTRUCTIONS DE LOCAUX SOUTERRAINS DXME-KAVO-KASA_KASATO,Machines du complexe de pose de béton sur des moules à rails Profileuses de fondations,Equipment,General,Heures machine,20.11,20.11,20.11,20.11,1,EUR,199.35,9.9142,55,55,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS INORGANIQUES DXME-MEDX-KAME_SAMEKA,"Machines à boue, volume de la citerne à boue 10 m3",Equipment,General,Heures machine,51.07,51.07,51.07,51.07,1,EUR,1562.43,30.5927,55,55,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Nettoyage de la section de tuyau sous le bouchon RITO-TO-KATO-KARI_KAMEPUPU,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 168 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,94.36,94.36,94.36,94.36,1,EUR,351.94,3.7295,55,55,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES KASA-ME-KARI-KANE,Préfixes en béton armé,Abstract Material,General,m3,955.4,951.92,971.07,951.92,2,EUR,485.67,0.51,55,55,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR DXME-MELI-KARI_KAMEME,Agrégats à vide pour le contrôle des assemblages soudés avec une pression limite de 6x10 MPa,Equipment,General,Heures machine,0.29,0.29,0.29,0.29,1,EUR,10.04,34.9882,55,55,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,CONDUITES TECHNOLOGIQUES D'ATELIER,CONDUITES EN TUBES D'ACIER ALLIÉ ET HAUTEMENT ALLIÉ DXME-KAPU-KAME_KALIME,"Installations de forage par percussion profondeur de forage jusqu'à 25 m, diamètre des trous 48-60 mm lors du fonctionnement à partir d'installations de compression mobiles",Equipment,General,Heures machine,30.38,30.38,30.38,30.38,1,EUR,1726.93,56.8455,55,55,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À PERFORATION DXME-KAPU-KARI_KARIRI,Installations de forage horizontal avec convoyeur à vis sans fin pour tuyaux de 720 à 1020 mm de diamètre,Equipment,General,Heures machine,17.83,17.83,17.83,17.83,1,EUR,233.72,13.11,55,55,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE KAME-PU-KAME-MEKA,Vis sans fin,Abstract Material,General,pièce,2905.41,2905.41,2905.41,2905.41,1,EUR,478.42,0.245,54,54,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AUTRES TRAVAUX,AÉRATION DES SOLS GELÉS DXME-KAME-KASA_METOPU,"Électricité : consommation 82,5 kWh/machine-heure",Electricity,Electricity,Heures machine,10.6,10.6,10.6,10.6,1,EUR,56.92,5.3719,54,54,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE DXME-KAME-KASA_METONE,"Pelles électriques à godet unique sur chenilles, capacité du godet 8 m3",Equipment,General,Heures machine,929.68,929.68,929.68,929.68,1,EUR,3604.4,3.877,54,54,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE KAME-LI-MEME-KAPU_KAKARIME,"Fil de soudage SV08-08A, diamètre 0,9 mm",Material,General,t,2592.98,2592.98,2592.98,2592.98,1,EUR,84.03,0.0322,54,54,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE AUTOMATIQUE DES JOINTS DE TUYAUX SUR LA TRONÇONNEE KAVO-TO-KAVO-KARI,Acier angulaire,Abstract Material,General,t,1407.13,1407.13,1407.13,1407.13,1,EUR,939.68,0.7739,54,54,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation de moyens de protection physique du périmètre sur des poteaux métal DXME-MEKA-MEKA_KAKAME,Systèmes de soudage avec centreur interne et système interne automatique à plusieurs têtes pour le soudage de la racine,Equipment,General,Heures machine,364.48,364.48,364.48,364.48,1,EUR,6773.04,18.5828,54,54,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE AUTOMATIQUE DES JOINTS DE TUYAUX SUR LA TRONÇONNEE DXME-KAME-KASA_METOPU,"Pelles électriques à godet unique sur chenilles, capacité du godet 5,2 m3",Equipment,General,Heures machine,322.47,322.47,322.47,322.47,1,EUR,1732.27,5.3719,54,54,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE MERI-ME-KARI-KANE,Matériaux de couverture en rouleaux,Abstract Material,General,m2,1.6,1.6,1.6,1.6,1,EUR,162.95,101.8135,54,54,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates RIME-ME-KANE-MEKA_KAKAMENE,Câble électrique à conducteurs en cuivre SBG 3kh50(ozh)-1000,Material,General,1000 m,40048.61,40048.61,40048.61,40048.61,1,EUR,196.75,0.012,54,54,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Préchauffage des joints soudés des tuyaux KANE-RI-KASA-KAPU,Carreaux ordinaires,Abstract Material,General,m2,5.74,5.08,6.87,5.08,2,EUR,458.35,78.1667,54,22,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS DXME-MEPU-KALI_KAMEME,"Camions-citernes, capacité de la citerne 13 m3",Equipment,General,Heures machine,68.59,68.59,68.59,68.59,1,EUR,109.24,1.5926,54,54,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Installation du conducteur lors du forage à la tige KAVO-TO-KATO-KASA_KAKAMETO,"Fil d'acier à faible teneur en carbone galvanisé à usage divers, diamètre 1,6 mm",Material,General,t,2268.39,2268.39,2268.39,2268.39,1,EUR,39.57,0.09,54,54,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Construction de l'enveloppe des tours de refroidissement d'une hauteur maximale KAME-LI-KAPU-MEME,Articles de quincaillerie,Abstract Material,General,compl,3.0,2.23,5.21,2.23,2,EUR,163.29,38.5,54,52,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"CONSTRUCTIONS DE COUVERTURES DE TOITURE, CHATRIERS" DXME-MELI-KAPU_RIKARI,"Systèmes de soudage externes avec deux têtes de soudage à double arc, vitesse de soudage jusqu'à 1,54 m/min, courant de soudage jusqu'à 290 A",Equipment,General,Heures machine,131.83,131.83,131.83,131.83,1,EUR,15591.74,118.2704,54,54,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE AUTOMATIQUE DES JOINTS DE TUYAUX SUR LA TRONÇONNEE KASA-ME-KALI-METO,Panneaux,Abstract Material,General,pièce,716.11,716.11,716.11,716.11,1,EUR,3001.16,4.1909,54,54,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" RITO-ME-KARI-KAVO,Raccords en acier pour conduites de gaz,Abstract Material,General,pièce,239.7,239.7,239.7,239.7,1,EUR,239.7,1.0,54,30,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MELI-KAPU_RIKAME,"Systèmes de soudage externes avec deux têtes de soudage à arc unique, vitesse de soudage jusqu'à 1,52 m/min, courant de soudage jusqu'à 290 A",Equipment,General,Heures machine,72.13,72.13,72.13,72.13,1,EUR,1526.48,21.1633,54,54,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE AUTOMATIQUE DES JOINTS DE TUYAUX SUR LA TRONÇONNEE RIRI-RI-KARI-KALI,Structures en acier préfabriquées en béton armé centrifugé pour pylônes de lignes électriques aériennes,Abstract Material,Steel & Metal,t,5026.19,4455.34,12530.41,4455.34,3,EUR,5310.95,1.0273,54,54,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BÉTON ARMÉ CENTRIFUGÉ VL 35-500 KV KAME-LI-KAVO-KARI,Additifs tensioactifs,Abstract Material,General,kg,8943.99,6619.11,9080.75,9080.75,2,EUR,296086.75,32.6067,54,54,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE À PETITS PANNEAUX,Construction de paliers d'escalier monolithiques dans un coffrage à panneaux fin KAME-RI-KAME-KAME_MEKARINE,Bitume routier BND 90/130,Material,General,t,749.43,749.43,749.43,749.43,1,EUR,32.78,0.051,54,54,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-KAME-KASA_METONE,"Électricité : consommation 171,6 kW·h/machine-heure",Electricity,Electricity,Heures machine,22.04,22.04,22.04,22.04,1,EUR,85.45,3.877,54,54,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES AVEC CHARGEMENT SUR DES CAMIONS À BE RITO-SA-KAME-KAVO_KAKATOSA,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 630 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,331.33,331.33,331.33,331.33,1,EUR,1738.07,5.2459,54,54,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KARI,Tubes en acier de tubage,Abstract Material,Pipes & Fittings,m,69.38,69.38,69.38,69.38,1,EUR,7.01,0.1,54,54,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAME-ME-KAME-KADX_KAKARITO,"Cordon en amiante à usage général, diamètre 2,0-2,5 mm",Material,General,t,22063.67,22063.67,22063.67,22063.67,1,EUR,8111.64,1.7117,54,54,INSTALLATION DE L'ÉQUIPEMENT,"Équipements de concassage, de broyage, d'enrichissement et d'agglomération",ÉQUIPEMENT D'AGGLOMÉRATION,MACHINES D'AGGLOMÉRATION RISA-RI-KAME-KANE_MEKAMELI,"Pince en bronze pour la fixation des cordes au fil de contact, dimensions 47 x 38 x 28 mm",Material,General,pièce,9.76,9.76,9.76,9.76,1,EUR,886.48,90.8378,54,54,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KAME-RI-KAME-KAME_MEKARIRI,Bitume routier pétrolier BND 60/90,Material,General,t,761.27,761.27,761.27,761.27,1,EUR,99.83,0.1287,54,54,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-RIME-MENE_KAKAME,"Électricité : consommation 1,58 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.2,0.2,0.2,0.2,1,EUR,0.18,0.8062,53,53,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-KANE-MERI_KAKAKAVO,"Rubans isolants en PVC avec couche adhésive sur une face pour travaux d'installation et de réparation électriques, couleur bleue, largeur 15 mm, épaisseur 0,2 mm",Material,General,m,0.02,0.02,0.02,0.02,1,EUR,0.89,43.3279,53,53,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR KASA-RI-KARI-RIPU,Béton flexible,Abstract Material,General,m2,68.61,0.64,663.37,0.64,3,EUR,7040.65,21.1294,53,53,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE MELI-TO-KARI-MEDX,Produits en chamotte à usage général,Abstract Material,General,t,652.66,652.66,652.66,652.66,1,EUR,1113.75,1.7597,53,45,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de soupapes anti-explosion, DXME-MEVO-KAME_KAKARI,"Compresseurs à vis mobiles avec moteur à combustion interne, pression jusqu'à 1,3 MPa (13 atm), débit jusqu'à 12 m3/min",Equipment,General,Heures machine,26.38,26.38,26.38,26.38,1,EUR,343.45,13.0185,53,53,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KAME-KATO_KARIKA,"Racleurs tractés (avec tracteur à chenilles), capacité du godet 3,0 m3",Equipment,General,Heures machine,45.21,45.21,45.21,45.21,1,EUR,819.68,18.1287,53,53,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS KAVO-PU-KARI-KASA,Treillis soudés,Abstract Material,General,t,1587.31,1587.31,1587.31,1587.31,1,EUR,77328.42,53.015,53,53,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé PU_MEKAKA_KANELI,Personnel : 3 personnes-heures/machine-heures,Operator,Operators,Heures machine,87.02,36.9,110.69,110.69,2,EUR,430.05,4.594,53,53,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES AIGUILLAGES KAME-LI-MESA-MEPU_KAKADXRI,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, pointues, diamètre 6 mm, longueur 90 mm",Material,General,kg,3.42,3.42,3.42,3.42,1,EUR,87.87,25.6915,53,53,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Fabrication de panneaux en bois pour coffrage démontable et repositionnable dans MEME-ME-KARI-KANE_KAKAKAME,"Bois rond (grumes) de conifères (pin, sapin) non écorcé pour pieux, longueur 4,5-13 m, diamètre 22-34 cm, classe I-III",Material,General,m3,220.55,220.55,220.55,220.55,1,EUR,414.21,1.9885,53,53,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-MESA-MEKA_KAKANENE,"Agrafes en acier, type SK-1",Material,General,kg,3.67,3.67,3.67,3.67,1,EUR,59.81,16.3071,53,53,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Installation de puits rectangulaires en béton armé préfabriqué MELI-PU-KATO-KAME_KAKAMERI,"Mortier réfractaire aluminosilicate chamotté, marque MSH-42",Material,General,t,1485.32,1485.32,1485.32,1485.32,1,EUR,249.2,0.1743,53,53,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE FOURS À HAUTE TEMPÉRATURE,Maçonnerie de hauts fourneaux DXME-KAME-KATO_KARITO,"Racleurs tractés (avec tracteur à chenilles), capacité du godet 8,0 m3",Equipment,General,Heures machine,122.0,122.0,122.0,122.0,1,EUR,1411.23,11.5677,53,53,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS DXME-RIME-MENE_KAKAME,"Cisailles électriques combinées, force nominale 630 kN, puissance 5 kW",Equipment,General,Heures machine,1.48,1.48,1.48,1.48,1,EUR,1.19,0.8062,53,53,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-KANE-KAME_KAKAPURI,Bandes élastiques autocollantes pour profilés de guidage 50 x 30000 mm,Material,General,m,0.2,0.2,0.2,0.2,1,EUR,31.57,157.0677,53,53,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim DXME-RIME-RIRI_PUPUTO,"Électricité : consommation 0,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.08,1.7374,53,53,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'un système de chauffage dans des bâtiments temporaires à usage ré KALI-RI-KANE-KATO,Profilé de guidage angulaire,Abstract Material,General,m,185.13,5.05,2390.23,5.05,3,EUR,838.8,125.8885,53,45,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" DXME-RIME-RIRI_PUPUTO,"Machines électromécaniques universelles pour la fabrication de bandages, diaphragmes, boucles, puissance 0,75 kW",Equipment,General,Heures machine,0.81,0.81,0.81,0.81,1,EUR,1.4,1.7374,53,53,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'un système de chauffage dans des bâtiments temporaires à usage ré DXME-RIKA-KADX_KAKARI,"Grues flottantes non automotrices, 16 t",Equipment,General,Heures machine,198.6,198.6,198.6,198.6,1,EUR,2304.28,11.6025,53,53,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RISA-ME-KAPU-KAPU_KAKAKASA,"Boulons de voie pour la fixation des rails, diamètre M22, longueur 135 mm, 140 mm",Material,General,t,4733.75,4733.75,4733.75,4733.75,1,EUR,7.06,0.0,53,53,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR DXME-MEKA-MEKA_KAMEPU,Centrateurs hydrauliques internes pour tuyaux d'un diamètre de 1200 mm,Equipment,General,Heures machine,5.82,5.82,5.82,5.82,1,EUR,284.11,48.8457,53,53,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,SOUFFLAGE DE TUBES DE TYPE SST-PAU DXME-MELI-KATO_KAPUTO,"Installations de chauffage électrique pour le traitement thermique des assemblages soudés, puissance 38 kVA",Equipment,General,Heures machine,5.11,5.11,5.11,5.11,1,EUR,301.27,58.91,52,52,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines DXME-KASA-MERI_KAKAME,"Grues à flèche sur rails, capacité de charge 50-100 t",Equipment,General,Heures machine,203.67,203.67,203.67,203.67,1,EUR,4487.04,22.0302,52,52,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments DXME-KADX-MERI_KASAME,Enfonce-piquets,Equipment,General,Heures machine,0.28,0.28,0.28,0.28,1,EUR,3.48,12.5175,52,52,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" DXME-KADX-MERI_KASAME,"Électricité : consommation 0,69 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,1.11,12.5175,52,52,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" DXME-KASA-KAPU_KATOME,"Électricité : consommation 2,31 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.3,0.3,0.3,0.3,1,EUR,2.08,7.0277,52,52,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE LA PARTIE SUPÉRIEURE DES FOURS DE VERRERIE,Maçonnerie de la structure supérieure des fours à verre DXME-KASA-KAPU_KATOME,"Ponts roulants électriques (ponts roulants), capacité de charge 3,2 t",Equipment,General,Heures machine,3.1,3.1,3.1,3.1,1,EUR,21.77,7.0277,52,52,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE LA PARTIE SUPÉRIEURE DES FOURS DE VERRERIE,Maçonnerie de la structure supérieure des fours à verre DXME-KATO-KANE_KAMETO,"Machines de chargement et de livraison avec moteur à combustion interne sur châssis pneumatique, capacité de charge jusqu'à 10 t",Equipment,General,Heures machine,123.89,123.89,123.89,123.89,1,EUR,818.26,6.605,52,52,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" DXME-KAME-KAME_KAPULI,"Bulldozers, puissance 340 kW (450 ch)",Equipment,Bulldozers,Heures machine,207.48,207.48,207.48,207.48,1,EUR,948.97,4.5738,52,52,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI DXME-KATO-KANE_KARIVO,"Machines de chargement à godet unique, pour une profondeur finale du puits jusqu'à 300 m",Equipment,General,Heures machine,312.99,312.99,312.99,312.99,1,EUR,6122.05,19.5596,52,52,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DE PUITS VERTICAUX, DE PUITS DE FORAGE ET DE LEURS EMBRANCHEMENTS" MERI-RI-KALI-KAPU,"Tubes en caoutchouc mousse, polyéthylène",Abstract Material,Pipes & Fittings,m,26.96,17.86,35.38,35.38,2,EUR,1558.92,44.2593,52,44,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de climatiseurs et de systèmes split KAVO-TO-KATO-KAPU_KAKASAME,"Fil métallique noir, diamètre 6,0-6,3 mm",Material,General,t,2044.12,2044.12,2044.12,2044.12,1,EUR,9.26,0.018,52,52,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Revêtement de la canalisation avec des lattes en bois DXME-MESA-KAME_KAMEME,"Remorques tractées, capacité de charge jusqu'à 20 t",Equipment,General,Heures machine,3.56,3.56,3.56,3.56,1,EUR,60.27,16.9342,52,52,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS INORGANIQUES KARI-RI-KARI-KAME,Matériaux filtrants,Abstract Material,General,m3,12.92,12.92,12.92,12.92,1,EUR,470.78,36.4286,52,52,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D RISA-ME-KARI-KAME_KAKATOTO,Traverses en béton armé pour chemins de fer,Material,General,m3,750.29,750.29,750.29,750.29,1,EUR,153.12,0.2042,52,52,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR KATO-RI-KAME-KAPU_KAKAKARI,"Ciment pouzzolanique pour la construction générale CEM IV 32,5N",Material,General,t,268.84,268.84,268.84,268.84,1,EUR,28.54,0.1062,52,52,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS DXME-KASA-MERI_KAKAME,Électricité : consommation 69 kW·h/machine-heure,Electricity,Electricity,Heures machine,8.86,8.86,8.86,8.86,1,EUR,195.24,22.0302,52,52,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments MEPU-PU-KAPU-KADX_KAKAMENE,"Émail HV-124, coloré",Material,General,t,4921.47,4921.47,4921.47,4921.47,1,EUR,11.28,0.02,52,52,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées PU_MEKAKA_KALINE,Personnel : 5 personnes-heures/machine-heures,Operator,Operators,Heures machine,72.23,65.21,91.3,65.21,2,EUR,554.19,7.8929,52,52,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES AIGUILLAGES DXME-MELI-KATO_KAPUTO,"Électricité : consommation 10,03 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.29,1.29,1.29,1.29,1,EUR,75.91,58.91,52,52,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines DXME-RIKA-KADX_KAMEKA,"Grues flottantes en service dans la rade ouverte, automotrices, 100 t",Equipment,General,Heures machine,955.89,955.89,955.89,955.89,1,EUR,4308.47,4.5073,52,52,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-LI-KALI-RIDX_KARISAME,Tuyaux à vide en PVC,Material,General,m,3.24,3.24,3.24,3.24,1,EUR,1.48,0.4752,52,52,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES DXME-MEDX-MEKA_KATOME,"Stations hydrauliques pour l'entraînement de vérins hydrauliques, pression jusqu'à 10 MPa",Equipment,General,Heures machine,1.07,1.07,1.07,1.07,1,EUR,21.47,20.0951,51,51,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au RITO-VO-KATO-KASA,Pièces moulées en acier,Abstract Material,General,pièce,0.87,0.87,0.87,0.87,1,EUR,2.94,3.3952,51,51,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication d'éléments et assemblage de nœuds de conduites en acier à partir de DXME-MEDX-MEKA_KATOME,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,4.69,20.0951,51,51,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au MEPU-RI-KAPU-KATO_KAKAMESA,Résine époxy ED-20,Material,General,t,7565.52,7565.52,7565.52,7565.52,1,EUR,343.88,0.0958,51,51,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements sans joints d'une épaisseur de 5 mm KASA-ME-KAME-KAVO,Puits (Structures préfabriquées en béton),Abstract Material,Steel & Metal,m3,511.75,507.26,553.1,507.26,2,EUR,364.15,0.7038,51,50,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de dispositifs de déversement d'eau à partir de la chaussée à parti RISA-ME-KATO-KANE_KAKAMERI,"Rondelles élastiques à double filetage, diamètre du trou M25",Material,General,t,3437.6,3437.6,3437.6,3437.6,1,EUR,3821.24,1.2064,51,51,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE MEVO-SA-KAVO-KAPU,Tapis,Abstract Material,General,pièce,124.86,124.86,124.86,124.86,1,EUR,124.86,1.0,51,51,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Installation de robinets d'eau publics KAME-LI-MESA-KATO_KAKAMERI,"Boulons en acier à tête hexagonale, avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M10, longueur du boulon 16-160 mm",Material,General,t,3998.45,3998.45,3998.45,3998.45,1,EUR,270.01,0.0914,51,51,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,COUVERTURE DE LA ZONE D'EXPLOSION POUR LA PROTECTION DES INSTALLATIONS DXME-MEKA-KAME_KAKAPU,"Unités de remplissage et de pressage, débit jusqu'à 25 m3/h",Equipment,General,Heures machine,22.55,22.55,22.55,22.55,1,EUR,450.02,19.9584,51,51,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Tête de colonne de gel KAME-LI-MEME-KALI_KARIPUPU,"Électrodes de soudage pour le soudage d'aciers alliés à haute résistance et résistants à la chaleur TsU-5, diamètre 2,5 mm",Material,General,kg,5.3,5.3,5.3,5.3,1,EUR,13.66,2.6271,50,50,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES RITO-TO-KAME-KAPU_KAKALIME,"Tubes de cuvelage sans soudure en acier de groupe D, avec filetage triangulaire court, diamètre extérieur 377 mm, épaisseur de paroi 9-12 mm",Material,Pipes & Fittings,t,3029.37,3029.37,3029.37,3029.37,1,EUR,15.59,0.0104,50,50,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-RIME-MEDX_KARIME,"Électricité : consommation 0,99 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.13,0.13,0.13,0.13,1,EUR,0.44,2.1468,50,50,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEKA-TO-KARI-KATO_KAKARIVO,"Soudures étain-plomb à faible teneur en antimoine, marque POSSu 61-0,5",Material,General,kg,76.89,76.89,76.89,76.89,1,EUR,0.75,0.0144,50,50,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RITO-TO-KAME-KALI_KAKAKARI,"Tubes de forage en acier alourdis de la série K, type UBT, diamètre extérieur 89 mm, épaisseur de paroi 16 mm",Material,Pipes & Fittings,m,145.52,145.52,145.52,145.52,1,EUR,44.14,0.303,50,50,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF RITO-TO-KAME-KANE_KAKAKAPU,"Tubes de forage en acier du groupe D avec extrémités soudées à l'intérieur et manchons correspondants, diamètre extérieur 89 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,61.35,61.35,61.35,61.35,1,EUR,341.89,5.573,50,50,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF DXME-KATO-MEME_KAKAPU,Chariots de montage pour travaux à ciel ouvert,Equipment,General,Heures machine,0.89,0.89,0.89,0.89,1,EUR,44.86,50.329,50,50,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MESA-MEPU_KATOKAPU,"Vis autotaraudeuses en acier galvanisé à tête demi-ronde et fente en croix, pointues, diamètre 4 mm, longueur 12 mm",Material,General,t,8486.07,8486.07,8486.07,8486.07,1,EUR,10.96,0.01,50,50,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Montage de systèmes de faux-planchers démontables à partir de panneaux de partic KAVO-PU-KATO-KATO_KAKATOPU,"Acier d'armature laminé à chaud à profil périodique, classe A-III, diamètre 16-18 mm",Material,General,t,1398.35,1398.35,1398.35,1398.35,1,EUR,731.78,0.7247,50,50,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé RIME-RI-KAME-KARI_KAMEPUME,Fil non isolé pour lignes aériennes de transport d'électricité M 4,Material,General,t,28612.4,28612.4,28612.4,28612.4,1,EUR,71.47,0.014,50,50,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV RITO-VO-KAPU-MERI,Raccords en T,Abstract Material,General,pièce,468.7,468.7,468.7,468.7,1,EUR,4387.05,9.36,50,50,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,PIÈCES MOULEES RITO-SA-KAME-KAVO_KAKAPUTO,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 720 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,429.93,429.93,429.93,429.93,1,EUR,2420.74,5.6306,50,50,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KASA-KAME_KAMENE,"Électricité : consommation 2,49 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,4.21,13.1306,50,50,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHIQUES DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À ,Construction de dalles préfabriquées et monolithiques à ossature et poutres KASA-ME-KATO-KALI,Colonnes à section rectangulaire,Abstract Material,General,pièce,1175.01,1175.01,1175.01,1175.01,1,EUR,117505.68,100.004,50,50,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,COLONNES ET CAPITAUX DXME-KASA-KAME_KAMENE,"Grues à tour, capacité de charge 5 t",Equipment,General,Heures machine,9.3,9.3,9.3,9.3,1,EUR,122.05,13.1306,50,50,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHIQUES DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À ,Construction de dalles préfabriquées et monolithiques à ossature et poutres DXME-RIME-KARI_SAKARI,"Nettoyeurs haute pression à moteur à combustion interne, débit jusqu'à 8 l/min, pression 16 MPa",Equipment,General,Heures machine,1.46,1.46,1.46,1.46,1,EUR,2.55,1.7448,50,50,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse MEKA-TO-KAME-KANE_KAKAKARI,"Fil de plomb rond, diamètre 11 mm",Material,General,kg,5.52,5.52,5.52,5.52,1,EUR,11.38,2.1477,50,50,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ DXME-RIME-MEDX_KARIME,Machines à cintrer l'armature,Equipment,General,Heures machine,0.74,0.74,0.74,0.74,1,EUR,1.58,2.1468,50,50,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-ME-KAME-KARI,Compensateurs en forme de P,Abstract Material,General,pièce,612.07,612.07,612.07,612.07,1,EUR,612.07,1.0,50,50,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,INSTALLATION DE COMPENSATEURS ME_MEKAKA_SAVO,Charge de travail moyenne 5,Labor,Labor,heures,21.5,21.5,21.5,21.5,1,EUR,8568.33,398.4994,50,50,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en béton résistant aux acides et à la chaleur KAME-LI-KALI-METO_KAKAKAME,"Farine andésitique résistante aux acides, marque A",Material,Chemicals,t,411.61,411.61,411.61,411.61,1,EUR,23.4,0.15,50,50,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité KAPU-TO-KAME-MERI_KAKAKARI,"Mortier de maçonnerie, ciment-chaux, M25",Material,General,m3,125.13,125.13,125.13,125.13,1,EUR,120.58,1.0491,49,49,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,Maçonnerie de murs et cloisons non armés en pierres calcaires RISA-ME-KAME-KASA,Traverses imprégnées,Abstract Material,General,pièce,38.97,38.97,38.97,38.97,1,EUR,16242.17,416.8,49,49,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" DXME-KAVO-KASA_KADXME,Cimentateurs pour le jointoiement,Equipment,General,Heures machine,0.24,0.24,0.24,0.24,1,EUR,4.02,16.9261,49,49,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RITO-VO-KATO-KAPU,Raccords compensateurs,Abstract Material,General,pièce,166.25,114.24,963.7,114.24,2,EUR,8200.3,29.3529,49,49,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE DXME-KAVO-KASA_KASAME,Machines de pose de béton sur moules à rails pour la finition des revêtements en ciment-béton,Equipment,General,Heures machine,30.54,30.54,30.54,30.54,1,EUR,276.8,9.0639,49,49,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES KAME-LI-MEDX-KADX_KAKARIPU,"Tuyau en caoutchouc et tissu pour une pression d'eau de 1 MPa (10 kgf/cm2), diamètre intérieur 32 mm",Material,General,m,10.15,10.15,10.15,10.15,1,EUR,261.86,25.81,49,49,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KAME-LI-MESA-KATO_MEKAKAPU,"Boulons pour le montage de structures en acier, avec écrous et rondelles, diamètre 6-8 mm, longueur 55-80 mm",Material,Steel & Metal,kg,5.66,5.66,5.66,5.66,1,EUR,35.78,6.4526,49,49,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri DXME-KAVO-KASA_KASAPU,Machines de pose de béton sur rails - distributeurs de béton,Equipment,General,Heures machine,20.58,20.58,20.58,20.58,1,EUR,186.49,9.0639,49,49,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-MEPU-KATO_KAKARI,"Camions à benne basculante, capacité de charge jusqu'à 10 t",Equipment,General,Heures machine,25.64,25.64,25.64,25.64,1,EUR,18.95,0.7392,49,49,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RISA-ME-KANE-MEDX_KAKASAME,"Cale en caoutchouc sous la cale, type TsP-328",Material,General,pièce,1.45,1.45,1.45,1.45,1,EUR,50107.2,34562.4082,49,49,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-MERI-KARI_KAKARI,"Débroussailleuses-ramasseuses avec tracteur, puissance 79 kW (108 ch)",Equipment,General,Heures machine,33.77,33.77,33.77,33.77,1,EUR,261.51,7.7446,48,48,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS KAME-LI-KARI-MEKA_KAKAKASA,Papier à rôles,Material,General,t,1446.21,1446.21,1446.21,1446.21,1,EUR,10.25,0.01,48,48,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES RISA-ME-KASA-KAME_KAKAKARI,"Cale de rail à deux têtes, type 2R65",Material,General,pièce,118.63,118.63,118.63,118.63,1,EUR,22200.65,187.146,48,48,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-KANE-KAVO_KAKATO,"Palans électriques, capacité de charge 2 t",Equipment,General,Heures machine,0.29,0.29,0.29,0.29,1,EUR,9.52,32.4744,48,48,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Fabrication d'armatures spatiales dans des conditions de chantier DXME-MEVO-KAME_KAKANE,"Compresseurs à moteur à combustion interne sur châssis de type automobile, pression jusqu'à 21,57 MPa (220 atm), débit jusqu'à 5 m3/min",Equipment,General,Heures machine,91.54,91.54,91.54,91.54,1,EUR,1473.04,16.0912,48,48,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE KAME-LI-MESA-MEME_KAKAPUVO,"Rondelles en acier galvanisé rondes, diamètre du trou M16-24",Material,General,kg,5.71,5.71,5.71,5.71,1,EUR,129.57,34.0516,48,48,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,"Poutres, ceintures, linteaux, traverses",Construction de poutres et de linteaux DXME-MEDX-MERI_KAVOME,"Motopompes à essence, débit 54 m3/h, hauteur de refoulement 26 m, profondeur d'aspiration 8 m",Equipment,General,Heures machine,1.21,1.21,1.21,1.21,1,EUR,13.5,11.1402,48,48,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE RISA-ME-KAPU-KATO_KAKAMETO,"Boulons de voie pour la fixation des rails, diamètre M12, longueur 58 mm, avec écrou de diamètre M12",Material,General,t,5633.03,5633.03,5633.03,5633.03,1,EUR,11.42,0.0,48,48,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAME-LI-MEME-KALI_KARITOPU,"Électrodes de soudage pour le soudage d'aciers alliés à haute résistance et résistants à la chaleur TsL-17, diamètre 4-5 mm",Material,General,kg,8.83,8.83,8.83,8.83,1,EUR,5.45,0.6175,48,48,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DU COMPLEXE DE TRANSFORMATION DU PÉTROLE ET DU GAZ,TUYAUTERIES EN TUBES D'ACIER CARBONÉ ET DE HAUTE QUALITÉ MEDX-ME-KAME-KARI,Conduits d'air métalliques,Abstract Material,General,m2,75.53,75.53,75.53,75.53,1,EUR,7552.65,100.0,48,48,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en tôle d'acier galvanisé et en aluminium de classe H (no RISA-ME-KANE-MESA_MEKAVOPU,"Aiguillage simple, écartement de voie 1520 mm, type de rail R50, marque 1/11, projet 2642.000.00",Material,General,compl,70862.62,70862.62,70862.62,70862.62,1,EUR,239.61,0.0,48,48,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR KAME-LI-MESA-KATO,Boulons avec écrous,Abstract Material,General,t,1634.86,4.95,4538.81,4.95,3,EUR,1334.43,8.8735,48,48,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES DE BÂTIMENTS INDUSTRIELS À UN OU PLUSIEURS ÉTAGES KALI-RI-KANE-KATO_KAMEMERI,"Profilé de guidage en acier galvanisé, pour le montage de cloisons en plâtre et de plafonds suspendus, dimensions 50 x 40 mm, épaisseur de l'acier 0,6 mm",Material,General,m,1.68,1.68,1.68,1.68,1,EUR,210.02,125.3333,48,48,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim DXME-KANE-KAVO_KAKASA,"Palans électriques, capacité de charge 5 t",Equipment,General,Heures machine,0.51,0.51,0.51,0.51,1,EUR,26.64,51.8321,48,48,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment DXME-KARI-KAPU_KAMEME,"Installations de forage de pieux sur chenilles, capacité de charge 25 t, diamètre de forage jusqu'à 1000 mm",Equipment,General,Heures machine,51.68,51.68,51.68,51.68,1,EUR,128.81,2.4923,48,48,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KANE-KAVO_KAKASA,"Électricité : consommation 0,42 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,2.88,51.8321,48,48,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment RITO-TO-KAME-KANE_KAKARIPU,"Tubes de forage en acier de groupe D avec extrémités chanfreinées et manchons correspondants, diamètre extérieur 168 mm, épaisseur de paroi 9 mm",Material,Pipes & Fittings,m,145.57,145.57,145.57,145.57,1,EUR,166.01,1.1404,48,48,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF MEPU-RI-KARI-MEME,Composition ignifuge et antibactérienne pour imprégnation du bois,Abstract Material,General,l,4413.04,3.43,5165.55,5165.55,3,EUR,2881.61,2.8235,48,48,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES RISA-ME-KASA-KARI_MEKAKANE,"Coussinets pour voies ferrées à écartement étroit à fixation par crampons, type D-18",Material,General,pièce,6.73,6.73,6.73,6.73,1,EUR,13.64,2.025,48,48,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" DXME-MEKA-MEME_KAPUTO,Installations avec 4 vérins hydrauliques pour le fonçage de tubes d'un diamètre de 1000 à 1720 mm lors de travaux sur des pipelines principaux,Equipment,General,Heures machine,18.19,18.19,18.19,18.19,1,EUR,1130.63,62.14,48,48,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE DXME-MEKA-MEME_KAPUTO,Électricité : consommation 33 kW·h/machine-heure,Electricity,Electricity,Heures machine,4.24,4.24,4.24,4.24,1,EUR,263.38,62.14,48,48,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE KAVO-TO-KASA-KASA,Tôle d'acier galvanisée,Abstract Material,General,t,1803.06,13.59,1925.07,1925.07,2,EUR,504.51,8.661,47,47,TRAVAUX DE CONSTRUCTION,Structures en bois,CLOISONS REVÊTUES DE PLAQUES DE PLÂTRE OU DE PLAQUES DE FIBRE DE PLÂTRE,CLOISONS SUR OSSATURE MÉTALLIQUE KASA-ME-KAME-KADX,"Anneaux préfabriqués en béton armé pour puits, diamètre 1500 mm",Abstract Material,General,m3,453.24,108.01,485.35,485.35,2,EUR,27.0,0.25,47,41,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Dispositif de puits ronds en béton armé préfabriqué RISA-ME-KAPU-KAME_KAKAKAME,"Boulons de fixation pour les attaches de rails de voie ferrée, diamètre M22, longueur 175 mm, avec écrou de diamètre M22",Material,General,t,3163.85,3163.85,3163.85,3163.85,1,EUR,10002.09,3.1617,47,47,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KAVO-MEME_KAKAME,"Électricité : consommation 65,67 kW·h/machine-heure",Electricity,Electricity,Heures machine,8.43,8.43,8.43,8.43,1,EUR,33.48,3.9691,47,47,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges d'asphalte à partir de gravats fractionnés (gravier) pou DXME-KASA-KARI_KAKALI,"Électricité : consommation 21,12 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.71,2.71,2.71,2.71,1,EUR,26.25,9.6772,47,47,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIKA-SA-KAPU-KADX_KAKAKARI,Serre-joints de type U731M pour fils et câbles principaux et dérivés,Material,General,100 pièces,63.18,63.18,63.18,63.18,1,EUR,45.28,0.7164,47,47,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e KASA-ME-KANE-MEPU,Panneaux en béton fibré,Abstract Material,General,m3,591.89,591.89,591.89,591.89,1,EUR,57955.26,97.9149,47,47,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-KASA-KARI_KAKALI,"Grues à portique, capacité de charge 65 t, hauteur de levage du crochet 24 m",Equipment,General,Heures machine,149.49,149.49,149.49,149.49,1,EUR,1446.67,9.6772,47,47,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KAVO-MEME_KAKAME,"Usines d'enrobés bitumineux à commande à distance, capacité jusqu'à 56 t/h",Equipment,General,Heures machine,141.58,141.58,141.58,141.58,1,EUR,561.94,3.9691,47,47,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges d'asphalte à partir de gravats fractionnés (gravier) pou DXME-KATO-MESA_KAKALI,"Installations de forage pneumatiques sur chenilles, automotrices avec 2 foreuses pour le travail dans des galeries horizontales et inclinées",Equipment,General,Heures machine,158.49,158.49,158.49,158.49,1,EUR,3452.0,21.7806,47,47,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,PASSAGE DES PUITS INCLINÉS KAME-LI-KALI-METO_KAKAMEME,Poudre résistante aux acides,Material,Chemicals,t,401.82,401.82,401.82,401.82,1,EUR,60.75,0.1778,47,47,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en polymère-ciment MEPU-SA-KADX-KAPU_KAMEMEME,Durcisseur n° 1,Material,General,t,43524.4,43524.4,43524.4,43524.4,1,EUR,129.25,0.02,47,47,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" RITO-SA-KAME-KAVO_KAKANEVO,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 1020 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,754.37,754.37,754.37,754.37,1,EUR,7308.04,10.5884,47,47,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KAVO-KATO_KAMETO,"Rouleaux compresseurs automoteurs lisses vibrants, poids 9 t",Equipment,General,Heures machine,48.22,48.22,48.22,48.22,1,EUR,548.52,11.3745,47,47,TRAVAUX DE CONSTRUCTION,Routes automobiles,COUCHES DE BASE ET DE NIVELLEMENT DE LA FONDATION ET DU REVÊTEMENT,COUCHES DE SOUS-COUCHE ET DE NIVELLEMENT DE LA FONDATION DXME-KASA-METO_KARIME,"Camions à plateau, capacité de charge jusqu'à 1,5 t, avec grue-manipulateur, capacité de charge 1 t",Equipment,General,Heures machine,16.62,16.62,16.62,16.62,1,EUR,31.03,1.867,46,46,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES EN MÉTAL LÉGER RISA-ME-KARI-KAME_KAKATOSA,"Traverse en béton armé, type Sh1, volume de béton 0,106 m3, consommation d'acier 7,25 kg",Material,General,pièce,128.99,128.99,128.99,128.99,1,EUR,102098.18,791.5,46,46,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-LI-KANE-KALI_KAKAKATO,"Bandes perforées en acier galvanisé, largeur 17 mm, épaisseur 0,6 mm",Material,General,100 m,51.68,51.68,51.68,51.68,1,EUR,31.42,0.6368,46,46,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,ASCENSEURS,"ASCENSEURS POUR PASSAGERS, HÔPITAUX ET MARCHANDISES" KAME-LI-MESA-KAVO,"Éléments de fixation des encadrements et des pièces d'encadrement (vis autotaraudeuses, rivets, etc.)",Abstract Material,General,t,631.14,6.29,7191.85,6.29,3,EUR,159.0,25.1371,46,46,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-RIKA-KATO_KAMEKA,"Remorqueurs diesel utilisés en rade ouverte, puissance 552 kW (750 ch)",Equipment,General,Heures machine,327.45,327.45,327.45,327.45,1,EUR,2265.87,6.9198,46,46,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS MELI-ME-KARI-KASA,Brique réfractaire,Abstract Material,General,t,163.48,31.73,214.85,214.85,3,EUR,3135.33,96.9559,46,46,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Maçonnerie des poêles et des foyers RIPU-TO-KASA-KARI,Bouchons en polyéthylène,Abstract Material,General,kg,50.14,20.6,117.47,43.17,3,EUR,98.31,3.6661,46,46,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites d'alimentation en eau à partir de tuyaux en polyéthylène sous KAME-ME-KARI-KAVO_KAKAKATO,"Joints en paronite PMB, épaisseur 1 mm, diamètre 150 mm",Material,General,1000 pièces,543.12,543.12,543.12,543.12,1,EUR,8.46,0.0347,46,46,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Installation de raccords à brides sur des conduites en acier KAME-LI-MEDX-KARI,Anneaux d'étanchéité en caoutchouc pour l'étanchéité des joints du disque d'appui des couvercles d'injection au verre d'appui,Abstract Material,General,pièce,6.65,1.08,8.01,8.01,2,EUR,1351.64,404.3085,46,44,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment RISA-ME-KASA-KARI_KAKAKATO,"Cale pour voies ferrées à écartement large à fixation par crampons, type D-65",Material,General,pièce,45.69,45.69,45.69,45.69,1,EUR,65354.69,1430.5374,46,46,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KASA-RI-KARI-KAME,Blocs de béton pour murs de sous-sols,Abstract Material,General,pièce,248.76,248.76,248.76,248.76,1,EUR,14022.57,56.3703,46,46,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",BLOCS DE MURS DE SOUS-SOLS RIKA-RI-MEKA-KATO_KAKAKANE,Embouts annulaires isolés,Material,General,100 pièces,8.12,8.12,8.12,8.12,1,EUR,0.37,0.0461,46,46,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES RISA-RI-KAME-MENE_KAKAKASA,Selle simple pour piston KS-009,Material,General,pièce,23.45,23.45,23.45,23.45,1,EUR,209.43,8.9291,46,46,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-MEME-KARI_KARIME,"Complexes pour le montage de câbles par traction, force de traction (freinage) 15 t",Equipment,General,Heures machine,99.91,99.91,99.91,99.91,1,EUR,754.25,7.5496,46,46,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,CÂBLES ET CÂBLES DE PROTECTION CONTRE LA FOUDRE VL 35-750 KV RISA-RI-KAME-KAPU_KAKAKASA,"Insert en cuivre pour la suspension dans la selle de fils et câbles en cuivre ou en bronze, dimensions 162 x 54 x 22 mm",Material,General,pièce,9.05,9.05,9.05,9.05,1,EUR,59.78,6.6096,46,46,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RITO-TO-KAME-KAPU_KAKATOPU,"Tubes de cuvelage sans soudure en acier de groupe D, avec filetage triangulaire court, diamètre extérieur 219 mm, épaisseur de paroi 7,7-14,2 mm",Material,Pipes & Fittings,t,2968.1,2968.1,2968.1,2968.1,1,EUR,70.68,0.51,46,46,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KAME-LI-KALI-KADX_KAKAPURI,"Garnitures d'étanchéité en chanvre imprégnées, marque LP",Material,General,kg,9.02,9.02,9.02,9.02,1,EUR,89.95,9.9696,45,45,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES DXME-KAME-KASA_METOSA,"Pelles électriques à godet unique sur chenilles, capacité du godet 6,3 m3",Equipment,General,Heures machine,562.19,562.19,562.19,562.19,1,EUR,2318.24,4.1236,45,45,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE RIKA-RI-MEKA-KATO_KAKARIKA,"Embouts de câbles en cuivre P 2,5-4",Material,General,100 pièces,27.74,27.74,27.74,27.74,1,EUR,4.71,0.2117,45,45,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES DXME-KAME-KASA_METOSA,"Électricité : consommation 117,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,15.09,15.09,15.09,15.09,1,EUR,62.22,4.1236,45,45,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE MEPU-ME-KATO-KARI_KARIKAME,Colle pour papier peint en fibre de verre,Material,General,kg,1.85,1.85,1.85,1.85,1,EUR,3.03,1.64,45,45,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'EAU À L'INTÉRIEUR DES LOCAUX DXME-KALI-KADX_KAKARI,"Installations de cimentation automatisées, capacité 15 m3/h",Equipment,General,Heures machine,14.43,14.43,14.43,14.43,1,EUR,452.75,31.3713,45,45,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Installation du conducteur lors du forage à la tige DXME-KANE-KANE_KAPUDX,Élévateurs à benne,Equipment,General,Heures machine,53.31,53.31,53.31,53.31,1,EUR,2271.11,42.604,45,45,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-KALI-KADX_KAKARI,"Électricité : consommation 5,61 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.72,0.72,0.72,0.72,1,EUR,22.6,31.3713,45,45,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Installation du conducteur lors du forage à la tige DXME-KAME-KATO_KAKAME,"Électricité : consommation 26,4 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.06,3.06,3.06,3.06,1,EUR,44.0,14.3933,45,45,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-MELI-KAPU_KASAVO,Appareils à commande semi-automatique pour le soudage bout à bout de tuyaux en plastique d'un diamètre supérieur à 315 mm et inférieur à 630 mm,Equipment,General,Heures machine,5.0,5.0,5.0,5.0,1,EUR,106.51,21.31,45,45,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE DXME-MELI-KAPU_KASAVO,"Électricité : consommation 2,18 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.28,0.28,0.28,0.28,1,EUR,5.96,21.31,45,45,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE DXME-KASA-KASA_KAMELI,"Grues sur châssis-cabine, capacité de charge 40 t",Equipment,General,Heures machine,70.52,70.52,70.52,70.52,1,EUR,2598.12,36.8411,45,45,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KAME-LI-MESA-MERI_KAKATOVO,"Goujons filetés en acier galvanisé, diamètre du filetage M12, longueur 100 mm",Material,General,t,3194.19,3194.19,3194.19,3194.19,1,EUR,5.39,0.015,45,45,INSTALLATION DE L'ÉQUIPEMENT,Équipement des silos à grains et des entreprises de transformation des céréales,"ÉQUIPEMENT POUR LE NETTOYAGE, LE SÉCHAGE ET LE TRAITEMENT DES CÉRÉALES",Machines pour le traitement du grain à l'eau RITO-VO-KATO-MEME_KAMERILI,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 40 mm",Material,General,pièce,8.33,8.33,8.33,8.33,1,EUR,64.82,7.7778,45,45,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CALORIFÈRES,Installation d'appareils de chauffage à air DXME-KARI-KATO_KARIRI,"Marteaux diesel, poids de la partie frappante 1,8 t",Equipment,General,Heures machine,17.22,17.22,17.22,17.22,1,EUR,18.89,1.0971,45,45,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-PU-KARI-KATO,Éléments coupants,Abstract Material,General,pièce,4511.09,4511.09,4511.09,4511.09,1,EUR,4511.09,1.0,45,45,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-SA-KARI-KAME,Pièces de fixation pour barrières de sécurité,Abstract Material,General,compl,1967.83,56.19,3735.26,1951.36,4,EUR,52107.24,44.5179,45,43,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation de moyens de protection physique du périmètre sur des poteaux métal MEME-RI-METO-KANE_KAKAMEPU,"Panneaux de plancher, épaisseur 50 mm",Material,General,m2,18.02,18.02,18.02,18.02,1,EUR,113.27,6.2867,45,45,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-KAME-KATO_KAKAME,"Complexes à raclettes, capacité du godet 0,6-0,8 m3",Equipment,General,Heures machine,35.45,35.45,35.45,35.45,1,EUR,510.3,14.3933,45,45,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES RIRI-RI-KARI-RIME,Goupilles,Abstract Material,General,t,1.74,1.72,1.95,1.72,2,EUR,1054.32,612.0,45,45,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RISA-ME-KAME-KASA_KAKARISA,"Traverse en bois de conifères, imprégnée, type II, longueur 1500 mm",Material,General,pièce,38.25,38.25,38.25,38.25,1,EUR,5218.89,142.7784,45,45,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-KARI-KAVO_KAKAKARI,"Sacs en papier non imprégnés, à trois couches, ouverts, cousus, marque NM",Material,General,1000 pièces,596.08,596.08,596.08,596.08,1,EUR,186.93,0.314,45,45,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,COUVERTURE DE LA ZONE D'EXPLOSION POUR LA PROTECTION DES INSTALLATIONS RIPU-TO-KASA-KANE,Manchon thermorétractable pour l'isolation des joints soudés,Abstract Material,General,compl,43.68,43.68,43.68,43.68,1,EUR,213.71,4.8927,44,44,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE MELI-ME-KARI-KATO_KAKAKARI,"Mats thermo-isolants haute température en laine de mullite-silice recouverts de tissu de verre, groupe de combustibilité NG, densité 95±10 kg/m3, conductivité thermique à 25 °C ne dépassant pas 0,044 W/(m*K), température limite de la surface isolée de -60 à +1250 °C, largeur 400 mm, épaisseur 40 mm",Material,General,m,37.97,37.97,37.97,37.97,1,EUR,3.09,0.0814,44,44,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Préchauffage des joints soudés des tuyaux MEPU-SA-KAPU-KARI_KAKAKARI,Mastic adhésif en caoutchouc KN-3,Material,General,t,2708.35,2708.35,2708.35,2708.35,1,EUR,85.11,0.0388,44,44,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" MEPU-SA-KARI-KARI_KAMEKAME,"Mastic de protection à base acrylique, universel",Material,General,kg,2.08,2.08,2.08,2.08,1,EUR,66.27,31.8032,44,44,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE VITRERIE,VITRAGE DES CHÂSSIS DE BÂTIMENTS INDUSTRIELS MEPU-SA-KADX-METO_KAKAKAME,Térébenthine,Material,General,kg,13.23,13.23,13.23,13.23,1,EUR,106.79,8.0745,44,44,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements sans joints d'une épaisseur de 5 mm DXME-KANE-KANE_KAMESA,"Ponts élévateurs hydrauliques, hauteur de levage 37 m",Equipment,General,Heures machine,60.38,60.38,60.38,60.38,1,EUR,772.88,12.7998,44,44,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS RIME-RI-KATO-KATO_KAKAMENE,Câble flexible de puissance avec conducteurs en cuivre PSU-180 1kh6-380,Material,General,1000 m,3451.09,3451.09,3451.09,3451.09,1,EUR,0.0,0.0,44,44,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Préchauffage des joints soudés des tuyaux MEPU-SA-MEME-KAME_KAKAKATO,Mastic à base d'huile et de colle,Material,General,t,1033.31,1033.31,1033.31,1033.31,1,EUR,37.78,0.0488,44,44,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES EN PLASTIQUE DXME-MELI-KAPU_MESARI,Positionneurs-centreurs pour l'assemblage et le soudage de tuyaux en polyéthylène d'un diamètre allant jusqu'à 63 mm,Equipment,General,Heures machine,0.11,0.11,0.11,0.11,1,EUR,8.77,82.1305,44,44,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE KAVO-TO-KARI-KAME_KAKARIDX,"Bandes en acier laminées à chaud, nuances d'acier St3sp, St3ps, épaisseur 3,5 mm, largeur 100-220 mm",Material,General,t,1704.37,1704.37,1704.37,1704.37,1,EUR,57.6,0.215,44,44,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BOIS VL 35-220 KV DXME-MEPU-KANE_KAMETO,"Camions porte-tubes sur châssis automobile, capacité de charge jusqu'à 30 t",Equipment,General,Heures machine,52.4,52.4,52.4,52.4,1,EUR,1375.74,26.2523,44,44,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,"TRAVAUX DE CHARGEMENT, DE DÉCHARGEMENT ET DE TRANSPORT",TRAVAUX DE TRANSPORT DXME-KANE-KANE_KATOME,"Élévateurs à deux mâts, capacité de charge jusqu'à 2 t, hauteur jusqu'à 60 m",Equipment,General,Heures machine,9.14,9.14,9.14,9.14,1,EUR,16.85,1.8434,44,44,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES RÉCHAUFFEURS D'AIR DES FOURS À HAUTE TEMPÉRATURE,Maçonnerie des murs KAME-TO-KAPU-KAVO_KAKARILI,Huile MS-20,Material,General,kg,2.33,2.33,2.33,2.33,1,EUR,3.89,1.6711,44,44,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT MÉCANIQUE DES INSTALLATIONS HYDRAULIQUES,MÉCANISMES DE LEVAGE FIXES RIKA-ME-KARI-MEVO_MEKAKARI,"Bandes de fixation en acier inoxydable 08Kh18N10, épaisseur de l'acier 0,76 mm, largeur de la bande 19 mm",Material,General,10 m,31.75,31.75,31.75,31.75,1,EUR,86.98,2.7391,44,44,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES DXME-KASA-KADX_KAMEME,"Grues sur châssis spécial de type automobile, capacité de charge 250 t",Equipment,General,Heures machine,350.56,350.56,350.56,350.56,1,EUR,13914.35,39.6923,44,44,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX RITO-VO-KAPU-KANE,Pièces profilées en acier soudées,Abstract Material,General,pièce,651.09,254.99,4612.11,254.99,2,EUR,12857.39,10.3455,44,44,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,PIÈCES MOULEES DXME-MEKA-KAME_KAKATO,"Unités de remplissage et de pressage, débit jusqu'à 500 m3/h",Equipment,General,Heures machine,87.58,87.58,87.58,87.58,1,EUR,1068.88,12.2043,44,44,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Calibrage de conduites principales d'un diamètre nominal de 200 à 1400 mm KAME-LI-KALI-RIDX_KAKADXME,Sciure de bois,Material,General,m3,45.5,45.5,45.5,45.5,1,EUR,57.87,1.4716,44,44,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE RISA-TO-KAVO-KAME_PUDXSANE,Traverse en béton armé Sh3-D,Material,General,pièce,82.8,82.8,82.8,82.8,1,EUR,72079.24,870.4773,44,44,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RINE-ME-KARI-KAVO,Tige pendulaire,Abstract Material,General,pièce,71.83,71.83,71.83,71.83,1,EUR,171832.82,2392.3568,44,39,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KANE-KANE_KATOME,"Électricité : consommation 0,65 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.08,0.08,0.08,0.08,1,EUR,0.16,1.8434,44,44,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES RÉCHAUFFEURS D'AIR DES FOURS À HAUTE TEMPÉRATURE,Maçonnerie des murs RISA-RI-KAME-KANE_MEKAMEVO,"Pince en bronze pour la fixation des cordes au câble porteur, dimensions 42 x 45 x 23 mm",Material,General,pièce,9.46,9.46,9.46,9.46,1,EUR,506.08,53.5036,44,44,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RITO-SA-KAME-KAVO_KAKASAME,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 820 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,500.96,500.96,500.96,500.96,1,EUR,3105.6,6.1995,44,44,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIKA-ME-KARI-MEVO_MEKAKAKA,Serrures en acier inoxydable 08Kh18N10 pour bande de cerclage de 19 mm de largeur,Material,General,100 pièces,78.05,78.05,78.05,78.05,1,EUR,21.71,0.2782,44,44,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES KAME-LI-KARI-MEKA_KAKAKATO,"Papier isolant, épaisseur 0,4 mm",Material,General,kg,4.15,4.15,4.15,4.15,1,EUR,0.89,0.214,43,43,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KALI-RI-KATO-KANE,Structures en acier,Abstract Material,Steel & Metal,t,2335.96,2335.96,2335.96,2335.96,1,EUR,14362.27,6.1483,43,40,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,INSTALLATION D'ÉLÉMENTS DE FIXATION EN ACIER KARI-RI-KASA-KAPU_RIKAKANE,"Gravier de roches denses pour travaux de construction M 400, fraction 5(3)-10 mm",Material,General,m3,39.53,39.53,39.53,39.53,1,EUR,133.91,3.3877,43,43,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" KASA-ME-KARI-KARI,Blocs en béton armé pour les parois des tunnels de métro,Abstract Material,General,m3,1921.24,1887.49,2177.71,1887.49,2,EUR,165044.08,85.1391,43,43,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES MEKA-ME-KARI-KAPU_KAKAKADX,"Barres à section ronde en alliages d'aluminium de marques AD0, AD1, AD, AD31, AD33, AD35, AB, diamètre 135,0-200,0 mm",Material,General,t,9792.88,9792.88,9792.88,9792.88,1,EUR,167.92,0.0338,43,43,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV DXME-KAVO-KATO_KAKADX,"Rouleaux vibrants lisses automoteurs, poids 2,2 t",Equipment,General,Heures machine,15.05,15.05,15.05,15.05,1,EUR,16.3,1.083,43,43,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL MEPU-SA-KASA-KAME_KAKAKARI,"Huile de lin pour une meilleure coloration (10 % naturelle, 90 % combinée)",Material,General,t,2494.24,2494.24,2494.24,2494.24,1,EUR,49.41,0.0286,43,43,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'EAU À L'INTÉRIEUR DES LOCAUX KARI-RI-KASA-KAPU_RIKASAVO,"Gravier de roches denses pour travaux de construction M 800, fraction 10-20 mm",Material,General,m3,64.07,64.07,64.07,64.07,1,EUR,1035.66,16.9522,43,43,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE RIKA-ME-KARI-MESA_KAKAMEME,Connecteur pour fils en aluminium et en acier-aluminium (SOAS) 062-3,Material,General,pièce,21.0,21.0,21.0,21.0,1,EUR,52.66,2.5081,43,43,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" KAVO-PU-KATO-KATO_KAKATORI,"Acier d'armature laminé à chaud à profil périodique, classe A-III, diamètre 12 mm",Material,General,t,1492.37,1492.37,1492.37,1492.37,1,EUR,749.28,0.514,43,43,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de l'enceinte de confinement du bâtiment réacteur d'une centrale nu DXME-KAME-KASA_METORI,"Pelles électriques à godet unique sur chenilles, capacité du godet 4 m3 (avec équipement de travail allongé)",Equipment,General,Heures machine,189.7,189.7,189.7,189.7,1,EUR,1049.45,5.5321,43,43,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE MEKA-TO-KARI-KASA_KAKAMERI,"Plomb en lingots C0, C1",Material,General,t,9407.38,9407.38,9407.38,9407.38,1,EUR,1533.4,0.16,43,43,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES DXME-KAME-KASA_METORI,Électricité : consommation 170 kW·h/machine-heure,Electricity,Electricity,Heures machine,21.83,21.83,21.83,21.83,1,EUR,120.79,5.5321,43,43,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE DXME-KATO-MEDX_METOTO,"Électricité : consommation 42,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,5.51,5.51,5.51,5.51,1,EUR,94.64,17.176,43,43,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" KAME-LI-MEME-KANE,Flux,Abstract Material,General,kg,44.34,44.34,44.34,44.34,1,EUR,11296.79,254.7674,43,43,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KATO-MEDX_METOTO,"Installations de forage à double flèche sur châssis pneumatique, en version antidéflagrante, section de forage jusqu'à 55 m2, diamètre de forage jusqu'à 90 mm, profondeur de forage jusqu'à 5000 mm",Equipment,General,Heures machine,399.7,399.7,399.7,399.7,1,EUR,6865.3,17.176,43,43,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" MERI-RI-KASA-KASA_KAKAKAPU,"Panneaux en laine minérale à liant synthétique, isolants thermiques PZ-120, rigides, densité 111-130 kg/m3",Material,General,m3,238.37,238.37,238.37,238.37,1,EUR,1403.02,5.8858,43,43,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Couverture des espaces au-dessus des ouvertures de portes dans les cloisons en p DXME-MEDX-KARI_KAKARI,"Pompes à huile à engrenages, débit 2,3 m3/h",Equipment,General,Heures machine,0.29,0.29,0.29,0.29,1,EUR,3.06,10.6002,43,43,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MEME-KANE_KAKAKARI,Flux AN-47,Material,General,kg,4.5,4.5,4.5,4.5,1,EUR,1323.32,293.8837,43,43,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-MEDX-KAVO_KAKATO,"Électricité : consommation 0,4 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.52,10.274,43,43,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ DXME-MEDX-KARI_KAKARI,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.99,10.6002,43,43,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-TO-KAME-KANE_KAKAPUME,Graisse Litol-24,Material,General,kg,9.23,9.23,9.23,9.23,1,EUR,4.7,0.5084,43,43,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment DXME-MEDX-KAVO_KAKATO,"Pompes, débit 3,6 m3/h, pression 16 m, puissance 1,2 kW",Equipment,General,Heures machine,0.38,0.38,0.38,0.38,1,EUR,3.95,10.274,43,43,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ RIPU-TO-KATO-KAME_KAMEMEME,"Gaine thermorétractable en polyéthylène, épaisseur de paroi 1-1,5 mm, diamètre intérieur 20-60 mm",Material,General,m,1.39,1.39,1.39,1.39,1,EUR,0.57,0.4109,43,43,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" KAME-TO-KASA-TOVO_KAMEKAME,"Phtalate de dibutyle technique, grade I",Material,General,t,6302.56,6302.56,6302.56,6302.56,1,EUR,13.86,0.01,43,43,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR DXME-RIME-METO_KAMEME,Générateurs de vapeur tractés,Equipment,General,Heures machine,13.79,13.79,13.79,13.79,1,EUR,57.99,4.206,42,42,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-MELI-KAME_KAKATO,"Électricité : consommation 15,18 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.95,1.95,1.95,1.95,1,EUR,43.03,22.0695,42,42,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,Soudage de tuyaux de type LST-PAU KAVO-TO-KASA-KASA_KAKASAME,"Tôle d'acier galvanisée, épaisseur 0,5 mm",Material,General,t,2166.56,2166.56,2166.56,2166.56,1,EUR,1183.93,0.656,42,42,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" KAME-LI-KADX-KATO_KAKARIPU,"Câble à conducteurs en cuivre VP 2x0,7 mm",Material,General,1000 m,154.88,154.88,154.88,154.88,1,EUR,12.9,0.0836,42,42,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" RISA-RI-KAME-KANE_KAKALITO,Pince d'ancrage intermédiaire pour fil de contact KS-051,Material,General,pièce,27.25,27.25,27.25,27.25,1,EUR,37.06,1.3602,42,42,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,REMPLACEMENT DES CÂBLES ET TRANSFERT DES SUSPENSIONS DE CONTACT EXISTANTES ET DE KAME-TO-KASA-MENE_KAKARIRI,Carbure de calcium pour morceaux 50/80,Material,General,t,3778.51,3778.51,3778.51,3778.51,1,EUR,177.51,0.1329,42,42,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX KAME-LI-MEME-KALI_KARITOVO,"Électrodes de soudage pour le soudage des aciers hautement alliés résistants à la corrosion TsT-15, diamètre 2 mm",Material,General,kg,21.13,21.13,21.13,21.13,1,EUR,45.87,2.1712,42,42,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie des matériaux de construction,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT DE MÉLANGE ET DE DISTRIBUTION KAPU-TO-KARI-MEPU,Liant pour tamponnage,Abstract Material,General,t,54.27,8.94,643.59,8.94,2,EUR,26216.07,2932.101,42,42,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX RISA-RI-KAME-KALI_MEKAKAPU,"Connecteurs électriques bout à bout pour voies de tramway, longueur 300 mm, diamètre 20 mm",Material,General,pièce,12.95,12.95,12.95,12.95,1,EUR,161.08,12.4398,42,42,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,"Pose de voies par tronçons de 12,5 m sur des sections droites avec des rails de " DXME-MELI-KARI_MEKAME,Installation de contrôle de l'étanchéité des joints sous vide,Equipment,General,Heures machine,0.5,0.5,0.5,0.5,1,EUR,0.54,1.0762,42,42,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAVO-RI-KARI-MENE_KAKAMEME,Câbles d'armature en acier,Material,General,kg,3.9,3.9,3.9,3.9,1,EUR,322.02,82.4771,42,42,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri KAME-ME-KAME-KADX_KAKARIPU,"Cordon en amiante à usage général ShAON, diamètre 3-6 mm",Material,General,t,15950.68,15950.68,15950.68,15950.68,1,EUR,251.95,0.0257,42,42,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES RISA-RI-KAME-KANE_KAKALINE,Pince d'ancrage intermédiaire pour câble porteur KS-052-2,Material,General,pièce,18.49,18.49,18.49,18.49,1,EUR,35.59,1.9245,42,42,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,REMPLACEMENT DES CÂBLES ET TRANSFERT DES SUSPENSIONS DE CONTACT EXISTANTES ET DE KAVO-TO-KATO-KAPU_KAKARIME,"Fil métallique à usage général en acier à faible teneur en carbone, diamètre 0,8 mm",Material,General,kg,2.38,2.38,2.38,2.38,1,EUR,1.94,0.9263,42,42,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de murs et de dalles préfabriqués en béton armé pour les bâtiments KAME-TO-KATO-KAPU_KAKAKATO,Acide orthophosphorique technique,Material,Chemicals,kg,2.46,2.46,2.46,2.46,1,EUR,135.94,55.3229,42,42,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en xylolite et en polyvinylacétate RIPU-TO-KATO-MEME,Tuyaux en polyéthylène pour gazoducs,Abstract Material,General,m,53.2,53.2,53.2,53.2,1,EUR,6628.59,124.5859,42,42,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,POSE SOUTERRAINE DE CONDUITES DXME-RIME-RIRI_TOPUME,"Réflectomètres optiques, longueur d'onde de travail 1310/1550/1625 nm",Equipment,General,Heures machine,2.43,2.43,2.43,2.43,1,EUR,5.41,2.225,42,42,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE DXME-RIME-METO_KAMEME,"Électricité : consommation 61,05 kW·h/machine-heure",Electricity,Electricity,Heures machine,7.84,7.84,7.84,7.84,1,EUR,32.98,4.206,42,42,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-PU-KATO-KANE_KARIKARI,"Ampoule à chambre unique en matériau non tissé pour la fixation d'ancrages, le bourrage de trous lors de travaux à l'explosif, remplie d'un mélange minéral sec, diamètre 38 mm, longueur 350 mm",Material,General,pièce,1.05,1.05,1.05,1.05,1,EUR,258.99,245.5,42,42,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" KAME-PU-KAME-KARI,Forets pour sols,Abstract Material,General,pièce,12249.26,12249.26,12249.26,12249.26,1,EUR,0.0,0.0,42,42,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À LA VIS DXME-MELI-KAME_KAKATO,"Redresseurs de soudage pour l'équipement des machines à souder automatiques, courant de soudage 1000 A, nombre de postes 1",Equipment,General,Heures machine,3.79,3.79,3.79,3.79,1,EUR,83.54,22.0695,42,42,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,Soudage de tuyaux de type LST-PAU MEVO-SA-KAVO-KASA_KAKARIRI,"Supports simples renforcés en acier pour la fixation de radiateurs, longueur du support 130 mm",Material,General,100 pièces,113.71,113.71,113.71,113.71,1,EUR,65.42,0.5762,42,42,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier RIPU-TO-KASA-MEDX,Raccords et pièces de jonction pour tuyaux en polyéthylène,Abstract Material,General,pièce,21.12,21.12,21.12,21.12,1,EUR,97.16,4.6,42,42,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de canalisations d'égouts à partir de tuyaux en polyéthylène haute densité RIPU-RI-KAME-KAME,Tuyaux de drainage en céramique,Abstract Material,General,m,20.95,20.95,20.95,20.95,1,EUR,18759.92,895.283,42,42,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D KAME-LI-MEME-KAPU_KAKAMEME,"Fil métallique en poudre autoprotecteur pour le soudage mécanisé semi-automatique sans utilisation de gaz de protection pour le soudage des aciers au carbone et faiblement alliés, classification E71T8-K6, diamètre 1,73 mm",Material,General,t,54154.82,54154.82,54154.82,54154.82,1,EUR,17270.76,0.3193,41,41,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUDAGE MÉCANISÉ (SEMI-AUTOMATIQUE) DES JOINTS DE TUBES SUR LA TRONÇONNEE DXME-KALI-KATO_KAMEKA,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,8.18,35.1034,41,41,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS EN BÉTON ARMÉ,Installation de cloisons en béton baryté et d'une couche isolante en béton baryt DXME-KANE-KATO_KAPUKA,"Treuils de forage avec une force de traction de 49,05 kN (5 t)",Equipment,General,Heures machine,8.15,8.15,8.15,8.15,1,EUR,326.35,40.0437,41,41,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RIRI-RI-KARI-RITO_KAMELIME,"Pièces forgées pour structures de communication, acier de marque 20",Material,Steel & Metal,kg,2.23,2.23,2.23,2.23,1,EUR,4.72,2.1134,41,41,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",POTEAUX EN ACIER POUR ANTENNES SUR LES TOITS DES BÂTIMENTS KAVO-TO-KASA-KASA_KAKASAPU,"Tôle d'acier galvanisée, épaisseur 0,8 mm",Material,General,t,1886.74,1886.74,1886.74,1886.74,1,EUR,48.11,0.049,41,41,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MEKA-RI-KARI-KAPU_KAKAKAVO,"Tôles laminées à chaud en cuivre de marque M2, épaisseur 3 mm",Material,General,t,28291.98,28291.98,28291.98,28291.98,1,EUR,7.26,0.0,41,41,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES KAME-LI-MEME-KAPU_KAKAMEPU,Fil métallique en poudre pour soudage à l'arc,Material,General,t,8999.8,8999.8,8999.8,8999.8,1,EUR,1700.33,0.4283,41,41,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTION D'ENTREPRISES DE STOCKAGE ET DE TRANSFORMATION DE CÉRÉALES,Montage de structures pour les installations de stockage et de transformation du DXME-MELI-KAPU_METORI,"Mécanismes d'alimentation en fil à quatre rouleaux, vitesse d'alimentation en fil 2-18 m/min, diamètre du fil de soudage 0,8-1,6 mm",Equipment,General,Heures machine,0.28,0.28,0.28,0.28,1,EUR,58.02,204.7571,41,41,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUDAGE MÉCANISÉ (SEMI-AUTOMATIQUE) DES JOINTS DE TUBES SUR LA TRONÇONNEE DXME-KANE-KATO_KAPUKA,"Électricité : consommation 0,39 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,1.99,40.0437,41,41,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RISA-ME-KATO-KANE_KAKAPURI,"Rondelles en acier, diamètre extérieur 28 mm, diamètre intérieur 10,2 mm, épaisseur 1,5 mm",Material,General,t,42599.04,42599.04,42599.04,42599.04,1,EUR,110.24,0.01,41,41,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES ÉLÉMENTS DE LA SUPERSTRUCTURE DE LA VOIE RIKA-ME-KARI-RITO_KAKALIME,Embout pour fils en cuivre (douille 70-13),Material,General,pièce,1.29,1.29,1.29,1.29,1,EUR,54.36,42.1044,41,41,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIME-RI-KATO-KADX_MERIPURI,"Fil thermoélectrique multibrins en alliages chromel et alumel, avec isolation en plastique PVC, sans gaine, nombre de conducteurs : 2, section : 1,5 mm2",Material,General,1000 m,3589.83,3589.83,3589.83,3589.83,1,EUR,0.75,0.0,41,41,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines RIME-RI-KATO-KADX_MERIPUTO,"Fil thermocouple monofilaire en alliages chromel et alumel, avec isolation et gaine en fil de silice, nombre de conducteurs : 2, diamètre du conducteur : 0,71 mm",Material,General,1000 m,2921.91,2921.91,2921.91,2921.91,1,EUR,1.44,0.0,41,41,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines KAME-LI-MENE-KAPU_KAKAMETO,"Panneau de coffrage linéaire en acier à grande surface, démontable et repositionnable, inventaire, pour le coffrage des murs",Material,General,t,3529.74,3529.74,3529.74,3529.74,1,EUR,1369.58,0.4184,41,41,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" DXME-KANE-KANE_KAMERI,"Élévateurs hydrauliques automatiques, hauteur de levage 18 m",Equipment,General,Heures machine,20.82,20.82,20.82,20.82,1,EUR,192.4,9.2405,41,41,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-MEVO-KASA_KAKAKAME,"Chauffage électrique céramique pour le traitement thermique des assemblages soudés, tension nominale 60 V, puissance 2,7 kW, surface de 0,05 à 0,06 m2",Material,General,pièce,143.86,143.86,143.86,143.86,1,EUR,59.13,0.411,41,41,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines KAME-TO-KAPU-KAVO_KAKATOPU,Huile moteur pour moteurs à essence à deux temps,Material,General,l,5.4,5.4,5.4,5.4,1,EUR,0.35,0.0739,41,41,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-KALI-KATO_KAMEKA,"Bétonnières à action forcée mobiles, capacité de la trémie 250 l",Equipment,General,Heures machine,0.78,0.78,0.78,0.78,1,EUR,27.46,35.1034,41,41,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS EN BÉTON ARMÉ,Installation de cloisons en béton baryté et d'une couche isolante en béton baryt DXME-KAVO-KADX_KAKAME,"Plaques vibrantes à moteur à combustion interne, puissance jusqu'à 6 kW (8 ch)",Equipment,General,Heures machine,1.28,1.28,1.28,1.28,1,EUR,8.88,6.9259,41,41,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL ME_MEKAKA_MENE,Charge de travail moyenne 1,Labor,Labor,heures,12.96,12.96,12.96,12.96,1,EUR,949.51,73.2371,41,41,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS KAPU-ME-KARI-KAME,Mélanges pour béton à granulométrie fine,Abstract Material,General,m3,145.03,145.03,145.03,145.03,1,EUR,9904.79,68.2937,41,41,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE CONDUITES D'EAU ET DE CANALISATIONS,Construction de murs et de fonds plats KAME-LI-MELI-MEME_KAKAMETO,"Feuille abrasive à base de tissu, résistante à l'eau",Material,General,m2,27.41,27.41,27.41,27.41,1,EUR,59.72,2.179,41,41,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE KAVO-ME-KARI-KAPU_KAKAKAME,"Tôle blanche électrolytique étamée, épaisseur 0,22-0,25 mm",Material,General,kg,1.43,1.43,1.43,1.43,1,EUR,1.21,0.8444,41,41,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES RITO-SA-KAME-KAVO_KAKALIDX,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 1220 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,896.52,896.52,896.52,896.52,1,EUR,9962.33,11.1122,41,41,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,INSERTION DE RACCORDS DANS LES CONDUITES EXISTANTES KAME-LI-MEME-KASA_KAKAMETO,"Barre en polyéthylène basse pression pour soudage, diamètre 4 mm",Material,General,t,16671.28,16671.28,16671.28,16671.28,1,EUR,382.95,0.0364,41,41,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,TRAVAUX CONNEXES KAVO-ME-KARI-MEME_KAKARIME,"Pièces forgées simples pour la construction (agrafes, attaches, colliers), poids 1,8 kg",Material,General,kg,3.47,3.47,3.47,3.47,1,EUR,2649.52,763.1195,40,40,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CLOISONS,Installation de cloisons en plaques de plâtre et en béton léger DXME-KASA-KASA_KAMEVO,"Grues sur châssis automobile, capacité de charge 70 t",Equipment,General,Heures machine,102.47,102.47,102.47,102.47,1,EUR,1183.65,11.5515,40,40,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-MESA-KALI_KAKASARI,"Clous à béton pour pistolet de montage dans une douille en plastique, diamètre du clou 3,05 mm, longueur du clou 60 mm",Material,General,t,15189.38,15189.38,15189.38,15189.38,1,EUR,294.23,0.12,40,40,TRAVAUX DE CONSTRUCTION,Structures en bois,CLOISONS REVÊTUES DE PLAQUES DE PLÂTRE OU DE PLAQUES DE FIBRE DE PLÂTRE,CLOISONS SUR OSSATURE MÉTALLIQUE RIPU-TO-KAME-KAME_KAKAKATO,"Tuyau en PVC, diamètre 16 mm",Material,General,kg,4.56,4.56,4.56,4.56,1,EUR,3.22,0.7236,40,40,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES D'UN VOLUME DE BÉTON INFÉRIEUR À 100,ALIMENTATION ET POSE DU MÉLANGE DE BÉTON DANS LES BLOCS DE CONSTRUCTIONS EN BÉTO DXME-KARI-KAPU_KAPUME,"Installations de forage sur chenilles, diamètre de forage avec tubes de cuvelage jusqu'à 2300 mm, profondeur jusqu'à 46 m, couple de 250-350 kNm",Equipment,General,Heures machine,366.38,366.38,366.38,366.38,1,EUR,383.79,1.0475,40,40,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-ME-KARI-KATO,Anneaux de centrage pour tuyaux,Abstract Material,General,pièce,59.99,59.99,59.99,59.99,1,EUR,0.0,0.0,40,40,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE TUYAUX SANS TRANCHÉE,Passage des tuyaux en fibre de verre dans le fourreau MEPU-PU-KAME-MESA,Apprêt,Abstract Material,General,t,13258.36,37.05,13597.37,13597.37,2,EUR,811.26,1.5091,40,40,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS MELI-PU-KASA-KAME_KAKARIME,"Argile réfractaire, marque PGMS-23",Material,General,t,389.39,389.39,389.39,389.39,1,EUR,14.56,0.0887,40,40,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Maçonnerie des poêles et des foyers RIRI-RI-KARI-RITO_KAKAMEME,Bouchons,Material,General,100 pièces,9.26,9.26,9.26,9.26,1,EUR,5.62,0.6068,40,40,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES DXME-KANE-KASA_KASALI,"Chargeuses frontales universelles à godet unique sur pneus, capacité nominale du godet principal 1,5 m3, capacité de charge 3 t",Equipment,General,Heures machine,33.06,33.06,33.06,33.06,1,EUR,285.54,8.6382,40,40,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse DXME-MEDX-KAPU_KAKAME,"Électricité : consommation 3,63 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.47,0.47,0.47,0.47,1,EUR,0.53,1.1295,40,40,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À PERFORATION DXME-MEKA-MEKA_KAMENE,Centrateurs hydrauliques internes pour tuyaux de 400 à 500 mm de diamètre,Equipment,General,Heures machine,1.67,1.67,1.67,1.67,1,EUR,39.08,23.3543,40,40,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,Soudage de tuyaux de type LST-PAU DXME-MEDX-KAPU_KAKAME,"Pompes de forage pour l'injection de fluide de lavage, débit 0,9-7,2 m3/h, pression 400-200 m",Equipment,General,Heures machine,1.47,1.47,1.47,1.47,1,EUR,1.66,1.1295,40,40,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À PERFORATION MERI-RI-KATO-KARI_KAKAKARI,Laine minérale,Material,General,m3,97.1,97.1,97.1,97.1,1,EUR,98.21,1.251,40,40,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Installation de revêtements en plaques de chrysotile-ciment dans les bâtiments i RIME-ME-KASA-KAME_KAKAMEPU,Câble flexible de puissance avec conducteurs en cuivre H07RN-F 1x10-660,Material,General,1000 m,3250.24,3250.24,3250.24,3250.24,1,EUR,0.46,0.0,40,40,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines RISA-RI-KAME-KANE_KAKATORI,Pince à platine pour fil de mise à la terre KS-066-2,Material,General,pièce,2.9,2.9,2.9,2.9,1,EUR,38.03,13.1353,40,40,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO DXME-RIME-RIKA_KAMEPU,"Installations hydrauliques de forage au diamant dans le béton armé, diamètre de forage 200-400 mm",Equipment,General,Heures machine,4.56,4.56,4.56,4.56,1,EUR,208.89,45.84,39,39,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX MEVO-PU-KAME-KARI_KAKANEME,"Structures métalliques (selles pour conduites, colliers ou suspensions)",Material,Steel & Metal,t,3887.14,3887.14,3887.14,3887.14,1,EUR,1669.51,0.6967,39,39,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air KAME-LI-MESA-MEPU_KAKAPUPU,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, pointues, diamètre 3,5 mm, longueur 25 mm",Material,General,100 pièces,0.74,0.74,0.74,0.74,1,EUR,13.17,17.8821,39,39,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim RITO-SA-KAME-KAVO_KAKADXTO,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 1420 mm, épaisseur de paroi 14 mm",Material,Pipes & Fittings,m,1217.46,1217.46,1217.46,1217.46,1,EUR,14163.06,11.6333,39,39,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE KASA-ME-KASA-MENE_KAKAKAME,"Blocs d'ancrage pour ancrage en béton armé, béton B22,5, volume de 1 à 4 m3, consommation d'armature de 50 à 100 kg/m3",Material,General,m3,1270.17,1270.17,1270.17,1270.17,1,EUR,510.64,0.4477,39,39,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KASA-METO_KAMESA,"Camions à benne basculante, capacité de charge jusqu'à 12 t, avec grue-manipulateur, capacité de charge 1,5 t",Equipment,General,Heures machine,29.89,29.89,29.89,29.89,1,EUR,114.64,3.8359,39,39,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de bordures KASA-ME-KATO-METO,Poutres,Abstract Material,General,pièce,996.44,996.44,996.44,996.44,1,EUR,88098.13,88.4129,39,39,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,CONSTRUCTIONS DE LOCAUX SOUTERRAINS MEPU-SA-KADX-KARI_KAKAKARI,"Xylène pétrolier, marque A",Material,General,t,2900.35,2900.35,2900.35,2900.35,1,EUR,160.86,0.335,39,39,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" RIKA-RI-KAME-KAME_KAKAKAME,"Douilles en papier GB-2,8",Material,General,1000 pièces,124.78,124.78,124.78,124.78,1,EUR,69.56,0.5569,39,39,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIME-ME-KASA-KAME_KAKAPUME,Câble flexible de puissance avec conducteurs en cuivre H07RN-F 3x6-660,Material,General,1000 m,6617.63,6617.63,6617.63,6617.63,1,EUR,2.56,0.0,39,39,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,SYSTÈMES DE LUBRIFICATION ÉPAISSE ET LIQUIDE,SYSTÈMES DE LUBRIFICATION ÉPAISSE RIME-RI-KATO-KASA_KAKAKARI,"Fil électrique d'installation APuV 1x2,5-450",Material,General,1000 m,102.51,102.51,102.51,102.51,1,EUR,0.09,0.01,39,39,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,SYSTÈMES DE LUBRIFICATION ÉPAISSE ET LIQUIDE,SYSTÈMES DE LUBRIFICATION ÉPAISSE KAME-PU-KARI-KAPU_MEMETOPU,"Barre de forage hexagonale en acier, taille de l'hexagone 32 mm, queue filetée R38, filetage extérieur R32, longueur 3700 mm",Material,General,pièce,475.5,475.5,475.5,475.5,1,EUR,255.51,0.5369,39,39,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" MEPU-SA-KARI-KAME_KAKAKATO,"Mastic d'étanchéité, marque U-20",Material,General,kg,18.55,18.55,18.55,18.55,1,EUR,42.66,2.3,39,39,INSTALLATION DE L'ÉQUIPEMENT,Équipement des silos à grains et des entreprises de transformation des céréales,"ÉQUIPEMENT POUR LA FABRICATION DE FARINE, DE CÉRÉALES ET D'ALIMENTS COMBINÉS",Installations pour l'ajout de graisse DXME-KALI-MEME_SAKALI,"Installations fixes de mélange et de pompage, débit de sortie du mélange de béton 3 m3/h, puissance 30 kW",Equipment,General,Heures machine,41.14,41.14,41.14,41.14,1,EUR,207.42,5.0415,39,39,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des conduites à l'aide de composés ciment-polymère par projection cen KAME-PU-KARI-KARI_MEKAKAKA,"Fraise rotative pour fraiseuse routière avec pointe en alliage dur, diamètre d'emmanchement 20 mm, longueur 88 mm",Material,General,pièce,11.75,11.75,11.75,11.75,1,EUR,45.28,3.8559,39,39,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES FONDATIONS ET REVÊTEMENTS EXISTANTS POUR LES REVÊTEMENTS EN GRAV,DÉMONTAGE DES INSTALLATIONS EXISTANTES DXME-KALI-MEME_SAKALI,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,3.2,5.0415,39,39,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des conduites à l'aide de composés ciment-polymère par projection cen KATO-RI-KARI-MEKA_KAKAKAME,Ciment Portland de remplissage sans additif,Material,General,t,297.49,297.49,297.49,297.49,1,EUR,387.42,1.3028,39,39,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE PAR PERCUSSION ET ROTATION KALI-RI-KAME-KAPU,Porte étanche en acier,Abstract Material,General,t,81.56,81.56,81.56,81.56,1,EUR,81.18,0.9954,39,39,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR KAME-LI-MEDX-KAPU_KAKAKATO,Plaques techniques sans intercalaires en tissu,Material,General,t,3065.67,3065.67,3065.67,3065.67,1,EUR,53.99,0.021,39,39,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-MEDX-KAVO_KAKAPU,"Pompes, débit 53 m3/h, pression 10 m, puissance 4 kW",Equipment,General,Heures machine,0.51,0.51,0.51,0.51,1,EUR,20.94,41.4458,38,38,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL DXME-KAVO-KASA_KASALI,"Machines à haute performance pour la pose de béton, machines pour l'application de matériaux filmogènes",Equipment,General,Heures machine,58.49,58.49,58.49,58.49,1,EUR,443.54,7.5826,38,38,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-KANE-KATO_KADXME,"Treuils hydrauliques autonomes avec moteur à combustion interne pour le remplacement sans tranchée de conduites et le tirage de câbles, livrés avec un groupe hydraulique, force de traction 20 t",Equipment,General,Heures machine,12.44,12.44,12.44,12.44,1,EUR,545.23,43.8263,38,38,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ADDUCTION D'EAU PAR DES MÉ,Destruction souterraine de l'ancienne canalisation à l'aide d'un perforateur pne KAVO-TO-MEME-KAME_MEMEKAKA,"Profilés en acier laminés à chaud, nuances d'acier St3ps, St3sp, n° 5U-10U, n° 5P-10P",Material,General,t,1505.49,1505.49,1505.49,1505.49,1,EUR,1415.05,1.231,38,38,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,"Poutres, ceintures, linteaux, traverses",Construction de poutres et de linteaux RINE-ME-KARI-KAPU_KAKAKAME,"Joints en amiante-bitume, diamètre 60 mm",Material,General,1000 pièces,1218.98,1218.98,1218.98,1218.98,1,EUR,35.83,0.0309,38,38,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION KAME-LI-MESA-MEPU_KAMENEDX,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 6 mm, longueur 40 mm",Material,General,t,3368.92,3368.92,3368.92,3368.92,1,EUR,16.85,0.0123,38,38,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets KATO-RI-KAME-KARI_KAKAMERI,"Ciment Portland avec additifs minéraux pour la construction générale CEM II 32,5N",Material,General,t,214.51,214.51,214.51,214.51,1,EUR,56.65,0.3579,38,38,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Finition des poêles KAME-TO-KAPU-KAVO_KAKATOSA,Huile adhésive pour chaînes toutes saisons,Material,General,l,3.69,3.69,3.69,3.69,1,EUR,5.64,1.5289,38,38,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS KAVO-TO-KASA-KARI_KAKALISA,"Tôles laminées à chaud, marques d'acier St3sp, St3ps, largeur 1200-3000 mm, épaisseur 25-60 mm",Material,General,t,1701.94,1701.94,1701.94,1701.94,1,EUR,249.66,0.1787,38,38,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES MEPU-PU-KAME-MEVO_KAKAKARI,Apprêt FL-03K,Material,General,t,2457.92,2457.92,2457.92,2457.92,1,EUR,29.31,0.0667,38,38,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques DXME-MEDX-KAVO_KAKAPU,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,7.22,41.4458,38,38,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL DXME-KADX-KALI_KAMEVO,"Machines de nettoyage des gravats, capacité jusqu'à 600 m3/h, automotrices",Equipment,General,Heures machine,1129.8,1129.8,1129.8,1129.8,1,EUR,9863.16,8.73,38,38,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES AIGUILLAGES DXME-KADX-KARI_KAKATO,"Wagons basculants, capacité 0,8 m3",Equipment,General,Heures machine,0.23,0.23,0.23,0.23,1,EUR,16.25,70.9521,38,38,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RISA-ME-KATO-KAPU_KAKAMETO,"Rondelles-agrafes en acier, type TsP-138, dimensions 65 x 40 mm",Material,General,1000 pièces,535.35,535.35,535.35,535.35,1,EUR,1872.59,3.4974,38,38,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KARI-RI-KASA-KAPU_RIMEMEKA,"Gravier de roches denses pour travaux de construction M 1200, fraction 40-80(70) mm",Material,General,m3,80.63,80.63,80.63,80.63,1,EUR,32.83,0.4071,38,38,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,BRISAGE MÉCANISÉ ET EXPLOITATION DE SOLS PERMANENTEMENT GELÉS (À L'AIDE D'EXCAVA,AFFLANCHAGE ET EXPLOITATION DU SOL PERMANENTEMENT GELÉ À L'AIDE D'EXCAVATRICES A KAME-TO-KASA-KADX_KAKAKAME,Glycérine synthétique,Material,General,t,3738.92,3738.92,3738.92,3738.92,1,EUR,37.47,0.02,38,38,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER DXME-KANE-KARI_KAKARI,"Convoyeurs à bande inclinés mobiles, hauteur 10 m",Equipment,General,Heures machine,1.03,1.03,1.03,1.03,1,EUR,0.57,0.5539,38,38,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RISA-RI-KAME-MEKA_KAKAKANE,"Balance composée de deux plaques triangulaires équilatérales en acier galvanisé d'une épaisseur de 12 mm, d'une longueur de 124 mm, avec des trous de 24 mm de diamètre aux angles des plaques et trois rouleaux avec goupilles pour la connexion d'isolateurs à tige lisse, charge totale admissible 36 kN, classe de charge de rupture 100 kN",Material,General,pièce,35.56,35.56,35.56,35.56,1,EUR,208.3,5.8574,38,38,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-KANE-KARI_KAKARI,"Électricité : consommation 2,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,0.17,0.5539,38,38,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KASA-METO_KAKARI,"Camions à plateau, capacité de charge jusqu'à 6 t, avec grue-manipulateur, capacité de charge 6,2 t",Equipment,General,Heures machine,51.47,51.47,51.47,51.47,1,EUR,498.18,9.6792,38,38,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS KAME-LI-KANE-KATO_KAKARIRI,"Rubans polyéthylène avec couche adhésive, transparents, largeur 50 mm, épaisseur 0,08 mm",Material,General,m,0.1,0.1,0.1,0.1,1,EUR,11.1,107.2282,38,38,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage MEPU-SA-KAPU-KAVO_KAKAMERI,Mastic bitumineux non durcissant pour le calfeutrage et l'étanchéification des vitrages des serres et des châssis,Material,General,t,2618.2,2618.2,2618.2,2618.2,1,EUR,231.73,0.0905,38,38,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS DXME-KARI-KARI_KAMEME,Compacteurs à chenilles pour pieux d'une longueur maximale de 12 m,Equipment,General,Heures machine,59.72,59.72,59.72,59.72,1,EUR,76.91,1.2879,38,38,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-PU-KAME-KARI_KAKAMETO,"Pièces encastrées et superposées fabriquées par soudage, pliage, perçage (poinçonnage) de trous (lorsque l'une de ces opérations ou l'ensemble de ces opérations sont réalisées dans n'importe quelle combinaison), livrées séparément",Material,General,t,3890.21,3890.21,3890.21,3890.21,1,EUR,4425.7,1.1388,38,38,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE MURS MONOLITHIQUES DANS UN COFFRAGE GLISSANT,Bétonnage des structures murales RISA-RI-KAME-KANE_KAKAKARI,Pince à coin pour boucle d'oreille avec coin KS-035,Material,General,pièce,31.21,31.21,31.21,31.21,1,EUR,604.87,19.3816,37,37,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KANE-KASA_KAMEPU,"Chariots élévateurs à fourche, capacité de charge 3 t",Equipment,General,Heures machine,12.79,12.79,12.79,12.79,1,EUR,9.12,0.7127,37,37,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-KANE-MERI_KAKAMETO,"Rubans électro-isolants en fils complexes torsadés en verre, largeur 10 mm, épaisseur 0,15 mm",Material,General,m,0.05,0.05,0.05,0.05,1,EUR,2.45,50.6224,37,37,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES DXME-RIME-MEVO_KAMEME,"Réchauffeurs d'huile, puissance 150 kW",Equipment,General,Heures machine,15.53,15.53,15.53,15.53,1,EUR,85.02,5.4754,37,37,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-RIME-RIRI_MEDXRI,"Électricité : consommation 0,4 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.06,1.2243,37,37,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES DXME-RIME-RIRI_MEDXRI,Machines à aléser les trous,Equipment,General,Heures machine,5.4,5.4,5.4,5.4,1,EUR,6.61,1.2243,37,37,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES DXME-MEPU-KANE_KAKAME,"Chariots à tubes tractés par tracteur, capacité de charge jusqu'à 30 t",Equipment,General,Heures machine,62.17,62.17,62.17,62.17,1,EUR,1832.25,29.4705,37,37,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,"TRAVAUX DE CHARGEMENT, DE DÉCHARGEMENT ET DE TRANSPORT",TRAVAUX DE TRANSPORT KAME-RI-KAME-KARI_KAKASARI,Bitume pétrolier de construction BN-70/30,Material,General,t,796.54,796.54,796.54,796.54,1,EUR,692.13,0.9459,37,37,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité DXME-KARI-KATO_KARISA,"Marteaux diesel, poids de la partie frappante 3,5 t",Equipment,General,Heures machine,38.38,38.38,38.38,38.38,1,EUR,35.01,0.9122,37,37,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-TO-KARI-KASA_KAKAKAME,Gaz naturel,Material,General,100 m3,29.12,29.12,29.12,29.12,1,EUR,162.1,6.0588,37,37,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie électrotechnique,ÉQUIPEMENT POUR LA CONSTRUCTION DE MACHINES ÉLECTRIQUES,ÉQUIPEMENT POUR LA PRODUCTION DE SOURCES DE COURANT CHIMIQUES KAPU-ME-KARI-KASA_KAMETOKA,"Mélanges de béton lourd (BST) sur gravier concassé, classe B15, F(1)100, W4",Material,General,m3,118.27,118.27,118.27,118.27,1,EUR,71.8,0.7009,37,37,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-MEKA-KAPU_KARIPU,Machines d'isolation pour tuyaux d'un diamètre de 600 à 800 mm,Equipment,General,Heures machine,18.12,18.12,18.12,18.12,1,EUR,474.78,26.1984,37,37,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale en bitume-caoutchouc ou bitume DXME-KANE-KASA_KASADX,"Chargeuses frontales universelles à godet unique, pneumatiques, capacité nominale du godet principal 2,3 m3, capacité de charge 4 t",Equipment,General,Heures machine,39.75,39.75,39.75,39.75,1,EUR,58.97,1.4835,37,37,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEKA-KAPU_KARIPU,"Électricité : consommation 10,07 kWh/machine-heure",Electricity,Electricity,Heures machine,1.29,1.29,1.29,1.29,1,EUR,33.87,26.1984,37,37,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale en bitume-caoutchouc ou bitume RIPU-RI-KATO-KATO,Tubes en acier pour béton armé,Abstract Material,Pipes & Fittings,m,327.21,327.21,327.21,327.21,1,EUR,13.53,0.0411,37,37,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEVO-KAME_KAMEPU,"Compresseurs mobiles, pression 2,5 MPa (25 atm), débit 34 m3/min",Equipment,General,Heures machine,104.84,104.84,104.84,104.84,1,EUR,2582.08,24.6281,37,37,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment DXME-MELI-KAPU_KASALI,"Électricité : consommation 0,92 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.12,0.12,0.12,0.12,1,EUR,1.51,12.7238,37,37,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE KAME-LI-KARI-KARI_KAKARIME,Papier d'emballage en feuilles,Material,General,1000 m2,166.03,166.03,166.03,166.03,1,EUR,288.34,1.737,37,37,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion très renforcée à base de bitume-caoutc DXME-MEPU-KARI_KAKASA,"Camions, capacité de charge jusqu'à 12 t",Equipment,General,Heures machine,25.3,25.3,25.3,25.3,1,EUR,303.15,11.9814,37,37,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE DXME-MELI-KAPU_KASALI,Appareils à commande semi-automatique pour le soudage bout à bout de tuyaux en plastique d'un diamètre supérieur à 160 et inférieur à 315 mm,Equipment,General,Heures machine,3.12,3.12,3.12,3.12,1,EUR,39.74,12.7238,37,37,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE DXME-RIME-RIRI_PUTOVO,"Électricité : consommation 10,89 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.4,1.4,1.4,1.4,1,EUR,6.18,4.4208,37,37,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-MEDX-KAVO_KAKANE,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,50.78,217.7395,37,37,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Remplacement sans tranchée des canalisations d'égout par des tuyaux raccourcis à KAME-LI-MEME-KALI_KAKASASA,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés UONI 13/45, E42A, diamètre 6 mm",Material,General,t,3225.98,3225.98,3225.98,3225.98,1,EUR,40.59,0.028,37,37,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS RIKA-RI-KADX-METO_KAKAMEME,Manchons,Material,General,pièce,14.81,14.81,14.81,14.81,1,EUR,221.42,14.9476,37,37,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-RIME-RIRI_PUTOVO,Installations mobiles à zéolite,Equipment,General,Heures machine,4.4,4.4,4.4,4.4,1,EUR,19.46,4.4208,37,37,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-RIME-MEVO_KAMEME,"Électricité : consommation 49,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,6.36,6.36,6.36,6.36,1,EUR,34.81,5.4754,37,37,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-MEDX-KAVO_KAKANE,"Pompes, débit 40 m3/h, pression 25 m, puissance 5,5 kW",Equipment,General,Heures machine,0.63,0.63,0.63,0.63,1,EUR,137.75,217.7395,37,37,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Remplacement sans tranchée des canalisations d'égout par des tuyaux raccourcis à DXME-MEVO-KATO_KAKAME,"Compresseurs stationnaires, débit 15 m3/min",Equipment,General,Heures machine,8.89,8.89,8.89,8.89,1,EUR,244.86,27.5559,37,37,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse MEPU-SA-KALI-KAME_KAKAMEME,Poudre d'aluminium PAP-1,Material,General,t,12718.64,12718.64,12718.64,12718.64,1,EUR,94.16,0.0467,37,37,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,REVÊTEMENT ET PEINTURE AVEC DES VERNIS ET DES COMPOSÉS SPÉCIAUX DXME-MEVO-KATO_KAKAME,"Électricité : consommation 36,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.66,4.66,4.66,4.66,1,EUR,128.47,27.5559,37,37,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse KAME-LI-MELI-KAVO_KAKATORI,Poudre à polir,Material,General,kg,29.41,29.41,29.41,29.41,1,EUR,3.14,0.1068,37,37,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES DXME-KAME-KASA_MEKAPU,"Pelles hydrauliques à godet unique diesel sur châssis pneumatique, volume du godet 0,4 m3",Equipment,General,Heures machine,36.88,36.88,36.88,36.88,1,EUR,39.67,1.0754,37,37,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE RIKA-RI-KADX-KAME_KAKATORI,"Composition pour le remplissage des manchons de câbles, marque MBM",Material,General,t,2440.65,2440.65,2440.65,2440.65,1,EUR,4.45,0.01,37,37,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" KASA-ME-KARI-KASA,Supports en béton armé,Abstract Material,General,m3,1365.74,819.55,2503.63,819.55,2,EUR,70363.97,85.8571,37,37,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CONDUITES DE CENDRES ET DE SCORIES,Pose de supports pour conduites de cendres et de scories à partir d'éléments pré KAME-TO-KARI-KAME_KAKAKARI,Azote gazeux technique,Material,General,m3,4.22,4.22,4.22,4.22,1,EUR,169.47,40.1333,36,36,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-MEME-KALI_KAMEKAME,"Électrodes de soudage pour le soudage des aciers fortement alliés TS-11, diamètre 4 mm",Material,General,kg,14.74,14.74,14.74,14.74,1,EUR,34.76,2.3589,36,36,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" DXME-RIME-KAME_KARIME,"Appareils de peinture à pulvérisation sans air à entraînement pneumatique fonctionnant à partir de compresseurs mobiles, débit jusqu'à 8,7 l/min",Equipment,General,Heures machine,1.57,1.57,1.57,1.57,1,EUR,10.42,6.6278,36,36,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une étanchéité pour toitures plates à partir de composés polymère KASA-ME-KAME-MEKA,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,m3,682.21,682.21,682.21,682.21,1,EUR,20520.04,30.0789,36,36,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE CONDUITES D'EAU ET DE CANALISATIONS,Installation de supports et de goulottes pour réservoirs KAME-TO-KAME-KANE_KAKARIPU,Graisse automobile universelle,Material,General,kg,26.03,26.03,26.03,26.03,1,EUR,0.83,0.0543,36,36,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS MEPU-SA-KAPU-KATO_KAKAKARI,Mastic d'étanchéité non durcissant à base de caoutchouc synthétique pour le remplissage et l'étanchéification des joints des clôtures en verre des serres,Material,General,t,2536.06,2536.06,2536.06,2536.06,1,EUR,21.16,0.0371,36,36,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS MEPU-ME-KASA-KAPU_KAMEKAME,"Colle à base d'époxy à deux composants, composants A et B, marque VK-9",Material,General,kg,61.16,61.16,61.16,61.16,1,EUR,5.66,0.0897,36,36,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX KAME-RI-KATO-KATO_KAMERIRI,"Mastic bitume-polymère d'étanchéité, pour toitures, pour constructions et installations (réparations) de toitures, à froid, prêt à l'emploi, plage de température de -20 à +40 °C, adhérence au métal/béton d'au moins 0,9/0,6 MPa, consommation pour l'étanchéité/la construction de toitures 2,5-3,5/3,8-5,7 kg/m2 pour une épaisseur de couche de 2 mm",Material,General,kg,7.54,7.54,7.54,7.54,1,EUR,5159.25,684.0969,36,36,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS MERI-ME-KARI-KADX,Matériau isolant,Abstract Material,General,m2,2.87,2.87,2.87,2.87,1,EUR,999.72,348.7419,36,36,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE CONDUITES SANS CANALISATION DXME-KAPU-KARI_KARIME,"Électricité : consommation 15,68 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.01,2.01,2.01,2.01,1,EUR,23.38,11.6117,36,36,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE KAME-LI-MESA-MEPU_KAKANERI,"Vis autotaraudeuses en acier à tête demi-ronde et fente en croix, pointe de forage, diamètre 4,2 mm, longueur 16 mm",Material,General,100 pièces,1.08,1.08,1.08,1.08,1,EUR,7.96,7.398,36,36,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHIQUES DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À ,Montage de coffrages permanents pour dalles en béton armé à partir de planchers DXME-KAPU-KARI_KARIME,Installations de forage horizontal avec convoyeur à vis sans fin pour tuyaux de 325 à 630 mm de diamètre,Equipment,General,Heures machine,16.25,16.25,16.25,16.25,1,EUR,188.64,11.6117,36,36,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE ME_MEKAKA_LITO,Charge de travail moyenne 7,Labor,Labor,heures,24.1,24.1,24.1,24.1,1,EUR,48.07,1.995,36,36,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE KAME-LI-MESA-MEME_KAKAPUNE,"Rondelles en acier galvanisé rondes, diamètre du trou M12-14",Material,General,kg,5.63,5.63,5.63,5.63,1,EUR,1.36,0.2414,36,36,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-KAME-KAME_KAPUKA,"Bulldozers, puissance 243 kW (330 ch)",Equipment,Bulldozers,Heures machine,143.62,143.62,143.62,143.62,1,EUR,379.91,2.6453,36,36,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE BULLDOZERS KAME-LI-MESA-KATO_KAKARIRI,"Boulons en acier galvanisé à tête hexagonale, livrés avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M16 (M18), longueur du boulon 25-200 mm",Material,General,t,4548.51,4548.51,4548.51,4548.51,1,EUR,700.52,0.69,36,36,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL DXME-RIKA-KARI_KAKALI,"Barges non automotrices pour une utilisation en eaux fermées, capacité de charge 400-450 t",Equipment,General,Heures machine,36.3,36.3,36.3,36.3,1,EUR,274.09,7.5517,36,36,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-RIKA-KARI_KAMEME,"Les barges ne sont pas automotrices lorsqu'elles naviguent en rade ouverte, capacité de charge 400-450 t",Equipment,General,Heures machine,43.34,43.34,43.34,43.34,1,EUR,327.28,7.5517,36,36,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-LI-MESA-KAPU_KAKAMERI,"Vis en acier à tête demi-ronde, longueur 55-120 mm",Material,General,t,4107.57,4107.57,4107.57,4107.57,1,EUR,4.51,0.01,36,36,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier RISA-ME-KANE-MEVO,Cales pour traverses,Abstract Material,General,1000 pièces,1325.29,1325.29,1325.29,1325.29,1,EUR,1952.59,1.4733,36,36,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE MEME-ME-KATO-KANE_KAKAMETO,"Planches de bois feuillu (bouleau) équarries, humidité naturelle, longueur 2-6,5 m, toutes largeurs, épaisseur 20-22 mm, classe III",Material,General,m3,1428.76,1428.76,1428.76,1428.76,1,EUR,100.43,0.0732,36,36,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-LI-RIKA-KALI_KAKAKARI,"Ficelle en fibre de chanvre, diamètre 1,7 mm",Material,General,kg,8.81,8.81,8.81,8.81,1,EUR,44.45,5.0456,36,36,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction d'une dalle de fondation sous les bâtiments du bâtiment réacteur d' DXME-KAVO-KARI_KAKARI,"Autogoudronneurs, capacité du réservoir 7000 l",Equipment,General,Heures machine,46.49,46.49,46.49,46.49,1,EUR,61.01,1.3122,36,36,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS ORGANIQUES RISA-RI-KAME-MEME_KAKAKARI,Cosse à fourche pour boucle d'oreille KS-006,Material,General,pièce,26.51,26.51,26.51,26.51,1,EUR,61.69,2.3274,35,35,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-TO-MEPU-KAME_MEDXRIPU,"Vis de voie à tête hexagonale, type TsP 54, diamètre M24, longueur 195 mm",Material,General,t,3299.52,3299.52,3299.52,3299.52,1,EUR,9255.99,2.8063,35,35,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RIKA-ME-KARI-MESA_KAKAMEDX,Connecteurs SMZ-10,Material,General,100 pièces,127.93,127.93,127.93,127.93,1,EUR,136.27,1.0651,35,35,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-RI-KADX-MEKA_KAKAMEPU,"Manchon de protection pour câbles de communication, connecteur MC-65",Material,General,pièce,18.37,18.37,18.37,18.37,1,EUR,18.37,1.0,35,35,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE KAME-LI-RIKA-KAPU_KAKAKAPU,"Fil à coudre en coton, diamètre 1,7 mm",Material,General,kg,18.54,18.54,18.54,18.54,1,EUR,0.05,0.0,35,35,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation électrique interne des bâtiments temporaires à usage industriel et DXME-KAPU-KAME_KARIME,"Installations de forage à vis sans fin sur châssis automobile, profondeur de forage jusqu'à 60 m, capacité de charge du mât 3,7 t",Equipment,General,Heures machine,73.81,73.81,73.81,73.81,1,EUR,2478.42,33.5789,35,35,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RISA-RI-KAME-RIME_KAKANEME,Barrette de connexion KS-082,Material,General,pièce,6.27,6.27,6.27,6.27,1,EUR,48.99,7.816,35,35,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-KARI-KAME_KAKAPU,"Vibrateurs électriques à basse fréquence pour l'enfoncement de pieux métalliques et en béton armé jusqu'à 3 t, couple excentrique 71,4 kgm, force centrifuge 604 kN",Equipment,General,Heures machine,37.91,37.91,37.91,37.91,1,EUR,86.45,2.2803,35,35,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-RI-KARI-METO_KAKAMEME,"Câble à double torsion TLK-O, structure 6x37(1+6+15+15)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 33 mm",Material,Steel & Metal,10 m,154.55,154.55,154.55,154.55,1,EUR,260.93,1.6883,35,35,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,POSE DE CONDUITES DANS DES CONDITIONS PARTICULIÈRES,POSE DE CONDUITES DANS LES MARAIS ET À TRAVERS LES OBSTACLES AQUATIQUES DXME-MEPU-KASA_KARIME,"Remorques pour bobines de tuyaux en polyéthylène, capacité de charge jusqu'à 4 tonnes",Equipment,General,Heures machine,1.09,1.09,1.09,1.09,1,EUR,2.88,2.6523,35,35,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE KARI-RI-KAME-KATO_KAKAMEVO,"Gravier d'expansé argileux M 600, fraction 10-20 mm",Material,General,m3,66.33,66.33,66.33,66.33,1,EUR,1960.35,29.5529,35,35,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation de béton léger RIKA-RI-KADX-KARI_KAKATORI,Anneaux d'appui,Material,General,10 pièces,1.65,1.65,1.65,1.65,1,EUR,0.22,0.1343,35,35,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE DXME-MEKA-MEME_KATOME,Systèmes d'inspection à distance pour l'examen des tuyaux à partir d'un véhicule,Equipment,General,Heures machine,32.25,32.25,32.25,32.25,1,EUR,195.79,6.0714,35,35,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Remplacement sans tranchée des canalisations d'égout par des tuyaux raccourcis à MEME-ME-KATO-KASA_KAKANEME,"Planches non sciées de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250, épaisseur 25 mm, classe III",Material,General,m3,469.47,469.47,469.47,469.47,1,EUR,418.67,0.9458,35,35,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé KAME-LI-MESA-MEPU_KATOMEKA,"Vis autotaraudeuses en acier galvanisé à tête fraisée et fente en croix, pointues, diamètre 3,5 mm, longueur 16 mm",Material,General,kg,8.85,8.85,8.85,8.85,1,EUR,20.77,2.3463,35,35,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-LI-MELI-KARI,Injecteur,Abstract Material,General,pièce,236.03,236.03,236.03,236.03,1,EUR,382.45,1.62,35,35,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Enfoncement et extraction d'injecteurs KALI-TO-KARI-MEME_KAMEKAME,"Vis de serrage en acier, diamètre de fixation 15/17 mm, longueur 1000 mm, avec deux écrous de serrage en fonte d'un diamètre extérieur de 90 mm",Material,General,t,3924.36,3924.36,3924.36,3924.36,1,EUR,1460.07,0.4811,35,35,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage MEPU-SA-MEME-KATO_KAKAKAPU,"Mélanges secs universels pour enduits à base de gypse avec additifs polymères, granulométrie maximale de 0,2 mm, résistance à la flexion d'au moins 1,0 MPa",Material,General,kg,0.65,0.65,0.65,0.65,1,EUR,76.39,116.8571,35,35,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim RISA-RI-KAME-MEME_KAKAKALI,Cosses pour câbles en acier KS-063-1,Material,General,100 pièces,53.64,53.64,53.64,53.64,1,EUR,16.02,0.2969,35,35,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RITO-ME-KAME-KANE,Compensateurs à soufflet,Abstract Material,General,pièce,942.17,942.17,942.17,942.17,1,EUR,5303.07,5.6286,35,35,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,INSTALLATION DE COMPENSATEURS KAME-LI-MESA-MEPU_KAKAPUSA,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, pointues, diamètre 3,5 mm, longueur 35 mm",Material,General,100 pièces,0.96,0.96,0.96,0.96,1,EUR,48.27,50.5169,35,35,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-KASA-KAVO_KAKAVO,"Grues sur châssis pneumatique, capacité de charge 40 t",Equipment,General,Heures machine,54.75,54.75,54.75,54.75,1,EUR,4319.85,78.8977,35,35,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE MEPU-PU-KATO-KAVO_KAKAKAME,Vernis AS-9115,Material,General,t,10691.08,10691.08,10691.08,10691.08,1,EUR,4.65,0.0,35,35,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",COMMUNICATIONS RADIO AVEC DES OBJETS MOBILES DXME-KARI-KAME_KAKAPU,"Électricité : consommation 39,6 kW·h/machine-heure",Electricity,Electricity,Heures machine,5.09,5.09,5.09,5.09,1,EUR,11.6,2.2803,35,35,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MERI-RI-KASA-KASA,Plaques en laine minérale à liant synthétique,Abstract Material,General,m3,203.72,196.15,220.25,196.15,2,EUR,3677.6,16.8714,35,35,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" RIPU-RI-KATO-KAME_KARIKAME,"Section (tube) en acier pour la conduite à béton pour l'alimentation en mélange de béton, diamètre intérieur 125 mm, épaisseur de paroi 4,5 mm, longueur 3000 mm",Material,Pipes & Fittings,pièce,222.94,222.94,222.94,222.94,1,EUR,81.57,0.3659,34,34,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RIKA-ME-KARI-MESA_KAKAMESA,Connecteur pour fils en cuivre (SOM) 062-1,Material,General,pièce,5.15,5.15,5.15,5.15,1,EUR,14.13,2.7424,34,34,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-TO-KATO-KASA_KAKAKARI,"Acide sulfurique accumulateur, qualité supérieure",Material,Chemicals,t,889.7,889.7,889.7,889.7,1,EUR,6.19,0.0162,34,34,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,INSTALLATIONS D'ACCUMULATION KAME-TO-KASA-RITO_KAMEKATO,Laurylsulfate de sodium,Material,General,kg,16.74,16.74,16.74,16.74,1,EUR,48.88,2.9194,34,34,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" KAME-LI-MELI-KAVO_KAKAKAME,Laitier de cuivre,Material,General,t,175.93,175.93,175.93,175.93,1,EUR,291.86,1.6583,34,34,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX PRÉPARATOIRES,Nettoyage au cupro-scorie des surfaces extérieures des conduites en acier MEPU-SA-KAPU-KATO_KAMEKAPU,Mastic adhésif caoutchouc KN-2,Material,General,kg,5.13,5.13,5.13,5.13,1,EUR,266.49,51.9497,34,34,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" KAME-LI-MESA-MEME_KAKANERI,Rondelles en acier,Material,General,t,5296.68,5296.68,5296.68,5296.68,1,EUR,19.95,0.01,34,34,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri MEPU-SA-KASA-KAME_KAKAKATO,Huile combinée OKSOL,Material,General,t,2218.01,2218.01,2218.01,2218.01,1,EUR,55.29,0.095,34,34,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES RIKA-ME-KARI-MELI_KAKAKANE,"Câble conducteur en bronze avec cosses et embouts en cuivre pour boulon M10, charge admissible 1 kN, section du câble 16 mm2, longueur 1200 mm",Material,General,pièce,100.56,100.56,100.56,100.56,1,EUR,1341.26,13.3382,34,34,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KAME-LI-MELI-KANE_KAKADXME,"Cercle plat coupé, dimensions 125 x 2,5 x 22 mm",Material,General,pièce,0.69,0.69,0.69,0.69,1,EUR,4.13,5.959,34,34,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é DXME-KASA-KANE_KARIVO,"Grues sur chenilles, capacité de levage 300 t",Equipment,General,Heures machine,464.27,464.27,464.27,464.27,1,EUR,3023.1,6.5115,34,34,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-SA-KATO-KATO,Panneaux de signalisation routière,Abstract Material,General,pièce,101.59,101.59,101.59,101.59,1,EUR,9701.38,95.5,34,27,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES RIKA-RI-KARI-KARI_KAKAMEME,Bouchons,Material,General,10 pièces,0.25,0.25,0.25,0.25,1,EUR,0.25,1.0088,34,34,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e KANE-ME-KAME-KARI,Pierres céramiques ou silicatées de maçonnerie,Abstract Material,General,1000 pièces,799.22,799.22,799.22,799.22,1,EUR,340.35,0.425,34,34,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,Maçonnerie des murs extérieurs en briques céramiques ou silicatées RILI-ME-KAME-KARI,Rampes pour rails de tramway rainurés,Abstract Material,General,pièce,480.42,480.42,480.42,480.42,1,EUR,469893.7,978.0961,34,20,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,"Pose de voies par tronçons de 12,5 m sur des sections droites avec des rails de " KALI-RI-KALI-KAPU,Structures en acier à couteau et à joint,Abstract Material,Steel & Metal,t,4412.08,4412.08,4412.08,4412.08,1,EUR,18579.46,4.8592,34,33,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAVO-TO-KASA-KASA_KAKASATO,"Tôle d'acier galvanisée, épaisseur 0,7 mm",Material,General,t,1936.46,1936.46,1936.46,1936.46,1,EUR,632.41,0.3584,34,34,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation des raccords des toitures en rouleaux et en mastic aux murs et aux p RIPU-RI-KATO-KAME_KAKAKAME,"Verrou pour tuyau à béton, diamètre 125 mm",Material,General,pièce,49.27,49.27,49.27,49.27,1,EUR,24.35,0.4941,34,34,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-KARI-KARI_KAKARI,"Agrégats à copro sans marteau diesel sur la base d'une excavatrice avec une capacité de godet de 0,65 m3",Equipment,General,Heures machine,54.6,54.6,54.6,54.6,1,EUR,86.07,1.5762,34,34,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RISA-RI-KAME-KAPU_KAKAKAME,Inserts pour chapeau à fourche KS-068,Material,General,100 pièces,95.46,95.46,95.46,95.46,1,EUR,1.99,0.0206,34,34,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT METO-RI-KAME-KAME,Produits en pierre naturelle,Abstract Material,General,m2,348.52,322.28,369.24,369.24,2,EUR,20983.87,65.0588,34,34,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en dalles de marbre et de granit KAVO-ME-KARI-MEPU,Bouchons d'extrémité en acier pour caniveaux de drainage,Abstract Material,General,pièce,75.92,75.92,75.92,75.92,1,EUR,8351.56,110.0,34,28,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de caniveaux de drainage préfabriqués en béton sur des fondations p KASA-RI-KARI-KAME_KAKASAME,"Blocs de béton pleins pour murs de sous-sols de type FBS, béton B7,5",Material,General,m3,220.99,220.99,220.99,220.99,1,EUR,578.21,2.6958,34,34,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL KAME-PU-KAME-KALI,Cartouches,Abstract Material,General,kg,19.08,19.08,19.08,19.08,1,EUR,4172.14,218.6338,34,34,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,INSTALLATION DE RIDEAUX DE BRUMISATION KAME-TO-KASA-KATO_KAKARIME,Phosphate d'ammonium double (phosphate diammonique),Material,General,t,5379.74,5379.74,5379.74,5379.74,1,EUR,265.31,0.0607,34,34,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KARI-RI-KAME-KARI_MEKAPURI,"Gravier M 400-1000, fraction 5(3)-10 mm",Material,General,m3,66.9,66.9,66.9,66.9,1,EUR,992.49,14.8344,34,34,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation du béton lourd KAME-TO-KASA-KATO_KAKAKASA,Sulfate d'ammonium (sulfate d'ammonium) purifié,Material,General,t,3592.71,3592.71,3592.71,3592.71,1,EUR,132.04,0.0454,34,34,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en polymère-ciment KAPU-ME-KARI-KASA_KAMERIKA,"Mélanges de béton lourd (BST) sur gravier concassé, classe B10, F(1)100, W4",Material,General,m3,110.6,110.6,110.6,110.6,1,EUR,12.76,0.325,34,34,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,TUNNELS ET CANALISATIONS,"Construction de murs, de fonds et de plafonds de tunnels et de canaux de passage" MEPU-SA-MEME-KATO_KAKAKAME,"Mélanges secs pour enduits à base de plâtre haute résistance avec additifs polymères, granulométrie maximale de 0,15 mm, résistance à la flexion 2,7 MPa",Material,General,kg,2.52,2.52,2.52,2.52,1,EUR,41.8,16.6061,33,33,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim DXME-MEDX-KAVO_KAMEDX,"Électricité : consommation 14,85 kWh/machine-heure",Electricity,Electricity,Heures machine,1.91,1.91,1.91,1.91,1,EUR,55.09,28.8821,33,33,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE DXME-MEDX-KAVO_KAMEDX,"Pompes, débit 300 m3/h, pression 30 m, puissance 45 kW",Equipment,General,Heures machine,5.1,5.1,5.1,5.1,1,EUR,147.42,28.8821,33,33,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE MEPU-SA-MEME-KATO_KAKAKATO,"Mélanges secs pour enduits à base de plâtre avec additifs polymères, granulométrie maximale de 0,2 mm, résistance à la flexion maximale de 1,0 MPa",Material,General,kg,0.65,0.65,0.65,0.65,1,EUR,84.53,129.303,33,33,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE FIBRÉES (G",Installation de cloisons en plaques de plâtre renforcées de fibres (GVL) ou en p DXME-MELI-KAPU_SAPUPU,"Générateurs portables à essence, puissance jusqu'à 6 kW",Equipment,General,Heures machine,4.83,4.83,4.83,4.83,1,EUR,84.48,17.5058,33,33,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KALI-KALI_KAMETO,"Électricité : consommation 1,24 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.16,0.16,0.16,0.16,1,EUR,6.89,43.3342,33,33,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au KAME-LI-MESA-MEPU_KAKAMEPU,"Vis autotaraudeuses en acier phosphaté à tête fraisée et fente en croix, pointues, diamètre 4,2 mm, longueur 65 mm",Material,General,1000 pièces,24.51,24.51,24.51,24.51,1,EUR,24.0,0.9788,33,33,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de caniveaux de drainage préfabriqués en béton sur des fondations p KAME-LI-MEDX-MEPU_KAKAMEME,"Dispositifs amortisseurs en caoutchouc, diamètre 300-400 mm",Material,General,kg,4.97,4.97,4.97,4.97,1,EUR,1566.07,314.9091,33,33,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE DÉFLECTION DES INSTALLATIONS FLUVIALES,Installation de dispositifs anti-chocs pour les installations d'amarrage fluvial RISA-ME-KATO-KAME_KAKAKAME,Borne à ressort à tige TsP-369.102,Material,General,pièce,2.54,2.54,2.54,2.54,1,EUR,11833.0,4659.8788,33,33,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-LI-MEDX-KALI_KAKAMEKA,"Mélange de caoutchouc calandré SKMS-30ARKM15, dureté 80-100 unités Shore A, épaisseur 1,5 mm",Material,General,kg,8.79,8.79,8.79,8.79,1,EUR,1.18,0.1381,33,33,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT MÉCANIQUE DES INSTALLATIONS HYDRAULIQUES,MÉCANISMES DE LEVAGE FIXES KAVO-TO-KALI-KAME_KAKALIME,"Bandes d'acier laminées à chaud, nuances St3sp, St3ps, dimensions 40 x 5 mm",Material,General,t,1574.51,1574.51,1574.51,1574.51,1,EUR,94.42,0.0762,33,33,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Dispositif de mise à la terre de la voie ferrée pour grues à tour KAME-LI-MESA-MEPU_KAKARIRI,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, filetage à double pas, pointues, diamètre 3,9 mm, longueur 30 mm",Material,General,100 pièces,1.18,1.18,1.18,1.18,1,EUR,21.7,18.4488,33,33,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE FIBRÉES (G",Installation de cloisons en plaques de plâtre renforcées de fibres (GVL) ou en p DXME-KAPU-KAME_KATOSA,"Machines de forage à rouleaux sur tracteur à chenilles, puissance jusqu'à 132 kW (180 ch), profondeur de forage jusqu'à 32 m, diamètre de forage jusqu'à 200 mm",Equipment,General,Heures machine,71.32,71.32,71.32,71.32,1,EUR,328.59,4.6073,33,33,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLABLAGE DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS LES CARRIÈRES ET DXME-KAVO-KATO_KAMEDX,"Rouleaux compresseurs vibrants lisses automoteurs, poids 18 t",Equipment,General,Heures machine,69.03,69.03,69.03,69.03,1,EUR,167.48,2.4261,33,33,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL KAME-TO-KARI-KAPU_KAKAKAME,Hydrogène gazeux technique,Material,General,m3,10.72,10.72,10.72,10.72,1,EUR,225.84,21.0721,33,33,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV DXME-MEPU-KASA_KAPUME,"Convoyeurs remorqués pour câbles, capacité de charge jusqu'à 7 t",Equipment,General,Heures machine,1.38,1.38,1.38,1.38,1,EUR,21.52,15.6206,33,33,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV ME_MEKAKA_MESA,Charge de travail moyenne 1,Labor,Labor,heures,12.85,12.85,12.85,12.85,1,EUR,2008.21,156.2306,33,33,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL DXME-KALI-KALI_KAMETO,"Pompes à mortier, débit 6 m3/h",Equipment,General,Heures machine,0.83,0.83,0.83,0.83,1,EUR,36.0,43.3342,33,33,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au DXME-MEPU-KAPU_KAKALI,"Tracteurs routiers, charge sur la sellette d'attelage jusqu'à 30 t, poids total du train routier jusqu'à 130 t",Equipment,General,Heures machine,79.92,79.92,79.92,79.92,1,EUR,305.95,3.8282,33,33,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature RISA-ME-KASA-KASA_KAMEKAVO,"Rails de chemin de fer, type P65, catégorie OT350",Material,General,m,223.17,223.17,223.17,223.17,1,EUR,15.25,0.0688,33,33,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-MEDX-MEKA_KARIRI,"Stations de pompage diesel remorquées à moyenne pression, débit jusqu'à 320 m3/h, pression jusqu'à 50 m",Equipment,General,Heures machine,19.47,19.47,19.47,19.47,1,EUR,664.68,34.1339,33,33,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE TRAVERSÉE EN BÉTON ARMÉ DE PONTS POUR UNE VOIE FERROVIAIRE RISA-ME-KANE-MEVO_KAMEKASA,"Joints en caoutchouc pour base sous-rail, type TsP-538, TsP-638",Material,General,1000 pièces,1781.61,1781.61,1781.61,1781.61,1,EUR,4290.71,2.4082,33,33,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE MEPU-PU-KARI-KAPU_KARIRIME,"Peinture à l'huile MA-15, blanc de zinc",Material,General,t,3277.67,3277.67,3277.67,3277.67,1,EUR,0.81,0.0,33,33,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Installation d'un poste de contrôle et de mesure (PCM) MEVO-SA-KAVO-METO_KAKAMEME,Tubes de protection ondulés,Material,Pipes & Fittings,m,0.64,0.64,0.64,0.64,1,EUR,6.54,10.2109,32,32,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES MULTICOUCHES MÉTAL-POLYMÈRE,Pose de conduites de chauffage à partir de tuyaux métalliques-polymères multicou KAVO-TO-KAVO-KARI_KAKAVONE,"Cornière en acier laminé à chaud à ailes égales, nuances d'acier St3sp, St3ps, largeur des ailes 140-160 mm, épaisseur des ailes 9-20 mm",Material,General,t,1526.64,1526.64,1526.64,1526.64,1,EUR,73.02,0.4933,32,32,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KARI-KAPU_KAPUKA,"Installations de forage sur chenilles, diamètre de forage avec tubes de cuvelage jusqu'à 1500 mm, profondeur jusqu'à 30 m, couple de 150-250 kNm",Equipment,General,Heures machine,231.84,231.84,231.84,231.84,1,EUR,361.6,1.5597,32,32,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEDX-ME-KAME-MEME_KAKAPUSA,Fixations (colliers) pour conduits d'air STD 205,Material,General,t,2144.6,2144.6,2144.6,2144.6,1,EUR,8.72,0.01,32,32,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air RIRI-RI-KARI-MEME_KAKATORI,"Boulons d'assemblage avec écrous et rondelles, classe de résistance 5.8",Material,General,t,3255.85,3255.85,3255.85,3255.85,1,EUR,210.7,0.5,32,32,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",POTEAUX EN ACIER POUR ANTENNES SUR LES TOITS DES BÂTIMENTS RIKA-RI-MEKA-KATO_KAKARIME,Embouts de câble en cuivre P 6-5,Material,General,100 pièces,69.17,69.17,69.17,69.17,1,EUR,44.2,0.639,32,32,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",TRANSMETTEURS D'UNE PUISSANCE JUSQU'À 2000 kW DXME-KAPU-KARI_KARITO,Installations de forage horizontal avec convoyeur à vis sans fin pour tuyaux de 1220 à 1420 mm de diamètre,Equipment,General,Heures machine,18.9,18.9,18.9,18.9,1,EUR,297.6,15.7459,32,32,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE MERI-RI-KANE-KAVO,Produits en béton cellulaire,Abstract Material,General,compl,92.06,89.53,109.77,89.53,2,EUR,6890.95,76.9425,32,32,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE CONDUITES SANS CANALISATION DXME-KASA-KADX_KAKARI,"Grues sur châssis spécial de type automobile, capacité de charge 180 t",Equipment,General,Heures machine,298.18,298.18,298.18,298.18,1,EUR,2331.18,7.8181,32,32,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ RITO-VO-KATO-KAVO,Équerres,Abstract Material,General,pièce,2.27,2.27,2.27,2.27,1,EUR,1.09,0.48,32,32,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,INSTALLATION ET DÉMONTAGE DE CONDUITS DE VENTILATION DE PUITS RIPU-RI-KATO-KARI,Tuyaux de ventilation,Abstract Material,General,m,18.06,18.06,18.06,18.06,1,EUR,789.84,43.7375,32,32,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,INSTALLATION ET DÉMONTAGE DE CONDUITS DE VENTILATION DE PUITS DXME-KATO-MEKA_KAKATO,"Machines de forage pour le forage de puits souterrains avec pompes à boue, diamètre 100-150 mm et profondeur jusqu'à 300 m",Equipment,General,Heures machine,30.03,30.03,30.03,30.03,1,EUR,2752.49,91.6606,32,32,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES KAME-LI-MESA-KALI_KAKARISA,"Chevilles expansibles en polyéthylène, diamètre 10 mm, longueur 40 mm",Material,General,1000 pièces,18.83,18.83,18.83,18.83,1,EUR,1.83,0.1894,32,32,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites internes d'alimentation en eau et de chauffage à partir de tuy KAME-RI-KAME-KARI_KAKAMEME,Bitume liquéfié RB-1,Material,General,t,2035.66,2035.66,2035.66,2035.66,1,EUR,61.7,0.0303,32,32,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ISOLATION EN PLÂTRE DES SURFACES EN BÉTON DXME-MEVO-KATO_KAMEME,"Compresseurs tractés à moteur à combustion interne pour le lavage inversé des puits, pression 680 kPa (6,8 atm), débit 9,5 m3/min",Equipment,General,Heures machine,19.49,19.49,19.49,19.49,1,EUR,1552.87,79.6881,32,32,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF KAME-LI-KASA-KADX_KAKAMERI,"Feuilles de textolite pour travaux manuels, épaisseur de 1 à 3 mm",Material,General,kg,6.54,6.54,6.54,6.54,1,EUR,0.78,0.1469,32,32,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES KAVO-RI-KARI-KATO_KAKATOSA,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 25,5 mm",Material,Steel & Metal,10 m,91.62,91.62,91.62,91.62,1,EUR,109.8,1.1984,32,32,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,POSE DE CONDUITES DANS DES CONDITIONS PARTICULIÈRES,POSE DE CONDUITES DANS LES MARAIS ET À TRAVERS LES OBSTACLES AQUATIQUES KAPU-RI-KAME-KAME_KAKAPUVO,"Mélanges d'enrobés bitumineux denses à grains fins, type B, marque I",Material,General,t,169.6,169.6,169.6,169.6,1,EUR,128.21,0.7559,32,32,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Dispositif de puits ronds en béton armé préfabriqué DXME-KAPU-KARI_KARITO,"Électricité : consommation 15,68 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.01,2.01,2.01,2.01,1,EUR,31.7,15.7459,32,32,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE MEPU-PU-KATO-KADX_KAKAKAME,Vernis HS-76,Material,General,t,6265.3,6265.3,6265.3,6265.3,1,EUR,681.6,0.1142,32,32,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces en béton et enduites DXME-KAME-KASA_KAVOVO,"Pelles hydrauliques à godet unique diesel sur chenilles, volume du godet 1,6 m3",Equipment,General,Heures machine,58.1,58.1,58.1,58.1,1,EUR,639.2,11.0016,32,32,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE RIPU-RI-KANE-KAME,Raccords et pièces de jonction pour tuyaux multicouches métal-polymère,Abstract Material,General,pièce,107.49,107.49,107.49,107.49,1,EUR,0.0,0.0,32,32,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES MULTICOUCHES MÉTAL-POLYMÈRE,Pose de conduites de chauffage à partir de tuyaux métalliques-polymères multicou KANE-RI-KASA-KATO,Carreaux céramiques pour plinthes,Abstract Material,General,m,19.64,19.61,19.66,19.66,2,EUR,1395.5,71.0866,32,32,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de plinthes RITO-NE-KARI-KAME,Tuyaux en fonte à embout,Abstract Material,General,m,491.82,491.82,491.82,491.82,1,EUR,491816.53,1000.0,32,32,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN FONTE KAME-LI-MELI-KATO,Pierre à aiguiser à grain moyen,Abstract Material,General,kg,10.03,10.03,10.03,10.03,1,EUR,377.79,37.6539,31,17,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES DXME-RIME-RIRI_MEDXPU,Machines à plier les tôles spéciales (rouleaux),Equipment,General,Heures machine,0.75,0.75,0.75,0.75,1,EUR,15.28,20.4961,31,31,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-KAME-KATO_KAMERI,"Racleurs automoteurs, capacité géométrique du godet 15,0 m3",Equipment,General,Heures machine,147.26,147.26,147.26,147.26,1,EUR,650.82,4.4197,31,31,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS MEPU-ME-KAPU-KARI_KAKAKARI,"Colle, marque 88-CA",Material,General,kg,13.89,13.89,13.89,13.89,1,EUR,91.25,6.7893,31,31,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,CAOUTCHOUTAGE (REVÊTEMENT AVEC DES FEUILLES DE CAOUTCHOUC ET DES MÉLANGES DE CAO,Gommage à partir de solutions RISA-ME-KASA-KARI_KAKAKANE,"Cales de fixation séparée des voies ferrées pour traverses en béton armé, type KB-65",Material,General,t,5383.05,5383.05,5383.05,5383.05,1,EUR,53670.44,9.9706,31,31,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-SA-KAME-KARI,Plastique à froid pour le marquage routier,Abstract Material,General,kg,5.37,5.37,5.37,5.37,1,EUR,1830.52,340.6255,31,31,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-MELI-KAPU_MEDXPU,Appareils de soudage pour le soudage de câbles optiques avec un dispositif de coupe,Equipment,General,Heures machine,1.21,1.21,1.21,1.21,1,EUR,1.8,1.4826,31,31,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE MEPU-SA-KAPU-KASA_KAMEKAPU,Mastic d'étanchéité monocomposant durcissant pour la construction,Material,General,t,6481.8,6481.8,6481.8,6481.8,1,EUR,309.82,0.0556,31,31,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-KALI-MEKA_KATOME,"Installations de gunitage pneumatiques fonctionnant à partir d'installations de compression mobiles, capacité jusqu'à 3 m3/h",Equipment,General,Heures machine,1.85,1.85,1.85,1.85,1,EUR,9.69,5.2235,31,31,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Grenaillage de la surface en béton KAME-LI-KALI-RIME_KAKAKAME,"Charbon de bois, marque A",Material,General,t,324.12,324.12,324.12,324.12,1,EUR,60.13,0.1863,31,31,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES DXME-RIME-RIRI_MEDXPU,"Électricité : consommation 0,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.65,20.4961,31,31,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-KASA-KADX_KAKASA,"Grues sur châssis spécial de type automobile, capacité de charge 50 t",Equipment,General,Heures machine,168.19,168.19,168.19,168.19,1,EUR,2898.43,17.2332,31,31,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIPU-ME-KARI-KAME,Colliers de serrage pour tuyaux,Abstract Material,General,pièce,32.72,4.31,102.17,4.31,2,EUR,620.49,21.7647,31,31,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites d'alimentation en eau pour la lutte contre l'incendie à partir DXME-KASA-MEPU_SAMENE,"Grues remorquées pneumatiques avec tracteur à chenilles et treuil, puissance 132 kW (180 ch), sans compte du tracteur, capacité de charge 25 t",Equipment,General,Heures machine,8.68,8.68,8.68,8.68,1,EUR,43.31,4.9897,31,31,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,FONDATIONS EN BÉTON ARMÉ PRÉFABRIQUÉ ET MONOLITHIQUE POUR LES PILIERS DE LIGNE À KAME-LI-MESA-KATO_KAKATOPU,"Boulons en acier galvanisé à tête hexagonale et écrou hexagonal galvanisé, diamètre du filetage du boulon et de l'écrou M12, longueur du boulon 20-160 mm",Material,General,kg,4.66,4.66,4.66,4.66,1,EUR,5.81,1.2448,31,31,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu DXME-KAPU-KAME_KALIDX,"Installations de forage sur châssis automobile pour le forage rotatif de puits, profondeur de forage jusqu'à 1 500 m, capacité de levage du treuil jusqu'à 30 t",Equipment,General,Heures machine,131.98,131.98,131.98,131.98,1,EUR,10619.87,80.4674,31,31,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE ROTATIF KAVO-ME-KARI-MELI_KAKAMERI,"Grillage métallique simple en fil galvanisé à mailles carrées, diamètre du fil 2 mm, taille des mailles 35 x 35 mm",Material,General,m2,4.69,4.69,4.69,4.69,1,EUR,165.29,35.2762,31,31,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,COUVERTURE DE LA ZONE D'EXPLOSION POUR LA PROTECTION DES INSTALLATIONS RIKA-ME-KARI-RIRI_KAKAKANE,Œillet à une patte U1-12-16,Material,General,pièce,8.79,8.79,8.79,8.79,1,EUR,55.25,6.289,31,31,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RITO-SA-KAME-KAVO_KAKARILI,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 530 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,262.89,262.89,262.89,262.89,1,EUR,2635.88,10.0265,31,31,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KASA-KADX_KAMELI,"Grues sur châssis spécial de type automobile, capacité de charge 110 t",Equipment,General,Heures machine,262.46,262.46,262.46,262.46,1,EUR,888.38,3.3848,31,31,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ MEME-RI-KALI-KADX,Boîtes de fenêtre,Abstract Material,General,m,3.25,3.25,3.25,3.25,1,EUR,826.26,254.2645,31,31,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES KAME-LI-KALI-KAPU_KAKAKAPU,Dispersion polyvinylacétate homopolymère grossièrement dispersée plastifiée DB,Material,General,t,2985.72,2985.72,2985.72,2985.72,1,EUR,42.6,0.0293,31,31,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"ARMOIRES ENCASTRÉES, ÉTAGÈRES ENTRESOL, ARTICLES À L'UNITÉ" DXME-KASA-KADX_KAKADX,"Grues sur châssis spécial de type automobile, capacité de charge 130 t",Equipment,General,Heures machine,287.5,287.5,287.5,287.5,1,EUR,339.44,1.1806,31,31,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ DXME-MELI-KAPU_MESATO,Positionneurs-centreurs pour l'assemblage et le soudage de tuyaux en polyéthylène d'un diamètre supérieur à 63 mm et jusqu'à 160 mm,Equipment,General,Heures machine,0.24,0.24,0.24,0.24,1,EUR,3.43,14.1906,31,31,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-MEKA-KAPU_KAPUME,Installations pour le nettoyage chimique des oléoducs,Equipment,General,Heures machine,15.32,15.32,15.32,15.32,1,EUR,18.68,1.2194,31,31,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES RIKA-ME-KARI-MEDX,Câble,Abstract Material,General,m,6.0,2.43,8.58,8.58,2,EUR,97.23,40.0789,31,31,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-MELI-KAPU_KASANE,Appareils à commande semi-automatique pour le soudage bout à bout de tuyaux en plastique d'un diamètre allant jusqu'à 160 mm,Equipment,General,Heures machine,1.91,1.91,1.91,1.91,1,EUR,19.36,10.1132,31,31,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites d'alimentation en eau à partir de tuyaux en polyéthylène sous DXME-MELI-KAPU_KASANE,"Électricité : consommation 0,66 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.08,0.08,0.08,0.08,1,EUR,0.86,10.1132,31,31,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites d'alimentation en eau à partir de tuyaux en polyéthylène sous KAME-VO-KARI-KANE_MEKARIKA,"Verre flotté en feuilles M4, incolore, épaisseur nominale 4 mm",Material,General,m2,8.12,8.12,8.12,8.12,1,EUR,86.22,10.6216,31,31,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de veines KALI-RI-KASA-KAME_KAKATONE,"Échelle métallique, marque NTS 62-91-111a, largeur 600 mm, hauteur des marches 300 mm, hauteur de 1 à 6 m",Material,General,t,4301.24,4301.24,4301.24,4301.24,1,EUR,4301.24,1.0,31,31,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,PUITS D'ÉGOUT,Installation de puits d'égout préfabriqués en béton armé de forme circulaire KAVO-TO-KALI-KAME,Bandes laminées à chaud,Abstract Material,General,t,1855.81,1855.81,1855.81,1855.81,1,EUR,136.03,0.1084,30,30,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Fabrication de structures métalliques RIPU-TO-KASA-METO,Siège de robinet en polyéthylène avec éléments chauffants intégrés,Abstract Material,General,pièce,9.44,9.44,9.44,9.44,1,EUR,528.48,56.0,30,30,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-MEPU-KASA_KAKAPU,"Semi-remorques poids lourds, capacité de charge jusqu'à 70 t",Equipment,General,Heures machine,20.25,20.25,20.25,20.25,1,EUR,85.05,4.2,30,30,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ DXME-MEKA-KAVO_KAKARI,Installations pour le séchage de tuyaux d'un diamètre de 500 mm,Equipment,General,Heures machine,26.89,26.89,26.89,26.89,1,EUR,95.9,3.566,30,30,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale en bitume-caoutchouc ou bitume MENE-RI-KARI-KALI,Graines d'herbes,Abstract Material,General,kg,8.33,8.33,8.33,8.33,1,EUR,174.76,20.989,30,30,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-KATO-KASA_KAMENE,"Combines de creusement pour galeries horizontales et inclinées d'une section de 4,7 à 15 m2",Equipment,General,Heures machine,65.56,65.56,65.56,65.56,1,EUR,18210.02,277.764,30,30,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES RISA-RI-KARI-KAME_KAKAKAME,Boulon à crochet KS-107,Material,General,pièce,3.66,3.66,3.66,3.66,1,EUR,52.78,14.4207,30,30,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEKA-ME-KARI-KARI,"Tôles en aluminium, épaisseur 0,5-2,0 mm",Abstract Material,General,kg,10.7,10.7,10.7,10.7,1,EUR,126.16,11.7889,30,30,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS À USAGE SPÉCIAL,CONSTRUCTIONS DE TOUR DE REFROIDISSEMENT RITO-TO-KANE-KASA,Tuyaux en acier pour conduites d'eau et de gaz,Abstract Material,General,m,5.26,5.26,5.26,5.26,1,EUR,385.01,73.2027,30,30,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Fabrication et installation de clôtures en tubes d'acier pour l'élevage de gros KALI-RI-KANE-KANE,Accessoires pour main courante,Abstract Material,General,pièce,141.73,3.22,3011.31,31.04,7,EUR,1314.68,109.3127,30,24,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" DXME-MEKA-MEKA_KAMESA,Centrateurs hydrauliques internes pour tuyaux d'un diamètre de 1400 mm,Equipment,General,Heures machine,6.44,6.44,6.44,6.44,1,EUR,501.64,77.8507,30,30,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,SOUFFLAGE DE TUBES DE TYPE SST-PAU RISA-RI-KAME-KANE_KAKADXPU,Pince à mandrin KS-085,Material,General,pièce,243.5,243.5,243.5,243.5,1,EUR,1220.6,5.0127,30,30,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-PU-KAME-KAPU,Pompes à clapet plat,Abstract Material,General,pièce,438.12,438.12,438.12,438.12,1,EUR,0.0,0.0,30,30,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE PAR PERCUSSION À CORDAGE DXME-KATO-KASA_KAMENE,Électricité : consommation 85 kW·h/machine-heure,Electricity,Electricity,Heures machine,10.92,10.92,10.92,10.92,1,EUR,3032.46,277.764,30,30,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-KADX-KALI_KAMETO,"Machines rotatives pour la découpe du ballast aux extrémités des traverses, non automotrices",Equipment,General,Heures machine,230.91,230.91,230.91,230.91,1,EUR,402.24,1.742,30,30,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES MAILLONS DE LA GRILLE DE RAYONS KAME-NE-KAME-MEME,Panneaux de plafond,Abstract Material,General,m2,26.71,26.71,26.71,26.71,1,EUR,2541.69,95.1582,30,30,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-KADX-MERI_KAKAME,Visseuses à moteur pour voies ferrées,Equipment,General,Heures machine,143.88,143.88,143.88,143.88,1,EUR,315.62,2.1937,30,30,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" DXME-MELI-KARI_KASARI,Laboratoires semi-stationnaires pour le contrôle des assemblages soudés,Equipment,General,Heures machine,34.06,34.06,34.06,34.06,1,EUR,2893.57,84.96,30,30,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS PU_MEKAKA_KAVOLI,Personnel : 3 personnes-heures/machine-heures,Operator,Operators,Heures machine,42.07,42.07,42.07,42.07,1,EUR,89.19,2.1203,30,30,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE MENE-TO-KAME-KAME,Accélérateur de croissance,Abstract Material,General,kg,0.87,0.87,0.87,0.87,1,EUR,2.94,3.3656,30,18,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"AMÉNAGEMENT DE PELOUSES, DE PARTS DE FLEURS, DE JARDINS ALPINARIES ET DE ROCAIRE" DXME-KAVO-KATO_KATOKA,"Rouleaux compresseurs automoteurs à pneumatiques statiques, poids 30 t",Equipment,General,Heures machine,83.32,83.32,83.32,83.32,1,EUR,221.03,2.6527,30,30,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS ORGANIQUES KAME-LI-KALI-RIRI_KAKAMEME,"Charbon de houille, marque A",Material,General,t,308.47,308.47,308.47,308.47,1,EUR,19.21,0.0804,30,30,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES FAÇADES MEPU-RI-KAPU-KATO,Résine époxy bicomposante,Abstract Material,General,kg,32.19,32.19,32.19,32.19,1,EUR,1299.54,40.3767,30,30,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements coulés DXME-KATO-KARI_KAMERI,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,202.97,319.28,30,30,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation sans tranchée des canalisations d'égout à l'aide de tuyaux en polyéth DXME-KATO-KARI_KAMERI,"Ventilateurs centrifuges pour la ventilation des tunnels, débit d'air nominal 3,65 m3/s",Equipment,General,Heures machine,2.93,2.93,2.93,2.93,1,EUR,934.87,319.28,30,30,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation sans tranchée des canalisations d'égout à l'aide de tuyaux en polyéth RITO-TO-KATO-KARI_KAMETODX,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 159 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,67.67,67.67,67.67,67.67,1,EUR,590.98,8.7333,30,30,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-MERI-KARI_KAKAPU,"Débroussailleuses-ramasseuses avec tracteur, puissance 118 kW (160 ch)",Equipment,General,Heures machine,66.87,66.87,66.87,66.87,1,EUR,211.26,3.1593,30,30,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS KAME-LI-MESA-MEPU_KAKAVOTO,"Vis autotaraudeuses en acier galvanisé pour toiture avec tête hexagonale et rondelle, pointe de forage, diamètre 4,8 mm, longueur 50 mm",Material,General,t,6941.66,6941.66,6941.66,6941.66,1,EUR,34.29,0.01,30,30,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS DES COMPLEXES INDUSTRIELS DE PRODUCTION D'ENGRAIS MINÉRAUX DXME-MEKA-KAPU_SANEPU,"Installations réversibles avec générateur de vapeur pour la réhabilitation de tuyaux à l'aide d'un manchon en tissu, diamètre de la canalisation 100-400 mm",Equipment,General,Heures machine,165.7,165.7,165.7,165.7,1,EUR,781.01,4.7133,30,30,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Chargement d'une installation réversible avec générateur de vapeur pour la rénov RIKA-SA-KAPU-MEKA_KAKAMERI,"Bornes en plastique avec contacts en laiton, section des conducteurs 0,5-2,5 mm2",Material,General,100 pièces,33.14,33.14,33.14,33.14,1,EUR,10.09,0.3804,30,30,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e DXME-MELI-KARI_KASARI,"Électricité : consommation 1,06 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.14,0.14,0.14,0.14,1,EUR,12.35,84.96,30,30,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KARI-KASA_KASAME,"Ensembles de machines pour la réalisation de pieux en béton-sol selon la technologie de cimentation à jet à deux composants, profondeur de forage jusqu'à 35 m",Equipment,General,Heures machine,264.79,264.79,264.79,264.79,1,EUR,6247.47,23.5943,30,30,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Fixation du sol par cimentation par jet à l'aide de pieux verticaux en béton DXME-KARI-KASA_KASAME,"Électricité : consommation 7,43 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.95,0.95,0.95,0.95,1,EUR,22.5,23.5943,30,30,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Fixation du sol par cimentation par jet à l'aide de pieux verticaux en béton KASA-RI-KARI-RISA,Goulottes de drainage en béton d'une longueur de 1000 mm,Abstract Material,General,pièce,252.83,252.83,252.83,252.83,1,EUR,16181.36,64.0,30,25,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de caniveaux de drainage préfabriqués en béton sur des fondations p KAME-LI-MESA-KARI_KAKAKARI,"Boulons d'ancrage avec écrou en acier à friction à calage, avec filetage extérieur M8, diamètre 10 mm, longueur 100 mm",Material,General,100 pièces,24.07,24.07,24.07,24.07,1,EUR,19.14,0.7955,29,29,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER MEPU-SA-MEME-MEKA,Mastic polymère-ciment,Abstract Material,General,kg,4303.58,4303.58,4303.58,4303.58,1,EUR,964.51,0.295,29,29,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en dalles de polychlorure de vinyle DXME-METO-KATO_KASAME,"Machines de chauffe-eau mobiles, puissance thermique 300 kW",Equipment,General,Heures machine,58.45,58.45,58.45,58.45,1,EUR,2572.81,44.0172,29,29,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des canalisations d'égout à l'aide de gaines en polymère et en tissu MEPU-PU-KAPU-MERI_KAKAKAVO,Émail EP-140,Material,General,t,9810.35,9810.35,9810.35,9810.35,1,EUR,23.02,0.012,29,29,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées RITO-TO-KAME-KANE_KAKAMESA,"Tubes de forage en acier du groupe D avec extrémités chanfreinées et raccords correspondants, diamètre extérieur 114 mm, épaisseur de paroi 11 mm",Material,Pipes & Fittings,m,110.48,110.48,110.48,110.48,1,EUR,288.44,2.6107,29,29,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES KAME-NE-KAME-KAME,Plaques de plâtre et panneaux de plâtre,Abstract Material,General,m2,9.03,9.03,9.03,9.03,1,EUR,3266.83,361.6793,29,29,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE FIBRÉES (G",Installation de cloisons en plaques de plâtre renforcées de fibres (GVL) ou en p KASA-ME-KAME-MENE,Dalles en béton,Abstract Material,General,m3,20.09,20.09,20.09,20.09,1,EUR,68.67,3.4179,29,29,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KALI-RI-KANE-KAPU_KAKAMEME,"Cornières supérieures et inférieures pour la fixation des éléments porteurs de la porte, dimensions 100 x 123 mm",Material,General,100 pièces,110.53,110.53,110.53,110.53,1,EUR,48.25,0.4366,29,29,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim RITO-TO-KANE-KAPU_KAKAKANE,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, légers, diamètre nominal 20 mm, épaisseur de paroi 2,5 mm",Material,Pipes & Fittings,m,2.24,2.24,2.24,2.24,1,EUR,2.53,1.1314,29,29,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE MEPU-RI-KANE-KALI,Composition époxy d'injection,Abstract Material,General,kg,23.48,23.48,23.48,23.48,1,EUR,1457.63,62.0762,29,29,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Murs,MURS,Renforcement structurel des joints de dilatation et des fissures dans les struct KAVO-TO-KAME-KARI_KAKAPUNE,"Poutrelles à ailes parallèles, nuance d'acier St3sp, St3ps, n° 20Sh-50Sh",Material,General,t,2629.72,2629.72,2629.72,2629.72,1,EUR,1487.71,0.5861,29,29,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES KAME-LI-MESA-KALI_KAKARIRI,"Chevilles en polyéthylène à expansion, diamètre 6 mm, longueur 40 mm",Material,General,1000 pièces,8.42,8.42,8.42,8.42,1,EUR,1.09,0.1695,29,29,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de plinthes DXME-KAVO-KATO_KAMESA,"Rouleaux vibrants lisses automoteurs, poids 5 t",Equipment,General,Heures machine,32.06,32.06,32.06,32.06,1,EUR,138.76,4.3286,29,29,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI RITO-TO-KAME-KAME_KAKAMENE,"Manchon pour tubes de forage géologique, diamètre extérieur 102 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,pièce,44.97,44.97,44.97,44.97,1,EUR,18.19,0.4045,29,29,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES DXME-KALI-KANE_KAKAME,"Complexes de mélange à base de bentonite sur véhicule, volume de la trémie 14,5 m3",Equipment,General,Heures machine,47.05,47.05,47.05,47.05,1,EUR,71.71,1.5241,29,29,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAME-LI-MESA-MEPU_KAMENEVO,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 5 mm, longueur 70 mm",Material,General,t,3556.36,3556.36,3556.36,3556.36,1,EUR,5.8,0.01,29,29,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS UTILISANT DES PLAQUES DE CIMENT-COPEAUX,CLOISONS SUR OSSATURE MÉTALLIQUE MEME-RI-KAVO-KAME_KAKAKAVO,"Panneaux de fibres de bois fabriqués selon un procédé humide, souples M-2, épaisseur 12 mm",Material,General,1000 m2,5963.76,5963.76,5963.76,5963.76,1,EUR,196.6,0.0723,29,29,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAME-LI-KAPU-KALI,Articles de quincaillerie,Abstract Material,General,compl,58.62,58.62,58.62,58.62,1,EUR,5861.77,100.0,29,29,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-KANE-KATO_KATOSA,"Treuils auxiliaires de mine avec une force de traction de 49,05 kN (5 t)",Equipment,General,Heures machine,1.7,1.7,1.7,1.7,1,EUR,450.34,264.8097,29,29,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DES STRUCTURES INTÉRIEURES KAVO-PU-KATO-KATO_KAKATOKA,"Acier d'armature laminé à chaud à profil périodique, classe A-III, diamètre 8 mm",Material,General,t,1590.71,1590.71,1590.71,1590.71,1,EUR,43.34,0.0428,29,29,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-LI-KADX-KAPU_KAKASAME,Relais pyrotechniques de type KZDSH-69,Material,General,1000 pièces,1000.21,1000.21,1000.21,1000.21,1,EUR,5.47,0.0175,29,29,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS LES RETRAITS KAPU-TO-KAME-KADX_KAKAMEME,"Mortier prêt à l'emploi pour maçonnerie, ciment, M25",Material,General,m3,112.83,112.83,112.83,112.83,1,EUR,53.65,0.4973,29,29,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"Poutres, traverses et linteaux" DXME-RIME-KAME_KAMENE,Appareils de masticage et de peinture fonctionnant à partir de compresseurs mobiles,Equipment,General,Heures machine,0.77,0.77,0.77,0.77,1,EUR,25.66,33.3493,29,29,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,AUTRES CONSTRUCTIONS MEPU-RI-KASA-KATO_MEKAKANE,Composé polyuréthane à deux composants pour la restauration des conduites,Material,General,l,37.72,37.72,37.72,37.72,1,EUR,0.0,0.0,28,28,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Restauration des canalisations à l'aide de composés polyuréthanes par pulvérisat DXME-MEKA-MEKA_KAMEME,Centrateurs hydrauliques internes pour tuyaux de 500 à 600 mm de diamètre,Equipment,General,Heures machine,1.8,1.8,1.8,1.8,1,EUR,61.62,34.2596,28,28,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,Soudage de tuyaux de type LST-PAU MEPU-SA-KAME-KANE_KAKAMEPU,"Mastic polyuréthane monocomposant, résistant à l'eau, aux rayons UV et aux milieux agressifs, pour la réalisation de joints entre panneaux, entre blocs, de raccords de structures préfabriquées, de joints de toiture, de joints de structures de construction",Material,Steel & Metal,kg,16.45,16.45,16.45,16.45,1,EUR,130.95,7.9621,28,28,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de raccords en membranes PVC aux murs et aux parapets DXME-MEKA-KAPU_KASAME,Installations pour l'application d'un revêtement polymère par pulvérisation sur la surface interne des conduites d'un diamètre de 200 à 1600 mm,Equipment,General,Heures machine,88.14,88.14,88.14,88.14,1,EUR,209.77,2.38,28,28,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Restauration des canalisations à l'aide de composés polyuréthanes par pulvérisat DXME-KAME-KATO_KARIPU,"Racleurs tractés (avec tracteur à chenilles), capacité du godet 10,0 m3",Equipment,General,Heures machine,176.84,176.84,176.84,176.84,1,EUR,1066.65,6.0318,28,28,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS KAVO-TO-KALI-KARI_KAKARINE,"Acier laminé à chaud à large bande, nuances St3sp, St3ps, longueur 6 m, épaisseur 12 mm",Material,General,t,1956.35,1956.35,1956.35,1956.35,1,EUR,30.11,0.0148,28,28,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,COUVERTURE DE LA ZONE D'EXPLOSION POUR LA PROTECTION DES INSTALLATIONS RITO-TO-KANE-KASA_KAKAKALI,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 65 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,9.65,9.65,9.65,9.65,1,EUR,3.73,0.3868,28,28,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE DXME-KADX-KADX_MEKAPU,"Électricité : consommation 6,07 kWh/machine-heure",Electricity,Electricity,Heures machine,0.78,0.78,0.78,0.78,1,EUR,89.46,114.6871,28,28,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-KADX_MEKAPU,Bancs d'assemblage (équipement d'atelier),Equipment,General,Heures machine,34.76,34.76,34.76,34.76,1,EUR,3986.6,114.6871,28,28,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAVO-RI-KARI-KASA_KAKAPUSA,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 18 mm",Material,Steel & Metal,10 m,48.16,48.16,48.16,48.16,1,EUR,144.87,3.0082,28,28,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE RITO-SA-KAME-KAVO_KAKARISA,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 530 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,220.26,220.26,220.26,220.26,1,EUR,2104.08,9.5529,28,28,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,INSERTION DE RACCORDS DANS LES CONDUITES EXISTANTES RIRI-RI-KARI-RITO_KAKAKARI,"Douilles en acier, diamètre 65 mm, longueur 50 mm",Material,General,t,24234.94,24234.94,24234.94,24234.94,1,EUR,7.39,0.0,28,28,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DANS LES INSTALLATIONS MINIÈRES D'UNE RISA-ME-KARI-KAME_MEKAPUPU,"Traverse en béton armé à ancrage, type II, pour fixation de rail ARS",Material,General,pièce,223.7,223.7,223.7,223.7,1,EUR,88506.17,395.6429,28,28,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE MEME-ME-KARI-KANE,Matériaux en bois pour pieux,Abstract Material,General,m3,220.55,220.55,220.55,220.55,1,EUR,202.36,0.9175,28,28,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-PU-KAME-KAME,Tuyaux en acier avec isolation en béton cellulaire armé,Abstract Material,General,m,15.48,15.48,15.48,15.48,1,EUR,15416.13,995.7143,28,28,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE CONDUITES SANS CANALISATION MEME-TO-KATO-MESA_KAKAMEME,Bordure isolante en PVC,Material,General,kg,13.1,13.1,13.1,13.1,1,EUR,23.77,1.8179,28,28,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RIKA-ME-KARI-MESA_KAKAMETO,Connecteur modulaire à huit canaux (prise Internet),Material,General,pièce,0.1,0.1,0.1,0.1,1,EUR,0.46,4.5714,28,28,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" DXME-KADX-MEPU_KAKAME,Échafaudages démontables,Equipment,General,Heures machine,0.46,0.46,0.46,0.46,1,EUR,1.82,3.9489,28,28,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-LI-MESA-KAME_MEPUDXME,"Ancrages en acier galvanisé à tête hexagonale pour charges élevées, diamètre M24, longueur 235 mm",Material,General,10 pièces,1355.73,1355.73,1355.73,1355.73,1,EUR,1850.19,1.3646,28,28,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-KASA-KADX_SAKARI,"Grues sur châssis spécial de type automobile, capacité de charge 100 t",Equipment,General,Heures machine,256.29,256.29,256.29,256.29,1,EUR,6293.25,24.5554,28,28,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RIKA-ME-KAME-MEME_KAKAKATO,Pince de raccordement à platine PA 1-1,Material,General,pièce,0.9,0.9,0.9,0.9,1,EUR,1.99,2.2143,28,28,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI EN BLOCS AGRÉGÉS ME_MEKAKA_MEPU,"Classe de travail moyenne 1,4",Labor,Labor,heures,12.74,12.74,12.74,12.74,1,EUR,1500.45,117.7432,28,28,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL KAPU-TO-KAME-KADX_KAKAMEVO,"Mortier prêt à l'emploi pour maçonnerie, à base de ciment, M300",Material,General,m3,159.68,159.68,159.68,159.68,1,EUR,458.39,2.8707,28,28,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE CONDUITES D'EAU ET DE CANALISATIONS,Installation de panneaux muraux et de cloisons pour structures de stockage KALI-TO-KARI-MEME,Structures métalliques lourdes,Abstract Material,Steel & Metal,t,3386.82,3386.82,3386.82,3386.82,1,EUR,6180.95,1.825,28,28,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-MEPU-KASA_KAKAME,"Semi-remorques poids lourds, capacité de charge jusqu'à 20 t",Equipment,General,Heures machine,7.9,7.9,7.9,7.9,1,EUR,23.06,2.9178,28,28,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KAVO-KAPU_KARISA,"Chaudières mobiles pour la préparation de thermoplastique, capacité 1000 l",Equipment,General,Heures machine,15.12,15.12,15.12,15.12,1,EUR,29.17,1.9296,28,28,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-LI-MEME-KANE_KAKARIME,Flux LTI-1,Material,General,kg,64.05,64.05,64.05,64.05,1,EUR,0.68,0.0144,28,28,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS FILAIRES KASA-PU-KAME-KATO,Panneaux pour cloisons d'une épaisseur maximale de 100 mm,Abstract Material,General,m2,21.33,21.33,21.33,21.33,1,EUR,3295.41,154.5,28,28,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CLOISONS,Installation de cloisons en plaques de plâtre et en béton léger RIKA-ME-KARI-RIME_MEKARILI,"Raccord en aluminium pour la fixation du dispositif de fixation à la tige inclinée d'une console horizontale isolée d'un diamètre de 70-80 mm, dimensions 120 x 130 mm",Material,General,pièce,152.83,152.83,152.83,152.83,1,EUR,1399.32,9.1561,28,28,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX MEME-ME-KARI-KAPU,Pièces de poteaux en bois résineux scié,Abstract Material,General,m3,723.56,723.56,723.56,723.56,1,EUR,1040.12,1.4375,28,28,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BOIS VL 35-220 KV KAVO-TO-KATO-KASA_KAKAKAME,"Fil métallique galvanisé, diamètre 2,6 mm",Material,General,t,3898.18,3898.18,3898.18,3898.18,1,EUR,16.02,0.01,28,28,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,"CROISEMENT DE CÂBLES, ÉQUIPEMENT DE PÔLES DE CONTRÔLE, INSTALLATION DE PLATES-FO" RITO-NE-KARI-KATO,Tuyaux en fonte à embout,Abstract Material,General,m,15.48,15.48,15.48,15.48,1,EUR,5031.84,325.0025,28,28,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN FONTE,Pose de tuyaux en fonte à embouts évasés dans des tranchées RITO-TO-KATO-KARI_KAKATOKA,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 57 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,15.37,15.37,15.37,15.37,1,EUR,2654.24,172.67,28,28,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de chauffage et d'alimentation en ea RIPU-TO-KATO-KANE,"Tuyau de drainage en polyéthylène, ondulé",Abstract Material,General,m,88.25,88.25,88.25,88.25,1,EUR,10941.21,123.9852,28,28,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D MEKA-PU-KAME-KAME_KAKAKATO,Soudures PRMNMTS 68-4-2,Material,General,kg,85.78,85.78,85.78,85.78,1,EUR,580.33,6.7654,28,28,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",ENSEMBLES DE MOYENS TECHNIQUES POUR LES SALLES DE CONTRÔLE (SALLES DE DISPATCH),Câblages dans les panneaux et les pupitres ME_MEKAKA_SADX,Charge de travail moyenne 5,Labor,Labor,heures,21.82,21.82,21.82,21.82,1,EUR,3845.35,176.22,28,28,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-RIKA-MENE_KAKATO,Barges automotrices pour travail en eaux fermées 450 t,Equipment,General,Heures machine,124.08,124.08,124.08,124.08,1,EUR,627.42,5.0564,28,28,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAME-LI-MEME-KANE_KAKARIDX,Flux FKSP,Material,General,kg,48.5,48.5,48.5,48.5,1,EUR,0.05,0.0,28,28,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",DISPOSITIFS DE MICROPROCESSEURS ET DE TECHNIQUES DE CALCUL,DÉCOUPAGE DE CÂBLES ET DE FILS EN CONNECTEURS DXME-RIKA-KARI_KAKADX,"Barges autopropulsées pour travail en eaux fermées, capacité de charge 250 t",Equipment,General,Heures machine,221.33,221.33,221.33,221.33,1,EUR,1148.55,5.1893,27,27,TRAVAUX DE CONSTRUCTION,Structures en pierre des ouvrages hydrauliques,RÉTENTIONS MARITIMES EN PIERRE,DÉVERSEMENT DE MATÉRIAUX OU DE ROCHES À PARTIR DE BARGES KAME-LI-KANE-MEME_KAKAKAME,"Bandes précomprimées auto-expansibles à base de mousse de polyuréthane, avec une couche adhésive sur une face, largeur 10 mm, épaisseur à l'état comprimé 4 mm, épaisseur à l'état expansé 20 mm",Material,General,10 m,6.52,6.52,6.52,6.52,1,EUR,121.49,18.62,27,27,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KANE-KADX_KARIRI,"Cages à deux places auto-élévatrices, capacité de charge 300 kg",Equipment,General,Heures machine,0.57,0.57,0.57,0.57,1,EUR,31.92,55.8744,27,27,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MEPU-SA-KALI-KAPU_KARIKAME,Colorant acide jaune,Material,Chemicals,t,17614.79,17614.79,17614.79,17614.79,1,EUR,44.03,0.01,27,27,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL KAME-LI-KADX-KAPU_KAKASATO,"Ampoules hydrauliques en polyéthylène pour le bouchage des trous lors des travaux à l'explosif, diamètre 38 mm, longueur 450 mm",Material,General,1000 pièces,1055.02,1055.02,1055.02,1055.02,1,EUR,367.3,0.3489,27,27,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" DXME-METO-KAME_KAPUTO,"Machines de nettoyage de canalisations, débit de la pompe haute pression jusqu'à 13 m3/h, volume de la citerne jusqu'à 8 m3",Equipment,General,Heures machine,61.03,61.03,61.03,61.03,1,EUR,3291.89,53.9415,27,27,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Nettoyage hydrodynamique de la surface interne des conduites en acier à très hau DXME-RIKA-MEME_KAKADX,"Pontons de déchargement, capacité de charge 1,5 t",Equipment,General,Heures machine,0.21,0.21,0.21,0.21,1,EUR,23.53,110.6833,27,27,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KANE-KADX_KARIRI,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,5.22,55.8744,27,27,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-MEDX-MERI_KATOME,"Pompes de vidange avec moteur à combustion interne, débit 400 m3/h",Equipment,General,Heures machine,31.25,31.25,31.25,31.25,1,EUR,413.84,13.2426,27,27,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAME-LI-KADX-KAME_KAKAMEPU,"Ammonite en cartouches PZV-20, diamètre 36-37 mm",Material,General,t,6883.46,6883.46,6883.46,6883.46,1,EUR,1391.73,0.2019,27,27,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" DXME-KANE-KANE_KAMETO,"Élévateurs hydrauliques, hauteur de levage 22 m",Equipment,General,Heures machine,28.1,28.1,28.1,28.1,1,EUR,235.95,8.3974,27,27,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" RISA-ME-KAME-KASA_KAKAMERI,"Traverses en bois de conifères, imprégnées, pour voies ferrées à écartement large, type II",Material,General,pièce,81.29,81.29,81.29,81.29,1,EUR,1989.51,24.4752,27,27,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES RIKA-RI-KADX-KARI_KAKATOME,"Joints en paronite, dimensions 2,7 x 5 mm",Material,General,1000 pièces,69.51,69.51,69.51,69.51,1,EUR,25.39,0.3659,27,27,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIME-ME-KASA-KAPU,Câble pour systèmes de climatisation,Abstract Material,General,1000 m,9469.46,29.97,9832.52,9832.52,2,EUR,299.69,10.0,27,27,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de climatiseurs et de systèmes split MEME-RI-KANE-KARI,Structures en bois collé,Abstract Material,Steel & Metal,m3,1327.73,1327.73,1327.73,1327.73,1,EUR,1327.73,1.0,27,27,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"CONSTRUCTIONS DE COUVERTURES DE TOITURE, CHATRIERS" RITO-VO-KATO-KALI,Élément de raccordement « acier-polyéthylène »,Abstract Material,General,pièce,162.54,82.8,322.03,82.8,2,EUR,567.38,3.0,27,27,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-RIME-RIRI_KADXME,Redresseurs à semi-conducteurs pour le chauffage des transformateurs,Equipment,General,Heures machine,1.17,1.17,1.17,1.17,1,EUR,24.38,20.8852,27,27,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV KAME-LI-MEDX-KADX_KAKAMESA,"Tuyau en caoutchouc et tissu pour oxygène sous une pression de 2 MPa (20 kgf/cm2), classe III, diamètre intérieur 9 mm",Material,General,m,1.31,1.31,1.31,1.31,1,EUR,1.74,1.3293,27,27,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,SYSTÈMES DE LUBRIFICATION ÉPAISSE ET LIQUIDE,SYSTÈMES DE LUBRIFICATION ÉPAISSE DXME-MEVO-KAME_KAMETO,"Compresseurs mobiles, pression 2 MPa (20 atm), débit 60 m3/min",Equipment,General,Heures machine,142.13,142.13,142.13,142.13,1,EUR,1609.95,12.7429,27,27,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES KAME-LI-KATO-KAME_KAKAKASA,Eau distillée,Material,General,kg,0.46,0.46,0.46,0.46,1,EUR,44.44,96.1741,27,27,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,INSTALLATIONS D'ACCUMULATION RITO-TO-KAME-KASA_KAKAKATO,"Tubes de forage universels en acier avec verrous soudés, diamètre extérieur 63,5 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,162.89,162.89,162.89,162.89,1,EUR,1384.29,8.4981,27,27,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE AU TÉMOIN KAVO-PU-KARI-KANE_KAKAKATO,"Treillis soudé en fil tréfilé à froid, diamètre 4-5 mm",Material,General,t,1520.77,1520.77,1520.77,1520.77,1,EUR,147.61,0.1243,27,27,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de structures monolithiques en béton armé de la partie souterraine KAME-LI-KALI-KAPU_KAKAKASA,Dispersion polyvinylacétate homopolymère grossièrement dispersée non plastifiée D50H,Material,General,kg,2.62,2.62,2.62,2.62,1,EUR,124.21,47.4519,27,27,TRAVAUX DE CONSTRUCTION,Structures en bois,CLOISONS REVÊTUES DE PLAQUES DE PLÂTRE OU DE PLAQUES DE FIBRE DE PLÂTRE,CLOISONS SUR OSSATURE EN BOIS KAME-LI-MEDX-KADX_KAKAMERI,"Tuyau en caoutchouc et tissu pour acétylène, pression 0,63 MPa (6,3 kgf/cm2), classe I, diamètre intérieur 6,3 mm",Material,General,m,1.13,1.13,1.13,1.13,1,EUR,1.67,1.4856,27,27,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,SYSTÈMES DE LUBRIFICATION ÉPAISSE ET LIQUIDE,SYSTÈMES DE LUBRIFICATION ÉPAISSE KAME-LI-KANE-KATO_KAKAKAME,"Bandes anticorrosion en polymère-asphalte, thermorésistantes, en film PVC avec une couche adhésive d'un côté et un revêtement antiadhésif de l'autre pour l'isolation des pipelines, largeur 450 mm, épaisseur 2 mm",Material,Pipes & Fittings,m2,3.83,3.83,3.83,3.83,1,EUR,76.78,20.023,27,27,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN ACIER KAVO-RI-KARI-KASA_KAKASAPU,"Câble à double torsion LK-R, structure 6kh19(1+6+6/6)+1 o.s., marque V, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 32 mm",Material,Steel & Metal,10 m,135.62,135.62,135.62,135.62,1,EUR,461.1,3.5308,27,27,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Déplacement longitudinal des structures en acier à voie unique des ponts sur une KAME-LI-MESA-MERI_KAKAPUPU,"Goujons en acier galvanisé filetés, diamètre du filetage M16, longueur 150 mm",Material,General,t,3690.74,3690.74,3690.74,3690.74,1,EUR,58.52,0.0512,27,27,INSTALLATION DE L'ÉQUIPEMENT,Équipement des silos à grains et des entreprises de transformation des céréales,"ÉQUIPEMENT POUR LE NETTOYAGE, LE SÉCHAGE ET LE TRAITEMENT DES CÉRÉALES",Concentrateurs PU_MEKAKA_KAPUTO,Personnel : 4 personnes-heures/machine-heures,Operator,Operators,Heures machine,32.16,27.42,36.56,36.56,2,EUR,106.81,3.3067,27,27,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KASA-KARI_KAKAVO,"Électricité : consommation 52,8 kW·h/machine-heure",Electricity,Electricity,Heures machine,6.78,6.78,6.78,6.78,1,EUR,195.6,28.8433,27,27,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu DXME-KASA-KARI_KAKAVO,"Grues à portique, capacité de charge 120 t",Equipment,General,Heures machine,276.9,276.9,276.9,276.9,1,EUR,7986.6,28.8433,27,27,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu RIRI-RI-KARI-MEME_KAKASAME,Écrous de mise à la terre,Material,General,100 pièces,28.51,28.51,28.51,28.51,1,EUR,10.16,0.3563,27,27,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CONTACT POUR LES TRANSPORTS INDUSTRIELS KAVO-RI-KARI-MEME_KAKATOVO,"Câble à double torsion TK, structure 6x37(1+6+12+18)+1 o.s., marque B, en fil galvanisé du groupe Zh, groupe de marquage 1570-1770 N/mm2, diamètre 15,5 mm",Material,Steel & Metal,10 m,52.37,52.37,52.37,52.37,1,EUR,16.83,0.3215,27,27,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI EN BLOCS AGRÉGÉS RITO-TO-KAME-KALI_KAKAKATO,"Tubes de forage en acier alourdis en acier de groupe K, type UBT, diamètre extérieur 89 mm, épaisseur de paroi 19 mm",Material,Pipes & Fittings,m,95.52,95.52,95.52,95.52,1,EUR,16.03,0.1678,27,27,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE AU TÉMOIN RISA-RI-KARI-MEME,Structures métalliques pour la fixation des équipements des lignes à haute tension à autoblocage,Abstract Material,Steel & Metal,t,74.14,74.14,74.14,74.14,1,EUR,0.0,0.0,27,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR DXME-KAVO-KARI_KAMEME,Goudronneuses manuelles,Equipment,General,Heures machine,0.26,0.26,0.26,0.26,1,EUR,0.5,1.8881,26,26,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements en terre et en gravier MEVO-SA-KAVO-MEVO,Fixations pour tuyaux,Abstract Material,General,pièce,6.12,1.48,11.33,2.08,3,EUR,113.33,37.8867,26,22,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites d'alimentation en eau et de chauffage à partir de tuyaux en po RIPU-RI-KARI-KAME,Tubes métalliques polymères multicouches,Abstract Material,Pipes & Fittings,m,5.28,5.28,5.28,5.28,1,EUR,510.58,96.6846,26,26,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES MULTICOUCHES MÉTAL-POLYMÈRE,Pose de conduites de chauffage à partir de tuyaux métalliques-polymères multicou KAPU-RI-KARI-KAME,Mélanges d'asphalte coulé à chaud,Abstract Material,General,t,332.64,332.64,332.64,332.64,1,EUR,5820.69,17.4985,26,26,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en béton bitumineux DXME-KANE-KARI_KAKATO,"Convoyeurs à bande inclinés mobiles, hauteur 15 m",Equipment,General,Heures machine,1.68,1.68,1.68,1.68,1,EUR,45.8,27.3146,26,26,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX DXME-MEPU-KATO_KAKASA,"Camions à benne basculante pour carrières, capacité de charge jusqu'à 42 t",Equipment,General,Heures machine,90.26,90.26,90.26,90.26,1,EUR,1250.81,13.8577,26,26,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B MEPU-RI-KANE-KATO_KAPUKAME,"Composition hydrophobe à pénétration profonde à base de silanes et de siloxanes pour le traitement de surface de la brique, du béton, du plâtre, du carrelage, de l'ardoise, du bois, de la pierre naturelle, sans odeur caractéristique, densité 0,7-0,8 g/cm3",Material,General,l,19.98,19.98,19.98,19.98,1,EUR,4.91,0.2446,26,26,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DU COMPLEXE DE TRANSFORMATION DU PÉTROLE ET DU GAZ,TUYAUTERIES EN TUBES D'ACIER CARBONÉ ET DE HAUTE QUALITÉ MEPU-ME-KANE-KAME,Colle sèche pour montage en plâtre,Abstract Material,General,t,427.31,427.31,427.31,427.31,1,EUR,118.35,0.2754,26,26,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CLOISONS,Installation de cloisons en plaques de plâtre et en béton léger MEME-TO-KATO-MESA_MEKAMEME,"Fixations de protection pour boulons de serrage de coffrage en plastique, forme conique, diamètre 22 mm",Material,General,100 pièces,2.41,2.41,2.41,2.41,1,EUR,2.87,1.1892,26,26,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES MONOLITHES DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À L'AIDE ,Montage d'un coffrage à poutres et traverses à panneaux de grande taille avec fa KAME-ME-KARI-KAVO_KAKAKAPU,"Joints en paronite PMB, épaisseur 1 mm, diamètre 200 mm",Material,General,1000 pièces,943.75,943.75,943.75,943.75,1,EUR,3.56,0.0167,26,26,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Installation de raccords à brides sur des conduites en acier KARI-RI-KASA-KAPU_RIMEKARI,"Gravier concassé issu de roches denses pour travaux de construction M 400, fraction 40-80(70) mm",Material,General,m3,40.12,40.12,40.12,40.12,1,EUR,103.56,13.404,26,26,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,BÂTIMENTS TEMPORAIRES EN STRUCTURES PRÉFABRIQUÉES,Assemblage de bâtiments temporaires en bois et en panneaux à usage résidentiel MEDX-TO-KARI-KAVO_KAKATORI,"Tuyaux de drainage (tuyaux) ondulés pour systèmes de climatisation, diamètre 20 mm",Material,General,10 m,10.82,10.82,10.82,10.82,1,EUR,10.82,1.0,26,26,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de climatiseurs et de systèmes split KAME-LI-MERI-KALI,Grille pour pelouse,Abstract Material,General,m2,7.75,7.75,7.75,7.75,1,EUR,5467.51,705.9,26,25,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KAME-LI-KALI-RINE_KAKATORI,"Cordon polyamide torsadé, diamètre 2 mm",Material,General,t,26412.91,26412.91,26412.91,26412.91,1,EUR,12.06,0.0,26,26,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES KAME-LI-MESA-MEKA_KAKAPUME,Agrafes,Material,General,10 pièces,5.32,5.32,5.32,5.32,1,EUR,13.93,2.6206,26,26,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAVO-ME-KARI-MERI,Appareils de chauffage,Abstract Material,General,compl,523.56,523.56,523.56,523.56,1,EUR,52356.07,100.0,26,26,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Maçonnerie des poêles et des foyers MEPU-ME-KANE-KARI,Composition de la colle,Abstract Material,General,kg,765.17,0.66,1104.95,1104.95,2,EUR,363.82,54.1088,26,26,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,Maçonnerie de murs en blocs de béton cellulaire collés sans revêtement MEPU-SA-KADX-KALI_KAKATOPU,Solvant R-7,Material,General,t,4797.77,4797.77,4797.77,4797.77,1,EUR,1.1,0.0,26,26,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES KAME-TO-KARI-MEKA_KAKAKAME,Carbone tétrachloré,Material,General,kg,8.84,8.84,8.84,8.84,1,EUR,134.65,15.2258,26,26,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,CONDUITES TECHNOLOGIQUES D'ATELIER,CONDUITES EN TUBES D'ACIER ALLIÉ ET HAUTEMENT ALLIÉ DXME-KATO-MEDX_METORI,"Électricité : consommation 42,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,5.51,5.51,5.51,5.51,1,EUR,78.21,14.1935,26,26,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" RISA-ME-KANE-METO_KAKARIKA,"Sangle pour rails, type P-33",Material,General,pièce,16.39,16.39,16.39,16.39,1,EUR,69.23,4.2246,26,26,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" KAME-LI-KANE-KADX_KAKAKALI,"Bandes de raccordement bitume-polymère pour revêtements routiers en enrobés bitumineux, dimensions 50 x 5 mm",Material,General,m,1.0,1.0,1.0,1.0,1,EUR,124.57,125.2,26,26,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de caniveaux de drainage préfabriqués en béton sur des fondations p DXME-KATO-MEDX_METORI,"Installations de forage à double flèche sur châssis pneumatique, section de travail jusqu'à 55 m2, diamètre de forage jusqu'à 90 mm, profondeur de forage jusqu'à 5000 mm",Equipment,General,Heures machine,291.3,291.3,291.3,291.3,1,EUR,4134.55,14.1935,26,26,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" DXME-MEKA-MEME_SALIKA,Installations automotrices complexes pour la réhabilitation des canalisations d'égouts sans pression à l'aide d'un manchon photopolymérisable,Equipment,General,Heures machine,142.06,142.06,142.06,142.06,1,EUR,525.34,3.6981,26,26,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation de canalisations sans pression à l'aide d'un manchon en fibre de verr MEPU-SA-KARI-KARI_KAKAKARI,"Mastic-mastic chimiquement résistant, solution",Material,General,t,3556.86,3556.86,3556.86,3556.86,1,EUR,79.84,0.0421,26,26,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic chimiquement r MEPU-SA-KARI-KARI_KAKAKAME,"Mastic-mastic chimiquement résistant, sec",Material,General,t,1941.8,1941.8,1941.8,1941.8,1,EUR,56.63,0.05,26,26,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic chimiquement r DXME-KAVO-MEKA_KASAPU,"Fraises routières à froid automotrices à roues, largeur maximale de fraisage 1 000 mm",Equipment,General,Heures machine,189.58,189.58,189.58,189.58,1,EUR,156.99,0.8281,26,26,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES FONDATIONS ET REVÊTEMENTS EXISTANTS POUR LES REVÊTEMENTS EN GRAV,DÉMONTAGE DES INSTALLATIONS EXISTANTES RISA-ME-KANE-MEPU,Revêtement pour passages à niveau en plaques de caoutchouc,Abstract Material,General,m2,27423.31,27423.31,27423.31,27423.31,1,EUR,0.0,0.0,26,26,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION ET DÉMONTAGE DES PASSAGES À NIVEAU DXME-KARI-KAPU_KATONE,"Installations de forage à vis sans fin pour la mise en place de pieux forés à partir d'une grue sur chenilles, capacité de charge 25 t, profondeur de forage jusqu'à 30 m, diamètre de forage jusqu'à 600 mm, diamètre de la cavité élargie jusqu'à 1600 mm",Equipment,General,Heures machine,58.4,58.4,58.4,58.4,1,EUR,453.42,7.7638,26,26,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À LA VIS KAME-LI-MESA-KANE_KAKAVOLI,"Clous en acier formés à partir de fil métallique, diamètre 1,8 mm, longueur 150 mm",Material,General,t,2741.21,2741.21,2741.21,2741.21,1,EUR,19.26,0.0131,26,26,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,COUVERTURE DES ZONES D'EXPLOSION ET RÉALISATION DE TRAVAUX DE FORAGE ET D'EXPLOS,RÉALISATION DE TRAVAUX DE FORAGE ET DE MINAGE SUR DES VOIES FERRÉES EN SERVICE DXME-MEDX-KATO_KAKARI,"Électricité : consommation 9,9 kWh/machine-heure",Electricity,Electricity,Heures machine,1.27,1.27,1.27,1.27,1,EUR,32.49,25.5519,26,26,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEDX-KATO_KAKARI,"Stations de graissage mobiles, puissance du moteur électrique 30 kW",Equipment,General,Heures machine,5.03,5.03,5.03,5.03,1,EUR,128.52,25.5519,26,26,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS RIPU-RI-KASA-KAME_KAKAKAME,"Tuyaux en chrysotile-ciment sans pression, diamètre nominal 100 mm",Material,General,m,3.64,3.64,3.64,3.64,1,EUR,928.62,254.8854,26,26,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" KASA-ME-KANE-KANE,Panneaux de plancher nervurés,Abstract Material,General,pièce,548.36,84.9,754.34,754.34,2,EUR,6161.93,35.4746,26,26,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",PANNEAUX DE PLANCHERS ET DE TOITURES DXME-KANE-KARI_KAKATO,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,17.37,27.3146,26,26,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX KAVO-PU-KATO-KATO_KAKATONE,"Acier d'armature laminé à chaud à profil périodique, classe A-III, diamètre 25-28 mm",Material,General,t,1438.08,1438.08,1438.08,1438.08,1,EUR,206.86,0.1442,26,26,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,COLLECTEURS POUR COMMUNICATIONS SOUTERRAINES EN BÉTON ARMÉ RECTANGULAIRES ASSEMB MEME-RI-MEME-KANE_MEKATOME,"Contreplaqué de bouleau recouvert d'un film sur les deux faces, avec une surface lisse d'un côté et une surface maillée de l'autre, classe I/I, épaisseur 18 mm",Material,General,m3,1249.49,1249.49,1249.49,1249.49,1,EUR,5166.15,4.1346,26,26,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ RIKA-ME-KARI-MESA_KAKAMERI,Connecteur de fils en aluminium (SOA) 062-2,Material,General,pièce,12.87,12.87,12.87,12.87,1,EUR,26.93,2.0915,26,26,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-MEKA-KATO_KAKARI,"Chargeurs de bitume, capacité de charge 6 t",Equipment,General,Heures machine,38.91,38.91,38.91,38.91,1,EUR,799.66,20.5519,26,26,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX KAME-LI-MESA-KAVO_KAKAMEME,Rivets combinés pour assembler des planchers en acier profilé et divers éléments en tôle,Material,General,t,6442.43,6442.43,6442.43,6442.43,1,EUR,7.03,0.0,26,26,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHIQUES DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À ,Montage de coffrages permanents pour dalles en béton armé à partir de planchers KAME-LI-MELI-KADX_MEKAMETO,"Foret avec pointe en alliage dur, avec queue SDS-plus pour le perçage à percussion dans des matériaux durs, longueur totale 160 mm, diamètre 10 mm",Material,General,pièce,2.13,2.13,2.13,2.13,1,EUR,0.5,0.3042,26,26,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" RISA-ME-KANE-MEDX_KAKANEME,"Cale en caoutchouc sous la cale, type TsP-67",Material,General,pièce,2.27,2.27,2.27,2.27,1,EUR,2738.18,1203.6769,26,26,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Installation et démontage de voies de roulement pour grues à tour à partir d'élé PU_MEKAKA_KASAPU,Personnel : 5 personnes-heures/machine-heures,Operator,Operators,Heures machine,61.09,53.66,85.85,53.66,2,EUR,277.28,4.2212,26,26,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-SA-KAME-KAVO_KAMEKALI,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 1720 mm, épaisseur de paroi 16 mm",Material,Pipes & Fittings,m,1686.2,1686.2,1686.2,1686.2,1,EUR,26311.28,15.6038,26,26,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE RITO-PU-KAME-KAPU,Tuyaux en acier isolés par un revêtement double couche en polyéthylène extrudé,Abstract Material,General,m,111.14,111.14,111.14,111.14,1,EUR,11225.49,101.0,26,26,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN ACIER DXME-RIME-MESA_KAKAME,"Tronçonneuses, puissance du moteur 3 kW (4 ch)",Equipment,General,Heures machine,1.21,1.21,1.21,1.21,1,EUR,5.03,4.155,26,26,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,INSERTION DE RACCORDS DANS LES CONDUITES EXISTANTES DXME-KATO-MEME_KAKADX,"Chariots de wagon voyageurs à voie large, charge par chariot (à partir du poids brut de la caisse, 218 kN (22 t), masse jusqu'à 7 t",Equipment,General,Heures machine,8.99,8.99,8.99,8.99,1,EUR,9142.14,1017.1519,26,26,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MEPU-SA-KAME-KALI_KAMETOPU,"Mastic monocomposant à base de silicone, neutre, universel",Material,General,l,13.43,13.43,13.43,13.43,1,EUR,300.07,23.244,26,26,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de structures monolithiques en béton armé de la partie souterraine DXME-RIME-MEDX_KATOPU,Machines à affûter à double face,Equipment,General,Heures machine,0.07,0.07,0.07,0.07,1,EUR,0.24,3.36,26,26,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES RISA-ME-KATO-KANE_KAKATOLI,"Rondelles élastiques à une seule spire, version 2, diamètre du trou M27",Material,General,t,5217.5,5217.5,5217.5,5217.5,1,EUR,1517.89,0.2908,26,26,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,"Pose de voies par tronçons de 12,5 m sur des sections droites avec des rails de " RITO-TO-KANE-KASA_KAKAKATO,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 25 mm, épaisseur de paroi 3,2 mm",Material,Pipes & Fittings,m,3.36,3.36,3.36,3.36,1,EUR,69.47,20.645,26,26,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'un système de chauffage dans des bâtiments temporaires à usage ré DXME-RIKA-KARI_KAMETO,"Barges autopropulsées pour une utilisation en rade ouverte, capacité de charge 1 250 t",Equipment,General,Heures machine,307.54,307.54,307.54,307.54,1,EUR,1299.67,4.226,25,25,TRAVAUX DE CONSTRUCTION,Structures en pierre des ouvrages hydrauliques,RÉTENTIONS MARITIMES EN PIERRE,DÉVERSEMENT DE MATÉRIAUX OU DE ROCHES À PARTIR DE BARGES DXME-KAVO-MEME_KALIME,"Stabilisateurs de sol, largeur de travail 2,33 m, puissance 360 kW (482 ch)",Equipment,General,Heures machine,324.6,324.6,324.6,324.6,1,EUR,1207.39,3.7196,25,25,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MEME-ME-KARI-KATO_KAKAKATO,"Perches en bois résineux, longueur 3-6,5 m, épaisseur 3-5 cm",Material,General,m3,78.91,78.91,78.91,78.91,1,EUR,65.88,0.8348,25,25,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL PU_MEKAKA_KADXTO,Personnel : 3 personnes-heures/machine-heures,Operator,Operators,Heures machine,44.0,44.0,44.0,44.0,1,EUR,99.89,2.27,25,25,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE RISA-ME-KANE-METO_KAKAKARI,"Rail de roulement, type P-24",Material,General,pièce,15.6,15.6,15.6,15.6,1,EUR,18.42,1.474,25,25,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" KAME-LI-MEME-KALI_KAKASARI,"Électrodes de soudage EPS-5, diamètre 5 mm",Material,General,t,26344.26,26344.26,26344.26,26344.26,1,EUR,358.28,0.0725,25,25,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Recouvrement des joints verticaux entre les éléments préfabriqués en béton armé KAME-LI-MELI-KADX_KAKANETO,"Foret diamanté annulaire, diamètre 25 mm",Material,General,pièce,15.25,15.25,15.25,15.25,1,EUR,31.49,2.4391,25,25,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES DXME-KAME-KASA_METOVO,"Pelles électriques à godet unique sur chenilles, capacité du godet 12,5 m3",Equipment,General,Heures machine,1014.11,1014.11,1014.11,1014.11,1,EUR,2184.79,2.1544,25,25,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE RITO-RI-KARI-KARI,Tuyaux en cuivre pour systèmes de climatisation,Abstract Material,General,m,15.43,15.43,15.43,15.43,1,EUR,1543.16,100.0,25,25,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de climatiseurs et de systèmes split RIRI-RI-KAME-KAPU_KAKAMESA,Isolateurs linéaires à broches TF-16,Material,General,100 pièces,216.23,216.23,216.23,216.23,1,EUR,28.62,0.143,25,25,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,SUSPENSION DE CÂBLES SUR LES LIGNES DE COMMUNICATION ET DE RADIO MEPU-SA-KAME-KALI_MEKAKAKA,"Mastic monocomposant à base de silicone, acide, universel",Material,Chemicals,l,20.36,20.36,20.36,20.36,1,EUR,66.04,3.2444,25,25,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" MEPU-SA-KARI-KARI_KAMEKASA,Mastic sanitaire,Material,General,kg,3.0,3.0,3.0,3.0,1,EUR,4.05,1.3488,25,25,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" KAME-LI-MESA-KALI_KAKAKALI,"Chevilles en plastique, diamètre 14 mm, longueur 70 mm",Material,General,100 pièces,5.5,5.5,5.5,5.5,1,EUR,13.08,2.3772,25,25,TRAVAUX DE CONSTRUCTION,Canalisations internes,AUTRES TRAVAUX,Installation d'armoires KAME-ME-KARI-KAVO_KAKAKANE,"Joints en paronite PMB, épaisseur 1 mm, diamètre 300 mm",Material,General,1000 pièces,2041.2,2041.2,2041.2,2041.2,1,EUR,15.51,0.0178,25,25,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Installation de raccords à brides sur des conduites en acier DXME-MELI-KAPU_KATORI,"Groupes de soudage avec moteur à combustion interne pour soudage à l'arc manuel tracté, courant de soudage jusqu'à 250 A, nombre de postes 2",Equipment,General,Heures machine,11.86,11.86,11.86,11.86,1,EUR,45.19,3.812,25,25,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MERI-KAVO_KATOME,Tracteurs à charrue (sans tracteur),Equipment,General,Heures machine,0.8,0.8,0.8,0.8,1,EUR,1.45,1.8108,25,25,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-RIKA-KANE_KAKAME,"Bateaux remorqueurs, puissance 66 kW (90 ch)",Equipment,General,Heures machine,15.62,15.62,15.62,15.62,1,EUR,50.71,3.246,25,25,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KANE-KATO_KASATO,"Treuils à moteur à combustion interne, force de traction 1471,5 kN (150 t)",Equipment,General,Heures machine,139.35,139.35,139.35,139.35,1,EUR,2024.03,14.5244,25,25,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" DXME-KAVO-KATO_KARITO,"Rouleaux compresseurs automoteurs combinés vibrants, poids 12 t",Equipment,General,Heures machine,58.89,58.89,58.89,58.89,1,EUR,173.98,2.9544,25,25,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MEME-TO-KATO-MEKA,Profilé d'angle en PVC avec grille,Abstract Material,General,m,34.5,4.98,41.83,41.83,3,EUR,1745.93,42.2328,25,21,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KAME,Supports de construction de revêtement,Abstract Material,General,compl,4.48,1.28,8.12,3.69,3,EUR,276.19,183.5967,25,19,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-KAME_KAKAPUKA,"Ancrages enfoncés en acier d'armature A-I, diamètre 12 mm, longueur 900 mm",Material,General,t,2223.16,2223.16,2223.16,2223.16,1,EUR,3115.33,1.4695,25,25,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KAME-LI-MEPU-KASA_KAKAKAME,"Feuille en polyéthylène basse pression, épaisseur 6 mm",Material,General,m2,55.0,55.0,55.0,55.0,1,EUR,1242.0,22.5824,25,25,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE À PETITS PANNEAUX,Construction de paliers d'escalier monolithiques dans un coffrage à panneaux fin DXME-MEPU-KATO_KAKANE,"Camions à benne basculante, capacité de charge jusqu'à 75 t",Equipment,General,Heures machine,119.98,119.98,119.98,119.98,1,EUR,1940.93,16.1772,25,25,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B DXME-MEPU-KATO_KAKALI,"Camions à benne basculante pour carrières, capacité de charge jusqu'à 110 t",Equipment,General,Heures machine,316.2,316.2,316.2,316.2,1,EUR,5781.6,18.2844,25,25,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE TERRE À L'AIDE D'EXCAVATRICES DANS DES CAMIONS À B KAME-LI-KANE-MEKA_KAKAMERI,"Bandes d'étanchéité hydrofuges anticorrosion, thermorétractables en polyéthylène avec une couche adhésive sur une face pour l'isolation des tuyaux, couleur noire, largeur 630 mm, épaisseur 1,2 mm",Material,General,m,9.84,9.84,9.84,9.84,1,EUR,1601.23,162.7116,25,25,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,CONDUITES DANS LES CANALISATIONS ET EN SURFACE MEPU-RI-KANE-KASA_KARIMERI,Composé époxy thixotrope,Material,General,kg,31.91,31.91,31.91,31.91,1,EUR,66.87,2.0956,25,25,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MESA-MEPU_KAKAPURI,"Vis autotaraudeuses en acier oxydé à tête demi-ronde et fente en croix, pointues, diamètre 3,5 mm, longueur 9,5 mm",Material,General,100 pièces,0.74,0.74,0.74,0.74,1,EUR,2.41,3.2556,25,25,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim KASA-ME-KAPU-RILI,Panneaux préfabriqués en béton armé,Abstract Material,General,m3,20.09,20.09,20.09,20.09,1,EUR,1429.45,71.1443,25,25,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-ME-KARI-METO_KAKAKASA,"Manchon métallique en bande d'acier galvanisé, non étanche, profil simple, RZ-TsKh, diamètre nominal 15 mm",Material,General,m,1.13,1.13,1.13,1.13,1,EUR,40.58,35.88,25,25,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,ASCENSEURS,"ASCENSEURS POUR PASSAGERS, HÔPITAUX ET MARCHANDISES" DXME-KAME-KASA_METOVO,"Électricité : consommation 412,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,52.98,52.98,52.98,52.98,1,EUR,114.14,2.1544,25,25,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE KAVO-TO-KAME-KARI,Poutres en I à ailes parallèles,Abstract Material,General,t,1817.91,1817.91,1817.91,1817.91,1,EUR,2121.86,1.1672,25,25,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES RISA-RI-KAME-KANE_KAKASATO,Pince de raccordement KS-054-2,Material,General,pièce,26.86,26.86,26.86,26.86,1,EUR,223.53,8.3224,25,25,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-KALI-KATO_KAKATO,"Bétonnières gravitaires mobiles, volume du tambour 350 l",Equipment,General,Heures machine,0.27,0.27,0.27,0.27,1,EUR,15.47,56.6052,25,25,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation d'une barrière routière automatique pour contrôler le passage DXME-KALI-KATO_KAKATO,"Électricité : consommation 0,36 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,2.63,56.6052,25,25,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation d'une barrière routière automatique pour contrôler le passage KAME-LI-KANE-MEPU,Bande porteuse,Abstract Material,General,m,2.09,2.09,2.09,2.09,1,EUR,269.27,129.0568,25,25,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" KAVO-TO-KATO-KAPU_KAKAMESA,"Fil métallique clair, diamètre 6,0-6,3 mm",Material,General,t,2044.12,2044.12,2044.12,2044.12,1,EUR,11.99,0.022,25,25,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","Poutres, traverses, lisses" KASA-ME-KALI-RIVO,Marches en béton armé,Abstract Material,General,m,772.11,772.11,772.11,772.11,1,EUR,28585.79,37.0227,25,25,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" DXME-KADX-KAPU_KAKAME,"Draisines à voie large, universelles, avec grue, capacité de levage de la grue 1 t",Equipment,General,Heures machine,31.44,31.44,31.44,31.44,1,EUR,186.14,5.9204,25,25,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS KAME-LI-MEME-KALI_KAMEDXPU,"Électrodes de soudage à revêtement rutile pour le soudage de structures en aciers au carbone et faiblement alliés ANO-1, diamètre 5 mm",Material,Steel & Metal,kg,3.71,3.71,3.71,3.71,1,EUR,11.13,3.0,24,24,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX SOUS-MARINS AVEC DES STRUCTURES MÉTALLIQUES EN MILIEU FLUVIAL (RIVIÈRES," KAME-LI-MEME-KALI_KAMEDXSA,"Électrodes de soudage à revêtement rutile pour le soudage de structures en aciers au carbone et faiblement alliés ANO-1, diamètre 6 mm",Material,Steel & Metal,kg,3.71,3.71,3.71,3.71,1,EUR,70.5,19.0,24,24,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX SOUS-MARINS AVEC DES STRUCTURES MÉTALLIQUES EN MILIEU FLUVIAL (RIVIÈRES," MERI-RI-KATO-MEME_KAKAMERI,"Tissu isolant en fibre de verre, densité 230 g/m2, épaisseur 0,2 mm",Material,General,m2,2.71,2.71,2.71,2.71,1,EUR,382.12,140.9704,24,24,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de sols coulés en polyuréthane DXME-KARI-KASA_KASAKA,"Ensembles de machines pour la mise en place de pieux en béton selon la technologie de cimentation par jet à un composant, profondeur de forage jusqu'à 35 m",Equipment,General,Heures machine,214.73,214.73,214.73,214.73,1,EUR,2362.29,11.0012,24,24,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Fixation du sol par cimentation par jet à l'aide de pieux verticaux en béton RISA-RI-KAME-KANE_KAMEKAME,Pince de fixation KS-049-5 (KS-329),Material,General,pièce,19.6,19.6,19.6,19.6,1,EUR,224.65,11.46,24,24,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-RIME-KARI_KARIKA,"Installations pour le nettoyage hydraulique des tuyaux à très haute pression, pression 1350 bars, débit 100 l/min",Equipment,General,Heures machine,115.9,115.9,115.9,115.9,1,EUR,1579.35,13.6271,24,24,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Nettoyage hydrodynamique de la surface interne des conduites en acier à très hau KASA-ME-KALI-RILI,Poteaux en béton,Abstract Material,General,pièce,1205.52,1205.39,1206.03,1205.39,2,EUR,75525.97,62.6567,24,24,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" KAME-LI-MEDX-MEME_KAKAKAPU,Tubes en caoutchouc sous vide,Material,Pipes & Fittings,kg,16.13,16.13,16.13,16.13,1,EUR,1.67,0.1017,24,24,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RIKA-RI-KAME-KANE_KAKAKATO,"Douilles de câble en cuivre étamé pour sertissage, pour raccordement bout à bout de fils et câbles à conducteurs en cuivre de section 10 mm2, diamètre intérieur 5 mm",Material,General,100 pièces,54.51,54.51,54.51,54.51,1,EUR,39.84,0.7308,24,24,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" DXME-KARI-KASA_KASAKA,"Électricité : consommation 7,43 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.95,0.95,0.95,0.95,1,EUR,10.49,11.0012,24,24,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Fixation du sol par cimentation par jet à l'aide de pieux verticaux en béton KAME-LI-KADX-KATO_KAKAMERI,Cordon détonant OSH,Material,General,1000 m,233.42,233.42,233.42,233.42,1,EUR,20.12,0.207,24,24,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AUTRES TRAVAUX,ARRACHAGE DE SOUCHES KAPU-ME-KARI-KASA_KAMERIRI,"Mélanges de béton lourd (BST) sur gravier concassé, classe B12,5, F(1)75, W2",Material,General,m3,113.2,113.2,113.2,113.2,1,EUR,0.87,0.08,24,24,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER DXME-RIME-KATO_SAKALI,"Appareils à jet abrasif fonctionnant à partir de compresseurs mobiles, volume jusqu'à 200 l, débit d'air jusqu'à 16 m3/min",Equipment,General,Heures machine,0.25,0.25,0.25,0.25,1,EUR,3.37,13.6767,24,24,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX PRÉPARATOIRES,Rugosification pour assurer l'adhérence sur des surfaces préalablement apprêtées DXME-RIKA-MEME_KAKAME,"Pontons pour travail en eaux fermées, 40 t",Equipment,General,Heures machine,1.01,1.01,1.01,1.01,1,EUR,123.56,122.6617,24,24,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAVO-PU-KATO-KARI,Armature en acier lisse,Abstract Material,General,t,1268.83,1268.83,1268.83,1268.83,1,EUR,3412.0,2.6891,24,24,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KATO-KARI_KAMERIDX,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 152 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,54.63,54.63,54.63,54.63,1,EUR,178.2,3.2621,24,24,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS RIPU-RI-KANE-KASA_KAKAKARI,"Bouchon pneumatique en caoutchouc, diamètre extérieur nominal jusqu'à 600 mm",Material,General,pièce,1114.65,1114.65,1114.65,1114.65,1,EUR,128.18,0.12,24,24,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Montage et démontage d'un bouchon pneumatique en caoutchouc RISA-ME-KAME-KARI,Poutres pour aiguillages ferroviaires,Abstract Material,General,m3,467.41,467.41,467.41,467.41,1,EUR,6414.98,13.7246,24,24,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" KAVO-PU-KAME-KARI_KAKAMEME,"Pièces encastrées et superposées fabriquées sans soudure, cintrage, perçage (poinçonnage) de trous, livrées séparément",Material,General,t,3890.21,3890.21,3890.21,3890.21,1,EUR,203.4,0.1008,24,24,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,FONDATIONS POUR ÉQUIPEMENTS,Réalisation de fondations pour équipements de laminoirs à barres KAME-LI-KADX-KARI_KAKAMEME,Capsules détonatrices KD-8S,Material,General,1000 pièces,159.74,159.74,159.74,159.74,1,EUR,4.53,0.068,24,24,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AUTRES TRAVAUX,ARRACHAGE DE SOUCHES KAME-TO-KAME-KANE_KAKARILI,Graisse anticorrosion pour la protection des câbles AMS,Material,General,kg,15.4,15.4,15.4,15.4,1,EUR,362.87,23.5637,24,24,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,TÉLÉPHÉRIQUES,"VOIES DE ROULEMENT À DOUBLE CANAL SUSPENDUES, À ANNEAUX ET À PENDULES" DXME-MEKA-KAVO_KAKAPU,Installations pour le séchage de tuyaux d'un diamètre allant jusqu'à 1000-1200 mm,Equipment,General,Heures machine,93.96,93.96,93.96,93.96,1,EUR,535.36,5.6979,24,24,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale en bitume-caoutchouc ou bitume DXME-RIME-MEVO_KATOME,Installations pour la protection de l'isolation des transformateurs contre l'humidité,Equipment,General,Heures machine,6.38,6.38,6.38,6.38,1,EUR,231.54,36.2958,24,24,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV MEKA-ME-KARI-KATO_KAKAKARI,"Fil d'aluminium en alliage de marque AMZ, diamètre 3,0-5,8 mm",Material,General,t,18857.75,18857.75,18857.75,18857.75,1,EUR,27.11,0.0,24,24,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" MEVO-ME-KARI-KATO_KAKARIME,"Vanne en acier, diamètre nominal 50 mm",Material,General,pièce,182.44,182.44,182.44,182.44,1,EUR,243.25,1.3333,24,24,INSTALLATION DE L'ÉQUIPEMENT,"Compresseurs, pompes et ventilateurs",POMPES,"POMPES À VIDE, DE MINE ET ARTÉSIENNES" DXME-RIME-MEVO_KATOME,"Électricité : consommation 13,2 kWh/machine-heure",Electricity,Electricity,Heures machine,1.7,1.7,1.7,1.7,1,EUR,61.54,36.2958,24,24,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV RIME-RI-KATO-KARI_KAKAKANE,"Fil de montage NV-1 0,75-600",Material,General,1000 m,104.22,104.22,104.22,104.22,1,EUR,1.29,0.0138,24,24,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES DXME-MELI-KAPU_MEDXRI,"Électricité : consommation 5,68 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.73,0.73,0.73,0.73,1,EUR,37.92,52.0142,24,24,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE KAME-LI-MESA-METO_KAKAKARI,Goupilles en fil métallique,Material,General,kg,3.83,3.83,3.83,3.83,1,EUR,62.26,16.2658,24,24,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MEVO-RI-KAPU-KADX,Accessoires pour puits et systèmes d'évacuation des eaux pluviales et d'égouts (éléments de puits),Abstract Material,General,m,1693.14,1434.5,1730.09,1730.09,2,EUR,1730.09,1.0,24,9,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,PUITS D'ÉGOUT,Installation de puits ronds préfabriqués et soudés en matériaux polymères RISA-RI-KAME-KANE_MEKARIME,"Pince pour fil de contact bout à bout, section du fil de contact 85-150 mm2, dimensions 120 x 39 x 31,5 mm",Material,General,pièce,60.44,60.44,60.44,60.44,1,EUR,98.56,1.6308,24,24,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-MEME_KAKAKAPU,Cosses pour fils en cuivre 25-35 mm KS-063,Material,General,100 pièces,190.48,190.48,190.48,190.48,1,EUR,182.73,0.9592,24,24,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX MEPU-SA-KADX-KASA_KAKAKAME,Nettoyant dégraissant à évaporation rapide,Material,General,l,61.67,61.67,61.67,61.67,1,EUR,445.53,7.225,24,24,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-KASA-KAPU_KAMENE,"Ponts roulants électriques, capacité de charge 250 t",Equipment,General,Heures machine,298.64,298.64,298.64,298.64,1,EUR,58732.9,196.6692,24,24,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER LES TÔLES DXME-KASA-KAPU_KAMENE,"Électricité : consommation 92,07 kW·h/machine-heure",Electricity,Electricity,Heures machine,11.83,11.83,11.83,11.83,1,EUR,2325.73,196.6692,24,24,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER LES TÔLES DXME-MELI-KAPU_MEDXRI,Appareils à commande automatique pour le soudage bout à bout de tuyaux en plastique d'un diamètre supérieur à 630 mm et inférieur à 1200 mm,Equipment,General,Heures machine,12.32,12.32,12.32,12.32,1,EUR,640.6,52.0142,24,24,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE KAME-SA-KAME-KAME,Peintures de marquage routier,Abstract Material,General,t,3.8,3.8,3.8,3.8,1,EUR,0.19,0.0496,24,24,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE RITO-SA-KARI-KARI_KAKAVOVO,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 219 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,47.83,47.83,47.83,47.83,1,EUR,2233.87,46.7083,24,24,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEME-ME-KATO-KANE_KAKAVOPU,"Planches équarries de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 20-22 mm, classe IV",Material,General,m3,358.2,358.2,358.2,358.2,1,EUR,124.62,0.3479,24,24,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KALI-MEME_KAKARI,"Installations pour la préparation et la distribution de solutions à partir de mélanges secs, capacité jusqu'à 3 m3/min",Equipment,General,Heures machine,3.45,3.45,3.45,3.45,1,EUR,128.61,37.2643,23,23,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation de pieux forés-injectés dans des puits prêts à l'emploi à l'aide de DXME-KAVO-KALI_KAMERI,"Distributeurs de liants minéraux tractés, largeur de pose 2500 mm, capacité 8 m3, débit 80-2000 l/min",Equipment,General,Heures machine,17.62,17.62,17.62,17.62,1,EUR,64.21,3.6448,23,23,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KASA-KANE_KARIDX,"Grues sur chenilles, capacité de charge 350 t",Equipment,General,Heures machine,539.13,539.13,539.13,539.13,1,EUR,6975.12,12.9378,23,23,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEPU-PU-KAPU-KADX_KAKARISA,"Émail KhV-1100, coloré",Material,General,t,4303.23,4303.23,4303.23,4303.23,1,EUR,5.4,0.0,23,23,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" DXME-KANE-KADX_SAVOME,"Nacelles doubles auto-élévatrices, capacité de charge 630 kg",Equipment,General,Heures machine,0.62,0.62,0.62,0.62,1,EUR,34.72,55.663,23,23,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAVO-TO-KATO-KAPU_KAKAPUSA,"Fil métallique noir, diamètre 1,6 mm",Material,General,t,2058.19,2058.19,2058.19,2058.19,1,EUR,91.66,0.1111,23,23,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS PRINCIPAUX DES CENTRALES THERMIQUES,Installation de silos PU_MEKAKA_KANEME,Personnel : 25 personnes-heures/machine-heures,Operator,Operators,Heures machine,278.74,165.6,295.71,295.71,2,EUR,77.41,0.3161,23,23,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIME-RIRI_PUTORI,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,3.39,19.9783,23,23,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV RIKA-ME-KARI-RIME_KAKANEME,Nœud de fixation des cordes de soutien aux fixations,Material,General,compl,44.68,44.68,44.68,44.68,1,EUR,547.86,12.2609,23,23,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEVO-ME-KADX-KAME,Robinets à boisseau sphérique en acier pour gaz à passage droit,Abstract Material,General,pièce,380.18,380.18,380.18,380.18,1,EUR,1272.79,3.3478,23,23,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RISA-RI-KAME-MELI_KAKAKAME,Œillet à deux branches KS-013,Material,General,pièce,25.22,25.22,25.22,25.22,1,EUR,35.01,1.3883,23,23,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEVO-SA-KAVO-KASA,Supports en acier avec chevilles en plastique pour la fixation des radiateurs,Abstract Material,General,100 pièces,509.32,509.32,509.32,509.32,1,EUR,1195.8,2.3478,23,23,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de radiateurs en aluminium et bimétalliques RIRI-RI-KARI-KAVO_KAKAMEME,"Support de câble en bande d'acier (KCP) pour installation dans des puits de câbles, longueur 1300 mm",Material,General,pièce,20.67,20.67,20.67,20.67,1,EUR,851.24,41.1826,23,23,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES DXME-MENE-KATO_KAKAME,"Centrales électriques fixes, puissance 1 000 kW",Equipment,General,Heures machine,321.55,321.55,321.55,321.55,1,EUR,95133.94,295.8583,23,23,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KADX-KADX_KAKARI,Grues de pose pour rails de 25 m sur traverses en bois,Equipment,General,Heures machine,318.03,318.03,318.03,318.03,1,EUR,1662.59,5.2278,23,23,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-TO-KAPU-KAVO_KAKAKAME,Huile pour moteurs de véhicules automobiles M8B,Material,General,kg,3.54,3.54,3.54,3.54,1,EUR,1.33,0.3765,23,23,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) METO-RI-KATO-KAME,Pierre,Abstract Material,General,m3,95.13,93.33,107.13,93.33,2,EUR,6844.91,71.86,23,23,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-RIME-RIRI_PUTORI,Installations de traitement sous vide de l'huile de transformateur,Equipment,General,Heures machine,1.61,1.61,1.61,1.61,1,EUR,32.15,19.9783,23,23,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV RIKA-RI-KADX-MEKA_KAKAMETO,"Manchon de protection pour câbles de communication, connecteur MC-50",Material,General,pièce,13.23,13.23,13.23,13.23,1,EUR,13.23,1.0,23,23,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE MEPU-SA-KADX-KALI_KAKATOME,Solvant R-4A,Material,General,t,4050.23,4050.23,4050.23,4050.23,1,EUR,9.42,0.02,23,23,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-KALI-MEME_KAKARI,"Électricité : consommation 1,24 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.16,0.16,0.16,0.16,1,EUR,7.56,37.2643,23,23,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation de pieux forés-injectés dans des puits prêts à l'emploi à l'aide de RIRI-RI-KARI-RITO_KAMEDXME,Plastifiant Sovol,Material,General,t,2056.15,2056.15,2056.15,2056.15,1,EUR,12.6,0.01,23,23,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-KANE-KADX_SAVOME,"Électricité : consommation 0,99 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.13,0.13,0.13,0.13,1,EUR,7.08,55.663,23,23,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MEPU-TO-KARI-KASA,Peintures silicatées,Abstract Material,General,t,3189.5,3189.5,3189.5,3189.5,1,EUR,82.23,0.0243,23,23,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'EAU À L'INTÉRIEUR DES LOCAUX DXME-KAVO-MEME_MERIKA,"Installations automotrices de battage de pieux pour la mise en place de barrières de sécurité, puissance du marteau jusqu'à 1200 J",Equipment,General,Heures machine,47.93,47.93,47.93,47.93,1,EUR,121.6,2.537,23,23,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES RITO-SA-KARI-KARI_KAKARILI,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 32 mm, épaisseur de paroi 3 mm",Material,Pipes & Fittings,m,3.97,3.97,3.97,3.97,1,EUR,279.45,70.3183,23,23,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS KAVO-RI-KARI-KATO_KAKATOVO,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 32,5 mm",Material,Steel & Metal,10 m,139.43,139.43,139.43,139.43,1,EUR,280.08,2.0087,23,23,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,POSE DE CONDUITES DANS DES CONDITIONS PARTICULIÈRES,POSE DE CONDUITES DANS LES MARAIS ET À TRAVERS LES OBSTACLES AQUATIQUES DXME-MEME-KARI_KALIRI,"Grues-manipulateurs multifonctionnelles (travaux de chargement et de déchargement, forage à la tarière, levage et déplacement de personnes) à haute maniabilité, capacité de charge jusqu'à 4 t, diamètre de forage jusqu'à 500 mm, profondeur de forage jusqu'à 5 m, nacelle d'une capacité de charge jusqu'à 250 kg",Equipment,General,Heures machine,78.06,78.06,78.06,78.06,1,EUR,234.4,3.003,23,23,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BOIS VL 35-220 KV MERI-RI-KATO-MERI_KAKARIME,Feuille de cuivre M1,Material,General,kg,38.28,38.28,38.28,38.28,1,EUR,152.59,3.9865,23,23,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,MACHINES ÉLECTRIQUES RISA-ME-KASA-KARI_KAKAKASA,"Cales pour fixation séparée des voies ferrées, type KB-50, KD-50",Material,General,t,6841.65,6841.65,6841.65,6841.65,1,EUR,117747.55,17.2113,23,23,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-LI-MESA-KASA_KAKAMEPU,"Écrous hexagonaux en acier, diamètre du filetage M12 (M14)",Material,General,t,3497.89,3497.89,3497.89,3497.89,1,EUR,6.54,0.01,23,23,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire DXME-MELI-KARI_KAKATO,"Appareils à rayons X portables à potentiel constant, plage de réglage de la tension sur le tube à rayons X 100-250 kV, intensité du courant anodique 1-5 mA, épaisseur de transparence jusqu'à 54 mm sur l'acier",Equipment,General,Heures machine,9.56,9.56,9.56,9.56,1,EUR,12.18,1.2741,22,22,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" RIKA-RI-KAME-KAVO_KAKAKAME,"Douilles avec isolation thermorétractable, section 0,5-1,0 mm2",Material,General,100 pièces,108.99,108.99,108.99,108.99,1,EUR,26.87,0.2586,22,22,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" DXME-KADX-KALI_KAMESA,"Machines de nettoyage de gravats, capacité 600-800 m3/h, non automotrices",Equipment,General,Heures machine,364.13,364.13,364.13,364.13,1,EUR,1246.14,3.4223,22,22,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES AIGUILLAGES KAME-PU-KATO-KARI_KAKARIME,"Rails ferroviaires pour transport souterrain, type R33",Material,General,t,4211.31,4211.31,4211.31,4211.31,1,EUR,260622.76,61.8864,22,22,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" DXME-KASA-KADX_KAMEDX,"Grues sur châssis spécial de type automobile, capacité de charge 230 t",Equipment,General,Heures machine,341.4,341.4,341.4,341.4,1,EUR,2984.32,8.7414,22,22,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ RISA-ME-KAME-KASA_KAKARIVO,"Traverse en bois résineux imprégné, type II, longueur 1700 mm",Material,General,pièce,39.68,39.68,39.68,39.68,1,EUR,59743.95,1505.4545,22,22,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" MEPU-PU-KARI-KADX_KATOKARI,Peinture BT-177,Material,General,t,3220.06,3220.06,3220.06,3220.06,1,EUR,10.29,0.01,22,22,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées KARI-RI-KASA-KAPU_RIKAMERI,"Gravier issu de roches denses pour travaux de construction M 1000, fraction 5(3)-10 mm",Material,General,m3,63.5,63.5,63.5,63.5,1,EUR,758.13,11.9395,22,22,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE PONTS ET DE SOUS-PONT,CONSTRUCTION DE PONTS DXME-KAME-KATO_KARISA,"Racleurs tractés (avec tracteur à chenilles), capacité du godet 15,0 m3",Equipment,General,Heures machine,274.02,274.02,274.02,274.02,1,EUR,1274.94,4.6527,22,22,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS MEPU-ME-KASA-KARI_KAMEKANE,"Colle-mastic polyuréthane monocomposant, volume 310 ml",Material,General,pièce,13.72,13.72,13.72,13.72,1,EUR,464.13,33.8294,22,22,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-KAVO-KATO_KATOME,"Rouleaux compresseurs automoteurs à roues pneumatiques statiques, poids 14 t",Equipment,General,Heures machine,66.01,66.01,66.01,66.01,1,EUR,130.97,1.9841,22,22,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-KALI-KARI_KATORI,"Électricité : consommation 5,91 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.76,0.76,0.76,0.76,1,EUR,2.44,3.2082,22,22,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX DXME-KALI-KARI_KATORI,"Pompes à béton électriques remorquées, débit 10 m3/h",Equipment,General,Heures machine,5.62,5.62,5.62,5.62,1,EUR,18.03,3.2082,22,22,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX RITO-TO-KATO-KARI_KAKANERI,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 89 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,32.8,32.8,32.8,32.8,1,EUR,407.35,12.4191,22,22,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Essai hydraulique préliminaire des conduites d'un diamètre nominal de 100 à 1400 KAVO-TO-KASA-KARI_KAKAVOME,"Tôles laminées à chaud, nuance d'acier 09G2S, 12G2S, largeur 1200-3000 mm, épaisseur 1-8 mm",Material,General,t,1535.84,1535.84,1535.84,1535.84,1,EUR,4.26,0.03,22,22,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des parois courbes du réacteur des centrales nucléaires équipées de KAME-NE-KAME-MEKA,Panneaux de ciment-sciure non poncés,Abstract Material,General,m2,16.22,16.22,16.22,16.22,1,EUR,3716.49,229.0909,22,22,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS UTILISANT DES PLAQUES DE CIMENT-COPEAUX,CLOISONS SUR OSSATURE EN BOIS KASA-RI-KARI-RIPU_KAKARIME,"Cubes de voie, béton B15, volume 0,006 m3",Material,General,m3,663.37,663.37,663.37,663.37,1,EUR,6053.21,9.125,22,22,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-TO-KASA-RITO_KAKANERI,"Sodium caustique de marque TR, technique",Material,General,t,3371.39,3371.39,3371.39,3371.39,1,EUR,364.65,0.1124,22,22,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES DXME-KADX-MERI_SAMEPU,"Cintreuses de rails, force de cintrage jusqu'à 36 t",Equipment,General,Heures machine,0.37,0.37,0.37,0.37,1,EUR,16.03,43.5559,22,22,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KALI-RI-KALI-METO_KARIRIME,Colliers en acier,Material,General,kg,1.59,1.59,1.59,1.59,1,EUR,17.27,10.8809,22,22,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-KASA-KARI_KAKAPU,"Électricité : consommation 25,01 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.21,3.21,3.21,3.21,1,EUR,792.61,246.7018,22,22,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KAME-LI-MERI-KASA_MEKAKAPU,"Géotextile non tissé en polypropylène, aiguilleté, thermolié, densité superficielle 200 g/m2",Material,General,m2,0.72,0.72,0.72,0.72,1,EUR,25.22,35.0564,22,22,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE DXME-MEPU-KASA_KAKASA,"Semi-remorques poids lourds, capacité de charge jusqu'à 110 t",Equipment,General,Heures machine,75.78,75.78,75.78,75.78,1,EUR,331.21,4.3709,22,22,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature MERI-ME-KARI-MESA_KAKAPUME,"Matériau d'étanchéité en rouleau, caoutchouc-bitume, sans additifs polymères",Material,General,m2,5.12,5.12,5.12,5.12,1,EUR,429.35,83.9191,22,22,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,CONDUITES DANS LES CANALISATIONS ET EN SURFACE DXME-KASA-KAPU_KATOTO,"Ponts roulants à rotation complète, capacité de charge 10 t",Equipment,General,Heures machine,31.66,31.66,31.66,31.66,1,EUR,65.54,2.0705,22,22,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE FOURS À HAUTE TEMPÉRATURE,Maçonnerie de hauts fourneaux RISA-ME-KARI-KAME,Demi-traverse en béton armé à vibrations réduites,Abstract Material,General,compl,197.92,194.68,266.05,194.68,2,EUR,468075.53,2404.2857,22,22,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-RI-KAME-MENE_KAKAKATO,Selle double pour anneau KS-010,Material,General,pièce,50.44,50.44,50.44,50.44,1,EUR,143.6,2.8477,22,22,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEPU-ME-KANE-KAME_KAKAKAME,"Mélanges secs pour travaux extérieurs à grains fins, à base de plâtre, adhésifs, pour coller des plaques de plâtre et des panneaux de laine minérale, application manuelle, résistance à la compression 2,0 MPa, résistance à l'adhérence au support 0,3 MPa, résistance à la flexion 1,0 MPa",Material,General,kg,0.32,0.32,0.32,0.32,1,EUR,37.98,118.4818,22,22,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple en profilés de plafond av KAME-LI-MELI-KADX_KAKANERI,"Foret diamanté annulaire, diamètre 20 mm",Material,General,pièce,14.59,14.59,14.59,14.59,1,EUR,39.71,2.7229,22,22,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é MENE-RI-KARI-KADX,Semis,Abstract Material,General,1000 pièces,1901.72,1901.72,1901.72,1901.72,1,EUR,3218.29,1.6923,22,22,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,PLANTATION ET SEMIS MÉCANISÉS DE CULTURES FORESTIÈRES KAVO-TO-KASA-KASA_KAKASADX,"Tôle d'acier galvanisée, épaisseur 1,5 mm",Material,General,t,1913.68,1913.68,1913.68,1913.68,1,EUR,752.19,0.6654,22,22,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAVO-TO-KASA-KARI_KAMEPURI,"Tôles laminées à chaud, nuance d'acier C345, largeur 1200-3000 mm, épaisseur 9-12 mm",Material,General,t,2354.77,2354.77,2354.77,2354.77,1,EUR,0.0,0.0,22,22,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEPU-ME-KARI-KAPU_KAMEKAME,"Colle-mastic, marque colle Bustilat",Material,General,t,2046.53,2046.53,2046.53,2046.53,1,EUR,26.09,0.0227,22,22,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en relina et de moquettes RISA-ME-KANE-RITO,Sorties croisées,Abstract Material,General,compl,806.17,412.45,2144.82,412.45,2,EUR,412.45,1.0,22,22,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" KARI-RI-KARI-KATO_KAKARIME,"Poudre minérale, non activée",Material,General,t,44.49,44.49,44.49,44.49,1,EUR,260.21,5.8482,22,22,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Réalisation d'un joint de dilatation pour fondations sous équipement avec rempli RISA-RI-KARI-KAME_KAKAMEME,"Boulons spéciaux pour fixation avec écrou et rondelle, diamètre 12-16 mm, longueur 400 mm",Material,General,t,6679.96,6679.96,6679.96,6679.96,1,EUR,150.45,0.035,22,22,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR DXME-KADX-MEKA_KAKAME,"Machines de redressage, de bourrage et de finition",Equipment,General,Heures machine,768.43,768.43,768.43,768.43,1,EUR,884.74,1.1514,22,22,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,RÉTABLISSEMENT DE LA VOIE ET DES AIGUILLAGES RITO-LI-KAME-KATO,Conduites avec manchons,Abstract Material,General,m,15.48,15.48,15.48,15.48,1,EUR,731.16,47.225,22,22,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites d'alimentation en gaz à partir de tuyaux en acier non galvanis DXME-MELI-KARI_KAKATO,"Électricité : consommation 0,33 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.04,0.04,0.04,0.04,1,EUR,0.05,1.2741,22,22,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" DXME-KAME-KATO_KARIME,"Racleurs tractés (avec tracteur à chenilles), capacité de la benne 4,5 m3",Equipment,General,Heures machine,59.16,59.16,59.16,59.16,1,EUR,722.32,12.2086,22,22,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS PU_MEKAKA_KAVOVO,Personnel : 4 personnes-heures/machine-heures,Operator,Operators,Heures machine,56.45,56.45,56.45,56.45,1,EUR,65.0,1.1514,22,22,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,RÉTABLISSEMENT DE LA VOIE ET DES AIGUILLAGES DXME-KASA-MEME_KAMETO,"Électricité : consommation 60,28 kW·h/machine-heure",Electricity,Electricity,Heures machine,7.74,7.74,7.74,7.74,1,EUR,15.36,1.9832,22,22,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) DXME-METO-KAME_KATOLI,"Machines de marquage routière sur base automobile pour l'application de peinture avec éléments réfléchissants, capacité du réservoir de peinture 650 kg, pour billes de verre 160 kg",Equipment,General,Heures machine,46.79,46.79,46.79,46.79,1,EUR,51.08,1.0918,22,22,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE MEPU-SA-KAPU-KALI_KAKAMERI,"Mastic thiokolique à deux composants pour usage dans le bâtiment, à durcissement à froid",Material,General,kg,6.97,6.97,6.97,6.97,1,EUR,488.01,70.0241,22,22,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes en acier inoxydable à tr DXME-KADX-MEME_KARIRI,Machines pour creuser des fosses sous les poteaux du réseau de contact lors de travaux « sur voie »,Equipment,General,Heures machine,226.94,226.94,226.94,226.94,1,EUR,3585.89,15.8009,22,22,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,SUPPORTS DU RÉSEAU DE CONTACT EN BÉTON ARMÉ DXME-MELI-KAPU_KASATO,"Électricité : consommation 0,66 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.08,0.08,0.08,0.08,1,EUR,0.18,2.1782,22,22,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-MELI-KAPU_KASATO,Appareils à commande automatique pour le soudage bout à bout de tuyaux en plastique d'un diamètre allant jusqu'à 160 mm,Equipment,General,Heures machine,3.94,3.94,3.94,3.94,1,EUR,8.58,2.1782,22,22,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE MEVO-SA-KAVO-KADX_KAKAKARI,Tuyaux en acier,Material,General,m,8.63,8.63,8.63,8.63,1,EUR,11.9,1.3786,22,22,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Dispositif d'installation pour la réduction de la pression du gaz, DXME-RIKA-MENE_SAMEME,"Barges autopropulsées à fond ouvrant, capacité de la cale : 7 000 m3",Equipment,General,Heures machine,3575.04,3575.04,3575.04,3575.04,1,EUR,1434.89,0.4014,22,22,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-RIKA-MENE_SAMEKA,"Barges autopropulsées à fond ouvrant, à déchargement automatique, capacité de la cale : 3 700 m3",Equipment,General,Heures machine,2319.95,2319.95,2319.95,2319.95,1,EUR,1105.14,0.4764,22,22,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-MELI-KAPU_KASAPU,"Électricité : consommation 1,14 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.15,0.15,0.15,0.15,1,EUR,0.75,5.0882,22,22,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE RITO-TO-KANE-KAPU_KAKAMESA,"Tuyaux en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, légers, diamètre nominal 100 mm, épaisseur de paroi 4 mm",Material,General,m,15.89,15.89,15.89,15.89,1,EUR,10.06,0.6332,22,22,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Dispositif d'installation pour la réduction de la pression du gaz, KALI-RI-KANE-KATO_KAMEMEDX,"Profilé de guidage en acier galvanisé, pour le montage de cloisons en plâtre et de plafonds suspendus, dimensions 28 x 27 mm, épaisseur de l'acier 0,6 mm",Material,General,m,1.03,1.03,1.03,1.03,1,EUR,68.98,66.7555,22,22,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec ossature métallique sim KASA-ME-KASA-MERI,Structures préfabriquées en béton armé (pieux-coques),Abstract Material,Steel & Metal,m3,909.94,909.94,909.94,909.94,1,EUR,919.04,1.01,22,22,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KANE-ME-KAME-KAPU,Brique en terre cuite pour cheminées,Abstract Material,General,1000 pièces,420.36,420.36,420.36,420.36,1,EUR,278.52,0.7668,22,22,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de cuisinières à gaz, DXME-KASA-KARI_KAKAPU,"Grues à portique, capacité de charge 20 t",Equipment,General,Heures machine,41.57,41.57,41.57,41.57,1,EUR,10256.04,246.7018,22,22,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KAME-LI-MESA-MEME_KAKAPUPU,"Rondelles en acier galvanisé rondes, diamètre du trou M8-10",Material,General,kg,5.71,5.71,5.71,5.71,1,EUR,4.82,1.2373,22,22,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,ÉLÉMENTS DE CONSTRUCTION DES COUVERTURES DE BÂTIMENTS DXME-KALI-KAME_KAKARI,"Bennes, capacité 2 m3",Equipment,General,Heures machine,0.08,0.08,0.08,0.08,1,EUR,0.44,5.5727,22,22,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé RISA-ME-KANE-MEVO_KAKAMEPU,"Cales en caoutchouc pour fondations en béton armé sous rails, type TsP-143",Material,General,1000 pièces,1354.95,1354.95,1354.95,1354.95,1,EUR,1703.25,1.2564,22,22,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-MELI-KAPU_KASAPU,Appareils à commande automatique pour le soudage bout à bout de tuyaux en plastique d'un diamètre supérieur à 160 mm et inférieur à 315 mm,Equipment,General,Heures machine,5.27,5.27,5.27,5.27,1,EUR,26.84,5.0882,22,22,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE KAME-LI-MESA-KALI_KAKAMEKA,"Chevilles en plastique avec vis, diamètre 10 mm, longueur 50-60 mm, diamètre de la vis 6 mm, longueur de la vis 50-80 mm",Material,General,100 pièces,19.2,19.2,19.2,19.2,1,EUR,16.42,0.8555,22,22,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CLOISONS,Installation de cloisons en plaques de plâtre et en béton léger KAME-LI-MESA-KATO_KAKATOSA,"Boulons en acier galvanisé à tête hexagonale et écrou hexagonal galvanisé, diamètre du filetage du boulon et de l'écrou M20 (M22), longueur du boulon 40-220 mm",Material,General,kg,4.95,4.95,4.95,4.95,1,EUR,40.62,8.2095,22,22,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations MEME-ME-KATO-KASA,"Planches non sciées de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250, épaisseur 20 mm",Abstract Material,General,m3,615.17,615.17,615.17,615.17,1,EUR,1638.75,2.93,22,22,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" KARI-RI-KAME-KARI,Gravier,Abstract Material,General,m3,66.9,66.9,66.9,66.9,1,EUR,2376.79,35.5255,22,22,TRAVAUX DE CONSTRUCTION,Forages,INSTALLATION DE FILTRES ET POMPAGE DE L'EAU DU PUITS,Remplissage de gravier ou de sable dans l'espace intertubulaire DXME-MEKA-KAPU_SALINE,"Installations pour le mélange, le chauffage et l'application d'une composition polymère à deux composants sur la surface interne des pipelines lors du fonctionnement à partir d'installations de compression mobiles, débit 3 l/min",Equipment,General,Heures machine,11.5,11.5,11.5,11.5,1,EUR,9.85,0.8568,22,22,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration de la surface interne des conduites par pulvérisation d'un composé DXME-MEKA-KAPU_SALINE,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.08,0.8568,22,22,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration de la surface interne des conduites par pulvérisation d'un composé RIPU-TO-KAME-KARI_MEKAKAPU,"Joint d'étanchéité en caoutchouc pour tuyaux d'égout en PVC, diamètre 50 mm",Material,General,pièce,0.15,0.15,0.15,0.15,1,EUR,1.48,10.0,22,22,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" KAME-LI-MESA-KATO_KAKAPUTO,Boulons d'ancrage de construction avec écrous,Material,General,t,2694.19,2694.19,2694.19,2694.19,1,EUR,67.62,0.0491,22,22,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,CHAUFFE-EAU,Installation d'échangeurs de chaleur à plaques MEVO-ME-KARI-KAPU,Vannes avec raccords pour le gaz,Abstract Material,General,pièce,9669.39,9669.39,9669.39,9669.39,1,EUR,9669.39,1.0,22,22,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ MEPU-ME-KANE-KAPU_KAKAKARI,Colle de montage pour tuyaux en PVC et polypropylène,Material,General,l,147.45,147.45,147.45,147.45,1,EUR,2765.71,18.7568,22,22,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de canalisations d'alimentation en eau et de chauffage à partir de tuyaux e DXME-KASA-MEME_KAMETO,"Grues à portique, capacité de charge 640 t",Equipment,General,Heures machine,187.98,187.98,187.98,187.98,1,EUR,372.8,1.9832,22,22,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) MEVO-ME-KADX-KALI,"Robinets à boisseau sphérique à souder, isolés avec de la mousse de polyuréthane",Abstract Material,General,pièce,763.35,763.35,763.35,763.35,1,EUR,7633.49,10.0,22,22,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE DXME-KASA-KAPU_KATOTO,"Électricité : consommation 22,11 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.84,2.84,2.84,2.84,1,EUR,5.88,2.0705,22,22,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE FOURS À HAUTE TEMPÉRATURE,Maçonnerie de hauts fourneaux MELI-RI-KARI-KASA,Produits siliceux en dinas,Abstract Material,General,t,989.31,989.31,989.31,989.31,1,EUR,1883.0,1.9033,22,22,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES RÉCHAUFFEURS D'AIR DES FOURS À HAUTE TEMPÉRATURE,Maçonnerie des murs DXME-RIME-RIRI_TOVOME,Racleurs pneumatiques fonctionnant à partir de compresseurs mobiles,Equipment,General,Heures machine,0.39,0.39,0.39,0.39,1,EUR,0.56,1.4405,21,21,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Nettoyage de la section de tuyau sous le bouchon KAME-LI-MEME-KAPU_KAKAKARI,"Fil à souder en poudre PP-Np-19ST, diamètre 3 mm",Material,General,t,2249.9,2249.9,2249.9,2249.9,1,EUR,14.03,0.01,21,21,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" KAME-TO-KASA-MEDX_KAKAMEME,"Cuivre vert, marque A",Material,General,t,6199.11,6199.11,6199.11,6199.11,1,EUR,3.48,0.0,21,21,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'EAU À L'INTÉRIEUR DES LOCAUX RITO-TO-KANE-KAPU_KAKAMETO,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, légers, diamètre nominal 80 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,10.81,10.81,10.81,10.81,1,EUR,6.49,0.6,21,21,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAPU-ME-KAME-KAME,Mélanges de béton léger à base de granulats poreux,Abstract Material,General,m3,130.88,130.88,130.88,130.88,1,EUR,4707.37,35.9662,21,21,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,MURS ET CLOISONS,Construction de murs et de cloisons en béton et en béton léger MEME-ME-KATO-KASA_KAKALIRI,"Planches non sciées de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250, épaisseur 20 mm, classe II",Material,General,m3,275.0,275.0,275.0,275.0,1,EUR,2374.97,8.6362,21,21,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D KAME-LI-MELI-KADX_MERIMEDX,"Foret guide en acier, acier de marque R6M5F3, diamètre 9 mm, longueur 81 mm",Material,General,pièce,362.03,362.03,362.03,362.03,1,EUR,91.03,0.2514,21,21,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MEME-KALI_KAKAVORI,"Électrodes de soudage pour le soudage des aciers fortement alliés OZL-8, diamètre 2 mm",Material,General,kg,20.88,20.88,20.88,20.88,1,EUR,1126.96,53.9776,21,21,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,SOUFFLAGE MANUEL AVEC ÉLECTRODES À REVÊTEMENT DE BASE KAME-LI-MESA-KATO_KAKATOTO,"Boulons en acier galvanisé à tête hexagonale et écrou hexagonal galvanisé, diamètre du filetage du boulon et de l'écrou M10, longueur du boulon 16-160 mm",Material,General,kg,4.58,4.58,4.58,4.58,1,EUR,60.71,13.2495,21,21,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KASA-RI-KARI-RITO,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,2234.91,2234.91,2234.91,2234.91,1,EUR,491147.36,219.7619,21,21,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" KAME-TO-KAME-KALI_KAKAKATO,Alcool isopropylique,Material,General,l,3.88,3.88,3.88,3.88,1,EUR,17.96,4.6352,21,21,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION ÉLÉGAZ 45-750 KV MEPU-RI-KANE-KASA_KAKAKAME,Composé à base de caoutchouc siloxane,Material,General,kg,30.69,30.69,30.69,30.69,1,EUR,10.71,0.349,21,21,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION ÉLÉGAZ 45-750 KV MEME-TO-KATO-KADX,Mains courantes en polychlorure de vinyle,Abstract Material,General,m,27.13,20.35,41.57,20.35,3,EUR,3748.7,120.8,21,13,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" RITO-SA-KARI-KARI_KAKASALI,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 108 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,14.78,14.78,14.78,14.78,1,EUR,49.05,3.3195,21,21,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse KASA-ME-KASA-METO,Fondations en béton armé pour les supports du réseau de contact,Abstract Material,General,pièce,1183.93,1183.93,1183.93,1183.93,1,EUR,11839.29,10.0,21,21,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,SUPPORTS DU RÉSEAU DE CONTACT EN BÉTON ARMÉ MEPU-SA-KADX-KALI_KAKARILI,Solvant n° 649,Material,General,t,3967.66,3967.66,3967.66,3967.66,1,EUR,32.13,0.035,21,21,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Protection des structures en béton et en béton armé à l'aide d'un système de rev KAVO-ME-KARI-KATO,Plaque de fixation pour caisson de fenêtre en pente,Abstract Material,General,pièce,6.67,1.14,7.41,7.41,3,EUR,336.65,123.3065,21,19,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MEDX-KAME_KAKARIME,Granulés de caoutchouc,Material,General,kg,0.81,0.81,0.81,0.81,1,EUR,4015.15,4935.211,21,21,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en « gazon artificiel » MEPU-PU-KAPU-MERI_KAKAMEPU,Émail EP-1236,Material,General,t,6038.87,6038.87,6038.87,6038.87,1,EUR,138.72,0.041,21,21,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées DXME-RIKA-KARI_KAKARI,"Barges non motorisées, capacité de charge 200 t",Equipment,General,Heures machine,9.89,9.89,9.89,9.89,1,EUR,96.86,9.7895,21,21,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE DÉFLECTION DES INSTALLATIONS FLUVIALES,Installation de dispositifs de protection des installations d'amarrage fluviales MEVO-RI-KALI-KAME,Conduites avec manchons,Abstract Material,General,m,24.04,24.04,24.04,24.04,1,EUR,2403.99,100.0,21,21,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites d'alimentation en eau à partir de tuyaux en acier galvanisé po MEPU-SA-KASA-KAME_KAKAKAME,"Huile pour peinture de haute qualité (25 % naturelle, 75 % combinée)",Material,General,t,2631.74,2631.74,2631.74,2631.74,1,EUR,26.94,0.0116,21,21,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'HUILE KAME-LI-KALI-RIRI_KAKAMENE,"Charbon minéral, marque SS",Material,General,t,210.57,210.57,210.57,210.57,1,EUR,4.81,0.0243,21,21,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" MEPU-SA-KADX-KALI_MEKAMENE,Solvant organique pour le nettoyage des composés polyuréthanes,Material,General,l,8.83,8.83,8.83,8.83,1,EUR,119.55,13.5348,21,21,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-PU-KAPU-KAME,Filtres à aiguilles,Abstract Material,General,pièce,5432.84,5351.18,5541.73,5351.18,2,EUR,5652.56,1.02,21,21,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE DXME-RIME-MELI_KAKARI,Pneumo-perforateurs pour le remplacement sans tranchée de tuyaux d'un diamètre de 200 à 355 mm lors du fonctionnement à partir d'installations de compression mobiles,Equipment,General,Heures machine,3.33,3.33,3.33,3.33,1,EUR,412.68,124.1081,21,21,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ADDUCTION D'EAU PAR DES MÉ,Destruction souterraine de l'ancienne canalisation à l'aide d'un perforateur pne DXME-KAPU-KAME_SAKAPU,"Kits d'équipement de forage rotatif à colonne électrique, profondeur de forage jusqu'à 300 m, diamètre des tubes de forage jusqu'à 60 mm, puissance 30 kW",Equipment,General,Heures machine,6.97,6.97,6.97,6.97,1,EUR,37.13,5.3281,21,21,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Extraction des tubes du puits DXME-KAPU-KAME_SAKAPU,"Électricité : consommation 8,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.06,1.06,1.06,1.06,1,EUR,5.65,5.3281,21,21,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Extraction des tubes du puits RITO-ME-KATO-KAME,"Supports fixes, isolés par mousse de polyuréthane, dans une enveloppe en polyéthylène",Abstract Material,General,pièce,1176.05,1176.05,1176.05,1176.05,1,EUR,10248.44,8.7143,21,21,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Montage de supports fixes lors de la pose de canalisations isolées en surface KAME-LI-KALI-RIDX_KAMEDXPU,"Composition organosilicate résistante aux intempéries pour la protection des structures métalliques, des matériaux de revêtement de construction, des façades de bâtiments et de structures, colorée",Material,Steel & Metal,kg,6.18,6.18,6.18,6.18,1,EUR,0.37,0.06,21,21,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DES CENTRALES NUCLÉAIRES ET DES BÂTIME DXME-KADX-KASA_SAMELI,"Locomotives à vapeur à deux sections à voie large, puissance 5300 kW (7200 ch)",Equipment,General,Heures machine,1333.7,1333.7,1333.7,1333.7,1,EUR,13517.98,10.1357,21,21,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-MELI-KAPU_KASASA,"Électricité : consommation 2,42 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.31,0.31,0.31,0.31,1,EUR,1.13,3.6233,21,21,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-MELI-KAPU_KASASA,Appareils à commande automatique pour le soudage bout à bout de tuyaux en plastique d'un diamètre supérieur à 315 mm et inférieur à 630 mm,Equipment,General,Heures machine,7.24,7.24,7.24,7.24,1,EUR,26.24,3.6233,21,21,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE KAME-LI-MELI-KADX_MEKADXKA,"Foret hélicoïdal à queue cylindrique, équipé de plaquettes en carbure de tungstène, diamètre 8 mm, longueur 120 mm",Material,General,pièce,1.45,1.45,1.45,1.45,1,EUR,1.27,0.873,21,21,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de radiateurs en aluminium et bimétalliques RISA-RI-KAME-RIKA_KAKAMEVO,"Barre articulée piston-œillet KS-1180, galvanisée, longueur 1600 mm",Material,General,pièce,42.14,42.14,42.14,42.14,1,EUR,53.74,1.2752,21,21,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIKA-RI-KARI-KALI_KAKATOME,"Bouchons en polyéthylène pour tuyaux en amiante-ciment, diamètre intérieur 100 mm",Material,General,100 pièces,56.18,56.18,56.18,56.18,1,EUR,18.86,0.3357,21,21,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES DXME-MEKA-KADX_KAKARI,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.35,3.7762,21,21,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE KAPU-TO-KAME-KADX_KAKAMETO,"Mortier prêt à l'emploi, ciment, M75",Material,General,m3,121.97,121.97,121.97,121.97,1,EUR,30.43,0.249,21,21,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,COLONNES ET CAPITAUX KARI-RI-KAPU-KATO_KAKAMEME,Mélange sable-gravier enrichi avec une teneur en gravier de 15 à 25 %,Material,General,m3,28.55,28.55,28.55,28.55,1,EUR,623.81,21.8481,21,21,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE MENE-TO-KARI-KAME,Engrais minéraux,Abstract Material,General,kg,1.14,1.14,1.14,1.14,1,EUR,3.43,3.0,21,21,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KASA-ME-KAPU-METO,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,3.35,3.35,3.35,3.35,1,EUR,335.24,100.0,21,21,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS MEVO-SA-KALI-KAPU,Tuyau d'évacuation de condensat,Abstract Material,General,compl,39.03,39.03,39.03,39.03,1,EUR,39.03,1.0,21,21,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" RISA-RI-KAME-KANE_MEKAMEPU,"Pince en bronze pour la fixation du câble d'ancrage intermédiaire au câble porteur, dimensions 80 x 67 mm",Material,General,pièce,98.19,98.19,98.19,98.19,1,EUR,356.99,3.6352,21,21,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-RIKA-KAVO_KAKAME,"Copras flottants pour utilisation en eaux fermées, 6 t",Equipment,General,Heures machine,266.88,266.88,266.88,266.88,1,EUR,286.45,1.0733,21,21,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS PU_MEKAKA_KASARI,Personnel : 6 personnes-heures/machine-heures,Operator,Operators,Heures machine,62.35,62.35,62.35,62.35,1,EUR,66.93,1.0733,21,21,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAPU-TO-KARI-MEME_KAKAMELI,"Mélanges secs à base de ciment (béton de sable), classe B25 (M350)",Material,General,t,199.9,199.9,199.9,199.9,1,EUR,30.74,0.1543,21,21,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,VÉGÉTALISATION EN CONTENEURS DXME-MEKA-KAPU_KAMEME,Machines pour le nettoyage et l'apprêtage de tuyaux d'un diamètre de 150 à 300 mm,Equipment,General,Heures machine,22.75,22.75,22.75,22.75,1,EUR,291.82,12.8257,21,21,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX KALI-RI-KAPU-KAPU_KAKAKAME,Ancrages en acier réfractaire de marque 20Kh23N18,Material,General,t,55998.92,55998.92,55998.92,55998.92,1,EUR,234.67,0.01,21,21,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement d'agrégats thermiques à partir de matériaux fibreux en rouleaux et de DXME-MEPU-KASA_KAMEPU,"Semi-remorques à usage général, capacité de charge jusqu'à 30 t",Equipment,General,Heures machine,4.92,4.92,4.92,4.92,1,EUR,0.39,0.079,21,21,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEKA-KADX_KAKARI,"Groupes électropompes de mise sous pression, débit jusqu'à 4,2 l/min, pression jusqu'à 15 MPa",Equipment,General,Heures machine,1.11,1.11,1.11,1.11,1,EUR,4.2,3.7762,21,21,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RISA-ME-KAPU-KAPU_KAKAMETO,"Boulons de voie pour la fixation des rails, diamètre M27, longueur 160 mm, 180 mm",Material,General,t,3747.84,3747.84,3747.84,3747.84,1,EUR,461.81,0.1295,21,21,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,CONSTRUCTION DE STRUCTURES DE VOIES EN BÉTON ARMÉ NON COUPÉES POUR LES PONTS ROU RITO-TO-KATO-KARI_KAMESADX,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 219 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,124.43,124.43,124.43,124.43,1,EUR,437.31,3.5152,21,21,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES VANNES LINÉAIRES DES OLÉODUCS KAVO-RI-KARI-KASA_KAKAPUTO,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 15 mm",Material,Steel & Metal,10 m,34.98,34.98,34.98,34.98,1,EUR,187.42,5.9226,21,21,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE DXME-KARI-KATO_KARITO,"Marteaux diesel, poids de la partie frappante 1,25 t",Equipment,General,Heures machine,16.36,16.36,16.36,16.36,1,EUR,41.9,2.561,21,21,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIKA-RI-KADX-KATO_KAKARINE,Manchon droit en polyéthylène MPP 5/6,Material,General,pièce,26.85,26.85,26.85,26.85,1,EUR,37.08,1.381,21,21,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES MEME-ME-KARI-KALI_KAKAKAME,"Bois résineux (pin, sapin), longueur supérieure à 1,6 m",Material,General,m3,347.95,347.95,347.95,347.95,1,EUR,275.21,0.791,21,21,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FOYERS ET COULOIRS AVEC SOUTÈEMENTS PERMANENTS KARI-RI-KASA-KAVO,"Gravier noir chaud, fraction 10 (15)-20 (25) mm",Abstract Material,General,t,140.5,140.5,140.5,140.5,1,EUR,6023.57,42.8715,21,11,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KATO-RI-KARI-KADX_KAKAMEME,"Ciment Portland résistant aux sulfates CEM I 32,5N SS",Material,General,t,172.73,172.73,172.73,172.73,1,EUR,54.19,0.3138,21,21,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"FIXATIONS TEMPORAIRES DES RACCORDS DES TIGES VERTICALES AUX COURONNES, AUX CHAMB" DXME-KASA-METO_KARITO,"Grues-manipulateurs réglables, capacité de charge 2 t",Equipment,General,Heures machine,3.04,3.04,3.04,3.04,1,EUR,2.04,0.669,21,21,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,FOURNITURE ET MISE EN PLACE DU MÉLANGE DE BÉTON DANS LES BLOCS DE CONSTRUCTIONS DXME-KASA-METO_KARITO,"Électricité : consommation 1,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.24,0.24,0.24,0.24,1,EUR,0.18,0.669,21,21,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,FOURNITURE ET MISE EN PLACE DU MÉLANGE DE BÉTON DANS LES BLOCS DE CONSTRUCTIONS RITO-TO-KAME-KASA_KAKAKAME,"Tubes de forage universels en acier avec verrous soudés, diamètre extérieur 43 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,148.25,148.25,148.25,148.25,1,EUR,1319.13,8.8981,21,21,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Enfoncement et extraction d'injecteurs MEPU-PU-KAPU-KAPU_KAKAMEKA,"Émail organosilicié KO-811, KO-811K, coloré",Material,General,t,8746.02,8746.02,8746.02,8746.02,1,EUR,53.05,0.0143,20,20,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées METO-RI-KAME-KARI,Produits architecturaux et de construction en roches poreuses,Abstract Material,General,m2,160.01,160.01,160.01,160.01,1,EUR,16377.03,102.35,20,20,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,"TRAVAUX DE REVÊTEMENT AVEC DES EXIGENCES ÉLEVÉES EN MATIÈRE DE FINITION, DANS LE" KAME-LI-MEDX-KAPU_KAKAKAME,Plaques spongieuses en caoutchouc AF-1,Material,General,kg,12.25,12.25,12.25,12.25,1,EUR,876.76,71.5815,20,20,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS UTILISANT DES PLAQUES DE CIMENT-COPEAUX,CLOISONS SUR OSSATURE EN BOIS DXME-MEPU-KAPU_KAKADX,"Tracteurs routiers à sellette, charge sur la sellette d'attelage jusqu'à 27 t, poids total du train routier jusqu'à 250 t",Equipment,General,Heures machine,81.53,81.53,81.53,81.53,1,EUR,391.33,4.8,20,20,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ DXME-KASA-KADX_KAMEKA,"Grues sur châssis spécial de type automobile, capacité de charge 200 t",Equipment,General,Heures machine,320.46,320.46,320.46,320.46,1,EUR,17915.48,55.905,20,20,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"GALERIES, PASSERELLES" DXME-MELI-KARI_KATOTO,Appareils de contrôle par ultrasons à impulsions pour produits d'une épaisseur maximale de 5 000 mm,Equipment,General,Heures machine,1.31,1.31,1.31,1.31,1,EUR,2.19,1.6755,20,20,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" KAME-LI-MESA-MEPU_KAKARITO,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente cruciforme, filetage à double pas, pointues, diamètre 3,9 mm, longueur 45 mm",Material,General,100 pièces,1.54,1.54,1.54,1.54,1,EUR,42.18,27.316,20,20,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE FIBRÉES (G",Installation de cloisons en plaques de plâtre renforcées de fibres (GVL) ou en p MEPU-RI-KANE-KAME,Antiseptique-ignifuge,Abstract Material,General,kg,2033.08,6.69,2708.54,2708.54,2,EUR,131.24,12.9954,20,20,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,ANTISEPTIQUE DES CONSTRUCTIONS RIKA-ME-KARI-RITO_MEKARIVO,"Embout à pince en acier inoxydable pour augmenter la résistance de la fixation du câble d'ancrage moyen du fil de contact, diamètre 21 mm, longueur 35 mm, section du câble 70 mm2",Material,General,pièce,70.39,70.39,70.39,70.39,1,EUR,130.65,1.856,20,20,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-RIKA-KASA_KAKAPU,"Chariots motorisés, puissance 66 kW (90 ch)",Equipment,General,Heures machine,31.46,31.46,31.46,31.46,1,EUR,177.5,5.642,20,20,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-SA-KARI-KATO,Panneau tubulaire soudé à partir de tubes électrosoudés,Abstract Material,Pipes & Fittings,t,3325.94,1362.01,4635.23,4635.23,2,EUR,3353.76,1.006,20,20,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RINE-ME-KARI-KATO_KAKARIME,"Cale de fixation de rail, type « Métro » P50",Material,General,pièce,48.8,48.8,48.8,48.8,1,EUR,76138.64,1560.088,20,20,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-RIKA-MERI_KAPUNE,"Dragues auto-transportables, volume de cale 24 000 m3",Equipment,General,Heures machine,28762.92,28762.92,28762.92,28762.92,1,EUR,2761.24,0.1357,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES KARI-PU-KATO-KATO,"Sable de scories, fraction moyenne",Abstract Material,General,m3,114.47,114.47,114.47,114.47,1,EUR,11697.36,102.1884,20,20,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,"Poutres, ceintures, linteaux, traverses",Installation du remblai des poutres de fondation DXME-RIKA-MERI_KAPUSA,"Dragues auto-transportables, volume de cale 22 500 m3",Equipment,General,Heures machine,23897.41,23897.41,23897.41,23897.41,1,EUR,2985.98,0.1316,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KAPUPU,"Dragues auto-transportables, volume de cale 19 000 m3",Equipment,General,Heures machine,22016.38,22016.38,22016.38,22016.38,1,EUR,2928.18,0.133,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KAPUME,"Dragues auto-transportables, volume de cale 12 500 m3",Equipment,General,Heures machine,15087.37,15087.37,15087.37,15087.37,1,EUR,2745.9,0.182,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KAPUKA,"Dragues auto-transportables, volume de cale 11 000 m3",Equipment,General,Heures machine,13321.42,13321.42,13321.42,13321.42,1,EUR,2757.53,0.207,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KAPURI,"Dragues auto-transportables, volume de cale 13 500 m3",Equipment,General,Heures machine,15912.37,15912.37,15912.37,15912.37,1,EUR,2744.88,0.1725,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KAPUTO,"Dragues auto-transportables, volume de cale 18 000 m3",Equipment,General,Heures machine,20369.45,20369.45,20369.45,20369.45,1,EUR,2729.51,0.134,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KATODX,"Dragues auto-transportables, volume de cale 9100 m3",Equipment,General,Heures machine,11596.69,11596.69,11596.69,11596.69,1,EUR,2568.67,0.2215,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KATOTO,"Dragues auto-transportables, volume de cale 2400 m3",Equipment,General,Heures machine,4514.84,4514.84,4514.84,4514.84,1,EUR,2842.09,0.6295,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES MEKA-ME-KAME-KARI_KAKAMEME,Alliages d'aluminium moulés AK5M2,Material,General,t,8105.01,8105.01,8105.01,8105.01,1,EUR,0.0,0.0,20,20,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,INSTALLATIONS D'ACCUMULATION DXME-RIKA-MERI_KATOVO,"Dragues auto-transportables, volume de cale 7700 m3",Equipment,General,Heures machine,9751.27,9751.27,9751.27,9751.27,1,EUR,2233.04,0.229,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KATOLI,"Dragues auto-transportables, volume de cale 6200 m3",Equipment,General,Heures machine,8610.61,8610.61,8610.61,8610.61,1,EUR,2156.96,0.2505,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KATONE,"Dragues auto-transportables, volume de cale 4700 m3",Equipment,General,Heures machine,7175.12,7175.12,7175.12,7175.12,1,EUR,2267.34,0.316,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES MEPU-SA-KAPU-KATO,Mastic d'étanchéité,Abstract Material,General,kg,5.13,5.13,5.13,5.13,1,EUR,174.41,34.0,20,20,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS DXME-RIKA-MERI_KATORI,"Dragues auto-transportables, volume de cale 1800 m3",Equipment,General,Heures machine,3944.37,3944.37,3944.37,3944.37,1,EUR,3045.05,0.772,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES KAME-PU-KATO-KAME_KAKAMEME,"Poudre (poudre d'argile) bentonite pour la préparation de boues de forage, rendement de la boue 12,0-15,0 m3/t",Material,General,t,372.45,372.45,372.45,372.45,1,EUR,860.88,2.3125,20,20,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Réalisation d'une tranchée à l'aide d'une fraise hydraulique pour la constructio RIKA-RI-KADX-KATO_KAKARISA,Manchon droit en polyéthylène MPP 2/4,Material,General,pièce,26.48,26.48,26.48,26.48,1,EUR,35.74,1.35,20,20,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES MERI-RI-KASA-MEME_KAKAMEME,Feuille de mousse polyuréthane élastique difficilement inflammable,Material,General,t,19443.64,19443.64,19443.64,19443.64,1,EUR,85.55,0.01,20,20,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS MEPU-RI-KAME-KANE,Composition adhésive,Abstract Material,General,t,2629.22,2629.22,2629.22,2629.22,1,EUR,4.99,0.0,20,20,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Chargement d'une installation réversible avec générateur de vapeur pour la rénov DXME-RIKA-MERI_KAPUVO,"Dragues auto-transportables, volume de cale 45 000 m3",Equipment,General,Heures machine,41696.68,41696.68,41696.68,41696.68,1,EUR,2356.07,0.1009,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KAPULI,"Dragues auto-transportables, volume de cale 35 000 m3",Equipment,General,Heures machine,31670.61,31670.61,31670.61,31670.61,1,EUR,2182.42,0.1133,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES MEPU-ME-KAPU-KAME_KAKAKAME,Colle à base de caoutchouc synthétique expansé pour le collage de matériaux isolants,Material,General,l,31.02,31.02,31.02,31.02,1,EUR,20.08,0.6475,20,20,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS DXME-MESA-KAME_KAKARI,"Remorques basculantes pour tracteurs, capacité de charge jusqu'à 6,5 t",Equipment,General,Heures machine,1.03,1.03,1.03,1.03,1,EUR,2.39,2.3275,20,20,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BOIS VL 35-220 KV KALI-ME-KAPU-KARI,Pièces de fixation en acier,Abstract Material,General,kg,81.56,81.56,81.56,81.56,1,EUR,5056.83,62.0,20,20,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,ÉLÉMENTS DE CONSTRUCTION DES LUMINAIRES DXME-RIKA-MERI_KATOPU,"Dragues auto-transportables, volume de cale 2700 m3",Equipment,General,Heures machine,5195.3,5195.3,5195.3,5195.3,1,EUR,2862.61,0.551,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KATOSA,"Dragues auto-transportables, volume de cale 3500 m3",Equipment,General,Heures machine,6021.64,6021.64,6021.64,6021.64,1,EUR,2505.0,0.416,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES KANE-ME-KAME-KANE,"Brique résistante aux acides, droite",Abstract Material,Chemicals,t,641.56,641.56,641.56,641.56,1,EUR,284.21,0.4435,20,20,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic silicate résis KAME-LI-MESA-KALI_KAKAKATO,"Clous à cheville en acier galvanisé avec rondelles pour pistolet de montage, diamètre 4,5 mm, longueur 30-50 mm",Material,General,10 pièces,0.37,0.37,0.37,0.37,1,EUR,1.9,5.183,20,20,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MEPU-KALI_KAKALIRI,"Feuille de PVC, température d'utilisation de -15 °C à +70 °C, résistance à la rupture 16,7 MPa",Material,General,t,11229.97,11229.97,11229.97,11229.97,1,EUR,1182.1,0.1933,20,20,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENTS ADHÉSIFS,Collage de surfaces avec du plastique polyvinylchlorure KAME-LI-MESA-KARI_KAKAVONE,"Boulons en acier à tête hexagonale, diamètre du filetage M20 (M22), longueur 40-220 mm",Material,General,t,2939.97,2939.97,2939.97,2939.97,1,EUR,14.8,0.012,20,20,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAME-LI-KASA-KATO_KAKAKANE,"Tissu enduit de vernis organique au silicium, type 445, imprégné de vernis organique au silicium, collant, épaisseur 0,08 mm",Material,General,10 m2,100.97,100.97,100.97,100.97,1,EUR,1.83,0.036,20,20,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RISA-RI-KAME-KANE_MEKAMENE,"Pince à mandrin en bronze pour la fixation du câble d'ancrage intermédiaire au fil de contact, dimensions 130,5 x 45 mm",Material,General,pièce,86.41,86.41,86.41,86.41,1,EUR,240.57,2.784,20,20,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-RIME-KAME_SAKAVO,"Électricité : consommation 1,27 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.16,0.16,0.16,0.16,1,EUR,0.72,4.413,20,20,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS MEPU-PU-KAME-KADX,Apprêt bicomposant à base de résine époxy,Abstract Material,General,kg,1571.46,48.67,7662.6,48.67,2,EUR,4662.53,95.79,20,20,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements coulés DXME-RIME-KAME_SAKAVO,"Groupes de plâtrage, débit 1,0-2,5 m3/h",Equipment,General,Heures machine,1.05,1.05,1.05,1.05,1,EUR,4.63,4.413,20,20,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS DXME-RIKA-MERI_KATOKA,"Dragues auto-transportables, volume de cale 900 m3",Equipment,General,Heures machine,2090.85,2090.85,2090.85,2090.85,1,EUR,3123.73,1.494,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES DXME-RIKA-MERI_KATOME,"Dragues auto-transportables, volume de cale 1300 m3",Equipment,General,Heures machine,3024.87,3024.87,3024.87,3024.87,1,EUR,3086.88,1.0205,20,20,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINAGE À L'AIDE DE DRAGUES AUTOPROPULSÉES MELI-PU-KATO-KARI_KAKAKARI,"Mortier réfractaire plastifié à base de dinas, marque MD-92",Material,General,t,702.21,702.21,702.21,702.21,1,EUR,61.09,0.087,20,20,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES RÉCHAUFFEURS D'AIR DES FOURS À HAUTE TEMPÉRATURE,Maçonnerie des murs MEME-RI-KALI-MERI,Produits à l'unité,Abstract Material,General,pièce,0.45,0.45,0.45,0.45,1,EUR,184.27,411.0,19,19,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"ARMOIRES ENCASTRÉES, ÉTAGÈRES ENTRESOL, ARTICLES À L'UNITÉ" DXME-KAVO-KATO_KAKALI,"Rouleaux compresseurs remorqués à roues pneumatiques statiques, poids 25 t",Equipment,General,Heures machine,12.87,12.87,12.87,12.87,1,EUR,23.3,1.8105,19,19,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL DXME-KASA-MEPU_KARITO,"Grues sur tracteur, puissance 121 kW (165 ch), capacité de charge 5 t",Equipment,General,Heures machine,35.2,35.2,35.2,35.2,1,EUR,512.69,14.5668,19,19,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR RISA-RI-KAME-MEKA_KAKAKARI,Balance pour l'ancrage des câbles KS-113,Material,General,pièce,62.33,62.33,62.33,62.33,1,EUR,102.13,1.6384,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAVO-TO-KAVO-KAME_KAKAKAPU,"Cornière en acier laminé à chaud à ailes inégales, nuances d'acier St3sp, St3ps, largeur de la plus grande aile 180-200 mm, épaisseur 11-16 mm",Material,General,t,2064.36,2064.36,2064.36,2064.36,1,EUR,177.94,0.09,19,19,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX MENE-TO-KARI-KARI,Engrais organiques,Abstract Material,General,m3,191.33,1.3,449.83,4.5,3,EUR,25.03,1.1654,19,19,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,APPORT D'ENGRAIS ET INSTALLATION D'UNE ISOLATION LORS DE LA PLANTATION D'ARBRES DXME-KAME-KASA_KAKAME,Grappins à large prise sur base d'excavatrice pour le creusement de tranchées de rideaux anti-filtration,Equipment,General,Heures machine,138.79,138.79,138.79,138.79,1,EUR,589.86,4.25,19,19,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIPU-RI-KATO-KAME,Convoyeur à béton,Abstract Material,General,m,120.72,120.72,120.72,120.72,1,EUR,0.0,0.0,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é RISA-RI-KAME-KANE_KAKAMEME,Pince d'alimentation KS-053-1 (KS-323),Material,General,pièce,8.37,8.37,8.37,8.37,1,EUR,55.33,6.6137,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KARI-RI-KARI-KAME_KAKARIME,Remplissage hydrophobe,Material,General,kg,12.92,12.92,12.92,12.92,1,EUR,4.42,0.3421,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE",DISPOSITIFS D'ALIMENTATION ÉLECTRIQUE ET CÂBLÉS KAME-LI-KANE-KARI_KAKAKAME,"Bandes d'étanchéité, perméables à la vapeur, en caoutchouc butyle, en matériau non tissé de type membrane, avec revêtement adhésif sur les bords à l'intérieur et revêtement antiadhésif, couleur beige, largeur 80 mm",Material,Waterproofing,m,1.0,1.0,1.0,1.0,1,EUR,329.88,329.2442,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale DXME-RIKA-KADX_KAKATO,"Grues flottantes non automotrices, 25 t",Equipment,General,Heures machine,226.39,226.39,226.39,226.39,1,EUR,1585.08,7.0016,19,19,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-RI-KARI-KATO_KAKATOTO,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 22 mm",Material,Steel & Metal,10 m,67.98,67.98,67.98,67.98,1,EUR,1682.38,24.7474,19,19,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES DE TRANSFERT DXME-RIME-RIRI_KARIME,"Agrégats pour l'application de compositions par projection, 3,2 m3/h",Equipment,General,Heures machine,3.67,3.67,3.67,3.67,1,EUR,126.41,34.4189,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale KALI-RI-KAME-KATO,"Pièces encastrées et superposées en acier angulaire, en bandes et en tubes",Abstract Material,Pipes & Fittings,t,3886.85,3832.41,3889.87,3889.87,2,EUR,3675.0,0.945,19,19,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX MEME-ME-KATO-KANE_KAKATODX,"Planches de bois feuillu (aulne) équarries, sèches, longueur 2-3,75 m, toutes largeurs, épaisseur 45 mm et plus, classe III",Material,General,m3,1936.18,1936.18,1936.18,1936.18,1,EUR,7445.12,3.8453,19,19,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX KAME-LI-RIKA-KASA_KAKAMEME,"Toile de voile en lin brut, densité 315 g/m2, largeur 920 mm",Material,General,m2,3.35,3.35,3.35,3.35,1,EUR,70.68,21.0847,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Installation et démontage du coffrage glissant des tours de puits DXME-KANE-KAVO_KAKARI,"Palans électriques, capacité de charge 1 t",Equipment,General,Heures machine,0.21,0.21,0.21,0.21,1,EUR,0.1,0.4526,19,19,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS KALI-RI-KARI-KATO,Tirants d'ancrage pour poteaux en béton armé,Abstract Material,General,pièce,956.94,956.94,956.94,956.94,1,EUR,956.94,1.0,19,19,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT DXME-KASA-KAPU_KAMESA,"Ponts roulants électriques, capacité de charge 200 t",Equipment,General,Heures machine,278.72,278.72,278.72,278.72,1,EUR,151639.79,544.0674,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipements de concassage, de broyage, d'enrichissement et d'agglomération",ÉQUIPEMENT DE BROYAGE ET DE MALTAGE,BROYEURS DXME-KASA-KAPU_KAMESA,"Électricité : consommation 138,93 kW·h/machine-heure",Electricity,Electricity,Heures machine,17.84,17.84,17.84,17.84,1,EUR,9708.37,544.0674,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipements de concassage, de broyage, d'enrichissement et d'agglomération",ÉQUIPEMENT DE BROYAGE ET DE MALTAGE,BROYEURS DXME-RIME-RIRI_KARIME,"Électricité : consommation 0,36 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,1.6,34.4189,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale KAME-LI-MEDX-MEPU_KAKAKAME,Pneus de voiture usagés pour dispositifs de rebond,Material,General,t,320.38,320.38,320.38,320.38,1,EUR,204.22,0.6368,19,19,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE DÉFLECTION DES INSTALLATIONS FLUVIALES,Installation de dispositifs anti-chocs pour les installations d'amarrage fluvial DXME-KAPU-KATO_KAMEME,"Installations de forage à percussion sur châssis automobile, profondeur de forage jusqu'à 50 m, capacité de charge 2,6 t",Equipment,General,Heures machine,34.66,34.66,34.66,34.66,1,EUR,1073.84,30.9842,19,19,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEME-ME-KATO-KANE_KAKARIME,"Planches équarries de feuillus (bouleau), humidité naturelle, longueur 4-6,5 m, toutes largeurs, épaisseur 20-22 mm, classe II",Material,General,m3,836.93,836.93,836.93,836.93,1,EUR,161.66,0.1937,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de structures monolithiques en béton armé de la partie souterraine KAME-LI-METO-KATO,Carreaux en béton bitumineux,Abstract Material,General,m2,58.62,58.62,58.62,58.62,1,EUR,491.99,8.3932,19,19,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mastic bitumineux à partir de carreaux KAVO-PU-KAME-KASA_KAKAKAME,Tiges de vérin,Material,General,t,2650.05,2650.05,2650.05,2650.05,1,EUR,1395.63,0.5268,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,"Construction de parois en coffrage glissant, construction de plafonds d'élévateu" KADX-TO-KAME-KAPU,Support en aluminium pour façades ventilées suspendues,Abstract Material,General,pièce,10.17,5.65,13.46,13.46,2,EUR,1849.33,264.0547,19,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RIKA-ME-KARI-RITO_KAMELIPU,"Poteau de mesure, d'identification, en plastique pour lignes de communication souterraines, diamètre 83 mm, hauteur 2200 mm",Material,General,pièce,25.59,25.59,25.59,25.59,1,EUR,200.69,7.8421,19,19,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES KAME-LI-MEME-KALI_KAKANENE,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés É46, diamètre 8 mm",Material,General,t,3200.56,3200.56,3200.56,3200.56,1,EUR,28.64,0.02,19,19,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KAVO-KATO_KAPURI,"Rouleaux compresseurs automoteurs combinés vibrants, poids 10 t",Equipment,General,Heures machine,53.84,53.84,53.84,53.84,1,EUR,176.18,3.2721,19,19,TRAVAUX DE CONSTRUCTION,Routes automobiles,COUCHES DE BASE ET DE NIVELLEMENT DE LA FONDATION ET DU REVÊTEMENT,COUCHES DE SOUS-COUCHE ET DE NIVELLEMENT DE LA FONDATION KAME-LI-METO-KAME,Granulats d'asphalte,Abstract Material,General,t,15.33,15.33,15.33,15.33,1,EUR,0.0,0.0,19,19,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MESA-KALI_KAKAKASA,"Chevilles métalliques pour montage sur cadre, diamètre 10 mm, longueur 130 (132) mm",Material,General,10 pièces,2.99,2.99,2.99,2.99,1,EUR,110.29,36.89,19,19,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MEPU-SA-KAPU-KALI_KAKAMETO,"Mastic thiokol à deux composants pour usage dans la construction, durcissant au polysulfure",Material,General,kg,11.76,11.76,11.76,11.76,1,EUR,246.97,21.0,19,19,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS DXME-KAME-KAME_KAMENE,"Bulldozers-décompacteurs sur tracteur, puissance 132 kW (180 ch)",Equipment,Bulldozers,Heures machine,84.31,84.31,84.31,84.31,1,EUR,90.61,1.0747,19,19,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES DXME-KANE-KANE_KASAME,"Ascenseurs de chantier pour le transport de marchandises et de personnes, capacité de charge jusqu'à 0,8 t, hauteur de levage jusqu'à 80 m",Equipment,General,Heures machine,10.51,10.51,10.51,10.51,1,EUR,492.28,46.8616,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,"Construction de parois en coffrage glissant, construction de plafonds d'élévateu" DXME-KANE-KANE_KASAME,"Électricité : consommation 0,77 kWh/machine-heure",Electricity,Electricity,Heures machine,0.1,0.1,0.1,0.1,1,EUR,4.93,46.8616,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,"Construction de parois en coffrage glissant, construction de plafonds d'élévateu" RISA-RI-KAME-KAPU_KAKAKATO,Inserts de selle KS-067-1,Material,General,100 pièces,717.59,717.59,717.59,717.59,1,EUR,123.17,0.1737,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-VO-KAME-KAPU_KAKANEVO,"Verre organique (acrylique) moulé en feuilles, marques TOSP, TOSN, incolore transparent, épaisseur 10 mm",Material,General,m2,228.48,228.48,228.48,228.48,1,EUR,26.5,0.1174,19,19,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES DXME-KALI-MEME_SAKANE,"Électricité : consommation 2,89 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.37,0.37,0.37,0.37,1,EUR,1.45,3.9111,19,19,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS DXME-RIME-MEDX_KARINE,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,0.43,2.5284,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Fabrication d'armatures spatiales dans des conditions de chantier KASA-RI-KATO-KAME,Pierres en béton léger,Abstract Material,General,m3,177.39,177.39,177.39,177.39,1,EUR,136.2,0.7678,19,19,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,"Maçonnerie de murs en pierres de béton léger, remplissage d'ouvertures et de col" KAME-TO-KAME-KANE_KAKARITO,"Graisse plastique antifriction pour les ensembles de friction fonctionnant sous des charges d'impact variables, plage de température de -60 °C à +80 °C",Material,General,t,17403.44,17403.44,17403.44,17403.44,1,EUR,63.02,0.02,19,19,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV MEME-ME-KAME-KANE,Planches de bois pour appuis de fenêtre,Abstract Material,General,m,36.95,36.95,36.95,36.95,1,EUR,2817.1,76.2474,19,19,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES RISA-RI-KAME-MEVO_KAKAPURI,"Fixateur articulé droit sans corde à vent avec support de longueur normale pour un fil de contact, projet KS-MENEKA.PU, type FP-1-3,0 A",Material,General,pièce,200.98,200.98,200.98,200.98,1,EUR,909.71,4.5263,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-RIME_KAKAVOME,"Boîtier d'about pour la fixation du câble de sécurité du fixateur de fil de contact, diamètre du tube du fixateur 50 mm",Material,Pipes & Fittings,compl,12.6,12.6,12.6,12.6,1,EUR,119.36,9.4737,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RITO-ME-KATO-KATO,Supports mobiles soudés,Abstract Material,General,pièce,46.33,41.49,49.16,49.16,2,EUR,959.68,19.6105,19,19,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Montage de supports mobiles longitudinaux lors de la pose de canalisations isolé RIRI-RI-KARI-KAVO_MEKAKAVO,"Éperon en acier pour la fixation des supports aux parois des puits de câbles, avec écrou et rondelle, filetage M12, longueur 170 mm",Material,General,compl,2.37,2.37,2.37,2.37,1,EUR,26.49,11.1579,19,19,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES RISA-RI-KAME-MEVO_KAKATODX,"Fixateur articulé inversé sans corde à vent avec support de longueur normale pour un fil conducteur, projet KS-MENEKA.PU, type FO-3-3,0 A",Material,General,pièce,458.77,458.77,458.77,458.77,1,EUR,2656.06,5.7895,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIRI-RI-KARI-KATO,Pièces de fixation en acier,Abstract Material,General,kg,3.19,3.19,3.19,3.19,1,EUR,4.78,1.5,19,19,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" DXME-RIME-MEDX_KARINE,"Machines à couper l'armature hydrauliques avec moteur électrique, puissance 4 kW",Equipment,General,Heures machine,2.83,2.83,2.83,2.83,1,EUR,7.16,2.5284,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Fabrication d'armatures spatiales dans des conditions de chantier DXME-RIKA-MEME_KAKASA,"Pontons pour utilisation en rade ouverte, 40 t",Equipment,General,Heures machine,2.6,2.6,2.6,2.6,1,EUR,389.67,150.0037,19,19,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU MARIN EN COÛTES OUVERTES,POSE DE CONDUITES EN MILIEU MARIN AU LARGE DE LA CÔTE (RAID OUVERT) MEDX-RI-KARI-KAME,Parapluies en acier pour systèmes de ventilation,Abstract Material,General,pièce,44.21,44.21,44.21,44.21,1,EUR,44.21,1.0,19,19,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de parapluies au-dessus des puits en tôle d'acier galvanisé de sect DXME-KALI-MEME_SAKANE,"Installations pour la réception et l'alimentation en solution, capacité 4 m3, débit 0,5 m3/min",Equipment,General,Heures machine,1.65,1.65,1.65,1.65,1,EUR,6.47,3.9111,19,19,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS RISA-TO-MEPU-KAME_MEKASAKA,Maillon intermédiaire double en acier 2PR-12-1,Material,General,pièce,14.83,14.83,14.83,14.83,1,EUR,90.03,6.0721,19,19,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RIPU-RI-KASA-KATO_KAKAKAME,"Tuyaux en chrysotile-ciment sous pression, classe BT6, diamètre nominal 100 mm",Material,General,m,7.53,7.53,7.53,7.53,1,EUR,877.22,116.4526,19,19,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de systèmes d'évacuation des eaux provenant des drainages longitudi DXME-METO-KAME_KAKAME,"Balayeuses-aspiratrices, capacité du bac 7 m3",Equipment,General,Heures machine,63.75,63.75,63.75,63.75,1,EUR,0.64,0.01,19,19,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES FONDATIONS ET REVÊTEMENTS EXISTANTS POUR LES REVÊTEMENTS EN GRAV,DÉMONTAGE DES INSTALLATIONS EXISTANTES KADX-TO-KAME-KARI,Montants métalliques télescopiques pour coffrage,Abstract Material,General,pièce,33.3,33.3,33.3,33.3,1,EUR,79.02,2.373,19,19,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PLACES,Installation de planchers KAME-NE-KARI-KAME,Cuir synthétique,Abstract Material,General,m2,2.72,2.64,2.73,2.73,2,EUR,17.76,6.6828,18,18,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES RITO-TO-KAME-KAPU_KAKAMEVO,"Tubes de cuvelage sans soudure en acier de groupe D, avec filetage triangulaire court, diamètre extérieur 168 mm, épaisseur de paroi 7,3-12,1 mm",Material,Pipes & Fittings,t,2911.74,2911.74,2911.74,2911.74,1,EUR,360.76,0.1267,18,18,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" DXME-KAPU-KAME_KAPUSA,Marteaux de forage lourds pour utilisation avec des compresseurs mobiles,Equipment,General,Heures machine,0.55,0.55,0.55,0.55,1,EUR,46.51,84.3267,18,18,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" MEKA-PU-KAME-KAME_KAKAKARI,"Soudures à l'étain et au zinc, teneur en zinc 10 %",Material,General,kg,63.96,63.96,63.96,63.96,1,EUR,55.71,0.8733,18,18,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAVO-TO-KALI-KAME_KAKALIRI,"Bandes d'acier laminées à chaud, nuances St3sp, St3ps, dimensions 70 x 4 mm",Material,General,t,1688.22,1688.22,1688.22,1688.22,1,EUR,42.89,0.0346,18,18,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,CONDUITES EN SURFACE DXME-RIME-MENE_KAMEPU,"Électricité : consommation 4,53 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.58,0.58,0.58,0.58,1,EUR,0.49,0.845,18,18,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",STRUCTURES POUR L'INSTALLATION D'APPAREILS ET DE MOYENS D'AUTOMATISATION,Structures pour l'installation d'appareils MEPU-SA-KASA-KAME,Huiles combinées,Abstract Material,General,t,2218.01,2218.01,2218.01,2218.01,1,EUR,17549.19,8.9006,18,18,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES MEPU-SA-KADX-MEKA_KAKAKAME,"Toluène de houille et de schiste, marques A, B",Material,General,t,2834.61,2834.61,2834.61,2834.61,1,EUR,46.17,0.054,18,18,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces en béton et enduites KAME-LI-MERI-MENE,Grille géotechnique en plastique anti-érosion,Abstract Material,General,m2,4.03,1.56,10.28,3.79,3,EUR,335.43,198.5635,18,18,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES KAME-LI-KANE-KAME_KAKAMEME,"Bandes d'étanchéité hydrofuges, pare-vapeur en caoutchouc butyle, doublées de toile d'un côté, avec une couche adhésive d'un côté, couleur grise, largeur 100 mm, épaisseur 1,5 mm",Material,General,m,1.49,1.49,1.49,1.49,1,EUR,1609.12,1080.735,18,18,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" RIME-RI-KAME-KAME,Fils autoportants isolés,Abstract Material,General,1000 m,5844.46,5800.43,6592.95,5800.43,2,EUR,13805.02,2.38,18,18,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES MEPU-SA-MEME-KATO_KAKAKARI,"Mélanges secs de masticage résistants à l'humidité à base de plâtre avec des additifs polymères et hydrophobes, granulométrie maximale de 0,2 mm, résistance à la flexion d'au moins 1,5 MPa",Material,General,kg,1.36,1.36,1.36,1.36,1,EUR,14.61,10.7556,18,18,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" DXME-RIKA-MERI_KAMELI,"Propergols flottants électriques, débit 600 m3/h, pression 80 m",Equipment,General,Heures machine,288.8,288.8,288.8,288.8,1,EUR,157.24,0.5444,18,18,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RISA-ME-KAPU-KAPU_KAKAMERI,"Boulons de voie pour la fixation des rails, diamètre M24, longueur 140 mm, 160 mm",Material,General,t,3549.08,3549.08,3549.08,3549.08,1,EUR,399.43,0.1263,18,18,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KARI-KARI_KAKAPU,"Agrégats de copro sans marteau diesel sur la base d'une excavatrice avec une capacité de godet de 1,25 m3",Equipment,General,Heures machine,75.58,75.58,75.58,75.58,1,EUR,68.49,0.9061,18,18,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-RIME-RIRI_TOSAME,Roulettes d'entraînement à montants,Equipment,General,Heures machine,0.38,0.38,0.38,0.38,1,EUR,2.57,6.7922,18,18,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAVO-TO-KATO-KASA_KAKAMEVO,"Fil d'acier à faible teneur en carbone galvanisé à usage divers, diamètre 4,0 mm",Material,General,t,1915.67,1915.67,1915.67,1915.67,1,EUR,35.99,0.0575,18,18,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MESA-KANE_KAKARIME,"Clous en acier galvanisé, diamètre 2-3 mm, longueur 20-40 mm",Material,General,kg,2.68,2.68,2.68,2.68,1,EUR,4.75,1.7711,18,18,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS MEPU-PU-KAPU-METO_KARIMERI,"Émail KCH-728, couleur blanche",Material,General,t,7023.29,7023.29,7023.29,7023.29,1,EUR,380.74,0.1056,18,18,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER RITO-SA-KARI-KARI_KAKALIRI,"Tubes en acier électrosoudés à soudure droite en acier de marques St2, 10, diamètre extérieur 159 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,25.58,25.58,25.58,25.58,1,EUR,20.15,0.7878,18,18,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,INSERTION DE RACCORDS DANS LES CONDUITES EXISTANTES MERI-ME-KAME-KATO,Matériau hydrofuge et coupe-vent,Abstract Material,General,m2,6.67,6.67,6.67,6.67,1,EUR,744.67,111.6067,18,15,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-MEKA-KAVO_KAKATO,Installations pour le séchage de tuyaux d'un diamètre de 800 mm,Equipment,General,Heures machine,55.55,55.55,55.55,55.55,1,EUR,269.64,4.8539,18,18,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation anticorrosion normale en bitume-caoutchouc ou bitume DXME-MEPU-KAME_KAKAPU,"Bétonnières automotrices, volume du tambour 7 m3",Equipment,General,Heures machine,30.36,30.36,30.36,30.36,1,EUR,194.21,6.3978,18,18,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RISA-ME-KATO-KAPU_KAKAKAME,Cales élastiques TsP 369.104,Material,General,100 pièces,36.43,36.43,36.43,36.43,1,EUR,919.67,25.2433,18,18,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RITO-VO-KATO-KAME,Bouchons métalliques sphériques,Abstract Material,General,t,4196.96,27.32,6281.78,6281.78,2,EUR,21.51,2.0,18,18,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net DXME-KARI-KASA_KATOME,"Installations avec grappin hydraulique de dimensions 600x800x3000 mm pour travaux selon la technologie « mur dans le sol », couple de 260 kN*m, puissance 333 kW",Equipment,General,Heures machine,294.93,294.93,294.93,294.93,1,EUR,218.41,0.7406,18,18,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEPU-PU-KARI-KAPU_KARIRITO,"Peinture à l'huile MA-22, blanc de zinc",Material,General,t,2728.53,2728.53,2728.53,2728.53,1,EUR,4.27,0.01,18,18,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Assemblage à grande échelle de dalles orthotropes PU_MEKAKA_KASAVO,Personnel : 6 personnes-heures/machine-heures,Operator,Operators,Heures machine,68.46,68.46,68.46,68.46,1,EUR,37.27,0.5444,18,18,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RISA-RI-KAME-KALI,Isolateurs à broches haute tension,Abstract Material,General,100 pièces,12.95,12.95,12.95,12.95,1,EUR,1180.33,91.155,18,18,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR KAME-LI-MELI-KANE_KAKANEME,"Disque diamanté segmenté, diamètre 350 mm, épaisseur du bord diamanté 3,2 mm, hauteur du bord diamanté 8 mm",Material,General,pièce,137.07,137.07,137.07,137.07,1,EUR,103.4,0.8607,18,18,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Découpe des bordures KAME-LI-MEME-KALI_KAKANERI,"Électrodes LPS, diamètre 7 mm",Material,General,t,5576.71,5576.71,5576.71,5576.71,1,EUR,741.7,0.1333,18,18,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX SOUS-MARINS AVEC DES STRUCTURES MÉTALLIQUES EN MILIEU FLUVIAL (RIVIÈRES," MEME-RI-KARI-KANE,Boîtes de porte,Abstract Material,General,m,6.31,6.31,6.31,6.31,1,EUR,1714.1,271.5,18,18,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" DXME-KANE-KADX_MEKAME,"Flèches de montage en forme de A pour le levage de pylônes de lignes électriques, hauteur jusqu'à 25 m",Equipment,General,Heures machine,2.97,2.97,2.97,2.97,1,EUR,1.83,0.6161,18,18,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,POTEAUX EN ACIER VL 35-1150 KV RISA-ME-KATO-KAPU_KAKAMENE,"Étrier en acier pour fixation de rail ZBR-65, type TsP-369.101",Material,General,pièce,5.43,5.43,5.43,5.43,1,EUR,13442.76,2476.2222,18,18,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-ME-KATO-KAPU_KAKAMESA,"Équerre en acier pour fixation de rails en béton armé, type TsP-369.003",Material,General,pièce,1.05,1.05,1.05,1.05,1,EUR,2612.37,2485.8889,18,18,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-TO-KAME-KANE_KAKAPUDX,Lubrifiant Torsiole-55,Material,General,kg,5.06,5.06,5.06,5.06,1,EUR,6.96,1.375,18,18,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS MEPU-PU-KAPU-KAME_KAKAKAME,Nitro-émail NC-132K,Material,General,kg,4.34,4.34,4.34,4.34,1,EUR,1.38,0.3189,18,18,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-ME-KARI-MELI_KAKATOME,"Grillage métallique simple en fil de fer non revêtu à mailles losangées, diamètre du fil 1,2 mm, taille des mailles 10 x 10 mm",Material,General,m2,5.6,5.6,5.6,5.6,1,EUR,35.89,6.4078,18,18,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KARI-KARI_KAMERI,Foreuses à chenilles pour pieux d'une longueur maximale de 20 m,Equipment,General,Heures machine,59.82,59.82,59.82,59.82,1,EUR,54.44,0.91,18,18,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MELI-KAPU_RIRITO,"Installations mobiles pour le soudage automatique de tuyaux à partir de centrales électriques mobiles, diamètre des tuyaux 1000-1400 mm",Equipment,General,Heures machine,61.09,61.09,61.09,61.09,1,EUR,1460.39,23.9067,18,18,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,SOUFFLAGE DE TUBES DE TYPE SST-PAU MEPU-PU-KARI-KAPU_KAMEMEPU,"Peinture à l'huile MA-025, colorée",Material,General,t,2198.45,2198.45,2198.45,2198.45,1,EUR,5.95,0.01,18,18,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RIKA-RI-KAVO-KALI_KAKAMEME,Agrafes pour câbles KS-061,Material,General,100 pièces,466.35,466.35,466.35,466.35,1,EUR,42.32,0.0889,18,18,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-MENE-KAME_SAKARI,"Centrales électriques mobiles, puissance 400 kW",Equipment,General,Heures machine,133.38,133.38,133.38,133.38,1,EUR,28902.98,216.6961,18,18,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-RIME-KALI_KAMEME,Machines à mosaïquer et à poncer,Equipment,General,Heures machine,0.44,0.44,0.44,0.44,1,EUR,9.14,20.955,18,18,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Réalisation de revêtements en béton, en béton cimenté et en béton armé" KASA-ME-KATO-KANE,Colonnes à section en I,Abstract Material,General,pièce,957.07,957.07,957.07,957.07,1,EUR,95707.08,100.0,18,18,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,COLONNES ET CAPITAUX KASA-ME-KAPU-KALI,Panneaux de murs extérieurs ordinaires en béton armé,Abstract Material,General,pièce,332.37,332.37,332.37,332.37,1,EUR,33237.33,100.0,18,18,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,CONSTRUCTIONS DE LOCAUX SOUTERRAINS RISA-RI-KAME-MEDX_KAKAKAME,"Rondelle en acier galvanisé à dents, type KS-044, dimensions 60 x 65 x 50 mm",Material,General,pièce,6.25,6.25,6.25,6.25,1,EUR,11.81,1.8883,18,18,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEPU-ME-KASA-KARI_MEKAMERI,"Colle monocomposante à base de diphénylméthane diisocyanate polymère pour matériaux en mousse de polyuréthane (PPU), consommation 0,3 kg/m2",Material,General,kg,13.38,13.38,13.38,13.38,1,EUR,29.73,2.2222,18,18,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE DXME-MELI-KAPU_KAPUVO,"Électricité : consommation 1,52 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.2,0.2,0.2,0.2,1,EUR,0.76,3.9039,18,18,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-MELI-KAPU_KAPUVO,Appareils à commande manuelle pour le soudage bout à bout de tuyaux en plastique d'un diamètre supérieur à 315 mm et inférieur à 630 mm,Equipment,General,Heures machine,4.08,4.08,4.08,4.08,1,EUR,15.91,3.9039,18,18,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-RIKA-MERI_KAMELI,Électricité : consommation 834 kW·h/machine-h,Electricity,Electricity,Heures machine,107.12,107.12,107.12,107.12,1,EUR,58.32,0.5444,18,18,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KARI-KANE,"Éléments de tuyauterie en acier, isolés avec de la mousse de polyuréthane",Abstract Material,General,pièce,433.53,433.53,433.53,433.53,1,EUR,4335.27,10.0,18,18,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIKA-RI-KAME-KADX_KAKAMERI,Manchons de raccordement GSI de section 4-6 mm2,Material,General,100 pièces,19.1,19.1,19.1,19.1,1,EUR,7.03,0.3683,18,18,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e KAME-RI-KAME-KARI_KAKARIME,Bitume pétrolier modifié pour toiture BNM-55/60,Material,General,t,734.14,734.14,734.14,734.14,1,EUR,67.91,0.0928,18,18,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE RIPU-ME-KAME-KANE,"Kit d'isolation pour joints soudés de tuyaux en acier en mousse de polyuréthane, avec manchon en polyéthylène",Abstract Material,General,pièce,193.11,193.11,193.11,193.11,1,EUR,1931.08,10.0,18,18,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE DXME-KASA-KAME_KARIME,"Électricité : consommation 11,2 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.44,1.44,1.44,1.44,1,EUR,1.04,0.7228,18,18,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu RITO-VO-KARI-KARI,"Coudes en acier, isolés avec de la mousse de polyuréthane",Abstract Material,General,pièce,272.19,272.19,272.19,272.19,1,EUR,2721.93,10.0,18,18,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RITO-VO-KARI-KAPU,"Tés en acier, isolés avec de la mousse de polyuréthane",Abstract Material,General,pièce,278.98,278.98,278.98,278.98,1,EUR,2789.78,10.0,18,18,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIME-RI-KATO-KADX_KAMEKAME,Câble électrique APRN 1x35-660,Material,General,1000 m,1736.81,1736.81,1736.81,1736.81,1,EUR,1.29,0.0,18,18,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES DXME-KASA-KAME_KARIME,"Grues à tour, capacité de levage 40 t",Equipment,General,Heures machine,86.9,86.9,86.9,86.9,1,EUR,62.81,0.7228,18,18,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu DXME-KALI-KARI_KARIME,"Électricité : consommation 24,75 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.18,3.18,3.18,3.18,1,EUR,137.91,43.38,18,18,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RIKA-ME-KARI-KANE_KAKATORI,Soudure LOK,Material,General,kg,69.04,69.04,69.04,69.04,1,EUR,8560.16,123.9844,18,18,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Pose de tuyauteries en métaux non ferreux MEDX-PU-KAME-KAME,Déflecteurs pour plaques insonorisantes,Abstract Material,General,pièce,50.05,50.05,50.05,50.05,1,EUR,50.05,1.0,18,9,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de silencieux sur les systèmes de ventilation à plaques KAME-NE-KATO-KAPU,Linoléum,Abstract Material,General,m2,15.92,15.92,15.92,15.92,1,EUR,1642.83,103.1889,18,18,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en linoléum RIPU-RI-KASA-KAME,Tuyaux en chrysolitciment sans pression,Abstract Material,General,m,16.82,16.24,26.65,16.24,2,EUR,9009.56,551.25,18,18,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX EN CHRYSOTILCIMENT SANS PRESSION RIKA-ME-KARI-RITO_MEKATONE,"Agrafes en cuir brut d'une épaisseur de 2 à 4 mm, largeur 10 mm",Material,General,kg,65.06,65.06,65.06,65.06,1,EUR,18.8,0.2889,18,18,INSTALLATION DE L'ÉQUIPEMENT,Équipement des silos à grains et des entreprises de transformation des céréales,CONVOYEURS À BANDE VERTICAUX DANS UN BOÎTIER MÉTALLIQUE POUR LES CÉRÉALES ET LES,Élevateurs à bande d'une largeur maximale de 175 mm DXME-KANE-KATO_KANESA,"Treuils de traction avec moteur à combustion interne, force de traction jusqu'à 3 t",Equipment,General,Heures machine,1.83,1.83,1.83,1.83,1,EUR,11.1,6.05,18,18,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Nettoyage hydrodynamique de la surface interne des conduites en acier à très hau RIRI-RI-KAME-KAPU_KAKAMELI,Isolateurs linéaires à broches TF-20,Material,General,100 pièces,216.34,216.34,216.34,216.34,1,EUR,50.15,0.2322,18,18,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,SUSPENSION DE CÂBLES SUR LES LIGNES DE COMMUNICATION ET DE RADIO RIRI-RI-KARI-MEVO,Traverses,Abstract Material,General,pièce,42.65,42.65,42.65,42.65,1,EUR,66.34,1.5556,18,18,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE TÉLÉCOMMUNICATIONS ET DE RADIO KAME-LI-MESA-KALI_KAKAKAME,Chevilles,Material,General,t,5283.53,5283.53,5283.53,5283.53,1,EUR,32.44,0.01,18,18,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" KAME-LI-KARI-KASA_KAKAMEME,"Feuille de getinax électrotechnique, marque 1, épaisseur 0,2-0,35 mm",Material,General,kg,9.83,9.83,9.83,9.83,1,EUR,1.35,0.1372,18,18,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES MEDX-ME-KAME-KAPU,Conduits d'air en acier résistant à la corrosion,Abstract Material,General,m2,177.98,177.98,177.98,177.98,1,EUR,17797.78,100.0,18,18,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations MEDX-TO-KAME-KARI,Clapets unifiés ou vannes,Abstract Material,General,pièce,108.8,108.8,108.8,108.8,1,EUR,108.8,1.0,18,18,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de registres d'air et de vannes d'air KVR à commande manuelle DXME-RIME-KALI_KAMEME,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,1.96,20.955,18,18,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Réalisation de revêtements en béton, en béton cimenté et en béton armé" KAPU-TO-KAME-MERI_KAKAKAPU,"Mortier de maçonnerie, ciment-chaux, M75",Material,General,m3,130.46,130.46,130.46,130.46,1,EUR,120.43,1.0388,18,18,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX KAME-LI-MESA-KARI_KAKANERI,"Boulons en acier galvanisé à tête hexagonale, diamètre du filetage M8 (M10, M12, M14), longueur 16-190 mm",Material,General,t,3571.94,3571.94,3571.94,3571.94,1,EUR,34.09,0.0178,18,18,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,ÉLÉMENTS DE CONSTRUCTION DES COUVERTURES DE BÂTIMENTS KAME-LI-MESA-MEPU_KAMELISA,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 8 mm, longueur 60 mm",Material,General,t,3345.9,3345.9,3345.9,3345.9,1,EUR,3.36,0.0,18,18,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CLOISONS,Installation de cloisons en plaques de plâtre et en béton léger DXME-KALI-KARI_KARIME,"Pompes à béton électriques tractées, débit 60 m3/h",Equipment,General,Heures machine,19.04,19.04,19.04,19.04,1,EUR,826.03,43.38,18,18,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAVO-TO-MEME-KAME_MEMEKAPU,"Profilés en acier laminés à chaud, nuances d'acier St3ps, St3sp, n° 27U-30U, n° 27P-30P",Material,General,t,1763.42,1763.42,1763.42,1763.42,1,EUR,321.31,0.2717,18,18,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAME-ME-KAME-KASA,Panneaux muraux en chrysotile-ciment,Abstract Material,General,m2,15.58,12.75,29.7,12.75,2,EUR,1037.69,81.1188,18,17,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Dispositif de parois KAME-LI-MESA-MEPU_KAMEDXNE,"Vis autotaraudeuses en acier à tête hexagonale, pointe de forage, diamètre 20 mm, longueur 80 mm",Material,General,t,2904.73,2904.73,2904.73,2904.73,1,EUR,17.59,0.01,18,18,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Installation de cloisons de 3 m de hauteur en panneaux extrudés en amiante-cimen KAVO-TO-KATO-KAPU_KAKAMEME,"Fil métallique clair, diamètre 0,55 mm",Material,General,t,2679.45,2679.45,2679.45,2679.45,1,EUR,317.81,0.14,18,18,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 35-220 KV KAME-LI-MESA-KALI_KAKAKAVO,"Chevilles en plastique avec vis, diamètre 8 mm, longueur 40 mm, diamètre de la vis 5 mm, longueur de la vis 40 mm",Material,General,100 pièces,10.96,10.96,10.96,10.96,1,EUR,67.17,6.4859,18,18,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER KAME-LI-MESA-MEME_KAKAPUME,"Rondelles en acier galvanisé rondes, diamètre du trou M4-6",Material,General,kg,6.27,6.27,6.27,6.27,1,EUR,2.4,0.4921,18,18,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" DXME-KASA-KANE_KATOPU,"Grues sur chenilles, capacité de charge 600 t",Equipment,General,Heures machine,1016.19,1016.19,1016.19,1016.19,1,EUR,28097.59,27.65,18,18,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ RITO-SA-KARI-KARI_KAMEKAKA,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 325 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,88.3,88.3,88.3,88.3,1,EUR,848.83,9.6133,18,18,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en eau à partir de tuyaux en ac DXME-MELI-KARI_KATOSA,Appareils de contrôle manuels à étincelles pour le contrôle de la continuité des revêtements protecteurs des structures métalliques,Equipment,General,Heures machine,0.49,0.49,0.49,0.49,1,EUR,1.14,2.3294,18,18,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONTRÔLE DE LA QUALITÉ DES ASSEMBLAGES SOUDÉS PAR DES MÉTHODES PHYSIQUES,CONTRÔLE DE LA QUALITÉ DE L'ISOLATION DXME-RIME-MENE_KAMEPU,Presses à cames à plier les tôles 1000 kN (100 tf),Equipment,General,Heures machine,6.78,6.78,6.78,6.78,1,EUR,5.73,0.845,18,18,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",STRUCTURES POUR L'INSTALLATION D'APPAREILS ET DE MOYENS D'AUTOMATISATION,Structures pour l'installation d'appareils RITO-TO-KATO-KARI_KAKATOSA,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 57 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,28.51,28.51,28.51,28.51,1,EUR,657.14,23.0522,18,18,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,SYSTÈMES DE LUBRIFICATION ÉPAISSE ET LIQUIDE,SYSTÈMES DE LUBRIFICATION ÉPAISSE DXME-KADX-KALI_KAMEPU,"Machines de nettoyage de gravats, capacité 400-600 m3/h, non automotrices",Equipment,General,Heures machine,345.46,345.46,345.46,345.46,1,EUR,5108.62,14.7878,18,18,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES AIGUILLAGES KAME-LI-MEME-KALI_KAKAPURI,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés É60, diamètre 4 mm",Material,General,t,3835.47,3835.47,3835.47,3835.47,1,EUR,49.51,0.015,18,18,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,FABRICATION DE COUDES COURBÉS ET MONTAGE D'ANGLES DE COUDES DE TUYAUTERIES,Montage de coudes cintrés à chaud DXME-KAME-KASA_MEMEVO,"Électricité : consommation 40,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,5.2,5.2,5.2,5.2,1,EUR,92.12,17.7083,18,18,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES DXME-KATO-MEKA_KAKAVO,"Perceuses pneumatiques manuelles fonctionnant à partir de compresseurs mobiles, diamètre de forage jusqu'à 35 mm",Equipment,General,Heures machine,0.69,0.69,0.69,0.69,1,EUR,28.11,40.9839,18,18,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES À BARRES POUR EXPLOITATIONS HORIZONTALES ET INCLINÉES ET C KARI-RI-KASA-KAPU_RIKADXRI,"Gravier issu de roches denses pour travaux de construction M 1000, fraction 20-40 mm",Material,General,m3,62.47,62.47,62.47,62.47,1,EUR,964.02,15.4306,18,18,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAME-KASA_MEMEVO,"Pelles électriques à godet unique sur chenilles, capacité du godet 2,5 m3",Equipment,General,Heures machine,69.94,69.94,69.94,69.94,1,EUR,1238.48,17.7083,18,18,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES RITO-TO-KATO-KARI_KAKAVORI,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de marques 10, 20, 35, diamètre extérieur 108 mm, épaisseur de paroi 9 mm",Material,Pipes & Fittings,m,64.42,64.42,64.42,64.42,1,EUR,7.39,0.1147,17,17,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI EN BLOCS AGRÉGÉS RITO-TO-KATO-KARI_KAMENEME,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 219 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,154.04,154.04,154.04,154.04,1,EUR,52.83,0.3429,17,17,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI EN BLOCS AGRÉGÉS RITO-TO-KATO-KARI_KAMENELI,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 273 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,235.13,235.13,235.13,235.13,1,EUR,226.55,0.9635,17,17,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI EN BLOCS AGRÉGÉS DXME-KADX-MEPU_KATOME,Machines de nettoyage des cuvettes,Equipment,General,Heures machine,459.85,459.85,459.85,459.85,1,EUR,1524.0,3.3141,17,17,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES AIGUILLAGES DXME-RIME-RIRI_LIKAME,"Installations de métallisation à arc électrique de type poussant, matériau pulvérisé : fil métallique, rendement jusqu'à 30 kg/h, puissance jusqu'à 40 kW",Equipment,General,Heures machine,6.37,6.37,6.37,6.37,1,EUR,11.49,1.8041,17,17,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENTS MÉTALLISÉS,Métallisation lors de travaux sur un chantier de construction et dans des atelie DXME-RIME-RIRI_LIKAME,"Électricité : consommation 13,2 kWh/machine-heure",Electricity,Electricity,Heures machine,1.7,1.7,1.7,1.7,1,EUR,3.06,1.8041,17,17,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENTS MÉTALLISÉS,Métallisation lors de travaux sur un chantier de construction et dans des atelie KARI-PU-KARI-KARI_KAKAKAME,Scories granulées,Material,General,t,17.38,17.38,17.38,17.38,1,EUR,4.35,0.2833,17,17,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy MERI-RI-KATO-MEME_KAKARIPU,Tissu de verre structurel T-11-GSV-9,Material,Steel & Metal,m2,6.84,6.84,6.84,6.84,1,EUR,98.9,14.4506,17,17,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de canaux d'évacuation du fumier MEME-TO-KATO-MESA_KAKARIME,Cales de montage en plastique,Material,General,100 pièces,10.77,10.77,10.77,10.77,1,EUR,74.75,6.9412,17,17,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation des boulons d'ancrage MENE-RI-KARI-MEKA_KAKARIME,"Brindilles, diamètre de 2 à 10 cm",Material,General,m3,78.44,78.44,78.44,78.44,1,EUR,6230.96,79.4388,17,17,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,TRAVERSES À GOUPILLES,Installation de traverses dans les sols KAME-PU-KAME-KATO_KAMERITO,Trépan à trois molettes III 93 T-CV,Material,General,pièce,467.92,467.92,467.92,467.92,1,EUR,2216.86,4.7376,17,17,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES KAME-TO-KAPU-KAPU_KAKAKAME,Huile pour compresseurs,Material,General,kg,3.69,3.69,3.69,3.69,1,EUR,16.16,4.3788,17,17,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,CONDUITES TECHNOLOGIQUES D'ATELIER,CONDUITES EN TUBES D'ACIER ALLIÉ ET HAUTEMENT ALLIÉ DXME-KAME-KASA_MERIVO,"Électricité : consommation 965,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,123.98,123.98,123.98,123.98,1,EUR,307.68,2.4818,17,17,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-RIME-KALI_KAKAME,Machines pour le ponçage des parquets en bois,Equipment,General,Heures machine,0.62,0.62,0.62,0.62,1,EUR,5.39,8.7365,17,17,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à partir de dalles à bords droits sur une couche inte DXME-RIME-KALI_KAKAME,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.82,8.7365,17,17,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à partir de dalles à bords droits sur une couche inte RITO-VO-KAPU-KANE_KAKANEPU,"Dérivation à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 50 mm, diamètre extérieur 57 mm, épaisseur de paroi 4 mm",Material,General,pièce,4.86,4.86,4.86,4.86,1,EUR,2.23,0.4588,17,17,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES MEME-RI-KASA-KASA,Toiles de portail,Abstract Material,General,pièce,77.54,77.54,77.54,77.54,1,EUR,10445.12,134.7059,17,17,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" RISA-RI-KAME-MENE_KAKAKAME,Double selle pour piston KS-011,Material,General,pièce,48.52,48.52,48.52,48.52,1,EUR,57.29,1.1806,17,17,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RINE-ME-KAME-KASA,Tubages,Abstract Material,General,t,7153.17,4365.1,20164.19,4365.1,2,EUR,43820.45,2.8,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS RIKA-RI-KADX-KAME_KAKAMETO,Masses de câbles de marque cable splice compound,Material,Electrical,t,13050.62,13050.62,13050.62,13050.62,1,EUR,11.67,0.0,17,17,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIPU-TO-KATO-KASA,Manchon en polyéthylène pour tuyaux de drainage,Abstract Material,General,pièce,0.8,0.78,0.88,0.78,2,EUR,26.33,33.8662,17,17,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D RITO-TO-KATO-KARI_KAKALISA,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 108 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,39.88,39.88,39.88,39.88,1,EUR,347.24,8.7071,17,17,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de chauffage et d'alimentation en ea KAVO-PU-KATO-KATO_KAKARIME,"Acier d'armature laminé à chaud à profil périodique, classe A-II, diamètre 10 mm",Material,General,t,1556.34,1556.34,1556.34,1556.34,1,EUR,20.52,0.0171,17,17,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation d'une barrière routière automatique pour contrôler le passage MEPU-SA-KANE-KARI_KAKAKATO,Pâte quartzo-vaseline,Material,General,kg,17.72,17.72,17.72,17.72,1,EUR,98.18,5.5412,17,17,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV MEDX-TO-KAME-KANE,Vannes d'air isolées KVU,Abstract Material,General,pièce,145.44,145.44,145.44,145.44,1,EUR,145.44,1.0,17,17,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de vannes d'air isolées KVU à commande électrique ou pneumatique KAPU-TO-KAME-KALI_KAKARITO,"Mortier de plâtre, à la chaux, M50",Material,General,m3,96.69,96.69,96.69,96.69,1,EUR,7.02,0.3025,17,17,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES RINE-ME-KARI-KAPU_KAKAKARI,"Cales en acier en forme de coin, poids jusqu'à 0,5 t",Material,General,t,919.9,919.9,919.9,919.9,1,EUR,355.53,0.4127,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-RIME-RIRI_RILIME,Pistolets de construction et de montage,Equipment,General,Heures machine,0.07,0.07,0.07,0.07,1,EUR,0.6,8.5047,17,17,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé RISA-ME-KANE-MEDX_KAMEKATO,"Joint en caoutchouc sous la semelle, type OP-366",Material,General,pièce,2.29,2.29,2.29,2.29,1,EUR,3150.47,1373.5882,17,17,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-RI-KAME-KARI_KAKAPURI,Bitume pétrolier de construction pour toiture BNK-90/30,Material,General,t,734.78,734.78,734.78,734.78,1,EUR,462.83,0.8231,17,17,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE RÉSEAUX THERMIQUES,Dispositif de canaux infranchissables DXME-KATO-MEME_KAKASA,"Électricité : consommation 5,94 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.76,0.76,0.76,0.76,1,EUR,18.93,24.8129,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,INJECTION DE MORTIER POUR LES FINITIONS KAVO-PU-KATO-KATO_KAKATOME,"Acier d'armature laminé à chaud à profil périodique, classe A-III, diamètre 10 mm",Material,General,t,1512.43,1512.43,1512.43,1512.43,1,EUR,48.76,0.0883,17,17,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,"Maçonnerie de murs en pierres de béton léger, remplissage d'ouvertures et de col" KATO-RI-KAME-KARI,Ciment,Abstract Material,General,t,236.97,236.97,236.97,236.97,1,EUR,6117.82,25.8159,17,17,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,",BÉTONNAGE DE CONDUITES DANS DES CONDITIONS DE TERRAIN DXME-KANE-KARI_KAKAPU,"Convoyeurs à bande mobiles, longueur 14 m",Equipment,General,Heures machine,0.8,0.8,0.8,0.8,1,EUR,58.49,73.0971,17,17,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,",BÉTONNAGE DE CONDUITES DANS DES CONDITIONS DE TERRAIN DXME-KANE-KARI_KAKAPU,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,17.05,73.0971,17,17,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,",BÉTONNAGE DE CONDUITES DANS DES CONDITIONS DE TERRAIN MEPU-PU-KARI-KALI,Peintures au perchlorovinyle,Abstract Material,General,t,3583.52,3583.52,3583.52,3583.52,1,EUR,168.56,0.045,17,17,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE DES FAÇADES À PARTIR D'ÉCHELLES OU DE PLATEAUX MEPU-PU-KATO-MELI,Vernis,Abstract Material,General,t,6334.33,61.64,6726.37,6726.37,2,EUR,392.93,4.5606,17,17,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,REVÊTEMENT ET PEINTURE AVEC DES VERNIS ET DES COMPOSÉS SPÉCIAUX DXME-KATO-MEME_KAKASA,Chariots de refoulement avec deux injecteurs de solution pour tunnel de distillation,Equipment,General,Heures machine,17.8,17.8,17.8,17.8,1,EUR,441.7,24.8129,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,INJECTION DE MORTIER POUR LES FINITIONS DXME-RIME-RIRI_KAVOME,Cribles vibrants,Equipment,General,Heures machine,0.16,0.16,0.16,0.16,1,EUR,0.08,0.5006,17,17,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement d'agrégats thermiques à partir de matériaux fibreux en rouleaux et de RITO-SA-KAME-KAVO_KAKASAVO,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 920 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,562.8,562.8,562.8,562.8,1,EUR,7311.23,12.9906,17,17,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,INSERTION DE RACCORDS DANS LES CONDUITES EXISTANTES RISA-RI-KAME-MEVO_KAKATONE,Fixation d'isolateur suspendu de câble porteur sur la face intérieure de la courbe pour console tubulaire,Material,General,pièce,87.82,87.82,87.82,87.82,1,EUR,160.14,1.8235,17,17,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RITO-TO-KATO-KARI_MERIMEPU,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 108 mm, épaisseur de paroi 7,5 mm",Material,Pipes & Fittings,m,55.57,55.57,55.57,55.57,1,EUR,27.95,0.5029,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RITO-TO-KATO-KARI_MERIDXRI,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 89 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,53.43,53.43,53.43,53.43,1,EUR,24.86,0.4653,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-MEDX-MERI_KAPURI,"Pompes centrifuges multicellulaires à entraînement électrique, débit 60 m3/h, pression 165 m",Equipment,General,Heures machine,4.55,4.55,4.55,4.55,1,EUR,30.0,6.5965,17,17,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KATO-KARI_KAKATOME,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 57 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,17.9,17.9,17.9,17.9,1,EUR,240.66,13.4412,17,17,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES RISA-ME-KAME-KAME,Traverses en bois imprégnées équipées pour circuits haute tension,Abstract Material,General,m3,1130.2,1130.2,1130.2,1130.2,1,EUR,1017.18,0.9,17,10,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR KALI-RI-KANE-KATO_KAMESASA,"Profilé de guidage en acier galvanisé, dimensions 60 x 27 mm, épaisseur de l'acier 0,6 mm",Material,General,m,1.51,1.51,1.51,1.51,1,EUR,421.22,279.3429,17,17,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple en profilés de plafond av RIRI-RI-KARI-MESA_KAKAKAME,Agrafes profilées SkF-10,Material,General,kg,8.09,8.09,8.09,8.09,1,EUR,1.16,0.1435,17,17,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,COMMUNICATIONS TÉLÉPHONIQUES OPÉRATIONNELLES RISA-ME-KATO-KAME_KAKAKAPU,"Pince de fixation de rail ARS-4, SH-ARS-PU-KAKAKA.KAME",Material,General,pièce,3.01,3.01,3.01,3.01,1,EUR,8000.11,2659.1765,17,17,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-ME-KATO-KAME_KAKARIME,"Sous-pince de fixation de rail ARS-4, ShS-ARS-PU-KAKAKA.KAPU",Material,General,pièce,0.91,0.91,0.91,0.91,1,EUR,2375.19,2624.4706,17,17,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-ME-KATO-KASA_KAKAMEME,"Régulateur unique de fixation de rail ARS-4, SH-ARS-PU-KAKAKA.KASA",Material,General,pièce,1.79,1.79,1.79,1.79,1,EUR,4735.2,2643.6471,17,17,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-ME-KATO-KASA_MEKAKAVO,"Cornière isolante pour fixation de rail à ancrage ARS-4, épaisseur 8 mm",Material,General,pièce,0.88,0.88,0.88,0.88,1,EUR,2341.1,2659.4118,17,17,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-ME-KANE-RIKA_KAKAKALI,"Cales en caoutchouc pour fondation en béton armé sous rail, type TsP-204",Material,General,1000 pièces,3710.57,3710.57,3710.57,3710.57,1,EUR,5510.41,1.4847,17,17,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-RI-KAME-KARI,Bitume,Abstract Material,General,t,734.78,734.78,734.78,734.78,1,EUR,1070.21,1.4575,17,17,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Imperméabilisation des murs et des fondations RITO-SA-KAME-KAVO_KAKANENE,"Tubes en acier électrosoudés à soudure droite et spirale, classe de résistance K38, diamètre extérieur 1020 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,629.87,629.87,629.87,629.87,1,EUR,196.99,0.3125,17,17,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-RI-KARI-KASA_KAKASANE,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 37 mm",Material,Steel & Metal,10 m,174.39,174.39,174.39,174.39,1,EUR,4049.39,23.22,17,17,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE KAME-LI-MESA-MEPU_KATOKANE,"Vis autotaraudeuses en acier galvanisé à tête demi-ronde et fente en croix, pointues, diamètre 3,5 mm, longueur 38 mm",Material,General,t,11837.25,11837.25,11837.25,11837.25,1,EUR,77.34,0.01,17,17,TRAVAUX DE CONSTRUCTION,Structures en bois,CLOISONS REVÊTUES DE PLAQUES DE PLÂTRE OU DE PLAQUES DE FIBRE DE PLÂTRE,CLOISONS SUR OSSATURE MÉTALLIQUE MEME-ME-KATO-KANE_KAMERISA,"Planches de bois résineux, sèches, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 44-50 mm, classe III",Material,General,m3,980.77,980.77,980.77,980.77,1,EUR,1502.3,1.5318,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAPU-ME-KARI-KASA_KAMEMENE,"Mélanges de béton lourd (BST) sur gravier concassé, classe B7,5, F(1)100, W4",Material,General,m3,109.19,109.19,109.19,109.19,1,EUR,28.0,0.2565,17,17,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Construction de puits en briques pour l'alimentation en eau DXME-MEDX-MERI_KAPURI,"Électricité : consommation 18,15 kWh/machine-heure",Electricity,Electricity,Heures machine,2.33,2.33,2.33,2.33,1,EUR,15.38,6.5965,17,17,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KATO-KARI_KAMETONE,"Tubes en acier sans soudure laminés à chaud avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 159 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,51.26,51.26,51.26,51.26,1,EUR,346.03,6.7506,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ DXME-RIME-MEDX_KARIDX,"Machines à profiler hydrauliques avec moteur électrique, puissance 7,5 kW",Equipment,General,Heures machine,13.0,13.0,13.0,13.0,1,EUR,213.93,16.4594,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ DXME-RIME-MEDX_KARIDX,"Électricité : consommation 2,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,5.23,16.4594,17,17,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ MEKA-TO-KARI-KAPU_KAKAKATO,"Rouleaux en plomb C1, épaisseur 3,0 mm",Material,General,t,12547.59,12547.59,12547.59,12547.59,1,EUR,1860.0,0.1482,17,17,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES MEPU-PU-KATO-KATO_KAMEKAME,Vernis bitumineux BT-99,Material,General,t,2881.2,2881.2,2881.2,2881.2,1,EUR,1.44,0.0,17,17,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",APPAREILS ET MOYENS D'AUTOMATISATION INSTALLÉS SUR LES ÉQUIPEMENTS ET LES COMMUN,TRANSDUCTEURS PRIMAIRE DE NIVEAU DXME-KAME-KASA_MERIVO,"Pelles électriques à godet unique avec équipement de travail « dragline », capacité du godet 15 m3",Equipment,General,Heures machine,2980.1,2980.1,2980.1,2980.1,1,EUR,7395.91,2.4818,17,17,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-MEKA-MEME_KAVORI,"Brise-roches hydrauliques pour le remplacement de canalisations, force de traction 400 t",Equipment,General,Heures machine,279.56,279.56,279.56,279.56,1,EUR,3919.11,14.0188,17,17,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Remplacement sans tranchée de tuyaux en acier par des tuyaux en polyéthylène ave RISA-ME-KASA-KAPU_KAKAKATO,"Rails de chemin de fer, type P24",Material,General,t,3615.48,3615.48,3615.48,3615.48,1,EUR,143889.62,39.7982,17,17,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" MEPU-SA-MEME-KADX_KAMEKASA,Mastic EP-0010,Material,General,t,7009.28,7009.28,7009.28,7009.28,1,EUR,86.86,0.03,17,17,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces en béton et enduites RIPU-RI-KANE-KASA_KAKAKAME,"Bouchon pneumatique en caoutchouc, diamètre extérieur nominal supérieur à 900 mm",Material,General,pièce,7836.75,7836.75,7836.75,7836.75,1,EUR,1733.13,0.2215,16,16,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Montage et démontage d'un bouchon pneumatique en caoutchouc RITO-VO-KATO-KAME_KAKATOME,"Bouchon en acier PT, diamètre nominal supérieur à 900 mm",Material,General,pièce,1034.9,1034.9,1034.9,1034.9,1,EUR,205.37,0.1988,16,16,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Montage et démontage d'un bouchon pneumatique en caoutchouc MEPU-RI-KANE-KANE,Apprêt,Abstract Material,General,kg,10372.62,10372.62,10372.62,10372.62,1,EUR,5238.17,0.505,16,16,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Murs,MURS,Réparation et restauration de l'étanchéité des joints des panneaux muraux extéri DXME-KADX-KAME_KAKASA,"Machines ferroviaires pour travaux d'installation sur le réseau de contact, tension lors de l'enroulement des câbles 20-36 kN, vitesse de déplacement technologique jusqu'à 5 km/h",Equipment,General,Heures machine,113.8,113.8,113.8,113.8,1,EUR,195.45,1.7175,16,16,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RIKA-ME-KAME-MEKA_KAKAKAME,Pince de raccordement à plat PA-2-1,Material,General,pièce,1.76,1.76,1.76,1.76,1,EUR,29.19,16.6088,16,16,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RISA-RI-KAME-KANE_KAKAPUTO,Pince à œillet (type 3U) KS-040,Material,General,pièce,27.06,27.06,27.06,27.06,1,EUR,99.28,3.6694,16,16,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIME-ME-KASA-KAME_KAKAMENE,Câble électrique flexible à conducteurs en cuivre H07RN-F 1x25-660,Material,General,1000 m,7747.84,7747.84,7747.84,7747.84,1,EUR,1.55,0.0,16,16,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines KAVO-RI-KARI-KASA_KAKATODX,"Câble à double torsion LK-R, structure 6 x 19 (1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 11 mm",Material,Steel & Metal,10 m,21.64,21.64,21.64,21.64,1,EUR,486.82,22.5,16,16,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES KAME-LI-KASA-KAPU_KAKARIME,"Tissu isolant en coton LHB, épaisseur 0,2 mm",Material,General,kg,6.18,6.18,6.18,6.18,1,EUR,15.82,2.5594,16,16,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-RIME-MEVO_KASAME,"Électricité : consommation 1,49 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.19,0.19,0.19,0.19,1,EUR,1.11,5.8125,16,16,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-RIME-MEVO_KASAME,Armoires de séchage,Equipment,General,Heures machine,1.06,1.06,1.06,1.06,1,EUR,6.17,5.8125,16,16,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV KAME-LI-MEDX-MELI_KAKATORI,"Cordon en caoutchouc de section ronde, diamètre de 2,5 à 3,5 mm",Material,General,kg,10.18,10.18,10.18,10.18,1,EUR,0.88,0.0862,16,16,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES RISA-ME-KAME-KASA_KAKATORI,"Traverse en bois de feuillus, imprégnée, pour voies ferrées à écartement large, type II, longueur 2750 mm",Material,General,pièce,103.24,103.24,103.24,103.24,1,EUR,14.33,0.1387,16,16,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAPU_KAKAPUNE,"Tubes de cuvelage sans soudure en acier de groupe D, avec filetage triangulaire court, diamètre extérieur 273 mm, épaisseur de paroi 7,1-13,8 mm",Material,Pipes & Fittings,t,2923.85,2923.85,2923.85,2923.85,1,EUR,1.96,0.0,16,16,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAPU_KAKAVORI,"Tubes de cuvelage sans soudure en acier du groupe D, avec filetage triangulaire court, diamètre extérieur 508 mm, épaisseur de paroi 11,1 mm",Material,Pipes & Fittings,t,3322.15,3322.15,3322.15,3322.15,1,EUR,4.58,0.0,16,16,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAPU_KAKANELI,"Tubes de cuvelage sans soudure en acier du groupe D, avec filetage triangulaire court, diamètre extérieur 351 mm, épaisseur de paroi 9-12 mm",Material,Pipes & Fittings,t,3251.52,3251.52,3251.52,3251.52,1,EUR,2.67,0.0,16,16,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAPU_KAKASALI,"Tubes de cuvelage sans soudure en acier du groupe D, avec filetage triangulaire court, diamètre extérieur 324 mm, épaisseur de paroi 9,5-14 mm",Material,Pipes & Fittings,t,2969.42,2969.42,2969.42,2969.42,1,EUR,2.55,0.0,16,16,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-RIME-RIKA_SAKATO,"Électricité : consommation 1,19 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.15,0.15,0.15,0.15,1,EUR,17.34,113.5812,16,16,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS DXME-RIME-RIKA_SAKATO,"Installations électriques de forage au diamant dans le béton armé, diamètre de forage jusqu'à 500 mm",Equipment,General,Heures machine,3.79,3.79,3.79,3.79,1,EUR,430.58,113.5812,16,16,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAME-TO-KASA-RITO_KARIKAME,"Tripoli phosphate de sodium technique, grade I",Material,General,t,2830.76,2830.76,2830.76,2830.76,1,EUR,220.13,0.0827,16,16,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Remplissage avec une masse réfractaire KAME-LI-METO-KARI_KAKAMEME,"Mastic bitumineux chaud AM-1, AM-2, AM-3",Material,General,t,1596.54,1596.54,1596.54,1596.54,1,EUR,61390.97,38.4525,16,16,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ISOLATION EN PLÂTRE DES SURFACES EN BÉTON RISA-ME-KANE-METO_KAKARIRI,"Cale pour rails, type 1R-38",Material,General,pièce,38.9,38.9,38.9,38.9,1,EUR,197.25,5.0713,16,16,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" DXME-KASA-KADX_KAKAPU,"Grues sur châssis spécial de type automobile, capacité de charge jusqu'à 25 t",Equipment,General,Heures machine,47.35,47.35,47.35,47.35,1,EUR,8180.8,172.7581,16,16,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé KAVO-PU-KAPU-KAME,Raccords filetés pour armatures,Abstract Material,General,pièce,8.09,8.09,8.09,8.09,1,EUR,80.94,10.0,16,16,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é MEPU-PU-KATO-KAPU_KAKAKARI,"Vernis à base de houille, marque B",Material,General,t,5192.45,5192.45,5192.45,5192.45,1,EUR,7.35,0.01,16,16,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"PUITS D'INSPECTION, PUITS DE RÉCEPTION DES EAUX PLUVIALES ET PUITS DE DRAINAGE" MEPU-SA-KADX-KALI,Solvants,Abstract Material,General,t,4008.94,4008.94,4008.94,4008.94,1,EUR,18.75,0.01,16,16,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,PEINTURE DES STRUCTURES DE PASSAGE RINE-ME-KARI-KAPU_KAKAKALI,"Cale polymère sous semelle de rail, dimensions 190 x 148 x 10 mm",Material,General,pièce,1.7,1.7,1.7,1.7,1,EUR,5996.99,3525.0,16,16,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAVO-TO-KAME-KARI_KAKAKATO,"Poutrelles à ailes parallèles, nuances d'acier St3sp, St3ps, n° 20K-40K",Material,General,t,2629.72,2629.72,2629.72,2629.72,1,EUR,474.27,0.24,16,16,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RINE-ME-KARI-KAPU,Cales en forme de coin,Abstract Material,General,t,1360.66,1.7,10873.41,1.7,2,EUR,7656.7,4500.5714,16,12,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION KAME-NE-KAME-KANE,Dalles en béton armé,Abstract Material,General,m3,934.05,934.05,934.05,934.05,1,EUR,0.0,0.0,16,16,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES DXME-KADX-KARI_KAKASA,Wagons à voie large,Equipment,General,Heures machine,0.46,0.46,0.46,0.46,1,EUR,490.85,1071.8294,16,16,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",PROTECTION DES CÂBLES KAVO-TO-KATO-KAPU_KAKATORI,"Fil d'acier à faible teneur en carbone à usage divers, galvanisé, diamètre 0,55 mm",Material,General,t,4229.76,4229.76,4229.76,4229.76,1,EUR,85.44,0.035,16,16,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS KAME-LI-MESA-KASA_KAKAMENE,"Écrous hexagonaux en acier, diamètre du filetage M20 (M22)",Material,General,t,4227.93,4227.93,4227.93,4227.93,1,EUR,27.99,0.0117,16,16,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,POTEAUX MÉTALLIQUES DU RÉSEAU DE CONTACT DXME-KADX-MEPU_MEMERI,"Composés pour broyeurs, capacité jusqu'à 760 m3",Equipment,General,Heures machine,870.2,870.2,870.2,870.2,1,EUR,25947.21,29.8175,16,16,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST KAVO-ME-KASA-KARI,Vannes d'admission,Abstract Material,General,pièce,88.68,88.68,88.68,88.68,1,EUR,423.98,4.7812,16,16,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment KAVO-ME-KASA-KATO,Tablier déflecteur en acier galvanisé,Abstract Material,General,pièce,42.09,18.35,45.48,45.48,2,EUR,95.97,2.55,16,5,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ KAME-SA-KARI-MEKA,Ensemble de structures métalliques pour les zones de travail des barrières routières à câbles,Abstract Material,Steel & Metal,1000 m,85619.04,85619.04,85619.04,85619.04,1,EUR,27826.18,0.325,16,16,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES DXME-KAVO-KATO_KARISA,"Rouleaux compresseurs automoteurs combinés vibrants, poids 7 t",Equipment,General,Heures machine,48.01,48.01,48.01,48.01,1,EUR,89.54,1.865,16,16,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MEDX-MELI_KAKATOLI,"Cordon en caoutchouc de section ronde, diamètre supérieur à 11,0 mm",Material,General,kg,10.18,10.18,10.18,10.18,1,EUR,414.37,40.6962,16,16,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de caniveaux de drainage préfabriqués en béton sur des fondations p RISA-ME-KASA-KAME,Rallonges pour voies ferrées à écartement large,Abstract Material,General,t,118.63,118.63,118.63,118.63,1,EUR,7278.36,61.355,16,16,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" DXME-RIME-RIRI_PUPUME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.68,10.6588,16,16,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS DXME-RIME-RIRI_PUPUME,Installations pour la fabrication de revêtements protecteurs d'isolation thermique,Equipment,General,Heures machine,1.02,1.02,1.02,1.02,1,EUR,10.85,10.6588,16,16,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS MEKA-ME-KARI-KAME_KAKAKAME,"Bandes en aluminium de marque AD1N, largeur 20 mm, épaisseur 0,8 mm",Material,General,kg,11.09,11.09,11.09,11.09,1,EUR,982.42,88.5938,16,16,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS MEVO-ME-KADX-MERI_KAKARIME,"Robinet à boisseau sphérique en acier à passage droit, diamètre nominal 50 mm",Material,General,pièce,72.72,72.72,72.72,72.72,1,EUR,20.0,0.275,16,16,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Essai hydraulique préliminaire des conduites d'un diamètre nominal de 100 à 1400 KAME-LI-MESA-KALI_MEKAMEKA,"Chevilles de façade en polymère avec vis en acier inoxydable à tête hexagonale, diamètre 10 mm, longueur 100 mm",Material,General,100 pièces,61.05,61.05,61.05,61.05,1,EUR,251.45,4.1188,16,16,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-MENE-KAME_KAKANE,"Centrales électriques mobiles, puissance 100 kW",Equipment,General,Heures machine,37.78,37.78,37.78,37.78,1,EUR,4255.19,112.6306,16,16,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,FABRICATION DE COUDES COURBÉS ET MONTAGE D'ANGLES DE COUDES DE TUYAUTERIES,Installation de coudes cintrés sur le bord d'une tranchée lors de la constructio MEKA-ME-KARI-KATO_KAKAKAME,"Fil d'aluminium en alliage de marque AMZ, diamètre 1,4-2,8 mm",Material,General,t,21164.99,21164.99,21164.99,21164.99,1,EUR,21.01,0.0,16,16,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR MEVO-SA-KALI-KATO,Collecteurs de condensat,Abstract Material,General,pièce,799.21,799.21,799.21,799.21,1,EUR,799.21,1.0,16,16,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" RITO-VO-KAPU-KANE_KAKANEDX,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 80 mm, diamètre extérieur 89 mm, épaisseur de paroi 3,5 mm",Material,General,pièce,6.7,6.7,6.7,6.7,1,EUR,18.8,2.8062,16,16,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ MEPU-PU-KATO-KASA_KAKAMEDX,Vernis PF-170,Material,General,t,4140.67,4140.67,4140.67,4140.67,1,EUR,5.0,0.0,16,16,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ DXME-MELI-KAPU_MESAPU,Positionneurs-centreurs pour l'assemblage et le soudage de tuyaux en polyéthylène d'un diamètre supérieur à 160 mm et jusqu'à 225 mm,Equipment,General,Heures machine,0.7,0.7,0.7,0.7,1,EUR,22.34,31.7244,16,16,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE RITO-ME-KAME-KAPU,Compensateurs à presse-étoupe,Abstract Material,General,pièce,1269.01,1269.01,1269.01,1269.01,1,EUR,1269.01,1.0,16,16,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,INSTALLATION DE COMPENSATEURS RITO-VO-KAPU-KAPU,Croisillons,Abstract Material,General,pièce,1954.27,1954.27,1954.27,1954.27,1,EUR,19542.72,10.0,16,16,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,PIÈCES MOULEES DXME-MELI-KAPU_KASAKA,"Électricité : consommation 1,01 kWh/machine-heure",Electricity,Electricity,Heures machine,0.13,0.13,0.13,0.13,1,EUR,25.35,194.9919,16,16,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE DXME-MELI-KAPU_KASAKA,Appareils pour le soudage par emboîtement de tuyaux en plastique d'un diamètre supérieur à 630 mm et jusqu'à 1600 mm,Equipment,General,Heures machine,0.79,0.79,0.79,0.79,1,EUR,153.26,194.9919,16,16,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE RIPU-RI-KASA-KATO,Tuyaux en chrysotile-ciment sous pression,Abstract Material,General,m,37.56,37.56,37.56,37.56,1,EUR,37859.26,1008.0,16,16,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RISA-ME-KASA-KARI_KAKATOME,"Cales pour joints de voie ferrée à écartement large, pour rails P50",Material,General,t,1247.77,1247.77,1247.77,1247.77,1,EUR,12627.17,10.1188,16,16,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Installation et démontage de voies de roulement pour grues à tour à partir d'élé KAME-TO-KAME-KANE_KAKASARI,Graisse CIATIM-205,Material,General,kg,11.48,11.48,11.48,11.48,1,EUR,5.06,0.4419,16,16,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations RITO-VO-KATO-KANE_KAKAMEME,"Raccord en acier assemblé avec manchon et contre-écrou, diamètre nominal 50 mm",Material,General,pièce,9.32,9.32,9.32,9.32,1,EUR,600.72,64.4375,16,16,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Dispositif d'installation pour la réduction de la pression du gaz, MEVO-SA-MEKA-KANE,Radiateurs en acier à panneaux,Abstract Material,General,pièce,209.28,209.28,209.28,209.28,1,EUR,20928.35,100.0,16,16,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de radiateurs à panneaux en acier KAPU-RI-KAME-KARI,Mélanges d'enrobés bitumineux,Abstract Material,General,t,154.94,154.94,154.94,154.94,1,EUR,5093.65,32.8763,16,16,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en béton bitumineux MEVO-SA-MEKA-KAVO,Réflecteurs pour sèche-serviettes,Abstract Material,General,pièce,11.7,9.12,13.25,13.25,2,EUR,198.68,15.0,16,15,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de sèche-serviettes, de mitigeurs, d'ensembles de toilettes" KAPU-TO-KARI-KADX_MEKAMEPU,"Mélanges secs pour enduits décoratifs de façades, à base de liant ciment avec additifs modificateurs, à structure rainurée",Material,Steel & Metal,kg,3.92,3.92,3.92,3.92,1,EUR,7592.57,1936.4375,16,16,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES FAÇADES KALI-RI-KALI-KAPU_KAKAKADX,"Structures en acier fabriquées sur mesure à partir de profilés laminés, acier C345",Material,Steel & Metal,t,4703.31,4703.31,4703.31,4703.31,1,EUR,248.8,0.1214,16,16,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS DXME-KAME-KASA_MERINE,"Électricité : consommation 412,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,52.98,52.98,52.98,52.98,1,EUR,189.74,3.5813,16,16,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-KAME-KASA_MERINE,"Pelles électriques à godet unique avec équipement de travail « dragline », capacité du godet 10 m3",Equipment,General,Heures machine,1883.98,1883.98,1883.98,1883.98,1,EUR,6746.99,3.5813,16,16,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-MEDX-MERI_KAPUPU,"Électricité : consommation 9,9 kWh/machine-heure",Electricity,Electricity,Heures machine,1.27,1.27,1.27,1.27,1,EUR,8.19,6.446,15,15,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Restauration des regards d'égouts à l'aide de segments en polyéthylène DXME-MEDX-MERI_KAPUPU,"Pompes centrifuges pour matières fécales, débit 180 m3/h, pression 28 m",Equipment,General,Heures machine,2.56,2.56,2.56,2.56,1,EUR,16.52,6.446,15,15,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Restauration des regards d'égouts à l'aide de segments en polyéthylène KAPU-ME-KARI-KARI_KAMERINE,"Mélanges de béton lourd (BST) pour ouvrages hydrauliques sur gravier concassé, classe B22,5, F(1)150, W4",Material,General,m3,146.67,146.67,146.67,146.67,1,EUR,17.39,0.1475,15,15,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE TRAVERSÉE EN BÉTON ARMÉ DE PONTS POUR UNE VOIE FERROVIAIRE KAME-LI-MESA-MEKA_KAKAKALI,"Étrier d'ancrage d'extrémité, calibre de chaîne 46 mm",Material,General,pièce,720.96,720.96,720.96,720.96,1,EUR,2883.85,4.0,15,15,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE PROTECTION DES INSTALLATIONS MARITIMES,Suspension de dispositifs anti-chocs pour installations d'amarrage maritimes à l MEPU-ME-KATO-KAME_KAKAKAME,"Colle sèche à base de carboxyméthylcellulose pour tous types de papiers peints, consommation 0,004 kg/m2",Material,General,t,2949.72,2949.72,2949.72,2949.72,1,EUR,5.84,0.0,15,15,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,"PLÂTRAGE DE CERTAINES ZONES, CAGE D'ESCALIER ET PLATEAUX, PLÂTRAGE DÉCORATIF" RITO-SA-KARI-KARI_KAKADXKA,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 219 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,65.15,65.15,65.15,65.15,1,EUR,1098.84,16.866,15,15,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KAME-KASA_METOLI,"Électricité : consommation 247,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,31.79,31.79,31.79,31.79,1,EUR,86.32,2.7153,15,15,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR DXME-MESA-KAME_KAMERI,"Remorques basculantes tractées, capacité de charge jusqu'à 9 t",Equipment,General,Heures machine,1.04,1.04,1.04,1.04,1,EUR,28.52,27.354,15,15,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D RITO-SA-KAME-KAVO_KAKAMENE,"Tubes en acier électrosoudés à joint droit et à joint spiralé, classe de résistance K38, diamètre extérieur 426 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,161.85,161.85,161.85,161.85,1,EUR,13161.77,81.3187,15,15,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE MEME-ME-KARI-KAPU_KAKAKARI,"Bois rond de conifères (épicéa, pin, sapin) non écorcé, longueur 8,5-13 m, diamètre 16-24 cm, classe I-III",Material,General,m3,224.08,224.08,224.08,224.08,1,EUR,14581.93,65.0753,15,15,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE DXME-KAME-KASA_METOLI,"Pelles électriques à godet unique sur chenilles, capacité du godet 10 m3",Equipment,General,Heures machine,960.68,960.68,960.68,960.68,1,EUR,2608.55,2.7153,15,15,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR KALI-RI-KASA-KAME,Barrières d'escalier,Abstract Material,General,m,1290.98,172.14,4171.74,302.84,3,EUR,1626.12,1.1111,15,11,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" RITO-SA-KARI-KARI_KAKASASA,"Tubes en acier électrosoudés à joint droit en acier de marques St2, 10, diamètre extérieur 108 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,12.12,12.12,12.12,12.12,1,EUR,866.67,71.5167,15,15,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,INSERTION DE RACCORDS DANS LES CONDUITES EXISTANTES RISA-RI-KAME-MEVO_KAKARIRI,"Fixation supplémentaire KS-109, galvanisée",Material,General,pièce,33.04,33.04,33.04,33.04,1,EUR,312.93,9.47,15,15,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-MEKA_KAKAKAPU,Balance pour deux fils de contact KS-158,Material,General,pièce,63.21,63.21,63.21,63.21,1,EUR,93.33,1.4767,15,15,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIKA-ME-KARI-KANE_KAKAKAME,Graisse à souder,Material,General,kg,27.41,27.41,27.41,27.41,1,EUR,5.21,0.19,15,15,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-METO-KAME_KARISA,"Machines de pose et de réparation, débit de la pompe 400 l/min, largeur de travail 3000 mm, capacité de charge 15,5 t, puissance du moteur 30 ch.",Equipment,General,Heures machine,61.9,61.9,61.9,61.9,1,EUR,38.7,0.6253,15,15,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-RIKA-KATO_KAKATO,"Remorqueurs, puissance 331 kW (450 ch)",Equipment,General,Heures machine,127.32,127.32,127.32,127.32,1,EUR,623.03,4.8933,15,15,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Construction de quais d'accostage à profil angulaire en béton armé préfabriqué s KAME-LI-MENE-KARI_KAKAKARI,"Échafaudages en acier à montants et traverses (montants, traverses, échelles) avec fixations (colliers, sabots, boulons), sans panneaux de plancher, hauteur des échafaudages jusqu'à 60 m",Material,General,t,3386.84,3386.84,3386.84,3386.84,1,EUR,56.03,0.0312,15,15,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,ÉCHAFAUDAGES EXTÉRIEURS ET INTÉRIEURS,Installation et démontage d'échafaudages extérieurs KAVO-TO-KATO-KANE,Spirale volumineuse,Abstract Material,General,m,577.74,2.16,2159.66,2.68,3,EUR,166.1,72.9391,15,14,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" KAME-LI-MESA-MERI_KAMERITO,"Goujons filetés en acier, diamètre du filetage M27, longueur 1100-2000 mm",Material,General,t,2471.79,2471.79,2471.79,2471.79,1,EUR,1945.03,1.0483,15,15,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION MEVO-ME-KADX-KAME_KAKAMERI,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 100 mm",Material,General,pièce,169.3,169.3,169.3,169.3,1,EUR,101.58,0.6,15,15,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RISA-TO-MEPU-KAME_MEVOLIVO,Rondelle plate ronde,Material,General,pièce,0.27,0.27,0.27,0.27,1,EUR,1990.04,7253.3333,15,15,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KASA-MEPU_KAKAME,"Électricité : consommation 2,61 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.33,0.33,0.33,0.33,1,EUR,67.35,201.1227,15,15,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-KASA-MEPU_KAKAME,"Grues à flèche, capacité de charge 5 t",Equipment,General,Heures machine,2.84,2.84,2.84,2.84,1,EUR,571.38,201.1227,15,15,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX MERI-ME-KARI-KANE_KAKARIRI,Couverture en carton bitumé RKP-350,Material,General,m2,1.57,1.57,1.57,1.57,1,EUR,106.33,67.77,15,15,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité en film polyéthylène sur colle butyle avec protection en RISA-RI-KARI-KAVO_KAKAKAPU,Ensemble de fixation en acier galvanisé pour support,Material,General,pièce,49.94,49.94,49.94,49.94,1,EUR,1522.43,30.488,15,15,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE CÂBLES SUPPLÉMENTAIRES DXME-KADX-KAME_KAMERI,Automotrices de montage sans grue,Equipment,General,Heures machine,91.27,91.27,91.27,91.27,1,EUR,166.53,1.8247,15,15,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,DÉMONTAGE DES PILIERS ET DES CONSTRUCTIONS DU RÉSEAU DE CONTACT RITO-TO-KANE-KARI,Tuyaux en acier pour conduites d'eau et de gaz,Abstract Material,General,m,10.39,10.39,10.39,10.39,1,EUR,1059.97,102.0,15,15,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",DISPOSITIF DE RÉSEAUX AÉRIENS POUR LE PNEUMATIQUE DES FLÈCHES DXME-KAME-KASA_METOTO,"Électricité : consommation 82,5 kWh/machine-heure",Electricity,Electricity,Heures machine,10.6,10.6,10.6,10.6,1,EUR,41.71,3.936,15,15,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE MEME-RI-KALI-MEKA,Cadres de fenêtres pour bâtiments résidentiels,Abstract Material,General,m2,78.14,78.14,78.14,78.14,1,EUR,8895.19,113.8333,15,15,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES MEKA-RI-KARI-MEME_KAKAMETO,"Barres rondes en laiton, marque LS59-1, diamètre 20 mm",Material,General,t,9235.55,9235.55,9235.55,9235.55,1,EUR,2.12,0.0,15,15,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-KALI-MEKA_KARIME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.8,12.5827,15,15,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-KALI-MEKA_KARIME,"Installations de gunitage pneumatiques à entraînement électrique fonctionnant à partir de stations de compression fixes, capacité jusqu'à 7 m3/h",Equipment,General,Heures machine,10.59,10.59,10.59,10.59,1,EUR,133.22,12.5827,15,15,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION KARI-TO-KAME-KALI,Sable de quartz,Abstract Material,General,kg,182.8,0.08,293.52,293.52,3,EUR,200.9,16.7246,15,14,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-KAVO-MEME_KAMEME,"Machines automotrices pour le remplissage des joints et des fissures, capacité du réservoir jusqu'à 480 l avec compresseur pour le soufflage des fissures et des joints",Equipment,General,Heures machine,74.12,74.12,74.12,74.12,1,EUR,540.27,7.2887,15,15,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES RITO-VO-KAPU-KAME,Bouchons elliptiques en acier,Abstract Material,General,pièce,48.05,48.05,48.05,48.05,1,EUR,90.28,1.88,15,15,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-KAPU_SANEVO,"Installations réversibles avec générateur de vapeur pour la réhabilitation des canalisations à l'aide d'un manchon en tissu, diamètre de la canalisation 800-1000 mm",Equipment,General,Heures machine,190.2,190.2,190.2,190.2,1,EUR,894.32,4.702,15,15,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Chargement d'une installation réversible avec générateur de vapeur pour la rénov DXME-MEKA-KAPU_SANENE,"Installations réversibles avec générateur de vapeur pour la réhabilitation de canalisations à l'aide d'un manchon en tissu, diamètre de la canalisation 500-700 mm",Equipment,General,Heures machine,173.87,173.87,173.87,173.87,1,EUR,771.51,4.4373,15,15,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Chargement d'une installation réversible avec générateur de vapeur pour la rénov DXME-KAVO-KADX_KARIPU,Pilonneuses pneumatiques fonctionnant à partir d'un compresseur fixe,Equipment,General,Heures machine,0.53,0.53,0.53,0.53,1,EUR,12.06,22.608,15,15,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D MEPU-RI-KASA-KASA,Composition bicomposante hydroisolante à base de ciment avec émulsion polymère,Abstract Material,General,kg,7.48,7.48,7.48,7.48,1,EUR,2140.32,286.125,15,15,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Application d'un revêtement imperméable à base de ciment Portland renforcé à l'a RIPU-RI-KANE-KARI_KAKAKAME,"Manchons en acier pour raccordement de tuyaux en chrysotile-ciment, diamètre 100 mm",Material,General,10 pièces,9.4,9.4,9.4,9.4,1,EUR,62.59,6.66,15,15,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES DXME-KAME-KASA_METOTO,"Pelles électriques à godet unique sur chenilles, capacité du godet 4,6 m3",Equipment,General,Heures machine,288.71,288.71,288.71,288.71,1,EUR,1136.35,3.936,15,15,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE KAME-RI-KAME-KARI_KAKAPUME,"Bitume pétrolier de construction pour toiture BNK-45/190, BNK-40/180",Material,General,t,734.78,734.78,734.78,734.78,1,EUR,159.41,0.2307,15,15,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mastic bitumineux à partir de carreaux KAME-LI-KANE-MEPU_KAKAPUME,"Bandes à base de tissu laminées de polyéthylène avec une couche adhésive sur une face pour l'étanchéité et l'isolation, couleur grise, largeur 48 mm, épaisseur 0,18 mm",Material,General,10 m,1.12,1.12,1.12,1.12,1,EUR,11.53,10.2807,15,15,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de systèmes de chauffage électrique au sol (« plancher chauffant ») KAME-LI-KANE-KAME_KAKAKASA,"Bandes d'étanchéité hydrofuges, pare-vapeur en caoutchouc butyle, doublées d'un matériau non tissé d'un côté, avec une couche adhésive d'un côté et un revêtement antiadhésif de l'autre, couleur beige, largeur 100 mm, épaisseur 2 mm",Material,General,m,1.33,1.33,1.33,1.33,1,EUR,317.31,239.34,15,15,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES MONOLITHES DE LA PARTIE SUPÉRIEURE DES BÂTIMENTS À L'AIDE,Montage du coffrage des structures monolithiques en béton armé de la partie aéri KAME-LI-KAVO-KASA,Épaississants pour mélange,Abstract Material,General,t,1570.12,7.87,2351.25,2351.25,2,EUR,48435.76,103.0,15,11,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation de pieux forés-injectés dans des puits prêts à l'emploi à l'aide de DXME-KARI-KATO_KARIME,"Marteaux diesel, poids de la partie frappante 0,6 t",Equipment,General,Heures machine,10.87,10.87,10.87,10.87,1,EUR,39.28,3.6147,15,15,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KASA-ME-KAVO-KALI,Plaques d'appui en béton armé,Abstract Material,General,pièce,576.91,576.91,576.91,576.91,1,EUR,3172.99,5.5,15,15,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,SUPPORTS DU RÉSEAU DE CONTACT EN BÉTON ARMÉ MEPU-SA-KADX-KADX_KAKAKARI,"Solvant technique à base de houille, marques A, B, C",Material,General,t,2341.07,2341.07,2341.07,2341.07,1,EUR,37.47,0.04,15,15,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation du bitume et de l'émulsion bitumineuse DXME-MERI-KAVO_SAMEVO,"Broyeurs automoteurs sur chenilles, puissance 305 kW (415 ch)",Equipment,General,Heures machine,275.97,275.97,275.97,275.97,1,EUR,3298.17,11.9513,15,15,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS KAME-LI-KAVO-KAPU_KAKAKARI,Craie naturelle en morceaux sciés,Material,General,kg,6.69,6.69,6.69,6.69,1,EUR,0.42,0.1033,15,15,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES MEME-RI-MEME-KARI_KAKAMEME,"Contreplaqué bakélisé de marque FBS, épaisseur 18 mm",Material,General,m3,2252.19,2252.19,2252.19,2252.19,1,EUR,328.26,0.2422,15,15,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Bétonnage de l'anneau de support inférieur de l'enveloppe en béton armé d'une to DXME-RIKA-KADX_KAKAPU,"Grues flottantes pour utilisation en eaux fermées, non automotrices, 5 t",Equipment,General,Heures machine,253.02,253.02,253.02,253.02,1,EUR,6243.92,24.6773,15,15,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU MARIN DANS UNE ZONE AQUA,RECOUVREMENT DE DIVERS OBJETS DANS DES CONDITIONS MARITIMES DANS UNE ZONE MARITI RIKA-RI-KARI-KAME_KAKAMEPU,"Douilles en polypropylène, diamètre 42 mm",Material,General,1000 pièces,104.29,104.29,104.29,104.29,1,EUR,18.16,0.1857,15,15,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols DXME-MERI-KAME_KAKAME,Herses à disques sans tracteur,Equipment,General,Heures machine,0.97,0.97,0.97,0.97,1,EUR,2.15,2.2107,15,15,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"TRAVAUX PRÉPARATOIRES, TERRASSEMENT ET AGROTECHNIQUES" KAME-LI-MESA-KANE_KAKAVOSA,"Clous en acier formés, diamètre 1,6 mm, longueur 100 mm",Material,General,t,2781.65,2781.65,2781.65,2781.65,1,EUR,4.75,0.01,15,15,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,Maçonnerie de structures en briques DXME-MERI-KAVO_KARIME,Râteaux à broussailles portés (sans tracteur),Equipment,General,Heures machine,1.34,1.34,1.34,1.34,1,EUR,1.75,1.3047,15,15,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-KARI-KASA_KASATO,"Électricité : consommation 7,43 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.95,0.95,0.95,0.95,1,EUR,22.14,23.2187,15,15,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Fixation du sol par cimentation par jet à l'aide de pieux verticaux en béton DXME-KARI-KASA_KASATO,"Ensembles de machines pour la réalisation de pieux en béton-sol selon la technologie de cimentation à jet à deux composants, profondeur de forage jusqu'à 70 m",Equipment,General,Heures machine,321.4,321.4,321.4,321.4,1,EUR,7462.44,23.2187,15,15,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Fixation du sol par cimentation par jet à l'aide de pieux verticaux en béton KAME-LI-MESA-KATO_KAKATORI,"Boulons en acier galvanisé à tête hexagonale et écrou hexagonal galvanisé, diamètre du filetage du boulon et de l'écrou M8, longueur du boulon 16-100 mm",Material,General,kg,4.62,4.62,4.62,4.62,1,EUR,54.25,11.7393,15,15,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR KAVO-RI-KARI-KATO_KAKARIPU,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 11,5 mm",Material,Steel & Metal,10 m,22.26,22.26,22.26,22.26,1,EUR,818.2,36.76,15,15,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES DE TRANSFERT DXME-RIKA-KADX_KAKAVO,"Grues flottantes pour travail en rade ouverte, non automotrices, 5 t",Equipment,General,Heures machine,314.33,314.33,314.33,314.33,1,EUR,7756.87,24.6773,15,15,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU MARIN EN COÛTES OUVERTES,RECOUVREMENT DE DIVERS OBJETS DANS LES CONDITIONS MARITIMES DE LA CÔTE OUVERTE ( PU_MEKAKA_KAPUVO,Personnel : 5 personnes-heures/machine-heures,Operator,Operators,Heures machine,48.96,48.96,48.96,48.96,1,EUR,1208.19,24.6773,15,15,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU MARIN DANS UNE ZONE AQUA,RECOUVREMENT DE DIVERS OBJETS DANS DES CONDITIONS MARITIMES DANS UNE ZONE MARITI DXME-MEKA-KAPU_SALIME,"Machines à projection centrifuge pneumatiques fonctionnant à partir d'installations de compression mobiles pour le revêtement de la surface intérieure des tuyaux avec des revêtements isolants en ciment-sable (ciment-polymère), diamètre des tuyaux jusqu'à 800 mm",Equipment,General,Heures machine,3.33,3.33,3.33,3.33,1,EUR,15.14,4.5453,15,15,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des conduites à l'aide de composés ciment-polymère par projection cen RINE-ME-KARI-KAPU_KAKAKASA,"Cale en polymère sous la cale, type « Métro » R50, dimensions 320 x 160 mm",Material,General,pièce,40.39,40.39,40.39,40.39,1,EUR,51138.84,1266.1333,15,15,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KADX-KAVO_KAMEME,"Composés spéciaux pour le transport de rails à un seul niveau, longueur des rails jusqu'à 800 m, nombre de rails jusqu'à 12",Equipment,General,Heures machine,579.6,579.6,579.6,579.6,1,EUR,417.7,0.7207,15,15,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS MENE-RI-KATO-KARI_KAKARIME,Mousse forestière,Material,General,m3,110.48,110.48,110.48,110.48,1,EUR,2718.59,24.606,15,15,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-LI-MELI-KADX_MEMEMERI,"Forets hélicoïdaux à queue cylindrique en acier rapide P6M5, classe de précision A1, longueur 86 mm, diamètre 5 mm",Material,General,100 pièces,197.44,197.44,197.44,197.44,1,EUR,5.18,0.078,15,15,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MEME-ME-KAME-MEKA_KAKAKAPU,"Encadrement en bois de conifères (épicéa, pin), type H-1, largeur 70-75 mm, épaisseur 10-18 mm",Material,General,m,2.86,2.86,2.86,2.86,1,EUR,330.2,115.6429,14,14,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Installation de cloisons de 3 m de hauteur en panneaux extrudés en amiante-cimen DXME-KATO-KARI_SAKAKA,"Ventilateurs de ventilation locale, puissance jusqu'à 55 kW",Equipment,General,Heures machine,5.62,5.62,5.62,5.62,1,EUR,2136.03,380.1957,14,14,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN ACIER DXME-KATO-KARI_SAKAKA,"Électricité : consommation 16,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.12,2.12,2.12,2.12,1,EUR,805.73,380.1957,14,14,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN ACIER DXME-MEKA-KALI_KAKARI,"Installations hydrauliques à perforation contrôlée pour la pose de tuyaux à partir d'une centrale électrique mobile, diamètre des tuyaux jusqu'à 400 mm, longueur de perforation jusqu'à 100 m",Equipment,General,Heures machine,7.28,7.28,7.28,7.28,1,EUR,558.23,76.6571,14,14,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE TUYAUX SANS TRANCHÉE,Perçage sans excavation (perforation) DXME-KAME-KASA_MERISA,"Pelles électriques à godet unique avec équipement de travail « dragline », capacité du godet 6,5 m3",Equipment,General,Heures machine,1291.38,1291.38,1291.38,1291.38,1,EUR,6253.03,4.8421,14,14,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE MERI-RI-KAVO-KATO,Cylindres et demi-cylindres isolants en laine minérale sur liant synthétique,Abstract Material,General,m3,440.49,440.49,440.49,440.49,1,EUR,141.66,0.3214,14,14,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'un système de chauffage dans des bâtiments temporaires à usage ré KAME-LI-MESA-KALI_KAKARIPU,"Chevilles expansibles en polyéthylène, diamètre 8 mm, longueur 40 mm",Material,General,1000 pièces,14.49,14.49,14.49,14.49,1,EUR,0.54,0.0425,14,14,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" DXME-RIKA-KAME_KARIRI,"Installations de raclage pour la réalisation de tranchées sous-marines avec godet de 1 à 1,5 m3",Equipment,General,Heures machine,108.73,108.73,108.73,108.73,1,EUR,1956.9,17.9986,14,14,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI DXME-RIME-RIRI_PULIME,Systèmes de contrôle radiographique des pipelines,Equipment,General,Heures machine,20.29,20.29,20.29,20.29,1,EUR,8.93,0.44,14,14,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONTRÔLE DE LA QUALITÉ DES ASSEMBLAGES SOUDÉS PAR DES MÉTHODES PHYSIQUES,AUTRES TRAVAUX DE CONTRÔLE DE LA QUALITÉ DES JOINTS SOUDÉS DXME-MELI-KARI_KASAPU,"Complexes de radiographie numérique des joints soudés annulaires de tuyaux d'un diamètre de 500 à 1420 mm, équipés d'un appareil à rayons X, schéma de contrôle frontal",Equipment,General,Heures machine,86.48,86.48,86.48,86.48,1,EUR,48.12,0.5564,14,14,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONTRÔLE DE LA QUALITÉ DES ASSEMBLAGES SOUDÉS PAR DES MÉTHODES PHYSIQUES,CONTRÔLE RADIOGRAPHIQUE À L'AIDE D'APPAREILS À RAYONS X À FONCTIONNEMENT CONTINU KAME-LI-KANE-KATO_KAKAKASA,"Bandes polymères pour l'isolation des conduites, épaisseur 0,5 mm",Material,General,m2,3.31,3.31,3.31,3.31,1,EUR,9.7,4.88,14,14,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAVO-ME-KARI-RISA_KAKARIME,"Granulés en acier moulé amélioré, fraction 0,3-3,2 mm",Material,General,t,2223.46,2223.46,2223.46,2223.46,1,EUR,493.68,0.2583,14,14,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR RIKA-RI-KARI-KAPU_KAKAKARI,"Capuchons isolants en polyamide pour torsader des fils de 2 x 1,5 mm2",Material,General,100 pièces,9.65,9.65,9.65,9.65,1,EUR,0.71,0.075,14,14,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e KAVO-RI-KARI-KASA_KAKAPUVO,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 22,5 mm",Material,Steel & Metal,10 m,70.38,70.38,70.38,70.38,1,EUR,600.48,8.5321,14,14,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES RILI-RI-KATO-KAME_KAKARIME,Prises de courant pour plafond avec crochet pour suspension de lustre,Material,General,pièce,4.05,4.05,4.05,4.05,1,EUR,22.78,5.625,14,14,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e RISA-RI-KARI-KAPU,Supports,Abstract Material,General,100 pièces,87.25,87.25,87.25,87.25,1,EUR,0.87,0.01,14,14,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" KARI-RI-KASA-KAPU_RIKAMEPU,"Gravier de roches denses pour travaux de construction M 1200, fraction 5(3)-10 mm",Material,General,m3,87.26,87.26,87.26,87.26,1,EUR,964.59,11.055,14,14,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES RISA-RI-KAME-MEVO_KAKATOVO,"Fixation articulée inversée sans corde à vent avec support allongé pour un fil de contact, projet KS-MENEKA.PU, type FO-3u-3,0 A",Material,General,pièce,356.56,356.56,356.56,356.56,1,EUR,1426.22,4.0,14,14,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-MEVO_KAKAPUME,"Fixateur articulé droit sans corde à vent avec support allongé pour un fil de contact, projet KS-MENEKA.PU, type FP-1u-3,0 A",Material,General,pièce,202.98,202.98,202.98,202.98,1,EUR,405.96,2.0,14,14,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEVO-SA-KASA-KATO,Détendeurs en acier,Abstract Material,General,pièce,9994.58,9994.58,9994.58,9994.58,1,EUR,9994.58,1.0,14,14,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,"INSTALLATION DE VANNES OU DE CLAPETS EN ACIER, DE SOUPAPES ET DE CLAPETS À RACCO" DXME-RIME-RIRI_PUPURI,"Installations pour la pulvérisation et le coulage de mousse de polyuréthane et de polyuréthane, avec compresseur et système de chauffage continu des composants, capacité jusqu'à 15 kg/min",Equipment,General,Heures machine,1.09,1.09,1.09,1.09,1,EUR,7.6,6.9929,14,14,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE DXME-RIME-RIRI_PUPURI,"Électricité : consommation 1,98 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.25,0.25,0.25,0.25,1,EUR,1.78,6.9929,14,14,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE DXME-MENE-KAME_KAKAVO,"Centrales électriques mobiles, puissance 500 kW",Equipment,General,Heures machine,161.37,161.37,161.37,161.37,1,EUR,38132.11,236.3,14,14,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAVO-ME-KANE-KASA,Toiles de faux portails,Abstract Material,General,pièce,1205.24,1205.24,1205.24,1205.24,1,EUR,121385.27,100.7143,14,14,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" KAME-NE-KAME-KASA,Plaques renforcées en ciment-minéral,Abstract Material,General,m2,26.88,26.88,26.88,26.88,1,EUR,6446.19,239.8571,14,14,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE CIMENT MINÉRAL RE",Installation de cloisons en plaques minérales renforcées de ciment à l'intérieur KAME-LI-METO-KARI,Mastic asphaltique à froid,Abstract Material,General,t,1538.97,1538.97,1538.97,1538.97,1,EUR,1143.24,0.7429,14,14,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité KASA-ME-KALI-RIRI,Blocs de parapet,Abstract Material,General,pièce,223.96,53.85,649.24,53.85,2,EUR,5464.33,78.9592,14,14,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" KASA-RI-KATO-KARI_KAKAKAME,"Blocs de béton lourd pour murs, dimensions 390 x 190 x 188 mm, marque 200",Material,General,m3,157.16,157.16,157.16,157.16,1,EUR,138.52,0.8814,14,14,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ MEVO-SA-MEKA-KALI,Radiateurs sectionnels en fonte,Abstract Material,General,pièce,243.5,243.5,243.5,243.5,1,EUR,24350.46,100.0,14,14,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de radiateurs en fonte KAME-LI-KALI-MEPU_KAKAMEME,"Anneaux en polyéthylène avec bandes d'étanchéité, diamètre extérieur 52 mm",Material,General,10 compl,3.37,3.37,3.37,3.37,1,EUR,1.63,0.4857,14,14,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES MEPU-RI-KANE-KANE_KAKAMEME,Latex SKS-65 GP,Material,General,t,10345.57,10345.57,10345.57,10345.57,1,EUR,262.93,0.0317,14,14,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-RIKA-MERI_KADXRI,"Projectiles à godets (à benne) d'une capacité maximale de 2,5 m3",Equipment,General,Heures machine,92.62,92.62,92.62,92.62,1,EUR,292.21,3.155,14,14,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" RIPU-TO-KASA-MEVO_KAKAKAME,"Raccord pour conduites en acier, longueur 200 mm",Material,General,pièce,9.19,9.19,9.19,9.19,1,EUR,36.61,3.9821,14,14,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols DXME-KAVO-KADX_KAKARI,"Plaques vibrantes électriques, puissance jusqu'à 1 kW",Equipment,General,Heures machine,0.27,0.27,0.27,0.27,1,EUR,0.94,3.5057,14,14,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements KAME-LI-MESA-MEPU_KAMEDXPU,"Vis autotaraudeuses en acier à tête hexagonale, pointe de forage, diamètre 12 mm, longueur 70 mm",Material,General,t,4240.36,4240.36,4240.36,4240.36,1,EUR,2.79,0.0,14,14,TRAVAUX DE CONSTRUCTION,Canalisations internes,AUTRES TRAVAUX,Installation d'un collecteur de distribution pour les systèmes de chauffage et d RIKA-ME-KARI-RITO_KAMEMEME,"Bande galvanisée à chaud pour mise à la terre, épaisseur 4 mm, largeur 40 mm, longueur 850 mm",Material,General,pièce,11.25,11.25,11.25,11.25,1,EUR,18.48,1.6429,14,14,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" MEPU-RI-KANE-KATO_KASAMEKA,Mélange liquide de polymères acryliques et de composants modificateurs pour mélanges de ciment,Material,General,l,20.62,20.62,20.62,20.62,1,EUR,175.82,8.525,14,14,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Fondations,FONDATIONS,Restauration et imperméabilisation des surfaces murales en béton et en béton arm MEVO-SA-KAVO-MEVO_KAKANEME,Capuchons d'isolation pour raccordement de conducteurs monofilaires,Material,General,1000 pièces,80.7,80.7,80.7,80.7,1,EUR,22.8,0.3046,14,14,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"ALARME ÉLECTRIQUE, ALARME INCENDIE, ALARME D'APPEL ET SIGNALISATION À DISTANCE",ALARME ÉLECTRIQUE ET ALARME INCENDIE KAME-TO-KASA-TOVO_KARISAME,Disulfure de molybdène,Material,General,kg,52.39,52.39,52.39,52.39,1,EUR,221.91,4.5608,14,14,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) KAVO-ME-KARI-MEME,Pièces forgées pour soudage à la bouteille,Abstract Material,General,t,438.97,3.47,2035.79,3.47,2,EUR,207.17,20.7583,14,14,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de structures monolithiques en béton armé de la partie souterraine DXME-KAVO-KANE_KAKATO,"Coupeurs de joints, profondeur maximale de coupe 200 mm, puissance 9 kW (12 ch)",Equipment,General,Heures machine,3.04,3.04,3.04,3.04,1,EUR,59.33,19.545,14,14,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-KASA-KASA_SAKANE,"Grues sur châssis automobile, capacité de charge 50 t",Equipment,General,Heures machine,79.7,79.7,79.7,79.7,1,EUR,2301.51,28.8771,14,14,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KASA-ME-KATO-KADX,Travées,Abstract Material,General,pièce,777.39,777.39,777.39,777.39,1,EUR,77739.19,100.0,14,14,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"Poutres, traverses et linteaux" RISA-RI-KAME-KAME_KAKAMESA,"Étiquettes de marquage U-153 U3,5",Material,General,100 pièces,1.34,1.34,1.34,1.34,1,EUR,0.03,0.023,14,14,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e DXME-KASA-KAPU_KAMEPU,"Ponts roulants électriques, capacité de charge 160 t",Equipment,General,Heures machine,180.46,180.46,180.46,180.46,1,EUR,124759.0,691.3286,14,14,INSTALLATION DE L'ÉQUIPEMENT,Fours électriques,PARTIE MÉCANIQUE DES FOURS,FOURS ÉLECTRIQUES À ARC POUR LA FUSION DE L'ACIER KAVO-TO-KAVO-KAME_KAKARISA,"Cornière en acier laminée à chaud à ailes inégales, nuances d'acier St3sp, St3ps, largeur de la plus grande aile 63-160 mm, épaisseur 5-6 mm",Material,General,t,1854.15,1854.15,1854.15,1854.15,1,EUR,13035.2,7.5708,14,14,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE DE VOIES SUR LES PONTS MEME-RI-METO-KAPU,Panneaux de plancher,Abstract Material,General,m2,3.25,3.25,3.25,3.25,1,EUR,16.24,4.9971,14,14,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,ÉCHAFAUDAGES EXTÉRIEURS ET INTÉRIEURS,Installation et démontage d'échafaudages extérieurs DXME-KASA-KAPU_KAMEPU,"Électricité : consommation 76,56 kW·h/machine-heure",Electricity,Electricity,Heures machine,9.83,9.83,9.83,9.83,1,EUR,6798.15,691.3286,14,14,INSTALLATION DE L'ÉQUIPEMENT,Fours électriques,PARTIE MÉCANIQUE DES FOURS,FOURS ÉLECTRIQUES À ARC POUR LA FUSION DE L'ACIER KAPU-ME-KARI-KAME_KAKAKANE,"Mélanges de béton à grains fins (BSM), classe B15 (M200)",Material,General,m3,140.47,140.47,140.47,140.47,1,EUR,143.78,1.0236,14,14,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" DXME-KAVO-KATO_KAPUME,"Rouleaux compresseurs automoteurs lisses vibrants, poids 12 t",Equipment,General,Heures machine,60.85,60.85,60.85,60.85,1,EUR,76.98,1.265,14,14,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL DXME-METO-KAME_SARIPU,"Machines de marquage automotrices pour l'application de thermoplastique, largeur de la ligne appliquée 50-400 mm, capacité du réservoir de thermoplastique 700 kg, débit 26 l/min",Equipment,General,Heures machine,55.39,55.39,55.39,55.39,1,EUR,41.94,0.7571,14,14,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-LI-MEME-KANE_KAKAKANE,Flux VAMI,Material,General,kg,51.35,51.35,51.35,51.35,1,EUR,41.52,0.8093,14,14,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE CONVERSION KAVO-TO-KASA-KASA_KAKASALI,"Tôle d'acier galvanisée, épaisseur 0,75 mm",Material,General,t,1936.46,1936.46,1936.46,1936.46,1,EUR,507.08,0.2614,14,14,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,CONDUITES DANS LES CANALISATIONS ET EN SURFACE KAME-VO-KAME-KAPU_KAKANETO,"Verre organique (acrylique) moulé en feuilles, marques TOSP, TOSN, incolore transparent, épaisseur 3 mm",Material,General,m2,65.29,65.29,65.29,65.29,1,EUR,0.54,0.0122,14,14,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) DXME-RIME-MENE_KAMETO,"Presses à manivelle à simple effet 25 kN (2,5 tf)",Equipment,General,Heures machine,0.84,0.84,0.84,0.84,1,EUR,0.19,0.2293,14,14,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",STRUCTURES POUR L'INSTALLATION D'APPAREILS ET DE MOYENS D'AUTOMATISATION,Structures pour l'installation d'appareils MEME-ME-KATO-KANE_KAKANEDX,"Planches de bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 25 mm, classe I",Material,General,m3,570.47,570.47,570.47,570.47,1,EUR,966.03,1.8238,14,14,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ RITO-TO-KANE-KAPU_KAKAKAVO,"Tuyaux en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, légers, diamètre nominal 25 mm, épaisseur de paroi 2,8 mm",Material,General,m,2.98,2.98,2.98,2.98,1,EUR,4.11,1.3771,14,14,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de conduits de ventilation avec ouverture manuelle individuelle des MEPU-PU-KATO-METO_KAKAKARI,Vernis KhV-784,Material,General,t,3949.64,3949.64,3949.64,3949.64,1,EUR,59.81,0.0233,14,14,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAPU-ME-KARI-KASA_KAMETOPU,"Mélanges de béton lourd (BST) sur gravier concassé, classe B15, F(1)150, W6",Material,General,m3,119.94,119.94,119.94,119.94,1,EUR,17.72,0.1471,14,14,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,JOINTS DE DÉFORMATION KAME-SA-KAME-KATO_MEKARIRI,"Billes de verre réfléchissantes pour saupoudrer les peintures de marquage, fraction 400-800 µm",Material,General,t,1387.14,1387.14,1387.14,1387.14,1,EUR,57.58,0.0421,14,14,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-METO-KAME_KALIME,"Machines de marquage universelles automotrices pour l'application de thermoplastique et de plastique en spray avec éléments réfléchissants, débit de la pompe jusqu'à 25 l/min",Equipment,General,Heures machine,96.36,96.36,96.36,96.36,1,EUR,68.07,0.7064,14,14,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KASA-RI-KARI-RINE,"Caniveaux de drainage en béton polymère, longueur 1000 mm",Abstract Material,General,pièce,190.37,190.37,190.37,190.37,1,EUR,8756.89,46.0,14,10,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de caniveaux préfabriqués en béton polymère sur des fondations prép KAME-RI-KAME-KAME_KAKAKAME,"Bitume routier MG 40/70, MG 70/130, MG 130/200, SG 40/70, SG 70/130, SG 130/200",Material,General,t,848.15,848.15,848.15,848.15,1,EUR,21.75,0.0378,14,14,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES FONDATIONS ET REVÊTEMENTS EXISTANTS POUR LES REVÊTEMENTS EN GRAV,CORRECTION DU PROFIL DES FONDATIONS KAME-LI-MESA-KARI_KAKASAPU,Boulons d'ancrage galvanisés,Material,General,kg,6.05,6.05,6.05,6.05,1,EUR,43.64,7.2093,14,14,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAPU-TO-KAME-KALI_KAKARILI,"Mortier de plâtre, à la chaux, M200",Material,General,m3,131.08,131.08,131.08,131.08,1,EUR,16.16,0.1243,14,14,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES MEME-RI-KALI-KATO,Blocs de fenêtre,Abstract Material,General,m2,210.62,210.62,210.62,210.62,1,EUR,21061.77,100.0,14,14,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES KAVO-PU-KARI-KAPU,Ébauches d'armature,Abstract Material,General,t,3948.89,3948.89,3948.89,3948.89,1,EUR,1241.93,0.314,14,14,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,Maçonnerie de murs extérieurs autoportants en brique sur des dalles dans des bât RISA-ME-KAME-KASA_KAKARIRI,"Traverse en bois résineux imprégné, pour voies ferrées à écartement étroit, type II, longueur 1 200 mm",Material,General,pièce,31.82,31.82,31.82,31.82,1,EUR,40913.77,1285.7157,14,14,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES KAME-LI-MEKA-MELI_MEKAKAKA,Mousse (éponge),Material,General,kg,8.05,8.05,8.05,8.05,1,EUR,32.3,4.0136,14,14,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS RISA-ME-KANE-MEVO_KAMEKARI,"Cales en caoutchouc pour fondations sous rails, type TsP-318",Material,General,1000 pièces,1166.01,1166.01,1166.01,1166.01,1,EUR,1847.45,2.217,14,14,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-ME-KARI-KAVO_KAKAMELI,"Joints en paronite PMB, épaisseur 3 mm, diamètre 400 mm",Material,General,1000 pièces,4108.41,4108.41,4108.41,4108.41,1,EUR,11.45,0.01,14,14,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Installation de raccords à brides sur des conduites en acier RITO-SA-KARI-KARI_KAKATOPU,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 57 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,6.2,6.2,6.2,6.2,1,EUR,160.93,28.1275,14,14,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier DXME-RIME-KARI_KAKAME,"Appareils électriques à haute pression pour le nettoyage hydraulique des surfaces, débit 17 l/min, pression 50 MPa",Equipment,General,Heures machine,1.68,1.68,1.68,1.68,1,EUR,10.43,6.205,14,14,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX PRÉPARATOIRES,Nettoyage des surfaces à l'eau sous pression DXME-RIME-KARI_KAKAME,"Électricité : consommation 6,11 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.78,0.78,0.78,0.78,1,EUR,4.87,6.205,14,14,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX PRÉPARATOIRES,Nettoyage des surfaces à l'eau sous pression KARI-TO-KAME-KALI_KAKAMEME,Poudre de quartz,Material,General,t,105.84,105.84,105.84,105.84,1,EUR,55.29,0.5221,14,14,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en béton résistant aux acides et à la chaleur DXME-MELI-KAPU_MESASA,Positionneurs-centreurs pour l'assemblage et le soudage de tuyaux en polyéthylène d'un diamètre supérieur à 225 à 355 mm,Equipment,General,Heures machine,0.79,0.79,0.79,0.79,1,EUR,11.8,14.8857,14,14,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE MEME-TO-KATO-MESA_MEKAMEPU,"Fixations en plastique pour la couche de protection des armatures, forme en étoile, épaisseur de la couche de protection en béton 40 mm",Material,General,100 pièces,4.25,4.25,4.25,4.25,1,EUR,1.85,0.4327,14,14,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é KAME-LI-MEME-KAPU_KAKALITO,"Fil à souder SV-12GS, diamètre 12 mm",Material,General,t,11879.78,11879.78,11879.78,11879.78,1,EUR,169.37,0.0182,14,14,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT DXME-RIKA-MEKA_KAKATO,"Plates-formes flottantes démontables, capacité de charge 13 t",Equipment,General,Heures machine,59.75,59.75,59.75,59.75,1,EUR,2933.81,49.1043,14,14,TRAVAUX DE CONSTRUCTION,Voies de halage des cales et des cales de halage,VOIES FERRÉES POUR LE TRANSPORT DE NAVIRES,Pose de poutres en béton armé avec rails sur une base de ballast sous-marine RILI-ME-KARI-KARI,Rails tramways à gorge,Abstract Material,General,m,199.87,199.87,199.87,199.87,1,EUR,404314.66,2022.8571,14,14,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,"Pose de voies par tronçons de 12,5 m sur des sections droites avec des rails de " RISA-ME-KATO-KANE_KAKATONE,"Rondelles élastiques ferroviaires à un filetage, version 2, diamètre du trou M24",Material,General,t,5506.26,5506.26,5506.26,5506.26,1,EUR,88.49,0.0164,14,14,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,Pose par tronçons de voies droites DXME-KAVO-KALI_KAMEPU,"Distributeurs de ciment sur châssis de type automobile, volume de la trémie 10 m3",Equipment,General,Heures machine,73.07,73.07,73.07,73.07,1,EUR,568.99,7.7871,14,14,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS INORGANIQUES DXME-MELI-KAPU_MESANE,Positionneurs-centreurs pour l'assemblage et le soudage de tuyaux en polyéthylène d'un diamètre supérieur à 355 à 500 mm,Equipment,General,Heures machine,1.87,1.87,1.87,1.87,1,EUR,8.14,4.3493,14,14,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE KAVO-TO-MERI-KANE_KAKARIRI,"Acier, marque 08Kh18N10T, épaisseur 4-16 mm",Material,General,t,8126.07,8126.07,8126.07,8126.07,1,EUR,48.99,0.01,14,14,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES MEKA-TO-KAME-KATO_KAKAMEVO,"Feuilles de précision normale en plomb de marque S1, épaisseur 1,0 mm",Material,General,kg,7.75,7.75,7.75,7.75,1,EUR,10.72,1.3836,14,14,INSTALLATION DE L'ÉQUIPEMENT,"Compresseurs, pompes et ventilateurs","COMPRESSEURS, AGRÉGATS ET MACHINES À PISTONS","COMPRESSEURS VERTICAUX, ANGULAIRES ET EN V POUR L'AIR ET LE GAZ" RITO-SA-KARI-KARI_KAKATODX,"Tubes en acier électrosoudés à joint droit en acier des nuances St2, 10, diamètre extérieur 76 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,6.95,6.95,6.95,6.95,1,EUR,168.6,24.2692,14,14,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier KAVO-TO-KALI-KAME_KAKALILI,"Bandes laminées à chaud en acier, nuances St3sp, St3ps, dimensions 220 x 10 mm",Material,General,t,1946.05,1946.05,1946.05,1946.05,1,EUR,43.37,0.0242,14,14,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,"TRAVAUX DE REVÊTEMENT AVEC DES EXIGENCES ÉLEVÉES EN MATIÈRE DE FINITION, DANS LE" MEPU-TO-KARI-KATO_KAKAMETO,"Peinture à dispersion aqueuse polyvinylacétate VD-BA-27A, couleur blanche",Material,General,t,2320.31,2320.31,2320.31,2320.31,1,EUR,37.13,0.02,14,14,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES MEVO-PU-KAME-KAVO,Tunnels en céramique (embouts),Abstract Material,General,pièce,3.44,3.44,3.44,3.44,1,EUR,3.44,1.0,14,14,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, MEVO-ME-KATO-KAME,Vannes hydrauliques,Abstract Material,General,pièce,24.04,24.04,24.04,24.04,1,EUR,24.04,1.0,14,14,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,"Installation de vannes hydrauliques, de boucliers pour les appareils de contrôle", RIPU-TO-KATO-METO_KAKAKAME,"Tuyaux en polyéthylène sous pression, à l'exception des conduites de gaz PE100, pour le transport de l'eau, rapport dimensionnel standard SDR11, diamètre extérieur nominal 32 mm, épaisseur de paroi 3,0 mm",Material,General,m,1.6,1.6,1.6,1.6,1,EUR,44.57,27.91,14,14,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage MELI-PU-KAME-KARI,Mélange aluminosilicate pour béton,Abstract Material,General,t,2694.99,2527.09,2762.15,2762.15,2,EUR,2060.21,0.8175,14,14,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Revêtement en béton réfractaire DXME-KADX-KALI_KAMELI,"Machines de nettoyage des ballasts, capacité 1000-1200 m3/h, non automotrices",Equipment,General,Heures machine,781.67,781.67,781.67,781.67,1,EUR,4753.68,6.0814,14,14,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST KAVO-TO-KASA-KASA_KAKASAVO,"Tôle d'acier galvanisée, épaisseur 1,0 mm",Material,General,t,1828.39,1828.39,1828.39,1828.39,1,EUR,600.25,0.3558,14,14,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Dispositif de parois DXME-KAME-KASA_MERISA,"Électricité : consommation 268,13 kW·h/machine-heure",Electricity,Electricity,Heures machine,34.44,34.44,34.44,34.44,1,EUR,166.75,4.8421,14,14,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE KAME-LI-MEME-KALI_KAMEDXME,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés E50, diamètre 3 mm",Material,General,t,4619.53,4619.53,4619.53,4619.53,1,EUR,238.57,0.0514,14,14,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,Soudage manuel à l'électrode avec revêtement cellulosique PU_MEKAKA_KATOSA,Personnel : 2 personnes-heures/machine-heure,Operator,Operators,Heures machine,16.52,16.52,16.52,16.52,1,EUR,558.46,33.815,14,14,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS MENE-RI-KARI-KATO,Arbres ou arbustes avec motte de terre,Abstract Material,General,pièce,55.79,55.79,55.79,55.79,1,EUR,557.9,10.0,14,14,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,PRÉPARATION DES EMPLACEMENTS DE PLANTATION ET PLANTATION D'ARBRES ET D'ARBUSTES KAME-LI-MEDX-KATO,Manchons en caoutchouc,Abstract Material,General,pièce,78.3,78.3,78.3,78.3,1,EUR,704.69,9.0,14,14,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT KAME-LI-MEME-KAPU_KAMEKAME,Fil à souder SV-08A,Material,General,kg,2.37,2.37,2.37,2.37,1,EUR,2.04,0.8629,14,14,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES DXME-MELI-KARI_MEMEME,"Installations à rayons X automotrices, épaisseur de radiographie accessible sur l'acier jusqu'à 45 mm",Equipment,General,Heures machine,7.04,7.04,7.04,7.04,1,EUR,1.34,0.19,13,13,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONTRÔLE DE LA QUALITÉ DES ASSEMBLAGES SOUDÉS PAR DES MÉTHODES PHYSIQUES,CONTRÔLE RADIOGRAPHIQUE À L'AIDE D'UN COMPLEXE RADIOGRAPHIQUE MOBILE AUTONOME SU DXME-METO-KATO_MEKAME,Laboratoires mobiles pour l'inspection télévisée des tuyaux,Equipment,General,Heures machine,33.1,33.1,33.1,33.1,1,EUR,252.75,7.6362,13,13,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ADDUCTION D'EAU PAR DES MÉ,Inspection télévisée de la canalisation après rinçage avec séchage simultané de DXME-KAME-KASA_KALIME,"Pelles hydrauliques à godet unique diesel sur chenilles, volume du godet 2,5 m3",Equipment,General,Heures machine,81.82,81.82,81.82,81.82,1,EUR,900.65,11.0077,13,13,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-MELI-KAPU_RIRIME,"Installations de terrain pour le soudage automatique de tuyaux lors du fonctionnement à partir de centrales électriques mobiles, diamètre des tuyaux 300-500 mm",Equipment,General,Heures machine,49.63,49.63,49.63,49.63,1,EUR,615.42,12.3992,13,13,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,Soudage de tuyaux de type LST-PAU DXME-RIKA-KAVO_KAKARI,"Copras flottants pour utilisation en rade ouverte, 6 t",Equipment,General,Heures machine,373.54,373.54,373.54,373.54,1,EUR,461.46,1.2354,13,13,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAME-LI-MESA-KASA_KAKAMEME,"Écrous hexagonaux en acier, diamètre du filetage M6",Material,General,t,3143.32,3143.32,3143.32,3143.32,1,EUR,16.09,0.01,13,13,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KAME-LI-RIKA-KAVO_KAMELIRI,"Tissu technique en coton, largeur 750 mm, densité de surface 200 g/m2",Material,General,m2,1.58,1.58,1.58,1.58,1,EUR,7.51,4.7554,13,13,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation de canalisations sans pression à l'aide d'un manchon en fibre de verr KAME-LI-MESA-KANE_KAKAVOPU,"Clous en acier formés, diamètre 1,6 mm, longueur 80 mm",Material,General,t,2781.65,2781.65,2781.65,2781.65,1,EUR,16.69,0.01,13,13,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,"TRAVAUX DE REVÊTEMENT AVEC DES EXIGENCES ÉLEVÉES EN MATIÈRE DE FINITION, DANS LE" RISA-ME-KANE-MENE,Croisement aveugle,Abstract Material,General,compl,90909.66,90909.66,90909.66,90909.66,1,EUR,90909.66,1.0,13,13,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" DXME-KAME-KASA_MESAPU,"Excavatrices à vis sans fin sur tracteur, puissance 79 kW (108 ch)",Equipment,General,Heures machine,63.13,63.13,63.13,63.13,1,EUR,663.38,10.5085,13,13,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE MEPU-PU-KAME-RIME,Apprêt,Abstract Material,General,kg,12.84,12.15,15.15,12.15,2,EUR,153.76,10.1571,13,13,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes KAME-LI-MENE-KAPU_KAKAMEDX,"Coffrage métallique mobile en blocs pour tunnels, s'appuyant sur la structure, pour le coffrage de dômes (voûtes et parois de tunnels)",Material,Steel & Metal,t,3529.74,3529.74,3529.74,3529.74,1,EUR,877.0,0.2485,13,13,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION KAME-TO-KASA-TOVO_KAKAPUME,Tungstène,Material,General,kg,189.47,189.47,189.47,189.47,1,EUR,2.31,0.13,13,13,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAPU-TO-KARI-KADX_KALIKATO,"Mélanges secs d'étanchéité à base de ciment et d'additifs modificateurs pour éliminer les fuites actives des structures en béton et en béton armé, temps de prise 3 min, classe B15 (M200), F25, W6, consommation 1800 kg/m3",Material,Steel & Metal,t,3908.32,3908.32,3908.32,3908.32,1,EUR,8.01,0.0,13,13,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ DXME-KAVO-KATO_KAMELI,"Rouleaux vibrants lisses automoteurs, masse 10 t",Equipment,General,Heures machine,55.7,55.7,55.7,55.7,1,EUR,371.88,6.6762,13,13,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES DXME-RIME-MEDX_KAMEME,Machines à cintrer manuelles,Equipment,General,Heures machine,0.1,0.1,0.1,0.1,1,EUR,0.05,0.4085,13,13,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage DXME-RIME-MEDX_KATODX,"Cisailles électrohydrauliques pour la coupe d'armatures, puissance 1,2 kW",Equipment,General,Heures machine,0.39,0.39,0.39,0.39,1,EUR,2.9,7.4069,13,13,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage DXME-RIME-MEDX_KATODX,"Électricité : consommation 0,38 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.43,7.4069,13,13,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage DXME-MEPU-KARI_KAKANE,"Camions à plateau, capacité de charge jusqu'à 20 tonnes",Equipment,General,Heures machine,39.11,39.11,39.11,39.11,1,EUR,304.63,7.79,13,13,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KAME-SA-KAME-KATO_MEKAMEPU,"Durcisseur liquide pour plastique à froid, application mécanique",Material,General,kg,39.98,39.98,39.98,39.98,1,EUR,470.15,11.76,13,13,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE MERI-RI-KATO-MEME_KAKARITO,Tissu de verre structurel T-11,Material,Steel & Metal,m2,4.86,4.86,4.86,4.86,1,EUR,169.31,34.8515,13,13,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENTS ADHÉSIFS,Collage de surfaces avec de la fibre de verre KAME-LI-MESA-KANE_KAKADXPU,"Clous en acier galvanisé, diamètre 4,5 mm, longueur 120 mm",Material,General,t,4438.24,4438.24,4438.24,4438.24,1,EUR,20.54,0.01,13,13,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,"TOITS, CORNICHES, FRONTONS, CHARPENTES" KALI-RI-KANE-KATO_KAMEMENE,"Profilé de guidage en acier galvanisé, pour le montage de cloisons en plâtre et de plafonds suspendus, dimensions 75 x 40 mm, épaisseur de l'acier 0,6 mm",Material,General,m,2.01,2.01,2.01,2.01,1,EUR,273.29,135.9154,13,13,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple composée de profilés de g KAME-LI-KALI-RIDX_KARIPUME,"Colliers (attaches) résistants aux intempéries en nylon, couleur noire, dimensions 370 x 4,8 mm",Material,General,10 pièces,2.3,2.3,2.3,2.3,1,EUR,11.08,4.8182,13,13,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS MERI-RI-KASA-MEME,Plaques de revêtement,Abstract Material,General,m3,520.11,469.87,1122.93,469.87,2,EUR,3830.97,8.1533,13,13,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé DXME-MEVO-KAME_KAKATO,"Compresseurs à vis mobiles avec moteur à combustion interne, pression 0,89 MPa (9 atm), débit jusqu'à 27 m3/min",Equipment,General,Heures machine,37.59,37.59,37.59,37.59,1,EUR,33.86,0.9008,13,13,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites technologiq DXME-KAVO-MEME_KATOME,"Transbordeurs d'enrobé bitumineux, capacité de la trémie jusqu'à 25 t",Equipment,General,Heures machine,316.44,316.44,316.44,316.44,1,EUR,223.7,0.7069,13,13,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-KALI-RIDX_KARIRIME,"Mastic d'étanchéité pour le scellement des entrées de câbles et des manchons, l'étanchéification des raccords filetés des tuyaux de gaz et d'eau",Material,General,kg,15.03,15.03,15.03,15.03,1,EUR,24.25,1.6131,13,13,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-MENE-KATO,Panneaux de coffrage,Abstract Material,General,m2,318.81,318.81,318.81,318.81,1,EUR,0.0,0.0,13,13,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ DXME-RIKA-MEME_KAMEKA,"Pontons de déchargement, capacité de charge 3 t",Equipment,General,Heures machine,0.24,0.24,0.24,0.24,1,EUR,29.54,125.3854,13,13,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" MEKA-ME-KARI-KAPU_KAKAKAME,"Barres à section ronde en alliages d'aluminium de marques AD0, AD1, AD, AD31, AD33, AD35, AV, diamètre 5,0 mm",Material,General,t,10909.29,10909.29,10909.29,10909.29,1,EUR,15.83,0.0,13,13,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS KAME-LI-MESA-MEME_KAKANEME,"Rondelles en acier galvanisé à ressort (grover), diamètre du trou M3",Material,General,t,6300.4,6300.4,6300.4,6300.4,1,EUR,3.45,0.0,13,13,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV DXME-KANE-KADX_KANEME,"Échafaudages mobiles, hauteur de levage 12 m",Equipment,General,Heures machine,5.43,5.43,5.43,5.43,1,EUR,570.96,105.0715,13,13,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" RITO-SA-KARI-KARI_KAKANESA,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 133 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,16.57,16.57,16.57,16.57,1,EUR,992.57,59.9,13,13,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" DXME-KANE-KADX_KANEME,"Électricité : consommation 3,2 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.41,0.41,0.41,0.41,1,EUR,43.19,105.0715,13,13,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" KAME-LI-MESA-KASA_KAKARIKA,"Écrous hexagonaux en acier, diamètre du filetage M48",Material,General,kg,5.28,5.28,5.28,5.28,1,EUR,2301.97,435.6385,13,13,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ RIKA-RI-KARI-KAME_KAKAKARI,Douille isolante en polyéthylène,Material,General,pièce,0.06,0.06,0.06,0.06,1,EUR,2.38,41.8338,13,13,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE CÂBLES SUPPLÉMENTAIRES DXME-KAVO-KADX_KARIRI,"Compacteurs sur tracteur, 118 kW (160 ch)",Equipment,General,Heures machine,48.68,48.68,48.68,48.68,1,EUR,390.23,8.0154,13,13,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL MENE-RI-KARI-MEKA,Fleurs,Abstract Material,General,1000 pièces,8.66,0.9,41.46,2.87,3,EUR,229.2,87.8042,13,13,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"AMÉNAGEMENT DE PELOUSES, DE PARTS DE FLEURS, DE JARDINS ALPINARIES ET DE ROCAIRE" KAME-LI-MESA-KALI_KAKAKADX,"Chevilles en plastique avec vis, diamètre 8 mm, longueur 60 mm, diamètre de la vis 5 mm, longueur de la vis 60 mm",Material,General,100 pièces,16.23,16.23,16.23,16.23,1,EUR,68.42,4.2162,13,13,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de canalisations d'alimentation en eau et de chauffage à partir de tuyaux e DXME-KASA-KATO_KAKATO,"Grues à console, capacité de charge 5 t",Equipment,General,Heures machine,2.46,2.46,2.46,2.46,1,EUR,44.73,18.2123,13,13,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) KAME-SA-KATO-KASA,Poteaux pour panneaux de signalisation,Abstract Material,General,t,175.08,153.41,188.63,188.63,2,EUR,4317.32,27.98,13,13,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES MEVO-ME-KADX-KAME_KAKAMEME,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 80 mm",Material,General,pièce,173.65,173.65,173.65,173.65,1,EUR,80.15,0.4615,13,13,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RITO-VO-KAPU-KANE_KAKALIPU,"Dérivation à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 100 mm, diamètre extérieur 108 mm, épaisseur de paroi 6 mm",Material,General,pièce,20.01,20.01,20.01,20.01,1,EUR,27.09,1.3538,13,13,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS DXME-KASA-KATO_KAKATO,"Électricité : consommation 5,58 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.72,0.72,0.72,0.72,1,EUR,13.05,18.2123,13,13,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) PU_MEKAKA_KARISA,Personnel : 2 personnes-heures/machine-heure,Operator,Operators,Heures machine,14.88,14.88,14.88,14.88,1,EUR,115.49,7.7592,13,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-METO-KAME_KALITO,"Machines de marquage automotrices pour l'application de plastique à froid avec éléments réfléchissants, largeur de la ligne appliquée 100-400 mm, vitesse de travail 1-3 km/h",Equipment,General,Heures machine,55.35,55.35,55.35,55.35,1,EUR,78.9,1.4254,13,13,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-KAPU-KAME_SARIPU,"Installations de forage sur chenilles, diamètre de forage 40-406 mm, profondeur de forage jusqu'à 30 m",Equipment,General,Heures machine,90.85,90.85,90.85,90.85,1,EUR,69.19,0.7615,13,13,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri MERI-RI-KASA-MEKA,Plaques d'isolation thermique à base de roches basaltiques,Abstract Material,General,m3,322.45,322.45,322.45,322.45,1,EUR,1297.7,4.0246,13,13,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes en acier inoxydable à tr KARI-RI-KASA-KAPU_RIKANEKA,"Gravier de roches denses pour travaux de construction M 1000, fraction 10-20 mm",Material,General,m3,63.5,63.5,63.5,63.5,1,EUR,1294.15,20.3815,13,13,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE PONTS ET DE SOUS-PONT,CONSTRUCTION DE PONTS MEKA-RI-KARI-KASA_MEKAMESA,"Feuilles laminées à froid en cuivre de marques M2 et M3, épaisseur 0,2-6,0 mm",Material,General,t,31518.71,31518.71,31518.71,31518.71,1,EUR,13396.76,0.5667,13,13,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX KAME-LI-MELI-KADX_MERIRIME,"Foret guide en acier, acier de marque R6M5F3, diamètre 12 mm, longueur 106 mm",Material,General,pièce,306.18,306.18,306.18,306.18,1,EUR,83.37,0.2723,13,13,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS RITO-SA-KAME-KAVO_KAKAMEPU,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 426 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,123.49,123.49,123.49,123.49,1,EUR,551.72,4.4677,13,13,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-MEME_KADXKA,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 50-100 mm, pression jusqu'à 1,2 MPa",Equipment,General,Heures machine,33.25,33.25,33.25,33.25,1,EUR,855.18,25.7162,13,13,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-TO-KAME-KANE_MEKARIPU,Lubrifiant (liquide) pour le graissage des coffrages,Material,General,kg,15.57,15.57,15.57,15.57,1,EUR,358.2,23.0062,13,13,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE STANDARD (ALIMENTATION EN BÉTON À L'AIDE,Construction de dalles en béton armé DXME-METO-KATO_SAKAVO,"Véhicules semi-passagers, capacité de charge jusqu'à 2 t",Equipment,General,Heures machine,13.94,13.94,13.94,13.94,1,EUR,37.87,2.7162,13,13,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES KALI-RI-KATO-KAPU,Armatures et fermes,Abstract Material,General,t,4913.48,4913.48,4913.48,4913.48,1,EUR,491348.27,100.0,13,13,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,ROBINETTERIE DXME-RIME-MEKA_KAKANE,Marteaux à percussion fonctionnant à partir de stations de compression fixes,Equipment,General,Heures machine,1.34,1.34,1.34,1.34,1,EUR,2.43,1.8131,13,13,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,FIXATIONS PERMANENTES DES PUITS VERTICAUX ET DES PUITS DE SECTEUR CIRCULAIRE ET RISA-ME-KATO-KANE_KAKAMEME,"Rondelles élastiques à double spire, diamètre du trou M22",Material,General,t,3550.91,3550.91,3550.91,3550.91,1,EUR,913.35,0.2577,13,13,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES ÉLÉMENTS DE LA SUPERSTRUCTURE DE LA VOIE KAME-ME-KARI-KASA_KAKANEME,"Garnitures imprégnées d'amiante à mailles traversantes, carrées, marque AP-31, taille 4-5 mm",Material,General,t,28659.43,28659.43,28659.43,28659.43,1,EUR,44.35,0.0,13,13,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) DXME-KARI-KASA_KAMEME,"Installations pour l'enfoncement de pieux, force d'enfoncement 92 t",Equipment,General,Heures machine,38.29,38.29,38.29,38.29,1,EUR,23.36,0.61,13,13,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KASA_KAMEME,"Électricité : consommation 16,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.12,2.12,2.12,2.12,1,EUR,1.29,0.61,13,13,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-TO-KAVO-KARI_MEMEKARI,"Cornière en acier laminée à chaud à ailes égales, acier de nuance 09G2S, 12G2S, largeur des ailes 100-125 mm, épaisseur des ailes 6-16 mm",Material,General,t,1384.73,1384.73,1384.73,1384.73,1,EUR,72.96,0.0523,13,13,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-MELI-KATO_KARIME,"Fours de chauffage mobiles au diesel, capacité du réservoir 0,5 m3",Equipment,General,Heures machine,4.16,4.16,4.16,4.16,1,EUR,95.29,22.9054,13,13,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de MEPU-SA-KAME-KASA_KAKAMEKA,"Mastic polyuréthane (mousse de montage) universel, volume 750 ml",Material,General,pièce,7.25,7.25,7.25,7.25,1,EUR,34.88,4.8146,13,13,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de KAME-LI-RIKA-KAVO_KAMERITO,"Serviette non pelucheuse sèche, dimensions 110 x 210 mm",Material,General,pièce,0.03,0.03,0.03,0.03,1,EUR,0.79,30.1538,13,13,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE ME_MEKAKA_LISA,"Décharge moyenne 7,5",Labor,Labor,heures,24.42,24.42,24.42,24.42,1,EUR,214.15,8.7708,13,13,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE RIRI-RI-KARI-KALI_KAKASARI,"Structures en acier, grillage (adaptateurs, tables pour pieux vissés), poids jusqu'à 0,1 t",Material,Steel & Metal,t,4669.75,4669.75,4669.75,4669.75,1,EUR,0.0,0.0,13,13,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,BARREAUX EN ACIER POUR FONDATIONS SUR PIEUX VISÉS SOUS PILIERS EN ACIER VL 35-50 KAME-LI-MESA-MEPU_KAKATOTO,"Vis autotaraudeuses en acier avec revêtement anticorrosion, à tête fraisée et fente en croix, filetage à double pas, pointues, diamètre 4,2 mm, longueur 25 mm",Material,General,1000 pièces,39.16,39.16,39.16,39.16,1,EUR,107.7,2.75,13,13,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE CIMENT MINÉRAL RE",Installation de cloisons en plaques minérales renforcées de ciment à l'intérieur KAME-TO-KASA-TOVO_KAMEVOME,Polyester (composant),Material,General,kg,4.78,4.78,4.78,4.78,1,EUR,1.55,0.3254,13,13,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIPU-TO-KAPU-KADX,Manchons en tissu polymère,Abstract Material,General,m,1165.01,1165.01,1165.01,1165.01,1,EUR,128150.92,110.0,13,13,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des canalisations d'égout à l'aide de gaines en polymère et en tissu RISA-ME-KATO-KANE_KAKATOME,"Rondelles élastiques à une spire, version 1, diamètre du trou M22",Material,General,t,4917.41,4917.41,4917.41,4917.41,1,EUR,519.78,0.1713,13,13,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE DE VOIES SUR LES PONTS KAME-LI-MESA-MERI_KAKAMEPU,"Goujon fileté en acier, diamètre du filetage M10, longueur 2000 mm",Material,General,pièce,2.07,2.07,2.07,2.07,1,EUR,9.34,4.5077,13,13,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KAPU_KAKADXTO,"Suspensions en acier galvanisé droites pour la fixation d'un plafond suspendu au profilé, dimensions du profilé 60 x 27 mm, longueur de la suspension 300 mm, épaisseur 0,7 mm",Material,General,100 pièces,33.05,33.05,33.05,33.05,1,EUR,61.1,1.8485,13,13,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple en profilés de plafond av KAME-LI-MESA-MEKA_KAKASALI,"Agrafes en acier galvanisé pour fixation à distance, diamètre de fixation 33,5 mm",Material,General,kg,154.05,154.05,154.05,154.05,1,EUR,217.8,1.4138,13,13,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'un système d'égouts dans les bâtiments temporaires à usage réside KAME-LI-MESA-KANE_KAMESAME,Clous renforcés,Material,General,kg,2.39,2.39,2.39,2.39,1,EUR,46.29,19.3615,13,13,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MONTAGE DE FOURS À PARTIR D'ÉLÉMENTS PRÉFABRIQUÉS À HAUT DEGRÉ DE FINITION EN US,Montage de fours à partir d'éléments préfabriqués à haut degré de finition MEPU-ME-KASA-KATO_KAKAMERI,"Colle phénol-polyvinylacétal, marque BF-2",Material,General,t,14630.04,14630.04,14630.04,14630.04,1,EUR,27.46,0.01,13,13,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'un système d'égouts dans les bâtiments temporaires à usage réside DXME-MEDX-MERI_SARISA,"Stations hydrauliques, pression maximale 150 bars, puissance 10 kW",Equipment,General,Heures machine,3.76,3.76,3.76,3.76,1,EUR,7.83,2.0842,12,12,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p RIPU-TO-KASA-RIKA,Raccords de ventilation en polyéthylène pour conduites de gaz,Abstract Material,General,pièce,1387.38,1387.38,1387.38,1387.38,1,EUR,1387.38,1.0,12,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-RIME-MEDX_KAPUKA,"Machines pour le rainurage de tuyaux en acier, diamètre des tuyaux 25-300 mm",Equipment,General,Heures machine,0.66,0.66,0.66,0.66,1,EUR,0.86,1.3167,12,12,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES SUR RACCORDS DÉTACHABLES,Pose de conduites en tubes d'acier sur des raccords à manchons démontables sans RISA-RI-KAME-MEVO_KAKAPUNE,"Fixation pour branche ancrée en acier avec pince de fixation en bronze, dimensions 70 x 47 x 41,5 mm, longueur de la tige principale 1800 mm",Material,General,pièce,254.09,254.09,254.09,254.09,1,EUR,804.62,3.1667,12,12,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX MEME-TO-KATO-MESA,Fixations en plastique pour assurer la couche protectrice du béton,Abstract Material,General,100 pièces,4.04,3.84,4.1,4.1,2,EUR,503.29,122.748,12,12,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Renforcement des chapes DXME-KASA-KARI_KAKATO,"Électricité : consommation 17,42 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.24,2.24,2.24,2.24,1,EUR,3.23,1.445,12,12,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu DXME-KANE-KASA_KAMETO,"Chariots élévateurs à fourche, capacité de charge 2 t",Equipment,General,Heures machine,12.44,12.44,12.44,12.44,1,EUR,19.58,1.5733,12,12,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-PU-KAME-KANE_MEKASARI,"Couronne en carbure pour le forage de colonnes dans des roches de dureté moyenne CM5, diamètre 151 mm",Material,General,pièce,19.48,19.48,19.48,19.48,1,EUR,8.87,0.455,12,12,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES RIKA-RI-KAVO-KALI_KAKALIRI,"Agrafes à une patte galvanisées, diamètre 8 mm, hauteur 10 mm, longueur 23 mm",Material,General,10 pièces,3.44,3.44,3.44,3.44,1,EUR,4.73,1.375,12,12,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,COMMUNICATIONS TÉLÉPHONIQUES OPÉRATIONNELLES MEPU-SA-KADX-KALI_KAKATORI,Solvant R-5,Material,General,t,4090.42,4090.42,4090.42,4090.42,1,EUR,46.93,0.055,12,12,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS DXME-RIME-RIRI_MEVONE,"Électricité : consommation 1,24 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.16,0.16,0.16,0.16,1,EUR,0.33,2.135,12,12,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Revêtement des puits avec des segments en polyéthylène KANE-ME-KAME-KAME,Pierres céramiques ou silicatées de parement,Abstract Material,General,1000 pièces,990.26,990.26,990.26,990.26,1,EUR,75.75,0.0767,12,12,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,Maçonnerie des murs extérieurs en briques et pierres céramiques ou silicatées av DXME-RIME-MEDX_KAPUKA,"Électricité : consommation 0,36 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.06,1.3167,12,12,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES SUR RACCORDS DÉTACHABLES,Pose de conduites en tubes d'acier sur des raccords à manchons démontables sans DXME-RIME-RIRI_LIKATO,"Marteaux perforateurs hydrauliques, diamètre des trous forés 25-50 mm",Equipment,General,Heures machine,1.67,1.67,1.67,1.67,1,EUR,3.47,2.0842,12,12,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p DXME-KANE-KANE_KASANE,"Ascenseurs de mine pour le revêtement de tuyaux industriels, hauteur 120 m",Equipment,General,Heures machine,65.6,65.6,65.6,65.6,1,EUR,720.31,10.9808,12,12,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES DES CONDUITES DE MINERAI AVEC DES BLOCS DE DIABASE KAME-PU-KARI-KAPU_MEMERIRI,"Tige de forage hexagonale en acier, taille de l'hexagone 28 mm, queue filetée R32, filetage extérieur R25, longueur 4305 mm",Material,General,pièce,614.28,614.28,614.28,614.28,1,EUR,82.79,0.135,12,12,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES À BARRES POUR EXPLOITATIONS HORIZONTALES ET INCLINÉES ET C MEVO-ME-MEKA-MEKA_KAKAKAME,"Robinet de laboratoire à une corne, diamètre 10 mm",Material,General,pièce,15.69,15.69,15.69,15.69,1,EUR,15.69,1.0,12,12,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, DXME-RIME-RIRI_MEVONE,"Stations de plâtrage, débit jusqu'à 85 l/min",Equipment,General,Heures machine,1.48,1.48,1.48,1.48,1,EUR,3.17,2.135,12,12,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Revêtement des puits avec des segments en polyéthylène MEPU-SA-KADX-METO_KAMEKATO,Éther éthylique technique,Material,General,kg,9.38,9.38,9.38,9.38,1,EUR,25.78,2.7483,12,12,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,CAOUTCHOUTAGE (REVÊTEMENT AVEC DES FEUILLES DE CAOUTCHOUC ET DES MÉLANGES DE CAO,Gommage à partir de solutions DXME-MERI-KAVO_MERIME,"Niveleuses à longue base (sans tracteur), largeur de travail 4,5 m",Equipment,General,Heures machine,4.19,4.19,4.19,4.19,1,EUR,9.54,2.2775,12,12,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D KAPU-ME-KARI-KARI_KAMELIRI,"Mélanges de béton lourd (BST) pour ouvrages hydrauliques sur gravier concassé, classe B30, F(1)75, W4",Material,General,m3,166.44,166.44,166.44,166.44,1,EUR,2.07,0.01,12,12,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KARI-TO-KAME-KALI_KAKAKAPU,Sable de quartz LPK-5,Material,General,kg,0.08,0.08,0.08,0.08,1,EUR,561.59,5757.67,12,12,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KATO-KANE_KASARI,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,22.79,35.8433,12,12,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES KALI-RI-KANE-KAPU,"Structures et pièces de fixation pour panneaux muraux multicouches (ancrages, équerres, vis, cales)",Abstract Material,Steel & Metal,compl,10.15,6.92,10.98,10.98,3,EUR,1515.51,138.611,12,12,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-KATO-KANE_KASARI,Transbordeurs à bande électriques,Equipment,General,Heures machine,40.22,40.22,40.22,40.22,1,EUR,1441.75,35.8433,12,12,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES DXME-KADX-MEPU_KANEME,Dispositifs à vis pour le réglage des joints et des jeux des voies ferrées,Equipment,General,Heures machine,0.11,0.11,0.11,0.11,1,EUR,4.62,40.5633,12,12,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MESA-MEPU_KAMELIPU,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 8 mm, longueur 100 mm",Material,General,t,3345.9,3345.9,3345.9,3345.9,1,EUR,18.93,0.03,12,12,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-ME-KARI-MEKA_MEKAMEPU,"Chrysotile (amiante chrysotile), groupe 3, marques 3-75, 3-70, 3-60, 3-50",Material,General,t,1802.19,1802.19,1802.19,1802.19,1,EUR,113.54,0.0625,12,12,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mastic bitumineux à partir de carreaux RISA-RI-KAME-KANE_MEKAMERI,"Pince pivotante en acier pour la fixation du câble porteur sur une tige tubulaire horizontale de la console d'un diamètre de 60 mm, dimensions 120 x 165 mm",Material,General,pièce,188.83,188.83,188.83,188.83,1,EUR,166.61,0.8833,12,12,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT DXME-MELI-KAPU_KAPUNE,"Électricité : consommation 0,22 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.08,2.8533,12,12,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-MELI-KAPU_KAPUNE,Appareils à commande manuelle pour le soudage bout à bout de tuyaux en plastique d'un diamètre allant jusqu'à 160 mm,Equipment,General,Heures machine,0.65,0.65,0.65,0.65,1,EUR,1.86,2.8533,12,12,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE MEVO-SA-METO-KAME,Conduites avec manchons,Abstract Material,General,m,24.04,24.04,24.04,24.04,1,EUR,1217.78,50.6567,12,12,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage en tuyaux d'acier non galvanisés pour le transpor DXME-MEVO-KAME_KAKASA,"Compresseurs à moteur à combustion interne sur châssis de type automobile, pression jusqu'à 9,8 MPa (100 atm), débit jusqu'à 9 m3/min",Equipment,General,Heures machine,76.68,76.68,76.68,76.68,1,EUR,3370.18,43.95,12,12,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES MONOLITHES DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À L'AIDE ,Montage d'un coffrage à poutres et traverses à panneaux de grande taille avec fa DXME-MELI-KAPU_KAKAME,"Soudeuses automatiques pour revêtements polymères, puissance 4,6 kW",Equipment,General,Heures machine,1.54,1.54,1.54,1.54,1,EUR,22.63,14.7217,12,12,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates monocouches en membranes PVC sur une base prête DXME-KASA-KARI_KAMEKA,"Électricité : consommation 157,08 kWh/machine-heure",Electricity,Electricity,Heures machine,20.18,20.18,20.18,20.18,1,EUR,545.14,27.02,12,12,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES KAVO-TO-MERI-KAPU,Laminés étirés à chaud,Abstract Material,General,t,1789.27,1789.27,1789.27,1789.27,1,EUR,81.23,0.046,12,12,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Fabrication de structures métalliques DXME-KASA-KARI_KAMEKA,"Grues à portique, capacité de charge 250 t",Equipment,General,Heures machine,478.34,478.34,478.34,478.34,1,EUR,12924.68,27.02,12,12,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES DXME-MELI-KAPU_KAKAME,"Électricité : consommation 1,52 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.2,0.2,0.2,0.2,1,EUR,2.87,14.7217,12,12,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates monocouches en membranes PVC sur une base prête DXME-KARI-KARI_KAKATO,Agrégats de concassage sans marteau diesel sur base d'excavatrice avec une capacité de godet de 1 m3,Equipment,General,Heures machine,64.29,64.29,64.29,64.29,1,EUR,74.52,1.1592,12,12,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEKA-KAPU_SALIRI,"Machines électriques à projection centrifuge pour le revêtement de la surface intérieure des tuyaux, diamètre des tuyaux 800-1200 mm",Equipment,General,Heures machine,10.93,10.93,10.93,10.93,1,EUR,58.79,5.3808,12,12,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des conduites à l'aide de composés ciment-polymère par projection cen DXME-MEKA-KAPU_SALIRI,"Électricité : consommation 1,04 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.13,0.13,0.13,0.13,1,EUR,0.72,5.3808,12,12,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des conduites à l'aide de composés ciment-polymère par projection cen DXME-KARI-KASA_KASARI,"Électricité : consommation 7,43 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.95,0.95,0.95,0.95,1,EUR,10.22,10.7167,12,12,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Fixation du sol par cimentation par jet à l'aide de pieux verticaux en béton DXME-MEVO-KAME_KAMEKA,"Compresseurs à moteur à combustion interne sur châssis de type automobile, pression jusqu'à 9,8 MPa (100 atm), débit jusqu'à 40 m3/min",Equipment,General,Heures machine,203.06,203.06,203.06,203.06,1,EUR,9250.54,45.5567,12,12,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Essai pneumatique (à l'air) de conduites d'un diamètre nominal de 100 à 1400 mm DXME-MERI-KAVO_SAMENE,"Broyeurs automoteurs à chenilles, puissance 205 kW (279 ch)",Equipment,General,Heures machine,203.2,203.2,203.2,203.2,1,EUR,3445.67,16.9567,12,12,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS KAME-LI-MELI-KANE_KAMEKAPU,"Cercle plat découpé, dimensions 400 x 4 x 32 mm",Material,General,pièce,8.54,8.54,8.54,8.54,1,EUR,11.06,1.2942,12,12,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier KAVO-TO-MERI-KAME_MEMEKAKA,"Poutres en I spéciales, nuance d'acier St3ps, St3sp, n° 18M-24M",Material,General,t,1965.63,1965.63,1965.63,1965.63,1,EUR,1445.39,0.7358,12,12,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Déplacement longitudinal des structures en acier à voie unique des ponts sur une DXME-RIKA-MERI_KAMESA,Électricité : consommation 278 kW·h/machine-heure,Electricity,Electricity,Heures machine,35.71,35.71,35.71,35.71,1,EUR,64.72,1.8125,12,12,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-SA-KARI-KARI_KAKARIDX,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 40 mm, épaisseur de paroi 3 mm",Material,Pipes & Fittings,m,3.53,3.53,3.53,3.53,1,EUR,0.46,0.1308,12,12,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS RITO-SA-KAME-KAVO_KAKAMEVO,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 426 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,203.87,203.87,203.87,203.87,1,EUR,6977.33,34.225,12,12,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KASA-TO-KARI-KAVO,Pièces moulées à l'unité,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,12,12,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment (chapiteaux, bases, pommeaux, corniches, conso" MEPU-SA-MEME-KARI_KAMEKASA,"Mastic à faible retrait, résistant à l'eau, pour façades",Material,General,t,2722.32,2722.32,2722.32,2722.32,1,EUR,18.78,0.01,12,12,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE DES FAÇADES À PARTIR D'ÉCHELLES OU DE PLATEAUX KAPU-TO-KAME-KARI,Composition décorative minérale ou polymère-minérale,Abstract Material,General,t,3367.54,3367.54,3367.54,3367.54,1,EUR,1150.58,0.3417,12,12,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,TRAVAUX DÉCORATIFS KAME-LI-MESA-MEPU_KAKANEME,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, filetage à double pas, pointues, diamètre 3,5 mm, longueur 45 mm",Material,General,t,3343.0,3343.0,3343.0,3343.0,1,EUR,7.23,0.01,12,12,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de plinthes MEME-RI-METO-KANE,Boucliers d'inventaire,Abstract Material,General,m2,17.9,17.9,17.9,17.9,1,EUR,1428.09,79.7875,12,12,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL KAME-LI-KALI-RINE_KAKARINE,"Cordon en mousse de polyéthylène thermo-isolant et d'étanchéité, section ronde continue, densité 25-40 kg/m3, diamètre 30 mm",Material,General,100 m,16.18,16.18,16.18,16.18,1,EUR,7.82,0.4833,12,12,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un conduit à déchets avec un tube en acier résistant à la corrosi DXME-KAPU-KARI_KARIPU,"Électricité : consommation 15,68 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.01,2.01,2.01,2.01,1,EUR,48.21,23.9467,12,12,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE KAME-LI-MESA-MEPU_KAKAPUNE,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, pointues, diamètre 3,5 mm, longueur 55 mm",Material,General,100 pièces,1.47,1.47,1.47,1.47,1,EUR,35.81,24.3333,12,12,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-KAPU-KARI_KARIPU,Installations de forage horizontal avec convoyeur à vis sans fin pour tubes de 1700 mm de diamètre,Equipment,General,Heures machine,20.44,20.44,20.44,20.44,1,EUR,489.36,23.9467,12,12,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE MEVO-ME-KADX-KAME_KAKAMESA,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 300 mm",Material,General,pièce,6220.94,6220.94,6220.94,6220.94,1,EUR,8812.99,1.4167,12,12,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS DXME-RIME-RIRI_PUNEME,Filtres-presses,Equipment,General,Heures machine,1.6,1.6,1.6,1.6,1,EUR,7.17,4.4883,12,12,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-KATO-KASA_KAMEPU,Combines d'abattage pour galeries d'une section de 9 à 25 m2,Equipment,General,Heures machine,113.61,113.61,113.61,113.61,1,EUR,1499.28,13.1967,12,12,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,PASSAGE DE COMBINES DANS DES GALERIES HORIZONTALES ET INCLINÉES JUSQU'À 13 DEGRÉ DXME-KARI-KASA_KASARI,"Ensembles de machines pour la réalisation de pieux en béton-sol selon la technologie de cimentation par jet à un composant, profondeur de forage jusqu'à 70 m",Equipment,General,Heures machine,271.34,271.34,271.34,271.34,1,EUR,2907.86,10.7167,12,12,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Fixation du sol par cimentation par jet à l'aide de pieux verticaux en béton DXME-KATO-KASA_KAMEPU,"Électricité : consommation 206,8 kW·h/machine-heure",Electricity,Electricity,Heures machine,26.56,26.56,26.56,26.56,1,EUR,350.52,13.1967,12,12,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,PASSAGE DE COMBINES DANS DES GALERIES HORIZONTALES ET INCLINÉES JUSQU'À 13 DEGRÉ MEPU-RI-KANE-KATO_KASAMEPU,Liquide hydrophobe organosilicié à base de solution aqueuse,Material,General,t,4024.45,4024.45,4024.45,4024.45,1,EUR,18.85,0.01,12,12,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une étanchéité à base d'un composé polymère-ciment d'une épaisseu MEDX-PU-KARI-KATO,Silencieux tubulaires,Abstract Material,General,pièce,84.9,84.9,84.9,84.9,1,EUR,84.9,1.0,12,12,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de silencieux pour les installations de ventilation à section tubul DXME-RIME-RIRI_PUNEME,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,0.76,4.4883,12,12,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-RIKA-MERI_KAKARI,"Projectiles hydromoteurs à éjecteur et dragues pour le creusement de tranchées sous-marines, capacité de 70 m3/h pour les sols",Equipment,General,Heures machine,32.6,32.6,32.6,32.6,1,EUR,156.41,4.7975,12,12,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" DXME-KARI-KAPU_KARIME,"Électricité : consommation 29,7 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.81,3.81,3.81,3.81,1,EUR,4.21,1.1042,12,12,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KAPU_KARIME,"Installation pour la mise en place de pieux forés à base d'une excavatrice avec une capacité de godet de 2,5 m3 pour le forage de puits d'un diamètre jusqu'à 1,7 m",Equipment,General,Heures machine,103.6,103.6,103.6,103.6,1,EUR,114.4,1.1042,12,12,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KASA-KARI_KAKATO,"Grues à portique, capacité de charge 12,5 t",Equipment,General,Heures machine,31.54,31.54,31.54,31.54,1,EUR,45.57,1.445,12,12,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KAVO-RI-KARI-KATO_KAKARIME,"Câble à double torsion LK-O, structure 6 x 19 (1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 7,8 mm",Material,Steel & Metal,10 m,13.58,13.58,13.58,13.58,1,EUR,12.69,0.9342,12,12,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment MEPU-RI-KANE-KATO_KASARIRI,Liquide organosilicié PFMS-4,Material,General,kg,126.72,126.72,126.72,126.72,1,EUR,307.35,2.6464,12,12,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) DXME-RIKA-MERI_KAMESA,"Propulseurs électriques flottants, débit 200 m3/h, pression 50-63 m",Equipment,General,Heures machine,96.27,96.27,96.27,96.27,1,EUR,174.48,1.8125,12,12,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KAPU-KAME_KAKARINE,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 125 mm, diamètre extérieur 133 mm, épaisseur de paroi 8,0 mm",Material,General,pièce,12.6,12.6,12.6,12.6,1,EUR,92.41,7.3333,12,12,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT DE L'INDUSTRIE CHIMIQUE FORESTIÈRE,"Appareils à colonnes en titane (colonnes de rectification, pré-condenseurs, extr" MEME-ME-KAME-METO,Parquet en lames,Abstract Material,General,m2,36.8,36.8,36.8,36.8,1,EUR,1919.7,52.1683,12,12,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en parquet, parquet mosaïque, parquet massif sans veines" DXME-KAVO-KATO_KAPUDX,"Rouleaux vibrants lisses automoteurs, poids 14 t",Equipment,General,Heures machine,60.02,60.02,60.02,60.02,1,EUR,92.04,1.5333,12,12,TRAVAUX DE CONSTRUCTION,Routes automobiles,COUCHES DE BASE ET DE NIVELLEMENT DE LA FONDATION ET DU REVÊTEMENT,"FONDATIONS ET REVÊTEMENTS EN GRAVIER, SABLE-GRAVIER ET GRAVIER-SABLE" RISA-RI-KAME-MEVO_KAKATOSA,Fixation de l'isolateur suspendu du câble porteur sur le côté extérieur de la courbe pour console tubulaire,Material,General,pièce,88.01,88.01,88.01,88.01,1,EUR,176.02,2.0,12,12,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,REMPLACEMENT DES CÂBLES ET TRANSFERT DES SUSPENSIONS DE CONTACT EXISTANTES ET DE RIKA-RI-KARI-KARI_KAKAMETO,"Capuchons-bouchons 2""",Material,General,10 pièces,95.13,95.13,95.13,95.13,1,EUR,627.86,6.6,12,12,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE KAME-PU-KAME-KANE_KAMENEPU,"Couronne de forage à broche pour marteaux hydrauliques et machines de forage rotatif à percussion, filetage intérieur R25, diamètre 33 mm",Material,General,pièce,119.19,119.19,119.19,119.19,1,EUR,244.93,2.055,12,12,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES À BARRES POUR EXPLOITATIONS HORIZONTALES ET INCLINÉES ET C KATO-RI-KARI-KASA,Liant inorganique,Abstract Material,General,t,238.79,238.79,238.79,238.79,1,EUR,0.0,0.0,12,12,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS INORGANIQUES KAVO-TO-KAME-KARI_KAMEMEKA,"Poutrelles à ailes parallèles, acier de nuance C345-C440, n° 10B-18B",Material,General,t,1770.72,1770.72,1770.72,1770.72,1,EUR,4547.81,2.5683,12,12,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RITO-TO-KASA-KAME,"Tubes en acier sans soudure, formés à froid, en acier résistant à la corrosion",Abstract Material,Pipes & Fittings,m,55.65,55.65,55.65,55.65,1,EUR,5626.07,101.1,12,12,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" MEME-RI-KAME-KAPU,Blocs de portes de balcon,Abstract Material,General,m2,207.28,207.28,207.28,207.28,1,EUR,20728.17,100.0,12,12,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" DXME-KAPU-KARI_KATORI,"Installations de forage dirigé pour la pose sans tranchée, force de traction 500 kN",Equipment,General,Heures machine,299.18,299.18,299.18,299.18,1,EUR,235.1,0.7858,12,12,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE RIKA-ME-KARI-RIKA_KAKAKAME,Ancrages à câble,Material,General,100 pièces,213.2,213.2,213.2,213.2,1,EUR,19.93,0.0933,12,12,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-MESA-MEPU_KAKAPUTO,"Vis autotaraudeuses en acier oxydé à tête demi-ronde et fente en croix, pointues, diamètre 3,5 mm, longueur 11 mm",Material,General,100 pièces,0.6,0.6,0.6,0.6,1,EUR,1.69,2.8367,12,12,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons et revêtement des murs à l'aide de panneaux à base de p RITO-SA-KARI-KARI_KAKATOTO,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 57 mm, épaisseur de paroi 3 mm",Material,Pipes & Fittings,m,5.29,5.29,5.29,5.29,1,EUR,171.99,32.5333,12,12,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ MEPU-RI-KAPU-KAPU_KAMEKAME,Polyisocyanate,Material,General,kg,5.09,5.09,5.09,5.09,1,EUR,0.67,0.1325,12,12,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES MEPU-RI-KAPU-KAPU_KAKAKAME,Lapromol,Material,General,kg,7.08,7.08,7.08,7.08,1,EUR,0.07,0.0125,12,12,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES MEME-ME-KATO-KASA_KAKADXSA,"Planche non sciée en bois feuillu (tilleul), humidité naturelle, longueur 2-6,5 m, toutes largeurs, épaisseur 45 mm et plus, classe II",Material,General,m3,1126.03,1126.03,1126.03,1126.03,1,EUR,20262.98,17.995,12,12,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES MEVO-ME-KASA-KAME,Vannes,Abstract Material,General,pièce,2073.56,2073.56,2073.56,2073.56,1,EUR,2073.56,1.0,12,12,TRAVAUX DE CONSTRUCTION,Canalisations internes,RACCORDS DE TUYAUTERIE À BRIDE,Installation de soupapes de sécurité MEPU-SA-KARI-KARI_KAMEKATO,"Mastic à base de liants silicatés et de charges minérales, universel",Material,General,kg,1.46,1.46,1.46,1.46,1,EUR,27.59,18.8333,12,12,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE VITRERIE,VITRAGE DES CHÂSSIS DE BÂTIMENTS INDUSTRIELS KAME-TO-KAME-KALI_KAKAKALI,Alcool éthylique rectifié à partir de matières premières alimentaires,Material,General,kg,44.57,44.57,44.57,44.57,1,EUR,425.3,9.5417,12,12,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX KAVO-TO-KAPU-KAME_MEKARIPU,"Fil machine en acier au carbone, nuance d'acier St3sp, St3ps, diamètre 5-9 mm",Material,General,t,1306.61,1306.61,1306.61,1306.61,1,EUR,314.45,0.9633,12,12,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-LI-MEME-KAPU_KAMERIME,"Fil à souder SvAK5M, diamètre 1,2 mm",Material,General,t,11809.19,11809.19,11809.19,11809.19,1,EUR,115.73,0.0133,12,12,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS KARI-RI-KASA-KAPU_RIMEKAVO,"Gravier de roches denses pour travaux de construction M 1000, fraction 40-80(70) mm",Material,General,m3,62.47,62.47,62.47,62.47,1,EUR,2996.71,47.9667,12,12,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Installation et démontage de voies de roulement pour grues à tour à partir d'élé KASA-ME-KANE-KAPU,Panneaux de plancher alvéolaires,Abstract Material,General,pièce,83.49,83.49,83.49,83.49,1,EUR,8348.98,100.0,12,12,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",PANNEAUX DE PLANCHERS ET DE TOITURES KAME-TO-KAPU-KANE_KAKAKANE,Huile transformatrice TKP,Material,General,kg,3.24,3.24,3.24,3.24,1,EUR,170.76,52.75,12,12,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Filetage de la tuyauterie lors de la réparation des systèmes en service DXME-METO-KATO_KATOME,Camionnettes-ateliers de type KUNG,Equipment,General,Heures machine,32.05,32.05,32.05,32.05,1,EUR,2056.2,64.1617,12,12,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des systèmes d'évacuation des eaux usées internes à l'aide de manch KAME-LI-KANE-MEPU_KAKATONE,"Bandes thermo-isolantes à base de caoutchouc mousse avec une couche adhésive sur une face pour l'étanchéification des joints d'isolation thermique en rouleau, couleur grise, largeur 50 mm, épaisseur 3 mm",Material,General,m,1.68,1.68,1.68,1.68,1,EUR,198.33,117.9225,12,12,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS RIPU-RI-KANE-KAPU,Manchons en chrysolitciment,Abstract Material,General,pièce,12.5,12.5,12.5,12.5,1,EUR,2566.37,205.35,12,12,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX EN CHRYSOTILCIMENT SANS PRESSION DXME-KAPU-KAME_KADXTO,Hydrorotateurs (foreuses hydrauliques) sur chenilles d'une masse maximale de 35 t,Equipment,General,Heures machine,86.77,86.77,86.77,86.77,1,EUR,926.15,10.6733,12,12,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À LA VIS MEME-RI-KARI-KAME,Blocs de porte,Abstract Material,General,m2,203.26,203.26,203.26,203.26,1,EUR,16972.31,83.5,12,12,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" MEME-ME-KARI-KARI_KAKAKAME,"Bois de chauffage coupé en morceaux de 1 mètre maximum (bouleau, hêtre, frêne, orme, chêne, mélèze, érable, charme)",Material,General,m3,235.13,235.13,235.13,235.13,1,EUR,942.13,4.3709,12,12,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Remplissage avec une masse de fond en charbon DXME-KAME-KARI_KARIME,Niveleuses tractées de type moyen,Equipment,General,Heures machine,3.98,3.98,3.98,3.98,1,EUR,36.94,9.2858,12,12,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D MEDX-RI-KATO-KADX,Grilles de ventilation,Abstract Material,General,m2,53.97,23.24,392.02,23.24,2,EUR,3794.13,19.0,12,12,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-KALI-MELI_KAKAKAME,"Aérosil, marque A-175",Material,General,t,21730.02,21730.02,21730.02,21730.02,1,EUR,4.4,0.0,12,12,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic époxy METO-RI-KATO-KAME_KAKAMEME,Pierres de taille,Material,General,m3,93.33,93.33,93.33,93.33,1,EUR,2387.86,25.5842,12,12,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RINE-ME-KARI-KAPU_KAKAKANE,"Cale en polymère pour sous-couche, type « Métro » R50, allongée, dimensions 380 x 160 mm",Material,General,pièce,10.89,10.89,10.89,10.89,1,EUR,19808.72,1819.1833,12,12,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MERI-RI-KATO-MESA_KAKAMEME,Feutre élastique en laine minérale sur liant synthétique,Material,General,m3,114.25,114.25,114.25,114.25,1,EUR,17.52,0.1533,12,12,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,"PLACES DE SOUS-SOL, INTER-ÉTAGES, GRENIERS ET PANNEAUX" KAPU-TO-KARI-KADX_MEKAKANE,"Mélanges secs pour béton, sans retrait, à prise rapide, contenant des fibres polymères et des fibres d'acier rigides, pour la réparation d'éléments en béton et en béton armé de ponts, de pistes d'aérodromes et de revêtements routiers soumis à des charges dynamiques et à des chocs, granulométrie 10 mm",Material,General,kg,2.54,2.54,2.54,2.54,1,EUR,223.93,88.0133,12,12,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS MEPU-PU-KAME-KADX_KAPURIVO,Apprêt protecteur contenant du zinc,Material,General,t,8887.93,8887.93,8887.93,8887.93,1,EUR,506.83,0.0756,12,12,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques KASA-TO-KAME-KAVO,Pièces moulées à l'unité,Abstract Material,General,pièce,171.43,171.43,171.43,171.43,1,EUR,171.43,1.0,12,12,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,Installation de pièces en plâtre sur des colonnes DXME-RIME-RIRI_SAVOVO,"Pompes à membrane haute pression, débit 2,5 l/min",Equipment,General,Heures machine,3.05,3.05,3.05,3.05,1,EUR,3.96,1.2973,11,11,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE KAME-LI-KANE-KANE_KAKAKASA,"Rubans adhésifs à base de papier, largeur 50 mm",Material,General,m,0.08,0.08,0.08,0.08,1,EUR,11.56,139.6355,11,11,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MENE-RI-KAME-KATO_KAKAMEME,Tourbe,Material,General,m3,34.96,34.96,34.96,34.96,1,EUR,1466.63,41.9545,11,11,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAVO-ME-KARI-KALI,"Éléments supplémentaires de la toiture en tôle métallique : solins, faîtières, noues, corniches et planches d'extrémité, bouchons, etc.",Abstract Material,General,pièce,22.43,22.43,22.43,22.43,1,EUR,1828.0,81.5,11,11,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures en tôle ondulée DXME-RIME-RIRI_SAVOVO,"Électricité : consommation 0,26 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.05,1.2973,11,11,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE KAME-LI-MESA-MEKA_KAKANETO,"Agrafe métallique de gréement, droite, type d'agrafe CA32, charge admissible 3,2 t",Material,General,pièce,37.21,37.21,37.21,37.21,1,EUR,740.19,19.8927,11,11,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE TRAVERSÉE EN BÉTON ARMÉ DE PONTS POUR UNE VOIE FERROVIAIRE KAME-VO-KAME-KANE_KAKAKAME,"Treillis en fibre de verre renforcé pour façade, dimensions des mailles 4 x 4 mm, densité superficielle 165 g/m2",Material,General,m2,1.16,1.16,1.16,1.16,1,EUR,118.94,102.9791,11,11,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAVO-ME-KARI-RIKA_KAKARIRI,Cordes intermédiaires 28-2/2a,Material,General,t,4993.86,4993.86,4993.86,4993.86,1,EUR,162.75,0.0336,11,11,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE DÉFLECTION DES INSTALLATIONS FLUVIALES,Installation de dispositifs anti-chocs pour les installations d'amarrage fluvial DXME-RIME-MESA_KARIRI,"Électricité : consommation 0,28 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.04,0.04,0.04,0.04,1,EUR,0.02,0.5736,11,11,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-KAME-KARI_KAKAME,"Niveleuses lourdes, puissance 135 kW (184 ch)",Equipment,General,Heures machine,94.74,94.74,94.74,94.74,1,EUR,281.05,2.9664,11,11,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-RIME-MESA_KARIRI,"Scies à ruban avec scie à ruban pivotante électrique, vitesse de déplacement du ruban 80 m/min",Equipment,General,Heures machine,0.25,0.25,0.25,0.25,1,EUR,0.15,0.5736,11,11,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAVO-PU-KATO-KATO_KAKARIVO,"Acier d'armature laminé à chaud à profil périodique, classe A-II, diamètre supérieur à 45 mm",Material,General,t,1339.36,1339.36,1339.36,1339.36,1,EUR,65.02,0.0589,11,11,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,SILOS PRÉFABRIQUÉS ET MONOLITHIQUES ET SILOS POUR LE STOCKAGE DE MATÉRIAUX EN VR RIRI-RI-KAME-KAVO,Isolateurs linéaires suspendus à plateau,Abstract Material,General,t,177.09,177.09,177.09,177.09,1,EUR,0.0,0.0,11,11,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" KAME-LI-KANE-KAME_KAKAPUME,Bandes élastiques autocollantes pour profilés de guidage 30 x 30000 mm,Material,General,m,0.15,0.15,0.15,0.15,1,EUR,15.71,105.6364,11,11,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-KAVO-KANE_KAMEME,"Coupeurs de joints dans le béton durci, automoteurs, profondeur de coupe maximale 480 mm, puissance 62 kW (84 ch)",Equipment,General,Heures machine,56.87,56.87,56.87,56.87,1,EUR,447.29,7.8655,11,11,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES KAVO-TO-KATO-KAPU_KAKASAKA,"Fil noir, diamètre 3 mm",Material,General,t,2055.38,2055.38,2055.38,2055.38,1,EUR,27.01,0.026,11,11,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTION D'ENTREPRISES DE STOCKAGE ET DE TRANSFORMATION DE CÉRÉALES,Montage de structures pour les installations de stockage et de transformation du RIRI-RI-KARI-KALI_KAKASAPU,"Structures en acier pour grillage (poutres pour pieux vissés), poids supérieur à 0,1 t",Material,Steel & Metal,t,4393.83,4393.83,4393.83,4393.83,1,EUR,0.0,0.0,11,11,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,BARREAUX EN ACIER POUR FONDATIONS SUR PIEUX VISÉS SOUS PILIERS EN ACIER VL 35-50 KAME-LI-MESA-KANE_KAKASAME,Clous de finition,Material,General,t,2266.35,2266.35,2266.35,2266.35,1,EUR,1.54,0.0,11,11,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,AUTRES CONSTRUCTIONS DXME-KAVO-KANE_KAKARI,"Fendeuses de joints, profondeur de coupe maximale 150 mm, puissance 4 kW (6 ch)",Equipment,General,Heures machine,1.65,1.65,1.65,1.65,1,EUR,2.16,1.3073,11,11,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MESA-MEME_KAKARINE,Rondelles carrées,Material,General,100 pièces,30.34,30.34,30.34,30.34,1,EUR,1.38,0.0455,11,11,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV RISA-RI-KAME-MEVO_KAKAMENE,"Fixation articulée droite tubulaire en acier avec une fixation tubulaire courbée supplémentaire en aluminium de 1 200 mm de long et une pince de fixation de 70 x 47 x 41,5 mm, longueur du support de la fixation supplémentaire 230 mm, diamètre de la tige principale 50 mm, longueur de la tige principale 600 mm",Material,General,pièce,363.76,363.76,363.76,363.76,1,EUR,979.67,2.6927,11,11,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-MEVO_KAKAMETO,"Fixation articulée droite tubulaire en acier avec deux fixations tubulaires courbées supplémentaires en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du montant de la fixation supplémentaire 230 mm, diamètre de la tige principale 50 mm, longueur de la tige principale 600 mm",Material,General,pièce,547.17,547.17,547.17,547.17,1,EUR,1473.63,2.6927,11,11,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX MEKA-RI-KARI-KALI_KAMEKADX,"Fil de laiton L68, rond, rigide, précision normale, diamètre 0,50 mm",Material,General,t,42795.21,42795.21,42795.21,42795.21,1,EUR,21.4,0.0,11,11,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-KAME-KASA_MEKASA,"Pelles hydrauliques à godet unique diesel sur châssis pneumatique, volume du godet 0,5 m3",Equipment,General,Heures machine,43.69,43.69,43.69,43.69,1,EUR,296.43,6.7845,11,11,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de dispositifs de déversement d'eau à partir de la chaussée à l'aid DXME-KANE-KASA_KAPUME,"Chariots télescopiques, capacité de charge jusqu'à 3 t, hauteur de levage jusqu'à 16 m",Equipment,General,Heures machine,41.1,41.1,41.1,41.1,1,EUR,1871.56,45.5345,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KALI-KANE_KAKASA,"Installations électriques pour la préparation de la boue de forage, volume du réservoir 22 m3",Equipment,General,Heures machine,14.99,14.99,14.99,14.99,1,EUR,503.64,33.5891,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KALI-KANE_KAKASA,"Électricité : consommation 34,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.43,4.43,4.43,4.43,1,EUR,148.82,33.5891,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KALI-KANE_KAMETO,"Conteneurs avec mélangeurs pour le stockage de la boue de forage, volume du réservoir 40 m3",Equipment,General,Heures machine,9.18,9.18,9.18,9.18,1,EUR,898.29,97.8182,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KALI-KANE_KAMETO,"Électricité : consommation 14,04 kWh/machine-heure",Electricity,Electricity,Heures machine,1.8,1.8,1.8,1.8,1,EUR,176.45,97.8182,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KALI-KANE_KAMESA,"Systèmes centraux de nettoyage grossier de la boue de forage, équipés d'un réservoir d'une capacité de 10 m3, surface de travail des tamis jusqu'à 6 m2",Equipment,General,Heures machine,12.18,12.18,12.18,12.18,1,EUR,397.06,32.6073,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KAME-KASA_MERILI,"Électricité : consommation 836,55 kWh/machine-heure",Electricity,Electricity,Heures machine,107.45,107.45,107.45,107.45,1,EUR,254.65,2.37,11,11,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE DXME-KAME-KASA_MERILI,"Pelles électriques à godet unique avec équipement de travail « dragline », capacité du godet 13 m3",Equipment,General,Heures machine,2582.75,2582.75,2582.75,2582.75,1,EUR,6121.12,2.37,11,11,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE MEPU-PU-KAPU-KAVO,Émail,Abstract Material,General,kg,3628.81,3560.51,3810.96,3560.51,2,EUR,124299.8,42.6678,11,11,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE RIKA-RI-KAVO-KASA_KAKARIRI,"Profilé de montage perforé, dimensions 35 x 7,5 x 2000 mm",Material,General,pièce,7.32,7.32,7.32,7.32,1,EUR,165.22,22.5836,11,11,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV RISA-RI-KAME-MEVO_KAKAMEKA,"Fixation articulée droite tubulaire en aluminium avec deux fixations tubulaires courbées supplémentaires en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du support de la fixation supplémentaire 230 mm, diamètre de la tige principale 70 mm, longueur de la tige principale 600 mm",Material,General,pièce,835.13,835.13,835.13,835.13,1,EUR,2249.16,2.6927,11,11,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KAME-ME-KARI-KAME_KAKAKATO,"Asbotechnostolit en feuilles de marque A, B, G, épaisseur 5-20 mm",Material,General,kg,52.41,52.41,52.41,52.41,1,EUR,267.37,5.1018,11,11,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV DXME-MEDX-KANE_KAMENE,"Électricité : consommation 9,9 kWh/machine-heure",Electricity,Electricity,Heures machine,1.27,1.27,1.27,1.27,1,EUR,161.52,127.0109,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE RISA-RI-KAME-MEVO_KAKAMERI,"Fixation articulée droite tubulaire en aluminium avec une fixation tubulaire courbée supplémentaire en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du montant de la fixation supplémentaire 230 mm, diamètre de la tige principale 55 mm, longueur de la tige principale 600 mm",Material,General,pièce,587.08,587.08,587.08,587.08,1,EUR,1581.1,2.6927,11,11,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KAME-LI-MESA-MEME,Rondelles élastiques,Abstract Material,General,t,1534.98,1.02,5625.53,1.02,2,EUR,3.45,0.0,11,11,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-MEKA,Agrafes de montage,Abstract Material,General,kg,14.47,4.06,40.74,4.06,3,EUR,34.82,3.1444,11,11,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" DXME-MEDX-KANE_KAMENE,"Pompes centrifuges horizontales à console pour boues, débit 100 m3/h, pression jusqu'à 32 m",Equipment,General,Heures machine,3.33,3.33,3.33,3.33,1,EUR,422.61,127.0109,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KAPU-KAME_MERIKA,"Installations de forage équipées d'un moteur à vis sans fin sur châssis automobile, profondeur de forage jusqu'à 1 200 m, diamètre de forage jusqu'à 1 200 mm, charge admissible sur le crochet jusqu'à 500 kN (50 t)",Equipment,General,Heures machine,484.87,484.87,484.87,484.87,1,EUR,16588.12,34.2118,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE RIKA-RI-KARI-KAME_KAKAMELI,"Douilles en polypropylène, diamètre 82 mm",Material,General,1000 pièces,264.46,264.46,264.46,264.46,1,EUR,5.36,0.0209,11,11,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS KASA-ME-KALI-RISA,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,429.27,429.27,429.27,429.27,1,EUR,42927.12,100.0,11,11,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MARCHES D'ESCALIER ET PLATEAUX KASA-ME-KASA-MESA,Fondations de type à godets,Abstract Material,General,pièce,541.42,541.42,541.42,541.42,1,EUR,54122.07,99.9636,11,11,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,FONDATIONS ET POUTRES DE FONDATION KAME-LI-MESA-MEPU_KAKADXME,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, pointues, diamètre 6 mm, longueur 30 mm",Material,General,kg,3.41,3.41,3.41,3.41,1,EUR,19.32,5.6682,11,11,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" RITO-VO-KAME-METO_KAKAKAME,"Raccords universels démontables avec écrou-raccord, droits, avec filetage intérieur et extérieur, taille 1 1/2""",Material,General,10 pièces,460.17,460.17,460.17,460.17,1,EUR,129.68,0.2818,11,11,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT POUR STATIONS-SERVICE KASA-ME-KALI-KADX,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,651.17,650.84,654.44,650.84,2,EUR,65146.54,100.0455,11,11,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MARCHES D'ESCALIER ET PLATEAUX KAVO-TO-KASA-KAPU,Coupure coupe-feu,Abstract Material,General,m2,7412.82,7327.72,8263.8,7327.72,2,EUR,13554.79,1.8382,11,11,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MERI-ME-KARI-KATO,"Matériau en rouleau bitume-polymère pour toiture et étanchéité, autocollant",Abstract Material,General,m2,9.49,9.49,9.49,9.49,1,EUR,1765.65,186.0309,11,11,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Dispositif d'étanchéité DXME-RIME-KADX_KAKAME,"Marteaux électriques à riveter, puissance 0,4 kW",Equipment,General,Heures machine,0.13,0.13,0.13,0.13,1,EUR,8.25,63.3291,11,11,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES MÉTALLURGIQUES À PORTIC RITO-TO-KANE-KASA_KAKAKASA,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 40 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,5.26,5.26,5.26,5.26,1,EUR,17.21,3.2709,11,11,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE DXME-KALI-KARI_KAMEPU,"Pompes à béton automotrices, débit 170 m3/h",Equipment,General,Heures machine,118.37,118.37,118.37,118.37,1,EUR,6766.14,57.1627,11,11,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é KAME-LI-MESA-MEPU_KATOKAME,"Vis autotaraudeuses en acier à tête demi-ronde et fente en croix, pointues, diamètre 4,8 mm, longueur 70 mm",Material,General,100 pièces,11.02,11.02,11.02,11.02,1,EUR,29.16,2.6455,11,11,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates monocouches en membranes PVC sur une base prête KAME-LI-KALI-KAPU_KAKAKATO,Dispersion (émulsion) de polyvinylacétate homopolymère à dispersion grossière non plastifiée,Material,General,t,3552.9,3552.9,3552.9,3552.9,1,EUR,76.55,0.0367,11,11,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES MEME-TO-KATO-MENE,Armature composite,Abstract Material,General,m,2.85,0.73,8.51,0.73,2,EUR,850.52,100.0,11,11,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation d'éléments d'armature lors de la construction de structures en béto DXME-MEVO-KARI_KAKARI,"Électricité : consommation 36,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.66,4.66,4.66,4.66,1,EUR,17.73,3.8027,11,11,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-RIKA-MEME_KAMERI,"Pontons de déchargement, capacité de charge 10 t",Equipment,General,Heures machine,0.78,0.78,0.78,0.78,1,EUR,2.27,2.9264,11,11,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-MEVO-KARI_KAKARI,"Stations de compression, pression 981 kPa (10 atm), débit 20 m3/min",Equipment,General,Heures machine,8.27,8.27,8.27,8.27,1,EUR,31.46,3.8027,11,11,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEPU-SA-KAPU-KAME,"Mastic polymère, hydrofuge, anticorrosion, biostable, à base de caoutchouc butyle",Abstract Material,General,kg,4.77,4.22,4.83,4.83,2,EUR,388.49,80.3845,11,11,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Imperméabilisation des murs et des fondations RIKA-RI-MEKA-KATO_KAKAKAPU,"Embouts de câble en cuivre, section du conducteur 16 mm2, diamètre de l'ouverture 8 mm",Material,General,100 pièces,48.28,48.28,48.28,48.28,1,EUR,3.08,0.0636,11,11,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Installation d'un poste de contrôle et de mesure (PCM) KAME-LI-MESA-KALI_MEKASANE,"Clous à cheville en acier galvanisé avec rondelle, diamètre 4,5 mm, longueur 30-60 mm",Material,General,t,7103.03,7103.03,7103.03,7103.03,1,EUR,26.86,0.01,11,11,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation d'un système de joints de dilatation à partir de structures profilé KALI-TO-KARI-KATO,Structures de ponts en acier,Abstract Material,Steel & Metal,m3,6961.55,6961.55,6961.55,6961.55,1,EUR,282638.77,40.6,11,11,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE DXME-KANE-KATO_KALIME,"Stations de levage, capacité de charge jusqu'à 0,5 t",Equipment,General,Heures machine,0.02,0.02,0.02,0.02,1,EUR,0.21,9.0609,11,11,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Maçonnerie des conduits de cheminées industrielles en briques DXME-KASA-MEPU_KAMEME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.58,9.0609,11,11,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Maçonnerie des conduits de cheminées industrielles en briques DXME-KASA-MEPU_KAMEME,"Grues à flèche, capacité de charge 0,5 t",Equipment,General,Heures machine,0.66,0.66,0.66,0.66,1,EUR,5.96,9.0609,11,11,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Maçonnerie des conduits de cheminées industrielles en briques DXME-MELI-KAPU_RIRIRI,"Installations mobiles pour le soudage automatique de tuyaux à partir de centrales électriques mobiles, diamètre des tuyaux 600-800 mm",Equipment,General,Heures machine,53.71,53.71,53.71,53.71,1,EUR,798.85,14.8727,11,11,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE TUBES EN SECTION SUR UNE BASE DE SOUDAGE DE TUBES,Soudage de tuyaux de type LST-PAU KAME-LI-KALI-MEDX_KAKAMEME,Produit nettoyant (solution),Material,General,l,5.12,5.12,5.12,5.12,1,EUR,18.1,3.5391,11,11,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAVO-ME-KARI-KANE_KAKAPUTO,"Trappe ronde en fonte lourde, charge nominale 250 kN, diamètre du passage 600 mm",Material,General,pièce,223.15,223.15,223.15,223.15,1,EUR,223.15,1.0,11,11,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KAVO-TO-KATO-KASA,"Fil d'acier à faible teneur en carbone à usage multiple, galvanisé, d'un diamètre de 2,5 mm",Abstract Material,General,kg,2052.38,2011.14,2056.5,2056.5,2,EUR,1145.47,0.557,11,11,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Fixation de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de disposi KADX-RI-KATO-KAME,Profilés en aluminium pour la fixation des panneaux,Abstract Material,General,pièce,11.96,8.47,16.15,8.47,2,EUR,998.72,61.8333,11,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS UTILISANT DES PLAQUES DE CIMENT-COPEAUX,CLOISONS SUR OSSATURE EN BOIS RITO-ME-KARI-KANE_KAMEKAME,"Colliers de serrage en plastique, largeur 10 mm, longueur 300 mm",Material,General,100 pièces,29.74,29.74,29.74,29.74,1,EUR,15.18,0.51,11,11,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER CARBONÉ ET FAIBLEMENT ALLIÉ MEPU-PU-KAPU-KADX_KAKAMEKA,"Émail HV-110, coloré",Material,General,t,4717.26,4717.26,4717.26,4717.26,1,EUR,404.53,0.0864,11,11,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,CONDUITES TECHNOLOGIQUES D'ATELIER,CONDUITES EN TUBES D'ACIER ALLIÉ ET HAUTEMENT ALLIÉ KAME-LI-KALI-RIDX_KAKAKAME,Film aluminisé,Material,General,kg,21.37,21.37,21.37,21.37,1,EUR,53.55,2.5055,11,11,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,CONDUITES TECHNOLOGIQUES D'ATELIER,CONDUITES EN TUBES D'ACIER ALLIÉ ET HAUTEMENT ALLIÉ DXME-KADX-METO_KAMEME,"Machines de soudage des rails sur voie, équipées d'appareils pour le traitement thermique et le meulage des joints soudés",Equipment,General,Heures machine,967.74,967.74,967.74,967.74,1,EUR,2712.32,2.8027,11,11,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS DXME-RIME-MELI_KAMEME,Pneumo-perforateurs pour le remplacement sans tranchée de tuyaux d'un diamètre allant jusqu'à 250 mm lors du fonctionnement à partir d'installations de compression mobiles,Equipment,General,Heures machine,2.36,2.36,2.36,2.36,1,EUR,206.18,87.3573,11,11,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ADDUCTION D'EAU PAR DES MÉ,Destruction souterraine de l'ancienne canalisation à l'aide d'un perforateur pne KARI-RI-KAPU-KAME_KAKAKATO,Ballast sableux,Material,General,m3,30.68,30.68,30.68,30.68,1,EUR,365.33,11.9073,11,11,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL RITO-TO-KATO-KARI_KAKALIDX,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 108 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,49.25,49.25,49.25,49.25,1,EUR,893.68,18.1455,11,11,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Essai hydraulique préliminaire des conduites d'un diamètre nominal de 100 à 1400 MEPU-SA-KANE-KATO_KAKAKAME,Pâte VNIINP-232,Material,General,kg,90.71,90.71,90.71,90.71,1,EUR,422.71,5.126,11,11,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de MEME-RI-KAPU-KANE_KAKAMERI,"Bande de plâtre, longueur 1000 mm, largeur 19-22 mm, épaisseur 3-4 mm",Material,General,1000 pièces,193.03,193.03,193.03,193.03,1,EUR,217.6,1.1273,11,11,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de conduits de ventilation avec ouverture manuelle individuelle des KAME-VO-KAME-KANE_KAKAKANE,"Treillis de renfort en fibre de verre, densité de la base 9 fils/cm, densité de la trame 8 fils/cm, densité superficielle 160-170 g/m2",Material,General,m2,1.32,1.32,1.32,1.32,1,EUR,71.27,53.9836,11,11,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Réalisation d'une isolation latérale des murs et des fondations à l'aide de méla DXME-RIME-RIRI_PUTOLI,Installations mobiles de purification d'huile (centrifugeuses),Equipment,General,Heures machine,6.08,6.08,6.08,6.08,1,EUR,38.4,6.32,11,11,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT HYDROÉLECTRIQUE,TURBINES HYDRAULIQUES RITO-SA-KAME-KAVO_KAKATORI,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 630 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,241.51,241.51,241.51,241.51,1,EUR,6968.65,28.8545,11,11,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-SA-KAME-KAVO_KAKARIPU,"Tubes en acier électrosoudés à joint droit et à joint spiralé, classe de résistance K38, diamètre extérieur 530 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,190.18,190.18,190.18,190.18,1,EUR,5575.53,29.3173,11,11,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-TO-KATO-KARI_KAMELITO,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 325 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,191.36,191.36,191.36,191.36,1,EUR,6112.18,31.94,11,11,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac METO-RI-KAME-KASA,Plaques de revêtement en dolomite,Abstract Material,General,m2,15.98,15.98,15.98,15.98,1,EUR,1572.08,98.3636,11,11,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-RIME-RIRI_PUTOLI,"Électricité : consommation 11,22 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.44,1.44,1.44,1.44,1,EUR,9.11,6.32,11,11,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT HYDROÉLECTRIQUE,TURBINES HYDRAULIQUES RITO-VO-KAPU-KANE_KAKALIRI,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 100 mm, diamètre extérieur 108 mm, épaisseur de paroi 4 mm",Material,General,pièce,14.33,14.33,14.33,14.33,1,EUR,117.81,8.2182,11,11,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ KAME-LI-RIKA-KAVO_KAKALIRI,Corde à trois brins en fils de nylon,Material,General,t,15413.29,15413.29,15413.29,15413.29,1,EUR,13.1,0.0,11,11,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES EN PLASTIQUE ME_MEKAKA_METO,"Décharge moyenne 1,3",Labor,Labor,heures,12.63,12.63,12.63,12.63,1,EUR,1548.68,122.5936,11,11,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS RITO-SA-KARI-KARI_KAKALISA,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 159 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,25.93,25.93,25.93,25.93,1,EUR,2440.97,94.1536,11,11,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ KAPU-RI-KARI-KAME_KAMEVOPU,Mélanges d'asphalte coulé à chaud LA11 NN sur PBV,Material,General,t,310.12,310.12,310.12,310.12,1,EUR,30.0,0.0982,11,11,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"PUITS D'INSPECTION, PUITS DE RÉCEPTION DES EAUX PLUVIALES ET PUITS DE DRAINAGE" DXME-MERI-KALI_KARIME,Semoirs traînés,Equipment,General,Heures machine,7.28,7.28,7.28,7.28,1,EUR,5.76,0.7909,11,11,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"TRAVAUX PRÉPARATOIRES, TERRASSEMENT ET AGROTECHNIQUES" MEME-ME-KARI-KARI_KAKAKATO,"Bois coupé en 2 groupes (pin, aulne), longueur jusqu'à 1 m",Material,General,m3,78.91,78.91,78.91,78.91,1,EUR,10.83,0.2143,11,11,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-KALI-MEME_KAMESA,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,41.09,64.6364,11,11,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é DXME-KALI-MEME_KAMESA,"Flèches de distribution de béton hydrauliques auto-élévatrices, portée de flèche 32 m",Equipment,General,Heures machine,27.95,27.95,27.95,27.95,1,EUR,1806.53,64.6364,11,11,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é KAME-LI-MEME-KANE_KAKAKAPU,Flux AN-348-A,Material,General,kg,3.44,3.44,3.44,3.44,1,EUR,14.26,4.1482,11,11,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAME-LI-MESA-KASA,"Écrou bombé en acier avec revêtement en zinc thermodiffusé, pour tige d'ancrage, classe de résistance 8,8",Abstract Material,General,pièce,3079.9,18.47,4227.93,4227.93,2,EUR,867.92,47.0,11,11,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-NE-KAPU-KASA,Toile pour plafond tendu avec rebord en PVC (harpon),Abstract Material,General,m2,1.93,0.62,5.43,0.62,2,EUR,0.0,0.0,11,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KARI-TO-KAME-KAVO_KAKAKAME,Sable de verre expansé M 600,Material,General,m3,33.92,33.92,33.92,33.92,1,EUR,1968.67,58.0455,11,11,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation de béton léger DXME-KALI-KANE_KAMELI,"Séparateurs hydrocyclones à tamis pour le nettoyage de la boue de forage, avec réservoir d'une capacité de 10 m3, débit de boue de forage jusqu'à 65 l/s",Equipment,General,Heures machine,12.7,12.7,12.7,12.7,1,EUR,414.08,32.6073,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KALI-KANE_KAMELI,"Électricité : consommation 1,52 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.2,0.2,0.2,0.2,1,EUR,6.36,32.6073,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAVO-ME-KARI-MELI_KAKATOTO,"Grillage métallique simple en fil de fer non revêtu à mailles carrées, diamètre du fil 1,6 mm, taille des mailles 20 x 20 mm",Material,General,m2,4.4,4.4,4.4,4.4,1,EUR,38.1,8.6618,11,11,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-KALI-KANE_KAMESA,"Électricité : consommation 2,51 kWh/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,10.5,32.6073,11,11,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAME-LI-MEDX-MEME_MEKAKAKA,Tube d'injection en polyéthylène de densité moyenne pour ancrages au sol à fil,Material,Pipes & Fittings,m,2.43,2.43,2.43,2.43,1,EUR,117.58,48.4,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri MEVO-RI-KADX-KAPU,Séparateur de graisse,Abstract Material,General,compl,30244.34,30244.34,30244.34,30244.34,1,EUR,30244.34,1.0,10,10,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,AUTRES TRAVAUX,ÉLÉMENTS DES INSTALLATIONS D'ÉGOUT MERI-RI-KATO-MEME,Tissu de verre,Abstract Material,General,1000 m2,6.84,4.0,8.05,8.05,2,EUR,361.85,90.53,10,10,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité RIKA-ME-KAME-KAME,Pinces d'ancrage,Abstract Material,General,100 pièces,63.37,20.14,128.22,20.14,2,EUR,2.56,0.02,10,10,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" KATO-ME-KARI-KARI,Chaux,Abstract Material,General,t,348.89,348.89,348.89,348.89,1,EUR,499.79,1.4325,10,10,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES RISA-RI-KAME-MEME_KAKAKAME,Chape fourchue pour piston KS-007,Material,General,pièce,25.54,25.54,25.54,25.54,1,EUR,192.55,7.538,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-KANE_MEKAMETO,"Pince en bronze pour la fixation articulée du câble à ressort et de la corde oblique au câble porteur, dimensions 64 x 30 mm",Material,General,pièce,24.09,24.09,24.09,24.09,1,EUR,893.12,37.08,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX MEDX-TO-KAME-KADX,Clapets anti-retour,Abstract Material,General,pièce,214.18,214.18,214.18,214.18,1,EUR,214.18,1.0,10,10,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations MERI-RI-KAPU-MERI_KAKASATO,"Tapis techniques, largeur 1 000 mm, épaisseur 25 mm",Material,General,m,23.56,23.56,23.56,23.56,1,EUR,461.69,19.6,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT POUR CERTAINES PRODUCTIONS DE L'INDUSTRIE CHIMIQUE,ÉQUIPEMENT POUR LA PRODUCTION D'AMMONIAC DXME-METO-KAME_SARIVO,"Machines de marquage automotrices à commande manuelle pour l'application de ruban polymère, vitesse de travail jusqu'à 6 km/h",Equipment,General,Heures machine,26.53,26.53,26.53,26.53,1,EUR,89.15,3.36,10,10,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-RIME-KALI_KAKARI,Machines à poncer le parquet,Equipment,General,Heures machine,0.52,0.52,0.52,0.52,1,EUR,4.53,8.671,10,10,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en parquet, parquet mosaïque, parquet massif sans veines" DXME-RIME-KALI_KAKARI,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.81,8.671,10,10,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en parquet, parquet mosaïque, parquet massif sans veines" KAME-LI-KANE-MEME_MEKAKARI,"Bandes d'étanchéité à base de caoutchouc synthétique pour façades ventilées suspendues, épaisseur 1 mm, largeur 36 mm",Material,General,10 m,5.87,5.87,5.87,5.87,1,EUR,116.14,19.78,10,10,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RISA-RI-KAME-MEVO_KAKAMESA,"Fixation articulée droite tubulaire en acier avec deux fixations tubulaires courbées supplémentaires en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du support de la fixation supplémentaire 150 mm, diamètre de la tige principale 50 mm, longueur de la tige principale 600 mm",Material,General,pièce,523.21,523.21,523.21,523.21,1,EUR,1497.69,2.862,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-KAVO-KADX_SAKARI,"Compacteurs à essence, puissance jusqu'à 4 kW",Equipment,General,Heures machine,1.47,1.47,1.47,1.47,1,EUR,9.31,6.327,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",COMPACTAGE DU SOL RISA-RI-KAME-MEVO_KAKAKADX,"Fixation articulée droite tubulaire en aluminium avec une fixation tubulaire courbée supplémentaire en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du montant de la fixation supplémentaire 150 mm, diamètre de la tige principale 55 mm, longueur de la tige principale 600 mm",Material,General,pièce,563.38,563.38,563.38,563.38,1,EUR,1612.69,2.862,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX MEDX-PU-KARI-KARI,Silencieux tubulaires,Abstract Material,General,pièce,196.75,196.75,196.75,196.75,1,EUR,196.75,1.0,10,10,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de silencieux pour les installations de ventilation tubulaires de t KASA-ME-KAPU-KARI,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,849.44,849.44,849.44,849.44,1,EUR,84944.21,100.0,10,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" RISA-RI-KAME-MEVO_KAKAMEPU,"Fixation articulée droite tubulaire en acier avec une fixation tubulaire courbée supplémentaire en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du montant de la fixation supplémentaire 150 mm, diamètre de la tige principale 50 mm, longueur de la tige principale 600 mm",Material,General,pièce,336.65,336.65,336.65,336.65,1,EUR,963.66,2.862,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KASA-ME-KAPU-MERI,Panneaux de cloisonnement en béton armé,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,2009.22,100.0,10,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" RIPU-TO-KATO-KATO,Tuyaux en polyéthylène à double couche profilés,Abstract Material,General,m,44.03,44.03,44.03,44.03,1,EUR,4512.62,102.5,10,10,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX EN POLYÉTHYLÈNE SANS PRESSION KASA-ME-KAPU-MESA,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,104.08,104.08,104.08,104.08,1,EUR,10408.26,100.0,10,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS DXME-KASA-KAME_KARILI,"Grues à tour mobiles, capacité de charge 8 t",Equipment,General,Heures machine,39.91,39.91,39.91,39.91,1,EUR,43.38,1.087,10,10,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES DE BÂTIMENTS INDUSTRIELS À UN OU PLUSIEURS ÉTAGES DXME-KASA-KAME_KARILI,"Électricité : consommation 8,12 kWh/machine-heure",Electricity,Electricity,Heures machine,1.04,1.04,1.04,1.04,1,EUR,1.13,1.087,10,10,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES DE BÂTIMENTS INDUSTRIELS À UN OU PLUSIEURS ÉTAGES DXME-KANE-KASA_KASAVO,"Chargeuses frontales universelles à godet unique, pneumatiques, capacité nominale du godet principal 3,8 m3, capacité de charge 7 t",Equipment,General,Heures machine,68.1,68.1,68.1,68.1,1,EUR,102.5,1.505,10,10,TRAVAUX DE CONSTRUCTION,Routes automobiles,COUCHES DE BASE ET DE NIVELLEMENT DE LA FONDATION ET DU REVÊTEMENT,COUCHES DE SOUS-COUCHE ET DE NIVELLEMENT DE LA FONDATION RIKA-ME-KARI-MEKA_KAKATOPU,"Suspension triangulaire galvanisée à chaud, longueur 400 mm, dimensions du support de la traverse rigide du réseau de contact 450 x 700 mm",Material,General,pièce,44.28,44.28,44.28,44.28,1,EUR,189.09,4.27,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE DXME-MEDX-KAPU_KAKARI,"Électricité : consommation 16,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.12,2.12,2.12,2.12,1,EUR,2.64,1.247,10,10,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS DXME-MEDX-KAPU_KAKARI,"Pompes de forage pour l'injection de fluide de lavage, débit jusqu'à 32 m3/h, pression jusqu'à 400 m",Equipment,General,Heures machine,4.71,4.71,4.71,4.71,1,EUR,5.88,1.247,10,10,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS KASA-ME-KAPU-MEKA,Blocs de socle,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,2009.22,100.0,10,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" DXME-KAVO-KASA_KASASA,"Machines du complexe de pose de béton à haut rendement, finisseurs à coffrages glissants",Equipment,General,Heures machine,262.44,262.44,262.44,262.44,1,EUR,1394.58,5.314,10,10,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES MEDX-TO-KATO-KATO,Filtres à air,Abstract Material,General,pièce,24065.64,24065.64,24065.64,24065.64,1,EUR,24065.64,1.0,10,10,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de filtres à air (secs) MEDX-TO-KATO-KAPU,Filtres à air,Abstract Material,General,pièce,26.94,26.94,26.94,26.94,1,EUR,26.94,1.0,10,10,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de filtres à air à mailles (à huile) KASA-ME-KASA-KALI,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,1278.83,1278.83,1278.83,1278.83,1,EUR,127882.87,100.0,10,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","Poutres, traverses, lisses" RIKA-RI-KAME-KANE_KAKAKASA,"Douilles de câble en cuivre étamé pour sertissage, pour raccordement bout à bout de fils et câbles avec conducteurs en cuivre d'une section de 25 mm2, diamètre intérieur 7 mm",Material,General,100 pièces,93.16,93.16,93.16,93.16,1,EUR,129.49,1.39,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" RIKA-RI-KAME-KAVO_KAKAKARI,"Manchons avec isolation thermorétractable, section 1,5-2,5 mm2",Material,General,100 pièces,108.07,108.07,108.07,108.07,1,EUR,7.78,0.09,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" DXME-MEDX-KAPU_KAKADX,Électricité : consommation 198 kW·h/machine-heure,Electricity,Electricity,Heures machine,25.43,25.43,25.43,25.43,1,EUR,1763.19,69.332,10,10,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAVO-TO-KADX-KAME,Tôle ondulée galvanisée,Abstract Material,General,m2,20.54,18.53,21.4,21.4,2,EUR,2068.47,111.65,10,10,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHIQUES DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À ,Montage de coffrages permanents pour dalles en béton armé à partir de planchers RISA-RI-KAME-MEVO_KAKAKAVO,"Fixation articulée droite tubulaire en aluminium avec deux fixations tubulaires courbées supplémentaires en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du support de la fixation supplémentaire 150 mm, diamètre de la tige principale 55 mm, longueur de la tige principale 600 mm",Material,General,pièce,787.84,787.84,787.84,787.84,1,EUR,2255.2,2.862,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-KAPU-KARI_KATOTO,"Installations de forage dirigé pour la pose sans tranchée, force de traction 1000 kN",Equipment,General,Heures machine,409.55,409.55,409.55,409.55,1,EUR,468.11,1.143,10,10,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KASA-TO-KARI-KAME,Pièces moulées à l'unité,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,10,10,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment (chapiteaux, bases, pommeaux, corniches, conso" KAVO-PU-KATO-KATO_KAKATOTO,"Acier d'armature laminé à chaud à profil périodique, classe A-III, diamètre 14 mm",Material,General,t,1492.37,1492.37,1492.37,1492.37,1,EUR,60611.03,40.614,10,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,SILOS PRÉFABRIQUÉS ET MONOLITHIQUES ET SILOS POUR LE STOCKAGE DE MATÉRIAUX EN VR MEPU-PU-KAME-MEDX_KAKAKAME,Apprêt HS-04,Material,General,t,3814.19,3814.19,3814.19,3814.19,1,EUR,59.73,0.02,10,10,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE DES FAÇADES À PARTIR D'ÉCHELLES OU DE PLATEAUX MEPU-PU-KATO-KASA_KAKAMENE,Vernis organosilicié thermorésistant KO-916,Material,General,kg,38.68,38.68,38.68,38.68,1,EUR,33.86,0.876,10,10,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAVO-ME-KARI-KAME,Entonnoirs,Abstract Material,General,pièce,12.0,10.61,24.5,10.61,2,EUR,709.47,50.5,10,10,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de siphons DXME-MEKA-KAPU_KARITO,Machines d'isolation pour tuyaux d'un diamètre allant jusqu'à 150 mm,Equipment,General,Heures machine,6.69,6.69,6.69,6.69,1,EUR,38.7,5.781,10,10,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX MENE-RI-KARI-KALI_KAMENEME,Graines de gazon (mélange urbain),Material,General,kg,6.2,6.2,6.2,6.2,1,EUR,184.76,29.7778,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES RILI-RI-KATO-KARI_KAKAKASA,"Fixateur en acier peint articulé droit, type FP-2, longueur 1400 mm",Material,General,pièce,115.63,115.63,115.63,115.63,1,EUR,526.23,4.551,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RITO-SA-KAME-KAVO_KAKASATO,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 820 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,599.67,599.67,599.67,599.67,1,EUR,6192.34,12.9075,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-SA-KAME-KAVO_KAKAPUSA,"Tubes en acier électrosoudés à soudure droite et spirale, classe de résistance K38, diamètre extérieur 720 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,514.39,514.39,514.39,514.39,1,EUR,10557.06,34.2033,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RILI-RI-KATO-KARI_KAKAKATO,"Fixation articulée inversée en acier peinte, type FOI-2, longueur 3200 mm",Material,General,pièce,215.35,215.35,215.35,215.35,1,EUR,1303.06,6.051,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-NE-KATO-KATO,Revêtements de sol en moquette,Abstract Material,General,m2,23.77,23.77,23.77,23.77,1,EUR,2424.27,102.0,10,10,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en relina et de moquettes KASA-TO-KAME-KAME,Pièces moulées à l'unité,Abstract Material,General,pièce,90.26,90.26,90.26,90.26,1,EUR,90.26,1.0,10,10,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,Installation de pièces en plâtre sur des colonnes RISA-RI-KAME-MEVO_KAKAKAME,"Support de fixation articulée inversée KS-118, peint",Material,General,pièce,24.43,24.43,24.43,24.43,1,EUR,157.57,6.451,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-MEVO_KAKAKATO,"Support de fixation droite articulée KS-117, en fonte, peint",Material,General,pièce,29.76,29.76,29.76,29.76,1,EUR,135.42,4.551,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-KAME-KASA_KANERI,"Pelles pour travaux souterrains, capacité du godet 1,2 m3",Equipment,General,Heures machine,72.07,72.07,72.07,72.07,1,EUR,357.99,4.967,10,10,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KAME-KASA_KANERI,"Électricité : consommation 18,15 kWh/machine-heure",Electricity,Electricity,Heures machine,2.33,2.33,2.33,2.33,1,EUR,11.58,4.967,10,10,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RIPU-RI-KAME-KARI,Tuyaux d'égout en céramique,Abstract Material,General,m,362.66,362.66,362.66,362.66,1,EUR,36556.54,100.8,10,10,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX D'ÉGOUT EN CÉRAMIQUE KAME-LI-MESA-MEPU_KAKARIME,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, filetage à double pas, pointues, diamètre 3,9 mm, longueur 25 mm",Material,General,100 pièces,0.93,0.93,0.93,0.93,1,EUR,27.0,29.084,10,10,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES DXME-KAPU-KAME_MEKARI,"Installations de forage à vis sans fin sur châssis automobile, profondeur de forage jusqu'à 15 m, diamètre de forage 150-500 mm",Equipment,General,Heures machine,67.69,67.69,67.69,67.69,1,EUR,167.05,2.468,10,10,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,FORAGE À LA VIS KASA-TO-KARI-KALI,Moulures décoratives,Abstract Material,General,m,20.09,20.09,20.09,20.09,1,EUR,2029.31,101.0,10,10,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment décoratifs plats, bombés et en relief, simples" MEPU-SA-KAME-KAME,"Mastic acrylique, 300 ml",Abstract Material,General,pièce,40.9,40.9,40.9,40.9,1,EUR,722.5,17.6667,10,10,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple en profilés de plafond av RISA-ME-KASA-KAPU_KAKAKAPU,"Rails de chemin de fer, type P38",Material,General,t,3017.3,3017.3,3017.3,3017.3,1,EUR,237202.4,78.614,10,10,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" KAME-LI-MEME-KAPU_KAKANERI,Fil à souder allié,Material,General,kg,3.21,3.21,3.21,3.21,1,EUR,23.71,7.384,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT HYDROÉLECTRIQUE,GÉNÉRATEURS POUR CENTRALES ÉLECTRIQUES DXME-MEDX-KAVO_KARIRI,"Électricité : consommation 24,75 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.18,3.18,3.18,3.18,1,EUR,32.5,10.222,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RITO-VO-KAPU-KANE_KAMEKALI,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 300 mm, diamètre extérieur 325 mm, épaisseur de paroi 8 mm",Material,General,pièce,232.77,232.77,232.77,232.77,1,EUR,1152.19,4.95,10,10,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac KASA-ME-KALI-KAME,Blocs de ventilation,Abstract Material,General,pièce,1007.14,1007.14,1007.14,1007.14,1,EUR,100713.56,100.0,10,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" RISA-RI-KAME-RIKA_KAKATOME,"Barre en acier galvanisé avec deux oreilles de fixation tournées l'une vers l'autre à 90°, diamètre 20 mm, longueur 1000 mm",Material,General,pièce,24.27,24.27,24.27,24.27,1,EUR,27.5,1.133,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KASA-ME-KALI-RIME,Panneaux pour loggias,Abstract Material,General,pièce,105.58,105.58,105.58,105.58,1,EUR,10557.58,100.0,10,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","DALLES DE LOGGIAS, BALCONS, AUVENTS, PARAPETS, MURS, BARRIÈRES ET PETITES CONSTR" DXME-KALI-KATO_KARIME,"Usines à béton automatisées, capacité de production 20 m3/h",Equipment,General,Heures machine,11.69,11.69,11.69,11.69,1,EUR,669.3,57.273,10,10,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RIKA-ME-KARI-MEDX_MEKARIME,"Câble à ressort en bronze avec fixation articulée au câble porteur et shuntage de la jonction articulée pour la fixation des cordes, section du câble 35 mm2, longueur 18,04 m",Material,General,pièce,608.56,608.56,608.56,608.56,1,EUR,10954.06,18.0,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RITO-TO-KATO-KARI_KAKAPUVO,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 76 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,26.2,26.2,26.2,26.2,1,EUR,40.04,1.528,10,10,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RITO-TO-KANE-KAPU_KAKAMEPU,"Tuyaux en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, légers, diamètre nominal 90 mm, épaisseur de paroi 3,5 mm",Material,General,m,13.64,13.64,13.64,13.64,1,EUR,81.85,6.0,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KANE-RI-KARI-KAME_KAKASAME,"Carreaux de céramique pour sols, non émaillés, lisses, multicolores",Material,General,m2,18.09,18.09,18.09,18.09,1,EUR,1845.02,102.0,10,10,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mortier de ciment à partir de carreaux KASA-RI-KARI-RIME,"Carreaux en béton, en ciment ou en mosaïque",Abstract Material,General,m2,19.56,19.56,19.56,19.56,1,EUR,1225.53,62.6571,10,10,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mortier de ciment à partir de carreaux RIKA-RI-KADX-KAME_KAKAMERI,Masses de câbles de marque MKS-M,Material,General,t,21278.03,21278.03,21278.03,21278.03,1,EUR,18.23,0.0,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RITO-SA-KAME-KAVO_KAKAMESA,"Tubes en acier électrosoudés à joint droit et à joint spiralé, classe de résistance K38, diamètre extérieur 426 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,143.72,143.72,143.72,143.72,1,EUR,7265.78,50.556,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-TO-KATO-KARI_KAKALIPU,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 102 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,54.75,54.75,54.75,54.75,1,EUR,1587.75,29.0,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,SYSTÈMES DE LUBRIFICATION ÉPAISSE ET LIQUIDE,NŒUDS DES SYSTÈMES DE LUBRIFICATION LIQUIDE KAME-LI-MESA-KALI_KAMEPUVO,"Chevilles-clous en plastique à expansion avec tige métallique pour l'isolation thermique, diamètre 10 mm, longueur 200 mm",Material,General,10 pièces,3.08,3.08,3.08,3.08,1,EUR,31.98,10.4,10,10,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,"Maçonnerie de murs en pierres de béton léger, remplissage d'ouvertures et de col" KAME-TO-KAME-KANE_MEKARISA,Lubrifiant de contact pour les pièces en caoutchouc des systèmes d'étanchéité des entrées de câbles et de tuyaux étanches dans les structures de construction,Material,Steel & Metal,kg,346.46,346.46,346.46,346.46,1,EUR,730.69,2.109,10,10,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES AUTRES STRUCTURES DXME-KALI-KAVO_KARITO,"Électricité : consommation 3,63 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.47,0.47,0.47,0.47,1,EUR,0.33,0.707,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Silicatisation et résinisation DXME-KARI-KAPU_KATORI,Électricité : consommation 42 kW·h/machine-heure,Electricity,Electricity,Heures machine,5.39,5.39,5.39,5.39,1,EUR,1.77,0.328,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KALI-KAVO_KARITO,"Mélangeurs de mortier stationnaires pour la préparation de mortiers à base de ciment et autres, capacité 2000 l",Equipment,General,Heures machine,1.8,1.8,1.8,1.8,1,EUR,1.27,0.707,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Silicatisation et résinisation MEVO-ME-KARI-KAME_KARIKARI,"Vanne parallèle à tige montante 30ch6br, raccordement à la canalisation par bride, pression nominale 1,0 MPa, diamètre nominal 80 mm",Material,General,pièce,124.43,124.43,124.43,124.43,1,EUR,12.44,0.1,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE MEME-ME-KAME-KAPU_KAKARIPU,"Planches pour revêtement de sol à rainure et languette en bois de conifères, épaisseur 27 mm, largeur sans crête 100-140 mm",Material,General,m3,849.14,849.14,849.14,849.14,1,EUR,934.9,1.101,10,10,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en planches et en lattes DXME-MEME-KAME_KAKATO,"Poseurs de câbles à roues tractés pour la pose sans tranchée de câbles en cuivre et à fibres optiques avec pose simultanée d'un ruban de contrôle, ainsi que de tuyaux en polyéthylène, diamètre du câble ou des tuyaux jusqu'à 65 mm, profondeur de pose jusqu'à 1,2 m",Equipment,General,Heures machine,4.58,4.58,4.58,4.58,1,EUR,59.21,12.921,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE KARI-TO-KAME-KAPU_KAKAKAME,"Sable fractionné, décoratif, issu de roches sédimentaires",Material,General,t,98.01,98.01,98.01,98.01,1,EUR,39.2,0.4,10,10,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS DXME-MEDX-KAVO_KARIRI,"Pompes, débit 150 m3/h, pression 100 m, puissance 75 kW",Equipment,General,Heures machine,7.95,7.95,7.95,7.95,1,EUR,81.29,10.222,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE MEME-RI-MEME-KANE,Contreplaqué laminé,Abstract Material,General,m3,1249.49,1249.49,1249.49,1249.49,1,EUR,9309.26,7.45,10,10,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Bétonnage des structures du puits du réacteur KAME-LI-MESA-MEKA_KAKANEKA,"Agrafes de montage en acier à une patte (SO), diamètre de fixation 10-14 mm",Material,General,100 pièces,4.06,4.06,4.06,4.06,1,EUR,21.1,5.197,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",COMMUNICATIONS RADIO AVEC DES OBJETS MOBILES RISA-RI-KAME-KANE_MEKAMESA,"Pince droite en bronze pour la fixation auxiliaire du câble d'ancrage intermédiaire du fil de contact au câble porteur du réseau de contact ferroviaire, type KS-052-8, dimensions 80 x 60 x 46 mm",Material,General,pièce,73.51,73.51,73.51,73.51,1,EUR,409.31,5.568,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-KALI-KATO_KARIME,"Électricité : consommation 18,56 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.38,2.38,2.38,2.38,1,EUR,136.55,57.273,10,10,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION KADX-RI-KATO-KAPU,Profilé d'angle en aluminium,Abstract Material,General,m,5857.07,17.89,9747.23,9747.23,3,EUR,1394.22,69.565,10,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-MEDX-KAPU_KAKADX,"Pompes de forage à trois pistons pour l'alimentation en boue de forage, débit 86-184 m3/h, pression de sortie 35-18 MPa",Equipment,General,Heures machine,74.1,74.1,74.1,74.1,1,EUR,5137.61,69.332,10,10,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KAVO-KAME_KARIME,"Finisseurs à chenilles, largeur de pose de 1,8 à 4,5 m, vitesse de pose 30 m/min, rendement 400 t/h",Equipment,General,Heures machine,61.16,61.16,61.16,61.16,1,EUR,201.94,3.302,10,10,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES FONDATIONS ET REVÊTEMENTS EXISTANTS POUR LES REVÊTEMENTS EN GRAV,CORRECTION DU PROFIL DES FONDATIONS DXME-KARI-KAPU_KATORI,"Installations de forage pour le forage de trous sous des pieux à godets, profondeur jusqu'à 24 m, diamètre jusqu'à 1200 mm",Equipment,General,Heures machine,47.35,47.35,47.35,47.35,1,EUR,15.53,0.328,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEME-ME-KATO-KASA_KAKATOPU,"Planches non sciées en bois feuillu (aulne), humidité naturelle, longueur 4-6,5 m, toutes largeurs, épaisseur 25, 32, 40 mm, classe II",Material,General,m3,915.46,915.46,915.46,915.46,1,EUR,6.77,0.01,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,"Équipements de signalisation, de centralisation et de verrouillage" MEME-ME-KARI-KAME,Bûches de construction,Abstract Material,General,m3,224.08,224.08,224.08,224.08,1,EUR,3122.25,13.9337,10,10,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" MEPU-PU-KAPU-KAVO_KAKAKADX,Émail PF-167,Material,General,t,3810.96,3810.96,3810.96,3810.96,1,EUR,223.55,0.1933,10,10,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES MARITIMES,REVÊTEMENT DES STRUCTURES MÉTALLIQUES DES ÉQUIPEMENTS HYDRAULIQUES AVEC DES PRIM DXME-MEDX-KANE_KAMERI,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,3.05,17.99,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse RIPU-TO-KATO-MERI,Tuyaux en polyéthylène,Abstract Material,General,m,271.32,271.32,271.32,271.32,1,EUR,27783.19,102.4,10,10,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER KAVO-TO-KAME-KARI_KAMEKAPU,"Poutres à ailes parallèles, nuance d'acier 09G2S, 12G2S, n° 20B-60B",Material,General,t,1811.46,1811.46,1811.46,1811.46,1,EUR,9807.25,5.414,10,10,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES MEPU-SA-KALI-KAME_KAKAMERI,Poudre d'aluminium PAP-2,Material,General,t,12718.64,12718.64,12718.64,12718.64,1,EUR,16.53,0.0,10,10,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES KAVO-ME-KARI-MEME_KAKAKANE,"Pièces forgées à partir de billettes carrées, poids 90 kg",Material,General,t,2007.83,2007.83,2007.83,2007.83,1,EUR,10.86,0.02,10,10,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,INSTALLATION D'ESCALIERS PU_MEKAKA_KANENE,Personnel : 8 personnes-heures/machine-heures,Operator,Operators,Heures machine,97.76,97.76,97.76,97.76,1,EUR,293.87,3.006,10,10,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-MEME-KAME_KAKARI,"Poseurs de câbles à roues tractés pour la pose de tous types de câbles de communication interurbains à une profondeur de 0,9 à 1,2 m",Equipment,General,Heures machine,3.79,3.79,3.79,3.79,1,EUR,98.86,26.107,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES DXME-KASA-MEME_KAMERI,"Grues à portique, capacité de levage 16 t",Equipment,General,Heures machine,113.86,113.86,113.86,113.86,1,EUR,26001.47,228.361,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,ROBINETS À PORTE KAME-ME-KARI-MEKA_MEKARIKA,"Chrysotile (amiante chrysotile), groupe 6, marques 6-55, 6-45, 6-40, 6-40M, 6-30, 6-20",Material,General,t,397.95,397.95,397.95,397.95,1,EUR,38.64,0.16,10,10,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE L'ARTICULATION DES PONTS ROUTIERS ET DES PASSERELLES AVEC REMBLA MEPU-SA-KADX-KANE,Diluant,Abstract Material,General,t,13.75,13.75,13.75,13.75,1,EUR,0.02,0.0,10,10,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,PEINTURE DES STRUCTURES DE PASSAGE DXME-KARI-KAME_KAKANE,"Vibromoteurs, couple excentrique 46 kgm, avec station hydraulique d'une puissance de 548 ch.",Equipment,General,Heures machine,270.88,270.88,270.88,270.88,1,EUR,290.92,1.074,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEME-RI-MEME-KANE_KAKAKATO,"Contreplaqué de bouleau recouvert d'un film des deux côtés, présentant une surface lisse des deux côtés, classe III/III, épaisseur 21 mm",Material,General,m3,1012.24,1012.24,1012.24,1012.24,1,EUR,342.34,0.339,10,10,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,"Poutres, ceintures, linteaux, traverses",Construction de poutres et de linteaux DXME-KASA-MEME_KAMERI,"Électricité : consommation 22,88 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.94,2.94,2.94,2.94,1,EUR,671.1,228.361,10,10,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,ROBINETS À PORTE DXME-MEDX-KANE_KAMERI,"Pompes à boue, débit jusqu'à 15 m3/h, pression jusqu'à 50 m",Equipment,General,Heures machine,0.5,0.5,0.5,0.5,1,EUR,9.0,17.99,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse DXME-KARI-KASA_SAKAKA,"Grappins à large prise sur chenilles, volume de la benne jusqu'à 1 m3",Equipment,General,Heures machine,150.55,150.55,150.55,150.55,1,EUR,4856.67,32.26,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse MEPU-PU-KAME-MELI_KAKAMERI,"Apprêt à base de vernis polyuréthane et de poudre de zinc hautement dispersée, durcissant à l'humidité de l'air",Material,General,kg,24.77,24.77,24.77,24.77,1,EUR,139.19,5.619,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-VO-KATO-MEME_KARISAPU,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,0 MPa, diamètre nominal 200 mm",Material,General,pièce,52.41,52.41,52.41,52.41,1,EUR,84.59,1.614,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,"Descente des puits avec excavation du sol par hydromécanisation, à l'aide d'une " MEME-ME-KATO-KANE_KAKARISA,"Planches équarries en bois feuillu (bouleau), humidité naturelle, longueur 4-6,5 m, toutes largeurs, épaisseur 25, 32, 40 mm, classe III",Material,General,m3,1428.76,1428.76,1428.76,1428.76,1,EUR,556.08,0.4322,10,10,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,"Descente des puits avec excavation du sol par hydromécanisation, à l'aide d'une " MEKA-ME-KARI-KARI_KAMEKARI,"Feuilles d'aluminium de marque AD1N, épaisseur 0,5-2,0 mm",Material,General,kg,10.7,10.7,10.7,10.7,1,EUR,184.29,17.22,10,10,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAME-LI-MESA-KAVO_KAKARIME,"Rivets en acier à tête demi-ronde, diamètre 4 mm, longueur 5 mm",Material,General,t,14036.23,14036.23,14036.23,14036.23,1,EUR,18.6,0.0,10,10,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION DXME-MERI-KAVO_MEKAME,"Pulvérisateurs à ventilateur suspendus, capacité du réservoir 0,6 m3",Equipment,General,Heures machine,2.16,2.16,2.16,2.16,1,EUR,2.25,1.041,10,10,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,ENTRETIEN DES ESPACES VERTS (NORMES OPÉRATIONNELLES) KAME-LI-MELI-MERI,Brosse à disque pour meuleuse d'angle en fil d'acier,Abstract Material,General,pièce,7.42,7.42,7.42,7.42,1,EUR,0.0,0.0,10,10,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,AUTRES TRAVAUX,Étanchéification des joints RIPU-TO-KASA-KAME_KAMEKAME,Douilles en polychlorure de vinyle,Material,General,100 pièces,123.47,123.47,123.47,123.47,1,EUR,472.88,3.83,10,10,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,"CONDUITES EN TUBES PLASTIQUES ET CÂBLES PNEUMATIQUES, BOÎTIERS DE RACCORDEMENT P" KASA-ME-KAVO-KANE,Dalles préfabriquées en béton armé pour tablier de pont sans ballast,Abstract Material,General,m3,556.89,556.89,556.89,556.89,1,EUR,55688.93,100.0,10,10,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE DE VOIES SUR LES PONTS KAME-ME-KAME-KADX_KAKARIME,"Cordon en amiante à usage général, marque SHAN, diamètre 0,7 mm",Material,General,t,36922.56,36922.56,36922.56,36922.56,1,EUR,406.41,0.1,10,10,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,CHAUDIÈRES DE CHAUFFAGE,Installation de chaudières de chauffage en fonte à sections fonctionnant au comb KAVO-TO-MEME-KAME_KAKATORI,"Profilé perforé ShP, nuances d'acier St3ps, St3sp, dimensions 60 x 35 mm",Material,General,m,8.37,8.37,8.37,8.37,1,EUR,29.92,3.577,10,10,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",STRUCTURES POUR L'INSTALLATION D'APPAREILS ET DE MOYENS D'AUTOMATISATION,Structures pour l'installation d'appareils RIPU-TO-KASA-MEKA,Adaptateurs en polymère,Abstract Material,General,pièce,21.95,21.95,21.95,21.95,1,EUR,2194.9,100.0,10,10,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation d'un compteur d'eau dans un appartement KAME-TO-KASA-TOVO_KARIPUME,Chlorure de méthylène technique,Material,General,kg,3.15,3.15,3.15,3.15,1,EUR,34.67,11.003,10,10,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites d'alimentation en eau à partir de tuyaux en polyéthylène sous KAME-LI-MEDX-KAPU_KAKAMETO,Plaques en polyisobutylène PSG,Material,General,t,4474.99,4474.99,4474.99,4474.99,1,EUR,27.91,0.01,10,10,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENTS ADHÉSIFS,"Collage de plaques de polyisobutylène d'une épaisseur de 2,5 mm sur une surface " MEVO-ME-KADX-KAME_KAKAMETO,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 150 mm",Material,General,pièce,380.18,380.18,380.18,380.18,1,EUR,433.41,1.14,10,10,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS KAME-LI-MELI-MEKA_KAKAPUPU,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 51 mm",Material,General,pièce,282.12,282.12,282.12,282.12,1,EUR,155.17,0.55,10,10,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-SA-KARI-KARI_KAMEKARI,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 325 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,112.27,112.27,112.27,112.27,1,EUR,17499.65,173.1911,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KALI-RI-KALI-MESA,Tubes en acier,Abstract Material,Pipes & Fittings,t,4507.32,4507.32,4507.32,4507.32,1,EUR,3090.09,0.6857,10,10,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CANALISATIONS D'ÉVACUATION D'EAU SUR DES FONDATIONS PRÊTES (BASES) ET CANIVEAUX ,TUBES D'ÉVACUATION DES EAUX EN MÉTAL ONDULÉ MEME-RI-METO-KANE_KAKAMETO,"Panneaux de plancher, épaisseur 40 mm",Material,General,m2,17.9,17.9,17.9,17.9,1,EUR,208.47,11.647,10,10,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KAME-ME-KAME-KASA_KAKAMENE,"Feuilles de chrysotile-ciment plates pressées, épaisseur 10 mm",Material,General,m2,11.24,11.24,11.24,11.24,1,EUR,649.84,57.801,10,10,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Couverture des espaces au-dessus des ouvertures de portes dans les cloisons en p DXME-KADX-METO_SAKAPU,"Locomotives à voie large, puissance jusqu'à 198 kW (270 ch)",Equipment,General,Heures machine,168.03,168.03,168.03,168.03,1,EUR,4511.99,26.852,10,10,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KADX-MEKA_KAKASA,"Machines de redressage, de battage et de nivellement, capacité 2200-2400 traverses/h",Equipment,General,Heures machine,959.67,959.67,959.67,959.67,1,EUR,1301.95,1.3567,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,RÉTABLISSEMENT DE LA VOIE ET DES AIGUILLAGES KAME-LI-MESA-MEPU_KAMENELI,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 5 mm, longueur 50 mm",Material,General,t,3556.36,3556.36,3556.36,3556.36,1,EUR,1.99,0.0,9,9,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" MELI-PU-KATO-KAME_KAKAKAVO,"Mortier réfractaire aluminosilicate chamotté, marque MSh-28",Material,General,t,649.94,649.94,649.94,649.94,1,EUR,79.43,0.1222,9,9,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Revêtement en produits réfractaires MEPU-PU-KAPU-KADX_KAKARIRI,"Émail HV-785, coloré, blanc",Material,General,t,4319.31,4319.31,4319.31,4319.31,1,EUR,140.23,0.07,9,9,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées RISA-RI-KAME-MEVO_KAKATOME,"Fixation supplémentaire avec pince de fixation, avec support de longueur normale",Material,General,pièce,61.06,61.06,61.06,61.06,1,EUR,1070.64,17.5344,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KALI-RI-KANE-KATO_KAMEDXDX,"Profilé en acier galvanisé pour montants, dimensions 75 x 50 mm, épaisseur 0,6 mm",Material,General,m,2.42,2.42,2.42,2.42,1,EUR,555.13,229.5,9,9,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple composée de profilés de g MEME-ME-KATO-KAME_KAKAKARI,"Bois rabotés de conifères (pin, sapin), dimensions 60 x 30, 75 x 50 mm, catégorie AB",Material,General,m3,1031.07,1031.07,1031.07,1031.07,1,EUR,110.0,0.1089,9,9,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple en profilés de plafond av RITO-VO-KATO-KATO_KAKAKAME,Contre-écrou,Material,General,pièce,0.27,0.27,0.27,0.27,1,EUR,2.73,10.0,9,9,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS MENE-RI-KAME-KAME_KAKARIME,Humus,Material,General,m3,43.18,43.18,43.18,43.18,1,EUR,142.3,3.2956,9,9,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"AMÉNAGEMENT DE PELOUSES, DE PARTS DE FLEURS, DE JARDINS ALPINARIES ET DE ROCAIRE" PU_MEKAKA_KARIPU,Personnel : 5 personnes-heures/machine-heures,Operator,Operators,Heures machine,36.88,36.88,36.88,36.88,1,EUR,159.99,4.3378,9,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KALI-KAVO_KARINE,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,14.41,61.7844,9,9,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation de blocs préfabriqués en béton armé pour les murs et les dalles de DXME-KALI-KAVO_KARINE,"Mélangeurs de mortier fixes, capacité 500 l",Equipment,General,Heures machine,0.96,0.96,0.96,0.96,1,EUR,59.41,61.7844,9,9,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation de blocs préfabriqués en béton armé pour les murs et les dalles de DXME-MELI-KATO_KAPUSA,"Électricité : consommation 19,8 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.54,2.54,2.54,2.54,1,EUR,12.79,5.0311,9,9,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines DXME-MELI-KATO_KAPUSA,"Installations de chauffage électrique pour le traitement thermique des assemblages soudés, puissance 75 kVA",Equipment,General,Heures machine,8.2,8.2,8.2,8.2,1,EUR,41.26,5.0311,9,9,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines DXME-KAPU-KAME_KASAPU,"Machines de forage rotatif automotrices, profondeur de forage jusqu'à 25 m, diamètre des puits 150 mm",Equipment,General,Heures machine,10.19,10.19,10.19,10.19,1,EUR,39.56,3.8822,9,9,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLABLAGE DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS LES CARRIÈRES ET DXME-KAVO-MEME_SAMESA,"Kocher sur châssis de voiture, capacité du réservoir jusqu'à 8 m3",Equipment,General,Heures machine,137.89,137.89,137.89,137.89,1,EUR,348.72,2.5289,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-RI-KATO-KAME,Liant polymère-bitume,Abstract Material,General,kg,1023.83,1023.83,1023.83,1023.83,1,EUR,3450016.93,3369.7125,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES RISA-RI-KAME-MEVO_KAKARIME,"Fixation supplémentaire KS-109, peinte",Material,General,pièce,11.0,11.0,11.0,11.0,1,EUR,124.6,11.33,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEPU-RI-KARI-KAPU,Vernis,Abstract Material,General,t,28.7,28.7,28.7,28.7,1,EUR,0.49,0.0178,9,9,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,REVÊTEMENT ET PEINTURE AVEC DES VERNIS ET DES COMPOSÉS SPÉCIAUX DXME-RIME-MEDX_KARITO,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,13.62,58.3833,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES DXME-RIME-MEDX_KARITO,"Machines à cintrer et à couper les armatures, puissance 5,5 kW",Equipment,General,Heures machine,1.98,1.98,1.98,1.98,1,EUR,115.83,58.3833,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES RIKA-RI-KAVO-KANE_KAKAMEME,"Rouleau suspendu en acier, capacité de charge 0,5 t, diamètre du câble 18 mm, diamètre du rouleau 120 mm",Material,General,pièce,93.55,93.55,93.55,93.55,1,EUR,1986.58,21.2378,9,9,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS DXME-RIME-KAME_KAMETO,"Électricité : consommation 0,46 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.03,0.28,9,9,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy DXME-RIME-KAME_KAMETO,"Groupes de peinture haute pression pour la peinture des surfaces de structures, puissance 2 kW",Equipment,General,Heures machine,0.44,0.44,0.44,0.44,1,EUR,0.12,0.28,9,9,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy KADX-PU-KATO-KASA,Blocs de fenêtres en alliages d'aluminium,Abstract Material,General,t,419.14,419.14,419.14,419.14,1,EUR,36727.06,87.625,9,9,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" RISA-TO-KAVO-KAME_PUDXVOKA,Traverse en béton armé ShP 350,Material,General,pièce,143.31,143.31,143.31,143.31,1,EUR,87959.15,613.7778,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-ME-KARI-KAME_KAKARITO,"Traverse en béton armé Sh5-DF avec fixation par vis et chevilles des deux côtés, type W30 « FOSSLO »",Material,General,compl,245.89,245.89,245.89,245.89,1,EUR,150923.93,613.7778,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-KADX_MEKATO,"Électricité : consommation 15,18 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.95,1.95,1.95,1.95,1,EUR,26.05,13.36,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-KADX_MEKATO,Lignes technologiques pour l'assemblage d'éléments avec des traverses en béton armé (équipement d'atelier),Equipment,General,Heures machine,47.2,47.2,47.2,47.2,1,EUR,630.58,13.36,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-RIME-RIRI_KAMEME,"Machines à couper les câbles, longueur de câble acceptée jusqu'à 21 m",Equipment,General,Heures machine,10.24,10.24,10.24,10.24,1,EUR,32.94,3.2167,9,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KASA-ME-KARI-MEKA,Lest en béton armé pour pipelines,Abstract Material,Pipes & Fittings,compl,876.62,876.62,876.62,876.62,1,EUR,876.62,1.0,9,9,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 300 à 1400 mm à l'aide de charges MEME-RI-METO-KATO,"Panneaux de clôture, pleins",Abstract Material,General,m2,3.25,3.25,3.25,3.25,1,EUR,320.81,98.7222,9,9,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"CLÔTURES DE PLACES ET DE TERRAINS D'ENTREPRISES, DE BÂTIMENTS ET D'INSTALLATIONS" DXME-KAVO-KAME_KAKATO,"Finisseurs à chenilles, largeur maximale de pose 11 m, vitesse de pose jusqu'à 25 m/min, capacité 900 t/h",Equipment,General,Heures machine,147.18,147.18,147.18,147.18,1,EUR,437.44,2.9722,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-MEME_MEMEME,Machines pour la destruction des revêtements en béton de ciment des routes et des aérodromes par la méthode de résonance vibratoire,Equipment,General,Heures machine,620.45,620.45,620.45,620.45,1,EUR,3426.97,5.5233,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-MEKA-KALI_KAKANE,"Installations pour la pose de tuyaux sans tranchée par le procédé d'enfoncement à partir d'une centrale électrique mobile, diamètre des tuyaux jusqu'à 1620 mm, longueur d'enfoncement jusqu'à 90 m",Equipment,General,Heures machine,25.54,25.54,25.54,25.54,1,EUR,6558.64,256.7778,9,9,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE TUYAUX SANS TRANCHÉE,Perçage avec excavation manuelle du sol KASA-ME-KAME-MESA,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,m3,20.09,20.09,20.09,20.09,1,EUR,2009.22,100.0,9,9,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTION D'ENTREPRISES DE STOCKAGE ET DE TRANSFORMATION DE CÉRÉALES,Montage de structures pour les installations de stockage et de transformation du RISA-RI-KAME-RIME_MEKAKARI,"Étrier à ressort en acier inoxydable de 8 mm de diamètre, dimensions 134 x 31 x 48 mm",Material,General,pièce,6.61,6.61,6.61,6.61,1,EUR,298.05,45.0689,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-METO-KAME_KARITO,"Machines combinées de nettoyage, capacité du réservoir 13 m3, capacité de la benne du sableur 9 m3",Equipment,General,Heures machine,55.69,55.69,55.69,55.69,1,EUR,42.51,0.7633,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES KAVO-PU-KATO-KATO_KAKARISA,"Acier d'armature laminé à chaud à profil périodique, classe A-II, diamètre 20-22 mm",Material,General,t,1421.44,1421.44,1421.44,1421.44,1,EUR,360.12,0.3783,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAME-LI-MESA-MERI_MEKAMEPU,"Goupilles filetées galvanisées, diamètre 8-16 mm",Material,General,kg,2.69,2.69,2.69,2.69,1,EUR,38.82,14.4467,9,9,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX MENE-RI-KARI-KASA,Arbustes,Abstract Material,General,pièce,16.04,15.64,19.27,15.64,2,EUR,2905.43,185.7143,9,9,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,PRÉPARATION DES PLACES DE PLANTATION ET PLANTATION DE SOUFFRANES EN GROUPES KAME-LI-MESA-MEPU_MEKAPUNE,"Vis autotaraudeuses en acier galvanisé pour toiture avec tête hexagonale et rondelle, pointe de forage, diamètre 4,8 mm, longueur 35 mm",Material,General,100 pièces,3.9,3.9,3.9,3.9,1,EUR,19.2,4.9233,9,9,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-RIKA-KAVO_KAKATO,"Copras flottants avec marteau diesel, 1,8 t",Equipment,General,Heures machine,56.82,56.82,56.82,56.82,1,EUR,77.91,1.3711,9,9,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KASA-METO_KAMEME,"Camions à plateau, capacité de charge jusqu'à 10 t, avec grue-manipulateur, capacité de charge 3,7 t",Equipment,General,Heures machine,35.14,35.14,35.14,35.14,1,EUR,1010.97,28.7711,9,9,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KANE-KATO_KATOME,"Treuils auxiliaires de mine avec une force de traction de 6,18 kN (0,63 t)",Equipment,General,Heures machine,0.23,0.23,0.23,0.23,1,EUR,0.7,2.3967,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie charbonnière et tourbière,ÉQUIPEMENT MINIER,ÉQUIPEMENT POUR INSTALLATIONS DE VENTILATION DE MINE MEME-RI-KALI-KALI,Blocs acoustiques spéciaux pour fenêtres,Abstract Material,General,m2,248.5,248.5,248.5,248.5,1,EUR,248.5,1.0,9,9,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX KAME-LI-MELI-KANE_KAKAVOME,"Disque diamanté à tronçonner avec tranchant profilé continu, diamètre 115 mm, épaisseur du tranchant diamanté 2,2 mm, hauteur du tranchant diamanté 10 mm",Material,General,pièce,8.65,8.65,8.65,8.65,1,EUR,0.0,0.0,9,9,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de systèmes multi-split MEME-ME-KATO-KANE_KAKAMEPU,"Planches équarries de feuillus (bouleau), sèches, longueur 2-3,75 m, toutes largeurs, épaisseur 25, 32, 40 mm, classe I",Material,General,m3,1536.6,1536.6,1536.6,1536.6,1,EUR,81.95,0.0533,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES KAPU-ME-KARI-KASA_KAMERIVO,"Mélanges de béton lourd (BST) sur gravier concassé, classe B12,5, F(1)100, W4",Material,General,m3,115.72,115.72,115.72,115.72,1,EUR,2.64,0.0222,9,9,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,AUTRES TRAVAUX,RACCORDEMENT DES CONDUITES D'ÉGOUT AU RÉSEAU EXISTANT KAVO-ME-KARI-RIKA_KAKAKAME,Maillon de raccordement Kentera 28-2/2a,Material,General,pièce,186.84,186.84,186.84,186.84,1,EUR,747.37,4.0,9,9,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE PROTECTION DES INSTALLATIONS MARITIMES,Suspension de dispositifs anti-chocs pour installations d'amarrage maritimes à l KAME-LI-MESA-MEKA_KAKAKADX,"Agrafe d'ancrage d'extrémité, calibre de chaîne 26 mm",Material,General,pièce,363.41,363.41,363.41,363.41,1,EUR,1453.65,4.0,9,9,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE PROTECTION DES INSTALLATIONS MARITIMES,Suspension de dispositifs anti-chocs pour installations d'amarrage maritimes à l RISA-RI-KAME-MELI_KAKAKASA,Œillet à une patte KS-012,Material,General,pièce,15.92,15.92,15.92,15.92,1,EUR,162.14,10.1856,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-KANE_KAKALIME,Pince d'ancrage moyenne KS-051-1 (KS-322),Material,General,pièce,29.6,29.6,29.6,29.6,1,EUR,220.18,7.4389,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KARI-RI-KAME-KARI_MEKADXVO,"Gravier M 400-1000, fraction 20-40 mm",Material,General,m3,66.9,66.9,66.9,66.9,1,EUR,1304.63,19.5,9,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",REMBLAYAGE DES MARAIS RINE-ME-KARI-KARI,Ensemble de jonction isolante,Abstract Material,General,compl,190.14,99.22,262.88,262.88,2,EUR,5302.1,35.1111,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER","JOINTS ISOLANTS, CONNECTEURS DE RAILS ET PONTS DE SIGNALISATION" RIPU-TO-KAPU-MEME_KAKAKATO,Tube en plastique de type TV40,Material,Pipes & Fittings,kg,7.97,7.97,7.97,7.97,1,EUR,0.64,0.08,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES DXME-RIME-RIRI_RIKATO,"Kits d'outils hydrauliques pour l'installation de tuyaux flexibles en polymère renforcé, diamètre des tuyaux 25-110 mm",Equipment,General,Heures machine,2.39,2.39,2.39,2.39,1,EUR,6.69,2.8044,9,9,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE MEKA-ME-KARI-KAME_KAKAKARI,"Bandes en aluminium de marque AD1N, largeur 30 mm, épaisseur 0,8 mm",Material,General,kg,11.09,11.09,11.09,11.09,1,EUR,0.57,0.0511,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES MEPU-SA-MEME-KADX_KAMEKATO,"Mastic thixotrope bicomposant à base de résine époxy, composant A",Material,General,kg,42.82,42.82,42.82,42.82,1,EUR,7406.07,172.9744,9,9,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,RENFORCEMENT DES CONSTRUCTIONS EN BÉTON ARMÉ DXME-MEPU-KAPU_SAKAKA,"Tracteurs routiers, charge sur l'attelage jusqu'à 20 t",Equipment,General,Heures machine,37.62,37.62,37.62,37.62,1,EUR,203.43,5.4078,9,9,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-RI-KARI-KASA_KAKAPUNE,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 19,5 mm",Material,Steel & Metal,10 m,55.26,55.26,55.26,55.26,1,EUR,276.31,5.0,9,9,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,",IMMERSION DE STRUCTURES MÉTALLIQUES ET EN BÉTON ARMÉ SOUS L'EAU EN MILIEU FLUVIA KAPU-TO-KARI-KADX_KAMEKARI,Mélanges secs résistants à l'eau pour le jointoiement des joints entre carreaux d'une largeur de 1 à 6 mm (différentes couleurs disponibles),Material,General,t,1955.79,1955.79,1955.79,1955.79,1,EUR,120.61,0.0771,9,9,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mortier de ciment à partir de carreaux DXME-KAME-KAPU_KAKAPU,"Installations à barre unique sur tracteur, puissance 79 kW (108 ch), largeur de fente 54 cm",Equipment,General,Heures machine,25.56,25.56,25.56,25.56,1,EUR,603.16,23.6,9,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX MEPU-ME-KASA-KAPU_KAMEKANE,"Colle à base d'époxy à deux composants, composants A et B",Material,General,t,11336.69,11336.69,11336.69,11336.69,1,EUR,12.48,0.0,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES DXME-MEPU-KAPU_KARIKA,"Tracteurs à ballast, poids total du train routier jusqu'à 400 t",Equipment,General,Heures machine,85.27,85.27,85.27,85.27,1,EUR,1099.93,12.9,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ DXME-KASA-KADX_KARIKA,"Grues sur châssis spécial de type automobile, capacité de charge 650 t",Equipment,General,Heures machine,978.14,978.14,978.14,978.14,1,EUR,28336.79,28.97,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ DXME-KASA-KANE_KATOLI,"Grues sur chenilles, capacité de charge 800 t",Equipment,General,Heures machine,1237.58,1237.58,1237.58,1237.58,1,EUR,34386.92,27.7856,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ KAVO-RI-KARI-MENE_KAMEMEKA,"Câble (corde) en acier laitonné dans une gaine en PVC, diamètre 5 mm",Material,General,kg,11.61,11.61,11.61,11.61,1,EUR,114.06,9.8278,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RIPU-TO-KARI-KASA,Tuyau de refoulement en polypropylène,Abstract Material,General,m,13.03,13.03,13.03,13.03,1,EUR,1335.28,102.5,9,9,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites internes d'alimentation en eau et de chauffage à partir de tuy KAME-TO-KAME-KANE_MEKAMEVO,Lubrifiant CIATIM-221,Material,General,kg,25.33,25.33,25.33,25.33,1,EUR,3.84,0.1522,9,9,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KAME-RI-KATO-KASA_KAKAMEME,"Mastic (apprêt) bitumineux avec solvants organiques pour la préparation des surfaces en béton et en ciment-sable avant la pose de matériaux de toiture et d'étanchéité, plage de température de -20 à +40 °C, consommation 0,2-0,3 kg/m2",Material,General,l,4.3,4.3,4.3,4.3,1,EUR,23.06,5.3678,9,9,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements à l'aide de panneaux KAVO-TO-KATO-KASA_KAKAKARI,"Fil métallique galvanisé, diamètre 3 mm",Material,General,t,3898.18,3898.18,3898.18,3898.18,1,EUR,203.13,0.0667,9,9,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,"Installation de finitions sur les façades (appuis de fenêtre extérieurs, ceintur" RIPU-TO-KATO-MESA,Gaine câblée,Abstract Material,General,m,0.95,0.95,0.95,0.95,1,EUR,53.57,56.1,9,9,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KAME-LI-MESA-MERI,Goupilles,Abstract Material,General,pièce,2305.04,1.34,2593.0,2593.0,2,EUR,1070.77,800.0,9,9,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CLÔTURE RIKA-ME-KARI-MEVO_KAKAKANE,"Sangles de serrage en polyester avec dispositif de tension, largeur 50 mm",Material,General,m,1.86,1.86,1.86,1.86,1,EUR,36.69,19.7778,9,9,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION D'INSTALLATIONS D'ÉPURATION DXME-KALI-MEKA_KAMETO,"Installations de gunitage pneumatiques fonctionnant à partir de stations de compression fixes, débit jusqu'à 3 m3/h",Equipment,General,Heures machine,9.03,9.03,9.03,9.03,1,EUR,960.54,106.3167,9,9,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ KARI-TO-KAME-KARI_MEMERIRI,"Sable naturel pour travaux de construction, classe II, granulométrie élevée",Material,General,m3,29.15,29.15,29.15,29.15,1,EUR,5.16,0.2012,9,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE RIKA-RI-KADX-MEME_KAKAMEME,Manchon de dérivation en polyéthylène de protection 2MRP 1,Material,General,pièce,14.03,14.03,14.03,14.03,1,EUR,14.03,1.0,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIRI-RI-KARI-RITO_KARIRIME,"Tubes modifiés par irradiation, thermorétractables, diamètre intérieur 60,0/30,0 mm",Material,Pipes & Fittings,kg,25.26,25.26,25.26,25.26,1,EUR,2.07,0.08,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES MEPU-ME-KARI-KAPU_KAMEKANE,"Colle, marque GIPK-14",Material,General,kg,42.91,42.91,42.91,42.91,1,EUR,0.64,0.0167,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES DXME-KAVO-KARI_KAKATO,"Autogoudronneuses, capacité du réservoir 6000 l",Equipment,General,Heures machine,45.74,45.74,45.74,45.74,1,EUR,35.27,0.7711,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES MEDX-ME-KARI-KALI,Distributeurs d'air,Abstract Material,General,pièce,26.94,26.94,26.94,26.94,1,EUR,26.94,1.0,9,9,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de diffuseurs d'air destinés à l'alimentation en air MEVO-PU-KAME-KARI,Tendeurs avec tendeurs à vis,Abstract Material,General,pièce,3396.93,3396.93,3396.93,3396.93,1,EUR,3396.93,1.0,9,9,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de déflecteurs DXME-MEPU-KASA_KAKAVO,"Semi-remorques poids lourds, capacité de charge jusqu'à 370 t",Equipment,General,Heures machine,100.6,100.6,100.6,100.6,1,EUR,1297.69,12.9,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ RITO-SA-KARI-KARI_KAKADXPU,"Tubes en acier électrosoudés à soudure droite en acier des nuances St2, 10, diamètre extérieur 273 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,67.11,67.11,67.11,67.11,1,EUR,1108.21,16.5133,9,9,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en eau à partir de tuyaux en ac KAVO-ME-KARI-KANE_KAKAMEME,"Trappe en fonte ronde légère, charge nominale 15 kN, diamètre du passage 600 mm",Material,General,pièce,124.75,124.75,124.75,124.75,1,EUR,124.75,1.0,9,9,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES RISA-RI-KAME-MEVO_KAKAMELI,"Fixation articulée tubulaire inversée en aluminium avec deux fixations tubulaires courbées supplémentaires en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du montant de la fixation supplémentaire 230 mm, diamètre de la tige principale 70 mm, longueur de la tige principale 2400 mm",Material,General,pièce,1473.51,1473.51,1473.51,1473.51,1,EUR,9209.43,6.25,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KAVO-PU-KATO-KAME_KAKAMERI,"Fil d'armature en acier à faible teneur en carbone, classe Vp-1, diamètre 4-5 mm",Material,General,t,1343.6,1343.6,1343.6,1343.6,1,EUR,138.57,0.1533,9,9,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE À PETITS PANNEAUX,Construction de paliers d'escalier monolithiques dans un coffrage à panneaux fin MEPU-SA-KARI-KAME_KAKAKARI,"Mastic d'étanchéité non durcissant pour l'étanchéification des joints et des raccords, marque UMS-50",Material,General,kg,3.06,3.06,3.06,3.06,1,EUR,3.85,1.2578,9,9,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,Maçonnerie de murs extérieurs autoportants en brique sur des dalles dans des bât RIKA-RI-KAVO-KALI_KAKARITO,Agrafes superposées,Material,General,100 pièces,124.2,124.2,124.2,124.2,1,EUR,15.6,0.1256,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE MEVO-SA-KATO-KAME,Inserts antivibratoires pour pompes,Abstract Material,General,compl,134.88,134.88,134.88,134.88,1,EUR,1348.84,10.0,9,9,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,POMPES CENTRIFUGES,Installation d'inserts antivibratoires sur les pompes RIRI-RI-KARI-KANE_KAKAKATO,"Consoles en fonte pour puits de câbles et puits de communication, dimensions 325 x 60 x 65 mm",Material,General,100 pièces,1359.74,1359.74,1359.74,1359.74,1,EUR,3192.37,2.3478,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIPU-RI-KASA-KAME_KAKAKANE,"Tuyaux en chrysotile-ciment sans pression, diamètre nominal 400 mm",Material,General,m,41.05,41.05,41.05,41.05,1,EUR,493.31,12.0178,9,9,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment KAME-PU-KATO-KANE_KARIRIRI,Élément de retenue à pattes pour fixer l'ampoule dans un trou de 24 mm à 28 mm de diamètre,Material,General,pièce,0.05,0.05,0.05,0.05,1,EUR,0.0,0.0,9,9,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES À BARRES POUR EXPLOITATIONS HORIZONTALES ET INCLINÉES ET C DXME-KATO-METO_KAKARI,"Électricité : consommation 15,18 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.95,1.95,1.95,1.95,1,EUR,438.11,224.7,9,9,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,SOUTÈNEMENTS PERMANENTS À CADRE POUR PUITS INCLINÉS D'OUVRAGES HORIZONTAUX ET IN DXME-KATO-METO_KAKARI,"Grues de mine pour la pose de tubages, diamètre intérieur du tubage 5,1 m",Equipment,General,Heures machine,76.73,76.73,76.73,76.73,1,EUR,17240.61,224.7,9,9,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,SOUTÈNEMENTS PERMANENTS À CADRE POUR PUITS INCLINÉS D'OUVRAGES HORIZONTAUX ET IN KAME-LI-RIKA-KATO_KAKAKAPU,"Sacs en polyéthylène, dimensions 700 x 1100 mm, épaisseur 0,03 mm",Material,General,100 pièces,33.46,33.46,33.46,33.46,1,EUR,3.97,0.1178,9,9,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,INSTALLATION DE RIDEAUX DE BRUMISATION RITO-TO-KATO-KARI_KAMESALI,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 219 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,97.87,97.87,97.87,97.87,1,EUR,792.28,8.0956,9,9,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation de compteurs d'eau avec fabrication de la tuyauterie sur le lieu de KAME-LI-MESA-MERI_KAKATOME,"Goujons filetés en acier galvanisé, diamètre du filetage M10, longueur 100 mm",Material,General,t,3831.21,3831.21,3831.21,3831.21,1,EUR,7.4,0.0,9,9,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites internes d'alimentation en eau et de chauffage à partir de tuy DXME-RIKA-METO_KAMEME,Stations de plongée mobiles,Equipment,General,Heures machine,107.35,107.35,107.35,107.35,1,EUR,1494.51,13.9222,9,9,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAME-LI-MELI-KADX_MERIPULI,"Foret à pointe en alliage dur, avec queue SDS-max pour le forage à percussion dans des matériaux durs, longueur totale 320 mm, diamètre 25 mm",Material,General,pièce,24.01,24.01,24.01,24.01,1,EUR,0.27,0.0111,9,9,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX RITO-TO-KAVO-KAME_KAKAPURI,"Tubes en acier électrosoudés carrés, dimensions 50 x 50 mm, épaisseur de paroi 3 mm",Material,Pipes & Fittings,t,1336.29,1336.29,1336.29,1336.29,1,EUR,2.67,0.0,9,9,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KADX-ME-KAME-KAME,Vitrages en alliages d'aluminium avec baguettes et gouttières,Abstract Material,General,m2,508.02,494.4,616.99,494.4,2,EUR,41302.67,83.5,9,9,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,ÉLÉMENTS DE CONSTRUCTION DES LUMINAIRES KAME-LI-MESA-MEKA_KAKASASA,"Agrafes métalliques pour agrafeuses mécaniques et électriques, taille 73, hauteur 12 mm",Material,General,kg,39.96,39.96,39.96,39.96,1,EUR,1273.41,31.87,9,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-KADX-MEME_KARIME,Machines pour creuser des fosses sous les supports du réseau de contact lors de travaux « sur le terrain »,Equipment,General,Heures machine,98.48,98.48,98.48,98.48,1,EUR,1061.53,10.7789,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,SUPPORTS DU RÉSEAU DE CONTACT EN BÉTON ARMÉ MEPU-SA-MEME-KADX_KAMEKAPU,"Mastic thixotrope bicomposant à base de résine époxy, composant B",Material,General,kg,42.82,42.82,42.82,42.82,1,EUR,2468.69,57.6578,9,9,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,RENFORCEMENT DES CONSTRUCTIONS EN BÉTON ARMÉ ME_MEKAKA_MERI,"Classe de travail moyenne 1,2",Labor,Labor,heures,12.52,12.52,12.52,12.52,1,EUR,1720.89,137.4278,9,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS MEVO-SA-MEPU-KAME,Filtres pour la purification de l'eau,Abstract Material,General,pièce,34.43,34.43,34.43,34.43,1,EUR,344.35,10.0,9,9,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de filtres DXME-KANE-KATO_KASARI,"Treuils tracteurs avec une force de traction de 78,48 kN (8 t)",Equipment,General,Heures machine,2.19,2.19,2.19,2.19,1,EUR,2.65,1.2111,9,9,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KALI-SA-KAME-KARI,Structures du ponton,Abstract Material,Steel & Metal,t,2245.61,428.3,4042.25,1378.3,3,EUR,1732.29,1.0,9,8,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" RISA-RI-KAME-MEVO_KAKAKASA,"Fixation articulée tubulaire inversée en aluminium avec une fixation tubulaire courbée supplémentaire en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du montant de la fixation supplémentaire 230 mm, diamètre de la tige principale 55 mm, longueur de la tige principale 2400 mm",Material,General,pièce,915.12,915.12,915.12,915.12,1,EUR,5719.51,6.25,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-MEVO_KAKAKANE,"Fixation articulée tubulaire en acier avec deux fixations tubulaires courbées supplémentaires en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du support de la fixation supplémentaire 230 mm, diamètre de la tige principale 60 mm, longueur de la tige principale 2800 mm",Material,General,pièce,836.54,836.54,836.54,836.54,1,EUR,5228.38,6.25,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-MEVO_KAKAKALI,"Fixation articulée tubulaire en acier avec une fixation tubulaire courbée supplémentaire en aluminium d'une longueur de 1200 mm et une pince de fixation de 70 x 47 x 41,5 mm, longueur du montant de la fixation supplémentaire 230 mm, diamètre de la tige principale 50 mm, longueur de la tige principale 2400 mm",Material,General,pièce,647.24,647.24,647.24,647.24,1,EUR,4045.23,6.25,9,9,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-KATO-MEDX_METOKA,"Électricité : consommation 20,79 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.67,2.67,2.67,2.67,1,EUR,39.6,14.83,9,9,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES À BARRES POUR EXPLOITATIONS HORIZONTALES ET INCLINÉES ET C DXME-KATO-MEDX_METOKA,"Installations de forage à un seul arbre sur châssis pneumatique, section de travail jusqu'à 40 m2, diamètre de forage jusqu'à 76 mm, profondeur de forage jusqu'à 5000 mm",Equipment,General,Heures machine,152.02,152.02,152.02,152.02,1,EUR,2254.45,14.83,9,9,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES À BARRES POUR EXPLOITATIONS HORIZONTALES ET INCLINÉES ET C RITO-VO-KATO-KANE_KAKAKADX,"Raccord en acier assemblé avec manchon et contre-écrou, diamètre nominal 40 mm",Material,General,pièce,7.3,7.3,7.3,7.3,1,EUR,29.2,4.0,9,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RIKA-RI-KADX-MEKA_KAKAMESA,"Manchon de protection pour câbles de communication, raccord MS-75",Material,General,pièce,35.31,35.31,35.31,35.31,1,EUR,35.31,1.0,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE KAME-LI-MENE-KASA_KAKAKAME,"Échafaudages extérieurs en acier suspendus, charge admissible jusqu'à 750 kg, longueur 1500-2400 mm, largeur 1500-2200 mm, hauteur de la barrière 1300 mm",Material,General,t,6751.03,6751.03,6751.03,6751.03,1,EUR,14.46,0.0,9,9,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-MERI-KASA_MEKAKAVO,"Géotextile non tissé en polypropylène, aiguilleté, thermosoudé, densité superficielle 300 g/m2",Material,General,m2,1.38,1.38,1.38,1.38,1,EUR,9.44,6.8233,9,9,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é RISA-ME-KAME-KASA_KAKARIME,"Traverse en bois de conifères, imprégnée, pour voies ferrées à écartement étroit, type I, longueur 1200 mm",Material,General,pièce,31.74,31.74,31.74,31.74,1,EUR,14993.96,472.3333,9,9,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" MEVO-ME-MEME-KARI,Régulateurs de pression de gaz,Abstract Material,General,pièce,611.88,611.88,611.88,611.88,1,EUR,611.88,1.0,9,9,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de régulateurs de pression de gaz, DXME-KADX-KATO_KATONE,"Plateformes à voie large, capacité de charge 200 t",Equipment,General,Heures machine,5.92,5.92,5.92,5.92,1,EUR,1.55,0.2622,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) DXME-KADX-METO_KARIME,Mototracteurs-centrales électriques,Equipment,General,Heures machine,49.16,49.16,49.16,49.16,1,EUR,297.73,6.0567,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,SUPPORTS DU RÉSEAU DE CONTACT EN BÉTON ARMÉ DXME-KADX-MEME_KAKAME,Agrégats pour l'enfoncement par vibration des fondations sur pieux des poteaux du réseau de contact (sans locomotive-électrocentrale),Equipment,General,Heures machine,224.32,224.32,224.32,224.32,1,EUR,1358.6,6.0567,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,SUPPORTS DU RÉSEAU DE CONTACT EN BÉTON ARMÉ KAME-TO-KAME-KANE_KAKASATO,Lubrifiant CIATIM-201,Material,General,kg,6.49,6.49,6.49,6.49,1,EUR,1.78,0.2738,9,9,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage KAME-LI-MESA-KANE_KAMERIPU,"Clous en acier de construction, diamètre 3 mm, longueur 70 mm",Material,General,t,2283.78,2283.78,2283.78,2283.78,1,EUR,4.91,0.01,9,9,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures en acier laminé sur une charpente en planches équarries DXME-MELI-KAPU_MESALI,Positionneurs-centreurs pour l'assemblage et le soudage de tuyaux en polyéthylène d'un diamètre supérieur à 500 à 630 mm,Equipment,General,Heures machine,2.57,2.57,2.57,2.57,1,EUR,15.15,5.8978,9,9,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE KAME-LI-MESA-KARI_KAKAVOME,"Boulons en acier à tête hexagonale, diamètre du filetage M6, longueur 12-50 mm",Material,General,t,4128.76,4128.76,4128.76,4128.76,1,EUR,44.16,0.0175,9,9,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES numérique DXME-KALI-KARI_KARIRI,"Pompes à béton tractées avec moteur à combustion interne, débit 60 m3/h",Equipment,General,Heures machine,37.6,37.6,37.6,37.6,1,EUR,2879.15,76.5733,9,9,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é KARI-ME-KARI-KARI,Mélange ciment-terre,Abstract Material,General,m3,46.4,46.4,46.4,46.4,1,EUR,7145.16,154.0,9,9,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS INORGANIQUES KAPU-TO-KAME-MEME,Mortiers ciment-argile,Abstract Material,General,m3,65.03,65.03,65.03,65.03,1,EUR,13.44,0.2067,9,9,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DE TUYAUX EN BRIQUES ET EN BÉTON ARMÉ,Revêtement de tuyaux en briques ordinaires avec des briques en terre cuite DXME-RIME-MELI_KAKAME,Pneumo-perforateurs pour le remplacement sans tranchée de tuyaux d'un diamètre compris entre 355 et 630 mm lors du fonctionnement à partir d'installations de compression mobiles,Equipment,General,Heures machine,5.82,5.82,5.82,5.82,1,EUR,1078.96,185.5278,9,9,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ADDUCTION D'EAU PAR DES MÉ,Destruction souterraine de l'ancienne canalisation à l'aide d'un perforateur pne DXME-KADX-MERI_KALIME,"Électricité : consommation 12,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.66,1.66,1.66,1.66,1,EUR,58.76,35.4611,9,9,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RISA-ME-KAPU-KAPU_KAKAKAME,"Boulons de voie pour la fixation des rails, diamètre M22, longueur 135 mm, 140 mm, avec écrou de diamètre M22",Material,General,t,4733.75,4733.75,4733.75,4733.75,1,EUR,1755.17,0.3711,9,9,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RITO-SA-KARI-KARI_KAKADXNE,"Tubes en acier électrosoudés à soudure droite en acier de nuance St2, 10, diamètre extérieur 273 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,87.37,87.37,87.37,87.37,1,EUR,11878.23,135.9578,9,9,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAVO-TO-KATO-KATO_KAKARIME,"Fil d'acier résistant à la chaleur, nuance d'acier 08Kh18N10, diamètre 1-6 mm",Material,General,t,8694.01,8694.01,8694.01,8694.01,1,EUR,565.11,0.06,9,9,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Revêtement en béton réfractaire KASA-ME-KARI-KADX,Tuyaux en béton armé sous pression,Abstract Material,General,m,206.55,206.55,206.55,206.55,1,EUR,205858.37,996.6667,9,9,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN BÉTON ARMÉ DXME-KADX-MERI_KALIME,Presses à simple manivelle horizontales pour le redressage des rails,Equipment,General,Heures machine,32.49,32.49,32.49,32.49,1,EUR,1152.27,35.4611,9,9,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-METO-KATO_KANEME,"Véhicules tout-terrain, capacité de charge 36 t",Equipment,General,Heures machine,190.8,190.8,190.8,190.8,1,EUR,18119.41,94.9667,9,9,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,POSE DE CONDUITES DANS DES CONDITIONS PARTICULIÈRES,POSE DE CONDUITES DANS LES MARAIS ET À TRAVERS LES OBSTACLES AQUATIQUES DXME-KALI-KATO_KAKAPU,"Bétonnières gravitaires mobiles, volume du tambour 500 l",Equipment,General,Heures machine,0.35,0.35,0.35,0.35,1,EUR,1.38,4.0,9,9,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Revêtement en béton réfractaire DXME-KALI-KATO_KAKAPU,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.25,4.0,9,9,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Revêtement en béton réfractaire KAME-LI-MELI-KADX_MEKAMEPU,"Foret à pointe en alliage dur, avec queue SDS-plus pour le perçage à percussion dans des matériaux durs, longueur totale 260 mm, diamètre 10 mm",Material,General,pièce,2.76,2.76,2.76,2.76,1,EUR,6.66,2.41,8,8,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-MESA-MEME_KAKARISA,"Rondelles en acier résistant à la chaleur de marque 20Kh23N18, rondes, diamètre du trou M16",Material,General,kg,97.38,97.38,97.38,97.38,1,EUR,116.86,1.2,8,8,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement des appareils thermiques avec des matériaux réfractaires fibreux DXME-MEKA-KAPU_KAMERI,Machines pour le nettoyage et l'apprêtage de tuyaux d'un diamètre de 350 à 500 mm,Equipment,General,Heures machine,26.7,26.7,26.7,26.7,1,EUR,558.92,20.935,8,8,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX KAVO-ME-KARI-RIRI,Produits pour tuyaux de descente,Abstract Material,General,pièce,11.27,11.27,11.27,11.27,1,EUR,709.78,63.0,8,8,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières métalliques RISA-RI-KAME-MEVO_KAKAKARI,"Support de fixation articulée KS-118, galvanisé",Material,General,pièce,44.28,44.28,44.28,44.28,1,EUR,448.35,10.125,8,8,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KALI-RI-KANE-KASA_KAKAMELI,"Raccords de profilés en acier galvanisé à un niveau pour plafond (crabe), dimensions 148 x 148 mm, épaisseur 0,9 mm",Material,General,100 pièces,76.95,76.95,76.95,76.95,1,EUR,95.91,1.2463,8,8,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple en profilés de plafond av DXME-KAPU-KAME_KATOLI,"Machines de forage à molettes électriques sur chenilles, profondeur de forage 36 m, diamètre des puits 215 mm",Equipment,General,Heures machine,260.09,260.09,260.09,260.09,1,EUR,224.01,0.8612,8,8,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS LES RETRAITS DXME-KAPU-KAME_KATOLI,Électricité : consommation 165 kWh/machine-heure,Electricity,Electricity,Heures machine,21.19,21.19,21.19,21.19,1,EUR,18.25,0.8612,8,8,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS LES RETRAITS KAME-LI-MEDX-MERI_KAKAKAME,"Tige en ébonite, diamètre 10-22 mm",Material,General,m,1.76,1.76,1.76,1.76,1,EUR,0.88,0.5038,8,8,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER","JOINTS ISOLANTS, CONNECTEURS DE RAILS ET PONTS DE SIGNALISATION" MEPU-SA-MEME-KARI_KAMEKAME,Mastic à dispersion aqueuse,Material,General,t,2182.35,2182.35,2182.35,2182.35,1,EUR,97.8,0.0514,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'EAU À L'INTÉRIEUR DES LOCAUX MEPU-SA-MEME-KAVO_KAKAKARI,Mastic polyvinylchlorure KhV-004,Material,General,t,5111.77,5111.77,5111.77,5111.77,1,EUR,207.03,0.04,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE DES FAÇADES À PARTIR D'ÉCHELLES OU DE PLATEAUX DXME-RIKA-MENE_KAKARI,"Les chalands utilisés en rade ouverte sont non automoteurs, d'une capacité de charge de 250 tonnes",Equipment,General,Heures machine,21.5,21.5,21.5,21.5,1,EUR,80.01,3.7212,8,8,TRAVAUX DE CONSTRUCTION,Structures en pierre des ouvrages hydrauliques,RÉTENTIONS MARITIMES EN PIERRE,DÉVERSEMENT DE MATÉRIAUX OU DE ROCHES À L'AIDE DE BARGES KAME-LI-MESA-MEPU_KAKATOPU,"Vis autotaraudeuses en acier avec revêtement anticorrosion, à tête fraisée et fente en croix, filetage à double pas, pointues, diamètre 4,2 mm, longueur 39 mm",Material,General,1000 pièces,66.09,66.09,66.09,66.09,1,EUR,203.06,3.0725,8,8,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KALI-RI-KANE-KATO_KARIRIDX,"Profilé d'angle en acier galvanisé, dimensions 31 x 31 mm, épaisseur 0,4 mm",Material,General,m,0.67,0.67,0.67,0.67,1,EUR,30.66,46.0,8,8,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple en profilés de plafond av KASA-TO-KAME-MEVO,Pièces moulées à l'unité,Abstract Material,General,pièce,27.06,27.06,27.06,27.06,1,EUR,27.06,1.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,Installation d'éléments en plâtre KASA-TO-KAME-MEKA,Pièces moulées à l'unité,Abstract Material,General,pièce,66.8,66.8,66.8,66.8,1,EUR,66.8,1.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,Installation d'éléments en plâtre MEPU-TO-KAME-KAME,Apprêts adhésifs,Abstract Material,General,kg,4.76,4.76,4.76,4.76,1,EUR,142.77,30.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS KAME-TO-KAPU-KAVO_KAKAMESA,Huile de schiste combustible,Material,General,t,581.68,581.68,581.68,581.68,1,EUR,17.36,0.22,8,8,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE DE VOIES SUR LES PONTS MEDX-TO-KAME-METO,Soupapes anti-explosion,Abstract Material,General,pièce,26.94,26.94,26.94,26.94,1,EUR,43.78,1.625,8,8,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,CHAUDIÈRES DE CHAUFFAGE,Installation de chaudières à tubes de fumée en acier pour la production de vapeu KAME-LI-MESA-KASA_KAKAMESA,"Écrous hexagonaux en acier, diamètre du filetage M16 (M18)",Material,General,t,3974.71,3974.71,3974.71,3974.71,1,EUR,59.05,0.0225,8,8,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire MELI-PU-KATO-KAME_MEKAMEKA,"Mortier réfractaire aluminosilicate mullite-corindon à liant phosphate, marque MMKF-85",Material,General,t,2300.42,2300.42,2300.42,2300.42,1,EUR,230.04,0.1,8,8,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE FOURS À HAUTE TEMPÉRATURE,Maçonnerie de hauts fourneaux MERI-ME-KARI-KATO_KAMEDXNE,"Matériau en rouleau bitume-polymère pour toiture et étanchéité, soudable, base en fibre de polyester, flexibilité maximale -15 °C, résistance minimale 400-600 N, résistance thermique minimale 130 °C",Material,General,m2,9.34,9.34,9.34,9.34,1,EUR,519.15,55.5575,8,8,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de toitures en tôle laminée sur une base en panneaux de ciment-sciur DXME-MEDX-MERI_KAKANE,"Groupes électropompes à régulation manuelle du débit pour liquides neutres et suspensions, débit jusqu'à 1000 m3/h, pression 100 m",Equipment,General,Heures machine,2.32,2.32,2.32,2.32,1,EUR,2.56,1.1025,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Silicatisation et résinisation RITO-TO-KAME-KATO,"Tubes en acier sans soudure de cuvelage, à filetage court et normal, avec manchons vissés, raccords de sécurité et bagues en acier des groupes de résistance C et D",Abstract Material,Pipes & Fittings,m,171.78,171.78,171.78,171.78,1,EUR,2.04,0.02,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au RITO-SA-KARI-KARI_KAKALINE,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 159 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,30.87,30.87,30.87,30.87,1,EUR,166.47,5.3925,8,8,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS DXME-MELI-KARI_KANEME,Périscopes,Equipment,General,Heures machine,0.32,0.32,0.32,0.32,1,EUR,0.62,1.9688,8,8,INSTALLATION DE L'ÉQUIPEMENT,Contrôle des assemblages soudés,CONTRÔLE DES ASSEMBLAGES SOUDÉS À L'AIDE DE MÉTHODES NON DESTRUCTIVES,Inspection par périscope des assemblages soudés des pipelines RITO-VO-KATO-KANE_KAKAKASA,"Raccord en acier assemblé avec manchon et contre-écrou, diamètre nominal 25 mm",Material,General,pièce,3.82,3.82,3.82,3.82,1,EUR,4.78,1.25,8,8,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, KAME-LI-MESA-MEKA_KAKASANE,"Agrafes de montage en acier à une patte (SO), diamètre de fixation 6 mm",Material,General,10 pièces,1.67,1.67,1.67,1.67,1,EUR,12.37,7.3975,8,8,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,APPAREILS TÉLÉPHONIQUES KAME-PU-KAME-KANE_KAKAPUME,"Couronne en carbure pour le forage de colonnes dans des roches de dureté moyenne CA2, diamètre 46 mm",Material,General,pièce,6.09,6.09,6.09,6.09,1,EUR,51.58,8.4712,8,8,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES DXME-KADX-KAME_KAKATO,"Machines ferroviaires pour les travaux d'installation sur le réseau de contact, tension lors du déroulement des fils jusqu'à 35 kN, vitesse de déplacement technologique jusqu'à 5 km/h",Equipment,General,Heures machine,202.93,202.93,202.93,202.93,1,EUR,312.01,1.5375,8,8,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-RIME_KAKALIRI,"Bloc de compensation en acier galvanisé pour l'égalisation des tensions des fils de contact, diamètre du bloc 100 mm, charge admissible 40 kN, longueur du bloc avec câble multibrins 880 mm",Material,General,pièce,232.98,232.98,232.98,232.98,1,EUR,419.94,1.8025,8,8,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX MEVO-TO-KAME-KAME_KAKAKAME,Têtes de compresseur,Material,General,kg,7.56,7.56,7.56,7.56,1,EUR,0.27,0.0357,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols RIKA-ME-KARI-KAVO_KAKAKARI,"Raccord en laiton, diamètre nominal 50 mm",Material,General,kg,62.74,62.74,62.74,62.74,1,EUR,68.84,1.0975,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols RITO-ME-KAME-KANE_MEKAPUNE,"Compensateur à soufflet de démarrage, diamètre 80 mm",Material,General,pièce,438.52,438.52,438.52,438.52,1,EUR,3.42,0.01,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols KAME-LI-KADX-KATO_KAKARIME,Allumeurs électriques pour mèches à percussion EZ-OSH,Material,General,1000 pièces,844.45,844.45,844.45,844.45,1,EUR,2.11,0.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DE PUITS VERTICAUX, DE PUITS DE FORAGE ET DE LEURS EMBRANCHEMENTS" DXME-RIME-MEDX_KAMEDX,Machines à cintrer les tubes hydrauliques manuelles pour le cintrage de tubes d'un diamètre extérieur jusqu'à 60 mm,Equipment,General,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.04,0.7063,8,8,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication d'éléments et assemblage de nœuds de conduites en acier à partir de DXME-RIME-RIRI_LIKAPU,"Marteaux hydrauliques sur base d'excavatrice à chenilles, poids de la partie frappante 0,44 t",Equipment,General,Heures machine,113.99,113.99,113.99,113.99,1,EUR,206.18,1.8087,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p DXME-MEVO-KARI_KAKAME,"Stations de compression, pression 245 kPa (2,5 atm), débit 40 m3/min",Equipment,General,Heures machine,16.42,16.42,16.42,16.42,1,EUR,96.57,5.8812,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEDX-MEKA_KARIME,"Stations de pompage diesel tractées à haute pression, débit jusqu'à 110 m3/h, pression jusqu'à 90 m",Equipment,General,Heures machine,12.78,12.78,12.78,12.78,1,EUR,33.41,2.6138,8,8,INSTALLATION DE L'ÉQUIPEMENT,Équipement des productions agricoles,MACHINES ET ÉQUIPEMENTS POUR LES INSTALLATIONS D'AMÉLIORATION AGRICOLE ET DE GES,MACHINES D'IRRIGATION À ACTION FRONTALE KAME-ME-KAME-KADX_KAKARIVO,"Cordon en amiante à usage général SHAN, diamètre 12 mm",Material,General,t,11209.69,11209.69,11209.69,11209.69,1,EUR,3.38,0.0,8,8,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,"Équipements de ventilation, d'alimentation en eau et de chauffage" DXME-MEVO-KARI_KAKAME,"Électricité : consommation 43,56 kWh/machine-heure",Electricity,Electricity,Heures machine,5.59,5.59,5.59,5.59,1,EUR,32.91,5.8812,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEPU-SA-KAME-KANE,Mastic polyuréthane,Abstract Material,General,kg,7.34,7.34,7.34,7.34,1,EUR,216.77,29.5512,8,8,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements renforcés (topping) pour sols en béton MEPU-RI-KANE-KAVO_KAKARIME,Agent filmogène à base de paraffine pour empêcher le dessèchement et entretenir le béton fraîchement coulé,Material,General,kg,28.64,28.64,28.64,28.64,1,EUR,4060.11,141.7813,8,8,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KALI-RI-KALI-METO_KAMEVOME,"Planchers et panneaux en acier pour les planchers intermédiaires des bâtiments industriels, épaisseur jusqu'à 5 mm",Material,General,t,8302.89,8302.89,8302.89,8302.89,1,EUR,1971.93,0.2375,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RISA-RI-KAME-RIME_MEKAKATO,"Connecteur pour cordes en bronze à partir d'un fil avec embouts en cuivre pour boulon M10, section du fil du connecteur 16 mm2, longueur selon les trous des embouts 350 mm",Material,General,pièce,14.36,14.36,14.36,14.36,1,EUR,308.2,21.4688,8,8,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-RIKA-KANE_KAKARI,"Bateaux remorqueurs, puissance 96 kW (130 ch)",Equipment,General,Heures machine,27.78,27.78,27.78,27.78,1,EUR,75.32,2.7112,8,8,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KARI-RI-KAPU-KAPU,"Mélange sable-gravier, gravier-sable, etc.",Abstract Material,General,m3,46.21,46.21,46.21,46.21,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,COUCHES DE BASE ET DE NIVELLEMENT DE LA FONDATION ET DU REVÊTEMENT,"FONDATIONS ET REVÊTEMENTS EN GRAVIER, SABLE-GRAVIER ET GRAVIER-SABLE" KASA-RI-KARI-KADX,Blocs de béton cellulaire pour murs,Abstract Material,General,m3,180.77,180.77,180.77,180.77,1,EUR,1460.65,8.08,8,8,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,Maçonnerie de murs en blocs de béton cellulaire collés sans revêtement MEPU-RI-KANE-KASA_KARIMEME,Composé polyisobutylène collant,Material,General,kg,5.33,5.33,5.33,5.33,1,EUR,5.83,1.0938,8,8,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RITO-TO-KATO-KARI_KAMEPUTO,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 159 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,107.7,107.7,107.7,107.7,1,EUR,8629.51,80.125,8,8,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,SYSTÈMES DE LUBRIFICATION ÉPAISSE ET LIQUIDE,NŒUDS DES SYSTÈMES DE LUBRIFICATION LIQUIDE RITO-TO-KAME-KARI_KAKAKAME,"Tubes en acier sans soudure pour tubage, soudables, alourdis, diamètre extérieur 73 mm, épaisseur de paroi 16 mm",Material,Pipes & Fittings,m,69.38,69.38,69.38,69.38,1,EUR,4.77,0.0786,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols RITO-TO-KAME-KANE_KAKAKAME,"Tubes de forage en acier du groupe D avec extrémités évasées à l'intérieur et manchons correspondants, diamètre extérieur 73 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,52.38,52.38,52.38,52.38,1,EUR,8.26,0.18,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols MENE-RI-KATO-KARI_KAKAKAME,Gazon en rouleaux standard,Material,General,m2,5.49,5.49,5.49,5.49,1,EUR,58.78,10.7163,8,8,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-LI-MELI-KADX_MERINERI,"Foret à pointe en alliage dur, avec queue SDS-max pour le forage à percussion dans des matériaux durs, longueur totale 340 mm, diamètre 12 mm",Material,General,pièce,9.27,9.27,9.27,9.27,1,EUR,1.37,0.1475,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX MEVO-ME-KAPU-KARI,Vannes,Abstract Material,General,pièce,524.1,524.1,524.1,524.1,1,EUR,524.1,1.0,8,8,TRAVAUX DE CONSTRUCTION,Canalisations internes,RACCORDS DE TUYAUTERIE À BRIDE,Installation de vannes de réception RITO-LI-KAME-KAME,Raccords pour compteurs d'eau en tubes d'acier,Abstract Material,Pipes & Fittings,compl,15.48,15.48,15.48,15.48,1,EUR,15.48,1.0,8,8,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation de compteurs d'eau livrés sur le lieu de montage assemblés en blocs RISA-ME-KANE-MEDX_KAKALIKA,"Cale en caoutchouc sous la cale, type TsP-361",Material,General,pièce,2.31,2.31,2.31,2.31,1,EUR,7255.69,3141.25,8,8,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RIPU-RI-KANE-KAPU_KAKAKANE,"Manchon en chrysotile-ciment pour tuyaux sans pression BNM, diamètre nominal 400 mm",Material,General,pièce,18.19,18.19,18.19,18.19,1,EUR,138.14,7.595,8,8,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment MEVO-SA-KASA-KAME,"Détendeurs en acier pour tuyauteries, à brides",Abstract Material,General,pièce,321.31,321.31,321.31,321.31,1,EUR,321.31,1.0,8,8,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de filtres à boue RISA-ME-KANE-RITO_KAKAKAME,Inserts de voie,Material,General,t,678.09,678.09,678.09,678.09,1,EUR,999.34,1.4737,8,8,TRAVAUX DE CONSTRUCTION,Voies de tramway,INSTALLATION DE CONTRE-RAILS ET DE TIRANTS DE VOIE,Fabrication et installation de contre-rails à partir de rails de chemin de fer KAVO-ME-KARI-RITO,Bardage métallique avec revêtement polymère,Abstract Material,General,m2,20.84,20.84,20.84,20.84,1,EUR,2458.68,118.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RITO-SA-KARI-KARI_KAKAVOLI,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 219 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,40.39,40.39,40.39,40.39,1,EUR,570.61,14.1275,8,8,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en eau à partir de tuyaux en ac RIRI-RI-KARI-MESA_KAKAKATO,Agrafes profilées SkF-30,Material,General,100 pièces,11.33,11.33,11.33,11.33,1,EUR,35.34,3.12,8,8,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,CÂBLES ET FILS STATIONNAIRES KAME-TO-KAME-KAME_KAKAKASA,Essence automobile AI-92,Material,General,t,1342.83,1342.83,1342.83,1342.83,1,EUR,0.4,0.0,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE MEDX-ME-KAPU-KARI,Déflecteurs,Abstract Material,General,pièce,215.15,215.15,215.15,215.15,1,EUR,215.15,1.0,8,8,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de déflecteurs DXME-KALI-KAME_KAMEME,"Silos à ciment, capacité 40 t",Equipment,General,Heures machine,0.73,0.73,0.73,0.73,1,EUR,1.2,1.6562,8,8,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation du béton dans des usines automatisées sur site RIPU-TO-KASA-KALI_KASAMEME,"Manchon en polyéthylène pour tuyaux en chrysotile-ciment, diamètre extérieur nominal 100 mm",Material,General,pièce,0.55,0.55,0.55,0.55,1,EUR,72.61,131.5,8,8,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES DXME-KASA-KANE_KATORI,"Grues sur chenilles, capacité de charge 500 t",Equipment,General,Heures machine,736.99,736.99,736.99,736.99,1,EUR,9762.35,13.2462,8,8,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ DXME-KASA-KAVO_KAMEKA,"Grues sur châssis pneumatique, capacité de charge 100 t",Equipment,General,Heures machine,87.01,87.01,87.01,87.01,1,EUR,3712.96,42.6737,8,8,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" KAME-PU-KARI-KAPU_MERIKAKA,"Tige de forage en acier, diamètre extérieur du tube 76 mm, épaisseur de la paroi du tube 5 mm, diamètre de l'ouverture intérieure du raccord 30 mm, filetage du manchon et du raccord trapézoïdal 56x12 mm, longueur 1230 mm",Material,Pipes & Fittings,pièce,103.98,103.98,103.98,103.98,1,EUR,126.85,1.22,8,8,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES DXME-KATO-MEKA_KAMEKA,"Machines de forage pneumatiques pour le forage de puits explosifs dans le cadre de l'exploitation souterraine de minéraux et de puits auxiliaires à partir de stations de compression fixes, profondeur de forage jusqu'à 150 m",Equipment,General,Heures machine,22.95,22.95,22.95,22.95,1,EUR,1175.98,51.2488,8,8,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES DXME-MEDX-KAPU_KAKANE,"Pompes de forage pour l'injection de fluide de lavage, débit 8-160 l/min, pression de sortie jusqu'à 6,3 MPa",Equipment,General,Heures machine,1.55,1.55,1.55,1.55,1,EUR,68.93,44.5675,8,8,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES DXME-MEDX-KAPU_KAKANE,"Électricité : consommation 3,63 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.47,0.47,0.47,0.47,1,EUR,20.78,44.5675,8,8,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES MEPU-PU-KAPU-MEKA,Composition autonivelante monocomposant,Abstract Material,General,kg,31.24,14.86,36.7,36.7,2,EUR,348.25,23.435,8,8,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes KASA-ME-KASA-KAPU,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,447.39,447.39,447.39,447.39,1,EUR,44739.36,100.0,8,8,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,FONDATIONS ET POUTRES DE FONDATION KAME-LI-KANE-MEME_MEKAKAPU,"Bandes d'étanchéité à base de caoutchouc synthétique pour façades ventilées suspendues, épaisseur 1 mm, largeur 60 mm",Material,General,10 m,7.5,7.5,7.5,7.5,1,EUR,34.14,4.55,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-KADX-MEKA_KARIME,Chariots élévateurs automoteurs,Equipment,General,Heures machine,42.59,42.59,42.59,42.59,1,EUR,160.66,3.7725,8,8,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",REMBLAYAGE DES MARAIS KASA-ME-KAVO-KANE_KAKADXRI,"Dalles en béton armé pour la pose de voies ferrées, volume jusqu'à 1,4 m3, béton B25, consommation d'armature de 300 à 350 kg/m3",Material,General,m3,832.92,832.92,832.92,832.92,1,EUR,5417.11,6.5038,8,8,TRAVAUX DE CONSTRUCTION,Lignes électriques,APPAREILS DE DISTRIBUTION OUVERTS DE 35 À 1150 KV,"VOIES DE ROULEMENT, CROISEMENTS ET CLOISONS COUPE-FEU POUR TRANSFORMATEURS ORU 1" RIKA-ME-KARI-RIRI_KAKAKATO,Œillet à deux branches U2-12-16,Material,General,pièce,17.33,17.33,17.33,17.33,1,EUR,26.78,1.545,8,8,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-KATO-MEDX_KADXRI,Clés à chapeau pneumatiques manuelles fonctionnant à partir de compresseurs mobiles,Equipment,General,Heures machine,0.15,0.15,0.15,0.15,1,EUR,4.87,33.4513,8,8,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL DXME-KAVO-KALI_KAMELI,"Distributeurs de gravats tractés, capacité de la trémie 2,1 m3, largeur de travail 250-3000 mm",Equipment,General,Heures machine,5.93,5.93,5.93,5.93,1,EUR,5.01,0.845,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-KAVO-MEKA_KASASA,"Fraiseuses routières à froid automotrices sur chenilles, largeur maximale de fraisage 2000 mm",Equipment,General,Heures machine,339.98,339.98,339.98,339.98,1,EUR,128.77,0.3787,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES FONDATIONS ET REVÊTEMENTS EXISTANTS POUR LES REVÊTEMENTS EN GRAV,DÉMONTAGE DES INSTALLATIONS EXISTANTES KAME-TO-KAME-KANE,Lubrification,Abstract Material,General,kg,15.4,15.4,15.4,15.4,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-RIME-KAME_KAMEME,"Installations électriques pour l'application de mastics bitumineux, puissance jusqu'à 3 kW",Equipment,General,Heures machine,0.61,0.61,0.61,0.61,1,EUR,2.75,4.4938,8,8,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en béton bitumineux DXME-RIME-KAME_KAMEME,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.42,4.4938,8,8,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en béton bitumineux MEVO-SA-MEKA-KATO,Raccord de radiateur,Abstract Material,General,pièce,27.42,27.42,27.42,27.42,1,EUR,0.0,0.0,8,8,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Regroupement des sections des anciens radiateurs KAME-LI-MELI-KANE_KAKAVOPU,"Disque diamanté à tronçonner avec tranchant profilé continu, diamètre 230 mm, épaisseur du tranchant diamanté 2,6 mm, hauteur du tranchant diamanté 10 mm",Material,General,pièce,15.28,15.28,15.28,15.28,1,EUR,116.15,19.0,8,8,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de KASA-ME-KATO-KASA,Chapiteaux,Abstract Material,General,pièce,700.92,700.92,700.92,700.92,1,EUR,70091.7,100.0,8,8,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,COLONNES ET CAPITAUX KASA-ME-KATO-KATO,Poutres de charpente,Abstract Material,General,pièce,822.52,822.52,822.52,822.52,1,EUR,82252.13,100.0,8,8,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"Poutres, traverses et linteaux" KASA-ME-KAPU-RISA,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,71.02,71.02,71.02,71.02,1,EUR,7102.18,100.0,8,8,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS MEPU-ME-KANE-KAPU_KAKAKAME,Colle pour coller la laine minérale,Material,General,kg,0.72,0.72,0.72,0.72,1,EUR,757.62,1051.7888,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-KASA-KASA_KAKAKAME,Micanite,Material,General,kg,41.98,41.98,41.98,41.98,1,EUR,440.76,10.5,8,8,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,MACHINES ÉLECTRIQUES KAPU-TO-KAME-KADX_KAKAMEDX,"Mortier prêt à l'emploi pour maçonnerie, à base de ciment, M400",Material,General,m3,187.29,187.29,187.29,187.29,1,EUR,78.21,0.4771,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES RIKA-ME-KARI-RIME_KAKAMERI,Nœud d'ancrage KS-156,Material,General,pièce,32.43,32.43,32.43,32.43,1,EUR,135.34,4.1738,8,8,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIKA-SA-KAPU-KAPU_KAKANEME,Pince à boulon de tension NBN en aluminium pour la fixation de câbles multiconducteurs d'une section de 95-120 mm2,Material,General,pièce,17.93,17.93,17.93,17.93,1,EUR,25.39,1.4163,8,8,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-KANE-KAVO_KAKAME,"Palans électriques, capacité de charge 0,5 t",Equipment,General,Heures machine,0.19,0.19,0.19,0.19,1,EUR,0.33,1.7213,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RIPU-TO-KATO-KADX,Tuyau spiralé à paroi structurée en polyéthylène pour systèmes d'évacuation des eaux,Abstract Material,General,m,1669.47,1669.47,1669.47,1669.47,1,EUR,1711201.64,1025.0,8,8,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX EN POLYÉTHYLÈNE SANS PRESSION KAME-LI-MEPU-KASA_KAKAKARI,Polyéthylène chlorosulfoné,Material,General,t,19813.12,19813.12,19813.12,19813.12,1,EUR,823.98,0.0425,8,8,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX EN POLYÉTHYLÈNE SANS PRESSION MEPU-PU-KAPU-MERI,Émaux époxy,Abstract Material,General,t,6909.26,6909.26,6909.26,6909.26,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,PEINTURE DES STRUCTURES DE PASSAGE MEPU-SA-KADX-KAPU,Durcisseurs,Abstract Material,General,t,30863.43,30863.43,30863.43,30863.43,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,PEINTURE DES STRUCTURES DE PASSAGE KAVO-TO-KADX-KASA,Structures en acier,Abstract Material,Steel & Metal,t,4226.64,4226.64,4226.64,4226.64,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" MEVO-SA-KAVO-KASA_KAKALISA,"Supports en acier à cheville, peints, pour la fixation de radiateurs, diamètre 7 mm, longueur du support 300 mm, cheville en plastique de diamètre 10 mm, longueur 60 mm",Material,General,100 pièces,110.41,110.41,110.41,110.41,1,EUR,27.46,0.25,8,8,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier RISA-ME-KANE-RIME,Raccord de rail,Abstract Material,General,pièce,1674.18,1674.18,1674.18,1674.18,1,EUR,64956.13,38.7988,8,8,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX KADX-PU-KATO-MEME,Rails et pièces d'encadrement en alliages d'aluminium,Abstract Material,General,t,24558.33,24558.33,24558.33,24558.33,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-KASA-KARI_KAKADX,"Grues à portique, capacité de charge 200 t",Equipment,General,Heures machine,317.68,317.68,317.68,317.68,1,EUR,243176.9,765.4775,8,8,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,",IMMERSION DE STRUCTURES MÉTALLIQUES ET EN BÉTON ARMÉ SOUS L'EAU EN MILIEU FLUVIA DXME-KASA-KARI_KAKADX,"Électricité : consommation 98,67 kW·h/machine-heure",Electricity,Electricity,Heures machine,12.67,12.67,12.67,12.67,1,EUR,9701.03,765.4775,8,8,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,",IMMERSION DE STRUCTURES MÉTALLIQUES ET EN BÉTON ARMÉ SOUS L'EAU EN MILIEU FLUVIA KAVO-TO-KASA-KARI_KAMEPUKA,"Tôles laminées à chaud, nuance d'acier C345, largeur 1200-3000 mm, épaisseur 1-8 mm",Material,General,t,2354.77,2354.77,2354.77,2354.77,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-KALI-KASA,Lamelles à base de fibres de carbone unidirectionnelles,Abstract Material,General,m2,956.0,106.57,3504.31,106.57,2,EUR,867.9,8.145,8,7,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,RENFORCEMENT DES CONSTRUCTIONS EN BÉTON ARMÉ RITO-VO-KAPU-MEME,Pièces moulées et raccords pour tuyaux flexibles isolés thermiquement,Abstract Material,General,pièce,363.11,363.11,363.11,363.11,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE DXME-KAPU-KARI_KATOME,"Installations de forage dirigé pour la pose sans tranchée, force de traction 200 kN",Equipment,General,Heures machine,152.18,152.18,152.18,152.18,1,EUR,87.5,0.575,8,8,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE MEDX-RI-KAME-KAME,Amortisseurs de vibrations à ressort,Abstract Material,General,pièce,10.82,10.82,10.82,10.82,1,EUR,108.24,10.0,8,8,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de vibro-isolateurs RIME-RI-KATO-KARI_MEKALIKA,"Fil de montage MGSHV 1x0,2-1000",Material,General,1000 m,292.13,292.13,292.13,292.13,1,EUR,102.31,0.4,8,8,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES KAPU-RI-KAPU-KAME,Mélanges d'enrobés bitumineux à froid,Abstract Material,General,t,346.18,346.18,346.18,346.18,1,EUR,1021.18,2.95,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-KATO_KAPUSA,"Rouleaux compresseurs automoteurs lisses vibrants, poids 7 t",Equipment,General,Heures machine,40.65,40.65,40.65,40.65,1,EUR,71.89,1.7688,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MEPU-PU-KAPU-MEME_KAKAMEKA,"Émail à base de copolymère de chlorure de vinyle et d'acétate de vinyle, couleur argentée",Material,General,t,12079.3,12079.3,12079.3,12079.3,1,EUR,11.91,0.0,8,8,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAVO-PU-KATO-KATO_KAKARITO,"Acier d'armature laminé à chaud à profil périodique, classe A-II, diamètre 14 mm",Material,General,t,1474.91,1474.91,1474.91,1474.91,1,EUR,689.52,0.4675,8,8,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ÉTANCHÉIFICATION DES JOINTS DE DÉFORMATION DANS LES OUVRAGES HYDRAULIQUES SOUS P RIKA-ME-KARI-KASA_KAKAKARI,"Balance galvanisée pour l'ancrage combiné du câble porteur et du fil de contact, largeur 150 mm, longueur 620 mm",Material,General,pièce,82.84,82.84,82.84,82.84,1,EUR,255.97,3.09,8,8,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-LI-MEME-KALI_KAKATOLI,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés UONI 13/45A, E46A, diamètre 4 mm",Material,General,t,3785.59,3785.59,3785.59,3785.59,1,EUR,15.56,0.01,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage MERI-RI-KAPU-KAPU,Plaques ou matelas en laine minérale ou en fibre de verre,Abstract Material,General,m2,125.64,125.64,125.64,125.64,1,EUR,4989.98,39.715,8,8,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une isolation thermique et acoustique continue KAME-RI-KATO-KATO_KAMEKATO,"Mastic bitumineux d'étanchéité pour structures souterraines, à froid, prêt à l'emploi, plage de température de -20 à +40 °C, adhérence au métal/béton d'au moins 0,1 MPa, consommation pour surface horizontale 1 kg/m2",Material,Steel & Metal,kg,4.0,4.0,4.0,4.0,1,EUR,5.25,1.3125,8,8,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DANS LES INSTALLATIONS MINIÈRES D'UNE DXME-RIME-RIRI_PUKAME,Chariots pour câbles,Equipment,General,Heures machine,0.17,0.17,0.17,0.17,1,EUR,0.77,4.645,8,8,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES CÂBLÉES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES DESTINÉES A,ÉQUIPEMENT ÉLECTRIQUE DANS LES EXPLOITATIONS MINIÈRES MEPU-RI-KANE-KATO,Liquide hydrophobe,Abstract Material,General,l,20.62,20.62,20.62,20.62,1,EUR,464.04,22.5,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,REVÊTEMENT ET PEINTURE AVEC DES VERNIS ET DES COMPOSÉS SPÉCIAUX KAPU-TO-KARI-KANE_KAKAKATO,Mélanges de plâtre en relief à base acrylique avec effet décoratif,Material,General,kg,2.95,2.95,2.95,2.95,1,EUR,431.58,146.25,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,TRAVAUX DÉCORATIFS DXME-RIKA-MEKA_KAKARI,"Plates-formes flottantes démontables, capacité de charge 7 t",Equipment,General,Heures machine,32.17,32.17,32.17,32.17,1,EUR,1499.15,46.5987,8,8,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Construction de quais d'accostage à profil angulaire en béton armé préfabriqué s MEPU-SA-KAME-KALI,Mastic silicone,Abstract Material,General,l,59.73,20.36,83.35,83.35,2,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE CIMENT MINÉRAL RE",Installation de plafonds suspendus en plaques minérales-ciment renforcées intern KAME-TO-KASA-MESA_KAKATOME,"Carbonate de potassium technique (potasse) calciné, catégorie I",Material,General,kg,2.77,2.77,2.77,2.77,1,EUR,22.32,8.0575,8,8,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX DXME-KAVO-KANE_KAKAPU,"Coupeurs de joints automoteurs, profondeur de coupe maximale 350 mm, puissance 22 kW (30 ch)",Equipment,General,Heures machine,19.17,19.17,19.17,19.17,1,EUR,7.02,0.3663,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES MENE-TO-KAME-KARI,Préparation bactérienne biologique,Abstract Material,General,kg,185.65,185.65,185.65,185.65,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,TRAVAUX DIVERS DXME-RIKA-KAVO_KAKAPU,"Copros flottants avec marteau diesel, 6 t",Equipment,General,Heures machine,148.77,148.77,148.77,148.77,1,EUR,153.79,1.0337,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS RITO-PU-KAME-KASA,Tuyaux en acier isolés,Abstract Material,General,m,82.91,82.91,82.91,82.91,1,EUR,83.73,1.01,8,8,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,POSE DE COUVERCLES SANS TRANSPARENCE RITO-TO-KATO-KARI_KAMEMEME,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 133 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,38.05,38.05,38.05,38.05,1,EUR,18.67,0.49,8,8,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de chauffage et d'alimentation en ea KAVO-TO-KATO-KASA_MEKANEVO,"Fil d'acier à faible teneur en carbone galvanisé à usage général, diamètre 7,0-10,0 mm",Material,General,t,1841.69,1841.69,1841.69,1841.69,1,EUR,68.43,0.075,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ KAME-LI-MELI-KADX_MERIRIPU,"Foret guide en acier, acier de marque 40Kh, diamètre 34 mm, longueur 170 mm",Material,General,pièce,1367.44,1367.44,1367.44,1367.44,1,EUR,331.6,0.2425,8,8,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS MEME-ME-KATO-KANE_KAKAPUPU,"Planche équarrie en bois feuillu (aulne), sèche, longueur 4-6,5 m, toutes largeurs, épaisseur 25, 32, 40 mm, classe II",Material,General,m3,1134.16,1134.16,1134.16,1134.16,1,EUR,0.31,0.0,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-SA-KAME-KAVO_KAKASAKA,"Tubes en acier électrosoudés à joint droit et à joint spiralé, classe de résistance K38, diamètre extérieur 820 mm, épaisseur de paroi 9 mm",Material,Pipes & Fittings,m,476.4,476.4,476.4,476.4,1,EUR,162.24,0.34,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KARI-RI-KASA-KAPU_RIKADXPU,"Gravier de roches denses pour travaux de construction M 1200, fraction 20-40 mm",Material,General,m3,78.98,78.98,78.98,78.98,1,EUR,1420.39,17.9843,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MEPU-RI-KAME-KARI_KAKAKARI,Composition polyuréthane à base de vernis,Material,General,kg,19.65,19.65,19.65,19.65,1,EUR,1.31,0.065,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-RIKA-KAVO_KAKADXRI,"Gaze brute, largeur 920 mm, densité superficielle 39 g/m2",Material,General,10 m,4.33,4.33,4.33,4.33,1,EUR,0.35,0.0813,8,8,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Installation d'électrodes de comparaison RIME-ME-KASA-KAME_KAMEPUKA,Câble flexible de puissance avec conducteurs en cuivre KGN 3x4-660,Material,General,1000 m,4974.0,4974.0,4974.0,4974.0,1,EUR,1.16,0.0,8,8,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments résidentiels e RIKA-RI-MEME-KAPU_KAKARIME,Entretoise R-4-120,Material,General,pièce,5.8,5.8,5.8,5.8,1,EUR,40.61,7.0,8,8,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS KAME-LI-KADX-KARI,Détonit M,Abstract Material,General,t,5366.65,5366.65,5366.65,5366.65,1,EUR,653.39,0.1225,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAVO-ME-KANE-KATO,Panneaux métalliques grillagés,Abstract Material,General,m2,74.22,74.22,74.22,74.22,1,EUR,6223.69,83.85,8,8,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" KALI-PU-KATO-KADX,Poteaux en acier pour éclairage extérieur,Abstract Material,General,t,6743.79,6743.79,6743.79,6743.79,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Lignes électriques,POTEAUX DU RÉSEAU DE CONTACT DU TRANSPORT ÉLECTRIQUE URBAIN ET DE L'ÉCLAIRAGE PU,POTEAUX DU RÉSEAU DE CONTACT DU TRANSPORT ÉLECTRIQUE URBAIN RITO-TO-KANE-KASA_KAKAKAPU,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 32 mm, épaisseur de paroi 3,2 mm",Material,Pipes & Fittings,m,4.35,4.35,4.35,4.35,1,EUR,44.99,10.3425,8,8,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-KAVO-MEKA_KAKAME,"Régénérateurs-mélangeurs, largeur de fraisage 2438 mm, puissance 400 kW (550 ch)",Equipment,General,Heures machine,424.9,424.9,424.9,424.9,1,EUR,1723.49,4.0563,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KATO-RI-KAME-KAME_KAKATORI,"Ciment Portland pour la construction générale CEM I 32,5B",Material,General,t,208.94,208.94,208.94,208.94,1,EUR,2.4,0.015,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MEPU-RI-KANE-KAVO_KAMEKATO,"Produit d'étanchéité haut de gamme pour l'entretien des sols en béton, couleur naturelle",Material,General,l,25.86,25.86,25.86,25.86,1,EUR,0.0,0.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,AUTRES TRAVAUX,Application manuelle en une seule couche de composés non rétractables à durcisse KAME-LI-MESA-KAME_MENETOTO,"Boulons d'ancrage à enfoncer en acier au carbone, galvanisés, diamètre 16 mm, longueur 50 mm",Material,General,100 pièces,113.94,113.94,113.94,113.94,1,EUR,52.27,0.4587,8,8,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES ET ROBINETTERIE DES INSTALLATIONS D'EXTINCTION AUTOMATIQUE D'INCENDI,"Dispositif de tuyauteries en tubes et raccords en polypropylène ignifugés, renfo" RITO-TO-KADX-KAME_KAKASAVO,"Tubes électrosoudés en acier inoxydable 08Kh18N10, diamètre extérieur 25 mm, épaisseur de paroi 2,5 mm",Material,Pipes & Fittings,10 m,52.67,52.67,52.67,52.67,1,EUR,36.87,0.7,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KAPU-KAME_KAVOPU,Installations de forage rotatif à percussion sur chenilles télescopiques avec un couple de rotation pouvant atteindre 240 kNm pour les travaux de construction hydroélectrique,Equipment,General,Heures machine,789.26,789.26,789.26,789.26,1,EUR,1021.1,1.2938,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-VO-KATO-MERI_MEKAVOPU,"Raccord en acier à souder, diamètre 50 mm",Material,General,pièce,10.38,10.38,10.38,10.38,1,EUR,0.0,0.0,8,8,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Tirage de conduites de gaz en polyéthylène dans des conduites de gaz en acier ex DXME-RIME-KATO_SAMEKA,"Appareils de sablage fonctionnant à partir d'installations de compression mobiles, volume jusqu'à 200 l, débit d'air jusqu'à 16 m3/min, avec embout pour le nettoyage de la surface interne des tuyaux d'un diamètre supérieur à 200 et jusqu'à 900 mm",Equipment,General,Heures machine,1.05,1.05,1.05,1.05,1,EUR,23.52,22.34,8,8,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Nettoyage par sablage de la surface interne de la canalisation DXME-MEKA-MEME_MEPUME,Expandeurs hydrauliques pour tuyaux en polymère d'un diamètre de 160 à 500 mm,Equipment,General,Heures machine,6.72,6.72,6.72,6.72,1,EUR,62.63,9.325,8,8,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya KAME-LI-MEME-KALI_KARIRIKA,"Électrodes en graphite avec revêtement cuivré pour le rabotage et la découpe du métal, diamètre 8 mm",Material,General,kg,29.26,29.26,29.26,29.26,1,EUR,68.61,2.345,8,8,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS KASA-TO-KARI-KARI,Pièces moulées à l'unité,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment (rosaces, balustres)" KASA-TO-KARI-MEKA,Pièces moulées à l'unité,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment (chapiteaux, bases, pommeaux, corniches, conso" MEPU-SA-KASA-KARI,Huile de lin,Abstract Material,General,t,4.23,4.23,4.23,4.23,1,EUR,0.05,0.01,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,REVÊTEMENT ET PEINTURE AVEC DES VERNIS ET DES COMPOSÉS SPÉCIAUX MEVO-RI-KAPU-KAME,Puits en polyéthylène,Abstract Material,General,compl,2186.56,2186.56,2186.56,2186.56,1,EUR,2186.56,1.0,8,8,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Installation de puits préfabriqués ronds en matériaux polymères sur raccord à br DXME-RIME-RIRI_SAPUKA,"Pistolets électriques, débit jusqu'à 0,5 l/min",Equipment,General,Heures machine,0.28,0.28,0.28,0.28,1,EUR,0.57,2.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS DXME-RIME-RIRI_SAPUKA,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.19,2.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS KASA-TO-KAME-KALI,Moulures décoratives,Abstract Material,General,m,97.48,97.48,97.48,97.48,1,EUR,9845.38,101.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments moulurés en plâtre plats, bombés, en relief, à motifs si" MELI-PU-KASA-MEPU_KAKAMEME,"Poudre de chamotte moulue, marque PSh",Material,General,t,649.68,649.68,649.68,649.68,1,EUR,10.15,0.0171,8,8,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Maçonnerie des poêles et des foyers DXME-RIME-RIRI_PURIME,Thermos 100 l,Equipment,General,Heures machine,0.84,0.84,0.84,0.84,1,EUR,2.87,3.4188,8,8,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité KAME-SA-KARI-KAME_KAMEKARI,"Élément en acier galvanisé réfléchissant pour la route, épaisseur 1,5 mm",Material,General,t,10457.62,10457.62,10457.62,10457.62,1,EUR,62.61,0.01,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KASA-TO-KAME-MEPU,Pièces moulées à l'unité,Abstract Material,General,pièce,39.69,39.69,39.69,39.69,1,EUR,39.69,1.0,8,8,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,Installation d'éléments en plâtre KAME-LI-MELI-KANE_KAKALIME,"Disque diamanté segmenté, diamètre 450 mm, épaisseur du bord diamanté 4 mm, hauteur du bord diamanté 12 mm",Material,General,pièce,252.1,252.1,252.1,252.1,1,EUR,101.72,0.4025,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-RIKA-MENE_KAKAME,"Les chalands utilisés dans les eaux fermées sont non automoteurs, capacité de charge 250 tonnes",Equipment,General,Heures machine,15.45,15.45,15.45,15.45,1,EUR,57.49,3.7212,8,8,TRAVAUX DE CONSTRUCTION,Structures en pierre des ouvrages hydrauliques,RÉTENTIONS MARITIMES EN PIERRE,DÉVERSEMENT DE MATÉRIAUX OU DE ROCHES À L'AIDE DE BARGES DXME-KAPU-KAME_KATONE,"Électricité : consommation 214,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,27.55,27.55,27.55,27.55,1,EUR,13.19,0.4788,8,8,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS LES RETRAITS DXME-KAPU-KAME_KATONE,"Machines de forage à rouleaux électriques sur chenilles, profondeur de forage 32 m, diamètre des puits 250 mm",Equipment,General,Heures machine,326.89,326.89,326.89,326.89,1,EUR,156.5,0.4788,8,8,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES,AFFLUFFEMENT DES SOLS ROCHEUX À L'AIDE DE CHARGES EXPLOSIVES DANS LES RETRAITS KAME-LI-MELI-KADX_KAKANENE,"Foret diamanté annulaire, diamètre 45 mm",Material,General,pièce,24.29,24.29,24.29,24.29,1,EUR,29.51,1.215,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-KAME-KASA_SAMEVO,"Pelles hydrauliques à godet unique diesel sur chenilles, volume du godet 1,8 m3",Equipment,General,Heures machine,66.52,66.52,66.52,66.52,1,EUR,13.42,0.2013,8,8,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS RISA-ME-KAME-KASA_KAKAKAME,"Demi-traverses en bois résineux (à l'exception du mélèze), imprégnées, pour voies de roulement, type 1",Material,General,pièce,37.79,37.79,37.79,37.79,1,EUR,349.94,9.26,8,8,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Installation et démontage de voies de roulement pour grues à tour à partir d'élé KAME-LI-KANE-KAME_KAKAPUTO,Bandes élastiques autocollantes pour profilés de guidage 70 x 30000 mm,Material,General,m,0.27,0.27,0.27,0.27,1,EUR,31.98,116.375,8,8,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Revêtement des murs sur une ossature métallique simple composée de profilés de g KALI-RI-KANE-KAPU_KAKALIVO,"Suspensions à ressort en acier galvanisé avec pince de profilé, dimensions du profilé 60 x 27 mm",Material,General,100 pièces,91.12,91.12,91.12,91.12,1,EUR,98.64,1.0825,8,8,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de plafonds suspendus en plaques de plâtre (GKL) DXME-KAVO-KADX_KAMEME,"Plaques vibrantes à moteur à combustion interne, puissance jusqu'à 11 kW (15 ch)",Equipment,General,Heures machine,5.13,5.13,5.13,5.13,1,EUR,9.13,1.78,8,8,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Réalisation de revêtements de trottoirs en dalles de granit MEVO-RI-KANE-KAVO,Tuyaux flexibles,Abstract Material,General,pièce,11.91,10.18,24.05,10.18,2,EUR,445.29,24.2857,8,8,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" DXME-KAME-KAME_KAMEVO,"Bulldozers-décompacteurs sur tracteur, puissance 243 kW (330 ch)",Equipment,Bulldozers,Heures machine,137.01,137.01,137.01,137.01,1,EUR,1794.77,13.1,8,8,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-KAME-KAME_KAMEDX,"Bulldozers-décompacteurs sur tracteur, puissance 303 kW (410 ch)",Equipment,Bulldozers,Heures machine,178.76,178.76,178.76,178.76,1,EUR,1637.93,9.1625,8,8,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RINE-ME-KARI-KAVO_KAKASAME,"Support de fixation du rail de contact, dimensions 540 x 620 x 100 mm",Material,General,pièce,69.15,69.15,69.15,69.15,1,EUR,4248.51,61.4375,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RINE-ME-KARI-KAVO_MEKAKANE,"Isolateur en porcelaine basse tension pour rail de contact, dimensions 150 x 112 mm",Material,General,pièce,18.54,18.54,18.54,18.54,1,EUR,2357.66,127.1375,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-MEKA-KAPU_KAMERI,"Électricité : consommation 12,54 kWh/machine-heure",Electricity,Electricity,Heures machine,1.61,1.61,1.61,1.61,1,EUR,33.72,20.935,8,8,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX DXME-KANE-KANE_KASARI,"Ascenseurs de mine pour tubes industriels, hauteur 120 m",Equipment,General,Heures machine,91.64,91.64,91.64,91.64,1,EUR,139.63,1.5238,8,8,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE FOURS À HAUTE TEMPÉRATURE,Maçonnerie de hauts fourneaux MEPU-ME-KASA-KASA_KAMEKATO,"Colle résorcinol-formaldéhyde, bicomposante, composants A et B, marque FR-12",Material,General,t,20227.79,20227.79,20227.79,20227.79,1,EUR,1436.17,0.0713,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MEVO-TO-KARI-KARI,Armoires anti-incendie,Abstract Material,General,pièce,66.48,66.48,66.48,66.48,1,EUR,6647.98,100.0,8,8,TRAVAUX DE CONSTRUCTION,Canalisations internes,AUTRES TRAVAUX,Installation d'armoires KAME-LI-MESA-MEPU_KATOKASA,"Vis autotaraudeuses en acier galvanisé à tête demi-ronde et fente en croix, pointues, diamètre 5 mm, longueur 45 mm",Material,General,t,5563.19,5563.19,5563.19,5563.19,1,EUR,17.11,0.01,8,8,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-MESA-MEPU_KAMELIME,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 6 mm, longueur 60 mm",Material,General,t,3368.92,3368.92,3368.92,3368.92,1,EUR,1.18,0.0,8,8,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" KAME-TO-KASA-MEME_KAKAKAME,"Dichloroéthane technique, catégorie I",Material,General,t,5157.19,5157.19,5157.19,5157.19,1,EUR,2011.3,0.39,8,8,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",RACCORDEMENT DES CÂBLES ÉLECTRIQUES ET DES TUYAUX AUX ÉQUIPEMENTS TECHNIQUES DES,Raccordement des câbles électriques aux appareils MERI-RI-KATO-MEME_KAKAMEME,"Tissu de verre A-1, pour l'étanchéité des tabliers de ponts",Material,General,m2,6.09,6.09,6.09,6.09,1,EUR,507.33,83.2975,8,8,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MERI-RI-KAPU-KAPU_MEKAMEPU,"Mats isolants thermo-isolants en laine minérale, sans revêtement, marque 125",Material,General,m3,158.48,158.48,158.48,158.48,1,EUR,18159.57,114.5887,8,8,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Installation de cloisons de 3 m de hauteur en panneaux extrudés en amiante-cimen DXME-KAME-KASA_KANESA,"Pelles hydrauliques à godet unique diesel sur chenilles, volume du godet 0,15 m3",Equipment,General,Heures machine,15.04,15.04,15.04,15.04,1,EUR,1072.01,71.2786,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-KALI-KAVO_KAPUME,"Installations de mélange, débit 20 m3/h",Equipment,General,Heures machine,3.18,3.18,3.18,3.18,1,EUR,226.03,71.0957,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment KATO-RI-KAME-KAME_KAKATOVO,"Ciment Portland pour la construction générale CEM I 42,5B",Material,General,t,274.85,274.85,274.85,274.85,1,EUR,0.55,0.0,7,7,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",DISPOSITIFS DE MICROPROCESSEURS ET DE TECHNIQUES DE CALCUL,"APPAREILS SDAU, ASDU, AIS, ASUTP, PAZ" MEPU-SA-KAME-KATO_KAKAKASA,"Mastic bicomposant fluororganique pâteux pour l'étanchéification des assemblages métalliques rivetés et soudés, couleur blanche",Material,General,kg,208.64,208.64,208.64,208.64,1,EUR,1706.07,8.1771,7,7,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS UTILISANT DES PLAQUES DE CIMENT-COPEAUX,CLOISONS SUR OSSATURE MÉTALLIQUE KALI-RI-KANE-KANE_KAKALIPU,"Profilé en aluminium pour socle, largeur 150 mm, longueur 2500 mm",Material,General,m,6.86,6.86,6.86,6.86,1,EUR,426.48,62.18,7,7,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS UTILISANT DES PLAQUES DE CIMENT-COPEAUX,CLOISONS SUR OSSATURE EN BOIS DXME-KASA-KALI_KAMEKA,"Grues de pose pour le remplacement des aiguillages, capacité de charge 30 t",Equipment,General,Heures machine,366.84,366.84,366.84,366.84,1,EUR,1295.45,3.5314,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" DXME-RIME-RIRI_SAVODX,"Électricité : consommation 0,23 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.95,32.7586,7,7,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Étanchéification des entrées de communications à travers les murs à l'aide de co DXME-RIME-RIRI_SAVODX,"Pompes à injection à piston avec une pression jusqu'à 40 MPa, débit 1 l/min",Equipment,General,Heures machine,0.28,0.28,0.28,0.28,1,EUR,9.24,32.7586,7,7,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Étanchéification des entrées de communications à travers les murs à l'aide de co DXME-KASA-KAPU_KAKAPU,"Électricité : consommation 19,8 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.54,2.54,2.54,2.54,1,EUR,0.41,0.1629,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,CONDUITES EN SURFACE DXME-KASA-KAPU_KAKAPU,"Ponts roulants électriques, capacité de levage principale 50 t, capacité de levage auxiliaire 10 t",Equipment,General,Heures machine,279.32,279.32,279.32,279.32,1,EUR,45.49,0.1629,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,CONDUITES EN SURFACE MERI-RI-KATO-MEKA_KAKAKAPU,"Fibre de verre en rouleau thermo-isolante, composition d'imprégnation à base de latex contenant de la poudre d'aluminium, résistante à l'humidité",Material,General,m2,1.65,1.65,1.65,1.65,1,EUR,2290.34,1391.7143,7,7,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MERI-RI-KATO-MEKA_KAKAKATO,"Fibre de verre en rouleau, densité 850 g/m2, épaisseur 0,7 mm",Material,General,m2,2.69,2.69,2.69,2.69,1,EUR,93.15,34.5714,7,7,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " DXME-RIKA-MERI_KARIDX,"Dragues suceuses papillon refouleres automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 7600 kW",Equipment,General,Heures machine,0.0,0.0,0.0,0.0,0,EUR,0.0,0.3186,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-RIKA-MERI_SAKADX,"Dragues à papillon automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 6600 kW",Equipment,General,Heures machine,0.0,0.0,0.0,0.0,0,EUR,0.0,0.37,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-RIKA-MERI_MEKADX,"Dragues papillon automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 5500 kW",Equipment,General,Heures machine,0.0,0.0,0.0,0.0,0,EUR,0.0,0.6271,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO MEKA-TO-KAME-KASA_KAKAKAME,"Poudre de zinc, marque PC1",Material,General,kg,8.5,8.5,8.5,8.5,1,EUR,12.29,1.4443,7,7,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,RENFORCEMENT DES STRUCTURES,Renforcement des poutres en béton armé existantes à l'aide de cerclages en béton DXME-KANE-KANE_KASALI,"Ascenseurs de mine pour le revêtement de tuyaux industriels, hauteur 180 m",Equipment,General,Heures machine,121.13,121.13,121.13,121.13,1,EUR,705.47,5.8243,7,7,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Construction de tuyaux industriels monolithiques en béton armé DXME-RIKA-MERI_MEKALI,"Dragues papillon automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 4200 kW",Equipment,General,Heures machine,0.0,0.0,0.0,0.0,0,EUR,0.0,0.7943,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-RIKA-MERI_KARISA,"Dragues suceuses papillon automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 3000 kW",Equipment,General,Heures machine,0.0,0.0,0.0,0.0,0,EUR,0.0,0.9986,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO KAVO-TO-KADX-KASA_KAKAPUPU,"Profilé plié en acier galvanisé d'une épaisseur de 0,40-0,65 mm, somme des dimensions égale à la largeur de la pièce brute 80-200 mm",Material,General,t,4226.64,4226.64,4226.64,4226.64,1,EUR,1406.26,0.3329,7,7,TRAVAUX DE CONSTRUCTION,Structures en bois,CLOISONS REVÊTUES DE PLAQUES DE PLÂTRE OU DE PLAQUES DE FIBRE DE PLÂTRE,CLOISONS SUR OSSATURE MÉTALLIQUE DXME-KANE-KATO_KAMERI,"Treuils hydrauliques remorqués pour le tirage de câbles, force de traction 10 t",Equipment,General,Heures machine,20.46,20.46,20.46,20.46,1,EUR,53.41,2.61,7,7,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RISA-RI-KAME-MEVO_KAKAKAPU,"Support de fixation directe articulée KS-117, galvanisé",Material,General,pièce,41.47,41.47,41.47,41.47,1,EUR,201.45,4.8571,7,7,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-KANE_KAKAMEPU,Pince d'alimentation pour câbles en aluminium KS-064,Material,General,pièce,13.88,13.88,13.88,13.88,1,EUR,36.75,2.6486,7,7,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEPU-SA-KAME-KALI_KAMEMEME,"Mastic monocomposant à base de silicone, neutre",Material,General,l,21.05,21.05,21.05,21.05,1,EUR,14.62,0.6929,7,7,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-KALI-KAPU_KAPUME,Vibro-raclettes,Equipment,General,Heures machine,1.03,1.03,1.03,1.03,1,EUR,5.42,5.2443,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ KAME-LI-MESA-MEME_KAKARITO,"Rondelles en acier rondes, diamètre du trou M16-20",Material,General,kg,5.3,5.3,5.3,5.3,1,EUR,22.35,4.22,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire RIPU-ME-KARI-KAME_KAKAMESA,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation de tuyaux, écrou de fixation M8, diamètre de 32 à 37 mm",Material,General,pièce,2.06,2.06,2.06,2.06,1,EUR,265.14,128.7143,7,7,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER CARBONÉ ET FAIBLEMENT ALLIÉ KAME-ME-KAME-KAPU,Plaques ondulées en chrysotile-ciment,Abstract Material,General,m2,8.17,8.17,8.17,8.17,1,EUR,1082.92,132.5714,7,7,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Dispositif de parois DXME-KADX-KALI_KAMENE,"Machines de nettoyage des ballasts, capacité 800-1200 m3/h, automotrices",Equipment,General,Heures machine,1292.61,1292.61,1292.61,1292.61,1,EUR,7144.46,5.5271,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST MEPU-PU-KAME-MESA_KAKAKARI,"Apprêt acrylique à base de latex pour chapes en plâtre, enduits et colles à carrelage",Material,General,kg,3.92,3.92,3.92,3.92,1,EUR,100.25,25.5614,7,7,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS MEPU-PU-KARI-KALI_KAKAKARI,Émail KhV-161,Material,General,t,3583.52,3583.52,3583.52,3583.52,1,EUR,55.26,0.02,7,7,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS KAME-ME-KARI-KAVO,Joints en paronite,Abstract Material,General,100 pièces,129.45,41.24,658.7,41.24,2,EUR,88.71,2.0657,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KASA-ME-KAME-KADX_KAKASARI,"Anneaux muraux pour regards en béton armé, volume jusqu'à 0,9 m3, béton B15, consommation d'armature jusqu'à 50 kg/m3",Material,General,m3,325.4,325.4,325.4,325.4,1,EUR,0.0,0.0,7,7,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES DXME-RIKA-MERI_KARIPU,"Dragues papillon automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 2500 kW",Equipment,General,Heures machine,0.0,0.0,0.0,0.0,0,EUR,0.0,1.1071,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-RIKA-MERI_MEKASA,"Dragues papillon automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 1600 kW",Equipment,General,Heures machine,0.0,0.0,0.0,0.0,0,EUR,0.0,1.3671,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-RIKA-MERI_MEKATO,"Dragues suceuses à papillon, refouloires, automotrices, avec brise-sol à fraise, puissance d'entraînement de la fraise 1400 kW",Equipment,General,Heures machine,0.0,0.0,0.0,0.0,0,EUR,0.0,1.4429,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-RIKA-MERI_MEKAME,"Dragues suceuses à papillon, autopropulsées, avec brise-lame, puissance d'entraînement de la fraise 800 kW",Equipment,General,Heures machine,0.0,0.0,0.0,0.0,0,EUR,0.0,1.7614,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-MERI-KASA_KAMEME,Charrues à socs (sans tracteur),Equipment,General,Heures machine,0.88,0.88,0.88,0.88,1,EUR,0.13,0.1471,7,7,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"PRÉPARATION DES ARBRES ET ARBUSTES, DE LA TERRE VÉGÉTALE, DU COMPOST ET DU GAZON" KAME-TO-KATO-KASA_KAKAKALI,Acide sulfurique technique amélioré,Material,Chemicals,t,462.06,462.06,462.06,462.06,1,EUR,20.02,0.05,7,7,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Oxydation des joints de revêtement sur mastic silicate KAME-LI-KAPU-KADX_KAKAMERI,"Charnière à poser avec revêtement en zinc, type PN, hauteur 130 mm",Material,General,pièce,2.74,2.74,2.74,2.74,1,EUR,94.72,34.6157,7,7,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTION D'ENTREPRISES DE STOCKAGE ET DE TRANSFORMATION DE CÉRÉALES,Montage de structures pour les installations de stockage et de transformation du KASA-RI-KAPU-KAPU,Dalles de béton lisses pour trottoirs,Abstract Material,General,m2,36.17,36.17,36.17,36.17,1,EUR,1246.63,34.4667,7,7,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Construction de trottoirs en dalles de béton avec remplissage des joints KAVO-TO-KATO-KAPU_KAKAMETO,"Fil métallique clair, diamètre 1,6 mm",Material,General,t,2058.19,2058.19,2058.19,2058.19,1,EUR,7.41,0.02,7,7,TRAVAUX DE CONSTRUCTION,Structures en pierre des ouvrages hydrauliques,CONSTRUCTIONS EN PIERRE D'ÉQUIPEMENTS HYDRAULIQUES FLUVIALES,Pose de tuyaux de drainage en béton poreux RISA-RI-KAME-KANE_KAKASAME,Pince de raccordement KS-054,Material,General,pièce,29.62,29.62,29.62,29.62,1,EUR,584.03,19.7171,7,7,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIKA-ME-KARI-RIME_KAKALIME,Nœud de fixation UK(U)P-200,Material,General,pièce,51.02,51.02,51.02,51.02,1,EUR,735.72,14.42,7,7,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-LI-MENE-KARI,Échafaudages modulaires de construction,Abstract Material,General,t,4357.21,4357.21,4357.21,4357.21,1,EUR,0.0,0.0,7,7,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,ÉCHAFAUDAGES EXTÉRIEURS ET INTÉRIEURS,Installation et démontage d'échafaudages métalliques modulaires MEPU-ME-KARI-KATO_KAKAKARI,"Colle, marque PVA",Material,General,kg,2.62,2.62,2.62,2.62,1,EUR,54.58,20.8657,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale KAME-RI-KATO-KATO_KAMETOTO,"Mastic bitumineux adhésif pour coller des matériaux de toiture et d'étanchéité en rouleaux bitumineux, bitumineux-polymères sur des surfaces en béton, métalliques, ciment-sable, à froid, prêt à l'emploi, plage de température de -20 à +40 °C, adhérence au métal d'au moins 0,45/0,6 MPa, consommation 2,5-3,5 kg/m2",Material,General,kg,9.19,9.19,9.19,9.19,1,EUR,9.85,1.0714,7,7,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS","Réalisation des fondations, maçonnerie des murs" KATO-ME-KARI-KATO_KAKAMETO,Chaux vive moulue,Material,General,t,334.02,334.02,334.02,334.02,1,EUR,401.32,1.4033,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-LI-KAVO-KATO_KAKAKARI,Matériau liant bicomposant à base de polyuréthane,Material,General,kg,30.92,30.92,30.92,30.92,1,EUR,11853.87,383.3333,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE MEME-ME-KATO-KAPU_KAKAKAME,"Bois de conifères scié, longueur supérieure à 2 m",Material,General,m3,108.84,108.84,108.84,108.84,1,EUR,407.69,3.7457,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL RIKA-RI-KAVO-KAME_KAKAKAME,"Rails DIN métalliques, galvanisés, dimensions 7,5 x 35 x 260 mm",Material,General,100 pièces,138.73,138.73,138.73,138.73,1,EUR,1.39,0.01,7,7,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" MERI-RI-KATO-KARI_KAKAKAME,Ouate en fibre de verre ultra-fine sans liant,Material,General,t,3623.65,3623.65,3623.65,3623.65,1,EUR,714.38,0.1971,7,7,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX KARI-TO-KAME-KARI_MEMEKAVO,"Sable naturel pour travaux de construction, classe I, granulométrie élevée",Material,General,m3,29.15,29.15,29.15,29.15,1,EUR,11.13,0.3814,7,7,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES MEPU-TO-KAME-KARI_KAMEKAME,Apprêt acrylique VD-AK-133,Material,General,t,1724.37,1724.37,1724.37,1724.37,1,EUR,31.26,0.024,7,7,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE DES FAÇADES À PARTIR D'ÉCHELLES OU DE PLATEAUX KAME-LI-KANE-MEPU_KAKARILI,"Bandes de montage à base de polypropylène, avec couche adhésive des deux côtés et revêtement antiadhésif, couleur blanche, largeur 50 mm, épaisseur 0,071 mm",Material,General,m,0.22,0.22,0.22,0.22,1,EUR,0.0,0.0,7,7,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAME-TO-KAPU-KAVO_KAKARISA,Huile pour câbles,Material,General,kg,3.62,3.62,3.62,3.62,1,EUR,153.52,42.4286,7,7,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-MEKA-KALI_KAKAPU,"Installations hydrauliques à perforation contrôlée pour la pose de tuyaux à partir d'une centrale électrique mobile, diamètre des tuyaux jusqu'à 400 mm, longueur de perforation jusqu'à 25 m",Equipment,General,Heures machine,5.26,5.26,5.26,5.26,1,EUR,326.58,62.0714,7,7,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE TUYAUX SANS TRANCHÉE,Perçage sans excavation (perforation) RITO-VO-KAPU-KANE_KAKAVONE,"Dérivation à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 150 mm, diamètre extérieur 159 mm, épaisseur de paroi 6 mm",Material,General,pièce,49.33,49.33,49.33,49.33,1,EUR,31.01,0.6286,7,7,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS DXME-MERI-KAVO_KALIME,Éplucheuses,Equipment,General,Heures machine,0.91,0.91,0.91,0.91,1,EUR,1.88,2.0786,7,7,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,TRAITEMENT DU SOL SELON LES SYSTÈMES DE LABOUR ET DE JEUX DE JEUX SUR LES TERRES DXME-MERI-KAPU_KAMEME,"Débroussailleuses, puissance 3 kW (4 ch)",Equipment,General,Heures machine,1.3,1.3,1.3,1.3,1,EUR,7.27,5.6029,7,7,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,TRAVAUX DIVERS DXME-RIME-RIRI_MERIME,"Électricité : consommation 2,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,0.05,0.1657,7,7,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Poussée de la structure du pont par glissement DXME-RIME-RIRI_MERIME,Cribles à inertie de type moyen,Equipment,General,Heures machine,2.03,2.03,2.03,2.03,1,EUR,0.34,0.1657,7,7,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Poussée de la structure du pont par glissement KARI-TO-KAME-KAME_KAKAKAME,Sable barytine,Material,General,m3,1026.98,1026.98,1026.98,1026.98,1,EUR,16138.18,15.7143,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS EN BÉTON ARMÉ,Installation de cloisons en béton baryté et d'une couche isolante en béton baryt KAME-LI-MEME-KALI_KAKASANE,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés É46, diamètre 6 mm",Material,General,t,3455.22,3455.22,3455.22,3455.22,1,EUR,167.83,0.0486,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE CONDUITES D'EAU ET DE CANALISATIONS,Construction de murs et de fonds plats KANE-RI-KARI-KAME_KAKANEME,"Carreaux de céramique pour sols, non émaillés, lisses, colorés, épaisseur 11 mm",Material,General,m2,32.49,32.49,32.49,32.49,1,EUR,3314.08,102.0,7,7,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mortier de ciment à partir de carreaux MEPU-SA-KAME-KASA_KAKAMETO,"Mastic polyuréthane expansé (mousse de montage) coupe-feu pour les lieux soumis à des exigences élevées en matière de sécurité incendie, volume 880 ml",Material,General,pièce,14.67,14.67,14.67,14.67,1,EUR,33.31,2.27,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,STRUCTURES DE PROTECTION DE TOITURE KALI-RI-KASA-KARI,Panneaux muraux multicouches avec revêtement en plancher profilé,Abstract Material,General,m2,85.06,85.06,85.06,85.06,1,EUR,8789.39,103.328,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,STRUCTURES DE PROTECTION DE TOITURE RITO-VO-KAPU-MERI_KAMETODX,"Raccord en T sans soudure à passage égal, pression nominale jusqu'à 16 MPa, diamètre nominal 300 mm, diamètre extérieur et épaisseur de paroi 325 x 8,0 mm",Material,General,pièce,261.23,261.23,261.23,261.23,1,EUR,171.67,0.6571,7,7,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net RIKA-RI-KAME-KASA_KAKAKADX,Douilles pour câbles en cuivre 70 mm,Material,General,100 pièces,136.49,136.49,136.49,136.49,1,EUR,4.52,0.0329,7,7,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-KAVO-KASA_KANEME,"Machines à haute performance pour la pose de béton, profileuses de fondation avec moules coulissants",Equipment,General,Heures machine,232.1,232.1,232.1,232.1,1,EUR,408.16,1.7586,7,7,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES RIKA-RI-KARI-KAME_KAKAMENE,"Douilles en polypropylène, diamètre 69 mm",Material,General,1000 pièces,219.02,219.02,219.02,219.02,1,EUR,6.77,0.0314,7,7,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS RIKA-RI-KARI-KAME_KAKAMESA,"Douilles en polypropylène, diamètre 54 mm",Material,General,1000 pièces,131.01,131.01,131.01,131.01,1,EUR,4.05,0.0314,7,7,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS KAPU-TO-KARI-KAPU_KATORIPU,"Mélanges secs pour béton de construction et de réparation, à prise ultra-rapide",Material,General,kg,4.66,4.66,4.66,4.66,1,EUR,44.68,9.5943,7,7,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ALIMENTATION EN GAZ,Réparation des systèmes d'alimentation en gaz à l'intérieur des bâtiments KAVO-RI-KARI-MENE,Câbles d'armature,Abstract Material,General,t,11.73,11.61,11.88,11.61,2,EUR,7554.09,650.255,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-RIKA-KARI_KAKASA,"Barges non motorisées, capacité de charge 600 t",Equipment,General,Heures machine,22.52,22.52,22.52,22.52,1,EUR,126.22,5.6057,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIKA-ME-KAME-MEME,Pince à platine,Abstract Material,General,pièce,2.57,2.57,2.57,2.57,1,EUR,2.57,1.0,7,7,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES DXME-RIME-KATO_KAMEME,Appareils de grenaillage fonctionnant à partir de compresseurs mobiles,Equipment,General,Heures machine,0.19,0.19,0.19,0.19,1,EUR,6.19,32.3643,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR MEME-ME-KATO-MEKA_KAKARIKA,"Planches rabotées en quart de conifères, sèches, longueur 2-6,5 m, largeur 100-150 mm, épaisseur 40 mm, classe II",Material,General,m3,1093.06,1093.06,1093.06,1093.06,1,EUR,4615.45,4.2225,7,7,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Fabrication et pose de panneaux en bois au-dessus des fosses et des canaux d'éva KASA-TO-KARI-MEVO,Détails,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,7,7,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,EMBLÈMES,Emblèmes ronds d'un diamètre allant jusqu'à 200 mm MEPU-PU-KARI-KAPU_KARIKATO,"Peinture à l'huile MA-25, blanc de plomb lithographique",Material,General,t,3084.64,3084.64,3084.64,3084.64,1,EUR,0.55,0.0,7,7,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,AGREGATS DE TURBINES A VAPEUR,TURBINES À VAPEUR FIXES MEKA-TO-KAME-KATO_KAKARIKA,"Feuilles de précision normale en plomb de marque S1, épaisseur 2-3 mm",Material,General,kg,7.75,7.75,7.75,7.75,1,EUR,0.14,0.024,7,7,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,AGREGATS DE TURBINES A VAPEUR,TURBINES À VAPEUR FIXES KAPU-TO-KARI-KADX_MESATOPU,"Mélanges secs à prise rapide sans retrait à base de ciment contenant des fibres polymères pour la réparation de structures en béton et en béton armé, de type thixotrope, classe R3, F300, W16, granulométrie jusqu'à 3 mm, consommation 18,5 kg/m2",Material,Steel & Metal,kg,1.35,1.35,1.35,1.35,1,EUR,434.12,322.7629,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de structures monolithiques en béton armé de la partie souterraine DXME-MEDX-MEKA_KAMEKA,"Électricité : consommation 13,2 kWh/machine-heure",Electricity,Electricity,Heures machine,1.7,1.7,1.7,1.7,1,EUR,8.0,4.72,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-MEKA_KAMEKA,"Stations de pompage électriques fixes, débit 100 m3/h, pression 80 m",Equipment,General,Heures machine,3.18,3.18,3.18,3.18,1,EUR,15.0,4.72,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION MEDX-TO-KARI-KAVO_KAKARIRI,"Supports en acier pour la fixation de l'unité extérieure d'un système split, avec fixation, charge recommandée jusqu'à 180 kg, dimensions 677 x 830 x 50 mm",Material,General,compl,41.93,41.93,41.93,41.93,1,EUR,41.93,1.0,7,7,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de climatiseurs et de systèmes split MEME-RI-KAVO-KARI,Panneaux en fibres de bois,Abstract Material,General,m2,2715.77,2715.77,2715.77,2715.77,1,EUR,208921.07,76.9286,7,7,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une isolation thermique et acoustique continue DXME-MEDX-KASA_SANEKA,"Électricité : consommation 2,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.37,0.37,0.37,0.37,1,EUR,0.02,0.0471,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Réalisation d'une tranchée à l'aide d'une fraise hydraulique pour la constructio DXME-MEDX-KASA_SANEKA,"Pompes centrifuges auto-amorçantes, débit jusqu'à 130 m3/h, pression jusqu'à 120 m",Equipment,General,Heures machine,1.41,1.41,1.41,1.41,1,EUR,0.07,0.0471,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Réalisation d'une tranchée à l'aide d'une fraise hydraulique pour la constructio KAME-LI-MESA-KAME_KAKAKAME,"Cheville à friction en acier, à expansion, avec filetage extérieur M12, longueur 115 mm",Material,General,pièce,9.69,9.69,9.69,9.69,1,EUR,3064.82,316.2729,7,7,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAVO-PU-KAME-KASA,Éléments en acier profilé,Abstract Material,General,t,2650.05,2650.05,2650.05,2650.05,1,EUR,13382.74,5.05,7,7,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-RI-KAME-KARI_KAKAMERI,Bitume fluidifié RB-2,Material,General,t,1934.72,1934.72,1934.72,1934.72,1,EUR,447.75,0.2314,7,7,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ISOLATION PAR PEINTURE DES SURFACES EN BÉTON RITO-TO-KATO-KARI_KAMEPUKA,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 159 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,77.93,77.93,77.93,77.93,1,EUR,181.92,2.3343,7,7,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES DES PUITS VERTICAUX ET DES PUITS DE SECTEUR CIRCULAIRE ET METO-ME-KARI-KAME,Dalles en marbre,Abstract Material,General,m2,245.88,245.88,245.88,245.88,1,EUR,21110.39,85.8571,7,7,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en dalles de marbre et de granit MEPU-RI-KARI-KATO,Peintures ignifuges,Abstract Material,General,kg,8568.21,17.63,14981.15,14981.15,2,EUR,1513.85,0.1,7,7,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES STRUCTURES MÉTALLIQUES DXME-KAPU-KAME_KALINE,"Installations de forage sur châssis automobile, profondeur de forage jusqu'à 200 m, capacité de charge 2,5 t",Equipment,General,Heures machine,35.19,35.19,35.19,35.19,1,EUR,409.08,11.6243,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols MERI-RI-KATO-MEME_KAKARIVO,Tissu électro-isolant en verre É1/1-100,Material,General,m2,1.73,1.73,1.73,1.73,1,EUR,11.57,6.6857,7,7,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CHAMBRES THERMIQUES MÉTALLIQUES DES POINTS D'AMPLIFICATION SOUTERRAINS SANS ENTR RISA-ME-KANE-MEDX_KAMEKAKA,"Cale en caoutchouc pour sous-couche, type OP-68-74",Material,General,pièce,2.62,2.62,2.62,2.62,1,EUR,10307.95,3931.4286,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-ME-KASA-KARI_KAKAKAVO,"Coussinets de fixation séparée pour voie ferrée pour traverses en bois, type KD-65",Material,General,pièce,55.02,55.02,55.02,55.02,1,EUR,197452.21,3588.5714,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-KALI_KAMERI,Machines pour la découpe de ballast automotrices,Equipment,General,Heures machine,1306.91,1306.91,1306.91,1306.91,1,EUR,11009.74,8.4243,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST DXME-KADX-KALI_SAKAPU,"Machines de nettoyage des gravats, capacité 1000-2000 m3/h, automotrices",Equipment,General,Heures machine,2672.47,2672.47,2672.47,2672.47,1,EUR,14942.95,5.5914,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST DXME-KADX-KALI_SAKATO,"Machines de nettoyage de gravats, capacité 1200-1600 m3/h, non automotrices",Equipment,General,Heures machine,1564.35,1564.35,1564.35,1564.35,1,EUR,8939.14,5.7143,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST RIKA-ME-KARI-KAVO_KAKAKAME,"Raccord en laiton, diamètre nominal 40 mm",Material,General,kg,61.78,61.78,61.78,61.78,1,EUR,79.78,1.2914,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Cimentation des sols DXME-RIKA-MERI_KAVOME,Projectiles à godets multiples d'une capacité de 200 m3/h,Equipment,General,Heures machine,532.99,532.99,532.99,532.99,1,EUR,825.38,1.5486,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" DXME-RIKA-MERI_KADXME,Projectiles à tige (à godet) avec une benne d'une capacité de 4 m3,Equipment,General,Heures machine,108.24,108.24,108.24,108.24,1,EUR,235.81,2.1786,7,7,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAME-VO-KARI-KARI_KAKAKATO,"Verre feuilleté armé de fil d'acier, à motifs, incolore, épaisseur 6 mm",Material,General,m2,54.46,54.46,54.46,54.46,1,EUR,5018.97,92.1667,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" DXME-MEDX-KAME_SAKAVO,"Machines à boue, volume de la citerne à boue 8 m3",Equipment,General,Heures machine,45.97,45.97,45.97,45.97,1,EUR,0.46,0.01,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Réalisation d'une tranchée à l'aide d'une fraise hydraulique pour la constructio DXME-KALI-KANE_KAKARI,"Installations pour la préparation et l'alimentation en solution bentonite, capacité 30 m3/h",Equipment,General,Heures machine,3.32,3.32,3.32,3.32,1,EUR,0.21,0.0643,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Réalisation d'une tranchée à l'aide d'une fraise hydraulique pour la constructio DXME-KARI-KASA_SARIPU,"Fraiseuses sur chenilles pour la construction de « murs dans le sol », largeur jusqu'à 1 500 mm, profondeur jusqu'à 35 m",Equipment,General,Heures machine,828.69,828.69,828.69,828.69,1,EUR,591.92,0.7143,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Réalisation d'une tranchée à l'aide d'une fraise hydraulique pour la constructio RISA-RI-KARI-MEME_KAKASAME,"Attaches pour fixation sur supports intermédiaires, taille 20 mm",Material,General,100 pièces,74.14,74.14,74.14,74.14,1,EUR,18.54,0.25,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RISA-RI-KARI-MEME_KAKARIME,"Ruban de fixation en acier inoxydable dans une boîte en plastique avec boucle de câble, largeur 20 mm, épaisseur 0,7 mm, longueur 50 m",Material,General,pièce,102.46,102.46,102.46,102.46,1,EUR,50.2,0.49,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES MEDX-RI-KAME-KASA,Inserts flexibles,Abstract Material,General,m2,141.71,116.93,290.42,116.93,2,EUR,241.93,1.8571,7,7,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation d'inserts flexibles sur les ventilateurs radiaux RIRI-RI-KARI-RITO_KATOMEME,"Marque de numérotation des poteaux de ligne électrique en acier galvanisé, dimensions 200 x 100 mm, épaisseur de l'acier 0,8 mm",Material,General,pièce,4.68,4.68,4.68,4.68,1,EUR,4.68,1.0,7,7,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BOIS VL 35-220 KV KALI-RI-KARI-KASA_KAKARISA,"Crochet en acier soudé, diamètre du filetage M20, avec deux rondelles de diamètre M20, écrou M20, anneau moulé SRS-7-16",Material,General,compl,14.62,14.62,14.62,14.62,1,EUR,75.21,5.1429,7,7,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BOIS VL 35-220 KV KAVO-ME-KARI-KAVO,Système de consolidation des pentes à base d'un treillis tissé à mailles rhombiques,Abstract Material,General,m2,435.7,435.7,435.7,435.7,1,EUR,52284.26,120.0,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RIRI-RI-KARI-MEVO_KAKAKANE,Traverse en acier à 4 tiges,Material,General,pièce,72.74,72.74,72.74,72.74,1,EUR,93.53,1.2857,7,7,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,TRAVERSES SUR LES PILIERS INSTALLÉS DES LIGNES DE COMMUNICATION DXME-KAVO-KAVO_KAMETO,"Électricité : consommation 47,74 kW·h/machine-heure",Electricity,Electricity,Heures machine,6.13,6.13,6.13,6.13,1,EUR,17.27,2.8171,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE DXME-KAVO-KAVO_KAMETO,"Installations pour la préparation de mélanges de sol, puissance jusqu'à 155 kW",Equipment,General,Heures machine,66.23,66.23,66.23,66.23,1,EUR,186.57,2.8171,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KAME-LI-MELI-KADX_KAKANEME,"Foret diamanté annulaire, diamètre 5 mm",Material,General,pièce,10.92,10.92,10.92,10.92,1,EUR,1.53,0.14,7,7,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MELI-KALI_KAKASAME,"Disque abrasif à profil droit, marque du matériau abrasif 25A, dimensions 100 x 20 x 20 mm",Material,General,pièce,3.03,3.03,3.03,3.03,1,EUR,16.21,5.3457,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-LI-MELI-KANE_KAKAMETO,"Disque diamanté segmenté, diamètre 800 mm, segment 4,8 x 10 x 40 mm",Material,General,pièce,1818.82,1818.82,1818.82,1818.82,1,EUR,4001.41,2.2,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KALI-RI-KASA-KAME_KAKARIME,"Escalier métallique à une volée sans palier, avec garde-corps de 1 200 mm de hauteur, hauteur de montée 3 000 mm, largeur de volée 600 mm",Material,General,m,270.5,270.5,270.5,270.5,1,EUR,120.04,0.5183,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES RITO-TO-KAME-KALI,Tubes de forage alourdis,Abstract Material,Pipes & Fittings,m,145.52,145.52,145.52,145.52,1,EUR,0.0,0.0,7,7,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE RITO-TO-KAME-KANE,Tubes de forage,Abstract Material,Pipes & Fittings,m,115.15,115.15,115.15,115.15,1,EUR,0.0,0.0,7,7,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAVO-RI-KARI-KATO_KAKATORI,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 20,5 mm",Material,Steel & Metal,10 m,60.62,60.62,60.62,60.62,1,EUR,0.82,0.0167,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" MEPU-SA-KAME-KASA_KAKAMEME,"Mastic polyuréthane expansé (mousse de montage) universel, volume 850 ml",Material,General,pièce,13.27,13.27,13.27,13.27,1,EUR,23.07,1.7386,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé KAME-LI-MESA-KASA_KAKARIRI,"Écrous en acier zingué à tête hexagonale, diamètre du filetage M8 (M10)",Material,General,kg,3.83,3.83,3.83,3.83,1,EUR,6.18,1.6157,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,ÉLÉMENTS DE CONSTRUCTION DES COUVERTURES DE BÂTIMENTS RISA-ME-KAPU-KAPU,Boulons de voie avec écrou pour la fixation des rails,Abstract Material,General,t,3892.38,3892.38,3892.38,3892.38,1,EUR,1238.33,0.3143,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" RISA-ME-KATO-KANE,Rondelles élastiques à une seule spire,Abstract Material,General,t,4917.41,4917.41,4917.41,4917.41,1,EUR,130.66,0.0271,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"PLAQUES D'APPUI, COLONNES, POUTRES DE GRUE, CHARPENTES DE GRUE ET DE POUTRES, VO" RITO-VO-KAPU-KAVO,Raccords,Abstract Material,General,pièce,88.16,88.16,88.16,88.16,1,EUR,680.12,7.7143,7,7,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS RITO-TO-KANE-KARI_KAKAKAVO,"Tubes en acier soudés galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 80 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,18.77,18.77,18.77,18.77,1,EUR,37.72,2.01,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KASA-KAVO_KAKADX,"Grues sur châssis pneumatique, capacité de charge 63 t",Equipment,General,Heures machine,73.33,73.33,73.33,73.33,1,EUR,1326.23,18.0857,7,7,INSTALLATION DE L'ÉQUIPEMENT,Équipement à usage général,INSTALLATION DE L'ÉQUIPEMENT,RÉCIPIENTS ET APPAREILS SANS MÉCANISMES DXME-RIME-RIRI_KAPUME,"Électricité : consommation 2,64 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.34,0.34,0.34,0.34,1,EUR,2.04,6.0043,7,7,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates DXME-RIME-RIRI_KAPUME,Chauffages infrarouges pour toiture souple,Equipment,General,Heures machine,0.94,0.94,0.94,0.94,1,EUR,5.61,6.0043,7,7,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates RITO-SA-KARI-KARI_KAKAKAVO,"Tubes en acier électrosoudés à joint droit en acier de marques St2, 10, diamètre extérieur 159 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,23.86,23.86,23.86,23.86,1,EUR,2573.02,107.8429,7,7,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES KAVO-TO-KAVO-KAME,"Acier laminé à chaud, cornière inégale",Abstract Material,General,t,1959.26,1959.26,1959.26,1959.26,1,EUR,4061.26,2.0729,7,7,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,ROBINETTERIE KAME-RI-KATO-KATO_KAMESAPU,"Mastic bitume-coudrette pour étanchéité, toiture, consommation 2,0 kg/m2 pour une épaisseur de couche de 1,0 mm",Material,General,t,2104.38,2104.38,2104.38,2104.38,1,EUR,19.12,0.02,7,7,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en parquet, parquet mosaïque, parquet massif sans veines" KALI-RI-KALI-KARI,Conducteur métallique d'inventaire,Abstract Material,General,pièce,2252.7,2252.7,2252.7,2252.7,1,EUR,0.95,0.0,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KANE-KAME_SAMEKA,"Crics hydrauliques, capacité de charge jusqu'à 1200 t",Equipment,General,Heures machine,17.22,17.22,17.22,17.22,1,EUR,7658.3,444.7814,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au KAME-NE-KAPU-KAME,Panneaux de plafond,Abstract Material,General,m2,49.61,49.61,49.61,49.61,1,EUR,5095.45,102.7143,7,7,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-TO-KASA-RITO_KAMEDXME,Phosphate trisodique technique,Material,General,kg,1.8,1.8,1.8,1.8,1,EUR,0.03,0.022,7,7,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT MÉCANIQUE DES INSTALLATIONS HYDRAULIQUES,MÉCANISMES DE LEVAGE FIXES DXME-KAVO-KASA_KANERI,"Machines à haute performance pour la pose de béton, distributeurs de béton avec moules coulissants",Equipment,General,Heures machine,203.66,203.66,203.66,203.66,1,EUR,1086.97,5.3371,7,7,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,FONDATIONS DXME-MEDX-KARI_KAKATO,"Pompes à huile à engrenages, débit 3,6 m3/h",Equipment,General,Heures machine,0.34,0.34,0.34,0.34,1,EUR,19.45,56.6114,7,7,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT HYDROÉLECTRIQUE,TURBINES HYDRAULIQUES MEME-RI-MEME-KAME,Plastique papier stratifié,Abstract Material,General,m2,8692.62,8692.62,8692.62,8692.62,1,EUR,772277.3,88.8429,7,7,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES RILI-ME-KAME-KATO_KAKAMEPU,"Tiges transversales en acier filetées, diamètre M24, longueur 1700 mm, quatre écrous de diamètre M24, quatre rondelles avec trou de diamètre M24",Material,General,t,3017.71,3017.71,3017.71,3017.71,1,EUR,3134.1,1.0386,7,7,TRAVAUX DE CONSTRUCTION,Voies de tramway,CONSTRUCTION DE VOIES SUR DES PONTS OU DES PASSERELLES,Construction de voies sur des ponts ou des passages supérieurs à partir de rails MEDX-TO-KARI-KAME,Diaphragmes à chambre,Abstract Material,General,pièce,468.44,468.44,468.44,468.44,1,EUR,468.44,1.0,7,7,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de diaphragmes de chambre, KAME-ME-KARI-KALI_KAKAMEME,"Additif (fibre) de renforcement en fibre de polypropylène, longueur de fibre 18 mm, diamètre 0,2 mm",Material,Concrete & Cement,kg,5.68,5.68,5.68,5.68,1,EUR,7.93,1.3957,7,7,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes RITO-TO-KATO-KARI_KAKARISA,"Tubes en acier sans soudure, laminés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 45 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,11.97,11.97,11.97,11.97,1,EUR,3.27,0.2757,7,7,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KADX-KATO_KATORI,Chariots mobiles pour tunnels de transfert,Equipment,General,Heures machine,0.05,0.05,0.05,0.05,1,EUR,1.48,27.9029,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-RIKA-MERI_KAMEPU,"Projectiles flottants électriques à aspiration de terre, débit 140 m3/h, pression 37-52 m",Equipment,General,Heures machine,71.13,71.13,71.13,71.13,1,EUR,239.42,3.3657,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KAPU-KARI_KATOPU,"Installations de forage dirigé pour la pose sans tranchée, force de traction 2500 kN",Equipment,General,Heures machine,647.99,647.99,647.99,647.99,1,EUR,538.76,0.8314,7,7,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAVO-RI-KARI-KATO_KAKARIDX,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 16,5 mm",Material,Steel & Metal,10 m,41.6,41.6,41.6,41.6,1,EUR,1.58,0.0386,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAVO-RI-KARI-KATO_KAKARIVO,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1860 N/mm2, diamètre 15 mm",Material,Steel & Metal,10 m,36.22,36.22,36.22,36.22,1,EUR,65.89,4.2433,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" DXME-MEDX-KARI_KAKATO,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,5.28,56.6114,7,7,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT HYDROÉLECTRIQUE,TURBINES HYDRAULIQUES KAVO-TO-MERI-KANE_KAKARITO,"Acier, marque 08kp",Material,General,t,1716.15,1716.15,1716.15,1716.15,1,EUR,59355.54,48.42,7,7,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES MEPU-RI-KASA-KATO,Composés bicomposants à base de résines polyuréthanes,Abstract Material,General,kg,21.87,21.87,21.87,21.87,1,EUR,1666.73,76.2267,7,7,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une étanchéité pour toitures plates à partir de composés polymère MEME-RI-KAVO-KARI_KAKAMEKA,"Panneaux de fibres de bois fabriqués selon un procédé à sec, durs T-S, groupe A, épaisseur 5 mm",Material,General,1000 m2,1848.38,1848.38,1848.38,1848.38,1,EUR,243.32,0.1286,7,7,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" RISA-RI-KAME-MEVO_KAKAPULI,"Fixation de branche ancrée en aluminium avec pince de fixation en bronze de 70 x 47 x 41,5 mm, fixation sur tige inclinée de la console - « œillet », longueur de la tige principale 1800 mm",Material,General,pièce,786.78,786.78,786.78,786.78,1,EUR,2023.15,2.5714,7,7,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-RIKA-MERI_KAMENE,Électricité : consommation 556 kW·h/machine-heure,Electricity,Electricity,Heures machine,71.41,71.41,71.41,71.41,1,EUR,78.96,1.1057,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MERI_KAMENE,"Pompes électriques flottantes, débit 400 m3/h, pression 71 m",Equipment,General,Heures machine,192.53,192.53,192.53,192.53,1,EUR,212.89,1.1057,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MERI_KAMEPU,"Électricité : consommation 214,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,27.55,27.55,27.55,27.55,1,EUR,92.73,3.3657,7,7,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEVO-KATO_KAMERI,"Électricité : consommation 9,9 kWh/machine-heure",Electricity,Electricity,Heures machine,1.27,1.27,1.27,1.27,1,EUR,31.31,24.6171,7,7,TRAVAUX DE CONSTRUCTION,Forages,INSTALLATION DE FILTRES ET POMPAGE DE L'EAU DU PUITS,Pompage de l'eau du puits à l'aide d'un élévateur à air comprimé lors du forage DXME-MEVO-KATO_KAMERI,"Compresseurs remorqués à moteur électrique pour le lavage à contre-courant des puits, pression 680 kPa (6,8 atm), débit 5,25 m3/min",Equipment,General,Heures machine,3.79,3.79,3.79,3.79,1,EUR,93.38,24.6171,7,7,TRAVAUX DE CONSTRUCTION,Forages,INSTALLATION DE FILTRES ET POMPAGE DE L'EAU DU PUITS,Pompage de l'eau du puits à l'aide d'un élévateur à air comprimé lors du forage MEME-TO-KATO-MESA_KAKATOME,Caches pour prises RPV-1,Material,General,100 pièces,21.19,21.19,21.19,21.19,1,EUR,0.24,0.0114,7,7,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,APPAREILS TÉLÉPHONIQUES MEPU-ME-KARI-KAPU,Composition de la colle,Abstract Material,General,kg,42.91,42.91,42.91,42.91,1,EUR,2065.27,48.1257,7,7,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en linoléum RITO-LI-KAME-KAPU,Conduites avec manchons,Abstract Material,General,m,15.48,15.48,15.48,15.48,1,EUR,1548.25,100.0,7,7,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en eau à partir de tuyaux en ac RIRI-RI-KARI-KAVO_MEKAKAKA,"Support de câble en bande d'acier (KCP) pour installation dans des puits de câbles, longueur 600 mm",Material,General,pièce,12.85,12.85,12.85,12.85,1,EUR,86.28,6.7143,7,7,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES RISA-RI-KAME-KANE_MEKAMEME,"Pince pivotante en aluminium pour la fixation du câble porteur sur une tige tubulaire horizontale de la console d'un diamètre de 70-80 mm, dimensions 120x165 mm",Material,General,pièce,244.96,244.96,244.96,244.96,1,EUR,153.55,0.6286,7,7,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT DXME-KALI-KARI_KAMETO,"Pompes à béton automotrices, débit 110 m3/h",Equipment,General,Heures machine,99.03,99.03,99.03,99.03,1,EUR,479.73,4.8443,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE STANDARD (ALIMENTATION EN BÉTON À L'AIDE,Construction de murs en béton armé KAME-LI-MESA-KARI_KAKANESA,"Boulons en acier galvanisé à tête hexagonale, diamètre du filetage M16 (M18), longueur 25-200 mm",Material,General,t,3380.62,3380.62,3380.62,3380.62,1,EUR,192.5,0.0557,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE STANDARD (ALIMENTATION EN BÉTON À L'AIDE,Construction de murs en béton armé KAME-LI-MENE-KATO_KAKARIME,"Panneau de coffrage linéaire, à petites lattes, combiné, démontable et repositionnable, inventaire, pour le coffrage des murs, en profilés de coffrage en acier de 2 mm d'épaisseur, de profilés de traverses d'une épaisseur de 1,5 mm, avec un plateau en contreplaqué laminé résistant à l'humidité d'une épaisseur de 18 mm, dimensions 1200 x 400 mm",Material,General,m2,321.41,321.41,321.41,321.41,1,EUR,5737.55,17.8514,7,7,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CONSTRUCTIONS EN BÉTON ARMÉ ET EN BÉTON DES PONTS ET DES CONDUITES,PILIERS DE PONTS SUR FONDATIONS PRÊTES KALI-ME-KAME-KAME,Porte métallique coupe-feu,Abstract Material,General,pièce,512.06,503.66,513.46,513.46,2,EUR,5134.61,10.0,7,7,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-KANE-KATO_KAPUME,"Treuils de forage avec une force de traction de 98,1 kN (10 t)",Equipment,General,Heures machine,12.67,12.67,12.67,12.67,1,EUR,310.81,24.5271,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KANE-KATO_KAPUME,"Électricité : consommation 0,39 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,1.22,24.5271,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-MELI-KARI_KASATO,"Complexes de radiographie numérique des joints soudés annulaires de tuyaux d'un diamètre de 500 à 1420 mm, équipés d'un appareil à rayons X, schéma de contrôle panoramique",Equipment,General,Heures machine,81.19,81.19,81.19,81.19,1,EUR,31.66,0.39,7,7,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONTRÔLE DE LA QUALITÉ DES ASSEMBLAGES SOUDÉS PAR DES MÉTHODES PHYSIQUES,CONTRÔLE RADIOGRAPHIQUE À L'AIDE D'APPAREILS À RAYONS X À FONCTIONNEMENT CONTINU KAME-LI-KALI-RIPU_KAMEMEPU,"Film radiographique en feuilles, paquet de 100 feuilles sans séparation, à utiliser avec un écran fluorescent amplificateur, dimensions 300 x 400 mm",Material,General,m2,119.57,119.57,119.57,119.57,1,EUR,12.98,0.1086,7,7,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONTRÔLE DE LA QUALITÉ DES ASSEMBLAGES SOUDÉS PAR DES MÉTHODES PHYSIQUES,CONTRÔLE RADIOGRAPHIQUE À L'AIDE D'APPAREILS À RAYONS X À IMPULSIONS SUR LA ROUT MEPU-SA-KAPU-KAVO_KAKAMEVO,"Mastic plastisol à deux composants, composé de résine et de durcisseur, pour l'étanchéification des structures de construction",Material,Steel & Metal,kg,53.85,53.85,53.85,53.85,1,EUR,5562.37,103.2857,7,7,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION DES JOINTS ET POSE DE TUYAUX RINE-ME-KARI-KAVO_KAKAPURI,Cale antivol P-65,Material,General,pièce,6.92,6.92,6.92,6.92,1,EUR,2974.88,429.8571,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KALI-KAVO_KAPUME,"Électricité : consommation 2,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,22.61,71.0957,7,7,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment DXME-MEKA-MEME_KANEME,Fixations pour modules,Equipment,General,Heures machine,1.73,1.73,1.73,1.73,1,EUR,8.67,5.0,7,7,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Remplacement sans tranchée des canalisations d'égout par des tuyaux raccourcis à RINE-ME-KARI-KANE_KAKAKAME,Étrier en acier pour suspension de rail de contact avec dispositif de fixation,Material,General,pièce,11.87,11.87,11.87,11.87,1,EUR,1573.62,132.5571,7,7,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KANE-RI-KAPU-KAME_KAKARITO,"Carreaux réfractaires en argile siliceuse, carrés et rectangulaires, épaisseur 35 mm",Material,General,m2,43.47,43.47,43.47,43.47,1,EUR,44.34,1.02,7,7,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic silicate résis KASA-ME-KAME-KAME,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,7,7,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE TRAVERSÉE EN BÉTON ARMÉ DE PONTS POUR UNE VOIE FERROVIAIRE DXME-KALI-KATO_KAKADX,"Électricité : consommation 0,99 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.13,0.13,0.13,0.13,1,EUR,0.08,0.62,7,7,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " DXME-KALI-KATO_KAKADX,"Bétonnières à action forcée mobiles, volume de la trémie 165 l",Equipment,General,Heures machine,0.42,0.42,0.42,0.42,1,EUR,0.26,0.62,7,7,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEPU-RI-KAME-KANE_KAKAKARI,Composition anticorrosion pour apprêt,Material,General,kg,26.55,26.55,26.55,26.55,1,EUR,14554.0,548.1286,7,7,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEPU-PU-KAME-MEDX_KAKAKATO,Apprêt KhS-059,Material,General,t,4407.29,4407.29,4407.29,4407.29,1,EUR,13.8,0.02,7,7,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques KAVO-ME-KARI-RIKA_KAKATOME,"Ancre Bruce de l'Amirauté, poids 50 kg",Material,General,pièce,778.84,778.84,778.84,778.84,1,EUR,87.49,0.1117,6,6,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE DXME-MEKA-KAPU_SALITO,"Machines électriques à projection centrifuge pour le revêtement de la surface intérieure des tuyaux, diamètre des tuyaux 1300-1600 mm",Equipment,General,Heures machine,13.37,13.37,13.37,13.37,1,EUR,79.36,5.935,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des conduites à l'aide de composés ciment-polymère par projection cen DXME-MEKA-KAPU_SALITO,"Électricité : consommation 1,57 kWh/machine-heure",Electricity,Electricity,Heures machine,0.2,0.2,0.2,0.2,1,EUR,1.19,5.935,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des conduites à l'aide de composés ciment-polymère par projection cen DXME-MEKA-KAPU_SALIPU,"Machines électriques à projection centrifuge pour le revêtement de la surface intérieure des tuyaux, diamètre des tuyaux 1700-2000 mm",Equipment,General,Heures machine,16.57,16.57,16.57,16.57,1,EUR,107.17,6.4667,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des conduites à l'aide de composés ciment-polymère par projection cen DXME-KAME-KASA_KANENE,"Pelles hydrauliques à godet unique diesel sur chenilles, volume du godet 0,25 m3",Equipment,General,Heures machine,22.65,22.65,22.65,22.65,1,EUR,1244.23,54.9233,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-KAME-KASA_MEMEDX,Électricité : consommation 177 kWh/machine-heure,Electricity,Electricity,Heures machine,22.73,22.73,22.73,22.73,1,EUR,131.74,5.795,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE DXME-KAME-KASA_MEMEDX,"Pelles électriques à godet unique, capacité du godet 5-6 m3",Equipment,General,Heures machine,176.49,176.49,176.49,176.49,1,EUR,1022.76,5.795,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES DANS LA DÉCHARGE KAME-LI-KALI-RIDX_KAMEPUME,"Film en fluoroplastique-4, marque IO",Material,General,t,47454.97,47454.97,47454.97,47454.97,1,EUR,94.91,0.0,6,6,TRAVAUX DE CONSTRUCTION,Travaux de forage et de dynamitage,"AFFLUENTION DES SOLS ROCHEUX À L'AIDE DE CHARGES CHAMBRÉES, EXPLOSION MASSIVE DE",EXPLOSION MASSIVE DE SOLS À L'AIDE DE CHARGES EXPLOSIVES POUR ÉVACUER ET JETER J DXME-MEKA-KAPU_KARIME,"Électricité : consommation 7,59 kWh/machine-heure",Electricity,Electricity,Heures machine,0.97,0.97,0.97,0.97,1,EUR,19.84,20.355,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX DXME-MEKA-KAPU_KARIME,Machines d'isolation pour tuyaux d'un diamètre de 350 à 500 mm,Equipment,General,Heures machine,15.14,15.14,15.14,15.14,1,EUR,308.26,20.355,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX DXME-MEDX-KAVO_KARIVO,"Électricité : consommation 105,6 kW·h/machine-heure",Electricity,Electricity,Heures machine,13.56,13.56,13.56,13.56,1,EUR,348.34,25.6833,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Assainissement de la surface interne des tuyaux en acier des réseaux d'adduction DXME-MEDX-KAVO_KARIVO,"Pompes, débit 1250 m3/h, pression 63 m, puissance 315 kW",Equipment,General,Heures machine,34.22,34.22,34.22,34.22,1,EUR,878.86,25.6833,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Assainissement de la surface interne des tuyaux en acier des réseaux d'adduction DXME-KALI-KAPU_KARIME,Trémies vibrantes,Equipment,General,Heures machine,0.47,0.47,0.47,0.47,1,EUR,1.27,2.685,6,6,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Construction de tuyaux industriels monolithiques en béton armé DXME-MEKA-KAPU_KAMENE,"Électricité : consommation 8,98 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.15,1.15,1.15,1.15,1,EUR,8.08,7.01,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION AVEC DES BANDES POLYMÈRES ET POSE DE CONDUITES DXME-MEKA-KAPU_KAMENE,Machines pour le nettoyage et l'isolation avec des bandes polymères de tuyaux d'un diamètre de 350 à 500 mm,Equipment,General,Heures machine,26.4,26.4,26.4,26.4,1,EUR,185.09,7.01,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION AVEC DES BANDES POLYMÈRES ET POSE DE CONDUITES DXME-KALI-KAVO_KAKAME,Trémies mélangeuses pour la pose de conduits de fumée en briques avec passerelle,Equipment,General,Heures machine,1.4,1.4,1.4,1.4,1,EUR,0.17,0.125,6,6,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES RÉCHAUFFEURS D'AIR DES FOURS À HAUTE TEMPÉRATURE,Maçonnerie des arcs KANE-ME-KAME-KANE_KAKARIME,"Brique réfractaire radiale longitudinale, type KRP, classe A, dimensions 230 x 113 x 65 mm",Material,General,t,666.87,666.87,666.87,666.87,1,EUR,1433.77,2.15,6,6,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DE TUYAUX EN BRIQUES ET EN BÉTON ARMÉ,Revêtement de tuyaux monolithiques en béton armé avec des briques résistantes au DXME-MEDX-MEKA_KAMEME,"Électricité : consommation 29,7 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.81,3.81,3.81,3.81,1,EUR,1.93,0.5067,6,6,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Construction de tuyaux industriels monolithiques en béton armé DXME-MEDX-MEKA_KAMEME,"Stations de pompage électriques fixes, débit 200 m3/h, pression 95 m",Equipment,General,Heures machine,7.11,7.11,7.11,7.11,1,EUR,3.6,0.5067,6,6,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Construction de tuyaux industriels monolithiques en béton armé DXME-MEKA-MEME_KARIME,Machines pour visser les ancrages (sans grue-poseur de tuyaux),Equipment,General,Heures machine,13.56,13.56,13.56,13.56,1,EUR,7.0,0.5167,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Fixation de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de disposi RITO-ME-KARI-KASA_KAKAKAME,Dispositif d'ancrage à vis pour empêcher les tuyaux de flotter,Material,General,compl,1740.6,1740.6,1740.6,1740.6,1,EUR,1740.6,1.0,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Fixation de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de disposi DXME-METO-KAME_KATOPU,"Machines combinées de nettoyage, capacité du réservoir 6 m3, capacité de la benne du sableur 4 m3",Equipment,General,Heures machine,36.95,36.95,36.95,36.95,1,EUR,25.93,0.7017,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KARI-TO-KAME-KASA,Sable issu du concassage,Abstract Material,General,m3,39.82,39.82,39.82,39.82,1,EUR,261.69,6.5717,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KATO-RI-KAME-KASA,Ciment,Abstract Material,General,t,217.33,217.33,217.33,217.33,1,EUR,316.57,1.4567,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-KALI-KAVO_KARIRI,"Électricité : consommation 2,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,0.2,0.6417,6,6,TRAVAUX DE CONSTRUCTION,Forages,TRAVAUX DE TAMPONNAGE,Cimentation sous la tête de puits lors du forage rotatif et du forage à percussi DXME-KALI-KAVO_KARIRI,"Malaxeurs stationnaires pour la préparation de mortiers à base de ciment et d'eau et d'autres mortiers, capacité 750 l",Equipment,General,Heures machine,1.31,1.31,1.31,1.31,1,EUR,0.84,0.6417,6,6,TRAVAUX DE CONSTRUCTION,Forages,TRAVAUX DE TAMPONNAGE,Cimentation sous la tête de puits lors du forage rotatif et du forage à percussi MEME-TO-KAPU-KASA,Canalisations rapides en matériaux polymères composites,Abstract Material,General,pièce,74.75,28.81,134.75,71.23,3,EUR,4892.64,46.0,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de dispositifs de déversement d'eau à partir de la chaussée à l'aid KAVO-TO-KATO-KASA_KAKAMESA,"Fil d'acier à faible teneur en carbone galvanisé à usage multiple, diamètre 2,2 mm",Material,General,t,2035.01,2035.01,2035.01,2035.01,1,EUR,7.53,0.01,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de portiques pour tuyaux de drainage à partir de blocs de gabions e DXME-RIKA-MERI_KAMETO,Électricité : consommation 99 kW·h/machine-heure,Electricity,Electricity,Heures machine,12.72,12.72,12.72,12.72,1,EUR,38.17,3.0017,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MERI_KAMETO,"Engins flottants de dragage électriques, débit 80 m3/h, pression 40 m",Equipment,General,Heures machine,36.31,36.31,36.31,36.31,1,EUR,109.01,3.0017,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-KAPU-KADX,Charnières,Abstract Material,General,pièce,1.45,1.45,1.45,1.45,1,EUR,144.55,100.0,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"ARMOIRES ENCASTRÉES, ÉTAGÈRES ENTRESOL, ARTICLES À L'UNITÉ" KAME-TO-KATO-KARI_KAKAKARI,"Acide nitrique concentré avec une teneur en substance principale de 98,2 %, grade I",Material,Chemicals,t,1261.15,1261.15,1261.15,1261.15,1,EUR,0.17,0.0,6,6,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV MEME-TO-KATO-MESA_MEKATONE,"Fixations en plastique pour la couche de protection de l'armature, forme en chaise, épaisseur de la couche de protection en béton 25 mm",Material,General,100 pièces,1.74,1.74,1.74,1.74,1,EUR,6.86,3.95,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHIQUES DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À ,Construction de dalles préfabriquées et monolithiques à ossature et poutres DXME-KAME-KASA_KASAME,"Pelles-niveleuses sur châssis de type automobile, capacité du godet 0,6 m3",Equipment,General,Heures machine,84.52,84.52,84.52,84.52,1,EUR,337.21,3.99,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES MEPU-SA-KAPU-KALI,Mastic thiokolique,Abstract Material,General,kg,10.02,10.02,10.02,10.02,1,EUR,450.02,44.8933,6,6,TRAVAUX DE CONSTRUCTION,Travaux de consolidation des berges,FIXATION DES PENTES DES OUVRAGES HYDRAULIQUES FLUVIALES ET DES CANAUX,FIXATION AVEC DES DALLES PRÉFABRIQUÉES EN BÉTON ARMÉ KANE-RI-KARI-KAME,Carreaux céramiques pour sols,Abstract Material,General,m2,22.94,22.94,22.94,22.94,1,EUR,2386.1,104.0,6,6,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements de cages d'escalier sur mortier de ciment à partir de DXME-KANE-KAME_KAKASA,"Crics hydrauliques, capacité de charge jusqu'à 300 t",Equipment,General,Heures machine,0.46,0.46,0.46,0.46,1,EUR,3.99,8.6683,6,6,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Extraction des tubes du puits KAVO-ME-KARI-RISA_KAKAPUME,"Agrafes en acier galvanisé fixes pour toiture, hauteur 25 mm, épaisseur 0,5 mm",Material,General,100 pièces,16.97,16.97,16.97,16.97,1,EUR,37.16,2.19,6,6,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures en acier laminé sur une charpente en planches équarries MEME-RI-KALI-MEME,Vantaux de fenêtre,Abstract Material,General,m2,133.59,133.59,133.59,133.59,1,EUR,13358.86,100.0,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"CONSTRUCTIONS DE COUVERTURES DE TOITURE, CHATRIERS" MEKA-TO-KARI-KATO_KAKAKATO,"Soudures à l'étain et au plomb sans antimoine en lingots, marque POS40",Material,General,kg,50.0,50.0,50.0,50.0,1,EUR,21.5,0.43,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,"Équipements de signalisation, de centralisation et de verrouillage" DXME-MEDX-MEKA_KATORI,"Stations de pompage hydrauliques pour l'entraînement de mécanismes hydrauliques, pression jusqu'à 70 MPa",Equipment,General,Heures machine,1.63,1.63,1.63,1.63,1,EUR,189.22,116.3467,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é DXME-KARI-KARI_KAMESA,"Électricité : consommation 19,8 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.54,2.54,2.54,2.54,1,EUR,5.24,2.0617,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KARI_KAMESA,Copras universels avec marteau pneumatique 8 t,Equipment,General,Heures machine,117.26,117.26,117.26,117.26,1,EUR,241.76,2.0617,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KARI_KAMETO,"Électricité : consommation 9,24 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.19,1.19,1.19,1.19,1,EUR,62.21,52.41,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KADX-KANE_KAKAPU,Machines pour le montage du réseau de contact lors du travail « sur le terrain »,Equipment,General,Heures machine,39.73,39.73,39.73,39.73,1,EUR,342.28,8.615,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT RITO-TO-KANE-KASA_KAKAKAME,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 15 mm, épaisseur de paroi 2,8 mm",Material,Pipes & Fittings,m,1.92,1.92,1.92,1.92,1,EUR,2.65,1.3833,6,6,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Prélèvement de gaz dans la canalisation avec installation d'un ventilateur, MEVO-ME-MEKA-KAME_KAMELIME,"Vanne, diamètre 32 mm",Material,General,pièce,13.3,13.3,13.3,13.3,1,EUR,10.96,0.988,6,6,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de bouteilles de gaz liquéfié dans un placard, DXDXDX_DXDXKARI,Autour de la pierre,Material,General,m3,0.0,0.0,0.0,0.0,0,EUR,0.0,0.0,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de la pierre DXME-KADX-METO_KAMEPU,"Installations à impulsions électriques à haute tension pour la création de décharges électriques dans le sol lors de la production de pieux selon la technologie à impulsions, valeur maximale de l'énergie stockée 40 kJ, valeur de la capacité du accumulateur d'énergie 1000 μF, plage de régulation de la tension de sortie 7-9 kV, puissance consommée 10 kW",Equipment,General,Heures machine,5.71,5.71,5.71,5.71,1,EUR,3.06,0.535,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation de pieux forés-injectés dans des puits prêts à l'emploi à l'aide de DXME-KATO-MEDX_METOME,"Électricité : consommation 20,79 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.67,2.67,2.67,2.67,1,EUR,20.15,7.545,6,6,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES À BARRES POUR EXPLOITATIONS HORIZONTALES ET INCLINÉES ET C DXME-KATO-MEDX_METOME,"Installations de forage à un seul bras sur châssis pneumatique, en version antidéflagrante, section de travail jusqu'à 40 m2, diamètre de forage jusqu'à 76 mm, profondeur de forage jusqu'à 5000 mm",Equipment,General,Heures machine,207.7,207.7,207.7,207.7,1,EUR,1567.1,7.545,6,6,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES À BARRES POUR EXPLOITATIONS HORIZONTALES ET INCLINÉES ET C DXME-KARI-KARI_KAMETO,"Copres universels pour rails avec marteau diesel 2,5 t",Equipment,General,Heures machine,69.71,69.71,69.71,69.71,1,EUR,3653.55,52.41,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KATO-KARI_KAKAVOSA,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 114 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,37.2,37.2,37.2,37.2,1,EUR,8.78,0.24,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KALI-MEME_KAMEKA,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,1.22,19.0517,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-KALI-MEME_KAMEKA,"Installations de gunitage à sec et humide, débit de 3,6 à 9,6 m3/h",Equipment,General,Heures machine,10.59,10.59,10.59,10.59,1,EUR,201.76,19.0517,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION MEDX-ME-KANE-KAME,Nœuds de passage des conduits de ventilation,Abstract Material,General,pièce,241.19,241.19,241.19,241.19,1,EUR,2411.92,10.0,6,6,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de nœuds de passage pour les conduits de ventilation KAME-SA-KATO-KARI,Piquet pour délinéateur,Abstract Material,General,pièce,46.03,46.03,46.03,46.03,1,EUR,0.0,0.0,6,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,Panneaux de signalisation routière KAME-RI-KATO-KASA_KAKARIME,"Apprêt polymère contenant des solvants organiques et des additifs adhésifs pour la préparation des surfaces métalliques, ciment-sable, béton et béton armé avant l'application de matériaux d'étanchéité bitume-polymère, consommation 0,1-0,3 kg/m2",Material,General,kg,10.54,10.54,10.54,10.54,1,EUR,181.26,17.2,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-KASA-KANE_KAPUKA,"Grues sur chenilles, capacité de charge 1 000 t",Equipment,General,Heures machine,1598.78,1598.78,1598.78,1598.78,1,EUR,96347.77,60.2633,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ KAME-TO-KASA-TOVO_KARINEME,Monohydrate de lithium,Material,General,kg,6.97,6.97,6.97,6.97,1,EUR,41.55,5.9617,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie charbonnière et tourbière,ÉQUIPEMENT MINIER,ÉQUIPEMENT POUR LE TRANSPORT SOUTERRAIN KAME-TO-KASA-MESA_KAKAMESA,Potassium caustique technique,Material,General,kg,9.71,9.71,9.71,9.71,1,EUR,640.41,65.95,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie charbonnière et tourbière,ÉQUIPEMENT MINIER,ÉQUIPEMENT POUR LE TRANSPORT SOUTERRAIN RITO-TO-KATO-KARI_KAKADXDX,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 121 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,66.25,66.25,66.25,66.25,1,EUR,2319.71,35.0167,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT POUR CERTAINES PRODUCTIONS DE L'INDUSTRIE CHIMIQUE,ÉQUIPEMENT POUR LES ENTREPRISES DE L'INDUSTRIE DE LA SODA KASA-RI-KARI-KADX_KAKAMERI,"Blocs en béton cellulaire pour murs de catégorie 1, masse volumique 500 kg/m3, béton B2",Material,General,m3,165.12,165.12,165.12,165.12,1,EUR,2726.65,16.5133,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHIQUES DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À ,Construction de dalles préfabriquées et monolithiques à ossature et poutres DXME-RIME-MEDX_KARISA,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,16.99,72.8383,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RITO-TO-KAME-KAPU_KAKAVOME,"Tubes de cuvelage sans soudure en acier du groupe D, avec filetage triangulaire court, diamètre extérieur 473 mm, épaisseur de paroi 11,1 mm",Material,Pipes & Fittings,t,3353.56,3353.56,3353.56,3353.56,1,EUR,4.26,0.0,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEPU-KATO_KAMEME,"Camions à benne basculante, capacité de charge jusqu'à 25 t",Equipment,General,Heures machine,35.87,35.87,35.87,35.87,1,EUR,58.66,3.27,6,6,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,DRAINAGES DXME-RIME-MEDX_KATOLI,"Électricité : consommation 0,36 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.47,10.0,6,6,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures en acier laminé sur une charpente en planches équarries DXME-RIME-MEDX_KATOLI,"Machines à rouler les joints, puissance 1,1 kW",Equipment,General,Heures machine,1.02,1.02,1.02,1.02,1,EUR,10.21,10.0,6,6,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures en acier laminé sur une charpente en planches équarries KAVO-TO-KASA-KASA_KAKAVOME,"Acier galvanisé avec revêtement polymère en rouleaux, classe de revêtement de zinc 120-140, épaisseur 0,5 mm",Material,General,t,2105.49,2105.49,2105.49,2105.49,1,EUR,1380.22,0.6567,6,6,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures en acier laminé sur une charpente en planches équarries RITO-SA-KARI-KARI_KAMEKAME,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 325 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,97.21,97.21,97.21,97.21,1,EUR,395.31,4.0667,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ DXME-KAME-KASA_SAPUVO,"Pelles hydrauliques pneumatiques sur pneus, capacité du godet d'excavation jusqu'à 0,3 m3, capacité de charge du godet frontal jusqu'à 1 t",Equipment,General,Heures machine,22.19,22.19,22.19,22.19,1,EUR,26.44,1.1917,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Remplacement de maillons individuels d'un bac de bordure RILI-RI-KAME-KAVO_KAKARILI,"Collier de fixation en acier pour câble de fixation inférieur, galvanisé",Material,General,pièce,3.43,3.43,3.43,3.43,1,EUR,7.07,2.06,6,6,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE KASA-ME-KATO-KARI,Poutres sous grue,Abstract Material,General,pièce,1270.3,1270.3,1270.3,1270.3,1,EUR,127030.49,100.0,6,6,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"Poutres, traverses et linteaux" RISA-RI-KAME-KANE_KAKASARI,Pince de raccordement KS-054-1 (KS-324),Material,General,pièce,26.85,26.85,26.85,26.85,1,EUR,55.3,2.06,6,6,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-LI-MESA-KALI_KAKAVOTO,"Clous-chevilles en polypropylène avec rebord, diamètre 8 mm, longueur 100 mm",Material,General,100 pièces,8.02,8.02,8.02,8.02,1,EUR,39.81,4.965,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé RITO-TO-KAME-KAPU_KAKALIVO,"Tubes de cuvelage sans soudure en acier du groupe D, avec filetage triangulaire court, diamètre extérieur 426 mm, épaisseur de paroi 10-11 mm",Material,Pipes & Fittings,t,3532.93,3532.93,3532.93,3532.93,1,EUR,3.67,0.0,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-SA-KARI-KARI_KAKAKASA,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 89 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,9.75,9.75,9.75,9.75,1,EUR,32.51,3.3333,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ DXME-KANE-KASA_KAKAME,"Chargeuses frontales universelles à godet unique, pneumatiques, capacité nominale du godet principal 5,5 m3, capacité de charge 10 t",Equipment,General,Heures machine,112.55,112.55,112.55,112.55,1,EUR,17.26,0.1533,6,6,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,DRAINAGES DXME-MEME-KAME_KARIME,"Dispositifs de poussée pour le tirage de câbles, force de traction 800 kg",Equipment,General,Heures machine,3.62,3.62,3.62,3.62,1,EUR,78.78,21.745,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de KANE-RI-KAME-KARI,Carreaux céramiques émaillés pour le revêtement intérieur des murs,Abstract Material,General,m,14.95,9.86,17.5,17.5,2,EUR,357.42,34.98,6,6,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS KAME-LI-MELI-KADX_MEMELIRI,"Foret diamanté annulaire à grande vitesse pour béton armé avec queue à démontage rapide pour forage sur banc en mode humide, soudure laser des segments, longueur 430 mm, diamètre 112 mm",Material,General,pièce,465.68,465.68,465.68,465.68,1,EUR,130.47,0.2783,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX KAME-LI-MELI-KAPU_KAKAKAPU,"Câble en acier diamanté pour machine à câble, diamètre 10,5 mm",Material,General,m,109.53,109.53,109.53,109.53,1,EUR,41.08,0.375,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX DXME-KADX-MEKA_KANEME,Râpes à rails électriques fonctionnant à partir d'une centrale électrique mobile,Equipment,General,Heures machine,0.1,0.1,0.1,0.1,1,EUR,4.13,41.3983,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",REMBLAYAGE DES MARAIS RITO-LI-KAME-KARI,Conduites avec manchons,Abstract Material,General,m,15.48,15.48,15.48,15.48,1,EUR,1548.25,100.0,6,6,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac MEVO-RI-KALI-KARI,Conduites en tuyaux d'égout en fonte et raccords correspondants,Abstract Material,General,m,24.04,24.04,24.04,24.04,1,EUR,2398.38,99.7667,6,6,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN FONTE,Pose de conduites en fonte pour égouts le long des murs des bâtiments et dans le KATO-RI-KAME-KASA_KAKAKANE,"Ciment Portland au laitier pour la construction générale CEM III 42,5N",Material,General,t,233.59,233.59,233.59,233.59,1,EUR,10842.31,46.4167,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation du béton lourd KAME-LI-KALI-RINE,Produits (joints) en mousse de polyéthylène,Abstract Material,General,m,39.91,10.66,45.76,45.76,2,EUR,13345.44,292.895,6,6,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" KAPU-TO-KARI-METO_KARIMERI,"Mélanges secs de ciment et de sable pour maçonnerie, classe B3,5 (M50)",Material,General,t,78.84,78.84,78.84,78.84,1,EUR,32.37,0.41,6,6,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates KAME-NE-KAME-KANE_KAKAKARI,"Plaques en béton armé, épaisseur 24,0 mm",Material,General,m3,934.05,934.05,934.05,934.05,1,EUR,1916.36,2.0517,6,6,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates MENE-TO-KAME-KAME_KATOMERI,Herbicide à base de glyphosate,Material,General,t,9735.64,9735.64,9735.64,9735.64,1,EUR,16.23,0.0,6,6,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates MEME-TO-KATO-MEDX,Matériaux plastiques,Abstract Material,General,m2,16.17,2.11,23.2,23.2,2,EUR,1441.12,71.36,6,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,ÉLÉMENTS DE CONSTRUCTION DES LUMINAIRES RIKA-RI-KARI-KAPU_KAKAKATO,"Capuchons polyéthylène universels, diamètre du câble entrant 25-30 mm",Material,General,100 pièces,129.88,129.88,129.88,129.88,1,EUR,3.47,0.0267,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE DXME-KASA-KAPU_KAMELI,"Électricité : consommation 214,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,27.55,27.55,27.55,27.55,1,EUR,37103.7,1346.7583,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER LES TÔLES DXME-KASA-KAPU_KAMELI,"Ponts roulants électriques, capacité de charge 320 t",Equipment,General,Heures machine,326.53,326.53,326.53,326.53,1,EUR,439757.43,1346.7583,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipement des usines de laminage,ÉQUIPEMENT DE LOCATION,MACHINES À LAMINER LES TÔLES RIRI-RI-KARI-RIME_KAKAKATO,"Tige métallique pour poteaux en bois, diamètre du filetage M16, longueur de la partie encastrée 100 mm",Material,General,pièce,3.59,3.59,3.59,3.59,1,EUR,94.51,26.3333,6,6,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,SUSPENSION DE CÂBLES SUR LES LIGNES DE COMMUNICATION ET DE RADIO RIRI-RI-KARI-RIME_KAKAKARI,"Tige métallique pour poteaux en bois, diamètre du filetage M16, longueur de la partie encastrée 125 mm",Material,General,pièce,1.72,1.72,1.72,1.72,1,EUR,38.47,22.3333,6,6,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,SUSPENSION DE CÂBLES SUR LES LIGNES DE COMMUNICATION ET DE RADIO MEPU-SA-KAME-MEME_KAPUKAME,"Mastic non durcissant à base de caoutchoucs synthétiques, de charges et de plastifiants pour l'étanchéification des joints des murs extérieurs des bâtiments et des constructions",Material,General,t,2074.76,2074.76,2074.76,2074.76,1,EUR,5.5,0.01,6,6,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MEVO-PU-KAME-KAPU,Installation en armoire,Abstract Material,General,pièce,9.54,9.54,9.54,9.54,1,EUR,1313.96,137.6667,6,6,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Dispositif d'installation pour la réduction de la pression du gaz, KAME-LI-MESA-KATO_KAKAKAME,"Boulons d'ancrage en tiges rondes droites ou courbées avec filetage, fournis avec écrous et rondelles",Material,General,t,2694.19,2694.19,2694.19,2694.19,1,EUR,11.67,0.01,6,6,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ DXME-RIME-MEDX_KARISA,"Machines à découper les réfractaires, diamètre du disque jusqu'à 500 mm",Equipment,General,Heures machine,0.88,0.88,0.88,0.88,1,EUR,64.3,72.8383,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAVO-TO-KASA-KASA_KAKASASA,"Tôle d'acier galvanisée, épaisseur 0,55 mm",Material,General,t,2047.18,2047.18,2047.18,2047.18,1,EUR,211.54,0.6,6,6,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RISA-RI-KAME-KAVO_KAKAKAME,Borne de mise à la terre KS-124,Material,General,pièce,9.66,9.66,9.66,9.66,1,EUR,19.9,2.06,6,6,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS DU RÉSEAU DE CONTACT RISA-RI-KARI-KAVO_KAKAKARI,"Nœud de fixation en acier galvanisé pour éclateur, type 1,2,3",Material,General,pièce,37.17,37.17,37.17,37.17,1,EUR,38.29,1.03,6,6,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE MEVO-SA-KALI-KARI,Nœuds de purgeurs de condensat,Abstract Material,General,compl,68.98,68.98,68.98,68.98,1,EUR,68.98,1.0,6,6,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation des nœuds de purgeurs de condensat et de pompes manuelles MEPU-ME-KANE-KAPU_KAKAKAVO,"Colle de montage sèche pour travaux intérieurs et extérieurs à base de liant ciment, pour la pose de blocs et de dalles en béton cellulaire",Material,General,t,287.25,287.25,287.25,287.25,1,EUR,6.13,0.02,6,6,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,"Maçonnerie de murs en pierres de béton léger, remplissage d'ouvertures et de col" KANE-ME-KAME-KALI,Brique céramique ou silicate,Abstract Material,General,1000 pièces,1986.74,1986.74,1986.74,1986.74,1,EUR,483.44,0.2433,6,6,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,Maçonnerie des murs extérieurs en briques et pierres céramiques ou silicatées av RISA-ME-KANE-RIKA,Cales sous semelle de rail pour traverses en béton armé,Abstract Material,General,pièce,3710.57,3710.57,3710.57,3710.57,1,EUR,13456983.15,3626.6667,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAVO-ME-KASA-KAVO,Vanne en acier pour conduit à déchets,Abstract Material,General,compl,128.85,95.41,195.72,95.41,2,EUR,128.85,1.0,6,4,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ RISA-ME-KANE-MEDX_KAMEKAME,"Cale en caoutchouc sous la semelle, type TsP-362",Material,General,pièce,2.36,2.36,2.36,2.36,1,EUR,8543.92,3626.6667,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-MEPU_KARIME,Machines à vide pour voies ferrées,Equipment,General,Heures machine,527.8,527.8,527.8,527.8,1,EUR,1583.39,3.0,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST DXME-KATO-MENE_KAKATO,Installations de forage pneumatiques pour puits d'une longueur finale allant jusqu'à 300 m avec 4 machines de forage fonctionnant à partir de stations de compression fixes,Equipment,General,Heures machine,157.79,157.79,157.79,157.79,1,EUR,813.39,5.155,6,6,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"PASSAGE DE PUITS VERTICAUX, DE PUITS DE FORAGE ET DE LEURS EMBRANCHEMENTS" KASA-ME-KARI-KALI_KAKARISA,Montants en béton armé vibré ORU,Material,General,m3,659.24,659.24,659.24,659.24,1,EUR,66583.7,101.0,6,6,TRAVAUX DE CONSTRUCTION,Lignes électriques,APPAREILS DE DISTRIBUTION OUVERTS DE 35 À 1150 KV,STRUCTURES PRÉFABRIQUÉES EN BÉTON ARMÉ ORU 35-1150 KV RIRI-RI-KARI-RIKA,Colliers de serrage en acier,Abstract Material,General,kg,3.42,3.42,3.42,3.42,1,EUR,2485.32,727.44,6,6,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,SUPPORTS EN BOIS VL 35-220 KV DXME-KALI-MEME_KAKAME,"Installations d'injection pour l'injection de solutions de ciment, pression 7 MPa, fonctionnant à partir d'installations de compression mobiles",Equipment,General,Heures machine,7.56,7.56,7.56,7.56,1,EUR,7.82,1.0333,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri DXME-KARI-KASA_SARINE,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,3.54,37.9433,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri KASA-ME-KAPU-KASA,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,67.03,67.03,67.03,67.03,1,EUR,6702.91,100.0,6,6,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" KAME-SA-KATO-KAVO,Structures métalliques pour ponts de signalisation lumineuse,Abstract Material,Steel & Metal,t,8.04,5.87,8.47,8.47,2,EUR,58.67,10.0,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER","JOINTS ISOLANTS, CONNECTEURS DE RAILS ET PONTS DE SIGNALISATION" MEME-RI-KALI-KAPU,Blocs de fenêtre,Abstract Material,General,m2,235.23,235.23,235.23,235.23,1,EUR,23523.42,100.0,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES RIPU-TO-KAME-KAPU,"Tuyaux en PVC sans pression, à emboîtement",Abstract Material,General,m,186.68,186.68,186.68,186.68,1,EUR,19405.49,103.95,6,6,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUBES D'ÉGOUTS EN POLYCHLORURE DE VINYLE (PVC) SANS PRESSION À EMBOÎTEMENT RILI-RI-KATO-KARI_KAKAKAPU,"Fixation en acier galvanisé articulée inversée, type FOI-2, longueur 3200 mm",Material,General,pièce,303.07,303.07,303.07,303.07,1,EUR,1767.89,5.8333,6,6,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KARI-RI-KAME-KATO,Gravier d'expansion,Abstract Material,General,m3,65.62,65.62,65.62,65.62,1,EUR,544.81,8.3033,6,6,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un conduit à déchets avec un tube en acier résistant à la corrosi KAME-LI-MESA-MEPU_KAMENEME,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 2,5 mm, longueur 20 mm",Material,General,t,6903.73,6903.73,6903.73,6903.73,1,EUR,1.1,0.0,6,6,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,"APPAREILS D'ÉCLAIRAGE, DE CHAUFFAGE, DE PROTECTION ET DE COMPTAGE" MEDX-TO-KARI-KAVO_KAKARIME,"Supports en acier pour la fixation de l'unité extérieure d'un système split, avec fixation, charge recommandée jusqu'à 80 kg, dimensions 500 x 500 x 45 mm",Material,General,compl,14.34,14.34,14.34,14.34,1,EUR,14.34,1.0,6,6,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de climatiseurs et de systèmes split RIPU-TO-KATO-METO_KAKARIRI,"Tuyaux en polyéthylène sous pression, à l'exception des tuyaux de gaz PE100, pour le transport de l'eau, rapport dimensionnel standard SDR13,6, diamètre extérieur nominal 40 mm, épaisseur de paroi 3,0 mm",Material,General,m,1.73,1.73,1.73,1.73,1,EUR,13.14,7.585,6,6,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS MEPU-RI-KAME-KATO,Compositions d'apprêt époxy-houillères,Abstract Material,General,t,6002.83,6002.83,6002.83,6002.83,1,EUR,416.2,0.07,6,2,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ISOLATION PAR PEINTURE DES SURFACES EN BÉTON KAME-LI-MESA-MEPU_KAMEVOME,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, pointues, diamètre 2,5 mm, longueur 25 mm",Material,General,t,7132.5,7132.5,7132.5,7132.5,1,EUR,3.33,0.0,6,6,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières en PVC KAME-PU-KAME-KANE_KAMENENE,"Trépan pour forage de trous, filetage intérieur R17, diamètre 30 mm",Material,General,pièce,9.67,9.67,9.67,9.67,1,EUR,19.87,2.055,6,6,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES À BARRES POUR EXPLOITATIONS HORIZONTALES ET INCLINÉES ET C KASA-ME-KAPU-KAVO,Dalles en béton armé,Abstract Material,General,m2,20.09,20.09,20.09,20.09,1,EUR,200.92,10.0,6,6,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,SOUTÈNEMENTS PERMANENTS À CADRE POUR PUITS INCLINÉS D'OUVRAGES HORIZONTAUX ET IN RINE-ME-KAME-KALI_KAKARIRI,"Structures métalliques en tôle laminée pour travaux de forage, poids de la structure jusqu'à 0,5 t",Material,Steel & Metal,t,4042.12,4042.12,4042.12,4042.12,1,EUR,9.34,0.0,6,6,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES DES PUITS VERTICAUX ET DES PUITS DE SECTEUR CIRCULAIRE ET DXME-KADX-KADX_MEKARI,"Électricité : consommation 35,31 kWh/machine-heure",Electricity,Electricity,Heures machine,4.54,4.54,4.54,4.54,1,EUR,86.17,19.0,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE MEVO-ME-KALI-KAME,Vannes,Abstract Material,General,pièce,240.82,240.82,240.82,240.82,1,EUR,240.82,1.0,6,6,TRAVAUX DE CONSTRUCTION,Canalisations internes,RACCORDS DE TUYAUTERIE À BRIDE,Installation de soupapes de réduction à ressort RITO-SA-KAME-KAVO_KAKAVODX,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 1420 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,872.65,872.65,872.65,872.65,1,EUR,698.12,0.8,6,6,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" RIPU-TO-KASA-RIME,Bride en polyéthylène pour gaine câblée,Abstract Material,General,pièce,20.95,20.95,20.95,20.95,1,EUR,20.95,1.0,6,6,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS MEVO-RI-KAPU-MEKA,Puits en matériaux composites polymères,Abstract Material,General,compl,4879.81,4879.81,4879.81,4879.81,1,EUR,4879.81,1.0,6,6,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION D'INSTALLATIONS D'ÉPURATION RITO-SA-KAME-KAVO_KAKALILI,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 1220 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,748.55,748.55,748.55,748.55,1,EUR,598.84,0.8,6,6,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" MEVO-RI-KANE-MERI,Manchons en caoutchouc,Abstract Material,General,compl,246.68,128.0,270.41,270.41,2,EUR,24667.36,100.0,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Remplacement des appareils sanitaires DXME-KASA-KAPU_KARILI,Électricité : consommation 66 kWh/machine-heure,Electricity,Electricity,Heures machine,8.48,8.48,8.48,8.48,1,EUR,4213.22,497.015,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,RÉVISION DE L'ÉQUIPEMENT PRINCIPAL DES CENTRALES NUCLÉAIRES,Groupe de pompage de circulation principal DXME-KASA-KAPU_KARILI,"Ponts roulants électriques spéciaux, capacité de charge 400 t",Equipment,General,Heures machine,823.62,823.62,823.62,823.62,1,EUR,409350.38,497.015,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,RÉVISION DE L'ÉQUIPEMENT PRINCIPAL DES CENTRALES NUCLÉAIRES,Groupe de pompage de circulation principal DXME-KADX-KADX_MEKARI,Lignes semi-automatiques pour l'assemblage d'éléments avec des traverses en bois (équipement d'atelier),Equipment,General,Heures machine,98.03,98.03,98.03,98.03,1,EUR,1862.48,19.0,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-MERI-KAPU_KAKARI,"Débroussailleuses portées à commande hydraulique sur tracteur, puissance 118 kW (160 ch)",Equipment,General,Heures machine,44.42,44.42,44.42,44.42,1,EUR,97.28,2.19,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-MERI-KAPU_KAKAME,"Débroussailleuses portées à commande hydraulique sur tracteur, puissance 79 kW (108 ch)",Equipment,General,Heures machine,32.43,32.43,32.43,32.43,1,EUR,84.7,2.6117,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-MERI-KAVO_KAKAME,Rouleaux pour résidus de bois (sans tracteur),Equipment,General,Heures machine,2.99,2.99,2.99,2.99,1,EUR,13.2,4.4183,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS MEVO-SA-MEKA-KAPU,Radiateurs sectionnels en aluminium et bimétalliques,Abstract Material,General,pièce,207.28,207.28,207.28,207.28,1,EUR,20727.66,100.0,6,6,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de radiateurs en aluminium et bimétalliques MEME-ME-KATO-KAME_KAKARINE,"Bois équarri de feuillus (bouleau, tilleul), humidité naturelle, longueur 2-3,75 m, largeur 20-70 mm, épaisseur 80-100 mm, classe III",Material,General,m3,330.51,330.51,330.51,330.51,1,EUR,57.84,0.175,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de structures monolithiques en béton armé de la partie souterraine MEPU-RI-KAPU-KATO_KAKAMEPU,Résine époxy ED-16,Material,General,t,7300.32,7300.32,7300.32,7300.32,1,EUR,1388.56,0.1917,6,6,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR KARI-TO-KAME-KARI_MEMEMEPU,"Sable naturel pour travaux de construction, classe II, très fin",Material,General,m3,22.98,22.98,22.98,22.98,1,EUR,101.4,5.294,6,6,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR RITO-VO-KAPU-MERI_KAMEMETO,"Raccord en T sans soudure à passage droit, pression nominale jusqu'à 16 MPa, diamètre nominal 50 mm, diamètre extérieur et épaisseur de paroi 57,0 x 4,0 mm",Material,General,pièce,10.18,10.18,10.18,10.18,1,EUR,3.06,0.3,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire de raccordement d'agrégats de rempliss KAME-VO-KARI-KAVO,Double vitrage,Abstract Material,General,m2,86.15,86.15,86.15,86.15,1,EUR,8528.73,99.0,6,6,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAVO-TO-KASA-KARI_KAMEPUPU,"Tôles laminées à chaud, nuance d'acier C345, largeur 1200-3000 mm, épaisseur 14-24 mm",Material,General,t,2354.77,2354.77,2354.77,2354.77,1,EUR,0.0,0.0,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-TO-KASA-RITO,Réactifs,Abstract Material,General,kg,7.12,7.12,7.12,7.12,1,EUR,0.0,0.0,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Préparation et acheminement d'une solution argileuse dans l'espace entre les par RILI-RI-KATO-KARI_KAKAKANE,"Fixation en acier galvanisé articulée droite, type FP-2, longueur 1400 mm",Material,General,pièce,174.51,174.51,174.51,174.51,1,EUR,727.11,4.1667,6,6,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEPU-ME-KAPU-KARI_KAKAKATO,"Colle, marque NT-150",Material,General,kg,18.45,18.45,18.45,18.45,1,EUR,92.27,5.0,6,6,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ISOLATION PAR COLLAGE DES SURFACES EN BÉTON MEME-ME-KARI-KAME_KAKARIRI,"Bois rond de conifères écorcé, longueur 3-6,5 m, diamètre 22-34 cm, classe I-III",Material,General,m3,226.58,226.58,226.58,226.58,1,EUR,2085.25,9.2033,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,ÉLÉMENTS EN BOIS DES ÉQUIPEMENTS HYDRAULIQUES,Installation de structures en bois sur les canaux RISA-RI-KAME-KANE_KAKAKAME,Pince pour câble simple KS-037,Material,General,pièce,26.67,26.67,26.67,26.67,1,EUR,346.65,13.0,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE PROTECTION DES INSTALLATIONS MARITIMES,Suspension de dispositifs anti-chocs pour installations d'amarrage maritimes à l KAVO-RI-KARI-KASA_KAKASARI,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 28 mm",Material,Steel & Metal,10 m,106.2,106.2,106.2,106.2,1,EUR,106.2,1.0,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE PROTECTION DES INSTALLATIONS MARITIMES,Suspension de dispositifs anti-chocs pour installations d'amarrage maritimes à l KAVO-ME-KARI-KANE_KAKAPURI,"Trappe en fonte avec grille pour regard d'égout, charge nominale 15 kN, diamètre du regard 600 mm",Material,General,pièce,230.48,230.48,230.48,230.48,1,EUR,0.0,0.0,6,6,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,PUITS D'ÉGOUT,Installation de puits d'égouttement ronds pour les égouts pluviaux DXME-KAVO-KAVO_KAKAME,"Mélangeurs-poseurs de mélanges minéraux émulsionnés coulés, trémie de gravats 9,2 m3, débit de la pompe à émulsion 400 l/min",Equipment,General,Heures machine,211.72,211.72,211.72,211.72,1,EUR,266.41,1.2583,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-KATO-KASA_KARIME,Électricité : consommation 1056 kWh/machine-heure,Electricity,Electricity,Heures machine,135.63,135.63,135.63,135.63,1,EUR,927.05,6.835,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS MEME-ME-KATO-KANE_KAMESAKA,"Bois de conifères à humidité naturelle, traité antiseptique, longueur jusqu'à 6000 mm, largeur 75 mm, épaisseur 75 mm",Material,General,m3,621.16,621.16,621.16,621.16,1,EUR,102.91,0.1667,6,6,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE",DISPOSITIFS D'ALIMENTATION ÉLECTRIQUE ET CÂBLÉS RIKA-RI-KAVO-KAME_KAKAKATO,"Rails DIN métalliques, galvanisés, dimensions 7,5 x 35 x 1000 mm",Material,General,100 pièces,339.09,339.09,339.09,339.09,1,EUR,6.78,0.02,6,6,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" MEVO-SA-KAVO-MESA,Billes en caoutchouc (de fermeture),Abstract Material,General,pièce,24.04,24.04,24.04,24.04,1,EUR,48.08,2.0,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Coupe de conduites de gaz en acier à moyenne et haute pression MEPU-RI-KASA-KAPU,Compositions de protection,Abstract Material,General,kg,4543.96,57.57,13516.73,57.57,2,EUR,1040.79,0.08,6,6,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Application d'un revêtement anticorrosion sur les surfaces du réservoir MEKA-TO-KARI-KATO_KAKAKAPU,"Soudures à l'étain et au plomb sans antimoine en lingots, marque POS61",Material,General,kg,73.49,73.49,73.49,73.49,1,EUR,5.42,0.1467,6,6,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,JOINTS DE DÉFORMATION MEPU-RI-KAPU-KAPU,Résine à base de polyméthacrylate de méthyle,Abstract Material,General,kg,11.67,7.08,13.97,13.97,2,EUR,1570.6,221.875,6,6,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,TROTTOIRS SUR LES PONTS ET LES PASSERELLES SOUS LES ROUTES DXME-KAPU-KAME_KADXME,Hydrorotateurs (foreuses hydrauliques) sur base d'une excavatrice sur chenilles d'un poids maximal de 25 t,Equipment,General,Heures machine,62.75,62.75,62.75,62.75,1,EUR,17.99,0.2867,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIPU-RI-KARI-KARI,Tubes métalliques polymères multicouches,Abstract Material,Pipes & Fittings,m,5.75,5.75,5.75,5.75,1,EUR,547.96,95.25,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Remplacement des canalisations internes en acier ; remplacement des canalisation MEDX-TO-KAME-KASA,Vannes,Abstract Material,General,pièce,232.83,232.83,232.83,232.83,1,EUR,232.83,1.0,6,6,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de conduits de ventilation avec ouverture manuelle individuelle des KARI-PU-KARI-KARI,Cendres volantes,Abstract Material,General,t,27.0,22.92,47.41,22.92,2,EUR,275.72,12.028,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-KARI-KASA_KARIME,"Installations d'enfoncement statique de pieux à palplanches en acier, force d'enfoncement 1500 kN, force d'extraction 1600 kN",Equipment,General,Heures machine,204.43,204.43,204.43,204.43,1,EUR,112.44,0.55,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-VO-KAPU-MERI_KAMEMEVO,"Raccord en T sans soudure à passage droit, pression nominale jusqu'à 16 MPa, diamètre nominal 80 mm, diamètre extérieur et épaisseur de paroi 89 x 3,5 mm",Material,General,pièce,14.11,14.11,14.11,14.11,1,EUR,6.35,0.45,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net RITO-SA-KARI-KARI_KAKARITO,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 20 mm, épaisseur de paroi 2 mm",Material,Pipes & Fittings,m,1.72,1.72,1.72,1.72,1,EUR,39.63,23.0083,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse KARI-TO-KAME-KARI_MEMEKARI,"Sable naturel pour travaux de construction, classe I, fin",Material,General,m3,27.05,27.05,27.05,27.05,1,EUR,2.27,0.084,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation d'un système de joints de dilatation à partir de structures profilé DXME-KAVO-KASA_KAMEME,"Agrégats pour le bétonnage des murs, automoteurs",Equipment,General,Heures machine,18.73,18.73,18.73,18.73,1,EUR,2049.46,109.4267,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Construction des parois et des cloisons des ouvrages DXME-KASA-KAME_KAMERI,"Électricité : consommation 9,31 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.2,1.2,1.2,1.2,1,EUR,79.26,66.2883,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Installation et démontage du coffrage glissant des tours de puits DXME-KASA-KAME_KAMERI,"Grues à tour mobiles, capacité de levage 10 t, hauteur de levage jusqu'à 150 m",Equipment,General,Heures machine,60.92,60.92,60.92,60.92,1,EUR,4038.47,66.2883,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Installation et démontage du coffrage glissant des tours de puits RISA-ME-KASA-KARI_KAKAKAPU,"Rail pour voies ferrées à écartement large à fixation par crampons, type DN6-65",Material,General,pièce,50.34,50.34,50.34,50.34,1,EUR,2847.42,56.5667,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX PU_MEKAKA_KALITO,Personnel : 3 personnes-heures/machine-heures,Operator,Operators,Heures machine,38.36,38.36,38.36,38.36,1,EUR,115.09,3.0,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST DXME-MEME-KARI_KASAME,Proportionneurs remorqués,Equipment,General,Heures machine,7.12,7.12,7.12,7.12,1,EUR,275.33,38.6667,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES DXME-KARI-KATO_KAKAME,"Marteaux hydrauliques sur base d'excavatrice sur chenilles pneumatiques d'un poids maximal de 20 t, poids de la partie frappante jusqu'à 1 t",Equipment,General,Heures machine,45.61,45.61,45.61,45.61,1,EUR,429.02,9.4067,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RIKA-ME-KARI-RITO_KAMERIME,Conducteur de mise à la terre P-750,Material,General,pièce,6.76,6.76,6.76,6.76,1,EUR,6.76,1.0,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Coupe de conduites de gaz en acier à moyenne et haute pression MEPU-RI-KAME-KATO_KAKAKATO,Émail époxy-houiller EP-5116,Material,General,t,6725.44,6725.44,6725.44,6725.44,1,EUR,423.7,0.06,6,6,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ISOLATION PAR COLLAGE DES SURFACES EN BÉTON MEPU-RI-KAME-KATO_KAKAKARI,"Vernis à base de charbon, marque « Morskoï », A, B",Material,General,t,5580.01,5580.01,5580.01,5580.01,1,EUR,466.86,0.0833,6,6,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ISOLATION PAR COLLAGE DES SURFACES EN BÉTON MEPU-RI-KAME-KATO_KAKAKAME,Composition modifiée époxy-houillère à deux composants (base et durcisseur) avec effet inhibiteur d'adhérence pour la protection des structures métalliques et en béton,Material,Steel & Metal,t,6002.83,6002.83,6002.83,6002.83,1,EUR,604.29,0.1033,6,6,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ISOLATION PAR COLLAGE DES SURFACES EN BÉTON KASA-ME-KAPU-MELI,Panneaux de murs extérieurs ordinaires en béton armé,Abstract Material,General,pièce,628.7,628.7,628.7,628.7,1,EUR,62870.22,100.0,6,6,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" KAVO-ME-KASA-KALI,Conduits de vide-ordures,Abstract Material,General,m,180.83,180.83,180.83,180.83,1,EUR,3098.21,17.1333,6,6,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un conduit à déchets avec un tube en acier résistant à la corrosi MEPU-PU-KARI-KADX,Peinture à base de quartz,Abstract Material,General,kg,7745.38,264.2,15226.57,7745.39,2,EUR,4220.82,15.3433,6,6,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,TRAVAUX DÉCORATIFS MEPU-PU-KATO-KATO,Vernis,Abstract Material,General,t,3242.63,3242.63,3242.63,3242.63,1,EUR,21.89,0.01,6,6,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,REVÊTEMENT ET PEINTURE AVEC DES VERNIS ET DES COMPOSÉS SPÉCIAUX KAME-LI-KANE-KAPU_KAKAKAME,"Bande de renfort en fibre de verre, résistante aux alcalis, largeur 100 mm, longueur 50 000 mm",Material,General,pièce,32.64,32.64,32.64,32.64,1,EUR,138.37,4.24,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-RIME-RIRI_PUTOPU,Installations de dégazage pour huile de câble,Equipment,General,Heures machine,20.86,20.86,20.86,20.86,1,EUR,172.22,8.255,6,6,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-KAVO-KAME_KAKARI,"Finisseurs à chenilles, largeur maximale de pose 7 m, vitesse de pose jusqu'à 24 m/min, rendement 700 t/h",Equipment,General,Heures machine,143.38,143.38,143.38,143.38,1,EUR,95.35,0.665,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-RIME-RIRI_PUTOPU,"Électricité : consommation 42,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,5.51,5.51,5.51,5.51,1,EUR,45.49,8.255,6,6,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-MELI-MEKA_KAKAPUTO,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 19 mm",Material,General,pièce,213.36,213.36,213.36,213.36,1,EUR,117.35,0.55,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-KADX_MERIMEVO,"Foret de guidage en acier, acier de marque R6M5F3, diamètre 6,3 mm, longueur 76 mm",Material,General,pièce,284.09,284.09,284.09,284.09,1,EUR,79.55,0.28,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEKAME,"Machines pour la dérivation dans une conduite de gaz en polyéthylène en service, diamètre des tuyaux 63 mm, pression jusqu'à 0,8 MPa",Equipment,General,Heures machine,16.64,16.64,16.64,16.64,1,EUR,93.16,5.5983,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-RIKA-MENE_KARIME,Bateaux,Equipment,General,Heures machine,2.27,2.27,2.27,2.27,1,EUR,11.83,5.2067,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-MERI-KALI_KAKARI,Unités de plantation attelées,Equipment,General,Heures machine,2.01,2.01,2.01,2.01,1,EUR,1.69,0.84,6,6,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,PLANTATION DE SEMIS ET DE PLANTS DANS UN SOL PARTIELLEMENT PRÉPARÉ ET ENTRETIEN KAME-LI-MELI-MEKA_KAKASADX,"Fraise couronne en acier pour raccordement à une canalisation, acier de marque P6M5F3, diamètre 48 mm",Material,General,pièce,758.12,758.12,758.12,758.12,1,EUR,166.79,0.22,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE MEPU-SA-KADX-KALI_MEKARIKA,Solvant pour peintures et apprêts époxy et à base d'époxy,Material,General,l,9.04,9.04,9.04,9.04,1,EUR,1.11,0.1233,6,6,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy RITO-VO-KATO-MERI_MEKAVORI,"Raccord en acier à souder, diamètre 32 mm",Material,General,pièce,6.92,6.92,6.92,6.92,1,EUR,0.0,0.0,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Tirage de conduites de gaz en polyéthylène dans des conduites de gaz en acier ex DXME-RIKA-MESA_KAKAME,Installations flottantes de dragage 25 m3/h,Equipment,General,Heures machine,35.5,35.5,35.5,35.5,1,EUR,3008.27,84.7333,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION MEME-RI-KARI-MERI,Panneaux de porte en bois,Abstract Material,General,m2,3.25,3.25,3.25,3.25,1,EUR,320.08,98.5,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois,CLOISONS REVÊTUES DE PLAQUES DE PLÂTRE OU DE PLAQUES DE FIBRE DE PLÂTRE,CLOISONS SUR OSSATURE MÉTALLIQUE DXME-KALI-MEME_SALIKA,"Pompes à béton-malaxeurs tractées avec moteur à combustion interne, débit 12 m3/h",Equipment,General,Heures machine,12.67,12.67,12.67,12.67,1,EUR,2.19,0.1733,6,6,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Installation de puits préfabriqués ronds en matériaux polymères sur raccord à br KAME-LI-MESA-KATO_KAKAMEVO,"Boulons en acier à tête hexagonale, fournis avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M30, longueur du boulon 60-300 mm",Material,General,t,4613.69,4613.69,4613.69,4613.69,1,EUR,183.86,0.048,6,6,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,"VANNES, CLAPETS" DXME-KASA-MEPU_KARIME,"Grues de montage spéciales (grues à flèche), capacité de charge 25 t",Equipment,General,Heures machine,27.9,27.9,27.9,27.9,1,EUR,51.66,1.8517,6,6,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Assemblage de structures de ponts en acier par suspension et semi-suspension MEPU-SA-KAME-KANE_KAKAMERI,"Mastic polyuréthane non durcissant, élastique, hautement résistant aux milieux agressifs, pour l'étanchéification et le scellement des raccords filetés et à brides, des pièces métalliques et plastiques",Material,General,kg,250.43,250.43,250.43,250.43,1,EUR,1915.8,7.65,6,6,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment DXME-KADX-METO_KAMERI,"Électricité : consommation 57,43 kW·h/machine-heure",Electricity,Electricity,Heures machine,7.38,7.38,7.38,7.38,1,EUR,201.06,27.2583,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-MEKA-MEME_MEKALI,"Machines pour la dérivation dans une conduite de gaz en acier en service, diamètre des tuyaux 32 mm, pression jusqu'à 1,2 MPa",Equipment,General,Heures machine,12.26,12.26,12.26,12.26,1,EUR,77.08,6.2883,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEME-KAME_KAKAPU,Poseurs de câbles sur voie ferrée,Equipment,General,Heures machine,99.47,99.47,99.47,99.47,1,EUR,408.66,4.1083,6,6,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RISA-TO-MEKA-KAME_MEMELIRI,"Cales pour voies ferrées à écartement large à fixation par vis et chevilles, type ZhBR M",Material,General,t,5845.9,5845.9,5845.9,5845.9,1,EUR,145231.57,24.8433,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-TO-KANE-KAME_MEKAKARI,"Cale élastique en plastique pour fixation de rail ZhBR-65, type TsP-369.104",Material,General,pièce,1.15,1.15,1.15,1.15,1,EUR,8320.74,7253.3333,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-TO-KANE-KAME_MEKAKAKA,"Insert polyamide de guidage pour fixation de rail ZhBR-65, type VP 920.1280",Material,General,pièce,0.99,0.99,0.99,0.99,1,EUR,7205.52,7253.3333,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-RIME-RIRI_SADXKA,"Pompes pneumatiques à piston pour composés polymères à deux composants fonctionnant à partir de compresseurs mobiles, débit d'air comprimé jusqu'à 8,5 l/min",Equipment,General,Heures machine,2.11,2.11,2.11,2.11,1,EUR,42.06,19.9817,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-TO-KASA-RIKA_KAKAKARI,Chlorure de magnésium technique (bischofite),Material,General,t,937.96,937.96,937.96,937.96,1,EUR,191.19,0.205,6,6,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en xylolite et en polyvinylacétate RISA-ME-KANE-MEDX_KAMEKAPU,"Cale en caoutchouc sous la semelle, type TsP-153",Material,General,pièce,1.49,1.49,1.49,1.49,1,EUR,5393.88,3626.6667,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-LI-MENE-KAPU_KAKARIME,"Panneau de coffrage linéaire, à petits panneaux, combiné, démontable et repositionnable, inventaire, pour le coffrage des murs, en profilés de coffrage en acier de 2 mm d'épaisseur, de profilés de traverses d'une épaisseur de 1,5 mm, avec un plateau en contreplaqué laminé résistant à l'humidité d'une épaisseur de 18 mm, dimensions 1200 x 1500 mm",Material,General,t,4245.29,4245.29,4245.29,4245.29,1,EUR,58.72,0.0133,6,6,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",COLONNES KAME-LI-MEME-KANE_KAKARIRI,Flux OF6,Material,General,kg,10.5,10.5,10.5,10.5,1,EUR,22.58,2.15,6,6,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,MONTAGE DE STRUCTURES MÉTALLIQUES DE CENTRALES NUCLÉAIRES RITO-TO-KATO-KARI_KAMENERI,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 273 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,140.51,140.51,140.51,140.51,1,EUR,75.5,0.5367,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-RIKA-MENE_SAKAVO,"Barges autopropulsées à fond ouvrant, à déchargement automatique, capacité de la cale : 1 600 m3",Equipment,General,Heures machine,1249.79,1249.79,1249.79,1249.79,1,EUR,1558.07,1.2467,6,6,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-RIKA-MENE_SAKALI,"Barges autopropulsées à fond ouvrant, à déchargement automatique, capacité de la cale : 1 200 m3",Equipment,General,Heures machine,979.43,979.43,979.43,979.43,1,EUR,1305.91,1.3333,6,6,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRANSPORT DE TERRES À L'AIDE DE BARGES AUTOMOTRICES DXME-KASA-KANE_KARIPU,"Grues sur chenilles, capacité de charge 220 t",Equipment,General,Heures machine,308.67,308.67,308.67,308.67,1,EUR,2320.67,9.022,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KATO-RI-KAME-KATO_KAKAKARI,Ciment alumineux GTs-35 50,Material,General,t,1225.34,1225.34,1225.34,1225.34,1,EUR,661.27,0.54,6,6,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,TRAVAUX DE RECONSTRUCTION D'OUVRAGES HYDRAULIQUES,Renforcement des fondations des ouvrages hydrauliques par injection avec immersi KAME-LI-KANE-KASA,Bande isolante hautement élastique et résistante aux produits chimiques,Abstract Material,General,m,105.97,105.97,105.97,105.97,1,EUR,10829.67,102.2,6,6,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,AUTRES TRAVAUX,Étanchéification des joints MENE-RI-KATO-KARI,Matériau de couverture,Abstract Material,General,t,44.38,9.5,79.27,44.38,2,EUR,5482.73,69.1667,6,6,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,ENTRETIEN DES ESPACES VERTS (NORMES GLOBALES) DXME-KAME-KASA_KAPURI,"Pelles-draineuses, puissance 79 kW (108 ch)",Equipment,General,Heures machine,60.98,60.98,60.98,60.98,1,EUR,3679.89,60.35,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-KASA-MEPU_KARIME,"Électricité : consommation 15,84 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.03,2.03,2.03,2.03,1,EUR,3.77,1.8517,6,6,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Assemblage de structures de ponts en acier par suspension et semi-suspension KAPU-RI-KATO-KAME,Mélanges d'enrobés bitumineux à base de gravillons et de mastic,Abstract Material,General,t,257.86,257.86,257.86,257.86,1,EUR,10326.07,40.045,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAVO-ME-KARI-RIKA_KAKARIPU,Liaisons intermédiaires 36-2/2a,Material,General,t,4450.66,4450.66,4450.66,4450.66,1,EUR,102.36,0.02,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE PROTECTION DES INSTALLATIONS MARITIMES,Suspension de dispositifs anti-chocs pour installations d'amarrage maritimes à l KALI-SA-KAME-KARI_KAKAPURI,Escaliers de mine,Material,General,t,4042.25,4042.25,4042.25,4042.25,1,EUR,458.12,0.1133,6,6,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTION D'ENTREPRISES DE STOCKAGE ET DE TRANSFORMATION DE CÉRÉALES,Montage de structures pour les installations de stockage et de transformation du RISA-ME-KASA-KARI_KAKATORI,"Cales pour joints de voie ferrée à écartement large, pour rails P65",Material,General,t,1274.16,1274.16,1274.16,1274.16,1,EUR,18898.85,14.8317,6,6,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Installation et démontage de voies de roulement pour grues à tour à partir d'élé KASA-TO-KAME-MESA,Pièces moulées à l'unité,Abstract Material,General,pièce,65.0,65.0,65.0,65.0,1,EUR,65.0,1.0,6,6,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation de rosaces en plâtre (caissons, plafonds ronds, polygonaux, à motif" RITO-SA-KAME-KAVO_KAKATOLI,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 630 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,374.51,374.51,374.51,374.51,1,EUR,19077.09,50.9383,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-RIKA-KAVO_KAMENEME,Tissu pour le collage des joints,Material,General,m2,2.71,2.71,2.71,2.71,1,EUR,284.19,104.8333,6,6,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",PANNEAUX DE PLANCHERS ET DE TOITURES DXME-KATO-KASA_KARIME,"Complexes de forage, diamètre du puits de mine 7700/5500 mm",Equipment,General,Heures machine,2524.06,2524.06,2524.06,2524.06,1,EUR,17251.98,6.835,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-KASA-KADX_KAKAVO,"Grues sur châssis spécial de type automobile, capacité de charge 300 t",Equipment,General,Heures machine,472.14,472.14,472.14,472.14,1,EUR,9238.26,19.5667,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS RISA-RI-KAME-KANE_KAKADXME,Pince à joint KS-059-6 (KS-321-1),Material,General,pièce,63.02,63.02,63.02,63.02,1,EUR,160.09,2.54,6,6,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RITO-VO-KATO-MEME_KAMETOVO,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 400 mm",Material,General,pièce,167.24,167.24,167.24,167.24,1,EUR,1159.54,6.9333,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KALI-RI-KALI-METO_KATOMEKA,"Pinces de connexion en acier galvanisé, tige-tige parallèles, diamètre du conducteur 8-10 mm, dimensions des pinces 60x30x38 mm",Material,General,kg,62.32,62.32,62.32,62.32,1,EUR,29.5,0.4733,6,6,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS DXME-MEKA-KAVO_KAKAME,Installations pour le séchage de tuyaux d'un diamètre de 1400 mm,Equipment,General,Heures machine,95.34,95.34,95.34,95.34,1,EUR,567.9,5.9567,6,6,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,ISOLATION ANTICORROSION DES TUYAUX EN ACIER,Application d'une isolation bitume-caoutchouc ou bitume-polymère sur des conduit KAME-LI-KARI-KAME_KAKAKARI,Papier bitumé en sac B-78,Material,General,t,1471.45,1471.45,1471.45,1471.45,1,EUR,23.28,0.016,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS MERI-ME-KARI-MEKA_METODXKA,"Bandes de caoutchouc butyle adhésives double face, largeur 15 mm",Material,General,m,0.59,0.59,0.59,0.59,1,EUR,117.56,198.4575,6,6,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-KADX-METO_KAMERI,Machines électrosoudantes automatiques pour le soudage par contact des rails suspendus,Equipment,General,Heures machine,148.76,148.76,148.76,148.76,1,EUR,4054.92,27.2583,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MELI-KADX_MEPUSASA,"Foret avec pointe en alliage dur, avec queue SDS-plus pour le perçage à percussion dans des matériaux durs, longueur totale 160 mm, diamètre 6 mm",Material,General,pièce,1.73,1.73,1.73,1.73,1,EUR,0.49,0.2833,6,6,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" RISA-ME-KANE-MEDX_KAMEKASA,"Cale en caoutchouc sous la semelle, type TsP-369.810",Material,General,pièce,0.78,0.78,0.78,0.78,1,EUR,2845.39,3626.6667,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-LI-MESA-KARI_KAKAPURI,"Boulons d'ancrage avec écrou en acier à friction, à visse, avec filetage extérieur M12, diamètre 16 mm, longueur 110 mm",Material,General,100 pièces,49.2,49.2,49.2,49.2,1,EUR,9.17,0.1867,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-LI-MELI-KADX_MEMEKAKA,"Forets hélicoïdaux à queue cylindrique en acier rapide P6M5, classe de précision A1, longueur 117 mm, diamètre 8 mm",Material,General,100 pièces,579.77,579.77,579.77,579.77,1,EUR,36.48,0.1233,6,6,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-MESA-KALI_KAKADXLI,"Chevilles à clou en polypropylène avec clou galvanisé, à bord cylindrique, dimensions 6 x 80 mm",Material,General,100 pièces,3.71,3.71,3.71,3.71,1,EUR,19.95,5.3833,6,6,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-RIME-RIKA_KAMEME,"Installations de forage au diamant dans le béton armé, hydrauliques, diamètre de forage jusqu'à 150 mm",Equipment,General,Heures machine,3.43,3.43,3.43,3.43,1,EUR,69.64,20.3117,6,6,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS RINE-ME-KARI-KANE_KAKAKATO,"Étrier de sécurité en acier, dimensions 87 x 56 mm",Material,General,pièce,24.42,24.42,24.42,24.42,1,EUR,1989.96,81.5,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MEVO-RI-KAME-KANE,Cuvettes de WC,Abstract Material,General,compl,204.92,204.92,204.92,204.92,1,EUR,7889.39,38.5,6,6,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" MEVO-RI-KARI-KAVO,Lavabos,Abstract Material,General,compl,223.35,223.35,223.35,223.35,1,EUR,5583.71,25.0,6,6,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" MEVO-RI-KATO-KAME,Baignoires,Abstract Material,General,compl,708.49,708.49,708.49,708.49,1,EUR,7084.89,10.0,6,6,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" RITO-TO-KANE-KASA_KAKAMEKA,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 100 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,17.68,17.68,17.68,17.68,1,EUR,556.82,31.5,6,6,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE RINE-ME-KARI-KAME_KAKAMEME,"Caisse de protection pour rail de contact, type KZR-1",Material,General,pièce,76.38,76.38,76.38,76.38,1,EUR,10871.82,142.3433,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RINE-ME-KARI-KAME_KAKAKAME,Caisses de protection en bois,Material,General,m,32.23,32.23,32.23,32.23,1,EUR,11458.55,355.55,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MELI-MERI_KAKAMEKA,"Brosse à disque avec tige pour montage sur perceuse, avec fil en acier laitonné, épaisseur 0,3 mm, diamètre de la brosse 75 mm",Material,General,pièce,3.7,3.7,3.7,3.7,1,EUR,15.01,4.0567,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION DES JOINTS ET POSE DE TUYAUX DXME-KALI-KAPU_KATOME,Goulottes vibrantes,Equipment,General,Heures machine,0.47,0.47,0.47,0.47,1,EUR,1.11,2.3367,6,6,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Construction de tuyaux industriels monolithiques en béton armé DXME-KAVO-KALI_KAKAME,"Épandeurs de bitume remorqués avec tracteur, capacité de la trémie 6 m3, largeur d'épandage 2,5 m",Equipment,General,Heures machine,103.23,103.23,103.23,103.23,1,EUR,72.6,0.7033,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KARI-KASA_SARINE,"Vérins hydrauliques pour la tension des câbles d'armature, livrés avec une station d'huile, pression de service jusqu'à 70 MPa",Equipment,General,Heures machine,1.82,1.82,1.82,1.82,1,EUR,69.13,37.9433,6,6,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri RIKA-RI-MERI-KAME_KAKAKALI,"Tube électro-isolant TKR, diamètre 5 mm",Material,Pipes & Fittings,100 m,87.29,87.29,87.29,87.29,1,EUR,73.47,1.26,6,6,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAVO-ME-KARI-MELI_KARIKAKA,"Grille de blindage en cuivre étamé pour câble, largeur 60 mm",Material,General,m2,88.83,88.83,88.83,88.83,1,EUR,48.85,0.55,6,6,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-MEME-KANE_KAKARINE,Flux FK-235,Material,General,kg,41.8,41.8,41.8,41.8,1,EUR,6.17,0.1483,6,6,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-KANE-MEKA_MEKARIPU,"Rubans thermorétractables à deux couches en polyéthylène irradié et couche de sévilène fusible pour la restauration des revêtements isolants, l'étanchéification des manchons et des gaines sur les câbles de communication, couleur noire, largeur 80 mm",Material,General,kg,48.42,48.42,48.42,48.42,1,EUR,197.87,4.0867,6,6,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-KASA-KADX_KAKAKASA,"Feuille de textolite électrotechnique, marque B, épaisseur 0,5-1 mm",Material,General,kg,19.13,19.13,19.13,19.13,1,EUR,51.0,2.6667,6,6,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-VO-KAME-KALI,Verre liquide,Abstract Material,General,t,1930.55,1930.55,1930.55,1930.55,1,EUR,0.0,0.0,6,6,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-MELI-KAPU_KAPULI,"Électricité : consommation 0,44 kWh/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.15,2.595,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-MELI-KAPU_KAPULI,Appareils à commande manuelle pour le soudage bout à bout de tuyaux en plastique d'un diamètre supérieur à 160 mm et jusqu'à 315 mm,Equipment,General,Heures machine,1.71,1.71,1.71,1.71,1,EUR,4.43,2.595,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-KAVO-KAPU_KARITO,"Électricité : consommation 23,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.02,3.02,3.02,3.02,1,EUR,28.42,9.4183,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de liants bitumineux et d'émulsions DXME-KAVO-KAPU_KARITO,"Installations bitumineuses fixes, volume de la cuve 15 000 l",Equipment,General,Heures machine,116.63,116.63,116.63,116.63,1,EUR,1098.44,9.4183,6,6,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de liants bitumineux et d'émulsions RITO-LI-KAME-KANE,Tuyauteries de raccordement avec brides,Abstract Material,General,m,15.48,15.48,15.48,15.48,1,EUR,1548.25,100.0,6,6,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,"Pose de tuyauteries de raccordement pour chaudières, chauffe-eau et pompes à par" DXME-KADX-KANE_KAKASA,"Machines pour le montage du réseau de contact lors de travaux « sur voie » avec grue-manipulateur, capacité de charge jusqu'à 10 t",Equipment,General,Heures machine,137.01,137.01,137.01,137.01,1,EUR,29.23,0.2133,6,6,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT KALI-PU-KATO-MEME,Poteaux à base étroite pour lignes électriques,Abstract Material,General,t,9803.5,9803.5,9803.5,9803.5,1,EUR,9803.5,1.0,6,6,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,POTEAUX EN ACIER VL 35-1150 KV DXME-MEKA-KAPU_SALIPU,"Électricité : consommation 1,57 kWh/machine-heure",Electricity,Electricity,Heures machine,0.2,0.2,0.2,0.2,1,EUR,1.3,6.4667,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation des conduites à l'aide de composés ciment-polymère par projection cen KASA-RI-KARI-RIPU_KAKASAME,"Cale en béton, dimensions 50 x 50 x 70 mm",Material,General,pièce,0.64,0.64,0.64,0.64,1,EUR,132.57,208.525,6,6,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CONSTRUCTIONS EN BÉTON ARMÉ ET EN BÉTON DES PONTS ET DES CONDUITES,FONDATIONS DE TUYAUX ET DE PILIERS DE PONTS MEVO-ME-KADX-KAME_KAKARITO,"Robinet à boisseau sphérique en acier à passage droit, diamètre nominal 50 mm",Material,General,pièce,72.8,72.8,72.8,72.8,1,EUR,3.64,0.05,6,6,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES MEPU-SA-KAME-MEME_MEKAKAME,"Matériau composite à trois composants pour la réparation composite par manchon des conduites, tension maximale à la compression d'au moins 70 MPa, résistance au cisaillement d'au moins 3 MPa, module d'élasticité d'au moins 0,5 GPa",Material,General,compl,82.71,82.71,82.71,82.71,1,EUR,0.0,0.0,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE DXME-MEKA-KAPU_KARIKA,"Électricité : consommation 4,49 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.58,0.58,0.58,0.58,1,EUR,7.32,12.705,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX DXME-MEKA-KAPU_KARIKA,Machines d'isolation pour tuyaux de 200 à 300 mm de diamètre,Equipment,General,Heures machine,10.69,10.69,10.69,10.69,1,EUR,135.88,12.705,6,6,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION À LA MASTIC ET POSE DE TUYAUX DXME-KAME-KASA_MESASA,"Excavatrices à vis sans fin sur tracteur, puissance 132 kW (180 ch)",Equipment,General,Heures machine,96.97,96.97,96.97,96.97,1,EUR,425.86,4.3917,6,6,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-METO-KATO_KARIME,"Camions à plateau, avec générateur, capacité de charge 4,5 t, puissance du générateur 30 kW",Equipment,General,Heures machine,33.17,33.17,33.17,33.17,1,EUR,987.04,29.76,6,6,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Assainissement de la surface interne des tuyaux en acier des réseaux d'adduction DXME-RIKA-KALI_KAKAME,"Électricité : consommation 24,2 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.11,3.11,3.11,3.11,1,EUR,94.77,30.488,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS RITO-TO-KAME-KAVO_KAKAKATO,"Tubes en acier de cuvelage, diamètre 750 mm, épaisseur de paroi 40 mm, longueur de section 6 m",Material,Pipes & Fittings,m,2748.42,2748.42,2748.42,2748.42,1,EUR,252.19,0.092,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KADX-MERI_SARIKA,"Machines à percer les rails, puissance 1,7 kW",Equipment,General,Heures machine,0.5,0.5,0.5,0.5,1,EUR,6.22,12.552,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION DE LA VOIE EN SURFACE DXME-KANE-KATO_KAPUTO,"Électricité : consommation 1,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,0.37,2.222,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KANE-KATO_KAPUTO,"Treuils de forage avec une force de traction de 245,25 kN (25 t)",Equipment,General,Heures machine,27.71,27.71,27.71,27.71,1,EUR,61.57,2.222,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-MEKA-MEME_KADXME,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 125-150 mm, pression jusqu'à 1,2 MPa",Equipment,General,Heures machine,38.62,38.62,38.62,38.62,1,EUR,705.84,18.276,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS MEPU-RI-KAPU-KAPU_MEKAMEKA,"Résine polyuréthane à deux composants pour l'obturation, l'étanchéification et le remplissage élastique des fissures, viscosité du mélange à +20 °C 80-120 MPa*s, densité du mélange à +20 °C 1080-1120 kg/m3",Material,General,kg,10.59,10.59,10.59,10.59,1,EUR,1848.05,174.544,5,5,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Étanchéification des entrées de communications à travers les murs à l'aide de co MEPU-TO-KAME-KAME_KAKAKAME,"Apprêt adhésif pour le traitement des supports denses, lisses, peu absorbants et non absorbants",Material,General,kg,4.76,4.76,4.76,4.76,1,EUR,17.34,3.644,5,5,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Étanchéification des entrées de communications à travers les murs à l'aide de co KAME-SA-KATO-KATO_KAKADXME,Indicateur,Material,General,pièce,6.76,6.76,6.76,6.76,1,EUR,6.76,1.0,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" DXME-RIKA-MERI_KANEVO,"Dragues à godet unique, capacité du godet 8,5 m3",Equipment,General,Heures machine,2849.26,2849.26,2849.26,2849.26,1,EUR,15699.43,5.51,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KANELI,"Dragues à godet unique, capacité du godet 5,7 m3",Equipment,General,Heures machine,1944.41,1944.41,1944.41,1944.41,1,EUR,15298.6,7.868,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS KAME-ME-KAME-KAME,Pièces moulées pour panneaux muraux en chrysotile-ciment,Abstract Material,General,m2,1154.97,1154.97,1154.97,1154.97,1,EUR,7091.54,6.14,5,5,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Dispositif de parois MEPU-SA-KAPU-KATO_KAKAKAME,"Mastic d'étanchéité non durcissant à base de caoutchoucs synthétiques, de charges et de plastifiants pour l'étanchéité des joints dans les bâtiments à grands panneaux et à grands blocs",Material,General,t,3112.31,3112.31,3112.31,3112.31,1,EUR,230.31,0.076,5,5,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Dispositif de parois KAPU-ME-KARI-KASA_KAMEMEVO,"Mélanges de béton lourd (BST) sur gravier concassé, classe B10, F(1)50, W2",Material,General,m3,109.81,109.81,109.81,109.81,1,EUR,0.11,0.0,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" RITO-TO-KAME-KAVO_KAKAKARI,"Tubes en acier de cuvelage, diamètre 620 mm, épaisseur de paroi 40 mm, longueur de section à couteau 2 m",Material,Pipes & Fittings,m,5186.27,5186.27,5186.27,5186.27,1,EUR,282.13,0.056,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAVO-PU-KARI-KANE,Treillis en fil métallique étiré à froid,Abstract Material,General,t,1520.77,1520.77,1520.77,1520.77,1,EUR,24.03,0.02,5,5,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " DXME-KADX-MERI_SARIKA,"Électricité : consommation 0,39 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.62,12.552,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION DE LA VOIE EN SURFACE RITO-TO-KAME-KAVO_KAKAKAME,"Tubes en acier de cuvelage, diamètre 620 mm, épaisseur de paroi 40 mm, longueur de section 6 m",Material,Pipes & Fittings,m,2347.98,2347.98,2347.98,2347.98,1,EUR,298.85,0.126,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RINE-ME-KAME-KANE,Éléments de protection contre l'eau,Abstract Material,General,m2,2797.99,364.22,12533.09,364.22,2,EUR,35664.94,90.036,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ MELI-PU-KAME-KARI_KAKAKAPU,"Mélange réfractaire aluminosilicate en béton à base de ciment à haute teneur en alumine, sec, SShVTs-40",Material,General,t,1910.03,1910.03,1910.03,1910.03,1,EUR,0.0,0.0,5,5,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement de fours industriels en béton projeté d'une épaisseur maximale de 200 MELI-PU-KAME-KARI_KAKAMEME,"Mélange réfractaire aluminosilicate pour béton, isolant thermique, SABT-50",Material,General,t,2909.08,2909.08,2909.08,2909.08,1,EUR,0.0,0.0,5,5,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement de fours industriels en béton projeté d'une épaisseur maximale de 200 MEPU-PU-KATO-MEKA_KAKAKARI,"Vernis XP-734, marques A, B",Material,General,t,4412.51,4412.51,4412.51,4412.51,1,EUR,5.9,0.0,5,5,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates KAVO-TO-KALI-KAME_MEKAVOVO,"Location de bandes laminées à chaud en acier, nuances St3sp, St3ps, dimensions 70 x 5 mm",Material,General,t,1688.22,1688.22,1688.22,1688.22,1,EUR,1315.8,0.778,5,5,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,PANNELES DE BARRAGES,Fabrication de panneaux de vannes pour barrages DXME-MEKA-MEME_KAMEME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.32,5.1,5,5,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE RITO-TO-KAVO-KAME_KAKAPUDX,"Tubes en acier électrosoudés carrés, dimensions 60 x 60 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,t,1401.93,1401.93,1401.93,1401.93,1,EUR,14.02,0.01,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES MEME-TO-KAME-KARI,Blocs de portes d'entrée,Abstract Material,General,m2,319.81,319.81,319.81,319.81,1,EUR,31981.38,100.0,5,5,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" RITO-TO-KATO-KARI_KAMETOME,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 152 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,64.56,64.56,64.56,64.56,1,EUR,21.91,0.338,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS KAVO-ME-KARI-MELI_KAKADXPU,"Treillis soudé en fil d'armature sans revêtement, diamètre du fil 4 mm, taille des mailles 150 x 150 mm",Material,General,m2,2.0,2.0,2.0,2.0,1,EUR,47.92,24.0,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-LI-MESA-MEME_MEKAMEKA,"Rondelles en acier rondes, classe de précision C, diamètre du trou M20-24",Material,General,t,6871.87,6871.87,6871.87,6871.87,1,EUR,173.0,0.05,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ KAME-LI-MELI-MEKA,Fraises à disque pour machine de découpe sans flamme de tuyaux,Abstract Material,General,pièce,1125.66,1125.66,1125.66,1125.66,1,EUR,0.0,0.0,5,5,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE KASA-RI-KARI-METO_KAKAKANE,"Blocs en arbolite, autres produits en arbolite non renforcés, isolants thermiques, classe B1,0",Material,General,m3,243.82,243.82,243.82,243.82,1,EUR,1989.68,10.2,5,5,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" RITO-SA-KARI-KARI_KAKADXDX,"Tuyaux en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 325 mm, épaisseur de paroi 5 mm",Material,General,m,70.95,70.95,70.95,70.95,1,EUR,2941.17,41.454,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION MEPU-PU-KAME-MEDX_KAKAKARI,Apprêt KhS-010,Material,General,t,4013.27,4013.27,4013.27,4013.27,1,EUR,0.6,0.0,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-RIME-RIKA_SAKARI,"Installations électriques de forage au diamant dans le béton armé, diamètre de forage jusqu'à 160 mm",Equipment,General,Heures machine,0.78,0.78,0.78,0.78,1,EUR,29.4,37.452,5,5,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,AUTRES TRAVAUX,ÉLÉMENTS DES INSTALLATIONS D'ÉGOUT RITO-TO-KANE-KASA_KAKAKANE,"Tuyaux en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 50 mm, épaisseur de paroi 3,5 mm",Material,General,m,6.68,6.68,6.68,6.68,1,EUR,26.65,3.9875,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DES STRUCTURES INTÉRIEURES MEPU-ME-KASA-KAPU_KAMEKADX,"Colle époxy bicomposante pour systèmes de renforcement extérieur, mélange thixotrope de résines époxy bisphénol A/F, diluants actifs, charges, pigments, additifs spécifiques (composant A), durcisseur aliphatique aminé (composant B), densité à 20 °C ne dépassant pas 1,85 g/cm3, adhérence au béton B30 d'au moins 2,5 MPa, couleur grise",Material,Concrete & Cement,kg,58.43,58.43,58.43,58.43,1,EUR,713.13,12.204,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ DXME-MELI-KAPU_KANEKA,Appareils pour le soudage par emboîtement de tuyaux en plastique d'un diamètre supérieur à 1600 et jusqu'à 4000 mm,Equipment,General,Heures machine,0.87,0.87,0.87,0.87,1,EUR,39.79,45.79,5,5,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX EN POLYÉTHYLÈNE SANS PRESSION DXME-MELI-KAPU_KANEKA,"Électricité : consommation 1,39 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.18,0.18,0.18,0.18,1,EUR,8.16,45.79,5,5,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX EN POLYÉTHYLÈNE SANS PRESSION DXME-MEKA-MEME_KADXRI,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 200 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,175.73,175.73,175.73,175.73,1,EUR,5230.13,29.762,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKATOPU,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 186 mm",Material,General,pièce,5904.11,5904.11,5904.11,5904.11,1,EUR,3247.26,0.55,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-KAME-KARI_KAKATO,"Niveleuses légères, puissance 77 kW (105 ch)",Equipment,General,Heures machine,49.11,49.11,49.11,49.11,1,EUR,71.89,1.464,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI MEPU-SA-KAPU-KATO_KAKAKAPU,"Mastic d'étanchéité non durcissant, résistant au gel, à base de caoutchouc synthétique, de charges, de plastifiants et d'additifs",Material,General,t,2640.81,2640.81,2640.81,2640.81,1,EUR,96.39,0.17,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI MEVO-ME-MEKA-KAME_KAMESANE,"Vanne à passage direct 15ch14br, raccordement à la canalisation par bride, pression nominale 1,6 MPa, diamètre nominal 100 mm",Material,General,pièce,209.09,209.09,209.09,209.09,1,EUR,1144.97,5.476,5,5,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE KAVO-RI-KARI-KASA_KAKASAME,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 27 mm",Material,Steel & Metal,10 m,98.55,98.55,98.55,98.55,1,EUR,1041.53,10.568,5,5,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE RITO-TO-KAME-KAVO_KAKAMERI,"Tubes de cuvelage en acier, diamètre 1500 mm, épaisseur de paroi 50 mm, longueur de la section à lame 2 m",Material,Pipes & Fittings,m,12993.87,12993.87,12993.87,12993.87,1,EUR,115.91,0.012,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-VO-KAPU-KANE_KAKANETO,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 50 mm, diamètre extérieur 57 mm, épaisseur de paroi 3 mm",Material,General,pièce,2.46,2.46,2.46,2.46,1,EUR,29.58,12.0,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RITO-SA-KAME-KAVO_KAKAMELI,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 426 mm, épaisseur de paroi 9 mm",Material,Pipes & Fittings,m,183.89,183.89,183.89,183.89,1,EUR,761.32,4.14,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ MEVO-SA-KAVO-MEDX_KAKAKAME,"Bille d'arrêt en caoutchouc, diamètre 100 mm",Material,General,pièce,162.9,162.9,162.9,162.9,1,EUR,2671.64,16.4,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-KANE-KATO_KATODX,"Treuils hydrauliques tractés avec moteur à combustion interne pour la rénovation de la surface interne des pipelines, force de traction 200 kN (20 t)",Equipment,General,Heures machine,22.68,22.68,22.68,22.68,1,EUR,226.78,10.0,5,5,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Remplacement sans tranchée des canalisations d'égout par des tuyaux en plastique DXME-MEDX-KAVO_KAKARI,"Électricité : consommation 0,92 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.12,0.12,0.12,0.12,1,EUR,0.17,1.41,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,"Descente des puits avec excavation du sol par hydromécanisation, à l'aide d'une " KAME-LI-MELI-KADX_MEMEMEKA,"Forets hélicoïdaux à queue cylindrique en acier rapide P6M5, classe de précision A1, longueur 75 mm, diamètre 4 mm",Material,General,100 pièces,91.55,91.55,91.55,91.55,1,EUR,0.99,0.015,5,5,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-MEDX-KAVO_KAKARI,"Pompes, débit 25 m3/h, pression 15 m, puissance 2,8 kW",Equipment,General,Heures machine,0.5,0.5,0.5,0.5,1,EUR,0.71,1.41,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,"Descente des puits avec excavation du sol par hydromécanisation, à l'aide d'une " KAME-LI-MESA-MEPU_KAMESAME,"Vis autotaraudeuses en acier à tête fraisée et fente en croix, pointues, diamètre 4,8 mm, longueur 50 mm",Material,General,100 pièces,8.87,8.87,8.87,8.87,1,EUR,44.54,5.024,5,5,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KARI-RI-KASA-KAPU_RIKAVOVO,"Gravier de roches denses pour travaux de construction M 600, fraction 20-40 mm",Material,General,m3,48.72,48.72,48.72,48.72,1,EUR,308.22,6.326,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs en béton armé préfabriqué pour puits de descente MEME-RI-KALI-MERI_KAKAMEME,"Baguette (disposition) en bois, non peinte, section 19 x 19 mm",Material,General,m,0.67,0.67,0.67,0.67,1,EUR,155.36,231.04,5,5,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" MEME-ME-KAME-MEKA_KAKAKATO,"Moulure en bois de conifères (épicéa, pin), type H-1, H-2, largeur 50-55 mm, épaisseur 10-18 mm",Material,General,m,1.94,1.94,1.94,1.94,1,EUR,95.15,49.14,5,5,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES MERI-RI-KAME-KAME_KAKARIME,Clips (pinces),Material,General,100 pièces,8.76,8.76,8.76,8.76,1,EUR,3.86,0.44,5,5,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAME-LI-MELI-KAVO,Matériaux abrasifs,Abstract Material,General,t,145.8,25.28,175.93,175.93,2,EUR,529.09,4.464,5,5,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Préparation des surfaces des réservoirs pour l'application d'un revêtement antic MEME-ME-KAME-MEKA_KAKAKAME,"Moulures en bois résineux (épicéa, pin), type H-1, H-2, largeur 30-35 mm, épaisseur 10-15 mm",Material,General,m,1.32,1.32,1.32,1.32,1,EUR,171.09,129.2,5,5,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES KAME-TO-KATO-KANE,Acide,Abstract Material,Chemicals,t,3498.99,1.46,5830.68,5830.68,2,EUR,0.0,0.0,5,5,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Traitement des puits avec des réactifs MEME-ME-KAME-MEME_KAKAKAME,"Moulure en bois, largeur 30 mm, épaisseur 5 mm",Material,General,m,1.33,1.33,1.33,1.33,1,EUR,337.51,254.044,5,5,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" MERI-RI-KATO-MEKA_KAKAKAVO,"Fibre de verre en rouleau pour isolation thermique, densité 120 g/m2",Material,General,m2,1.2,1.2,1.2,1.2,1,EUR,1.76,1.46,5,5,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAME-LI-KAVO-KASA_KAKAKANE,Additif plastifiant pour mélanges de béton,Material,General,t,2351.25,2351.25,2351.25,2351.25,1,EUR,13.31,0.01,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation d'une bordure en béton monolithique à l'aide d'une finisseuse à bét DXME-MEPU-KAME_KAKASA,"Bétonnières automotrices, volume du tambour 2,7 m3",Equipment,General,Heures machine,21.12,21.12,21.12,21.12,1,EUR,9.25,0.438,5,5,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES RÉCHAUFFEURS D'AIR DES FOURS À HAUTE TEMPÉRATURE,Maçonnerie des arcs MERI-RI-KAME-KAME,Feuilles en alliages d'aluminium,Abstract Material,General,m2,8.76,8.76,8.76,8.76,1,EUR,1046.3,119.4,5,5,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION DXME-KAPU-KARI_KAKAME,"Installations de forage horizontal à vis sans fin, équipées d'un groupe hydraulique de pression, d'une installation à bentonite, d'un système de navigation optique, force de pression 203 tf (2000 kN)",Equipment,General,Heures machine,154.66,154.66,154.66,154.66,1,EUR,6063.53,39.206,5,5,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-RIME-MERI_KAKAME,Cisailles mécaniques à guillotine pour tuyaux en polyéthylène d'un diamètre de 110 à 225 mm,Equipment,General,Heures machine,0.13,0.13,0.13,0.13,1,EUR,0.23,1.76,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-KANE-KATO_KASADX,"Treuils électriques avec une force de traction de 313,92 kN (32 t)",Equipment,General,Heures machine,5.19,5.19,5.19,5.19,1,EUR,193.58,37.304,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAME-LI-KALI-RILI,Matériaux pour l'étanchéité des joints,Abstract Material,General,t,19.43,18.1,19.76,19.76,2,EUR,2103.82,116.26,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAVO_KAKAMEKA,"Tubes en acier de cuvelage, diamètre 1180 mm, épaisseur de paroi 40 mm, longueur de section de lame 2 m",Material,Pipes & Fittings,m,8719.01,8719.01,8719.01,8719.01,1,EUR,148.4,0.016,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAVO_KAKAKADX,"Tubes en acier de cuvelage, diamètre 1180 mm, épaisseur de paroi 40 mm, longueur de section 6 m",Material,Pipes & Fittings,m,4585.53,4585.53,4585.53,4585.53,1,EUR,187.73,0.04,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAVO_KAKAKAVO,"Tubes de cuvelage en acier, diamètre 1000 mm, épaisseur de paroi 40 mm, longueur de la section à couteau 2 m",Material,Pipes & Fittings,m,7484.17,7484.17,7484.17,7484.17,1,EUR,157.17,0.02,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAVO_KAKAKALI,"Tubes en acier de cuvelage, diamètre 1000 mm, épaisseur de paroi 40 mm, longueur de section 6 m",Material,Pipes & Fittings,m,3786.92,3786.92,3786.92,3786.92,1,EUR,195.56,0.052,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MERI-ME-KATO-KAPU,Tuiles faîtières,Abstract Material,General,1000 pièces,8.84,8.84,8.84,8.84,1,EUR,0.0,0.0,5,5,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures KAPU-TO-KARI-METO_KATONENE,"Mélanges secs de ciment pour maçonnerie, classe B15 (M200)",Material,General,t,83.28,83.28,83.28,83.28,1,EUR,8.99,0.11,5,5,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Réparation des puits RIPU-TO-KASA-KARI_KARIMEME,"Bouchon en polyéthylène, PE100, rapport dimensionnel standard SDR11, diamètre extérieur nominal 63 mm",Material,General,pièce,1.85,1.85,1.85,1.85,1,EUR,126.8,68.48,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,POSE SOUTERRAINE DE CONDUITES MEVO-SA-KAVO-MEDX_KAKAKADX,"Boule d'arrêt en caoutchouc, diamètre 500 mm",Material,General,pièce,374.88,374.88,374.88,374.88,1,EUR,4652.24,12.41,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-KAPU-KAME_MEMEKA,"Installations de forage à vis sans fin compactes sur chenilles, diamètre de forage 70, 110 et 150 mm, profondeur de forage (en fonction des diamètres de forage) 50, 35 et 15 m",Equipment,General,Heures machine,12.33,12.33,12.33,12.33,1,EUR,70.29,5.7,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS KAME-PU-KAME-MEKA_KAMEKANE,"Tarière sans trou traversant, longueur 1500 mm, diamètre 90 mm",Material,General,pièce,148.24,148.24,148.24,148.24,1,EUR,249.05,1.68,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS KAVO-RI-KARI-KASA_KAKAPURI,"Câble à double torsion LK-R, construction 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 14 mm",Material,General,10 m,30.29,30.29,30.29,30.29,1,EUR,9.17,0.5033,5,5,TRAVAUX DE CONSTRUCTION,Voies de halage des cales et des cales de halage,VOIES FERRÉES POUR LE TRANSPORT DE NAVIRES,Pose sur une base de ballast sous-marine d'un cadre de montage avec voies MEVO-SA-KAVO-MEDX_KAKAKANE,"Bille d'arrêt en caoutchouc, diamètre 300 mm",Material,General,pièce,245.62,245.62,245.62,245.62,1,EUR,3048.09,12.41,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MERI-KAVO_KASAME,Rouleaux tractés à anneaux 2 t,Equipment,General,Heures machine,1.87,1.87,1.87,1.87,1,EUR,2.09,1.122,5,5,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"AMÉNAGEMENT DE PELOUSES, DE PARTS DE FLEURS, DE JARDINS ALPINARIES ET DE ROCAIRE" MEPU-RI-KANE-KAME_KAMEMESA,Antiseptique HM-11,Material,General,l,4.55,4.55,4.55,4.55,1,EUR,222.77,48.972,5,5,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures en acier laminé sur une charpente en planches équarries RITO-VO-KAPU-KANE_KAKAVOSA,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 150 mm, diamètre extérieur 159 mm, épaisseur de paroi 5 mm",Material,General,pièce,43.5,43.5,43.5,43.5,1,EUR,504.63,11.6,5,5,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ KAVO-ME-KANE-KAME,Structures en acier,Abstract Material,Steel & Metal,t,1600.79,1595.02,1623.85,1595.02,2,EUR,8023.36,4.97,5,5,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-KALI-MEPU,Compensateurs en polyéthylène expansé physiquement réticulé,Abstract Material,General,100 pièces,214.64,2.92,355.79,355.79,2,EUR,14090.11,4824.0,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de bordures RITO-TO-KATO-KARI_KAMELISA,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 325 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,237.69,237.69,237.69,237.69,1,EUR,1078.64,4.538,5,5,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES VANNES LINÉAIRES DES OLÉODUCS METO-RI-KATO-KARI,Pierres de bordure en roche,Abstract Material,General,m,90.22,90.22,90.22,90.22,1,EUR,9021.96,100.0,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de bordures MEPU-RI-KARI-MEKA,Revêtement ignifuge ablative,Abstract Material,General,kg,91.18,91.18,91.18,91.18,1,EUR,0.0,0.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES DXME-RIKA-KALI_KAKAME,Conducteurs flottants pour l'immersion de palplanches en béton armé et de pieux,Equipment,General,Heures machine,20.6,20.6,20.6,20.6,1,EUR,627.96,30.488,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS KASA-RI-KATO-KATO,Pierres de bordure en béton,Abstract Material,General,m3,310.51,310.51,310.51,310.51,1,EUR,28877.51,93.0,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de bordures KAME-VO-KAME-KAVO,Gravier de verre cellulaire,Abstract Material,General,m3,100.07,100.07,100.07,100.07,1,EUR,5395.35,53.912,5,5,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements MEPU-SA-KAPU-KAME_KAKAMEME,"Mastic caoutchouc butyle pour la construction, destiné à l'étanchéification des joints des revêtements en béton",Material,General,kg,1.97,1.97,1.97,1.97,1,EUR,3037.6,1540.0,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Dispositif de structures de déversement à partir de la chaussée à l'aide de cani DXME-RIKA-KATO_KAKASA,"Remorqueurs diesel pour utilisation en eaux fermées, puissance 294 kW (400 ch)",Equipment,General,Heures machine,98.36,98.36,98.36,98.36,1,EUR,274.24,2.788,5,5,TRAVAUX DE CONSTRUCTION,Travaux de consolidation des berges,"FIXATION DES PENTES DES QUAIS MARITIMES ET DES CÔTES, INSTALLATION DE STRUCTURES",FIXATION DES PENTES À L'AIDE DE BLOCS KARI-RI-KAPU-KAME_KAKAKARI,Ballast de gravier,Material,General,m3,68.29,68.29,68.29,68.29,1,EUR,18429.93,269.86,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KAVO-KASA_KARIME,"Finisseurs-niveleurs à moules coulissants, puissance 70 kW (92 ch)",Equipment,General,Heures machine,170.08,170.08,170.08,170.08,1,EUR,4009.05,23.572,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation d'une bordure en béton monolithique à l'aide d'une finisseuse à bét MEPU-SA-KAPU-KASA_KAMEKASA,"Mastic polymère pour le collage de matériaux de couverture en rouleaux, filmogène, à froid, plage de température -50 à +150 °C, consommation 1,5-2 kg/m2, coloré, blanc",Material,General,kg,4.6,4.6,4.6,4.6,1,EUR,326.48,71.03,5,5,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates RITO-SA-KAME-MEKA,Tubes en acier,Abstract Material,Pipes & Fittings,m,915.11,915.11,915.11,915.11,1,EUR,922430.06,1008.0,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX RISA-ME-KASA-KARI_KAKANEVO,Cale de fixation séparée SK-50 pour rails R-50,Material,General,t,6469.65,6469.65,6469.65,6469.65,1,EUR,168.21,0.026,5,5,TRAVAUX DE CONSTRUCTION,Travaux de consolidation des berges,FIXATION DES PENTES DES OUVRAGES HYDRAULIQUES FLUVIALES ET DES CANAUX,FIXATION SOUS-MARINE DES PENTES DXME-MERI-KASA_KAMETO,Charrues à quatre corps portées,Equipment,General,Heures machine,0.57,0.57,0.57,0.57,1,EUR,2.61,4.594,5,5,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"TRAVAUX PRÉPARATOIRES, TERRASSEMENT ET AGROTECHNIQUES" DXME-MELI-KAPU_MERIME,Manipulateurs universels pour le soudage de réservoirs sphériques d'une capacité maximale de 2000 m3,Equipment,General,Heures machine,80.47,80.47,80.47,80.47,1,EUR,388.35,4.826,5,5,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" MEVO-ME-KARI-KATO_KAKARIRI,"Vanne en acier, diamètre nominal 120 mm",Material,General,pièce,58.47,58.47,58.47,58.47,1,EUR,58.47,1.0,5,5,INSTALLATION DE L'ÉQUIPEMENT,"Compresseurs, pompes et ventilateurs",POMPES,"POMPES À VIDE, DE MINE ET ARTÉSIENNES" RITO-VO-KAPU-MERI_KAMETOKA,"Té sans soudure à passage droit, pression nominale jusqu'à 16 MPa, diamètre nominal 150 mm, diamètre extérieur et épaisseur de paroi 159 x 6,0 mm",Material,General,pièce,61.78,61.78,61.78,61.78,1,EUR,46.95,0.76,5,5,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS MEVO-ME-KADX-KAME_KAKAMENE,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 400 mm",Material,General,pièce,11816.22,11816.22,11816.22,11816.22,1,EUR,6144.44,0.52,5,5,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS KAVO-ME-KARI-RISA_KAKANEME,"Agrafes en acier galvanisé KL1, épaisseur de fixation jusqu'à 5 mm, épaisseur 0,5 mm",Material,General,1000 pièces,318.36,318.36,318.36,318.36,1,EUR,70.04,0.22,5,5,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER MEVO-ME-KADX-KAME_KAKAMEPU,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 200 mm",Material,General,pièce,490.98,490.98,490.98,490.98,1,EUR,589.18,1.2,5,5,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS DXME-RIKA-MERI_KALIME,"Dragues à godet unique, capacité du godet 25 m3",Equipment,General,Heures machine,8512.24,8512.24,8512.24,8512.24,1,EUR,21570.03,2.534,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KALIKA,"Dragues à godet unique, capacité du godet 15 m3",Equipment,General,Heures machine,5100.76,5100.76,5100.76,5100.76,1,EUR,17740.44,3.478,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KANEDX,"Dragues à godet unique, capacité du godet 11 m3",Equipment,General,Heures machine,3731.03,3731.03,3731.03,3731.03,1,EUR,16521.0,4.428,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS MEME-RI-KARI-KALI,Panneaux pour blocs de porte,Abstract Material,General,m2,32.28,32.28,32.28,32.28,1,EUR,2775.91,86.0,5,5,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" KAME-PU-KAME-KATO_MEKAPURI,"Trépan à vis à deux pales, diamètre 95 mm",Material,General,pièce,290.66,290.66,290.66,290.66,1,EUR,988.25,3.4,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS RITO-TO-KAME-KAVO_KAKAMEME,"Tubes de cuvelage en acier, diamètre 1500 mm, épaisseur de paroi 50 mm, longueur de section 6 m",Material,Pipes & Fittings,m,7424.83,7424.83,7424.83,7424.83,1,EUR,217.4,0.03,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL MERI-ME-KATO-KALI,Tuile pleine en ciment-sable,Abstract Material,General,pièce,11.72,11.72,11.72,11.72,1,EUR,0.0,0.0,5,4,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable DXME-RIKA-MERI_KANENE,"Dragues à godet unique, capacité du godet 5 m3",Equipment,General,Heures machine,1647.53,1647.53,1647.53,1647.53,1,EUR,14623.52,8.876,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KANESA,"Dragues à godet unique, capacité du godet 4,3 m3",Equipment,General,Heures machine,1421.32,1421.32,1421.32,1421.32,1,EUR,14517.33,10.214,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KANEPU,"Dragues à godet unique, capacité du godet 4 m3",Equipment,General,Heures machine,1308.32,1308.32,1308.32,1308.32,1,EUR,14292.12,10.924,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KANETO,"Dragues à godet unique, capacité du godet 3 m3",Equipment,General,Heures machine,1004.41,1004.41,1004.41,1004.41,1,EUR,14427.39,14.364,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KANERI,"Dragues à godet unique, capacité du godet 1,6 m3",Equipment,General,Heures machine,545.56,545.56,545.56,545.56,1,EUR,14399.6,26.394,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIME-RIKA_SAKARI,"Électricité : consommation 0,69 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,3.33,37.452,5,5,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,AUTRES TRAVAUX,ÉLÉMENTS DES INSTALLATIONS D'ÉGOUT RITO-VO-KAPU-MERI_KAMERIME,"Raccord en T sans soudure à passage égal, pression nominale jusqu'à 16 MPa, diamètre nominal 100 mm, diamètre extérieur et épaisseur de paroi 108 x 4,0 mm",Material,General,pièce,19.92,19.92,19.92,19.92,1,EUR,11.95,0.6,5,5,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net DXME-MEDX-MEKA_KAKAME,"Électricité : consommation 2,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,51.75,162.764,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEDX-MEKA_KAKAME,"Stations de pompage hydrauliques pour l'entraînement de mécanismes hydrauliques, pression jusqu'à 50 MPa",Equipment,General,Heures machine,1.83,1.83,1.83,1.83,1,EUR,297.81,162.764,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MERI-KANE_KAKAME,"Cultivateurs portés, largeur de travail jusqu'à 6 m",Equipment,General,Heures machine,1.9,1.9,1.9,1.9,1,EUR,0.66,0.346,5,5,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,ENTRETIEN DES CULTURES FORESTIÈRES MENE-RI-KARI-MEKA_KAKAMEME,Glands,Material,General,kg,2.87,2.87,2.87,2.87,1,EUR,0.0,0.0,5,5,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,PLANTATION ET SEMIS MÉCANISÉS DE CULTURES FORESTIÈRES DXME-MERI-KAVO_KAVOTO,Machines à planter (sans tracteur),Equipment,General,Heures machine,1.14,1.14,1.14,1.14,1,EUR,1.32,1.158,5,5,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,PLANTATION ET SEMIS MÉCANISÉS DE CULTURES FORESTIÈRES KAME-SA-KARI-KARI,Panneau métallique grillagé pour barrières de sécurité,Abstract Material,General,pièce,200.18,148.31,234.76,234.76,2,EUR,8814.18,40.0,5,5,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation de moyens de protection physique du périmètre sur des poteaux métal DXME-RIME-MEDX_KAPUNE,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,0.3,0.476,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature KAME-LI-MESA-KATO_KAKAMENE,"Boulons en acier à tête hexagonale, livrés avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M24, longueur du boulon 50-240 mm",Material,General,t,4529.11,4529.11,4529.11,4529.11,1,EUR,73.1,0.014,5,5,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR DXME-RIME-MEDX_KAPUNE,Machines à forger électrohydrauliques pour le forgeage à froid des barres d'armature et leur préparation au filetage parallèle,Equipment,General,Heures machine,11.37,11.37,11.37,11.37,1,EUR,5.41,0.476,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature KAME-LI-KANE-KARI_KAKAKASA,"Bandes autocollantes d'étanchéité en PVC pour la sectionnalisation de l'étanchéité d'un système réparable en membranes PVC, doublées d'un côté d'une couche de géotextile dont les rebords latéraux sont destinés à être collés à la base, couleur grise, largeur sans tenir compte des rebords du géotextile 180 mm, largeur totale 220 mm, épaisseur sans tenir compte du géotextile 1,7 mm, groupe de combustibilité G4, groupe d'inflammabilité B3",Material,Waterproofing,m,61.52,61.52,61.52,61.52,1,EUR,1716.28,27.896,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ KAPU-TO-KARI-KADX_KADXTODX,"Mélanges secs à prise rapide sans retrait à base de ciment contenant des fibres polymères pour la réparation des structures en béton et en béton armé, de type coulable, température d'application de -10 à +5 °C, classe R4, B70 (M900), F300, W16, granulométrie jusqu'à 2,5 mm, consommation 2,1 kg/m² pour une épaisseur de couche de 1 mm",Material,Steel & Metal,kg,2.24,2.24,2.24,2.24,1,EUR,1478.52,659.516,5,5,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Installation de corniches aux jonctions entre les parois des regards d'égout et KAPU-TO-KARI-KAVO_KAKARIKA,"Mélanges secs d'étanchéité à base de polymère-ciment pour la protection des surfaces en béton, en béton armé et en pierre utilisées dans des conditions souterraines, classe B45 (M600), F300, W10-W20, granulométrie jusqu'à 0,70 mm, consommation 3,5 kg/m2 pour une épaisseur de couche de 2 mm",Material,General,kg,2.82,2.82,2.82,2.82,1,EUR,18.82,6.67,5,5,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Installation de corniches aux jonctions entre les parois des regards d'égout et DXME-RIME-MEDX_KAPUPU,"Électricité : consommation 7,92 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.02,1.02,1.02,1.02,1,EUR,0.85,0.832,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature DXME-KANE-KATO_KASADX,"Électricité : consommation 1,06 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.14,0.14,0.14,0.14,1,EUR,5.06,37.304,5,5,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" DXME-RIME-MEDX_KAPUPU,Kits d'équipement pour le filetage métrique parallèle sur des tiges d'armature en acier d'un diamètre de 12 à 57 mm,Equipment,General,Heures machine,21.45,21.45,21.45,21.45,1,EUR,17.85,0.832,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature KATO-RI-KARI-MEKA,Ciments de tamponnage,Abstract Material,General,t,297.49,297.49,297.49,297.49,1,EUR,14973.69,50.334,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,INJECTION DE MORTIER POUR LES FINITIONS DXME-KAVO-MEKA_KASARI,"Fraises routières portées sur tracteur, puissance jusqu'à 110 kW (150 ch)",Equipment,General,Heures machine,45.81,45.81,45.81,45.81,1,EUR,1434.31,31.308,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS ORGANIQUES RITO-TO-KAME-KAVO_KAKARINE,"Tubes en acier de cuvelage, diamètre 880 mm, épaisseur de paroi 40 mm, longueur de la section à couteau 2 m",Material,Pipes & Fittings,m,6794.13,6794.13,6794.13,6794.13,1,EUR,182.08,0.028,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAVO_KAKARISA,"Tubes en acier de cuvelage, diamètre 880 mm, épaisseur de paroi 40 mm, longueur de section 6 m",Material,Pipes & Fittings,m,3248.52,3248.52,3248.52,3248.52,1,EUR,216.55,0.066,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KAME-KAVO_KAKAKAPU,"Tubes en acier de cuvelage, diamètre 750 mm, épaisseur de paroi 40 mm, longueur de section de lame 2 m",Material,Pipes & Fittings,m,5730.04,5730.04,5730.04,5730.04,1,EUR,214.3,0.036,5,5,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-MEDX-KAME_KAKATOME,"Tuyau de béton, diamètre 125 mm",Material,General,m,237.87,237.87,237.87,237.87,1,EUR,163.37,0.8575,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-KAVO-KAPU_KATOPU,"Machines à remplir les joints et les fissures, automotrices avec compresseur, capacité du réservoir de 550 l, puissance du moteur 18 kW (25 ch)",Equipment,General,Heures machine,36.94,36.94,36.94,36.94,1,EUR,53.11,1.438,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES RIKA-RI-KARI-KAME_KAKARITO,"Manchon inter-mur en porcelaine, diamètre intérieur 14 mm, diamètre extérieur 17 mm, longueur 28 mm",Material,General,pièce,1.41,1.41,1.41,1.41,1,EUR,88.53,62.8,5,5,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-KAVO-KATO_KARILI,"Rouleaux compresseurs automoteurs lisses vibrants, poids 3,5 t",Equipment,General,Heures machine,26.06,26.06,26.06,26.06,1,EUR,34.35,1.318,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-RIKA-KARI_KAKAPU,"Barges non automotrices, capacité de charge 400 t",Equipment,General,Heures machine,14.91,14.91,14.91,14.91,1,EUR,103.56,6.948,5,5,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,RYAZHI,Cabane en rondins RITO-SA-KAME-KAVO_KAKAPUKA,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 720 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,297.75,297.75,297.75,297.75,1,EUR,12135.4,40.756,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-MELI-KADX_MEMEKAPU,"Forets hélicoïdaux à queue cylindrique en acier rapide P6M5, classe de précision A1, longueur 133 mm, diamètre 10 mm",Material,General,100 pièces,823.9,823.9,823.9,823.9,1,EUR,2.68,0.0,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Bétonnage des structures du puits du réacteur KAVO-PU-KATO-KATO_KAKAKANE,"Armatures pour structures en béton armé, classe A500C, diamètre 16 mm",Material,Steel & Metal,t,1281.71,1281.71,1281.71,1281.71,1,EUR,132.07,0.1,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KAME-LI-MESA-KALI_KAMETORI,"Chevilles-clous en plastique à tige métallique pour l'isolation thermique, diamètre 10 mm, longueur 150 mm",Material,General,10 pièces,2.05,2.05,2.05,2.05,1,EUR,140.49,68.5333,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MEPU-PU-KAME-MESA_KAKAKAPU,Apprêt polymère pour enduits acryliques et minéraux et avant la peinture avec des peintures à base d'acrylique et de polyvinylacétate,Material,General,kg,1.5,1.5,1.5,1.5,1,EUR,19.12,12.71,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MEPU-PU-KAME-MEKA_KAKAKATO,Apprêt à base de silicate pour supports minéraux avant l'application de revêtements et de peintures silicatés en couche mince,Material,General,kg,7.53,7.53,7.53,7.53,1,EUR,191.47,25.42,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MEDX-KALI_KAMEKAKA,"Plaques poreuses pressées non collées, épaisseur 3-5 mm",Material,General,kg,9.73,9.73,9.73,9.73,1,EUR,83.02,8.536,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAVO-ME-KARI-KATO_KAKADXME,"Cornière extérieure et intérieure en acier galvanisé avec revêtement polymère, dimensions 100 x 100 mm, épaisseur 0,5 mm",Material,General,m,6.68,6.68,6.68,6.68,1,EUR,367.52,55.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAVO-ME-KARI-KATO_KAKALIME,"Cache en acier galvanisé avec revêtement polymère, épaisseur 0,5 mm",Material,General,m,4.42,4.42,4.42,4.42,1,EUR,53.09,12.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAVO-ME-KARI-KATO_KAKANEME,"Planchette de départ en acier galvanisé avec revêtement polymère, dimensions 200 x 50 mm, épaisseur 0,5 mm",Material,General,m,11.16,11.16,11.16,11.16,1,EUR,468.83,42.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAVO-ME-KARI-KATO_KAKAPUME,"Support de fixation en acier galvanisé angulaire, dimensions 200 x 50 x 50 mm, épaisseur 1,2 mm",Material,General,pièce,0.94,0.94,0.94,0.94,1,EUR,337.38,360.596,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RISA-RI-KAME-MEVO_KAKAPUVO,"Fixation pour branche ancrée en aluminium avec pince de fixation en bronze de 70 x 47 x 41,5 mm, fixation sur tige inclinée de la console - « crochet », longueur de la tige principale 1800 mm",Material,General,pièce,722.6,722.6,722.6,722.6,1,EUR,2890.39,4.0,5,5,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RIKA-RI-KAME-KASA_KAKAKATO,Douilles pour câbles en cuivre 6 mm,Material,General,100 pièces,23.0,23.0,23.0,23.0,1,EUR,3.63,0.158,5,5,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS MEME-RI-KAPU-KAME,"Pièces en bois de la tour de refroidissement, traitées avec un antiseptique, à partir de planches",Abstract Material,General,m3,519.82,519.82,519.82,519.82,1,EUR,1107.21,2.13,5,4,TRAVAUX DE CONSTRUCTION,Structures en bois,GRADERS,Revêtement des auvents des fenêtres d'aération DXME-KAVO-KAPU_KASAME,Réchauffeurs de revêtements en béton bitumineux,Equipment,General,Heures machine,11.53,11.53,11.53,11.53,1,EUR,68.02,5.9,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KALI-RI-KANE-KASA_KAKAKAME,"Rallonges en acier galvanisé pour raccorder des profilés de plafond de 60 x 27 mm, dimensions 110 x 58 x 25 mm, épaisseur 0,6 mm",Material,General,100 pièces,65.05,65.05,65.05,65.05,1,EUR,44.88,0.69,5,5,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de plafonds suspendus en plaques de plâtre (GKL) KAME-LI-KANE-MERI_KAKAKALI,"Rubans thermosoudables en polyéthylène, couleur noire, largeur 40 mm, épaisseur 0,1 mm",Material,General,100 m,11.18,11.18,11.18,11.18,1,EUR,0.07,0.01,5,5,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-MELI-KANE_KAKAMESA,"Disque diamanté segmenté, diamètre 1000 mm, segment 4,4 x 10 x 40 mm",Material,General,pièce,1867.19,1867.19,1867.19,1867.19,1,EUR,0.0,0.0,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KALI-RI-KAME-KAME,Rails de pont roulant,Abstract Material,General,t,4271.21,4271.21,4271.21,4271.21,1,EUR,3184.9,0.7467,5,5,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,AUTRES CONSTRUCTIONS MÉTALLIQUES MEPU-TO-KARI-KASA_KAMEKASA,"Peinture silicate pour travaux décoratifs et de restauration sur les surfaces minérales extérieures des bâtiments, consommation (support lisse/support rugueux) 0,12-0,20/0,20-0,28 l/m2, couleur blanche",Material,General,l,16.49,16.49,16.49,16.49,1,EUR,740.76,44.92,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAPU-TO-KARI-KADX_MESARINE,"Mélanges secs pour plâtre, décoratifs, en couche mince, pour travaux extérieurs et intérieurs, granulométrie 1,5 mm",Material,General,kg,1.43,1.43,1.43,1.43,1,EUR,573.1,400.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-KAVO_KAKAKATO,"Rivets combinés (aluminium-acier), diamètre 3,2 mm, longueur 12 mm",Material,General,kg,6.64,6.64,6.64,6.64,1,EUR,0.04,0.01,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-KALI-KAME_KAKAME,"Bacs, capacité 1 m3",Equipment,General,Heures machine,0.04,0.04,0.04,0.04,1,EUR,0.55,9.884,5,5,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES D'UN VOLUME DE BÉTON INFÉRIEUR À 100,ALIMENTATION ET POSE DU MÉLANGE DE BÉTON DANS LES BLOCS DE CONSTRUCTIONS EN BÉTO KARI-RI-KASA-KAPU_RIKAMEKA,"Gravier de roches denses pour travaux de construction M 800, fraction 5(3)-10 mm",Material,General,m3,64.07,64.07,64.07,64.07,1,EUR,3756.36,58.626,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES DXME-KATO-MEME_KAKALI,"Chariots à rails, capacité de charge 150 t",Equipment,General,Heures machine,29.23,29.23,29.23,29.23,1,EUR,301.85,10.326,5,5,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de gigantesques réservoirs sur des sites de transport fluvial KARI-RI-KARI-KARI,Gravillons de marque 300,Abstract Material,General,m3,73.07,73.07,73.07,73.07,1,EUR,217.9,2.982,5,5,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de couches de fondation RIKA-ME-KARI-RITO_KAKATOME,Cache pour support KFD 081,Material,General,pièce,49.81,49.81,49.81,49.81,1,EUR,513.05,10.3,5,5,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE CÂBLES SUPPLÉMENTAIRES RIPU-TO-KATO-METO_KAKAPURI,"Tuyaux en polyéthylène sous pression, à l'exception des tuyaux de gaz PE100, pour le transport de l'eau, rapport dimensionnel standard SDR17, diamètre extérieur nominal 50 mm, épaisseur de paroi 3,0 mm",Material,General,m,2.18,2.18,2.18,2.18,1,EUR,18.77,8.6,5,5,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS DXME-KAME-KASA_METODX,"Pelles électriques à godet unique sur chenilles, capacité du godet 15 m3",Equipment,General,Heures machine,1245.92,1245.92,1245.92,1245.92,1,EUR,2429.55,1.95,5,5,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR KAME-LI-MELI-KADX_KAKANEDX,"Foret diamanté annulaire, diamètre 60 mm",Material,General,pièce,30.79,30.79,30.79,30.79,1,EUR,78.2,2.54,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES DXME-KATO-KASA_KATOSA,"Électricité : consommation 56,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,7.23,7.23,7.23,7.23,1,EUR,355.32,49.12,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KATOSA,"Complexes de forage pour le forage sans bouclier, diamètre extérieur du tunnel 5,5 m",Equipment,General,Heures machine,104.21,104.21,104.21,104.21,1,EUR,5118.77,49.12,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RISA-RI-KAME-KANE_KAKASADX,Pince de raccordement KS-055 (KS-333) pour fils de section 95-120 mm2,Material,General,pièce,25.76,25.76,25.76,25.76,1,EUR,262.66,10.196,5,5,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAPU-ME-KARI-KASA_KAMESAKA,"Mélanges de béton lourd (BST) sur gravier concassé, classe B25, F(1)150, W6",Material,General,m3,136.33,136.33,136.33,136.33,1,EUR,26.01,0.192,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KASA-ME-KALI-MESA,Barrières de type parapet,Abstract Material,General,m3,867.64,867.64,867.64,867.64,1,EUR,65003.92,74.92,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES DXME-KAME-KASA_METODX,"Électricité : consommation 412,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,52.98,52.98,52.98,52.98,1,EUR,103.31,1.95,5,5,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXPLOITATION ET CHARGEMENT DE LA TERRE À L'AIDE D'EXCAVATRICES DANS DES TRANSPOR RISA-RI-KAME-MEVO_KAKATOLI,Fixation d'isolateur suspendu de câble porteur sur le côté intérieur de la courbe pour console en caisson,Material,General,pièce,87.83,87.83,87.83,87.83,1,EUR,122.97,1.4,5,5,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-MEVO_KAKATOPU,"Fixation des fils de contact de la branche ancrée pour un fil de contact, projet KS-MENEKA.PU, type FA-3-3,0 A",Material,General,pièce,335.92,335.92,335.92,335.92,1,EUR,470.28,1.4,5,5,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-MEVO_KAKATOTO,"Fixation des fils de contact de la branche ancrée pour un fil de contact, projet KS-MENEKA.PU, type FA-1-3,0 A",Material,General,pièce,239.51,239.51,239.51,239.51,1,EUR,335.31,1.4,5,5,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEME-RI-KAPU-KASA,Lattes en bois,Abstract Material,General,m3,1437.87,1437.87,1437.87,1437.87,1,EUR,26.57,0.018,5,5,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en dalles de grès cérame DXME-KATO-KASA_KAPURI,"Électricité : consommation 83,6 kW·h/machine-heure",Electricity,Electricity,Heures machine,10.74,10.74,10.74,10.74,1,EUR,245.5,22.864,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KAPURI,"Combines de forage universelles avec marteau hydraulique et équipement de chargement de roches, puissance du moteur 90 kW",Equipment,General,Heures machine,412.0,412.0,412.0,412.0,1,EUR,9420.03,22.864,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RIKA-RI-KADX-KARI_KAKARIME,"Composé d'étanchéité amovible pour le remplissage des manchons de câbles, conditionnement 90 ml",Material,General,kg,126.03,126.03,126.03,126.03,1,EUR,15.55,0.124,5,5,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DES CENTRALES NUCLÉAIRES ET DES BÂTIME MEPU-SA-KAME-MEME_KASAKAME,"Sous-couche à séchage à froid pour assurer l'adhérence des mastics et composés organosiliciés à la surface de divers alliages métalliques et de certains matériaux non métalliques, marque P-11",Material,General,kg,28.6,28.6,28.6,28.6,1,EUR,85.81,3.0,5,5,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DES CENTRALES NUCLÉAIRES ET DES BÂTIME KAME-LI-RIKA-KAPU_KAKAKAME,Fil de lin,Material,General,kg,22.94,22.94,22.94,22.94,1,EUR,1.61,0.07,5,5,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,INSTALLATIONS POUR LES ENTREPRISES THÉÂTRALES ET DE SPECTACLE KAME-RI-KATO-KATO_KAMESARI,"Mastic bitume-caoutchouc butyle pour étanchéité, toiture, consommation 0,9 kg/m² pour une épaisseur de couche de 1,0 mm",Material,General,t,2375.53,2375.53,2375.53,2375.53,1,EUR,446.6,0.186,5,5,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une étanchéité à base d'un composé polymère-ciment d'une épaisseu DXME-KATO-KASA_KAPUME,"Électricité : consommation 52,8 kW·h/machine-heure",Electricity,Electricity,Heures machine,6.78,6.78,6.78,6.78,1,EUR,180.16,26.566,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KAPUME,"Combines d'abattage universelles avec marteau hydraulique et équipement de chargement de roches, puissance du moteur 55 kW",Equipment,General,Heures machine,270.75,270.75,270.75,270.75,1,EUR,7192.84,26.566,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KALI-KAPU_KAMEME,Vibrateurs pour grues,Equipment,General,Heures machine,0.42,0.42,0.42,0.42,1,EUR,3.07,7.332,5,5,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,FOURNITURE ET MISE EN PLACE DU MÉLANGE DE BÉTON DANS LES BLOCS DE CONSTRUCTIONS RITO-SA-KARI-KARI_KAKALIVO,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 159 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,44.7,44.7,44.7,44.7,1,EUR,2096.65,46.9,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-NE-KATO-KAME_KAKAMEME,"Carrelage PVC pour sols, épaisseur 1,2 mm",Material,General,m2,10.09,10.09,10.09,10.09,1,EUR,644.01,63.8,5,5,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en dalles de polychlorure de vinyle KASA-TO-KARI-KASA,Pièces moulées à l'unité,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment (vases, blasons)" KASA-TO-KAME-MENE,Pièces moulées à l'unité,Abstract Material,General,pièce,72.23,72.23,72.23,72.23,1,EUR,72.23,1.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,Installation d'éléments en plâtre RISA-RI-KAME-METO_KAKAKASA,"Tête de fixation en acier sur supports en béton armé, type OG-1",Material,General,pièce,22.96,22.96,22.96,22.96,1,EUR,42.21,1.84,5,5,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER","JOINTS ISOLANTS, CONNECTEURS DE RAILS ET PONTS DE SIGNALISATION" RIRI-RI-KARI-KATO_KAKARIME,"Tendeur en acier galvanisé, crochet-crochet, diamètre du filetage M12, largeur de l'ouverture du crochet 12 mm, longueur de la tirante 210-310 mm",Material,General,pièce,3.19,3.19,3.19,3.19,1,EUR,42.66,13.392,5,5,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",POTEAUX EN ACIER POUR ANTENNES SUR LES TOITS DES BÂTIMENTS MEPU-PU-KAME-RIME_KARISAKA,Apprêt (primer) à base de méthyléthylcétone et d'acétate d'éthyle pour l'application de bandes polymères de marquage routier sur le revêtement routier existant,Material,Paint & Coatings,kg,24.29,24.29,24.29,24.29,1,EUR,140.9,5.802,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-RIME-RIRI_MENEME,"Électricité : consommation 2,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.35,0.35,0.35,0.35,1,EUR,4.27,12.18,5,5,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de sols en béton réalisés par la méthode du vide DXME-RIME-RIRI_MENEME,Complexes à vide pour le traitement vibro-vide du béton lors de la pose de sols,Equipment,General,Heures machine,1.66,1.66,1.66,1.66,1,EUR,20.25,12.18,5,5,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de sols en béton réalisés par la méthode du vide MEDX-TO-KAME-MERI,Clapets à clapet,Abstract Material,General,pièce,402.64,402.64,402.64,402.64,1,EUR,402.64,1.0,5,5,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de vannes RI_MEKAKA_KALI,Ouvrier de 7e catégorie,Labor,Labor,heures,23.62,23.62,23.62,23.62,1,EUR,3293.69,139.462,5,5,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES RITO-TO-KAME-KADX,"Tubes de cuvelage en acier de groupe D, type de raccordement des tubes - à emboîtement, diamètre extérieur 127 mm",Abstract Material,Pipes & Fittings,m,138.67,138.67,138.67,138.67,1,EUR,1414.4,10.2,5,5,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES MEVO-PU-KAME-KAME,Bouteilles pour gaz liquéfiés,Abstract Material,General,pièce,108.43,108.43,108.43,108.43,1,EUR,650.56,6.0,5,5,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de bouteilles de gaz liquéfié dans un placard, KASA-TO-KARI-MEPU,Pièces moulées à l'unité,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment (rosaces, balustres)" KASA-TO-KAME-KASA,Pièces moulées à l'unité,Abstract Material,General,pièce,126.33,126.33,126.33,126.33,1,EUR,126.33,1.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,Installation d'éléments en plâtre RIPU-TO-KATO-KAME_KAMEKAME,"Tube en polyéthylène, diamètre 6-10 mm",Material,Pipes & Fittings,10 m,3.71,3.71,3.71,3.71,1,EUR,1.78,0.48,5,5,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS INTERURBAINES FILAIRES,STATIONS TÉLÉPHONIQUES INTERURBAINES MANUELLES ET SEMI-AUTOMATIQUES KASA-ME-KAVO-KAME_KAKALILI,"Blocs de béton armé, volume jusqu'à 1,4 m3, béton B25, consommation d'armature de 100 à 150 kg/m3",Material,General,m3,316.15,316.15,316.15,316.15,1,EUR,63.86,0.202,5,5,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de bouteilles de gaz liquéfié dans un placard, DXME-KAVO-KAVO_KAMESA,"Installations mobiles de mélange d'asphalte pour la préparation de mélanges à froid, capacité 250 t/h",Equipment,General,Heures machine,319.8,319.8,319.8,319.8,1,EUR,273.11,0.854,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges organo-minéraux et d'enrobés bitumineux dans une install RIKA-RI-MEKA-KATO_KAKARITO,Embouts de câbles en cuivre P 16-6,Material,General,100 pièces,122.75,122.75,122.75,122.75,1,EUR,277.41,2.26,5,5,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",TRANSMETTEURS D'UNE PUISSANCE JUSQU'À 2000 kW KAME-LI-MESA-KAME_MEMENEVO,"Clou en acier d'armature A-III, galvanisé, diamètre 16 mm, longueur 600 mm",Material,General,pièce,9.96,9.96,9.96,9.96,1,EUR,995.86,100.0,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KALI-RI-KALI-KARI_KAKAKARI,"Conducteur métallique pour modules de sol, marque GP-1500, dimensions 2520 x 2520 mm",Material,General,pièce,1018.47,1018.47,1018.47,1018.47,1,EUR,40.74,0.04,5,5,TRAVAUX DE CONSTRUCTION,Routes automobiles,"ROUTES, GUIDES DE ROULEMENT, PASSERELLES, PASSERELLES ET PASSAGES À GUÉ SUR LES ","Pose de modules de remblai pour la construction de voies de circulation, de rout" DXME-MEME-KARI_KADXRI,"Trancheuses à disque de coupe pour roche sur chenilles, puissance 88 kW (120 ch)",Equipment,General,Heures machine,113.87,113.87,113.87,113.87,1,EUR,668.67,5.872,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES KAME-PU-KARI-KATO_KAKAMEPU,"Segment en acier assemblé avec kit de fixation pour disque à tronçonner la roche, diamètre 914,4 mm",Material,General,pièce,1338.36,1338.36,1338.36,1338.36,1,EUR,586.2,0.438,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES KAME-PU-KARI-KATO_KAKAMETO,"Rallonge en fonte résistante à l'usure avec kit de fixation pour coupe-disque à roche, dimensions 90 x 152 mm",Material,General,pièce,226.88,226.88,226.88,226.88,1,EUR,982.41,4.33,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES KAME-PU-KARI-KARI_MEKAKATO,"Lame rotative pour trancheuse à disque pour roche avec embout en cobalt, diamètre d'insertion 22 mm, longueur 89,66 mm",Material,General,pièce,26.06,26.06,26.06,26.06,1,EUR,1652.51,63.4,5,5,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES RISA-RI-KARI-KADX_KAKAMEME,"Colliers de serrage en nylon pour câbles, diamètre 10-45 mm, longueur 175 mm",Material,General,100 pièces,11.64,11.64,11.64,11.64,1,EUR,1.63,0.14,5,5,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES DXME-KASA-KADX_KAMETO,"Grues sur châssis spécial de type automobile, capacité de charge 400 t",Equipment,General,Heures machine,700.35,700.35,700.35,700.35,1,EUR,1941.37,2.772,5,5,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ RIRI-RI-KARI-MEPU_KAKAMETO,"Fil d'acier galvanisé pour lignes aériennes de communication, ordinaire, précision normale, classes 1, 2, diamètre 2,5 mm",Material,General,t,3540.24,3540.24,3540.24,3540.24,1,EUR,1841.75,0.8667,5,5,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR KAPU-TO-KARI-METO_KAMEKASA,"Mélanges secs ciment-sable pour montage et maçonnerie, granulométrie maximale de 3,5 mm, classe B15 (M200), F100",Material,General,t,169.15,169.15,169.15,169.15,1,EUR,748.65,4.426,5,5,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" DXME-KASA-KANE_KAPUVO,"Grues sur chenilles, capacité de levage 1350 t",Equipment,General,Heures machine,1971.78,1971.78,1971.78,1971.78,1,EUR,119576.43,60.644,5,5,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ RITO-VO-KATO-KANE_KAKAKAME,"Raccord en acier assemblé avec manchon et contre-écrou, diamètre nominal 15 mm",Material,General,pièce,1.86,1.86,1.86,1.86,1,EUR,1.86,1.0,5,5,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de cuisinières à gaz, KAME-VO-KAME-KAME_KAKARIME,"Blocs de verre creux incolores, dimensions 190 x 190 x 80 mm",Material,General,1000 pièces,11396.85,11396.85,11396.85,11396.85,1,EUR,23707.79,2.6,5,5,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CLOISONS,Installation de cloisons en blocs de verre et remplissage des ouvertures avec de KANE-RI-KATO-KARI,Dalles en céramique,Abstract Material,General,m2,66.66,66.66,66.66,66.66,1,EUR,6705.8,100.6,5,5,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,Maçonnerie de murs extérieurs d'une épaisseur de 2 briques avec revêtement en ca RIKA-RI-KARI-KARI_KAKAMERI,"Capuchons-bouchons 1/2""",Material,General,10 pièces,56.65,56.65,56.65,56.65,1,EUR,113.3,2.0,5,5,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE MEVO-RI-KAPU-KAVO,Puits en polyéthylène pour canalisation de câbles,Abstract Material,General,compl,426.06,426.06,426.06,426.06,1,EUR,8862.0,20.8,5,5,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES MEVO-SA-KAPU-KAME,"Peignes de distribution de vapeur et d'eau en tubes d'acier avec brides correspondantes, boulons, joints, supports",Abstract Material,Pipes & Fittings,compl,24.04,24.04,24.04,24.04,1,EUR,24.04,1.0,5,5,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs de distribution de vapeur et d'eau à partir de tuyau RIRI-RI-KARI-MEVO_KAKAKALI,Traverse en acier à 8 broches,Material,General,pièce,108.08,108.08,108.08,108.08,1,EUR,151.32,1.4,5,5,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,TRAVERSES SUR LES PILIERS INSTALLÉS DES LIGNES DE COMMUNICATION RIKA-RI-KADX-MEME_KAKAMETO,"Manchon de dérivation en polyéthylène de protection 2MRP 0,5",Material,General,pièce,11.0,11.0,11.0,11.0,1,EUR,11.0,1.0,5,5,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIME-RI-KARI-KATO_KAKAKARI,"Câble croisé de station PKSV 2x0,5",Material,General,1000 m,134.48,134.48,134.48,134.48,1,EUR,7.59,0.058,5,5,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS FILAIRES RISA-ME-KATO-KATO_KAKAKAME,"Dispositifs antivol à ressort pour rails de chemin de fer, type P-65",Material,General,t,4496.87,4496.87,4496.87,4496.87,1,EUR,17614.23,3.92,5,5,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE MEPU-ME-KANE-KANE,Cheville chimique,Abstract Material,General,pièce,103.37,46.71,123.64,123.64,3,EUR,8316.28,68.24,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation des boulons d'ancrage MELI-PU-KAME-KAME,Béton résistant à la chaleur,Abstract Material,General,m3,1154.77,1154.77,1154.77,1154.77,1,EUR,26063.15,22.57,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,FONDATIONS DE BÂTIMENTS ET D'OUVRAGES,Réalisation de fondations pour tuyaux industriels et hauts fourneaux KAVO-TO-KASA-KASA_KAKATORI,"Tôle de toiture en acier, marque STK-1, épaisseur 0,8 mm",Material,General,t,1586.54,1586.54,1586.54,1586.54,1,EUR,889.41,0.93,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Installation et démontage du coffrage glissant des tours de puits MEPU-SA-KAME-MEME_KARIMERI,"Mastic d'étanchéité séchant, hautement élastique, anticorrosion, à base de thermoplastique divinylstyrène, pour l'étanchéification d'appareils et d'équipements chimiques, plage de températures de service de -15 à +20 °C",Material,General,kg,6.8,6.8,6.8,6.8,1,EUR,1694.32,249.348,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Installation de joints de dilatation dans les réservoirs KAVO-TO-KASA-KAPU_KAKARITO,"Tôle en acier inoxydable, nuance d'acier 12Kh18N10T, épaisseur 1-3 mm",Material,General,t,9513.55,9513.55,9513.55,9513.55,1,EUR,1457.48,0.305,5,5,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Installation de joints de dilatation dans les réservoirs RIRI-RI-KARI-KADX_KAKARITO,Crochets pour la fixation des isolateurs KN-18,Material,General,t,4821.82,4821.82,4821.82,4821.82,1,EUR,79.97,0.0225,5,5,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,SUSPENSION DE CÂBLES SUR LES LIGNES DE COMMUNICATION ET DE RADIO RISA-RI-KAME-METO,Têtières pour traverses rigides,Abstract Material,General,pièce,20.76,20.76,20.76,20.76,1,EUR,41.52,2.0,5,5,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT MEVO-SA-KAVO-MERI,Sections de chauffe-eau avec calotte,Abstract Material,General,pièce,2749.24,2749.24,2749.24,2749.24,1,EUR,2749.24,1.0,5,5,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,CHAUFFE-EAU,Installation de sections de réchauffeurs d'eau à grande vitesse KAME-LI-MESA-KARI_KAKAVOLI,"Boulons en acier à tête hexagonale, diamètre du filetage M24, longueur 50-240 mm",Material,General,t,3346.05,3346.05,3346.05,3346.05,1,EUR,30.78,0.0125,5,5,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",APPAREILS ET MOYENS D'AUTOMATISATION INSTALLÉS SUR LES ÉQUIPEMENTS ET LES COMMUN,CONVERTISSEURS À COURANT CONTINU RISA-RI-KARI-MEME_KAKAPUME,"Cadre de marquage pour inscriptions, dimensions 58 x 38 x 18 mm",Material,General,pièce,0.46,0.46,0.46,0.46,1,EUR,13.86,30.0,5,5,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",ENSEMBLES DE MOYENS TECHNIQUES POUR LES SALLES DE CONTRÔLE (SALLES DE DISPATCH),Panneaux et pupitres KAME-LI-MEDX-KATO_KAKATOME,"Manchon en caoutchouc à gradins ou conique pour raccorder le réservoir ou le robinet de chasse à la cuvette, dimensions 40 x 70 mm",Material,General,pièce,0.38,0.38,0.38,0.38,1,EUR,3.77,10.0,5,5,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" KAPU-ME-KARI-KASA_KAMEMEKA,"Mélanges de béton lourd (BST) sur gravier concassé, classe B7,5, F(1)50, W2",Material,General,m3,103.06,103.06,103.06,103.06,1,EUR,16.7,0.162,5,5,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Installation de cloisons de 3 m de hauteur en panneaux extrudés en amiante-cimen KAME-LI-MESA-KALI_KAKARITO,"Chevilles expansibles en polyéthylène, diamètre 8 mm, longueur 30 mm",Material,General,1000 pièces,12.12,12.12,12.12,12.12,1,EUR,0.25,0.025,5,5,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets RITO-TO-KANE-KARI_KAKAKAME,"Tubes en acier soudés galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 15 mm, épaisseur de paroi 2,8 mm",Material,Pipes & Fittings,m,2.73,2.73,2.73,2.73,1,EUR,0.66,0.24,5,5,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation de compteurs d'eau avec fabrication de la tuyauterie sur le lieu de DXME-MEKA-MEME_KAMEME,Machines pour la découpe sans flamme de tuyaux,Equipment,General,Heures machine,2.09,2.09,2.09,2.09,1,EUR,10.68,5.1,5,5,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE KANE-ME-KARI-KAME_KAKAMETO,"Produits en céramique résistants aux acides, profilés, à rainures, moulés, moulés à rainures, marque ISH (ILSH, IL), épaisseur 70 mm",Material,Chemicals,t,1191.95,1191.95,1191.95,1191.95,1,EUR,184.75,0.16,5,5,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic silicate résis KANE-ME-KARI-KAME_KAKAMEME,"Produits résistants aux acides, profilés, en céramique, à rainure, moulés, moulés à rainure, marque ISH (ILSH, IL), épaisseur 50 mm",Material,Chemicals,t,997.0,997.0,997.0,997.0,1,EUR,111.66,0.11,5,5,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic silicate résis KANE-RI-KAPU-KAME_KAKARIME,"Carreaux réfractaires carrés et rectangulaires, épaisseur 20 mm",Material,General,m2,29.38,29.38,29.38,29.38,1,EUR,29.97,1.02,5,5,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic silicate résis KATO-RI-KAME-KATO_KAKAKAME,Ciment alumineux GTs-35 40,Material,General,t,1195.82,1195.82,1195.82,1195.82,1,EUR,62.18,0.052,5,5,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement d'agrégats thermiques à partir de matériaux fibreux en rouleaux et de RINE-ME-KARI-KARI_KAKARIME,"Cale pour support de tunnel, type PP-SA.LIKAME.KAME.KAKAME",Material,General,pièce,6.0,6.0,6.0,6.0,1,EUR,320.35,53.42,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RIKA-RI-KAVO-KALI_KAKAMERI,Agrafe de fixation de câble KS-162,Material,General,pièce,9.29,9.29,9.29,9.29,1,EUR,1509.05,162.4,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RISA-ME-KANE-KALI_KAKAKAME,"Croisement aigu préfabriqué, type de rail P50, marque 1/9",Material,General,pièce,16260.08,16260.08,16260.08,16260.08,1,EUR,32650.25,2.008,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RISA-ME-KASA-KATO_KAKAKAME,"Pointe d'aiguillage pour voies ferrées, type de rail P50, marque 1/6",Material,General,pièce,1701.67,1701.67,1701.67,1701.67,1,EUR,3430.57,2.016,5,5,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MERI-RI-KATO-KASA_KAKAKAME,Polyol du système de composants liquides pour pulvérisation de mousse polyuréthane,Material,General,kg,6.73,6.73,6.73,6.73,1,EUR,598.72,88.96,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAPU-TO-KAME-KALI,"Mortiers de finition, légers, à base de ciment et de chaux",Abstract Material,General,m3,121.33,121.33,121.33,121.33,1,EUR,194.14,1.6,4,4,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de conduits de ventilation avec ouverture manuelle individuelle des DXME-RIME-RIRI_PUPUVO,Installations électriques pour l'imprégnation de manchons polymères utilisés pour la réhabilitation de canalisations d'un diamètre intérieur jusqu'à 250 mm,Equipment,General,Heures machine,5.69,5.69,5.69,5.69,1,EUR,10.71,1.8825,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des systèmes d'évacuation des eaux usées internes à l'aide de manch MEVO-SA-KAVO-MEDX_KAKAKAVO,"Boule d'arrêt en caoutchouc, diamètre 400 mm",Material,General,pièce,268.26,268.26,268.26,268.26,1,EUR,4027.18,15.0125,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-RIKA-KATO_KAKAKATO,"Sacs en polypropylène, dimensions 550 x 1050 mm, capacité de charge jusqu'à 50 kg",Material,General,100 pièces,75.12,75.12,75.12,75.12,1,EUR,15.96,0.2125,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAVO-RI-KARI-KAVO_KAKASALI,"Câble à double torsion LK-RO, structure 6kh36(1+7+7/7+14)+1 o.s., marque V, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 56 mm",Material,Steel & Metal,10 m,365.57,365.57,365.57,365.57,1,EUR,3884.14,10.625,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAVO-RI-KARI-MESA_KAKAKANE,"Câble à triple torsion LK-R, structure 6x7x19(1+6+6/6)+1 o.s., marque B, en fil sans revêtement, groupe de marquage 1570-1770 N/mm2, diamètre 39 mm",Material,Steel & Metal,10 m,240.91,240.91,240.91,240.91,1,EUR,1445.44,6.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" MEPU-SA-KAME-KATO,Mastics ignifuges bicomposants silicone haute densité,Abstract Material,General,kg,7340.83,68.79,9764.84,9764.84,2,EUR,1692.57,0.1733,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES MERI-RI-KASA-KASA_KAKAMESA,"Panneaux en laine minérale à liant synthétique, isolants thermiques PPZh-160, rigidité accrue, densité 151-170 kg/m3",Material,General,m3,349.02,349.02,349.02,349.02,1,EUR,3141.17,9.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES STRUCTURES MÉTALLIQUES KASA-TO-KAME-KARI,Détails,Abstract Material,General,pièce,66.76,66.76,66.76,66.76,1,EUR,66.76,1.0,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,"BALUSTRADES, DEMI-BALUSTRADES","Balustres cylindriques, bouteilles et carrés d'une hauteur maximale de 750 mm" KAME-LI-MELI-KADX_MEKALIME,"Lames pour scie sabre, longueur 300 mm",Material,General,100 pièces,687.37,687.37,687.37,687.37,1,EUR,124.59,0.18,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KAME-RI-KATO-KATO_KAKANESA,Mastic bitume-caoutchouc isolant MBR-90,Material,General,t,926.1,926.1,926.1,926.1,1,EUR,60.2,0.065,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " RIKA-ME-KARI-MEVO_KAKAKAVO,"Sangles de serrage en polyester avec dispositif de tension, largeur 75 mm",Material,General,m,2.87,2.87,2.87,2.87,1,EUR,301.72,105.0,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION D'INSTALLATIONS D'ÉPURATION KAME-LI-KALI-RINE_MEKAKANE,"Produits (joints) en mousse de polyéthylène thermo-isolants pour l'étanchéification des joints des éléments préfabriqués des structures d'enveloppe, section ronde continue, diamètre 50 mm",Material,Steel & Metal,10 m,7.57,7.57,7.57,7.57,1,EUR,253.53,33.475,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-MEKA-KAPU_KAKAME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.06,0.96,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Nettoyage des tuyaux d'égouts internes d'un diamètre de 50 à 150 mm à l'aide d'u DXME-KATO-MEDX_MESAME,"Électricité : consommation 8,35 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.07,1.07,1.07,1.07,1,EUR,5.26,4.9025,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX DXME-KATO-MEDX_MESAME,Presses de vulcanisation pour le raccordement de bandes transporteuses d'une largeur maximale de 1 000 mm et d'une longueur maximale de 1 200 mm,Equipment,General,Heures machine,3.88,3.88,3.88,3.88,1,EUR,19.04,4.9025,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX KASA-TO-KAME-MELI,Détails,Abstract Material,General,pièce,32.47,32.47,32.47,32.47,1,EUR,32.47,1.0,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,TRIGLYPHES,Triglyphes d'une hauteur maximale de 250 mm MEPU-SA-MEME-KALI_KAKAKAME,Mastic NC-008,Material,General,kg,5.99,5.99,5.99,5.99,1,EUR,6.2,1.035,4,4,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de conduits de ventilation avec ouverture manuelle individuelle des KARI-TO-KAME-KARI_MEMERINE,"Sable naturel pour la construction routière, classe I, moyen, tamis carrés",Material,General,m3,22.23,22.23,22.23,22.23,1,EUR,2.19,0.1,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation de barrières routières de protection pour les animaux KAVO-TO-KATO-KASA_KAKAMENE,"Fil d'acier à faible teneur en carbone galvanisé à usage divers, diamètre 2,5 mm",Material,General,t,1987.28,1987.28,1987.28,1987.28,1,EUR,11.72,0.01,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation de moyens de protection physique du périmètre sur des poteaux métal RITO-TO-KANE-KASA_KAKARITO,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz sans filetage, ordinaires, diamètre nominal 90 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,14.06,14.06,14.06,14.06,1,EUR,19.29,1.3725,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" MEME-TO-KATO-MESA_MEKAKANE,"Rondelles en PVC, diamètre extérieur 75 mm, diamètre intérieur 25 mm, épaisseur 10 mm",Material,General,10 pièces,13.86,13.86,13.86,13.86,1,EUR,178.76,12.9,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION RITO-SA-KARI-KARI_KAKATOKA,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 48 mm, épaisseur de paroi 2,5 mm",Material,Pipes & Fittings,m,3.64,3.64,3.64,3.64,1,EUR,4.3,1.1825,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS MEVO-SA-KAVO-MEDX_KAKAMEKA,"Boule d'arrêt en caoutchouc, diamètre 600 mm",Material,General,pièce,480.79,480.79,480.79,480.79,1,EUR,7217.93,15.0125,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-TO-KATO-KAVO_KAKAMESA,Acide oxalique,Material,Chemicals,kg,6.57,6.57,6.57,6.57,1,EUR,195.27,29.7,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Fondations,FONDATIONS,Renforcement par injection des tunnels de métro MERI-ME-KARI-KAPU,Matériaux d'étanchéité en rouleaux autocollants,Abstract Material,General,m2,6.09,6.09,6.09,6.09,1,EUR,806.45,132.5,4,4,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates KAME-LI-MEDX-KAME,Tuyaux,Abstract Material,General,m,60.08,0.81,237.87,0.81,2,EUR,443.29,544.8667,4,4,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES ET EN PLASTIQUE D'HIVER MEME-ME-KATO-KANE_KAMERIME,"Planches de bois résineux, sèches, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 30-40 mm, classe III",Material,General,m3,980.77,980.77,980.77,980.77,1,EUR,870.43,0.8875,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ DXME-MERI-KAME_KAKARI,Herses à dents,Equipment,General,Heures machine,0.34,0.34,0.34,0.34,1,EUR,1.29,3.805,4,4,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"TRAVAUX PRÉPARATOIRES, TERRASSEMENT ET AGROTECHNIQUES" KAME-LI-MESA-KAME_MEPULILI,"Chevilles à expansion en acier galvanisé pour béton fissuré, filetage extérieur M12, longueur 105 mm",Material,General,10 pièces,55.96,55.96,55.96,55.96,1,EUR,166.49,2.975,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX MEPU-RI-KAPU-KAME,Résines de houille,Abstract Material,General,t,168.9,168.9,168.9,168.9,1,EUR,6.67,0.035,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Ouvertures,OUVERTURES,Installation des encadrements de fenêtres KATO-ME-KAME-KAME,Liant à base de plâtre,Abstract Material,General,t,439.92,439.92,439.92,439.92,1,EUR,39.92,0.09,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Murs,MURS,Obturation des ouvertures dans les murs ou cloisons monolithiques en béton armé RITO-SA-KARI-KARI_KAKANEVO,"Tubes en acier électrosoudés à joint droit en acier de marque St2, 10, diamètre extérieur 152 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,18.95,18.95,18.95,18.95,1,EUR,156.38,8.25,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES DXME-RIKA-MERI_KAKAME,"Projectiles hydromoteurs à éjecteur et dragues pour le creusement de tranchées sous-marines, débit 30 m3/h",Equipment,General,Heures machine,31.4,31.4,31.4,31.4,1,EUR,255.38,8.1325,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","TRAVAUX DE TERRASSEMENT EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" DXME-KAPU-KAME_SAMEPU,"Machines de forage à rouleaux hydrauliques sur chenilles, profondeur de forage jusqu'à 45 m, diamètre des puits 160-230 mm",Equipment,General,Heures machine,367.3,367.3,367.3,367.3,1,EUR,199.26,0.5425,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au RIPU-TO-KAPU-MEME_MEKAKAKA,"Tuyau en plastique polyvinylchlorure, diamètre extérieur 51 mm",Material,General,m,2.97,2.97,2.97,2.97,1,EUR,2.35,0.79,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au RITO-VO-KAME-KALI_MEKAKAPU,"Manchons de raccordement à compression en polymère, diamètre 50 x 50 mm",Material,General,10 pièces,107.25,107.25,107.25,107.25,1,EUR,1.82,0.02,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au KAME-PU-KAME-KATO_KAMEPULI,Trépan à trois molettes III 1460K-PV,Material,General,pièce,564.37,564.37,564.37,564.37,1,EUR,2.61,0.01,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fosse à l'aide d'ancrages à injection au KAME-ME-KARI-KADX_KAKAMEME,"Tissu en amiante avec fibre de coton AT-2, épaisseur 1,7 mm",Material,General,m2,8.8,8.8,8.8,8.8,1,EUR,0.59,0.0675,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES MEME-ME-KAME-KARI,Poutres à rainure,Abstract Material,General,m3,3.25,3.25,3.25,3.25,1,EUR,3.57,1.1,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL METO-ME-KARI-KAPU,Dalles de marbre polies pour marches et appuis de fenêtre,Abstract Material,General,m2,385.05,335.24,534.47,335.24,2,EUR,30207.27,75.25,4,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES MERI-ME-KARI-MEKA_KAKAVODX,"Membrane d'étanchéité de toiture en PVC, renforcée par un treillis en polyester, caractéristiques techniques de résistance au feu RP1, G2, B2, résistance à la traction longitudinale/transversale 1100/900 N, allongement à charge maximale d'au moins 15 %, épaisseur 1,2 mm",Material,Waterproofing,m2,20.19,20.19,20.19,20.19,1,EUR,1179.82,58.4375,4,4,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de raccords en membranes PVC aux murs et aux parapets DXME-MEPU-KASA_KASAME,"Citernes remorquées, capacité 2,5 m3",Equipment,General,Heures machine,0.54,0.54,0.54,0.54,1,EUR,0.32,0.5825,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Pose d'une membrane en béton souple pour protéger les structures en béton DXME-MERI-KAVO_MEPUME,Épandeurs tractés,Equipment,General,Heures machine,4.31,4.31,4.31,4.31,1,EUR,3.73,0.865,4,4,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"TRAVAUX PRÉPARATOIRES, TERRASSEMENT ET AGROTECHNIQUES" DXME-KASA-KARI_KARIKA,"Électricité : consommation 28,05 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.6,3.6,3.6,3.6,1,EUR,461.16,128.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Compresseurs, pompes et ventilateurs",VENTILATEURS ET EXTRACTEURS DE FUMÉE,VENTILATEURS DXME-KASA-KARI_KARIKA,"Grues semi-portiques, capacité de charge 30 t",Equipment,General,Heures machine,22.04,22.04,22.04,22.04,1,EUR,2821.36,128.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Compresseurs, pompes et ventilateurs",VENTILATEURS ET EXTRACTEURS DE FUMÉE,VENTILATEURS KAME-LI-MESA-KATO_KAKATOLI,"Boulons en acier galvanisé à tête hexagonale et écrou hexagonal galvanisé, diamètre du filetage du boulon et de l'écrou M30, longueur du boulon 60-300 mm",Material,General,kg,5.37,5.37,5.37,5.37,1,EUR,8.48,1.58,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KAVO-PU-KAME-KARI_KAKAKAME,"Pièces d'ancrage, poids jusqu'à 1 kg",Material,General,t,3889.99,3889.99,3889.99,3889.99,1,EUR,189.93,0.05,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature KAME-TO-KAME-KASA,Paraffines,Abstract Material,General,t,4169.91,4169.91,4169.91,4169.91,1,EUR,1649388.68,395.545,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de DXME-RIME-RIRI_TODXME,"Électricité : consommation 9,9 kWh/machine-heure",Electricity,Electricity,Heures machine,1.27,1.27,1.27,1.27,1,EUR,19.61,15.415,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX DXME-RIME-RIRI_TODXME,"Machines à découper les murs, profondeur de coupe maximale 730 mm",Equipment,General,Heures machine,14.32,14.32,14.32,14.32,1,EUR,220.72,15.415,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX KAME-LI-MELI-KADX_MERIPUTO,"Foret à pointe en alliage dur, avec queue SDS-max pour le forage à percussion dans les matériaux durs, longueur totale 320 mm, diamètre 16 mm",Material,General,pièce,16.15,16.15,16.15,16.15,1,EUR,1.12,0.07,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX KAPU-TO-KARI-METO_KAMEKAME,"Mélanges secs de plâtre à base de ciment et de sable pour les surfaces en béton, en pierre naturelle, en pierre artificielle et en brique, utilisées dans des locaux à humidité élevée, application manuelle, B12,5 (M150), F50, granulométrie jusqu'à 0,63 mm, consommation 1,7-1,8 kg/m² pour une épaisseur de couche de 1 mm",Material,General,t,307.88,307.88,307.88,307.88,1,EUR,8.46,0.05,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Fondations,FONDATIONS,Restauration et imperméabilisation des surfaces murales en béton et en béton arm DXME-KAPU-KAME_MEKAME,"Installations de forage et de levage sur châssis automobile, profondeur de forage jusqu'à 1 200 m, diamètre de forage jusqu'à 1 200 mm, charge admissible sur le crochet jusqu'à 500 kN (50 t)",Equipment,General,Heures machine,478.93,478.93,478.93,478.93,1,EUR,1464.34,3.0575,4,4,TRAVAUX DE CONSTRUCTION,Forages,"FIXATION DES PUITS AVEC DES TUBES, EXTRACTION DES TUBES, DESCENTE OU REMONTÉE LI",Fixation du puits lors du forage à l'aide de moteurs de fond à vis MEME-ME-KAME-MEME_KAKAKARI,"Moulure en bois, largeur 40 mm, épaisseur 5 mm",Material,General,m,1.65,1.65,1.65,1.65,1,EUR,191.31,116.0,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" MEME-TO-KARI-KAPU,Cloison en profilés PVC,Abstract Material,General,m2,169.21,169.21,169.21,169.21,1,EUR,16921.31,100.0,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" KAME-LI-MEME-KANE_KAKAKAME,Flux AN-22,Material,General,kg,4.65,4.65,4.65,4.65,1,EUR,32.54,7.0,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" RITO-ME-KATO-KAPU,Supports mobiles à collier,Abstract Material,General,pièce,54.0,54.0,54.0,54.0,1,EUR,54.0,1.0,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Montage de supports mobiles lors de la pose de conduites isolées en surface MEPU-PU-KAPU-MEME_KAKAKADX,"Émail à base de copolymère de chlorure de vinyle et d'acétate de vinyle, couleur rouge-brun",Material,General,t,5800.37,5800.37,5800.37,5800.37,1,EUR,2030.13,0.35,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES MARITIMES,REVÊTEMENT DES STRUCTURES MÉTALLIQUES DES ÉQUIPEMENTS HYDRAULIQUES AVEC DES PRIM MEPU-PU-KAPU-MERI_KAKAKAPU,Émail EP-46,Material,General,t,6909.26,6909.26,6909.26,6909.26,1,EUR,725.47,0.105,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES MARITIMES,REVÊTEMENT DES STRUCTURES MÉTALLIQUES DES ÉQUIPEMENTS HYDRAULIQUES AVEC DES PRIM MEPU-SA-KADX-MERI_KAMEKAME,"Éthylcellulose technique, catégorie I",Material,General,kg,4.38,4.38,4.38,4.38,1,EUR,175.03,40.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES MARITIMES,REVÊTEMENT DES STRUCTURES MÉTALLIQUES DES ÉQUIPEMENTS HYDRAULIQUES AVEC DES PRIM KAME-LI-MELI-KANE_KAKAMEDX,"Disque diamanté segmenté, diamètre 600 mm, segment 4,4 x 10 x 40 mm",Material,General,pièce,842.28,842.28,842.28,842.28,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,REVÊTEMENTS RITO-TO-KASA-KARI_METONENE,"Tubes en acier sans soudure, formés à froid, en acier de nuances 10, 20, 35, 45, diamètre extérieur 25 mm, épaisseur de paroi 5,0 mm",Material,Pipes & Fittings,m,12.24,12.24,12.24,12.24,1,EUR,5.88,0.48,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX RITO-TO-KATO-KARI_MERIMEKA,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 102 mm, épaisseur de paroi 9,5 mm",Material,Pipes & Fittings,m,72.45,72.45,72.45,72.45,1,EUR,2.9,0.04,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX KAVO-ME-KARI-MELI_KAKASARI,"Grillage métallique simple en fil galvanisé à mailles losangées, diamètre du fil 1,4 mm, taille des mailles 12 x 12 mm",Material,General,m2,7.29,7.29,7.29,7.29,1,EUR,2.77,0.38,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX RIPU-TO-KAME-KANE_KAKAPUNE,"Tuyaux en PVC, diamètre nominal 50 mm",Material,General,m,2.41,2.41,2.41,2.41,1,EUR,3.18,1.32,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,INJECTION DE MORTIER POUR LES FINITIONS RITO-TO-KANE-KASA_KAKARIPU,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz sans filetage, ordinaires, diamètre nominal 125 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,21.63,21.63,21.63,21.63,1,EUR,24.01,1.11,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,INJECTION DE MORTIER POUR LES FINITIONS KAME-LI-KAPU-MEKA,Poignées,Abstract Material,General,pièce,2.15,2.15,2.15,2.15,1,EUR,182.9,85.0,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"ARMOIRES ENCASTRÉES, ÉTAGÈRES ENTRESOL, ARTICLES À L'UNITÉ" DXME-KAVO-KALI_KATOKA,"Finisseurs (remplisseurs) de bas-côtés sur la base d'un chargeur frontal, largeur de pose jusqu'à 3000 mm",Equipment,General,Heures machine,64.48,64.48,64.48,64.48,1,EUR,243.43,3.775,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,COUCHES DE BASE ET DE NIVELLEMENT DE LA FONDATION ET DU REVÊTEMENT,COUCHES DE SOUS-COUCHE ET DE NIVELLEMENT DE LA FONDATION RISA-ME-KAME-KAPU_KAKAMEME,"Traverse en bois de conifères, non imprégnée, pour voies ferrées à voie étroite, type I, longueur 1200 mm",Material,General,pièce,23.11,23.11,23.11,23.11,1,EUR,35.38,1.53,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL DXME-MESA-KATO_KAMEME,"Tracteurs à roues pneumatiques, puissance 18 kW (25 ch)",Equipment,General,Heures machine,5.41,5.41,5.41,5.41,1,EUR,33.45,6.1825,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES MEME-ME-KAME-MERI_KAKAKALI,"Planches de revêtement en bois résineux (épicéa, pin), catégorie AB, profil plat, épaisseur 13 mm, largeur jusqu'à 96 mm",Material,General,m3,1765.65,1765.65,1765.65,1765.65,1,EUR,2427.76,1.375,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" KAME-LI-MESA-MEPU_KATOKAVO,"Vis autotaraudeuses en acier galvanisé à tête hexagonale, pointe de forage, diamètre 6 mm, longueur 90 mm",Material,General,t,5495.21,5495.21,5495.21,5495.21,1,EUR,45.03,0.015,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"CONSTRUCTIONS DE COUVERTURES DE TOITURE, CHATRIERS" DXME-KASA-KARI_LINEDX,"Grues mobiles à portique, capacité de charge jusqu'à 3 t, hauteur de levage 3 m, portée 3 m",Equipment,General,Heures machine,0.73,0.73,0.73,0.73,1,EUR,0.11,0.15,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,INSTALLATIONS D'ACCUMULATION KANE-RI-KAME-KARI_KAKAPUME,"Carrelage céramique pour revêtement intérieur des murs, émaillé, lisse, coloré, épaisseur 7 mm",Material,General,m2,17.5,17.5,17.5,17.5,1,EUR,0.7,0.04,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,INSTALLATIONS D'ACCUMULATION KAME-LI-KAPU-KAPU,Serrures encastrées,Abstract Material,General,compl,15.43,1.83,29.02,15.43,2,EUR,218.73,70.0,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" KAME-LI-KAPU-KATO,Vannes,Abstract Material,General,pièce,1.04,1.04,1.04,1.04,1,EUR,103.72,100.0,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" KAME-LI-KALI-MERI_KAKARITO,"Film isolant en polyéthylène, épaisseur 0,2-0,5 mm",Material,General,m2,0.25,0.25,0.25,0.25,1,EUR,9.77,39.0575,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES KARI-ME-KAME-KARI_KAKAKATO,Terre sableuse (sable),Material,General,m3,22.86,22.86,22.86,22.86,1,EUR,308.62,13.5,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,TRAVERSES À GOUPILLES,Installation de traverses dans les sols DXME-MEDX-MEKA_KAKASA,Électricité : consommation 1290 kW·h/machine-heure,Electricity,Electricity,Heures machine,165.69,165.69,165.69,165.69,1,EUR,247.7,1.495,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-MEKA_KAKASA,"Stations de pompage et installations de dragage électriques fixes, débit 200 m3/h, hauteur de refoulement de la station de pompage 100 m, hauteur de refoulement de l'installation de dragage 63 m",Equipment,General,Heures machine,266.99,266.99,266.99,266.99,1,EUR,399.14,1.495,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-MEKA-KANE,"Colorants, pigments",Abstract Material,General,kg,4.27,4.27,4.27,4.27,1,EUR,95.41,22.35,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS KAME-TO-KAME-KANE_KAKASAPU,Lubrifiant CIATIM-203,Material,General,kg,7.53,7.53,7.53,7.53,1,EUR,149.98,19.925,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT HYDROÉLECTRIQUE,GÉNÉRATEURS POUR CENTRALES ÉLECTRIQUES KAVO-PU-KATO-KATO_KAKARIRI,"Acier d'armature laminé à chaud à profil périodique, classe A-II, diamètre 12 mm",Material,General,t,1484.91,1484.91,1484.91,1484.91,1,EUR,78.7,0.055,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation des pièces encastrées MEPU-PU-KAPU-KATO_KAKAMENE,"Émail alkyde uréthane anticorrosion, résistant aux intempéries, pour la protection des surfaces métalliques, en béton, en béton armé et en bois, des canalisations souterraines, des infrastructures de transport contre les effets des rayons ultraviolets, consommation 0,28 kg/m2",Material,Steel & Metal,kg,29.21,29.21,29.21,29.21,1,EUR,151.92,5.2,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-RIME-MENE_KAMEME,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,2.78,16.3925,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é DXME-RIME-MENE_KAMEME,Presses à ferraillage pour l'assemblage de ferraillage à profil périodique d'un diamètre de 20 à 36 mm,Equipment,General,Heures machine,1.52,1.52,1.52,1.52,1,EUR,24.95,16.3925,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é KAME-LI-MESA-KAME_MEKAPUNE,"Goujons d'ancrage en acier galvanisé à friction et à calage pour béton sans fissures, filetage extérieur M10, longueur 98 mm",Material,General,10 pièces,30.53,30.53,30.53,30.53,1,EUR,281.31,9.215,4,4,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,PUITS D'ÉGOUT,Installation de puits ronds préfabriqués en matériaux polymères DXME-KAVO-KAME_KAKAPU,"Finisseurs à chenilles, largeur maximale de pose 5 m, vitesse de pose jusqu'à 30 m/min, rendement 350 t/h",Equipment,General,Heures machine,98.41,98.41,98.41,98.41,1,EUR,201.74,2.05,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-RI-KATO-KANE,Solution émulsifiante,Abstract Material,General,t,12.93,12.93,12.93,12.93,1,EUR,2.64,0.2033,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES KAME-TO-KASA-KAME_KAKAMEME,"Aluminium sulfurique (sulfate d'aluminium) technique purifié, marque A",Material,General,t,2121.29,2121.29,2121.29,2121.29,1,EUR,374.56,0.1775,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES KAME-NE-KAME-KASA_KAKAKARI,"Plaques renforcées en ciment minéral pour usage extérieur, épaisseur 12,5 mm",Material,General,m2,28.53,28.53,28.53,28.53,1,EUR,2938.5,103.0,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-RIME-RIRI_PUTOTO,"Électricité : consommation 6,44 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.83,0.83,0.83,0.83,1,EUR,8.81,10.6625,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION ÉLÉGAZ 45-750 KV DXME-RIME-RIRI_PUTOTO,"Chariot de service pour le stockage d'élégaz, volume d'élégaz 1000-2000 l, débit de la pompe pour le pompage d'élégaz 35 m3/h, débit de la pompe pour le pompage d'air 63 m3/h",Equipment,General,Heures machine,21.22,21.22,21.22,21.22,1,EUR,226.26,10.6625,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION ÉLÉGAZ 45-750 KV DXME-KASA-KARI_LINEDX,"Électricité : consommation 1,62 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.21,0.21,0.21,0.21,1,EUR,0.03,0.15,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,INSTALLATIONS D'ACCUMULATION DXME-RIME-MESA_KARITO,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.4,4.32,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RISA-RI-KARI-KAVO_KAKAMEKA,"Nœud de fixation en acier du support en U sur un montant métallique à angle par rapport à l'axe de la voie, largeur du support en U du montant 220-300 mm, largeur du montant 240-540 mm, angle d'installation du support par rapport à l'axe de la voie 30°",Material,General,pièce,114.66,114.66,114.66,114.66,1,EUR,229.31,2.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RIKA-ME-KARI-RITO_MEKARIDX,"Cale en acier galvanisé à installer entre le support en caisson et son point de fixation sur un poteau métallique afin d'empêcher le support de pivoter, longueur 700 mm",Material,General,pièce,32.81,32.81,32.81,32.81,1,EUR,32.81,1.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-RIME_MEKAKAME,"Cale pour limiter le déplacement vertical du fil de contact d'une section de 85 mm à 120 mm dans la zone de l'aiguille aérienne, en acier inoxydable avec deux pinces de fixation sur les bords, longueur selon l'axe des pinces 2000 mm, longueur 2075 mm",Material,Concrete & Cement,pièce,156.66,156.66,156.66,156.66,1,EUR,234.99,1.5,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KAME-LI-MEPU-KALI_KAKANEME,"Feuille de PVC expansé, épaisseur 3-4 mm",Material,General,m2,14.71,14.71,14.71,14.71,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES RITO-RI-KATO-KAME_KAKAKATO,"Manchon tubulaire en plomb, diamètre 37 mm, longueur 190 mm",Material,General,pièce,26.65,26.65,26.65,26.65,1,EUR,1043.5,39.1525,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-KANE-MERI_KAKAKARI,"Rubans en tissu de coton serré à armure sergée, largeur 10 mm",Material,General,m,0.02,0.02,0.02,0.02,1,EUR,1.66,80.615,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RIPU-ME-KARI-KAME_KAKARITO,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation de tuyaux, écrou de fixation M8, diamètre de 95 à 103 mm",Material,General,pièce,5.17,5.17,5.17,5.17,1,EUR,99.46,19.25,4,4,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES ET ROBINETTERIE DES INSTALLATIONS D'EXTINCTION AUTOMATIQUE D'INCENDI,"Dispositif de tuyauteries en tubes et raccords en polypropylène ignifugés, renfo" DXME-KAVO-MEME_MEKAME,"Cuiseurs sur châssis de voiture, capacité de la cuve jusqu'à 4,4 m3",Equipment,General,Heures machine,101.67,101.67,101.67,101.67,1,EUR,2497.64,24.565,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-KAME_KAMEME,"Finisseurs d'enrobés bitumineux, largeur de pose de 3 à 9 m",Equipment,General,Heures machine,116.02,116.02,116.02,116.02,1,EUR,58.88,0.5075,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-MEKA_KATOME,"Fraiseuses-recycleuses routières automotrices, largeur de fraisage 2180 mm",Equipment,General,Heures machine,518.62,518.62,518.62,518.62,1,EUR,1314.71,2.535,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-RIME-RIRI_TOLIME,"Électricité : consommation 1,1 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.14,0.14,0.14,0.14,1,EUR,0.2,1.41,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-RIME-RIRI_TOLIME,Systèmes hydrauliques pour le montage de raccords,Equipment,General,Heures machine,8.78,8.78,8.78,8.78,1,EUR,12.38,1.41,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RIRI-RI-KARI-RIME_KAKAKAPU,"Tige métallique pour supports en bois, diamètre du filetage M16, longueur de la partie encastrée 40 mm",Material,General,pièce,1.64,1.64,1.64,1.64,1,EUR,13.09,8.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV MEME-RI-MEME-KAPU_KAKASARI,"Contreplaqué avec couches extérieures en placage de bouleau, marque FK, classe II/IV, poncé, épaisseur 12-15 mm",Material,General,m3,829.78,829.78,829.78,829.78,1,EUR,1539.24,1.855,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de bases de sol en contreplaqué MEPU-RI-KASA-KATO_KAKAMEKA,"Composition polyuréthane à deux composants pour la réalisation de revêtements de sol monolithiques, consommation 2,3 kg/m² pour une épaisseur de couche de 1,5 mm",Material,General,kg,18.5,18.5,18.5,18.5,1,EUR,5807.17,313.875,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de sols coulés en polyuréthane KAME-TO-KASA-TOVO_KARIRIME,Quartz moulu pulvérulent,Material,General,t,563.84,563.84,563.84,563.84,1,EUR,171.69,0.3025,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en xylolite et en polyvinylacétate KAME-LI-MESA-KARI_KAKATOTO,"Boulons d'ancrage avec écrou en acier à friction à calage, avec filetage extérieur M6, diamètre 8 mm, longueur 85 mm",Material,General,100 pièces,11.31,11.31,11.31,11.31,1,EUR,9.16,0.81,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAME-LI-MESA-MEKA_KAKASADX,"Agrafes de montage en acier à deux griffes (SD), diamètre de fixation 22 mm",Material,General,10 pièces,1.01,1.01,1.01,1.01,1,EUR,23.85,23.5,4,4,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER CARBONÉ ET FAIBLEMENT ALLIÉ KAVO-ME-KARI-RIKA_KAKARIME,Archets intermédiaires 24-2/2a,Material,General,t,5565.74,5565.74,5565.74,5565.74,1,EUR,109.06,0.02,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE DÉFLECTION DES INSTALLATIONS FLUVIALES,Installation de dispositifs anti-chocs pour les installations d'amarrage fluvial KASA-ME-KARI-KATO_KAKAMERI,Poutres en béton armé pour aiguillages,Material,General,m3,777.5,777.5,777.5,777.5,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,"ASSEMBLAGE, DÉMONTAGE ET POSE D'AIGUILLAGES, DE CROISEMENTS SANS PASSAGE ET DE P" DXME-RIME-RIRI_PUPUSA,"Électricité : consommation 2,72 kWh/machine-heure",Electricity,Electricity,Heures machine,0.35,0.35,0.35,0.35,1,EUR,0.09,0.1975,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-RIME-RIRI_PUPUSA,Mélangeurs à action périodique avec pales en Z pour le mélange de colle à caoutchouc,Equipment,General,Heures machine,3.15,3.15,3.15,3.15,1,EUR,0.62,0.1975,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KANE-RI-KASA-KAME,Carreaux ordinaires,Abstract Material,General,m2,745.88,745.88,745.88,745.88,1,EUR,39158.67,52.5,4,3,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Finition des poêles KALI-RI-KAPU-KAPU,Plaques métalliques portables pour foyers,Abstract Material,General,pièce,42030.8,126.44,55998.92,55998.92,2,EUR,42030.8,1.0,4,4,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Installation de foyers métalliques DXME-MELI-KAPU_KATOME,"Électricité : consommation 7,22 kWh/machine-heure",Electricity,Electricity,Heures machine,0.93,0.93,0.93,0.93,1,EUR,120.76,130.2875,4,4,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE DXME-MELI-KAPU_KATOME,Appareils à commande automatique pour le soudage bout à bout de tuyaux en plastique d'un diamètre supérieur à 1200 mm et jusqu'à 1600 mm,Equipment,General,Heures machine,18.34,18.34,18.34,18.34,1,EUR,2388.88,130.2875,4,4,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN POLYÉTHYLÈNE KAME-LI-MESA-KALI_KAKAPUME,"Clous à béton pour pistolet de montage dans une douille en plastique, diamètre du clou 2,7 mm, longueur du clou 40 mm",Material,General,t,14547.67,14547.67,14547.67,14547.67,1,EUR,11.27,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KARI-RI-KAME-KARI_MEKALIRI,"Gravier M 400-1000, fraction 10-20 mm",Material,General,m3,66.9,66.9,66.9,66.9,1,EUR,1722.07,25.74,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE RÉSEAUX THERMIQUES,Aménagement d'un drainage unilatéral concomitant des canaux infranchissables RINE-ME-KAME-KARI_KAKAMEME,"Écrous en acier, diamètre M52",Material,General,kg,13.92,13.92,13.92,13.92,1,EUR,3980.18,286.0,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION KAME-LI-KANE-KAME,"Bandes d'étanchéité hydrofuges, pare-vapeur",Abstract Material,General,m,0.46,0.46,0.46,0.46,1,EUR,48.42,106.0,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS MEPU-RI-KASA-KANE,Composition polymère-ciment,Abstract Material,General,m3,166.41,29.06,303.76,166.41,2,EUR,18162.82,624.73,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS RIPU-TO-KAME-KANE_KAKAPURI,"Tubes en PVC, diamètre nominal 20 mm",Material,Pipes & Fittings,m,0.65,0.65,0.65,0.65,1,EUR,2.59,4.0,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri RITO-TO-KAME-KANE_KAKARIRI,"Tubes de forage en acier du groupe D avec extrémités évasées à l'intérieur et manchons correspondants, diamètre extérieur 140 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,129.65,129.65,129.65,129.65,1,EUR,0.81,0.01,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri MEME-TO-KATO-MESA_MEKAMEKA,Séparateurs en polyéthylène pour torons (fixateurs) pour la fixation des armatures en câble des ancrages,Material,General,100 pièces,169.15,169.15,169.15,169.15,1,EUR,2.2,0.01,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri MEME-TO-KATO-MESA_MEKAKAVO,Séparateurs en plastique pour la répartition des torons d'armature en câble,Material,General,100 pièces,5.87,5.87,5.87,5.87,1,EUR,0.08,0.01,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri MEME-TO-KATO-MESA_MEKAKARI,"Couvercle d'ancrage en fonte pour protéger l'ancrage au sol à fil métallique contre les dommages, diamètre 250 mm",Material,General,pièce,29.85,29.85,29.85,29.85,1,EUR,1.67,0.06,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri KATO-RI-KARI-KANE_KAKAKARI,"Ciment de précontrainte NC-5 42,5N",Material,General,t,668.42,668.42,668.42,668.42,1,EUR,17.38,0.03,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri MEPU-PU-KAPU-KADX_KAKAMEDX,"Émail HV-125, coloré",Material,General,t,5492.95,5492.95,5492.95,5492.95,1,EUR,84.59,0.02,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MELI-PU-KASA-KAPU_KAKAMEME,"Masse à froid à faible retrait pour électrolyseurs en aluminium, marque MKNU",Material,General,t,1120.55,1120.55,1120.55,1120.55,1,EUR,906.36,0.81,4,4,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Remplissage avec une masse de fond en charbon MELI-ME-KARI-KAPU_KAKAKARI,Plaques réfractaires en fibre de chamotte à liant argileux ShVP-350,Material,General,m3,1463.37,1463.37,1463.37,1463.37,1,EUR,159.51,0.11,4,4,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement des appareils thermiques avec des matériaux réfractaires fibreux MELI-ME-KARI-KATO_KAKAMEME,Feutre mullite-siliceux MKRV-200,Material,General,t,5085.54,5085.54,5085.54,5085.54,1,EUR,39.41,0.01,4,4,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement des appareils thermiques avec des matériaux réfractaires fibreux RITO-RI-KAME-KARI,Entretoises en aluminium,Abstract Material,General,m,10.85,10.85,10.85,10.85,1,EUR,502.47,46.2925,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KASA-ME-KARI-MEKA_KAKAMERI,Lestage composé de deux blocs en béton armé de type UBO avec deux sangles métalliques pour le ballastage de tuyaux d'un diamètre de 600 à 1000 mm,Material,General,compl,476.52,476.52,476.52,476.52,1,EUR,476.52,1.0,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta DXME-MEKA-KAPU_KAMEVO,"Électricité : consommation 15,58 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.0,2.0,2.0,2.0,1,EUR,19.79,9.89,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION AVEC DES BANDES POLYMÈRES ET POSE DE CONDUITES DXME-KAME-KASA_MENEKA,"Pelles sur chenilles avec grappin à bois, puissance 147 kW (200 ch), poids en ordre de marche 23 t, surface de préhension 0,7 m2",Equipment,General,Heures machine,84.41,84.41,84.41,84.41,1,EUR,330.88,3.92,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE KASA-ME-KAME-METO_KAKAMEME,"Plaques de charge et d'appui, préfabriquées en béton armé VL et ORU",Material,General,m3,974.0,974.0,974.0,974.0,1,EUR,49187.01,50.5,4,4,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,FONDATIONS EN BÉTON ARMÉ PRÉFABRIQUÉ ET MONOLITHIQUE POUR LES PILIERS DE LIGNE À DXME-MELI-KARI_KAKAME,Appareils portatifs à rayons X pulsés pour la radiographie de métaux d'une épaisseur maximale de 85 mm,Equipment,General,Heures machine,2.94,2.94,2.94,2.94,1,EUR,3.32,1.13,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONTRÔLE DE LA QUALITÉ DES ASSEMBLAGES SOUDÉS PAR DES MÉTHODES PHYSIQUES,CONTRÔLE RADIOGRAPHIQUE À L'AIDE D'APPAREILS À RAYONS X À IMPULSIONS SUR LA ROUT RIKA-RI-KAVO-KALI_KAKATOTO,Agrafes U1078,Material,General,100 pièces,111.11,111.11,111.11,111.11,1,EUR,12.22,0.11,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS DXME-RIME-MEDX_KAMESA,"Électricité : consommation 43,56 kWh/machine-heure",Electricity,Electricity,Heures machine,5.59,5.59,5.59,5.59,1,EUR,9.41,1.6825,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,FABRICATION DE COUDES COURBÉS ET MONTAGE D'ANGLES DE COUDES DE TUYAUTERIES,Fabrication de coudes cintrés à partir de tuyaux d'un diamètre nominal de 200 à DXME-KAME-KATO_KAMETO,"Racleurs automoteurs, capacité géométrique du godet 25,0 m3",Equipment,General,Heures machine,245.43,245.43,245.43,245.43,1,EUR,1298.91,5.2925,4,4,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE DE RÉCUPÉRATEURS,Déblayage et déplacement de terre à l'aide de décapeuses automotrices sur une di KAME-LI-MELI-KADX_KAKALIKA,"Foret diamanté annulaire, diamètre 70 mm",Material,General,pièce,35.43,35.43,35.43,35.43,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAME-LI-MELI-KADX_KAKANEVO,"Foret diamanté annulaire, diamètre 55 mm",Material,General,pièce,30.72,30.72,30.72,30.72,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KARI-RI-KASA-KAPU_RITOLIKA,"Gravier concassé issu de roches denses pour la construction routière M 1200, fraction 16-22,4 mm",Material,General,m3,99.01,99.01,99.01,99.01,1,EUR,471.17,4.7575,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-KALI-RINE_KAKAPUKA,"Cordon en mousse de polyéthylène thermo-isolant et d'étanchéité, section ronde continue, densité 25-40 kg/m3, diamètre 50 mm",Material,General,100 m,44.04,44.04,44.04,44.04,1,EUR,45.81,1.04,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MELI-KADX_KAKANELI,"Foret diamanté annulaire, diamètre 50 mm",Material,General,pièce,27.61,27.61,27.61,27.61,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS RIME-ME-KASA-KAME,Câble,Abstract Material,General,m,55966.98,55966.98,55966.98,55966.98,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'alimentation électrique interne dans les bâtiments temporaires à KADX-RI-KATO-KAME_KAKATOME,"Profilé-bouchon en aluminium en forme de P, largeur 10 mm, profondeur 5,5 mm, longueur 3000 mm",Material,General,pièce,3.4,3.4,3.4,3.4,1,EUR,109.32,32.1525,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons et revêtement des murs à l'aide de panneaux à base de p KADX-TO-KAPU-KATO_KAKAKAME,"Cloisons sur cadre en aluminium combinées, avec verre transparent de 5 mm d'épaisseur, avec plaque de plâtre recouverte de vinyle",Material,General,m2,115.91,115.91,115.91,115.91,1,EUR,11591.44,100.0,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,CLOISONS REVÊTUES DE PLAQUES DE PLÂTRE OU DE PLAQUES DE FIBRE DE PLÂTRE,CLOISONS SUR OSSATURE MÉTALLIQUE KAPU-ME-KARI-KASA_KAMEMERI,"Mélanges de béton lourd (BST) sur gravier concassé, classe B7,5, F(1)75, W4",Material,General,m3,107.09,107.09,107.09,107.09,1,EUR,42.14,0.395,4,4,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Construction de puits en briques pour l'alimentation en eau KAME-LI-MELI-KADX_KAKANESA,"Foret diamanté annulaire, diamètre 40 mm",Material,General,pièce,23.19,23.19,23.19,23.19,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAME-LI-MELI-KADX_KAKANEPU,"Foret diamanté annulaire, diamètre 32 mm",Material,General,pièce,17.24,17.24,17.24,17.24,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAME-LI-KAVO-KASA_KAKAKAME,"Additif superplastifiant en poudre pour bétons et mortiers de construction, augmentation de la mobilité de P1 à P5",Material,General,kg,1.9,1.9,1.9,1.9,1,EUR,0.19,0.1,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Autres travaux de réparation et de construction,AUTRES TRAVAUX DE RÉNOVATION ET DE CONSTRUCTION,Restauration de l'étanchéité et renforcement des structures à l'aide d'un mortie RISA-ME-KATO-KALI_MEKAKAKA,Cale à mandrin pour la fixation d'ancrages au sol à fil,Material,General,pièce,12.04,12.04,12.04,12.04,1,EUR,2.65,0.22,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri KASA-ME-KANE-KASA,Dalles de plancher plates,Abstract Material,General,pièce,390.25,390.25,390.25,390.25,1,EUR,39024.59,100.0,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,CONSTRUCTIONS DE LOCAUX SOUTERRAINS MEME-RI-MEME-KAPU_KAMEKANE,"Contreplaqué à usage général en placage de feuillus à résistance accrue à l'eau, FSF, classe I/II, épaisseur 12 mm",Material,General,m3,2176.98,2176.98,2176.98,2176.98,1,EUR,145.31,0.065,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHES DE LA PARTIE SOUTERRAINE ET DU SOUS-SOL DE,Démontage du coffrage des structures monolithiques en béton armé des parties sou MELI-PU-KARI-KAPU,Microsilice,Abstract Material,General,kg,0.48,0.48,0.48,0.48,1,EUR,4.75,10.0,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Autres travaux de réparation et de construction,AUTRES TRAVAUX DE RÉNOVATION ET DE CONSTRUCTION,Restauration de l'étanchéité et renforcement des structures à l'aide d'un mortie DXME-KASA-MEPU_KARIRI,"Électricité : consommation 12,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.66,1.66,1.66,1.66,1,EUR,78.76,47.53,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE DXME-KASA-MEPU_KARIRI,"Grues de montage spéciales (grues à flèche), capacité de charge 65 t",Equipment,General,Heures machine,67.33,67.33,67.33,67.33,1,EUR,3200.42,47.53,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE KAME-LI-MESA-MEPU,Vis,Abstract Material,General,100 pièces,3.64,3.64,3.64,3.64,1,EUR,17.35,4.7625,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-KANE-KANE_KAPULI,"Élévateurs à mât unique, capacité de charge jusqu'à 500 kg, hauteur de levage 35 m",Equipment,General,Heures machine,1.32,1.32,1.32,1.32,1,EUR,36.42,27.5,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RIKA-RI-KAVO-KASA_KAKAMELI,"Profil en P, épaisseur 2,5 mm, longueur 3000 mm",Material,General,pièce,50.35,50.35,50.35,50.35,1,EUR,1579.86,31.375,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS RINE-ME-KARI-KANE_KAKAKARI,Petite pince pour points d'appui,Material,General,pièce,3.28,3.28,3.28,3.28,1,EUR,1405.42,427.95,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-RIKA-MEME_KAKALI,"Pontons utilisés en rade ouverte, 400-450 t",Equipment,General,Heures machine,72.97,72.97,72.97,72.97,1,EUR,565.12,7.745,4,4,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS DE QUAIS ET DE PILoniers MARITIMES,QUAIS ET PILOTIS EN COQUES DE GRAND DIAMÈTRE DXME-RIKA-MEME_KAKATO,"Pontons pour utilisation en eaux fermées, 400-450 t",Equipment,General,Heures machine,37.81,37.81,37.81,37.81,1,EUR,292.83,7.745,4,4,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS DE QUAIS ET DE PILoniers MARITIMES,QUAIS ET PILOTIS EN COQUES DE GRAND DIAMÈTRE RINE-ME-KARI-KAPU_KAKAKATO,"Joint en polyuréthane pour isolateur de rail de contact, type PPI-2",Material,General,pièce,10.71,10.71,10.71,10.71,1,EUR,698.62,65.235,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-METO-KAME_KATOME,Machines pour la construction de bandes de renforcement,Equipment,General,Heures machine,53.38,53.38,53.38,53.38,1,EUR,393.82,7.3775,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,BANDES DE RENFORT AUX BORDES DES REVÊTEMENTS ROUTIERS ET RENFORT DES ACCOTEMENTS,Installation de bandes de renfort et renforcement des accotements KASA-ME-KARI-MEKA_KAKAKARI,Lest en béton armé de type cunéiforme UBKm pour le ballastage de tuyaux d'un diamètre de 350-400 mm,Material,General,pièce,368.61,368.61,368.61,368.61,1,EUR,368.61,1.0,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 300 à 1400 mm à l'aide de lestages KAME-LI-MESA-KARI_KAKAPUKA,"Boulons d'ancrage avec écrou en acier à friction, à visse, avec filetage extérieur M10, diamètre 12 mm, longueur 100 mm",Material,General,100 pièces,28.36,28.36,28.36,28.36,1,EUR,40.7,1.435,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-MESA-KAME_MEMERIPU,Plaque de distribution en acier pour ancrages filiformes,Material,General,pièce,147.66,147.66,147.66,147.66,1,EUR,8.27,0.06,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Dispositif de fixation des parois de la fouille à l'aide d'ancrages à quatre bri RIKA-ME-KARI-KASA_KAKAKAME,"Balance peinte pour l'ancrage combiné du câble porteur et du fil de contact, largeur 150 mm, longueur 620 mm",Material,General,pièce,82.84,82.84,82.84,82.84,1,EUR,255.97,3.09,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-RIKA_KAKAKASA,"Barre à double œillet KS-175, galvanisée, longueur 1000 mm",Material,General,pièce,33.72,33.72,33.72,33.72,1,EUR,52.09,1.545,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RITO-SA-KAME-KAVO_KAKAPUDX,"Tuyaux en acier électrosoudés à joint droit et à joint spiralé, classe de résistance K38, diamètre extérieur 820 mm, épaisseur de paroi 8 mm",Material,General,m,401.75,401.75,401.75,401.75,1,EUR,1211.68,3.015,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RISA-ME-KANE-RITO_KAKARIME,"Attelles en acier pour la fixation des rails, diamètre 22 mm, filetage M22, longueur 2250 mm, avec deux écrous M22",Material,General,t,3611.55,3611.55,3611.55,3611.55,1,EUR,163.7,0.06,4,4,TRAVAUX DE CONSTRUCTION,Lignes électriques,APPAREILS DE DISTRIBUTION OUVERTS DE 35 À 1150 KV,"VOIES DE ROULEMENT, CROISEMENTS ET CLOISONS COUPE-FEU POUR TRANSFORMATEURS ORU 1" DXME-RIME-RIKA_SAKAPU,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,46.23,198.225,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS RISA-RI-KAME-KAVO_KAKAKARI,Borne de mise à la terre KS-124 avec rondelle à dent KS-044,Material,General,pièce,19.7,19.7,19.7,19.7,1,EUR,25.37,1.2875,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE KADX-TO-KAME-KAPU_KAKAPUPU,"Profilé horizontal en aluminium courbe pour façades ventilées suspendues, section 60 x 23 mm, épaisseur de l'aluminium 2 mm",Material,General,m,11.34,11.34,11.34,11.34,1,EUR,3078.3,271.385,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KADX-TO-KAME-KAPU_KAKANERI,"Cornière de fixation en aluminium pour façades ventilées suspendues, dimensions 30 x 50 x 80 mm, épaisseur de l'aluminium 2 mm",Material,General,pièce,0.81,0.81,0.81,0.81,1,EUR,133.7,164.4675,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KADX-RI-KATO-KAME_KAKARIME,"Profilé en aluminium pour la fixation de panneaux en forme d'oméga, épaisseur du panneau à fixer 10-12 mm, longueur 3000 mm",Material,General,pièce,7.76,7.76,7.76,7.76,1,EUR,250.57,32.27,4,4,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons et revêtement des murs à l'aide de panneaux à base de p DXME-RIME-RIKA_SAKAPU,"Installations électriques de forage au diamant dans le béton armé, diamètre de forage jusqu'à 600 mm",Equipment,General,Heures machine,4.7,4.7,4.7,4.7,1,EUR,931.11,198.225,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAME-LI-KANE-MEPU_MEKAKAPU,"Rubans en aluminium avec couche adhésive pour l'étanchéité et l'isolation thermique des joints et des raccords, largeur 75 mm",Material,General,100 m,32.66,32.66,32.66,32.66,1,EUR,31.44,0.9625,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une isolation thermique et acoustique continue KAME-LI-MELI-KADX_KAKALILI,"Foret diamanté annulaire, diamètre 160 mm",Material,General,pièce,158.94,158.94,158.94,158.94,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS RIKA-ME-KARI-MEKA_KAKARITO,"Suspension à câble de type U3393, U3493",Material,General,pièce,11.97,11.97,11.97,11.97,1,EUR,119.73,10.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS RIKA-RI-MEME-KAPU_KAKAMEME,Entretoise 125-1,Material,General,pièce,19.27,19.27,19.27,19.27,1,EUR,193.49,10.0425,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RIKA-RI-KARI-KAME_KAKAKAME,"Douilles isolantes pour cordes de support des fixations dans les zones de fonte du givre, diamètre 50 mm",Material,General,100 pièces,999.58,999.58,999.58,999.58,1,EUR,56.62,0.055,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-LI-MELI-KADX_KAKALINE,"Foret diamanté annulaire, diamètre 140 mm",Material,General,pièce,146.62,146.62,146.62,146.62,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAME-LI-MELI-KADX_KAKALISA,"Foret diamanté annulaire, diamètre 125 mm",Material,General,pièce,86.07,86.07,86.07,86.07,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAME-LI-MELI-KADX_KAKALIPU,"Foret diamanté annulaire, diamètre 110 mm",Material,General,pièce,61.0,61.0,61.0,61.0,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS DXME-MELI-KATO_KAKAME,"Électricité : consommation 6,6 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.85,0.85,0.85,0.85,1,EUR,0.59,0.695,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,INSERTION DE BOBINES KALI-RI-KASA-KARI_KAKAKAPU,"Produits métalliques galvanisés profilés pour panneaux sandwich de façade, revêtement polyester, perforés, épaisseur de la tôle 0,5 mm",Material,Aggregates,m2,19.11,19.11,19.11,19.11,1,EUR,150.35,7.87,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-MERI_KAKARITO,Goupilles,Material,General,kg,2.18,2.18,2.18,2.18,1,EUR,17.95,8.24,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS RIKA-RI-KARI-KAME_KAKAMERI,"Douilles en polypropylène, diamètre 22 mm",Material,General,1000 pièces,51.08,51.08,51.08,51.08,1,EUR,1.58,0.03,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS DXME-MELI-KATO_KAKAME,"Sources d'alimentation pour chauffage par induction, puissance 20 kW, fréquence 10 kHz",Equipment,General,Heures machine,16.25,16.25,16.25,16.25,1,EUR,11.3,0.695,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,INSERTION DE BOBINES KADX-RI-KAME-KASA,"Modules de façade à double couche suspendus, cadre en alliages d'aluminium, isolant en plaques de laine minérale à base de fibres de basalte d'une épaisseur de 70 mm",Abstract Material,General,compl,1275.84,1275.84,1275.84,1275.84,1,EUR,1275.84,1.0,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" KAME-LI-MEME-KAPU_KAKAKAME,"Fil à souder par pulvérisation PP-Np-30Kh4G2M, diamètre 2 mm",Material,General,t,3058.99,3058.99,3058.99,3058.99,1,EUR,8.26,0.01,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RAILS LOURDS MERI-ME-KARI-MESA_KAKARIME,"Matériau roulé bitumineux pour toiture et étanchéité TPP, soudable, base en tissu de verre, flexibilité maximale à 0 °C, résistance à la rupture dans le sens longitudinal/transversal 800/900 N, résistance à la chaleur minimale 80 °C, masse 3,6 kg/m2",Material,General,m2,4.37,4.37,4.37,4.37,1,EUR,1.59,0.365,4,4,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RAILS LOURDS DXME-MEKA-KAPU_KAMEVO,Machines pour le nettoyage et l'isolation avec des bandes polymères de tuyaux d'un diamètre de 1000 à 1200 mm,Equipment,General,Heures machine,35.26,35.26,35.26,35.26,1,EUR,348.73,9.89,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION AVEC DES BANDES POLYMÈRES ET POSE DE CONDUITES MERI-RI-KAVO-KATO_KAKARITO,"Cylindres et demi-cylindres isolants en laine minérale sur liant synthétique, marque 200, diamètre intérieur 18-57 mm",Material,General,m3,440.49,440.49,440.49,440.49,1,EUR,13.25,0.03,4,4,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,INSTALLATION DE RÉSEAUX D'INGÉNIERIE INTÉRIEURS DANS LES BÂTIMENTS ET STRUCTURES,Installation d'un système de chauffage dans des bâtiments temporaires à usage ré KALI-RI-KASA-KARI_KAKAKATO,"Produits métalliques galvanisés profilés pour panneaux sandwich de façade, revêtement polyester, épaisseur de la tôle 0,5 mm",Material,Aggregates,m2,15.08,15.08,15.08,15.08,1,EUR,177.84,11.795,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MELI-PU-KATO-KAME_KAKAKASA,"Mortier réfractaire aluminosilicate mullite, marque MML-62",Material,General,t,2599.16,2599.16,2599.16,2599.16,1,EUR,201.43,0.0775,4,4,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES RÉCHAUFFEURS D'AIR DES FOURS À HAUTE TEMPÉRATURE,Maçonnerie des murs MERI-ME-KATO-KARI,Tôle métallique,Abstract Material,General,m2,19.81,19.81,19.81,19.81,1,EUR,2555.29,129.0,4,4,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures en tôle ondulée KAME-LI-MELI-KADX_KAKALITO,"Foret diamanté annulaire, diamètre 100 mm",Material,General,pièce,55.03,55.03,55.03,55.03,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAVO-TO-KASA-KAPU_KAKAPUTO,"Tôle en acier inoxydable, nuance d'acier 12Kh18N10T, épaisseur 4-8 mm",Material,General,t,8824.03,8824.03,8824.03,8824.03,1,EUR,5232.65,0.5925,4,4,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,FABRICATION DE STRUCTURES MÉTALLIQUES POUR CENTRALES NUCLÉAIRES RIKA-ME-KAME-MERI,Kit de fixation pour poteaux intermédiaires,Abstract Material,General,pièce,81.56,81.56,81.56,81.56,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" RIKA-ME-KAME-KAVO,Pinces de dérivation,Abstract Material,General,100 pièces,486.12,486.12,486.12,486.12,1,EUR,14.58,0.03,4,4,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" KAME-LI-MELI-KADX_KAKALIRI,"Foret diamanté annulaire, diamètre 90 mm",Material,General,pièce,43.98,43.98,43.98,43.98,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAME-LI-MELI-KADX_KAKALIME,"Foret diamanté annulaire, diamètre 80 mm",Material,General,pièce,39.7,39.7,39.7,39.7,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KARI-RI-KAME-KATO_KAKAMEPU,"Gravier d'expansé argileux M 400, fraction 10-20 mm",Material,General,m3,65.84,65.84,65.84,65.84,1,EUR,204.77,3.11,4,4,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,BÂTIMENTS TEMPORAIRES EN STRUCTURES PRÉFABRIQUÉES,Assemblage de bâtiments temporaires en bois et en panneaux à usage résidentiel KAME-LI-MESA-MERI_KAKAKARI,"Vis à tête hexagonale en acier pour plomberie avec filetage, diamètre du filetage M8, longueur 120 mm",Material,General,100 pièces,13.03,13.03,13.03,13.03,1,EUR,0.52,0.04,4,4,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de climatiseurs et de systèmes split RITO-SA-KARI-KARI_KAKARIVO,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 40 mm, épaisseur de paroi 2,5 mm",Material,Pipes & Fittings,m,3.03,3.03,3.03,3.03,1,EUR,6.81,2.2467,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS KAVO-TO-MEKA-KARI_KAKAMEME,Profilés laminés à chaud pour pieux battus L5-UM en acier de marque C255,Material,General,t,2812.12,2812.12,2812.12,2812.12,1,EUR,1314.67,0.4675,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-RIKA-KALI_KAKAPU,Conducteurs flottants pour l'immersion de pieux tubulaires lors de travaux en rade ouverte,Equipment,General,Heures machine,74.86,74.86,74.86,74.86,1,EUR,44.73,0.5975,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-RIME-KARI_KAKARI,"Appareils à haute pression avec moteur à combustion interne pour le nettoyage hydraulique des surfaces, débit 21 l/min, pression 35 MPa",Equipment,General,Heures machine,5.95,5.95,5.95,5.95,1,EUR,25.15,4.225,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,AUTRES TRAVAUX,Nettoyage des dépôts au fond de la surface interne du réservoir de pétrole KAPU-ME-KARI-KARI_KAMEKAKA,"Mélanges de béton lourd (BST) pour ouvrages hydrauliques sur gravier concassé, classe B15, F(1)50, W2",Material,General,m3,135.27,135.27,135.27,135.27,1,EUR,163.67,1.21,4,4,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,STRUCTURES PRÉFABRIQUÉES EN BÉTON ARMÉ KAME-SA-KATO-KALI,"Bosses artificielles modulaires ondulées pour routes, élément de bordure, dimensions 250 x 500 mm",Abstract Material,General,pièce,38.34,38.34,38.34,38.34,1,EUR,81.48,2.1233,4,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-KAME-KASA_METOKA,Électricité : consommation 1320 kWh/machine-heure,Electricity,Electricity,Heures machine,169.54,169.54,169.54,169.54,1,EUR,243.29,1.435,4,4,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE KAME-LI-MELI-MEKA_KAKAPUVO,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 121 mm",Material,General,pièce,824.43,824.43,824.43,824.43,1,EUR,453.44,0.55,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-MEKA_KAKAPULI,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 98 mm",Material,General,pièce,361.51,361.51,361.51,361.51,1,EUR,198.83,0.55,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KALI-RI-KALI-KAVO,Structures à ossature,Abstract Material,Steel & Metal,t,3721.62,3721.62,3721.62,3721.62,1,EUR,3721.62,1.0,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,Panneaux de signalisation routière MEPU-SA-KADX-KAPU_KAKAKAME,"Durcisseur modifié pour résines époxy, aminé",Material,General,kg,16.45,16.45,16.45,16.45,1,EUR,16.45,1.0,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE MEPU-SA-KALI-KAPU_KASAKARI,Pigment colorant pour résine époxy,Material,General,kg,106.66,106.66,106.66,106.66,1,EUR,2.67,0.02,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE MEPU-RI-KAPU-KATO_MEKAMENE,"Résine époxy modifiée, teneur massique en groupes époxy d'au moins 21,5 %, teneur massique en substances volatiles d'au plus 1,5 %, viscosité dynamique à 25 °C d'au plus 4,5 Pa*s, teneur massique en chlore saponifiable d'au plus 0,6 %",Material,General,kg,6.77,6.77,6.77,6.77,1,EUR,6.77,1.0,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-LI-KALI-RIDX_KAKAPUME,"Granulés de bauxite, fraction 1-3 mm",Material,General,kg,2.16,2.16,2.16,2.16,1,EUR,21.55,10.0,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-LI-KANE-MEPU_KAKAPURI,"Rubans papier thermorésistants pour travaux de peinture avec couche adhésive sur une face, couleur beige, largeur 100 mm",Material,General,m,0.3,0.3,0.3,0.3,1,EUR,1.04,3.5,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-LI-KANE-KARI,Bande d'étanchéité,Abstract Material,General,m,9.46,9.46,9.46,9.46,1,EUR,963.02,101.8,4,4,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,AUTRES TRAVAUX,Étanchéification des joints RITO-VO-KATO-MEME_KAMEPUME,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 600 mm",Material,General,pièce,316.57,316.57,316.57,316.57,1,EUR,4305.4,13.6,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-MEME_KAMEPUKA,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 500 mm",Material,General,pièce,268.52,268.52,268.52,268.52,1,EUR,3114.78,11.6,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-MEME_KAMETONE,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 300 mm",Material,General,pièce,101.51,101.51,101.51,101.51,1,EUR,1025.28,10.1,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-ME-KARI-KAME_KAKAKAME,"Charges en fonte pour le ballastage des gazoducs et oléoducs principaux, diamètre de la canalisation jusqu'à 600 mm",Material,General,t,2271.19,2271.19,2271.19,2271.19,1,EUR,766.53,0.3375,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage à l'aide de charges en fonte composées de deux moitiés de conduites d KASA-ME-KARI-MEKA_KAKAKAPU,Lest en béton armé de type cunéiforme UBKm pour le lestage de tuyaux d'un diamètre de 600 à 700 mm,Material,General,pièce,618.52,618.52,618.52,618.52,1,EUR,618.52,1.0,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 300 à 1400 mm à l'aide de lestages KAME-LI-MEKA-KANE_KAKAPUPU,"Additif (colorant) en poudre pour la création d'une pelouse par hydro-ensemencement, consommation 0,0005 kg/m2",Material,Concrete & Cement,kg,48.41,48.41,48.41,48.41,1,EUR,2.42,0.05,4,4,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"AMÉNAGEMENT DE PELOUSES, DE PARTS DE FLEURS, DE JARDINS ALPINARIES ET DE ROCAIRE" MEPU-PU-KATO-KAVO_KAKAMEME,"Vernis AK-113, AK-113F",Material,General,t,8352.81,8352.81,8352.81,8352.81,1,EUR,66.78,0.02,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES FAÇADES MERI-RI-KAME-KADX_KAKARISA,"Lamelle en laine minérale sur liant synthétique, densité 80 kg/m3, largeur 30 mm, épaisseur 60 mm",Material,General,m3,220.03,220.03,220.03,220.03,1,EUR,18.55,0.085,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MEME-RI-KAPU-KANE_KAKATOME,"Piquet en bois pour plantation, dimensions 2200 x 60 mm",Material,General,pièce,4.7,4.7,4.7,4.7,1,EUR,1315.73,280.0,4,4,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,PRÉPARATION DES PLACES DE PLANTATION ET PLANTATION D'ARBRES JEUNES RITO-SA-KAME-KALI_KAKARIRI,"Tubes en acier soudés pour gazoducs et oléoducs principaux, classe de résistance K52, diamètre extérieur 530 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,360.98,360.98,360.98,360.98,1,EUR,389.85,1.08,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES VANNES LINÉAIRES DES OLÉODUCS RIPU-ME-KAME-KASA,Protection de manchon d'étanchéité,Abstract Material,General,pièce,331.47,331.47,331.47,331.47,1,EUR,331.47,1.0,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT DXME-RIME-MEDX_KAMESA,Cintreuses de tubes avec mandrin pour le cintrage à froid de tubes d'un diamètre extérieur de 1020 à 1420 mm,Equipment,General,Heures machine,556.23,556.23,556.23,556.23,1,EUR,935.85,1.6825,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,FABRICATION DE COUDES COURBÉS ET MONTAGE D'ANGLES DE COUDES DE TUYAUTERIES,Fabrication de coudes cintrés à partir de tuyaux d'un diamètre nominal de 200 à RIKA-ME-KARI-MEVO,Bande de cerclage en acier inoxydable,Abstract Material,General,10 m,18.72,5.68,31.75,18.71,2,EUR,3.08,0.105,4,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-MEDX-KALI_KAMESA,"Électricité : consommation 24,75 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.18,3.18,3.18,3.18,1,EUR,3.18,1.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES DXME-MEDX-KALI_KAMESA,"Pompes pour le réseau de saumure et de refroidissement par eau des stations de congélation, débit 120 m3/h, pression 80 m à une température de saumure de -38 °C",Equipment,General,Heures machine,7.94,7.94,7.94,7.94,1,EUR,7.94,1.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES DXME-MELI-KARI_KATOME,"Détecteurs de défauts magnétiques portables, réglage du courant impulsionnel jusqu'à 3000 A",Equipment,General,Heures machine,2.27,2.27,2.27,2.27,1,EUR,43.85,19.3575,4,4,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air pour centrales nucléaires en tôle d'acier d'une épaisseur MEVO-ME-MEKA-KAME_KARIVORI,Vanne à tige,Material,General,pièce,30.56,30.56,30.56,30.56,1,EUR,106.95,3.5,4,4,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de bouteilles de gaz liquéfié dans un placard, MEVO-SA-KAVO-MEDX,Billes d'arrêt en caoutchouc,Abstract Material,General,pièce,321.57,321.57,321.57,321.57,1,EUR,643.13,2.0,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Installation et démontage d'un bypass en tubes d'acier dans des gazoducs en acie KAVO-ME-KARI-MEME_KAKATORI,"Pièces forgées pour la construction avec usinage mécanique (agrafes, attaches, colliers), poids jusqu'à 10 kg",Material,General,kg,2.68,2.68,2.68,2.68,1,EUR,458.98,171.165,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire MEME-ME-KAME-KADX_KAKAKARI,"Lattes en mélèze pour la pose de sols, traitées avec un antiseptique, épaisseur 40-60 mm, largeur 100-150 mm",Material,General,m3,1605.39,1605.39,1605.39,1605.39,1,EUR,1810.07,1.1275,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de lambourdes et installation de planchers MEDX-TO-KAME-KAVO,Clapets à lamelles,Abstract Material,General,pièce,276.79,276.79,276.79,276.79,1,EUR,276.79,1.0,4,4,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de vannes DXME-KAME-KASA_METOKA,"Pelles électriques à godet unique sur chenilles avec équipement de travail « dragline », capacité du godet 25 m3",Equipment,General,Heures machine,4966.83,4966.83,4966.83,4966.83,1,EUR,7127.41,1.435,4,4,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE RINE-ME-KARI-KASA_KAKAKAME,Rails de contact pour métro,Material,General,t,1312.94,1312.94,1312.94,1312.94,1,EUR,35229.38,26.8325,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAVO-ME-KATO-KAPU_KAKAKAME,"Blocs simples pour câble, galvanisés, poulie en plastique d'un diamètre de 40 mm, diamètre maximal du câble 9 mm",Material,General,10 pièces,48.42,48.42,48.42,48.42,1,EUR,8.47,0.175,4,4,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de vannes RIKA-RI-KANE-KASA,Supports,Abstract Material,General,kg,2.91,2.91,2.91,2.91,1,EUR,29.11,10.0,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,Panneaux de signalisation routière DXME-KAME-KASA_MERIDX,"Pelles électriques à godet unique avec équipement de travail « dragline », capacité du godet 20 m3",Equipment,General,Heures machine,4178.98,4178.98,4178.98,4178.98,1,EUR,9214.65,2.205,4,4,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE RINE-ME-KARI-KATO_KAKAKARI,"Raccords de transition pour jonction de rails, type P50/P65",Material,General,compl,272.15,272.15,272.15,272.15,1,EUR,952.51,3.5,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RITO-TO-KAME-KADX_KAKARIPU,"Tubes de cuvelage en acier du groupe D, type de raccordement : raccord à emboîtement, diamètre extérieur 146 mm, épaisseur de paroi 5 mm, longueur 4500-6000 mm",Material,Pipes & Fittings,m,62.09,62.09,62.09,62.09,1,EUR,65.03,1.0475,4,4,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES RITO-TO-KAME-KADX_KAKARIKA,"Tubes de cuvelage en acier de groupe D, type de raccordement des tubes - à emboîtement, diamètre extérieur 89 mm, épaisseur de paroi 5 mm, longueur 4500-6000 mm",Material,Pipes & Fittings,m,40.85,40.85,40.85,40.85,1,EUR,71.49,1.75,4,4,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES KAME-LI-KAVO-KASA_MEKARISA,"Additif en poudre pour bétons et mortiers à base de ciments Portland accélérant la prise, temps de prise du béton de 45 minutes à 4 heures, résistance à la compression du béton au bout de 1/2/3 jours supérieure à 15/20/25 MPa",Material,Fasteners,kg,31.08,31.08,31.08,31.08,1,EUR,157.58,5.07,4,4,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES MERI-ME-KARI-MEKA_KAKADXSA,"Membrane de toiture à base de PVC, non renforcée, épaisseur 1,5 mm",Material,Waterproofing,m2,12.35,12.35,12.35,12.35,1,EUR,41.73,3.38,4,4,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de raccords en membranes PVC aux murs et aux parapets RITO-VO-KASA-MERI_KAMETOME,"Té droit en fonte malléable avec filetage cylindrique, diamètre nominal 15 mm",Material,General,pièce,0.98,0.98,0.98,0.98,1,EUR,1.67,1.7,4,4,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,INSTALLATION ET DÉMONTAGE DE CONDUITS DE VENTILATION DE PUITS KAME-LI-MESA-KALI_MEKASAVO,"Packs d'injection en acier avec tête à pince, diamètre 18 mm, longueur 160 mm",Material,General,10 pièces,22.72,22.72,22.72,22.72,1,EUR,0.32,0.01,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Autres travaux de réparation et de construction,AUTRES TRAVAUX DE RÉNOVATION ET DE CONSTRUCTION,Restauration de l'étanchéité et renforcement des structures à l'aide d'un mortie KAME-LI-MESA-KALI_KAKARIME,"Chevilles expansibles en polyéthylène, diamètre 6 mm, longueur 30 mm",Material,General,1000 pièces,5.61,5.61,5.61,5.61,1,EUR,1.1,0.195,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de plinthes en polychlorure de vinyle MEPU-SA-KAVO-KAPU,Revêtements texturés à base de copolymères acryliques,Abstract Material,General,t,4771.2,4771.2,4771.2,4771.2,1,EUR,393.15,0.08,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,TRAVAUX DÉCORATIFS KASA-TO-KARI-MESA,Pièces moulées à l'unité,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment (chapiteaux, bases, pommeaux, corniches, conso" DXME-RIKA-MERI_KASANE,"Dragues à godets multiples, capacité du godet 0,6 m3",Equipment,General,Heures machine,1506.73,1506.73,1506.73,1506.73,1,EUR,6671.03,4.4275,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KASASA,"Dragues à godets multiples, capacité du godet 0,5 m3",Equipment,General,Heures machine,1283.44,1283.44,1283.44,1283.44,1,EUR,6282.42,4.895,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS MEPU-SA-KATO-KARI,Peintures sèches à base de ciment,Abstract Material,General,t,6546.76,6546.76,6546.76,6546.76,1,EUR,504.1,0.08,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE DES FAÇADES À PARTIR D'ÉCHELLES OU DE PLATEAUX MEPU-TO-KAME-KATO,Apprêt,Abstract Material,General,t,1.66,1.66,1.66,1.66,1,EUR,0.03,0.015,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'EAU À L'INTÉRIEUR DES LOCAUX MEPU-SA-KANE-KATO_KAKAKASA,Pâte à craie,Material,General,t,385.88,385.88,385.88,385.88,1,EUR,9.94,0.025,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'EAU À L'INTÉRIEUR DES LOCAUX MEME-RI-MEME-KATO,"Contreplaqué recouvert de papier décoratif opaque, marque DF-2, épaisseur 4 mm",Abstract Material,General,m2,142.94,142.94,142.94,142.94,1,EUR,15008.88,105.0,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX MEPU-PU-KATO-MEME_KAKAKAME,Vernis NC-221,Material,General,t,6554.91,6554.91,6554.91,6554.91,1,EUR,190.09,0.05,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX MEPU-PU-KARI-KAPU_KARIRIRI,"Peinture à l'huile MA-15N, blanc de zinc",Material,General,t,2964.73,2964.73,2964.73,2964.73,1,EUR,43.73,0.02,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX KAVO-ME-KARI-MELI_KAKATOLI,"Treillis métallique simple en fil galvanisé à mailles carrées, diamètre du fil 1,8 mm, taille des mailles 50 x 50 mm",Material,General,m2,2.75,2.75,2.75,2.75,1,EUR,81.45,29.58,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","Poutres, traverses, lisses" KAME-LI-MENE-KAPU_KAKAMEPU,"Panneau de coffrage linéaire, à petits panneaux, combiné, démontable et repositionnable, inventaire, pour le coffrage des murs, en profilés de coffrage en acier de 2 mm d'épaisseur, de profilés de traverses d'une épaisseur de 1,5 mm, avec un plateau en contreplaqué laminé résistant à l'humidité d'une épaisseur de 18 mm, dimensions 1200 x 500 mm",Material,General,m2,221.14,221.14,221.14,221.14,1,EUR,10561.63,47.76,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS PRINCIPAUX DES CENTRALES THERMIQUES,Installation de silos KAME-LI-MESA-MEPU_KATOKARI,"Vis autotaraudeuses en acier à tête demi-ronde et fente en croix, pointues, diamètre 3,5 mm, longueur 35 mm",Material,General,100 pièces,2.86,2.86,2.86,2.86,1,EUR,13.34,4.6575,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de plinthes en polychlorure de vinyle MEDX-TO-KAME-MEME,Clapets coupe-feu,Abstract Material,General,pièce,282.7,282.7,282.7,282.7,1,EUR,282.7,1.0,4,4,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations DXME-RIME-RIRI_LIKARI,Marteaux hydrauliques,Equipment,General,Heures machine,1.03,1.03,1.03,1.03,1,EUR,2.73,2.635,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p KAME-LI-MESA-KAME_MEMENEDX,"Ancrage au sol à enfoncer, à ouverture automatique, galvanisé, charge maximale admissible d'au moins 45 kN",Material,General,pièce,137.77,137.77,137.77,137.77,1,EUR,137.77,1.0,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p DXME-RIME-RIKA_KAKAME,"Électricité : consommation 1,13 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.15,0.15,0.15,0.15,1,EUR,0.54,3.755,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage DXME-RIME-RIKA_KAKAME,"Installations électriques de forage au diamant dans le béton armé, diamètre de forage jusqu'à 400 mm",Equipment,General,Heures machine,1.97,1.97,1.97,1.97,1,EUR,7.38,3.755,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Construction d'un mur de soutènement en béton armé monolithique dans un coffrage DXME-KAVO-KAPU_KAKAME,"Électricité : consommation 37,95 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.87,4.87,4.87,4.87,1,EUR,0.45,0.0925,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation du bitume et de l'émulsion bitumineuse DXME-KAVO-KAPU_KAKAME,"Installations bitumineuses avec 4 chaudières bitumineuses de 50 m3, réservoir de stockage de bitume de 1000 m3 et chauffage au gaz du caloporteur huileux",Equipment,General,Heures machine,141.34,141.34,141.34,141.34,1,EUR,13.08,0.0925,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation du bitume et de l'émulsion bitumineuse DXME-RIKA-MERI_KASAPU,"Dragues à godets multiples, capacité du godet 0,4 m3",Equipment,General,Heures machine,1060.15,1060.15,1060.15,1060.15,1,EUR,5915.66,5.58,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS RITO-VO-KATO-MEME_KARISASA,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,0 MPa, diamètre nominal 250 mm",Material,General,pièce,75.75,75.75,75.75,75.75,1,EUR,833.26,11.0,4,4,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de diaphragmes de chambre, DXME-KAME-KASA_MERIDX,Électricité : consommation 1056 kWh/machine-heure,Electricity,Electricity,Heures machine,135.63,135.63,135.63,135.63,1,EUR,299.07,2.205,4,4,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE MEKA-TO-KAME-KAME_KAKANETO,"Bandes en bronze de marque BrOF6,5-0,15, rigides, précision normale, largeur 51-300 mm, épaisseur 0,3, 0,35 mm",Material,General,t,41723.32,41723.32,41723.32,41723.32,1,EUR,16689.33,0.4,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX MEME-RI-KADX-KALI_KAKAKARI,"Panneaux de particules de bois de groupe A, ordinaires, poncés, laminés des deux côtés, unicolores, lisses, catégorie I, épaisseur 19 mm",Material,General,m2,37.69,37.69,37.69,37.69,1,EUR,3957.47,105.0,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX MEPU-PU-KAPU-KAPU_KAKAKATO,Émail organosilicié thermorésistant KO-174,Material,General,t,8268.01,8268.01,8268.01,8268.01,1,EUR,653.17,0.08,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE DES FAÇADES À PARTIR D'ÉCHELLES OU DE PLATEAUX RIPU-TO-KATO-KAME_KAMEMERI,"Tube thermorétractable en polyéthylène, épaisseur de paroi 1-1,5 mm, longueur du tube 240-270 mm, diamètre intérieur 18-38 mm",Material,Pipes & Fittings,m,7.99,7.99,7.99,7.99,1,EUR,19.97,2.5,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE",DISPOSITIFS D'ALIMENTATION ÉLECTRIQUE ET CÂBLÉS RITO-VO-KATO-MEME_KARISAME,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,0 MPa, diamètre nominal 100 mm",Material,General,pièce,20.54,20.54,20.54,20.54,1,EUR,41.07,2.0,4,4,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de régulateurs de pression de gaz, KAPU-TO-KARI-KAME,Mélanges secs à base de ciment,Abstract Material,General,t,738.84,738.84,738.84,738.84,1,EUR,477.3,0.645,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes DXME-RIKA-MERI_KASATO,"Dragues à godets multiples, capacité du godet 0,3 m3",Equipment,General,Heures machine,636.0,636.0,636.0,636.0,1,EUR,4285.02,6.7375,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KANEKA,"Dragues à godets multiples, capacité du godet 0,175 m3",Equipment,General,Heures machine,320.79,320.79,320.79,320.79,1,EUR,3215.07,10.0225,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS KAVO-TO-KAVO-KARI_MEKASARI,"Cornière en acier laminé à chaud à ailes égales, nuances d'acier St3sp, St3ps, largeur des ailes 110-125 mm, épaisseur des ailes 7-16 mm",Material,General,t,1324.23,1324.23,1324.23,1324.23,1,EUR,3164.91,2.39,4,4,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" RITO-VO-KASA-MERI_KAMERIME,"Té oblique à 60° en fonte malléable, diamètre nominal 50 x 50 mm",Material,General,pièce,15.15,15.15,15.15,15.15,1,EUR,15.15,1.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RITO-VO-KAPU-METO_KAKAKAPU,"Coude fileté à passage égal, diamètre nominal 40 mm",Material,General,pièce,210.52,210.52,210.52,210.52,1,EUR,684.18,3.25,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RIKA-RI-KAVO-KAME_KAKAKARI,"Rails DIN métalliques, galvanisés, dimensions 7,5 x 35 x 300 mm",Material,General,100 pièces,149.75,149.75,149.75,149.75,1,EUR,2.62,0.0175,4,4,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","SALLE DE CONTRÔLE, CENTRALISATION ÉLECTRIQUE ET AUTO-BLOCAGE" KADX-TO-KARI-KAME,Main courante en PVC pour la finition intérieure des murs avec base en aluminium,Abstract Material,General,m,177.45,177.45,177.45,177.45,1,EUR,17922.41,101.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation d'un système de protection des murs et des angles (butoirs) DXME-KASA-KAPU_KATOPU,"Électricité : consommation 12,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.61,1.61,1.61,1.61,1,EUR,12.67,7.89,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie charbonnière et tourbière,ÉQUIPEMENT MINIER,ÉQUIPEMENT POUR LE TRANSPORT SOUTERRAIN DXME-KASA-KAPU_KATOPU,"Grues pour dépôt de locomotives électriques, capacité de charge 7 t",Equipment,General,Heures machine,18.56,18.56,18.56,18.56,1,EUR,146.42,7.89,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie charbonnière et tourbière,ÉQUIPEMENT MINIER,ÉQUIPEMENT POUR LE TRANSPORT SOUTERRAIN MEME-RI-MEME-KAME_KAKAKAME,Plastique stratifié avec face décorative,Material,General,1000 m2,13626.48,13626.48,13626.48,13626.48,1,EUR,1403.53,0.1,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX RITO-VO-KAPU-MERI_KAMERITO,"Té sans soudure à passage droit, pression nominale jusqu'à 16 MPa, diamètre nominal 100 mm, diamètre extérieur et épaisseur de paroi 108 x 6,0 mm",Material,General,pièce,36.5,36.5,36.5,36.5,1,EUR,17.34,0.475,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RIKA-RI-MEKA-KATO_KAKARIRI,Embouts de câbles en cuivre P 10-6,Material,General,100 pièces,96.28,96.28,96.28,96.28,1,EUR,843.38,8.76,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",TRANSMETTEURS D'UNE PUISSANCE JUSQU'À 2000 kW KAME-PU-KAME-MEKA_KAKARISA,"Tarière sans passage, longueur 2000 mm, diamètre 200 mm",Material,General,pièce,576.35,576.35,576.35,576.35,1,EUR,118.15,0.205,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS RITO-VO-KATO-MEME_KARIDXME,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 2,5 MPa, diamètre nominal 100 mm",Material,General,pièce,36.89,36.89,36.89,36.89,1,EUR,73.78,2.0,4,4,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, KAVO-ME-KASA-KANE,"Tête pour système de nettoyage, rinçage, désinfection et extinction d'incendie",Abstract Material,General,pièce,1040.61,728.65,1144.6,1144.6,2,EUR,1005.95,1.0,4,3,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ RITO-TO-MEME-KAME,Puits thermométriques avec enveloppe de protection,Abstract Material,General,pièce,854.06,854.06,854.06,854.06,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS MENE-RI-KATO-KARI_KAKATOTO,Paille en vrac,Material,General,m3,54.87,54.87,54.87,54.87,1,EUR,44.45,0.81,4,4,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"PRÉPARATION DES ARBRES ET ARBUSTES, DE LA TERRE VÉGÉTALE, DU COMPOST ET DU GAZON" DXME-RIKA-MEKA_KAKALI,"Plates-formes flottantes auto-élévatrices démontables, capacité de charge 250 t",Equipment,General,Heures machine,1208.34,1208.34,1208.34,1208.34,1,EUR,1903.14,1.575,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-RIKA-MERI_KANEME,"Dragues à godets multiples, capacité du godet 1 m3",Equipment,General,Heures machine,3394.51,3394.51,3394.51,3394.51,1,EUR,11906.24,3.5075,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KASADX,"Dragues à godets multiples, capacité du godet 0,9 m3",Equipment,General,Heures machine,2926.81,2926.81,2926.81,2926.81,1,EUR,10719.43,3.6625,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-MEVO-KATO_SAKAPU,"Compresseurs électriques portables, pression jusqu'à 20 kPa, débit jusqu'à 12 m3/h",Equipment,General,Heures machine,0.13,0.13,0.13,0.13,1,EUR,3.19,25.1425,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Application de revêtements protecteurs multicomposants MEPU-ME-KASA-KAME_MEKAKAKA,Colle de montage (clous liquides),Material,General,kg,19.5,19.5,19.5,19.5,1,EUR,102.24,5.2425,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation d'un système de protection des murs et des angles (butoirs) KADX-TO-KAME-KAME,Main courante-pare-chocs en PVC pour la finition intérieure des murs avec base en aluminium,Abstract Material,General,m,294.24,294.24,294.24,294.24,1,EUR,29718.21,101.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation d'un système de protection des murs et des angles (butoirs) KASA-ME-KAPU-MEME,Panneaux de murs extérieurs ordinaires en béton armé,Abstract Material,General,pièce,130.64,130.64,130.64,130.64,1,EUR,13064.05,100.0,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS ET PANNEAUX DE MURS INTÉRIEURS ET EXTÉRIEURS, DIAPHRAGMES DE RIGIDITÉ, CLO" KASA-ME-KASA-KARI,Blocs de fondation en béton armé pour appareillages de distribution extérieurs,Abstract Material,General,pièce,589.38,589.38,589.38,589.38,1,EUR,39566.87,67.1333,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,CONSTRUCTIONS DES SOUS-STATIONS DE TRACTION DXME-RIKA-MERI_KASAVO,"Dragues à godets multiples, capacité du godet 0,8 m3",Equipment,General,Heures machine,2454.25,2454.25,2454.25,2454.25,1,EUR,9455.0,3.8525,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS DXME-RIKA-MERI_KASALI,"Dragues à godets multiples, capacité du godet 0,7 m3",Equipment,General,Heures machine,1981.7,1981.7,1981.7,1981.7,1,EUR,8124.98,4.1,4,4,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINISATION À L'AIDE DE DÉFLAGRATEURS KASA-ME-KALI-RIPU,Plaques de soubassement,Abstract Material,General,pièce,35.34,32.81,37.86,35.34,2,EUR,3566.32,101.0,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","DALLES DE LOGGIAS, BALCONS, AUVENTS, PARAPETS, MURS, BARRIÈRES ET PETITES CONSTR" RISA-ME-KAME-KAME_KAKAMEME,"Traverse en bois imprégnée d'antiseptique, type T-6, section 100 x 120 mm",Material,General,m3,1130.2,1130.2,1130.2,1130.2,1,EUR,50.86,0.045,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR DXME-KALI-KAVO_SAMEPU,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.29,4.56,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Protection des surfaces en béton armé des regards d'égout à l'aide de composés p DXME-KALI-KAVO_SAMEPU,"Mélangeurs de mortier mobiles cycliques, capacité du réservoir 80 l",Equipment,General,Heures machine,0.33,0.33,0.33,0.33,1,EUR,1.51,4.56,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Protection des surfaces en béton armé des regards d'égout à l'aide de composés p MEPU-RI-KANE-KAVO_KAKAMETO,"Additif liquide à base de polymèresilicate pour mélange minéral silicaté à deux composants, composant B",Material,General,kg,5.86,5.86,5.86,5.86,1,EUR,245.97,41.965,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Protection des surfaces en béton armé des regards d'égout à l'aide de composés p KAME-LI-MESA-MEPU_KAMEDXME,"Vis autotaraudeuses en acier à tête hexagonale, pointe de perçage, diamètre 6 mm, longueur 20 mm",Material,General,t,4371.9,4371.9,4371.9,4371.9,1,EUR,7.87,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Revêtement en polycarbonate de structures métalliques RIKA-ME-KARI-KANE_KAKARIRI,Pâte à souder PMKN-40,Material,General,kg,181.72,181.72,181.72,181.72,1,EUR,2.23,0.0125,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RITO-VO-KATO-KANE_KAKAKATO,"Raccord en acier avec manchon et contre-écrou, diamètre nominal 20 mm",Material,General,pièce,2.39,2.39,2.39,2.39,1,EUR,61.52,25.75,4,4,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de chauffe-eau, MEPU-RI-KANE-KAVO_KAKAMERI,Mélanges secs anticorrosion contre les acides (à l'exception de l'acide fluorhydrique) à base de polymère silicate pour mélange minéral silicaté à deux composants,Material,Chemicals,kg,10.17,10.17,10.17,10.17,1,EUR,3500.88,344.165,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Protection des surfaces en béton armé des regards d'égout à l'aide de composés p MEVO-ME-MEKA-METO_KAKAKATO,"Robinet à passage direct en laiton 11B1bk, raccordement à la canalisation par manchon, pression nominale 0,6 MPa, diamètre nominal 15 mm",Material,General,pièce,4.54,4.54,4.54,4.54,1,EUR,4.54,1.0,4,4,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de cuisinières à gaz, MEME-RI-MEME-KAPU_KAKARINE,"Contreplaqué avec couches extérieures en placage de bouleau, marque FK, classe II/II, poncé, épaisseur 9-10 mm",Material,General,m3,833.59,833.59,833.59,833.59,1,EUR,185.68,0.2967,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,PASSERELLES ET PONTS PIÉTONS PRÉFABRIQUÉS EN BÉTON ARMÉ,PASSERELLES POUR LA CIRCULATION AUTOMOBILE EN BÉTON ARMÉ PRÉFABRIQUÉ AU-DESSUS D KAME-SA-KATO-MEKA_KAKAKARI,"Revêtement routier mobile (MDP) en polyéthylène/polypropylène à haute densité moléculaire pour sols meubles, épaisseur 40 mm",Material,General,m2,317.96,317.96,317.96,317.96,1,EUR,31796.13,100.0,4,4,TRAVAUX DE CONSTRUCTION,Routes automobiles,"ROUTES, GUIDES DE ROULEMENT, PASSERELLES, PASSERELLES ET PASSAGES À GUÉ SUR LES ",Installation de revêtements modulaires en dalles polymères RISA-ME-KASA-KAPU,Fouet à rails,Abstract Material,General,t,3913.33,3913.33,3913.33,3913.33,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RIPU-RI-KANE-KASA_KAKAKATO,"Bouchon pneumatique en caoutchouc, diamètre extérieur nominal jusqu'à 900 mm",Material,General,pièce,2841.44,2841.44,2841.44,2841.44,1,EUR,326.77,0.12,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Montage et démontage d'un bouchon pneumatique en caoutchouc RIME-RI-KATO-KARI_MEKALIRI,"Fil de montage MGSHV 1x0,35-1000",Material,General,1000 m,386.6,386.6,386.6,386.6,1,EUR,17.59,0.06,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",NOEUDS DE RADIOTRANSMISSION MEME-RI-MEKA-KARI,Panneaux de parquet,Abstract Material,General,m2,266.95,266.95,266.95,266.95,1,EUR,23658.19,88.625,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en panneaux de parquet, en lattes de bois et en panneaux de " RITO-VO-KAPU-KANE_KAMEMELI,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 400 mm, diamètre extérieur 426 mm, épaisseur de paroi 9 mm",Material,General,pièce,519.53,519.53,519.53,519.53,1,EUR,5325.18,10.25,4,4,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en eau à partir de tuyaux en ac DXME-MEME-KARI_KAPUME,"Installations pour le forage horizontal du sol sur la base d'un véhicule d'une capacité de charge allant jusqu'à 3 tonnes, force de traction 30 tonnes",Equipment,General,Heures machine,9.92,9.92,9.92,9.92,1,EUR,35.04,3.5325,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,PASSAGES SOUTERRAINS CACHÉS MEPU-RI-KATO-KALI,Revêtement hydroisolant à base de ciment,Abstract Material,General,kg,24.33,24.33,24.33,24.33,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Imperméabilisation des surfaces en béton et en béton armé à l'aide de revêtement KASA-ME-KARI-KAME,Ancrages en béton armé,Abstract Material,General,m3,866.62,866.62,866.62,866.62,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT RISA-RI-KARI-KARI,Consoles isolées,Abstract Material,General,pièce,5739.27,5739.27,5739.27,5739.27,1,EUR,5739.27,1.0,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT KASA-ME-KALI-TOKA,Cages d'ascenseur,Abstract Material,General,pièce,947.86,947.86,947.86,947.86,1,EUR,94786.43,100.0,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" RIKA-RI-KARI-KALI_KAKAKAME,"Gouttière métallique, dimensions 48 x 1000 mm",Material,General,pièce,3.68,3.68,3.68,3.68,1,EUR,3.68,1.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RITO-SA-KARI-KARI_KAMEKADX,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 377 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,132.34,132.34,132.34,132.34,1,EUR,34299.16,259.1675,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-SA-KARI-KARI_KAKAPUNE,"Tubes en acier électrosoudés à joint droit en acier de marques St2, 10, diamètre extérieur 89 mm, épaisseur de paroi 2,8 mm",Material,Pipes & Fittings,m,9.21,9.21,9.21,9.21,1,EUR,0.68,0.07,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-RI-KADX-MEKA_KAKAMEME,"Manchon de protection pour câbles de communication, connecteur MS-25",Material,General,pièce,5.31,5.31,5.31,5.31,1,EUR,5.31,1.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIRI-RI-KARI-KANE_KAKAKAME,"Consoles en fonte pour puits de câbles et puits de communication, dimensions 109 x 60 x 65 mm",Material,General,100 pièces,569.68,569.68,569.68,569.68,1,EUR,121.06,0.2125,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE MEME-ME-KAME-KAPU,"Planches à rainure et languette de première qualité, épaisseur 60 mm",Abstract Material,General,m3,1121.11,1121.11,1121.11,1121.11,1,EUR,15331.19,13.675,4,4,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,ENCLOISEMENT DES PLANCHES (POSE) DXME-MEDX-KANE_KAKASA,"Pompes à boue submersibles, débit 50 m3/h, pression jusqu'à 50 m",Equipment,General,Heures machine,1.38,1.38,1.38,1.38,1,EUR,11.77,8.5275,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse DXME-MERI-KAME_KAKATO,Herses débroussailleuses (sans tracteur),Equipment,General,Heures machine,1.86,1.86,1.86,1.86,1,EUR,1.41,0.7525,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-KASA-KANE_KATOKA,"Grues sur chenilles, capacité de charge 400 t",Equipment,General,Heures machine,706.25,706.25,706.25,706.25,1,EUR,12724.94,18.0175,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ RITO-VO-KAPU-KANE_KAMEMEKA,"Dérivation à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 300 mm, diamètre extérieur 325 mm, épaisseur de paroi 12 mm",Material,General,pièce,355.77,355.77,355.77,355.77,1,EUR,355.77,1.0,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS MEME-ME-KARI-KAPU_KAKASALI,"Poteau simple en bois imprégné, longueur 6,5-13 m, diamètre au sommet 24 cm",Material,General,m3,1001.07,1001.07,1001.07,1001.07,1,EUR,58.56,0.06,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE TÉLÉCOMMUNICATIONS ET DE RADIO RIRI-RI-KARI-RITO_KAMENEME,Nœud de fixation de talus U-1,Material,General,pièce,52.29,52.29,52.29,52.29,1,EUR,130.72,2.5,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE TÉLÉCOMMUNICATIONS ET DE RADIO RIRI-RI-KARI-RIKA_KAKAKAME,"Collier de fixation pour traverses, peint",Material,General,pièce,6.4,6.4,6.4,6.4,1,EUR,71.99,11.25,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO RIRI-RI-KARI-MEVO_KAKAKAPU,"Traverse à un tenon imprégnée, équipée, longueur 1250+550 mm (poutre en pin de section 100x80 mm, imprégnée d'antiseptique, équipée d'un tenon et d'un collier)",Material,General,pièce,22.18,22.18,22.18,22.18,1,EUR,116.45,5.25,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO RIRI-RI-KARI-KAVO_MEKAKADX,"Support en acier pour l'installation de câbles optiques et de jonctions dans des puits de câbles, livré avec deux consoles et deux boulons, longueur 1250 mm",Material,General,compl,53.11,53.11,53.11,53.11,1,EUR,53.11,1.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE RIRI-RI-KARI-RIKA_MEKARIKA,"Collier en acier pour la fixation du capot de protection des raccords optiques, des dispositifs de suspension des raccords, des supports pour l'installation des raccords, des cadres pour l'enroulement des réserves de câbles optiques suspendus au poteau d'un diamètre de 150 à 400 mm, longueur jusqu'à 1004 mm",Material,General,compl,21.92,21.92,21.92,21.92,1,EUR,43.85,2.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE RIRI-RI-KARI-KAVO_MEKAMERI,"Dispositif en acier pour l'installation de raccords optiques et le stockage de câbles optiques sur des supports, avec traverses, dimensions 900 x 800 x 130 mm",Material,General,compl,76.05,76.05,76.05,76.05,1,EUR,76.05,1.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE KAME-LI-MELI-MERI_KAKAKAPU,"Brosse à disque en fil d'acier pour meuleuse d'angle, diamètre 175 mm",Material,General,pièce,11.99,11.99,11.99,11.99,1,EUR,28.79,2.4,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,PEINTURE DES STRUCTURES DE PASSAGE KARI-RI-KATO-KAME_KAKAKANE,"Pierre concassée M 300, taille de 150 à 500 mm",Material,General,m3,59.2,59.2,59.2,59.2,1,EUR,653.01,11.03,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,DRAINAGE DERRIÈRE LES APPUIS DES PONTS DXME-MESA-KATO_KAMETO,"Tracteurs à roues pneumatiques, puissance 40 kW (55 ch)",Equipment,General,Heures machine,11.61,11.61,11.61,11.61,1,EUR,29.9,2.575,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS RISA-ME-KAME-KASA_KAKARITO,"Traverse en bois résineux imprégné pour voies ferrées à écartement étroit, type III, longueur 1200 mm",Material,General,pièce,20.3,20.3,20.3,20.3,1,EUR,5.84,0.29,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,MURS DE SOUTÈNEMENT KAME-LI-MESA-KATO_KAKATONE,"Boulons en acier galvanisé à tête hexagonale et écrou hexagonal galvanisé, diamètre du filetage du boulon et de l'écrou M24, longueur du boulon 50-240 mm",Material,General,kg,5.2,5.2,5.2,5.2,1,EUR,13.5,2.5925,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction de la dalle de fondation des bâtiments et structures des centrales KAVO-ME-KARI-MELI_KAKATORI,"Grille métallique simple tissée en fil de fer non revêtu à mailles losangées, diamètre du fil 1,2 mm, taille des mailles 15 x 15 mm",Material,General,m2,3.59,3.59,3.59,3.59,1,EUR,40.0,11.15,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Dispositif des planchers des bâtiments et des structures des centrales nucléaire DXME-MEDX-KANE_KAKASA,"Électricité : consommation 4,29 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.55,0.55,0.55,0.55,1,EUR,4.7,8.5275,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Aménagement de tranchées sous une solution argileuse KAME-LI-KANE-MEPU_KAKATOPU,"Cordons en PVC pour le soudage à chaud du linoléum, diamètre 4 mm",Material,General,100 m,171.13,171.13,171.13,171.13,1,EUR,116.37,0.68,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en linoléum MERI-ME-KAME-KATO_KAKATOTO,"Film d'étanchéité à diffusion, résistance maximale à la traction 165/140 N/50 mm",Material,General,m2,2.45,2.45,2.45,2.45,1,EUR,7.23,2.95,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy RIRI-ME-KAME-KAME_KAKATORI,"Boîtier de câbles, type BM2-2",Material,General,pièce,241.74,241.74,241.74,241.74,1,EUR,302.18,1.25,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIRI-ME-KAME-KAME_KAKATOME,"Boîtier de câbles, type BM1-2",Material,General,pièce,238.83,238.83,238.83,238.83,1,EUR,238.83,1.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES KAME-TO-KAME-KAME_MEKAMEPU,Essence-solvant pétrolier Nepras-S 50/170,Material,General,t,3425.8,3425.8,3425.8,3425.8,1,EUR,19.47,0.01,4,4,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Imperméabilisation des murs et des fondations DXME-KASA-KADX_KAMESA,"Grues sur châssis spécial de type automobile, capacité de charge 90 t",Equipment,General,Heures machine,219.37,219.37,219.37,219.37,1,EUR,3771.45,17.1925,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage de colonnes inclinées préfabriquées en béton armé pour la colonnade du r KALI-RI-KATO-KAME,Liaisons horizontales à partir d'ébauches d'armature,Abstract Material,General,t,6493.91,6493.91,6493.91,6493.91,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation de blocs préfabriqués en béton armé pour les murs et les dalles de MEPU-SA-MEKA-KAME_KAKAKAME,Séchatif à base d'acide gras,Material,Chemicals,t,8056.16,8056.16,8056.16,8056.16,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE DE VOIES SUR LES PONTS MEVO-RI-KATO-KARI,Rideaux de douche,Abstract Material,General,compl,564.76,564.76,564.76,564.76,1,EUR,5647.57,10.0,4,4,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" KAME-LI-MEDX-KADX_KAKARITO,"Tuyau en caoutchouc et tissu pour une pression d'eau de 1 MPa (10 kgf/cm2), diamètre intérieur 25 mm",Material,General,m,9.21,9.21,9.21,9.21,1,EUR,26.7,2.9,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Essai et désinfection des réservoirs KAME-TO-KASA-TOVO_KATOPUME,Solution sulfurique,Material,General,kg,0.52,0.52,0.52,0.52,1,EUR,132.94,255.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements pour les entreprises de métallurgie noire,ÉQUIPEMENT POUR LA PRODUCTION DE TUBES,Machines centrifuges RITO-VO-KAPU-KANE_KAKADXPU,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 200 mm, diamètre extérieur 219 mm, épaisseur de paroi 6 mm",Material,General,pièce,76.86,76.86,76.86,76.86,1,EUR,576.43,7.5,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net RITO-TO-KATO-KARI_KAMERIME,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 146 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,51.98,51.98,51.98,51.98,1,EUR,8.32,0.16,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS RITO-TO-KATO-KARI_KAMEKAPU,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 127 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,44.95,44.95,44.95,44.95,1,EUR,7.19,0.16,4,4,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS KASA-ME-KALI-MELI,Panneaux pour balcons,Abstract Material,General,pièce,466.12,466.12,466.12,466.12,1,EUR,46611.52,100.0,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","DALLES DE LOGGIAS, BALCONS, AUVENTS, PARAPETS, MURS, BARRIÈRES ET PETITES CONSTR" RIKA-RI-MEKA-KATO_KAKAKASA,"Embouts de câbles en cuivre, section du conducteur 35 mm2, diamètre de l'ouverture 10 mm",Material,General,100 pièces,103.55,103.55,103.55,103.55,1,EUR,1.56,0.015,4,4,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Installation d'un poste de contrôle et de mesure (PCM) RIRI-RI-KARI-KADX_KAKARIRI,Crochets pour la fixation des isolateurs KN-16,Material,General,t,4857.32,4857.32,4857.32,4857.32,1,EUR,49.18,0.01,4,4,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,SUSPENSION DE CÂBLES SUR LES LIGNES DE COMMUNICATION ET DE RADIO MEVO-RI-KANE-MEKA,Échelles,Abstract Material,General,compl,110.55,110.55,110.55,110.55,1,EUR,6080.51,55.0,4,4,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" MEPU-RI-KATO-KALI_KAKAKAME,"Matériau monocomposant à base de caoutchouc et de résine, hydrofuge, anticorrosion, de type séchant, pour les ouvrages de transport et de génie civil",Material,General,kg,24.33,24.33,24.33,24.33,1,EUR,162.51,6.68,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CANALISATIONS D'ÉVACUATION D'EAU SUR DES FONDATIONS PRÊTES (BASES) ET CANIVEAUX ,TUBES D'ÉVACUATION DES EAUX EN MÉTAL ONDULÉ KAME-LI-MESA-MEPU_MEKASAPU,"Vis autotaraudeuses en acier oxydé à tête fraisée et empreinte cruciforme, pointe de forage, diamètre 4,2 mm, longueur 60 mm",Material,General,100 pièces,7.25,7.25,7.25,7.25,1,EUR,16.02,2.21,4,4,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de trappes sanitaires (d'inspection), d'écrans sous baignoire" KALI-TO-KARI-MERI,Tuyaux métalliques ondulés pour routes,Abstract Material,General,m,577.96,577.96,577.96,577.96,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CANALISATIONS D'ÉVACUATION D'EAU SUR DES FONDATIONS PRÊTES (BASES) ET CANIVEAUX ,TUBES D'ÉVACUATION DES EAUX EN MÉTAL ONDULÉ KAME-RI-KATO-KATO_KAMEMERI,Mastic bitumineux antibruit et anticorrosion,Material,General,t,1948.1,1948.1,1948.1,1948.1,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE DE VOIES SUR LES PONTS KAPU-TO-KARI-MEVO,Colles pour travaux de revêtement (mélange sec),Abstract Material,General,t,525.88,525.88,525.88,525.88,1,EUR,202.73,0.385,4,4,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mortier de ciment à partir de carreaux MEVO-ME-MEKA-KAVO_KAKAKAME,"Robinet d'eau en laiton, mural, poli, pour lavabos et éviers, diamètre 15 mm",Material,General,pièce,8.81,8.81,8.81,8.81,1,EUR,8.81,1.0,4,4,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation de compteurs d'eau avec fabrication de la tuyauterie sur le lieu de RIPU-TO-KATO-KAVO,Tuyaux en polyéthylène réticulé,Abstract Material,General,m,11.15,11.15,11.15,11.15,1,EUR,1142.45,102.5,4,4,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de conduites d'alimentation en eau et de chauffage à partir de tuyaux en po DXME-MERI-KALI_KAMEME,"Installations pour l'ensemencement hydraulique d'herbes vivaces sur un véhicule d'une capacité de charge maximale de 2 tonnes, volume de la cuve 1300 l",Equipment,General,Heures machine,16.12,16.12,16.12,16.12,1,EUR,13.1,0.8125,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-TO-KAME-KANE_KAKARIVO,Lubrifiant sous vide pour l'étanchéité des joints mobiles des installations sous vide en verre et en métal,Material,General,kg,148.81,148.81,148.81,148.81,1,EUR,0.32,0.0,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) KAME-TO-KAME-KANE_KAKATONE,Lubrifiant liquide (huile synthétique) pour réducteurs fonctionnant dans une plage de températures de -30 °C à +150 °C,Material,General,kg,95.71,95.71,95.71,95.71,1,EUR,147.4,1.54,4,4,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) MEVO-SA-KAVO-MEME_KAKAKARI,Plaque de montage simple,Material,General,pièce,2.81,2.81,2.81,2.81,1,EUR,11.22,4.0,4,4,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES MULTICOUCHES MÉTAL-POLYMÈRE,Pose de conduites d'alimentation en eau à partir de tuyaux métalliques-polymères MEVO-SA-KAVO-MEME_KAKAKAME,Plaque de montage double,Material,General,pièce,9.44,9.44,9.44,9.44,1,EUR,132.19,14.0,4,4,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES MULTICOUCHES MÉTAL-POLYMÈRE,Pose de conduites d'alimentation en eau à partir de tuyaux métalliques-polymères DXME-KADX-MERI_SARIRI,"Électricité : consommation 1,06 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.14,0.14,0.14,0.14,1,EUR,0.27,1.945,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX DXME-KADX-MERI_SARIRI,"Complexes mobiles mécanisés préfabriqués sectionnels pour le déplacement d'équipements lors de la mise en place de pieux forés injectés à l'aide de la technologie à impulsions, à deux plates-formes, avec deux treuils d'une force de traction de 3,2 t, capacité de charge 50 t",Equipment,General,Heures machine,42.01,42.01,42.01,42.01,1,EUR,81.71,1.945,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX DXME-KANE-KANE_KASAKA,"Ascenseurs de chantier pour le transport de marchandises et de personnes, capacité de charge 100 t, hauteur de levage 105 m",Equipment,General,Heures machine,55.53,55.53,55.53,55.53,1,EUR,7721.39,139.0525,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Installation et démontage du coffrage glissant des tours de puits RIPU-TO-KAME-KANE,Tuyaux de drainage,Abstract Material,General,m,1.3,1.3,1.3,1.3,1,EUR,134.76,104.0,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE RÉSEAUX THERMIQUES,Aménagement d'un drainage unilatéral concomitant des canaux infranchissables KALI-RI-KALI-METO_KARIKAME,"Tige filetée en acier, diamètre 15-17 mm, livrée avec écrou en acier galvanisé, diamètre 90 mm",Material,General,pièce,25.01,25.01,25.01,25.01,1,EUR,40.02,1.6,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX DXME-MEKA-KAPU_KASADX,"Tambours d'inversion pour la réhabilitation de tuyaux d'un diamètre jusqu'à 250 mm, pression jusqu'à 0,9 bar",Equipment,General,Heures machine,2.96,2.96,2.96,2.96,1,EUR,50.5,17.0725,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des systèmes d'évacuation des eaux usées internes à l'aide de manch KAME-LI-MELI-KADX_MERIRILI,"Foret guide en acier, acier de marque 40Kh, diamètre 34 mm, longueur 230 mm",Material,General,pièce,1677.3,1677.3,1677.3,1677.3,1,EUR,385.77,0.23,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS RIPU-TO-KAPU-MEME_KAKATOKA,"Tuyau d'évacuation ondulé pour WC en polypropylène renforcé avec joint en caoutchouc, diamètre de sortie 110 mm, longueur 500 mm",Material,General,pièce,5.55,5.55,5.55,5.55,1,EUR,55.51,10.0,4,4,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" MEVO-SA-KAVO-MEDX_KAKAKASA,"Bille d'arrêt en caoutchouc, diamètre 250 mm",Material,General,pièce,213.25,213.25,213.25,213.25,1,EUR,3201.46,15.0125,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS RISA-ME-KAPU-KASA_KAKAKAME,"Écrous de boulons de voie pour la fixation des rails, diamètre M22",Material,General,t,5218.86,5218.86,5218.86,5218.86,1,EUR,10.44,0.0,4,4,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE DE VOIES SUR LES PONTS KAME-TO-KAPU-KAME_KAKAKANE,Huile hydraulique VMGZ,Material,General,kg,2.31,2.31,2.31,2.31,1,EUR,14.72,6.375,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-TO-KASA-RITO_KAMETOME,Chlorure de sodium technique,Material,General,t,245.45,245.45,245.45,245.45,1,EUR,12.27,0.05,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXCAVATION MANUELLE DU SOL KAME-LI-MELI-KAPU,Câbles diamantés,Abstract Material,General,m,325.69,109.53,974.19,109.53,2,EUR,109.53,1.0,4,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RIPU-TO-KATO-KARI,"Conduites d'égout en polyéthylène haute densité avec manchons, diamètre 50 mm",Abstract Material,General,m,20.95,20.95,20.95,20.95,1,EUR,2091.23,99.8,4,4,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de canalisations d'égouts à partir de tuyaux en polyéthylène haute densité MEVO-SA-KAVO-MEDX_KAKAKAPU,"Bille d'arrêt en caoutchouc, diamètre 200 mm",Material,General,pièce,180.89,180.89,180.89,180.89,1,EUR,2715.62,15.0125,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS RITO-VO-KAPU-MERI_KAKAMERI,"Raccord en T droit en fonte, diamètre 25 mm",Material,General,pièce,1.02,1.02,1.02,1.02,1,EUR,1.02,1.0,4,4,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation de compteurs d'eau avec fabrication de la tuyauterie sur le lieu de RITO-VO-KATO-MEME_KARISANE,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,0 MPa, diamètre nominal 300 mm",Material,General,pièce,101.57,101.57,101.57,101.57,1,EUR,355.51,3.5,4,4,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation de compteurs d'eau avec fabrication de la tuyauterie sur le lieu de MEVO-SA-KAVO-MEDX_KAKAKATO,"Bille d'arrêt en caoutchouc, diamètre 150 mm",Material,General,pièce,162.92,162.92,162.92,162.92,1,EUR,2525.2,15.5,4,4,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAVO-PU-KARI-KAME,Treillis d'armature,Abstract Material,General,t,57.3,57.3,57.3,57.3,1,EUR,15.45,0.27,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Grenaillage de la surface en béton KAME-SA-KATO-KAVO_KAKAMEME,"Film réfléchissant pour la route, type A, B",Material,General,m2,9.38,9.38,9.38,9.38,1,EUR,274.1,29.2125,4,4,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale MEPU-SA-KALI-KAME_KAKAMEPU,Poudre d'aluminium PP-2,Material,General,t,18141.7,18141.7,18141.7,18141.7,1,EUR,109.17,0.02,4,4,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Toiture en mastic bitume-polymère MEPU-SA-KADX-MEKA_KAMEKAME,Toluène pétrolier,Material,General,t,3686.68,3686.68,3686.68,3686.68,1,EUR,248.85,0.0675,4,4,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Toiture en mastic bitume-polymère DXME-MEDX-KANE_KAKATO,"Électricité : consommation 1,16 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.15,0.15,0.15,0.15,1,EUR,0.04,0.2475,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Essais hydrauliques sur une section de pipeline rénovée à l'aide d'un manchon fl DXME-MEDX-KANE_KAKATO,"Pompes submersibles pour boues, débit 25 m3/h, pression jusqu'à 20 m",Equipment,General,Heures machine,0.38,0.38,0.38,0.38,1,EUR,0.09,0.2475,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Essais hydrauliques sur une section de pipeline rénovée à l'aide d'un manchon fl KASA-ME-KAVO-KADX_KAKAKARI,"Coussins d'appui en béton armé, volume de 0,003 à 0,016 m3, béton B15, consommation d'armature de 100 à 150 kg/m3",Material,General,m3,1225.32,1225.32,1225.32,1225.32,1,EUR,91.9,0.08,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Remplacement de certaines sections de conduites de réseaux de chauffage à l'inté DXME-RIME-MESA_KARITO,"Scies pendulaires électriques pour la coupe de métaux laminés, diamètre de disque 350 mm",Equipment,General,Heures machine,0.39,0.39,0.39,0.39,1,EUR,1.69,4.32,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-MEKA-MEME_SARIPU,"Électricité : consommation 2,64 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.34,0.34,0.34,0.34,1,EUR,0.67,1.975,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Diagnostic interne des canalisations existantes d'un diamètre de 290 à 620 mm pa DXME-MEKA-MEME_SARIPU,"Complexes mobiles pour le diagnostic de la surface interne des conduites par résonance acoustique, diamètre des conduites 290-620 mm",Equipment,General,Heures machine,37.93,37.93,37.93,37.93,1,EUR,74.91,1.975,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Diagnostic interne des canalisations existantes d'un diamètre de 290 à 620 mm pa MEPU-SA-KADX-KASA_KAMEKATO,Nettoyant pour colle,Material,General,l,31.76,31.76,31.76,31.76,1,EUR,1.53,0.05,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS MEPU-PU-KAME-KAME_KAKAKASA,Apprêt GF-0119,Material,General,t,3377.69,3377.69,3377.69,3377.69,1,EUR,9.33,0.01,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques MEPU-RI-KAME-KAME_KAKAKAPU,Composition organosilicatée OS-51-03,Material,General,t,7297.83,7297.83,7297.83,7297.83,1,EUR,139.94,0.02,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces en béton et enduites MEPU-RI-KAME-KAME_KAKAKATO,Composition organosilicatée OS-12-03,Material,General,t,6275.71,6275.71,6275.71,6275.71,1,EUR,120.33,0.02,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces en béton et enduites MEPU-TO-KARI-KANE_KAKAKAVO,"Peinture polymère à base d'eau pour la protection des matériaux d'isolation thermique, température d'application de +7 à +30 °C, consommation 0,4 l/m2, couleur blanche, grise",Material,General,l,35.41,35.41,35.41,35.41,1,EUR,0.0,0.0,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAME-ME-KARI-KAVO_MEKAPUSA,"Paronite de marque PMB-1, épaisseur de 0,4 à 5 mm",Material,General,kg,9.18,9.18,9.18,9.18,1,EUR,901.53,98.25,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Réparation des chaudières de chauffage DXME-MEKA-KAPU_KAKAME,Machines de nettoyage à sections pour tuyaux d'un diamètre allant jusqu'à 250 mm,Equipment,General,Heures machine,1.49,1.49,1.49,1.49,1,EUR,1.43,0.96,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Nettoyage des tuyaux d'égouts internes d'un diamètre de 50 à 150 mm à l'aide d'u MEPU-PU-KAME-MEPU_KAKAKARI,"Apprêt phosphatant, marques VL-02, VL-023",Material,General,t,8993.5,8993.5,8993.5,8993.5,1,EUR,351.42,0.04,4,4,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques KARI-PU-KATO-KATO_KAKATOKA,"Granulats issus de la sidérurgie et de la métallurgie non ferreuse pour bétons M 600, fraction 5-10 mm",Material,General,m3,132.91,132.91,132.91,132.91,1,EUR,0.05,0.0,4,4,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de conduits de ventilation avec ouverture manuelle individuelle des MELI-PU-KASA-KAVO_KAKAKAPU,"Poudre de magnésite caustique, marque prefabricated modular-90",Material,General,t,1434.69,1434.69,1434.69,1434.69,1,EUR,340.74,0.2375,4,4,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Enduit d'étanchéité de la surface des chaudières MERI-RI-KATO-KAPU_KAKARIME,Broyage de diatomite,Material,General,t,673.05,673.05,673.05,673.05,1,EUR,107.27,0.1575,4,4,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Revêtement en briques de diatomite expansée MERI-RI-KATO-KAPU,Brique en diatomite expansée,Abstract Material,General,m3,386.16,386.16,386.16,386.16,1,EUR,373.29,0.9667,4,4,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Revêtement en briques de diatomite expansée DXME-MERI-KAVO_KATORI,Fraisage de fossés (sur tracteur),Equipment,General,Heures machine,49.66,49.66,49.66,49.66,1,EUR,1085.06,21.85,4,4,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D MEPU-SA-KAPU-KAVO_KAKAMENE,Mastic isolant thermique à base d'asbose,Material,General,m3,802.54,802.54,802.54,802.54,1,EUR,14.25,0.02,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAVO-TO-KATO-KAPU_KAKATOME,"Fil d'acier à faible teneur en carbone recuit, diamètre 0,8 mm",Material,General,t,2732.49,2732.49,2732.49,2732.49,1,EUR,36.89,0.02,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION RISA-ME-KATO-KAPU,Agrafes de serrage,Abstract Material,General,pièce,3.24,3.24,3.24,3.24,1,EUR,20838.45,6432.0,4,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MEVO-ME-MEME-KALI,Régulateurs de largeur de voie pour métro,Abstract Material,General,pièce,5.34,5.34,5.34,5.34,1,EUR,41159.74,7712.0,4,4,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MERI-RI-KASA-KAVO,Panneaux isolants à base de fibre de verre,Abstract Material,General,m3,110.21,110.21,110.21,110.21,1,EUR,1418.93,12.875,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,"ISOLATION DES SURFACES FROIDES DES CONSTRUCTIONS, DES CHAMBRES FRIGORIFIQUES À L" MERI-RI-KATO-KASA_KAKAKATO,Isocyanate système de composants liquides pour pulvérisation de mousse polyuréthane,Material,General,kg,7.15,7.15,7.15,7.15,1,EUR,610.97,85.44,4,4,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAVO-PU-KATO-KAME,Fil d'armature en acier B-II,Abstract Material,General,t,1343.6,1343.6,1343.6,1343.6,1,EUR,1370.47,1.02,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE DXME-KASA-KATO_KAKASA,"Grues à console, capacité de charge 130 t",Equipment,General,Heures machine,399.05,399.05,399.05,399.05,1,EUR,4923.3,12.3375,4,4,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE TRAVERSÉE EN BÉTON ARMÉ DE PONTS POUR UNE VOIE FERROVIAIRE MEVO-ME-KADX-KALI_KAMEVOSA,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 65 mm",Material,Pipes & Fittings,pièce,182.28,182.28,182.28,182.28,1,EUR,1640.51,9.0,4,4,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MERI-RI-KASA-KANE_KAKAKARI,"Panneaux isolants en polystyrène expansé, type T, PPS40",Material,General,m3,297.57,297.57,297.57,297.57,1,EUR,143.88,0.485,4,4,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS MEPU-RI-KANE-KALI_MEKAKAME,"Gel d'injection, monocomposant, élastique, hydroactif, polyuréthane, sans solvants, pour l'étanchéité et le colmatage des joints et des sols meubles",Material,General,kg,37.63,37.63,37.63,37.63,1,EUR,12222.89,324.7767,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Autres travaux de réparation et de construction,AUTRES TRAVAUX DE RÉNOVATION ET DE CONSTRUCTION,Étanchéification des joints de dilatation (thermiques) dans les structures en bé DXME-MEKA-KAPU_KARISA,"Machines d'enroulement pour l'enroulement de profilés en PVC-R de configuration complexe d'une largeur de 67 à 80 mm, renforcés d'acier, avec double verrouillage mécanique et joint d'étanchéité, dans un tuyau par enroulement hélicoïdal",Equipment,General,Heures machine,101.97,101.97,101.97,101.97,1,EUR,8331.3,81.7033,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Restauration des canalisations par la méthode d'enroulement spiralé avec un prof RIPU-TO-KATO-METO_KARIVONE,"Tuyaux en polyéthylène sous pression, à l'exception des gazoducs PE100, pour le transport de l'eau, rapport dimensionnel standard SDR21, diamètre extérieur nominal 50 mm, épaisseur de paroi 2,4 mm",Material,General,m,1.79,1.79,1.79,1.79,1,EUR,14.35,8.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Restauration des canalisations par la méthode d'enroulement spiralé avec un prof KAVO-ME-KAME-KARI,Matelas et gabions,Abstract Material,General,pièce,4297.33,4297.33,4297.33,4297.33,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE MELI-ME-KARI-KAPU,Plaques en laine de mullite-silice,Abstract Material,General,m3,1632.76,1632.76,1632.76,1632.76,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement de structures modulaires de fours avec du béton réfractaire et une is DXME-KALI-KALI_KASAME,"Installations pour la réception et l'alimentation en solutions rigides, débit jusqu'à 22,5 m3/h, capacité 2,5 m3",Equipment,General,Heures machine,2.4,2.4,2.4,2.4,1,EUR,3.78,1.5733,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Remplissage avec une masse de fond en charbon DXME-KALI-KALI_KASAME,"Électricité : consommation 3,47 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.45,0.45,0.45,0.45,1,EUR,0.7,1.5733,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Remplissage avec une masse de fond en charbon RINE-ME-KARI-KAPU_KAKAKAVO,"Joint en polyuréthane pour étrier d'isolateur de rail de contact, type PPS-2",Material,General,pièce,8.82,8.82,8.82,8.82,1,EUR,755.06,85.6333,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAVO-RI-KARI-KASA_KAKASASA,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 33,5 mm",Material,Steel & Metal,10 m,148.04,148.04,148.04,148.04,1,EUR,1475.46,9.9667,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE DXME-MELI-KARI_KALIRI,Appareils de recherche de défauts d'isolation à impulsions,Equipment,General,Heures machine,0.32,0.32,0.32,0.32,1,EUR,0.43,1.3233,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Autres travaux de réparation et de construction,AUTRES TRAVAUX DE RÉNOVATION ET DE CONSTRUCTION,Contrôle de la qualité de l'isolation à l'aide d'un appareil ANPI ou IPIT dans u MEPU-PU-KAPU-KADX_KAKARIVO,Émail KhV-7141,Material,General,t,7291.54,7291.54,7291.54,7291.54,1,EUR,61.98,0.015,3,3,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées DXME-RIKA-MERI_KALIRI,"Dragues à papillon non automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 350 kW",Equipment,General,Heures machine,112.82,112.82,112.82,112.82,1,EUR,106.84,0.9467,3,3,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-RIKA-MERI_KALITO,"Dragues à pieux et à papillon non automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 550 kW",Equipment,General,Heures machine,216.47,216.47,216.47,216.47,1,EUR,107.22,0.4967,3,3,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-RIKA-MERI_KALIPU,"Dragues à pieux et à papillon non automotrices avec broyeur à fraise, puissance d'entraînement de la fraise 750 kW",Equipment,General,Heures machine,256.34,256.34,256.34,256.34,1,EUR,79.3,0.31,3,3,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO DXME-RIKA-MERI_KALISA,"Dragues à pieux et à papillon non automotrices avec brise-sol à fraise, puissance d'entraînement de la fraise 900 kW",Equipment,General,Heures machine,297.44,297.44,297.44,297.44,1,EUR,88.44,0.3,3,3,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE PROFONDINAGE EN MILIEU MARIN,TRAVAUX DE PROFONDINATION À L'AIDE D'ENGINS DE TERRASSEMENT À PILES ET À PAPILLO MEVO-ME-KADX-KAME_KAKARILI,"Robinet à boisseau sphérique en acier à passage droit, diamètre nominal 100 mm",Material,General,pièce,236.47,236.47,236.47,236.47,1,EUR,11.82,0.05,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES RIKA-TO-KAPU-KARI,"Signaux, plaques",Abstract Material,General,pièce,83.43,83.43,83.43,83.43,1,EUR,83.43,1.0,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER DXME-KANE-KANE_KASAVO,"Ascenseurs de mine pour le revêtement de tuyaux industriels, hauteur 250 m",Equipment,General,Heures machine,152.47,152.47,152.47,152.47,1,EUR,685.62,4.4967,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Construction de tuyaux industriels monolithiques en béton armé DXME-KANE-KANE_KASADX,"Ascenseurs de mine pour le revêtement de tuyaux industriels, hauteur 330 m",Equipment,General,Heures machine,217.0,217.0,217.0,217.0,1,EUR,731.27,3.37,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Construction de tuyaux industriels monolithiques en béton armé MEDX-TO-KARI-KALI_KAKAKAME,"Vanne à guillotine ronde en tôle d'acier au carbone et en acier de qualité, diamètre 160 mm",Material,General,pièce,14.62,14.62,14.62,14.62,1,EUR,102.37,7.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de chauffe-eau individuels, de colonnes pour baignoires, de bouillo" KAME-ME-KARI-KAVO_KAKAKASA,"Joints en paronite PMB, épaisseur 1 mm, diamètre 250 mm",Material,General,1000 pièces,1890.57,1890.57,1890.57,1890.57,1,EUR,70.58,0.055,3,3,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,CHAUFFE-EAU,Installation de sections de réchauffeurs d'eau à grande vitesse MEVO-RI-KARI-KATO,Cabine de douche,Abstract Material,General,compl,790.45,790.45,790.45,790.45,1,EUR,7904.48,10.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" KALI-TO-KARI-MEKA,Structures métalliques à joint de déformation,Abstract Material,Steel & Metal,m,636.18,636.18,636.18,636.18,1,EUR,43472.48,68.3333,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation d'un système de joints de dilatation à partir de structures profilé MEPU-ME-KARI-KAPU_KAMEKALI,Colle cyanoacrylate,Material,General,kg,1206.44,1206.44,1206.44,1206.44,1,EUR,3.56,0.01,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation d'un système de joints de dilatation à partir de structures profilé KAME-LI-MESA-KASA_KAKARINE,"Écrous hexagonaux en acier galvanisé, diamètre du filetage M20 (M22)",Material,General,kg,4.56,4.56,4.56,4.56,1,EUR,368.34,80.8333,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,"Poutres, ceintures, linteaux, traverses",Construction de poutres et de linteaux RITO-VO-KATO-MEME_KARISAVO,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,0 MPa, diamètre nominal 400 mm",Material,General,pièce,167.32,167.32,167.32,167.32,1,EUR,669.28,4.0,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation de compteurs d'eau avec fabrication de la tuyauterie sur le lieu de MEVO-ME-KADX-KAVO,Robinets à boisseau sphérique filetés,Abstract Material,General,pièce,57.29,57.29,57.29,57.29,1,EUR,9548.6,166.6667,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation d'un compteur d'eau dans un appartement RIPU-TO-KAME-KASA,Tubes en polychlorure de vinyle chloré (PVC-C),Abstract Material,Pipes & Fittings,m,45.03,45.03,45.03,45.03,1,EUR,4272.24,94.88,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de canalisations d'alimentation en eau et de chauffage à partir de tuyaux e KAME-LI-MERI-MEKA,Treillis géosynthétique,Abstract Material,General,m2,1.33,1.33,1.33,1.33,1,EUR,146.06,110.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-LI-MESA-MEKA_KAKASAVO,"Agrafes de montage en acier sans patte (SB), diamètre de fixation 10 mm",Material,General,10 pièces,3.63,3.63,3.63,3.63,1,EUR,27.62,7.6,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",ENSEMBLES DE MOYENS TECHNIQUES POUR LES SALLES DE CONTRÔLE (SALLES DE DISPATCH),Câblages dans les panneaux et les pupitres MELI-PU-KASA-KAVO_KAKAKATO,"Poudre de magnésite caustique, marque prefabricated modular-87",Material,General,t,1354.16,1354.16,1354.16,1354.16,1,EUR,137.44,0.2,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS KASA-ME-KAME-KALI,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,m3,409.81,409.81,409.81,409.81,1,EUR,40980.54,100.0,3,3,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE RÉSEAUX THERMIQUES,Dispositif de canaux infranchissables KASA-ME-KAME-MERI,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,415.05,415.05,415.05,415.05,1,EUR,41504.67,100.0,3,3,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE RÉSEAUX THERMIQUES,"Installation de chambres avec parois, supports fixes en forme de panneaux et dal" MEVO-RI-KANE-MERI_MEKATONE,"Couvercle de siège en plastique pour WC avec couvercle, taille de raccordement 160 mm, avec fixation, dimensions 450 x 370 mm",Material,General,pièce,16.48,16.48,16.48,16.48,1,EUR,164.83,10.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" MEVO-RI-KANE-KAME,Réservoir avec robinetterie,Abstract Material,General,compl,75.31,75.31,75.31,75.31,1,EUR,3012.36,40.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" RIKA-ME-KAME-MEPU,Pinces à câble,Abstract Material,General,pièce,7.02,7.02,7.02,7.02,1,EUR,5.06,0.72,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-TO-KAME-KALI_KAKAKANE,Alcool furfurylique,Material,General,t,8304.15,8304.15,8304.15,8304.15,1,EUR,304.49,0.0367,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en béton résistant aux acides et à la chaleur KAVO-ME-KARI-MELI_KAKAKAME,"Grillage métallique simple en fil de fer non revêtu à mailles carrées, diamètre du fil 1,6 mm, taille des mailles 45 x 45 mm",Material,General,m2,2.55,2.55,2.55,2.55,1,EUR,5.16,2.02,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX MEPU-SA-MEME-MEKA_KARIKARI,"Mastic MS-006, couleur rose",Material,General,t,5990.25,5990.25,5990.25,5990.25,1,EUR,2.4,0.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"ALARME ÉLECTRIQUE, ALARME INCENDIE, ALARME D'APPEL ET SIGNALISATION À DISTANCE",ALARME ÉLECTRIQUE ET ALARME INCENDIE KARI-TO-KAME-KARI_MEMEMENE,"Sable naturel pour travaux de construction, classe II, fin",Material,General,m3,25.63,25.63,25.63,25.63,1,EUR,27.4,1.0667,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à partir de dalles en fonte DXME-RIME-MEDX_KAPURI,"Électricité : consommation 0,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.0,0.0567,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication d'éléments et assemblage de nœuds de conduites en acier à partir de MEPU-RI-KAPU-KAPU_KARIMERI,Résine carbamide-formaldéhyde,Material,General,kg,1.05,1.05,1.05,1.05,1,EUR,52.82,50.0667,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements sans joints d'une épaisseur de 5 mm RISA-ME-KAME-KASA_KAKAMETO,"Traverse en bois de conifères, imprégnée, pour voies ferrées à écartement large, type III",Material,General,pièce,80.79,80.79,80.79,80.79,1,EUR,888.73,11.0,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX RISA-TO-KATO-KAME_MEKAKATO,"Butée latérale en polymère, pour fixation ZBR-65, type TsP-369.006",Material,General,pièce,2.17,2.17,2.17,2.17,1,EUR,15716.36,7253.3333,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-TO-KATO-KAME_MEKAKARI,"Cale en polymère pour fondation en béton armé sous rail de fixation par ancrage PFK-350, dimensions 200 x 194 x 10 mm",Material,General,pièce,3.82,3.82,3.82,3.82,1,EUR,13858.85,3626.6667,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-TO-MEPU-KAME_MEKADXRI,"Isolateur de pression en polyamide pour fixation de rail à ancrage PFK-350, dimensions 53,5 x 55,6 x 27 mm",Material,General,pièce,0.72,0.72,0.72,0.72,1,EUR,5233.96,7253.3333,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-TO-MEPU-KAME_MEKADXTO,"Isolateur latéral en polyamide pour fixation d'ancrage de rail PFK-350, dimensions 132 x 29,6 x 38,6 mm",Material,General,pièce,0.72,0.72,0.72,0.72,1,EUR,5233.96,7253.3333,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-TO-MEPU-KAME_MEMEKAKA,"Borne à ressort à tige pour fixation d'ancrage de rail PFK-350, dimensions 125 x 108 x 32 mm",Material,General,pièce,3.44,3.44,3.44,3.44,1,EUR,24969.48,7253.3333,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE KAME-LI-MESA-KATO_KAKATOVO,"Boulons en acier galvanisé à tête hexagonale et écrou hexagonal galvanisé, diamètre du filetage du boulon et de l'écrou M36, longueur du boulon 60-300 mm",Material,General,kg,5.5,5.5,5.5,5.5,1,EUR,25.71,4.6733,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",APPAREILS ET MOYENS D'AUTOMATISATION INSTALLÉS SUR LES ÉQUIPEMENTS ET LES COMMUN,DISPOSITIFS DE RÉDUCTION MEVO-RI-KARI-KADX,Cuves au sol,Abstract Material,General,compl,118.68,118.68,118.68,118.68,1,EUR,4747.2,40.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" MEVO-RI-KAME-KATO,Urinoirs,Abstract Material,General,compl,422.76,422.76,422.76,422.76,1,EUR,16910.48,40.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,Installation de urinoirs RITO-VO-KAPU-KANE_KAMEMETO,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 350 mm, diamètre extérieur 377 mm, épaisseur de paroi 9 mm",Material,General,pièce,341.72,341.72,341.72,341.72,1,EUR,4784.1,14.0,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac MEPU-TO-KAME-KATO_KAKAKAME,Composition d'apprêt à pénétration profonde,Material,General,kg,2.17,2.17,2.17,2.17,1,EUR,23.33,10.7333,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en linoléum DXME-KATO-MESA_KAKASA,"Installations de forage pneumatiques sur chenilles, non automotrices avec 1e machine de forage pour le travail dans des galeries horizontales et inclinées",Equipment,General,Heures machine,66.13,66.13,66.13,66.13,1,EUR,979.17,14.8067,3,3,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"EXCAVATIONS HORIZONTALES ET LEURS CONNEXIONS, RÉALISÉES À L'AIDE D'EXPLOSIFS" RIKA-RI-KADX-KATO_KAKARIPU,Manchon droit en polyéthylène MPP 2,Material,General,pièce,16.61,16.61,16.61,16.61,1,EUR,16.61,1.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIKA-RI-KADX-KATO_KAKARILI,Manchon droit en polyéthylène MPP 10/12,Material,General,pièce,67.03,67.03,67.03,67.03,1,EUR,111.71,1.6667,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIRI-RI-KARI-MEVO_KAKAKATO,"Traverse en bois imprégné, longueur 550 mm",Material,General,pièce,6.79,6.79,6.79,6.79,1,EUR,6.79,1.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO MEME-ME-KAME-MEPU,Plinthes,Abstract Material,General,m,1.95,1.95,1.95,1.95,1,EUR,200.88,103.0,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en linoléum RISA-RI-KARI-KATO,Consoles non isolées,Abstract Material,General,pièce,3810.33,3810.33,3810.33,3810.33,1,EUR,3810.33,1.0,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT RITO-SA-KARI-KARI_KAKARISA,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 32 mm, épaisseur de paroi 2,2 mm",Material,Pipes & Fittings,m,3.02,3.02,3.02,3.02,1,EUR,10.13,3.35,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier DXME-RIME-MEDX_KAPURI,"Machines électromécaniques à fileter les tubes, puissance du moteur jusqu'à 1 kW",Equipment,General,Heures machine,0.17,0.17,0.17,0.17,1,EUR,0.02,0.0567,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication d'éléments et assemblage de nœuds de conduites en acier à partir de MENE-TO-KARI-KATO_KAKAKAPU,"Engrais complexe granulé, en vrac",Material,General,t,1225.79,1225.79,1225.79,1225.79,1,EUR,100.27,0.12,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE MEVO-SA-KADX-KAME,Sèche-serviettes avec fixations,Abstract Material,General,compl,236.08,236.08,236.08,236.08,1,EUR,9443.01,40.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de sèche-serviettes, de mitigeurs, d'ensembles de toilettes" MEVO-ME-MEKA-MEKA,Mitigeurs,Abstract Material,General,pièce,39.57,39.57,39.57,39.57,1,EUR,2769.65,70.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de sèche-serviettes, de mitigeurs, d'ensembles de toilettes" DXME-KADX-KADX_MEKAME,Lignes de production pour l'assemblage de maillons avec des traverses en béton armé (équipement d'atelier),Equipment,General,Heures machine,199.13,199.13,199.13,199.13,1,EUR,2902.05,14.5733,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-KADX_MEKAME,"Électricité : consommation 54,45 kW·h/machine-heure",Electricity,Electricity,Heures machine,6.99,6.99,6.99,6.99,1,EUR,101.92,14.5733,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KAME-KAPU_KAKAME,"Installations à deux barres sur tracteur, puissance 79 kW (108 ch)",Equipment,General,Heures machine,39.2,39.2,39.2,39.2,1,EUR,470.5,12.0033,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RITO-TO-KATO-KARI_KAMENETO,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 273 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,159.97,159.97,159.97,159.97,1,EUR,11163.83,69.7867,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac DXME-KASA-KADX_KAMEPU,"Grues sur châssis spécial de type automobile, capacité de charge 500 t",Equipment,General,Heures machine,902.9,902.9,902.9,902.9,1,EUR,2771.9,3.07,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ DXME-MERI-KARI_KAKAME,"Débroussailleuses-ramasseuses sur tracteur, puissance 59 kW (80 ch)",Equipment,General,Heures machine,23.9,23.9,23.9,23.9,1,EUR,42.78,1.79,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS MEPU-SA-KAPU-KAVO,Mastic pour le polissage des sols,Abstract Material,General,kg,53.85,53.85,53.85,53.85,1,EUR,175.39,3.2567,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en xylolite et en polyvinylacétate DXME-KANE-KATO_KADXDX,"Treuils mobiles de forage avec compartiment, tension statique du câble 160 kN (16 t), capacité du câble 1500 m",Equipment,General,Heures machine,44.39,44.39,44.39,44.39,1,EUR,463.45,10.44,3,3,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES DES PUITS VERTICAUX ET DES PUITS DE SECTEUR CIRCULAIRE ET DXME-KANE-KATO_KADXDX,"Électricité : consommation 0,77 kWh/machine-heure",Electricity,Electricity,Heures machine,0.1,0.1,0.1,0.1,1,EUR,1.04,10.44,3,3,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES DES PUITS VERTICAUX ET DES PUITS DE SECTEUR CIRCULAIRE ET KASA-ME-KANE-KATO,Dalles en béton armé,Abstract Material,General,m2,215.14,215.14,215.14,215.14,1,EUR,2151.42,10.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,SOUTÈNEMENTS PERMANENTS À CADRE POUR PUITS INCLINÉS D'OUVRAGES HORIZONTAUX ET IN KAVO-RI-KARI-KANE_KAKAKAME,"Câble à double torsion LK-R de construction 6x19(1+6+6/6)+1 o.s., marque B, en fil galvanisé du groupe Zh, groupe de marquage 1570-1770 N/mm2, diamètre 6,9 mm",Material,General,10 m,15.18,15.18,15.18,15.18,1,EUR,159.4,10.5,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-ME-KARI-MEKA_KAKAKARI,Suspension métallique pour câbles de communication P-8,Material,General,t,13597.91,13597.91,13597.91,13597.91,1,EUR,389.81,0.03,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-ME-KARI-RIME_KAKASAKA,Nœud de fixation KGP-16-3,Material,General,pièce,8.03,8.03,8.03,8.03,1,EUR,20.74,2.58,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE DXME-KAPU-KATO_KAKAME,"Machines de forage à percussion et à câble de petite taille, profondeur maximale de forage jusqu'à 100 m, diamètre maximal de forage 168 mm",Equipment,General,Heures machine,20.18,20.18,20.18,20.18,1,EUR,283.86,14.0667,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",REMBLAYAGE DES MARAIS DXME-KAME-KAME_KAMEPU,"Bulldozers-décompacteurs sur tracteur, puissance 79 kW (108 ch)",Equipment,Bulldozers,Heures machine,34.51,34.51,34.51,34.51,1,EUR,59.35,1.72,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES DXME-KAME-KAME_KAMESA,"Bulldozers-décompacteurs sur tracteur, puissance 121 kW (165 ch)",Equipment,Bulldozers,Heures machine,71.89,71.89,71.89,71.89,1,EUR,69.97,0.9733,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES RIPU-TO-KATO-KAME,Lot de microtubes en polyéthylène,Abstract Material,Pipes & Fittings,m,1.58,1.58,1.58,1.58,1,EUR,1079.13,683.4,3,3,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES RIPU-TO-KASA-KARI_MEMETODX,"Bouchon pour microtubes en plastique, diamètre 16-63 mm",Material,Pipes & Fittings,pièce,0.67,0.67,0.67,0.67,1,EUR,4.14,6.14,3,3,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES RITO-VO-KAPU-KANE_KAMEKARI,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 250 mm, diamètre extérieur 273 mm, épaisseur de paroi 9 mm",Material,General,pièce,194.23,194.23,194.23,194.23,1,EUR,3237.21,16.6667,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac MEVO-ME-KANE-MEKA_KAKAKARI,"Robinet régulateur double en laiton avec bouchon KRDP, pression nominale 1,6 MPa, diamètre nominal 20 mm",Material,General,pièce,15.49,15.49,15.49,15.49,1,EUR,46.46,3.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE MEVO-ME-KANE-MEKA_KAKAKAPU,"Robinet régulateur à trois voies en laiton KRTP, pression nominale 1,6 MPa, diamètre nominal 15 mm",Material,General,pièce,5.44,5.44,5.44,5.44,1,EUR,10.87,2.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE ME_MEKAKA_MEME,"Charge moyenne de travail 1,1",Labor,Labor,heures,12.41,12.41,12.41,12.41,1,EUR,955.22,76.9633,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE ROUTES PROVISOIRES,INSTALLATION DE ROUTES TEMPORAIRES EN TERRE ET EN BOIS KARI-RI-KATO-KAME_KAKAMERI,"Pierre concassée M 800, taille de 150 à 500 mm",Material,General,m3,60.59,60.59,60.59,60.59,1,EUR,132.68,2.19,3,3,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"DALLES DE SOUS-VITRINES, PORCHES",Construction de porches KAVO-ME-KASA-KAPU_KAKAMEME,"Poubelle métallique avec couvercle sans roues, capacité 750 l, dimensions 930 x 958 x 1060 mm",Material,General,compl,313.53,313.53,313.53,313.53,1,EUR,313.53,1.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment MEVO-SA-METO-KARI,Élévateurs,Abstract Material,General,pièce,100.3,100.3,100.3,100.3,1,EUR,1003.02,10.0,3,3,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation d'élévateurs RITO-VO-KATO-KANE_KAKAKALI,"Raccord en acier assemblé avec manchon et contre-écrou, diamètre nominal 32 mm",Material,General,pièce,5.19,5.19,5.19,5.19,1,EUR,176.32,34.0,3,3,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de cuisinières à gaz, MEKA-TO-KARI-KATO_KAKAPUKA,"Soudures étain-plomb à l'antimoine, marque POSSu 40-2",Material,General,kg,44.79,44.79,44.79,44.79,1,EUR,1.7,0.0367,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIKA-RI-KADX-MEKA_KAKAMELI,"Manchon de protection pour câbles de communication, connecteur MSK-70",Material,General,pièce,65.15,65.15,65.15,65.15,1,EUR,65.15,1.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE DXME-KAVO-KAVO_KAMERI,"Installations pour la préparation d'émulsions bitumineuses, capacité 10-12 t/h",Equipment,General,Heures machine,22.98,22.98,22.98,22.98,1,EUR,2.76,0.12,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation du bitume et de l'émulsion bitumineuse RIRI-RI-KARI-MEPU_KAKARIRI,"Fil d'acier galvanisé pour lignes aériennes de communication, classes 1, 2, diamètre 2,0 mm",Material,General,t,3954.29,3954.29,3954.29,3954.29,1,EUR,84.75,0.03,3,3,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR KATO-RI-KAME-KAME_KAKAKASA,"Ciment Portland sans additif pour la construction générale CEM 0 52,5N",Material,General,t,219.53,219.53,219.53,219.53,1,EUR,6400.25,29.155,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation de béton léger KASA-ME-KALI-KAVO,Cabines et bacs sanitaires,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,2009.22,100.0,3,3,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" RITO-NE-KAME-KAME_KAKAKATO,"Tuyaux en fonte pour égouts, longueur 2 m, diamètre nominal 150 mm, épaisseur de paroi 5 mm",Material,General,m,75.17,75.17,75.17,75.17,1,EUR,7727.79,102.8,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN FONTE,Pose dans les tranchées de canalisations en fonte pour égouts RITO-TO-KATO-KARI_KAMESAVO,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 219 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,109.39,109.39,109.39,109.39,1,EUR,6797.07,62.1333,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac RITO-VO-KAPU-KANE_KAKADXSA,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 200 mm, diamètre extérieur 219 mm, épaisseur de paroi 7 mm",Material,General,pièce,92.76,92.76,92.76,92.76,1,EUR,1205.82,13.0,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac RITO-VO-KATO-KAPU_KAMEDXPU,"Manchon de raccordement en acier, diamètre nominal 40 mm",Material,General,pièce,1.53,1.53,1.53,1.53,1,EUR,6.1,4.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RITO-VO-KATO-KAPU_KAMEDXNE,"Manchon de raccordement en acier, diamètre nominal 63 mm",Material,General,pièce,6.99,6.99,6.99,6.99,1,EUR,27.96,4.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE KAVO-ME-KASA-KATO_MEKAMEPU,"Bride d'appui en acier, diamètre intérieur 450 mm, hauteur de bride 50 mm, diamètre extérieur du tuyau 392 mm",Material,General,pièce,79.93,79.93,79.93,79.93,1,EUR,79.93,1.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ KARI-TO-KAME-KASA_KATOLIPU,"Sable issu du criblage de concassage pour travaux de construction, classe I, M 1000, granulométrie élevée",Material,General,m3,42.01,42.01,42.01,42.01,1,EUR,542.97,12.9233,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges organo-minéraux et d'enrobés bitumineux dans une install KAME-LI-KALI-MERI_MEKAKANE,"Film polyéthylène, épaisseur 80 µm",Material,General,m2,0.21,0.21,0.21,0.21,1,EUR,4.86,23.3333,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes RITO-VO-KATO-MEME_KAMERIVO,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 50 mm",Material,General,pièce,10.42,10.42,10.42,10.42,1,EUR,20.83,2.0,3,3,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de régulateurs de pression de gaz, MELI-PU-KATO-KATO_KAKAKARI,"Mortier à base de periclase-chromite, marque MPHV",Material,General,t,1429.28,1429.28,1429.28,1429.28,1,EUR,9.53,0.01,3,3,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de soupapes anti-explosion, KAME-LI-KALI-RIDX,Revêtement anti-vandalisme monocomposant,Abstract Material,General,l,31.49,31.49,31.49,31.49,1,EUR,490.71,15.5833,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Application de revêtements protecteurs multicomposants DXME-KASA-KANE_KAMEME,"Grues sur chenilles, capacité de charge 130 t",Equipment,General,Heures machine,173.64,173.64,173.64,173.64,1,EUR,7662.27,44.1267,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT POUR CERTAINES PRODUCTIONS DE L'INDUSTRIE CHIMIQUE,ÉQUIPEMENT POUR LES ENTREPRISES DE L'INDUSTRIE AZOTÉE ET DES PRODUITS DE SYNTHÈS DXME-KAVO-KAVO_KAMERI,"Électricité : consommation 32,34 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.15,4.15,4.15,4.15,1,EUR,0.5,0.12,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation du bitume et de l'émulsion bitumineuse KALI-RI-KALI-KARI_KAKAKATO,"Conducteur métallique pour modules de sol, marque GP-1500, dimensions 4200 x 4200 mm",Material,General,pièce,3103.51,3103.51,3103.51,3103.51,1,EUR,46.55,0.02,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,"ROUTES, GUIDES DE ROULEMENT, PASSERELLES, PASSERELLES ET PASSAGES À GUÉ SUR LES ","Pose de modules de remblai pour la construction de voies de circulation, de rout" RIPU-RI-KASA-KAME_KAKAKASA,"Tuyaux en chrysotile-ciment sans pression, diamètre nominal 300 mm",Material,General,m,26.88,26.88,26.88,26.88,1,EUR,124.53,4.6333,3,3,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment RITO-VO-KATO-MEME_KARIDXKA,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 2,5 MPa, diamètre nominal 80 mm",Material,General,pièce,23.52,23.52,23.52,23.52,1,EUR,47.04,2.0,3,3,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, MEVO-ME-MEKA-METO_KAKASATO,"Robinet à passage direct à presse-étoupe 11ch8bk, raccordement à la canalisation par bride, pression nominale 1,0 MPa, diamètre nominal 100 mm",Material,General,pièce,447.41,447.41,447.41,447.41,1,EUR,447.41,1.0,3,3,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, DXME-MEME-KAME_KAKANE,Poseurs de câbles légers tractés pour les communications rurales et régionales,Equipment,General,Heures machine,3.79,3.79,3.79,3.79,1,EUR,11.85,3.13,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE KAME-ME-KARI-KASA_KAKAVOME,"Garnitures sèches en amiante avec tressage monocouche du noyau, rondes, carrées, marque ACC, taille 4-5 mm",Material,General,t,42535.24,42535.24,42535.24,42535.24,1,EUR,12.76,0.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE RITO-TO-KATO-KARI_KAMERIVO,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 152 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,49.69,49.69,49.69,49.69,1,EUR,5068.68,102.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES DXME-KAME-KASA_MERIPU,"Pelles électriques à godet unique avec équipement de travail « dragline », capacité du godet 4 m3",Equipment,General,Heures machine,794.69,794.69,794.69,794.69,1,EUR,4434.39,5.58,3,3,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE MEVO-PU-KAME-KANE,Filtres à poils à bride,Abstract Material,General,pièce,1167.44,1167.44,1167.44,1167.44,1,EUR,1167.44,1.0,3,3,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de filtres pour purifier le gaz des impuretés mécaniques, KAME-RI-KATO-KANE_KAKAKARI,Émulsifiant pour émulsions bitumineuses cationiques à désintégration rapide et moyenne,Material,General,kg,12.93,12.93,12.93,12.93,1,EUR,111.18,8.6,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation du bitume et de l'émulsion bitumineuse KAME-LI-KAVO-KASA_KAKAKALI,Additif d'adhérence superficielle au béton,Material,General,kg,5.92,5.92,5.92,5.92,1,EUR,12.43,2.1,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation du bitume et de l'émulsion bitumineuse KAME-PU-KARI-KAPU_MEMEKAPU,"Barre hexagonale en acier pour forage, taille de l'hexagone 32 mm, queue filetée T38, filetage extérieur R32, longueur 3700 mm",Material,General,pièce,475.49,475.49,475.49,475.49,1,EUR,262.47,0.55,3,3,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" DXME-KAME-KASA_MERIPU,Électricité : consommation 165 kWh/machine-heure,Electricity,Electricity,Heures machine,21.19,21.19,21.19,21.19,1,EUR,118.26,5.58,3,3,TRAVAUX DE CONSTRUCTION,Travaux de forage,EXPLOITATION DU SOL À L'AIDE D'EXCAVATRICES À GODET,EXCAVATION DU SOL À L'AIDE D'EXCAVATRICES AVEC DÉPÔT SUR LE BORD DE LA TRANCHÉE KAME-LI-MERI-KATO,Géomats extrudés,Abstract Material,General,m2,3.82,3.82,3.82,3.82,1,EUR,496.38,130.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAME-LI-MESA-KAPU_KAKAKAME,"Vis en laiton à tête demi-ronde et fente droite, diamètre du filetage M3, longueur 12 mm",Material,General,kg,83.27,83.27,83.27,83.27,1,EUR,15.32,0.1867,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,CROSS MERI-RI-KAPU-MERI,Plaques ou tapis isolants en laine minérale,Abstract Material,General,m3,218.83,218.83,218.83,218.83,1,EUR,429.64,1.9633,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de lambourdes et de sous-couches sous les planchers chauffants au-dessus de DXME-KAVO-KASA_KASARI,"Machines de pose de béton sur rails, découpeuses de joints dans le béton fraîchement coulé",Equipment,General,Heures machine,67.08,67.08,67.08,67.08,1,EUR,180.22,2.6867,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Découpe de joints dans le béton MEME-ME-KAME-MESA,Mains courantes en bois,Abstract Material,General,m,7.29,7.29,7.29,7.29,1,EUR,739.06,101.3333,3,3,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" KAME-NE-KARI-KATO_MEKAMEKA,"Film PVC décoratif de finition avec couche adhésive, épaisseur 0,12 mm",Material,General,m2,6.16,6.16,6.16,6.16,1,EUR,658.65,107.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Pose de film autocollant décoratif en polychlorure de vinyle sur les murs MEPU-ME-KASA-KATO_KAKAKAME,"Colle phénol-polyvinylacétal, marque BF-4",Material,General,t,25458.52,25458.52,25458.52,25458.52,1,EUR,178.21,0.01,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Pose de film autocollant décoratif en polychlorure de vinyle sur les murs RIME-RI-KATO-KADX_KAMEKATO,"Câble électrique PRGN 1kh2,5-660",Material,General,1000 m,724.2,724.2,724.2,724.2,1,EUR,1.45,0.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",NOEUDS DE RADIOTRANSMISSION RIME-RI-KATO-KADX_KAMEKASA,"Câble électrique à conducteurs en cuivre PRTO 1x1,5-660",Material,General,1000 m,725.15,725.15,725.15,725.15,1,EUR,5.08,0.01,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",NOEUDS DE RADIOTRANSMISSION KAME-LI-MEME-KALI_KARISAME,"Électrodes de soudage pour le soudage des aciers fortement alliés EA-981/15, diamètre 3 mm",Material,General,kg,43.95,43.95,43.95,43.95,1,EUR,3471.19,78.9733,3,3,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations KAME-SA-KAME-KATO_MEKAMENE,"Durcisseur en poudre pour plastique à froid, application manuelle",Material,General,kg,39.98,39.98,39.98,39.98,1,EUR,37.18,0.93,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-LI-MESA-KAME_MENELIKA,"Ancrage en profilé hélicoïdal en acier d'armature avec manchon de raccordement, écrou sphérique de 48 mm de diamètre, dimensions de la rondelle 100 x 100 x 5 mm, diamètre de la tige d'ancrage 25 mm, longueur de l'ancrage 1500 mm",Material,General,compl,32.21,32.21,32.21,32.21,1,EUR,515.37,16.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,FIXATIONS PERMANENTES DES PUITS VERTICAUX ET DES PUITS DE SECTEUR CIRCULAIRE ET DXME-KATO-KANE_KAPURI,"Machines de chargement à double grappin pneumatiques fonctionnant à partir de stations de compression fixes, équipées d'une station hydraulique et de vérins d'écartement, débit jusqu'à 3 m3/min",Equipment,General,Heures machine,198.79,198.79,198.79,198.79,1,EUR,1550.57,7.8,3,3,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,FIXATIONS PERMANENTES DES PUITS VERTICAUX ET DES PUITS DE SECTEUR CIRCULAIRE ET DXME-KAVO-KATO_KAKAVO,"Rouleaux tractés pneumatiques statiques, poids 50 t",Equipment,General,Heures machine,22.3,22.3,22.3,22.3,1,EUR,12.86,0.5767,3,3,TRAVAUX DE CONSTRUCTION,Structures en terre des ouvrages hydrauliques,CONSTRUCTIONS EN TERRE DES ÉQUIPEMENTS HYDRAULIQUES,"BARRAGES, DIGUES, REMBLAIS" KALI-PU-KATO-KANE,Support d'éclairage extérieur métallique avec raccord à bride,Abstract Material,General,pièce,1004.91,1004.91,1004.91,1004.91,1,EUR,1004.91,1.0,3,3,TRAVAUX DE CONSTRUCTION,Lignes électriques,POTEAUX DU RÉSEAU DE CONTACT DU TRANSPORT ÉLECTRIQUE URBAIN ET DE L'ÉCLAIRAGE PU,POTEAUX D'ÉCLAIRAGE PUBLIC URBAIN KASA-ME-KARI-KARI_KAKAMEME,"Bloc de revêtement de tunnel en béton armé avec éléments de liaison et joints d'étanchéité aux extrémités, pour anneau de revêtement composé de 4 blocs de puits de mine d'un diamètre de 5500 mm, largeur de l'anneau 1000 mm, BN",Material,General,compl,3939.73,3939.73,3939.73,3939.73,1,EUR,7879.47,2.0,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS KASA-ME-KARI-KARI_KAKAMERI,"Bloc de revêtement de tunnel en béton armé avec éléments de raccordement et joints d'étanchéité aux extrémités, pour anneau de revêtement composite composé de 4 blocs de puits de mine d'un diamètre de 5500 mm, largeur de l'anneau 1000 mm, MN",Material,General,compl,3939.73,3939.73,3939.73,3939.73,1,EUR,7879.47,2.0,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS METO-ME-KAME-KAME_KAKAKAME,"Granulats de marbre, fraction de 0,2 à 0,5 mm",Material,General,t,244.61,244.61,244.61,244.61,1,EUR,1.25,0.01,3,3,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" KASA-TO-KAME-KATO,Pièces moulées à l'unité,Abstract Material,General,pièce,317.5,317.5,317.5,317.5,1,EUR,317.5,1.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,Installation d'éléments en plâtre MEME-TO-KATO-KANE,Plinthes en plastique pour sols,Abstract Material,General,m,0.86,0.86,0.86,0.86,1,EUR,86.62,101.0,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de plinthes en polychlorure de vinyle KAME-LI-RIKA-KAPU_KAKAKARI,Fils en capron,Material,General,kg,13.4,13.4,13.4,13.4,1,EUR,1.34,0.1,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,CÂBLES ET FILS STATIONNAIRES RIPU-TO-KAPU-MEME_KAKAKARI,Tube isolant TPV,Material,Pipes & Fittings,kg,16.41,16.41,16.41,16.41,1,EUR,0.71,0.0433,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,COMMUNICATIONS TÉLÉPHONIQUES OPÉRATIONNELLES MEVO-SA-KAVO-KAVO,Panneau de protection pour appareils de contrôle et de mesure,Abstract Material,General,kg,8.02,8.02,8.02,8.02,1,EUR,107.39,13.3867,3,3,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,"Installation de vannes hydrauliques, de boucliers pour les appareils de contrôle", DXME-KAVO-KAVO_KAMEPU,"Installations pour la préparation d'additifs tensioactifs, capacité 5-10 t/h",Equipment,General,Heures machine,13.6,13.6,13.6,13.6,1,EUR,114.7,8.4333,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de liants bitumineux et d'émulsions DXME-KAVO-KAVO_KAMEPU,"Électricité : consommation 49,28 kWh/machine-heure",Electricity,Electricity,Heures machine,6.33,6.33,6.33,6.33,1,EUR,53.38,8.4333,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de liants bitumineux et d'émulsions KASA-ME-KARI-KARI_KAKAMEPU,"Bloc de revêtement de tunnel en béton armé avec éléments de raccordement et joints d'étanchéité aux extrémités, pour anneau de revêtement composite composé de 4 blocs de puits de mine d'un diamètre de 7700 mm, largeur de l'anneau 1000 mm, MN",Material,General,compl,4979.57,4979.57,4979.57,4979.57,1,EUR,9959.14,2.0,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-METO-KAME_KATONE,"Machines de marquage manuelles de petite taille pour l'application de peinture, équipées d'un réservoir pour éléments réfléchissants, largeur de la ligne appliquée 50-400 mm",Equipment,General,Heures machine,2.15,2.15,2.15,2.15,1,EUR,6.92,3.2133,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-RIME-KAME_SAMEPU,"Appareils de peinture à pulvérisation électro-pneumatique sans air, débit jusqu'à 5 l/min",Equipment,General,Heures machine,0.45,0.45,0.45,0.45,1,EUR,1.41,3.09,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-RIME-KAME_SAMEPU,"Électricité : consommation 0,46 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.18,3.09,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE MEPU-SA-KAPU-KAVO_KAKAMEME,"Mastic acrylique adhésif pour matériaux d'isolation thermique et d'étanchéité, PVC, plaques de plâtre, panneaux de particules, MDF, consommation 0,30-0,60 kg/m2",Material,General,t,3133.49,3133.49,3133.49,3133.49,1,EUR,182.06,0.0567,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité MERI-RI-KALI-KARI,Rouleaux en polyéthylène expansé,Abstract Material,General,m2,2.55,2.55,2.55,2.55,1,EUR,261.01,102.3333,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une isolation thermique et acoustique continue KAME-LI-MESA-KAME_KAKATONE,"Cheville à frapper en laiton, diamètre du filetage intérieur M8, diamètre 10 mm, longueur 28-30 mm",Material,General,pièce,0.31,0.31,0.31,0.31,1,EUR,29.56,94.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,"APPAREILS D'ÉCLAIRAGE, DE CHAUFFAGE, DE PROTECTION ET DE COMPTAGE" RIKA-RI-KARI-KALI_KAKARIME,Gant thermorétractable,Material,General,pièce,3.5,3.5,3.5,3.5,1,EUR,3.5,1.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DES CENTRALES NUCLÉAIRES ET DES BÂTIME RIKA-SA-KARI-KANE_KAKATOSA,Boîtes de dérivation U-196,Material,General,10 pièces,1.69,1.69,1.69,1.69,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de systèmes de chauffage électrique au sol (« plancher chauffant ») KASA-TO-KARI-KATO,Pièces moulées à l'unité,Abstract Material,General,pièce,338.58,338.58,338.58,338.58,1,EUR,338.58,1.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment (vases, blasons)" DXME-MESA-KARI_KARINE,"Tracteurs à chenilles, puissance 121 kW (165 ch)",Equipment,General,Heures machine,40.54,40.54,40.54,40.54,1,EUR,38.38,0.9467,3,3,TRAVAUX DE CONSTRUCTION,Structures en terre des ouvrages hydrauliques,CONSTRUCTIONS EN TERRE DES ÉQUIPEMENTS HYDRAULIQUES,"BARRAGES, DIGUES, REMBLAIS" DXME-KAPU-KAME_KAPUPU,Marteaux perforateurs moyens fonctionnant à partir de stations de compression fixes,Equipment,General,Heures machine,5.0,5.0,5.0,5.0,1,EUR,9994.5,1998.23,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,COFFRAGE KAME-SA-KATO-MEME,Écran anti-éblouissement à lamelles,Abstract Material,General,pièce,16.37,16.37,16.37,16.37,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-SA-KATO-KAME,Bornes routières axiales,Abstract Material,General,pièce,203.33,203.33,203.33,203.33,1,EUR,20333.42,100.0,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAVO-ME-KATO-KAME,Portes en acier pour chambres de ventilation,Abstract Material,General,pièce,208.39,207.19,210.79,207.19,2,EUR,13883.1,67.0,3,3,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de portes et trappes étanches KAME-LI-MEME-KALI_KARIPULI,"Électrodes de soudage pour le soudage des aciers résistants à la corrosion et aux acides EA-400/10T, diamètre 3-4 mm",Material,Chemicals,kg,19.93,19.93,19.93,19.93,1,EUR,2377.2,119.2667,3,3,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations KALI-RI-KANE-KATO_KAMEMEVO,"Profilé de guidage en acier galvanisé, pour le montage de cloisons en plâtre et de plafonds suspendus, dimensions 100 x 40 mm, épaisseur de l'acier 0,6 mm",Material,General,m,2.35,2.35,2.35,2.35,1,EUR,196.27,83.6667,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE FIBRÉES (G",Installation de cloisons avec ossature métallique simple et revêtement triple co KAME-LI-KASA-KAVO_KAKAKARI,"Feuille de fibre de verre électrotechnique, marque STEF",Material,General,kg,9.88,9.88,9.88,9.88,1,EUR,50.71,5.1333,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RAILS LOURDS KAPU-TO-KARI-MEPU_KAMEKAME,"Mélanges secs de plâtre à la chaux, à gros grains avec charge carbonatée, granulométrie de la charge 2,5 mm, résistance à la compression d'au moins 1,0 MPa",Material,General,t,185.98,185.98,185.98,185.98,1,EUR,0.93,0.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,"APPAREILS D'ÉCLAIRAGE, DE CHAUFFAGE, DE PROTECTION ET DE COMPTAGE" KAME-SA-KARI-KARI_MEKAMESA,"Montant d'extrémité de section de clôture en matériaux composites, avec extrémité de main courante, longueur 195 mm, hauteur 1100 mm, épaisseur 165 mm",Material,General,pièce,148.31,148.31,148.31,148.31,1,EUR,148.31,1.0,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES MEPU-ME-KANE-KANE_MEKARITO,"Composé adhésif bicomposant à injection à base de résine vinylester pour les fixations d'ancrage lourdes dans le béton, température de service de -40 °C à +40 °C",Material,General,l,46.71,46.71,46.71,46.71,1,EUR,97.83,2.0933,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAME-LI-MERI-KASA_KAMETORI,"Géotextile non tissé en polypropylène, aiguilleté, résistance à la traction 8,2/6,6 kN/m, densité superficielle 200 g/m2",Material,General,m2,1.61,1.61,1.61,1.61,1,EUR,69.73,43.41,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES MERI-RI-KASA-KANE_MEKARIRI,"Panneaux isolants en polystyrène expansé, type P, PPS10",Material,General,m3,64.49,64.49,64.49,64.49,1,EUR,2.92,0.0433,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES RISA-RI-KAME-KANE_KAKAVOTO,Pince à corde en aluminium KS-050,Material,General,pièce,27.41,27.41,27.41,27.41,1,EUR,1674.35,61.08,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-KATO-KASA_KATODX,"Complexes de microtunneling, diamètre extérieur maximal du tube (revêtement) 4,20 m",Equipment,General,Heures machine,2506.5,2506.5,2506.5,2506.5,1,EUR,170918.5,68.19,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES PU_MEKAKA_KAVORI,Personnel : 5 personnes-heures/machine-heures,Operator,Operators,Heures machine,67.82,67.82,67.82,67.82,1,EUR,4624.89,68.19,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KATODX,"Électricité : consommation 1602,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,205.82,205.82,205.82,205.82,1,EUR,14035.04,68.19,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KASAME,"Complexes de microtunneling, diamètre extérieur maximal du tube (revêtement) 0,86 m, longueur de tunneling jusqu'à 150 m",Equipment,General,Heures machine,490.0,490.0,490.0,490.0,1,EUR,88252.58,180.1067,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KASARI,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 1,09 m, longueur de forage jusqu'à 150 m",Equipment,General,Heures machine,584.31,584.31,584.31,584.31,1,EUR,109600.46,187.5733,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KASATO,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 1,28 m, longueur de passage jusqu'à 150 m",Equipment,General,Heures machine,625.35,625.35,625.35,625.35,1,EUR,120529.36,192.74,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KASAPU,"Complexes de microtunnelage, diamètre extérieur maximal du tuyau (revêtement) 1,49 m, longueur de forage jusqu'à 200 m",Equipment,General,Heures machine,742.89,742.89,742.89,742.89,1,EUR,153968.07,207.2567,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KASA-ME-KARI-KARI_KAKAMETO,"Bloc de revêtement de tunnels en béton armé avec éléments de liaison et joints d'étanchéité aux extrémités, pour anneau de revêtement composite composé de 4 blocs de puits de mine d'un diamètre de 7700 mm, largeur de l'anneau 1000 mm, BN",Material,General,compl,4979.57,4979.57,4979.57,4979.57,1,EUR,9959.14,2.0,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS DXME-KATO-KASA_KASASA,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 1,49 m, longueur de forage de 200 m à 500 m",Equipment,General,Heures machine,847.06,847.06,847.06,847.06,1,EUR,175558.47,207.2567,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KANERI,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 2,12 m, longueur de forage jusqu'à 200 m",Equipment,General,Heures machine,1057.68,1057.68,1057.68,1057.68,1,EUR,244355.24,231.03,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KANETO,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 2,12 m, longueur de forage de 200 m à 500 m",Equipment,General,Heures machine,1161.97,1161.97,1161.97,1161.97,1,EUR,268450.98,231.03,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KANEPU,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 2,12 m, longueur de passage de 500 m à 700 m",Equipment,General,Heures machine,1266.53,1266.53,1266.53,1266.53,1,EUR,292607.39,231.03,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KANEDX,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 2,7 m, longueur de forage jusqu'à 200 m",Equipment,General,Heures machine,1632.55,1632.55,1632.55,1632.55,1,EUR,434667.7,266.25,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KALIKA,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 2,7 m, longueur de passage de 200 m à 500 m",Equipment,General,Heures machine,1736.89,1736.89,1736.89,1736.89,1,EUR,462447.5,266.25,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KALIME,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 2,7 m, longueur de forage de 500 m à 1 000 m",Equipment,General,Heures machine,1841.95,1841.95,1841.95,1841.95,1,EUR,490420.18,266.25,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KALIRI,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 2,7 m, longueur de forage de 1 000 m à 1 500 m",Equipment,General,Heures machine,1947.55,1947.55,1947.55,1947.55,1,EUR,518535.41,266.25,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KAME-KAPU_KAKATO,"Installations à barre unique sur tracteur, puissance 79 kW (108 ch), largeur de fente 14 cm",Equipment,General,Heures machine,22.25,22.25,22.25,22.25,1,EUR,28.11,1.2633,3,3,TRAVAUX DE CONSTRUCTION,Lignes électriques,AUTRES TYPES DE TRAVAUX CONNEXES SUR LES LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRI,Réalisation de dispositifs de mise à la terre avec des conducteurs de mise à la RIRI-RI-KARI-RIPU,Dispositifs de protection des oiseaux sur les lignes électriques de type anti-collision,Abstract Material,General,pièce,150.9,150.9,150.9,150.9,1,EUR,352.1,2.3333,3,3,TRAVAUX DE CONSTRUCTION,Lignes électriques,AUTRES TYPES DE TRAVAUX CONNEXES SUR LES LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRI,Installation de dispositifs de protection contre les oiseaux MERI-RI-KARI-KARI,Produits décoratifs plats en béton fibré pour la finition des façades,Abstract Material,General,m2,46.66,46.66,46.66,46.66,1,EUR,4697.13,100.6667,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-KAME_KAKATODX,"Ancrages en acier inoxydable à friction et à calage, avec filetage extérieur M8, longueur 52 mm",Material,General,100 pièces,186.01,186.01,186.01,186.01,1,EUR,438.05,2.3533,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MEPU-SA-KAME-MEME_KARIKAPU,"Colle-mastic séchant en pâte à base de solvants organiques pour l'étanchéification des appareils radio, la fixation des éléments radio, des faisceaux, des fils, plage de températures de fonctionnement de -70 à +85 °C",Material,General,kg,54.75,54.75,54.75,54.75,1,EUR,62.59,1.1433,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Découpe de joints dans le béton MEPU-PU-KATO-MESA,Vernis polyuréthane bicomposant,Abstract Material,General,kg,62.16,62.16,62.16,62.16,1,EUR,1243.25,20.0,3,3,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements coulés MEPU-SA-KAVO-KASA_KAKAKATO,Composition du mastic de construction latex-craie hautement élastique,Material,General,t,4044.89,4044.89,4044.89,4044.89,1,EUR,34.11,0.01,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-KANE-KAME_KAKAPUPU,Rubans élastiques autocollants pour profilés de guidage 95 x 30000 mm,Material,General,m,0.46,0.46,0.46,0.46,1,EUR,53.3,116.6667,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE FIBRÉES (G",Installation de cloisons avec ossature métallique simple et revêtement triple co RIKA-RI-KADX-KAME_KAKAMEME,Mastic bitumineux pour raccords de câbles MB 70/60,Material,General,t,15041.96,15041.96,15041.96,15041.96,1,EUR,2.05,0.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS MEPU-SA-KAME-KATO_KAKAKADX,"Mastic bicomposant polysulfure thiokol pour éléments de toiture métallique, lanterneaux, communications, joints de dilatation difficiles d'accès de ponts, routes, tunnels, y compris métro",Material,General,t,10626.77,10626.77,10626.77,10626.77,1,EUR,148.78,0.0133,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KARI-RI-KASA-KAPU_RIKADXNE,"Gravier de roches denses pour travaux de construction M 1400, fraction 20-40 mm",Material,General,m3,78.98,78.98,78.98,78.98,1,EUR,13.03,0.1667,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAME-LI-MESA-KALI_KAKAPUTO,"Clous à béton pour pistolet de montage dans une douille en plastique, diamètre du clou 3,05 mm, longueur du clou 65 mm",Material,General,t,15165.4,15165.4,15165.4,15165.4,1,EUR,3.03,0.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS DXME-KALI-KADX_KAKAME,"Installations de cimentation pour le jointoiement, débit 7,2 m3/h",Equipment,General,Heures machine,6.52,6.52,6.52,6.52,1,EUR,2.28,0.35,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS DXME-KALI-KADX_KAKAME,"Électricité : consommation 4,13 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.53,0.53,0.53,0.53,1,EUR,0.19,0.35,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS KAPU-ME-KARI-KASA_KAMESARI,"Mélanges de béton lourd (BST) sur gravier concassé, classe B25, F(1)200, W8",Material,General,m3,138.93,138.93,138.93,138.93,1,EUR,88.91,0.64,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Assemblage de structures géantes sur les sites de transport fluvial KAME-LI-MESA-MEKA_KAKANEPU,"Agrafe métallique de gréement, droite, type d'agrafe CA50, charge admissible 5 t",Material,General,pièce,84.98,84.98,84.98,84.98,1,EUR,294.61,3.4667,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de gigantesques réservoirs sur des sites de transport fluvial KALI-RI-KANE-KASA_KAKAMESA,"Raccords profilés en acier galvanisé à deux niveaux pour plafond, dimensions 62 x 58 x 45 mm, épaisseur 0,9 mm",Material,General,100 pièces,31.49,31.49,31.49,31.49,1,EUR,116.22,3.69,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de plafonds suspendus en plaques de plâtre (GKL) KAME-NE-KAME-KAPU,Panneaux de finition en placoplâtre,Abstract Material,General,m2,43.96,43.96,43.96,43.96,1,EUR,6080.63,138.3333,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons et revêtement des murs à l'aide de panneaux à base de p KALI-RI-KANE-KATO_KARIKAME,"Profilé en acier galvanisé pour montants, dimensions 100 x 50 mm, épaisseur 0,6 mm",Material,General,m,3.57,3.57,3.57,3.57,1,EUR,1448.81,406.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE FIBRÉES (G",Installation de cloisons avec ossature métallique simple et revêtement triple co KAME-LI-MESA-KAME_KAKADXNE,"Ancrages à mandrin en acier inoxydable avec douille d'écartement conique pour la fixation invisible des panneaux de revêtement des façades ventilées suspendues, livrés avec un boulon à tête hexagonale et collerette cylindrique, M6x10, profondeur d'installation 7 mm",Material,General,100 pièces,146.98,146.98,146.98,146.98,1,EUR,902.44,6.14,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MELI-KADX_KAMERIRI,"Foret à pointe diamantée pour percer des trous pour les ancrages à mandrin, profondeur de perçage jusqu'à 15 mm, diamètre 7,2 mm avec alésage jusqu'à 9 mm",Material,General,pièce,175.78,175.78,175.78,175.78,1,EUR,372.65,2.12,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-RIME-MEDX_SASAKA,"Machines pour le perçage de trous borgnes pour ancrages, puissance 1,4 kW",Equipment,General,Heures machine,1.01,1.01,1.01,1.01,1,EUR,9.11,9.04,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-RIME-MEDX_SASAKA,"Électricité : consommation 0,46 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.54,9.04,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KASA-ME-KALI-MENE,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,172.38,172.38,172.38,172.38,1,EUR,17238.3,100.0,3,3,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS KASA-RI-KARI-MERI,Dalles en granit,Abstract Material,General,m2,34.87,34.87,34.87,34.87,1,EUR,711.42,20.4,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Réalisation de revêtements à partir de dalles de granit de petite taille KAME-RI-KATO-KATO_KAKANEPU,Mastic bitume-caoutchouc isolant MBR-75,Material,General,t,926.1,926.1,926.1,926.1,1,EUR,7.93,0.02,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MEPU-RI-KANE-KADX_MEKAMEPU,"Liant polyuréthane pour la fabrication de produits à base de granulés de caoutchouc et la mise en place de revêtements élastiques hautement résistants, viscosité 4,5-6,5 Pa*s à une température de +23 °C, densité 1,06-1,12 g/cm3",Material,General,kg,13.55,13.55,13.55,13.55,1,EUR,2883.9,212.8667,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en polyuréthane coulé pour terrains de sport et piste DXME-KAVO-KALI_KARIME,"Poseurs de granulés de caoutchouc sur les terrains de jeux et de sport, rendement jusqu'à 300 m²/h",Equipment,General,Heures machine,2.61,2.61,2.61,2.61,1,EUR,4.44,1.7033,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en polyuréthane coulé pour terrains de sport et piste DXME-KAVO-KALI_KARIME,"Électricité : consommation 1,98 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.25,0.25,0.25,0.25,1,EUR,0.43,1.7033,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en polyuréthane coulé pour terrains de sport et piste DXME-RIKA-MEME_KAKAPU,"Pontons pour utilisation en eaux fermées, 800 t",Equipment,General,Heures machine,53.69,53.69,53.69,53.69,1,EUR,261.81,4.8767,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS DE QUAIS ET DE PILoniers MARITIMES,QUAIS ET PILOTIS EN COQUES DE GRAND DIAMÈTRE DXME-RIKA-MEME_KAKAVO,"Pontons utilisés en rade ouverte, 800 t",Equipment,General,Heures machine,70.1,70.1,70.1,70.1,1,EUR,341.87,4.8767,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS DE QUAIS ET DE PILoniers MARITIMES,QUAIS ET PILOTIS EN COQUES DE GRAND DIAMÈTRE DXME-KASA-MEME_KAMEME,"Grues à portique, capacité de levage 10 t",Equipment,General,Heures machine,101.37,101.37,101.37,101.37,1,EUR,46.63,0.46,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS DE QUAIS ET DE PILoniers MARITIMES,Poutres sous-grues et voies DXME-KASA-MEME_KAMEME,"Électricité : consommation 17,16 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.2,2.2,2.2,2.2,1,EUR,1.01,0.46,3,3,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS DE QUAIS ET DE PILoniers MARITIMES,Poutres sous-grues et voies KAME-LI-MESA-MEKA_KAKASARI,"Agrafes de montage en acier à deux griffes (SD), diamètre de fixation 27 mm",Material,General,10 pièces,2.14,2.14,2.14,2.14,1,EUR,4.28,2.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS MEPU-SA-KAPU-KAME_KAMEMEME,"Mastic butyle caoutchouc d'étanchéité viscoélastique, s'applique sur surface sèche et humide",Material,General,kg,4.83,4.83,4.83,4.83,1,EUR,107.7,22.2867,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-KALI_KAMETOME,"Clous à expansion en plastique avec tige métallique pour isolation thermique, diamètre 10 mm, longueur 120 mm",Material,General,10 pièces,1.94,1.94,1.94,1.94,1,EUR,80.1,41.3333,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-KALI-KATO_KAKAME,"Bétonnières gravitaires mobiles, volume du tambour 65 l",Equipment,General,Heures machine,0.04,0.04,0.04,0.04,1,EUR,0.0,0.1133,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTION DE STRUCTURES MONOLITHES DE LA PARTIE SOUTERRAINE ET DU SOUS-SOL DE,Bétonnage des structures monolithiques en béton armé des parties souterraines et KASA-ME-KATO-KAME,Poutres de cerclage,Abstract Material,General,pièce,664.76,664.76,664.76,664.76,1,EUR,66475.5,100.0,3,3,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"Poutres, traverses et linteaux" RILI-RI-KAME-KAVO_KAKARINE,"Collier de fixation en acier pour câble de fixation inférieur, peint",Material,General,pièce,4.76,4.76,4.76,4.76,1,EUR,9.81,2.06,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE KALI-RI-KANE-KATO_KATOKAVO,"Profilé de fixation de façade en acier galvanisé avec revêtement polymère pour façades ventilées suspendues, avec éléments de fixation, section de 54 mm2, largeur 35,6 mm, épaisseur de l'acier 0,7 mm",Material,General,m,3.99,3.99,3.99,3.99,1,EUR,4773.01,1196.46,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-KAVO-KAME_KAKAME,"Finisseurs à chenilles, largeur maximale de pose 13 m, vitesse de pose jusqu'à 25 m/min, rendement 1100 t/h",Equipment,General,Heures machine,517.17,517.17,517.17,517.17,1,EUR,346.51,0.67,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MESA-MEPU_KARIKAME,"Vis autotaraudeuses en acier à tête tétraédrique, embout de perçage, diamètre 4,8 mm, longueur 16 mm",Material,General,100 pièces,2.1,2.1,2.1,2.1,1,EUR,9.2,4.3733,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAPU-TO-KARI-KADX_MEKAMESA,"Mélanges secs à base de ciment pour enduits et colles, pour travaux extérieurs et intérieurs, fraction 1,5 mm",Material,General,kg,0.67,0.67,0.67,0.67,1,EUR,473.95,710.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS RITO-NE-KAME-KAME_KAKAKARI,"Tuyaux d'égout en fonte, longueur 2 m, diamètre nominal 100 mm, épaisseur de paroi 4,5 mm",Material,General,m,43.3,43.3,43.3,43.3,1,EUR,2226.34,51.42,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE STANDARD (ALIMENTATION EN BÉTON À L'AIDE,Construction de dalles en béton armé MEME-RI-KADX-KARI_KAKAKAPU,"Panneaux de particules de bois de type R1 ordinaires non poncés, classe d'émission de formaldéhydes E1, sans revêtement, qualité II, épaisseur 18-20 mm",Material,General,100 m2,360.95,360.95,360.95,360.95,1,EUR,129.13,0.54,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction d'une dalle de fondation sous les bâtiments du bâtiment réacteur d' DXME-KALI-KARI_KAMERI,"Pompes à béton automotrices, débit 90 m3/h",Equipment,General,Heures machine,91.75,91.75,91.75,91.75,1,EUR,1164.34,12.69,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES RIKA-RI-MEKA-KAME_KAKAKAME,Embouts en aluminium pour sertissage de fils multibrins d'une section de 95-120 mm2,Material,General,100 pièces,64.75,64.75,64.75,64.75,1,EUR,16.19,0.25,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS D'ÉCLAIRAGE RISA-RI-KAME-RIME_MEKAKAVO,"Étrier d'ancrage en acier, charge totale admissible 36 kN, dimensions 135 x 70 mm",Material,General,pièce,27.61,27.61,27.61,27.61,1,EUR,56.88,2.06,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE CÂBLES SUPPLÉMENTAIRES RIKA-RI-KANE-KAPU_KAKAKARI,"Support de limiteur de tension pour poteaux en béton armé, galvanisé",Material,General,compl,49.64,49.64,49.64,49.64,1,EUR,50.14,1.01,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS DU RÉSEAU DE CONTACT KAME-LI-MESA-MEPU_KAKAPULI,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente cruciforme, pointues, diamètre 4,2 mm, longueur 75 mm",Material,General,100 pièces,2.31,2.31,2.31,2.31,1,EUR,10.29,4.4633,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS MERI-RI-KASA-KASA_KAKAMEVO,"Panneaux en laine minérale à liant synthétique, isolants thermiques PM-50, souples, densité 46-55 kg/m3",Material,General,m3,108.05,108.05,108.05,108.05,1,EUR,283.67,2.6267,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAME-LI-MESA-KATO_KAKAMEDX,"Boulons en acier à tête hexagonale, livrés avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M36, longueur du boulon 60-300 mm",Material,General,t,4755.26,4755.26,4755.26,4755.26,1,EUR,456.5,0.0967,3,3,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,"VANNES, CLAPETS" KAME-NE-KAME-KASA_KAKAKAME,"Plaques renforcées en ciment-minéral pour l'intérieur, épaisseur 8,0-12,5 mm",Material,General,m2,25.22,25.22,25.22,25.22,1,EUR,5195.55,206.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS DXME-RIME-MEDX_KARIVO,Machines à meuler à table croisée et broche horizontale de haute précision,Equipment,General,Heures machine,14.61,14.61,14.61,14.61,1,EUR,49.58,3.3933,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en dalles de trottoir DXME-RIME-MEDX_KARIVO,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,0.86,3.3933,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en dalles de trottoir MEPU-ME-KASA-KARI,Colles polyuréthanes,Abstract Material,General,kg,13.38,13.38,13.38,13.38,1,EUR,513.44,38.3733,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Installation de revêtements pour terrains de sport et aires de jeux à partir de MEME-TO-KATO-MEME,Profilés décoratifs pour le montage de panneaux muraux,Abstract Material,General,m,0.5,0.5,0.5,0.5,1,EUR,62.79,126.5367,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KARI-RI-KASA-KAPU_RIKANERI,"Gravier issu de roches denses pour travaux de construction M 1200, fraction 10-20 mm",Material,General,m3,87.26,87.26,87.26,87.26,1,EUR,556.11,6.3733,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MEPU-KALI,Polymère pour la stabilisation des sols,Abstract Material,General,t,9636.23,9636.23,9636.23,9636.23,1,EUR,8964.9,1.395,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-KALI_KAMETO,"Distributeurs de liants minéraux, largeur de pose 2460 mm, capacité 16 m3, débit 75 l/min",Equipment,General,Heures machine,89.36,89.36,89.36,89.36,1,EUR,261.84,2.93,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MEPU-ME-KASA-KAPU,Colle époxy,Abstract Material,General,kg,58.43,58.43,58.43,58.43,1,EUR,220.37,3.77,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES RIKA-RI-KAME-KASA_KAKAMEPU,Douilles de câble en cuivre 240 mm,Material,General,100 pièces,944.79,944.79,944.79,944.79,1,EUR,35.27,0.0367,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-TO-KARI-MEME_KAKARIME,Frégon,Material,General,l,16.83,16.83,16.83,16.83,1,EUR,12.97,0.7733,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KASA-ME-KANE-KADX,Plaques de recouvrement pour puits en béton armé,Abstract Material,General,pièce,523.02,519.23,524.92,524.92,2,EUR,35237.45,67.1333,3,3,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,TRAVAUX CONNEXES DXME-RIME-MEVO_KARIME,"Canons à chaleur, puissance thermique 26-44 kW",Equipment,General,Heures machine,3.59,3.59,3.59,3.59,1,EUR,5.24,1.46,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-RIME-MEVO_KARIME,"Électricité : consommation 13,2 kWh/machine-heure",Electricity,Electricity,Heures machine,1.7,1.7,1.7,1.7,1,EUR,2.48,1.46,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES RISA-RI-KARI-KAVO_KAKAKAVO,"Ensemble de fixation en acier d'un support tubulaire sur un poteau en béton armé, diamètre du poteau 300-320 mm",Material,General,pièce,64.84,64.84,64.84,64.84,1,EUR,1335.79,20.6,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KARI-KAVO_KAKAKADX,"Ensemble de fixation en acier d'un support tubulaire sur un poteau métallique, largeur du profilé en U du poteau de support 250-300 mm, largeur du poteau de support 320-460 mm",Material,General,pièce,151.91,151.91,151.91,151.91,1,EUR,3129.39,20.6,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX MERI-ME-KARI-KAME,Matériau d'étanchéité en rouleau,Abstract Material,General,m2,3.64,3.64,3.64,3.64,1,EUR,1089.22,299.3333,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ KAVO-PU-KATO-KATO_KAKAKAPU,"Acier d'armature pour structures en béton armé, classe A500C, diamètre 12 mm",Material,Steel & Metal,t,1471.03,1471.03,1471.03,1471.03,1,EUR,1066.45,0.7267,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu MEME-ME-KATO-KAVO_KAKAKAME,"Latte rabotée en bois résineux (épicéa, pin), sèche, longueur 2 m, dimensions 20x45 mm",Material,General,m3,1437.87,1437.87,1437.87,1437.87,1,EUR,143.79,0.1,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,TRAVERSES DE RYAZH,Installation des traverses de pontage KAME-LI-MEDX-MEPU_KAKAMERI,"Dispositifs amortisseurs en caoutchouc, diamètre 1000 mm",Material,General,kg,7.24,7.24,7.24,7.24,1,EUR,6904.04,953.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE PROTECTION DES INSTALLATIONS MARITIMES,Suspension de dispositifs anti-chocs pour installations d'amarrage maritimes à l KAME-LI-KANE-MEME_KAKAKATO,"Bandes à base de mousse de polyuréthane avec une couche adhésive sur une face, largeur 10 mm, épaisseur 5 mm",Material,General,10 m,6.02,6.02,6.02,6.02,1,EUR,54.8,9.1,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KARI-TO-KAME-KASA_KAPUNERI,"Sable issu du concassage pour travaux de construction, classe II, M 1200, granulométrie élevée",Material,General,m3,59.27,59.27,59.27,59.27,1,EUR,553.62,9.34,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-KAVO-KANE_KAKAME,"Fendeuses de joints, profondeur maximale de coupe 240 mm, puissance 17,7 kW (24 ch)",Equipment,General,Heures machine,5.47,5.47,5.47,5.47,1,EUR,112.13,20.5067,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-MEME_KAPUME,Réchauffeurs de joints infrarouges,Equipment,General,Heures machine,1.9,1.9,1.9,1.9,1,EUR,2.53,1.33,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES RIPU-TO-KARI-KATO,Tuyaux en polypropylène,Abstract Material,General,m,89.86,89.86,89.86,89.86,1,EUR,9210.75,102.5,3,3,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX EN POLYÉTHYLÈNE SANS PRESSION KANE-ME-KAME-KASA_KAKATOLI,"Brique céramique pleine simple, dimensions 250 x 120 x 65 mm, marque M150",Material,General,1000 pièces,635.11,635.11,635.11,635.11,1,EUR,1340.07,2.11,3,3,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,PUITS D'ÉGOUT,Installation de puits d'égouttement ronds pour les égouts pluviaux KAME-LI-MESA-MEPU_KAKAMEME,"Vis autotaraudeuses en acier phosphaté à tête fraisée et fente en croix, pointues, diamètre 3,8 mm, longueur 32 mm",Material,General,1000 pièces,18.37,18.37,18.37,18.37,1,EUR,0.29,0.02,3,3,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,PUITS D'ÉGOUT,Installation de puits ronds préfabriqués en matériaux polymères RIKA-RI-KAME-KASA_KAKAKALI,Douilles pour câbles en cuivre 35 mm,Material,General,100 pièces,103.73,103.73,103.73,103.73,1,EUR,3.88,0.0367,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV MEPU-PU-KATO-MENE_KAKAKATO,Vernis EP-730,Material,General,t,5824.56,5824.56,5824.56,5824.56,1,EUR,20.81,0.01,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ RINE-ME-KARI-KAPU_KAKAMERI,"Feuille de polychlorure de vinyle expansé, épaisseur 5 mm",Material,General,t,20826.92,20826.92,20826.92,20826.92,1,EUR,35.41,0.0,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ KAPU-TO-KARI-MEPU_MEKAKAKA,"Mélanges secs d'étanchéité à base de bentonite activée pour la création de rideaux et d'écrans anti-filtration pâteux, consommation 30-50 kg/m2",Material,General,t,1775.96,1775.96,1775.96,1775.96,1,EUR,2042.35,1.15,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ MEPU-PU-KAPU-MERI_KAKAMEDX,Émail EP-5285,Material,General,t,9658.32,9658.32,9658.32,9658.32,1,EUR,28.01,0.0,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é RISA-ME-KANE-KALI,Croisillons pointus,Abstract Material,General,compl,16239.02,16239.02,16239.02,16239.02,1,EUR,16239.02,1.0,3,3,TRAVAUX DE CONSTRUCTION,Voies de tramway,"POSE D'AIGUILLAGES, DE CROISEMENTS SANS ENTRAVE ET DE JOINTS NODULAIRES SUR LES ","Pose d'aiguillages moulés avec croisement, sorties, bifurcations" MEME-RI-KADX-KARI,Panneaux de particules,Abstract Material,General,m2,356.96,356.96,356.96,356.96,1,EUR,36588.08,102.5,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES MERI-RI-KALI-KARI_KAKAKALI,"Rouleau de mousse polyéthylène isolante, densité 20-30 kg/m3, conductivité thermique à +20 °C inférieure à 0,039 W/(m*K), épaisseur 10 mm",Material,General,m2,1.2,1.2,1.2,1.2,1,EUR,0.12,0.1,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,"Équipements de ventilation, d'alimentation en eau et de chauffage" RISA-RI-KARI-KADX_KAKAMETO,"Collier en acier pour la fixation d'une barre de chargement simple avec une seule oreille, diamètre de la charge 300 mm, épaisseur 30 mm",Material,General,pièce,22.36,22.36,22.36,22.36,1,EUR,30.7,1.3733,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX MEME-ME-KATO-KANE_KAMERITO,"Planches équarries de conifères, sèches, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 44-50 mm, classe I",Material,General,m3,755.07,755.07,755.07,755.07,1,EUR,473.18,0.6267,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"CONSTRUCTIONS DE COUVERTURES DE TOITURE, CHATRIERS" RIKA-ME-KARI-MEPU_KAKAKAME,Boucle d'oreille KS-095,Material,General,pièce,5.54,5.54,5.54,5.54,1,EUR,85.01,15.3333,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-KALI-RINE_KAKATOPU,"Cordon en polyéthylène, diamètre 4 mm",Material,General,10 m,1.78,1.78,1.78,1.78,1,EUR,33.81,19.0,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-KAVO-KASA_KANEPU,Machines du complexe de finition du béton à haute productivité finisseurs tubulaires,Equipment,General,Heures machine,50.79,50.79,50.79,50.79,1,EUR,79.74,1.57,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES MEPU-PU-KAPU-KAPU_KAKAKARI,Émail organosilicié thermorésistant KO-168,Material,General,t,3546.47,3546.47,3546.47,3546.47,1,EUR,12.53,0.01,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL MEME-TO-KARI-KARI,Blocs de fenêtres en plastique,Abstract Material,General,m2,159.67,159.67,159.67,159.67,1,EUR,15967.09,100.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES MEME-TO-KATO-KAME,Planches de fenêtre en PVC,Abstract Material,General,m,8.99,8.99,8.99,8.99,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES MEME-TO-KATO-MEPU_MEKAKAKA,"Bouchons d'extrémité double face pour plinthe en PVC, couleur blanche, dimensions 40 x 480 mm",Material,General,10 pièces,9.5,9.5,9.5,9.5,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES RIKA-RI-KASA-KAME_KAKAKARI,"Bandes de commutation pour SIP, charge de rupture 0,22 kN",Material,General,100 pièces,19.13,19.13,19.13,19.13,1,EUR,205.3,10.7333,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV KARI-RI-KASA-KAPU_RIMEKAPU,"Gravier issu de roches denses pour travaux de construction M 600, fraction 40-80(70) mm",Material,General,m3,47.34,47.34,47.34,47.34,1,EUR,746.31,15.7633,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,COUCHES DE BASE ET DE NIVELLEMENT DE LA FONDATION ET DU REVÊTEMENT,FONDATIONS ET REVÊTEMENTS EN MATÉRIAUX CONCASSÉS DXME-KAVO-KATO_KAMEME,"Rouleaux compresseurs automoteurs lisses vibrants, poids 11 t",Equipment,General,Heures machine,50.0,50.0,50.0,50.0,1,EUR,164.0,3.28,3,3,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,DRAINAGES KAME-VO-KAME-KANE,Treillis en verre,Abstract Material,General,m2,1.16,1.16,1.16,1.16,1,EUR,121.31,105.0333,3,3,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,REVÊTEMENTS METO-RI-KAPU-KATO,Dalles polies de différentes formes de type « Breccia »,Abstract Material,General,m2,83.8,83.8,83.8,83.8,1,EUR,8463.81,101.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,"TRAVAUX DE REVÊTEMENT AVEC DES EXIGENCES ÉLEVÉES EN MATIÈRE DE FINITION, DANS LE" RIKA-RI-KAME-KASA_KAKAMEME,Douilles de câble en cuivre 120 mm,Material,General,100 pièces,382.2,382.2,382.2,382.2,1,EUR,14.27,0.0367,3,3,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAVO-ME-KARI-RIKA_KAKAKARI,Maillon de raccordement Kentera 48-2/2a,Material,General,pièce,225.08,225.08,225.08,225.08,1,EUR,900.33,4.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE PROTECTION DES INSTALLATIONS MARITIMES,Suspension de dispositifs anti-chocs pour installations d'amarrage maritimes à l KAME-RI-KATO-KATO_KAKARIKA,"Mastic bitumineux d'étanchéité, adhésif pour matériaux d'étanchéité en rouleaux bitumineux et bitume-polymères, à froid, température de ramollissement non inférieure à +70 °C, adhérence au béton 0,3 MPa, consommation 0,7-1,0 kg/m2 pour une épaisseur de couche de 1 mm",Material,General,kg,2.28,2.28,2.28,2.28,1,EUR,3.14,1.3767,3,3,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,AUTRES TRAVAUX,ÉLÉMENTS DES INSTALLATIONS D'ÉGOUT MEPU-SA-KAPU-KAME_KAKAKAME,Mastic butylcaoutchouc d'étanchéité viscoélastique,Material,General,kg,5.86,5.86,5.86,5.86,1,EUR,4.1,0.7,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation d'une bordure en béton monolithique à l'aide d'une finisseuse à bét KARI-RI-KASA-KAPU_RIRITOPU,"Gravier concassé pour travaux de construction M 800, fraction 20-40 mm",Material,General,m3,63.04,63.04,63.04,63.04,1,EUR,730.08,11.58,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de structures de déversement à partir de la chaussée à l'aide de go KAVO-RI-KARI-KATO_KAKATOPU,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 23 mm",Material,Steel & Metal,10 m,74.87,74.87,74.87,74.87,1,EUR,0.19,0.0,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" RIPU-TO-KAPU-KARI,Raccord amplificateur en polyéthylène avec éléments chauffants électriques intégrés,Abstract Material,General,pièce,132.46,132.46,132.46,132.46,1,EUR,13246.33,100.0,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-KANE-KATO_KAKAME,"Treuils hydrauliques autonomes avec moteur à combustion interne pour le remplacement sans tranchée de conduites et le tirage de câbles, livrés avec un groupe hydraulique, force de traction 10 t",Equipment,General,Heures machine,11.42,11.42,11.42,11.42,1,EUR,11.57,1.0133,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,POSE SOUTERRAINE DE CONDUITES MERI-ME-KATO-KASA,Tuiles ordinaires,Abstract Material,General,1000 pièces,15.98,15.98,15.98,15.98,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures RISA-RI-KAME-KANE_KAKATOME,Pince à platine pour fil de mise à la terre KS-066-1,Material,General,pièce,2.29,2.29,2.29,2.29,1,EUR,9.15,4.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipement à usage général,TRAVAUX DE GRÉEMENT,INSTALLATION ET DÉMONTAGE DES BLOCS DE MONTAGE ET DES POLYSPASTS KAME-TO-KASA-TOME_KAKAKAME,Thiocols liquides,Material,General,t,35686.2,35686.2,35686.2,35686.2,1,EUR,2462.35,0.07,3,3,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,FABRICATION DE MATÉRIAUX D'ÉTANCHÉITÉ KAVO-TO-MERI-KAME,Poutres en I en acier,Abstract Material,General,t,2686.81,2686.81,2686.81,2686.81,1,EUR,1191.15,0.4433,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-MESA-KARI_KAKAPUTO,"Boulons d'ancrage avec écrou en acier à friction à calage, avec filetage extérieur M12, diamètre 16 mm, longueur 150 mm",Material,General,100 pièces,65.49,65.49,65.49,65.49,1,EUR,0.97,0.0133,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,BÂTIMENTS ET CHARPENTES DE BÂTIMENTS,STRUCTURES ET BÂTIMENTS À USAGE SPÉCIAL KARI-RI-KASA-KAPU_RITOLIVO,"Granulats de roches denses pour la construction routière M 800, fraction 16-31,5 mm",Material,General,m3,88.08,88.08,88.08,88.08,1,EUR,848.64,9.6367,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de dispositifs de déversement d'eau à partir de la chaussée à l'aid DXME-KASA-KASA_KAMEDX,"Grues sur châssis automobile, capacité de charge 30 t",Equipment,General,Heures machine,60.05,60.05,60.05,60.05,1,EUR,1754.33,29.2133,3,3,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage MEME-RI-MEME-KASA,Contreplaqué collé,Abstract Material,General,m3,3.25,3.25,3.25,3.25,1,EUR,1.85,0.57,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" KAME-LI-MESA-MEPU_KAKANETO,"Vis autotaraudeuses en acier à tête fraisée et empreinte cruciforme, pointe de forage, diamètre 4,8 mm, longueur 80 mm",Material,General,t,10287.88,10287.88,10287.88,10287.88,1,EUR,10.91,0.0,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" KAME-NE-KAME-KADX_KAKAMEKA,"Plaques fibrées monocouches à base de ciment gris, densité 300 kg/m3, épaisseur 50 mm",Material,General,m2,13.23,13.23,13.23,13.23,1,EUR,2097.99,158.6,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" MEME-RI-KADX-KARI_KAKAKATO,"Panneaux de particules de type R1 ordinaires non poncés, classe d'émission de formaldéhydes E1, sans revêtement, qualité II, épaisseur 15-17 mm",Material,General,100 m2,315.61,315.61,315.61,315.61,1,EUR,322.45,1.02,3,3,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" DXME-KANE-KATO_SALIVO,"Électricité : consommation 0,26 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.65,19.2,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CADRES, ARCHES, STRUCTURES DE SOUTIEN ET BARRIÈRES DE PROTECTION" KADX-RI-KARI-KAME,Éléments de revêtement,Abstract Material,General,t,2.88,2.88,2.88,2.88,1,EUR,296.24,103.0,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" DXME-RIME-KAME_SAMERI,"Appareils de peinture à pulvérisation sans air à commande pneumatique fonctionnant à partir de compresseurs mobiles, débit jusqu'à 12 l/min",Equipment,General,Heures machine,1.0,1.0,1.0,1.0,1,EUR,17.45,17.5267,3,3,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES DXME-RIME-MEDX_KAMELI,Cintreuses électriques pour tubes de 100 à 200 mm de diamètre,Equipment,General,Heures machine,7.13,7.13,7.13,7.13,1,EUR,7.22,1.0133,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS DXME-RIME-MEDX_KAMELI,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,0.17,1.0133,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS DXME-KAPU-KAME_KADXKA,Hydrorotateurs (foreuses hydrauliques) sur base d'excavatrice à chenilles pneumatiques d'un poids de 5 à 7 tonnes,Equipment,General,Heures machine,21.04,21.04,21.04,21.04,1,EUR,63.88,3.0367,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KARI-ME-KAME-KAME_KAKAKAPU,Argile en morceaux,Material,General,m3,33.42,33.42,33.42,33.42,1,EUR,49.79,1.49,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-MESA-KAME_MEMEPUSA,"Ancrage en acier galvanisé à cadre, diamètre 10 mm, longueur 110 mm",Material,General,pièce,1.08,1.08,1.08,1.08,1,EUR,58.24,53.89,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Planchers,PLACES,Installation de plafonds préfabriqués à ossature et poutres dans les murs en pie KAPU-TO-KARI-METO_KARIMEPU,"Mélanges secs de ciment et de sable pour maçonnerie, classe B7,5 (M100)",Material,General,t,80.37,80.37,80.37,80.37,1,EUR,7.63,0.1,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Planchers,PLACES,Installation de plafonds préfabriqués à ossature et poutres dans les murs en pie MEME-ME-KATO-KALI_KAKAMERI,"Bois profilé de conifères (épicéa, pin), humidité naturelle, longueur 2-6,5 m, largeur 150 mm, épaisseur 200 mm, classe II",Material,General,m3,464.0,464.0,464.0,464.0,1,EUR,406.77,0.8767,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Ouvertures,OUVERTURES,Réparation des encadrements de fenêtres MEME-RI-KAME-KASA,Panneaux en bois pour portes de balcon,Abstract Material,General,m2,162.07,162.07,162.07,162.07,1,EUR,0.0,0.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Ouvertures,OUVERTURES,Installation de panneaux de porte KAME-LI-MELI-MEKA_KAKAKAME,Fraise pour découpeuse,Material,General,pièce,106.53,106.53,106.53,106.53,1,EUR,10.65,0.1,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Découpe de rainures dans l'ancienne toiture à l'aide de découpeuses à disques di RISA-ME-KAPU-KATO_KAKARIME,"Boulons de voie pour la fixation des rails, diamètre M22, longueur 115 mm, avec écrou de diamètre M22",Material,General,t,4882.16,4882.16,4882.16,4882.16,1,EUR,104.48,0.06,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES AUXILIAIRES,PLATEFORMES ET PILOTIS KAME-LI-MESA-KALI_KAKAMETO,"Chevilles polypropylène à tête plate pour toiture, diamètre 50 mm, longueur 150 mm",Material,General,100 pièces,26.41,26.41,26.41,26.41,1,EUR,99.46,3.7667,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates MEPU-SA-KAPU-KAVO_KAKAKALI,"Mastic adhésif polymère à base de caoutchoucs synthétiques pour les travaux de toiture, l'étanchéité, la protection contre les gaz et la protection contre le radon",Material,General,t,11066.44,11066.44,11066.44,11066.44,1,EUR,809.33,0.0733,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Construction de toitures plates KAME-LI-KAVO-KASA_KAKAMEME,Additif synthétique pour mortier de ciment,Material,General,t,12794.74,12794.74,12794.74,12794.74,1,EUR,29.43,0.0,3,3,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation d'une bordure en béton monolithique à l'aide d'une finisseuse à bét DXME-RIKA-KADX_KAKALI,"Grues flottantes pour travail en eaux fermées, automotrices, 300 t",Equipment,General,Heures machine,1255.08,1255.08,1255.08,1255.08,1,EUR,223035.63,177.7067,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES DE TRANSFERT KAME-LI-MESA-KARI_KAKANENE,"Boulons en acier galvanisé à tête hexagonale, diamètre du filetage M20 (M22), longueur 40-200 mm",Material,General,t,3273.81,3273.81,3273.81,3273.81,1,EUR,25.59,0.02,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR DXME-RIME-MEME_KAKAME,"Moteurs à essence portatifs, diamètre de la mèche jusqu'à 200 mm, puissance du moteur jusqu'à 1,6 kW (2,2 ch)",Equipment,General,Heures machine,0.73,0.73,0.73,0.73,1,EUR,9.34,12.8533,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,MOYENS DE PROTECTION PHYSIQUE DU PÉRIMÈTRE,Installation de poteaux métalliques pour la mise en place de moyens de protectio KAME-SA-KATO-KANE,Colonnes de signalisation,Abstract Material,General,pièce,5.98,5.98,5.98,5.98,1,EUR,400.49,67.0,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES MEVO-PU-KAME-KATO,Protecteur,Abstract Material,General,pièce,216.8,216.8,216.8,216.8,1,EUR,216.8,1.0,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES MERI-ME-KATO-KANE,Tuile demi-ronde,Abstract Material,General,pièce,15.98,15.98,15.98,15.98,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-MEKA_KAKAKARI,"Pinces en aluminium pour tuiles faîtières, peintes, longueur 111,5 mm, largeur 10,8 mm",Material,General,100 pièces,42.94,42.94,42.94,42.94,1,EUR,83.88,1.9533,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-MEKA_KAKAKAPU,"Fixation en acier galvanisé pour faîtage/arêtier, longueur 220 mm, largeur d'appui 50 mm",Material,General,pièce,1.83,1.83,1.83,1.83,1,EUR,272.74,148.6667,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable KASA-TO-KARI-KADX,Détails,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,CARTOUSCHES,"Cartouches dont les dimensions maximales (hauteur, largeur) atteignent 500 mm" KASA-TO-KAME-KADX,Détails,Abstract Material,General,pièce,64.95,64.95,64.95,64.95,1,EUR,64.95,1.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,CARTOUSCHES,"Cartouches dont les dimensions maximales (hauteur, largeur) atteignent 500 mm" KASA-TO-KAME-MEME,Détails,Abstract Material,General,pièce,21.65,21.65,21.65,21.65,1,EUR,21.65,1.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,FEUILLES,Feuilles d'une hauteur maximale de 150 mm KAME-LI-MESA-KARI_KAKARIME,"Boulons d'ancrage avec écrou en acier à friction, à filetage extérieur M10, diamètre 12 mm, longueur 120 mm",Material,General,100 pièces,48.53,48.53,48.53,48.53,1,EUR,5.66,0.1167,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des colonnes des bâtiments et des structures des centrales nucléair RITO-SA-KAME-KAVO_KAKARINE,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 530 mm, épaisseur de paroi 9 mm",Material,Pipes & Fittings,m,243.58,243.58,243.58,243.58,1,EUR,1055.5,4.3333,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" MEPU-SA-KAME-MEKA,Mousses polyuréthanes thermo-expansibles ignifuges à deux composants,Abstract Material,General,pièce,115.94,115.94,115.94,115.94,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES KAME-LI-KANE-MEME,"Enveloppes en tissu hautement élastiques, ignifuges et imperméables",Abstract Material,General,10 m,6.52,6.52,6.52,6.52,1,EUR,0.0,0.0,3,2,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES DXME-KANE-KATO_SALIVO,"Treuils électriques à câble, force de traction 14,71 kN (1,5 t)",Equipment,General,Heures machine,0.34,0.34,0.34,0.34,1,EUR,6.53,19.2,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CADRES, ARCHES, STRUCTURES DE SOUTIEN ET BARRIÈRES DE PROTECTION" KAVO-ME-KARI-METO_KAKAMEKA,"Manchon métallique en bande d'acier galvanisé, non étanche, profil simple, RZ-TsKh, diamètre nominal 27 mm",Material,General,m,2.33,2.33,2.33,2.33,1,EUR,39.92,17.1667,3,3,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE TRANSPORT À ACTION CONTINUE,CONVOYEURS SPÉCIAUX MEPU-RI-KANE-KAME_KAMEKADX,Antiseptique pour la protection des structures en bois contre la détérioration biologique,Material,Steel & Metal,t,2180.7,2180.7,2180.7,2180.7,1,EUR,21.81,0.01,3,3,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,"ISOLATION DES SURFACES FROIDES DES CONSTRUCTIONS, DES CHAMBRES FRIGORIFIQUES À L" KAME-LI-MERI-KANE,Géotextile,Abstract Material,General,m2,5.74,5.74,5.74,5.74,1,EUR,1375.28,239.7333,3,3,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION RIKA-DX-KARI-KAME,Anode de mise à la terre profonde (guirlande),Abstract Material,General,compl,10548.07,10548.07,10548.07,10548.07,1,EUR,10548.07,1.0,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Mise à la terre anodique profonde à partir de structures modulaires préfabriquée MERI-RI-KATO-KADX_KAKAKALI,Fil de verre complexe spécial,Material,General,kg,3.03,3.03,3.03,3.03,1,EUR,0.25,0.08,3,3,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAME-LI-KALI-RILI_MEKAKARI,"Clavette d'étanchéité élastique en PVC, nombre de nervures 4 pièces, largeur 320 mm",Material,General,m,18.0,18.0,18.0,18.0,1,EUR,989.21,54.9433,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAVO-RI-KATO-KAME,Toron galvanisé à sept fils dans une graisse et une gaine individuelle,Abstract Material,General,t,57.3,57.3,57.3,57.3,1,EUR,51.82,0.9033,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS MEPU-SA-KAME-KANE_KAKAMEDX,"Mastic polyuréthane bicomposant résistant au gel, composé d'une pâte à base de polyol (composant A) et d'un durcisseur à base de prépolymère polyuréthane (composant B), destiné à l'étanchéification des joints de dilatation des structures de construction présentant une déformation maximale de 25 %.",Material,Steel & Metal,kg,4.5,4.5,4.5,4.5,1,EUR,316.99,70.3933,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS RIPU-TO-KAPU-MEME_KAKASAKA,"Bouchon en polyéthylène pour déviateur, livré avec deux butées, diamètre du bouchon 20 mm, longueur du bouchon 475 mm",Material,General,pièce,30.64,30.64,30.64,30.64,1,EUR,113.16,3.6933,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KAVO-ME-KARI-MERI_KAKAPUME,"Réservoir en acier pour sauna, capacité 40 l, dimensions 500 x 350 x 240 mm",Material,General,pièce,221.01,221.01,221.01,221.01,1,EUR,22100.55,100.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de chauffage,TRAVAUX DE CHAUFFAGE,Remplacement des appareils dans les poêles KAME-LI-MELI-KATO_KAKAKAME,"Pierre à aiguiser, à grain fin, à grain moyen",Material,General,kg,9.11,9.11,9.11,9.11,1,EUR,97.23,10.6667,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,"Travaux de vitrerie, de pose de papier peint et de revêtement",AUTRES TRAVAUX,Polissage et ponçage des surfaces KAME-RI-KATO-KATO_KAMERIME,"Mastic bitume-polymère d'étanchéité, pour toitures, pour constructions et installations (réparation) de toitures, à chaud, plage de température de -20 à +40 °C, adhérence au métal/béton 0,25-1,0/0,2-0,8 MPa",Material,General,kg,2.54,2.54,2.54,2.54,1,EUR,340.36,134.1667,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements à l'aide de panneaux KAVO-RI-KARI-MEKA_KAKARIVO,"Câble à double torsion TK sans revêtement, structure 6x37(1+6+12+18)+1 o.s., marque B, en fil sans revêtement, groupe de marquage 1570-1770 N/mm2, diamètre 5,0 mm",Material,Steel & Metal,10 m,17.21,17.21,17.21,17.21,1,EUR,60.22,3.5,3,3,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" RITO-SA-KAME-KAVO_KAKARIDX,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 530 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,322.88,322.88,322.88,322.88,1,EUR,322.88,1.0,3,3,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAVO-RI-KARI-KATO_KAKAKALI,"Câble à double torsion LK-O, structure 6 x 7 (1+6) + 1 x 7 (1+6), marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 15,5 mm",Material,Steel & Metal,10 m,36.38,36.38,36.38,36.38,1,EUR,18.19,0.5,3,3,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CÂBLES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" MEVO-SA-KAVO-MEDX_KAKAMEME,"Boule d'arrêt en caoutchouc, diamètre 700 mm",Material,General,pièce,599.2,599.2,599.2,599.2,1,EUR,4404.11,7.35,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-KAPU_KASASA,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.08,1.3333,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des systèmes d'évacuation des eaux usées internes à l'aide de manch MERI-RI-KAPU-KASA,Matériaux isolants thermiques,Abstract Material,General,m3,185.38,185.38,185.38,185.38,1,EUR,203.3,1.0967,3,3,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS MERI-RI-KASA-KAME,"Plaques (panneaux) en polyéthylène expansé, caoutchouc",Abstract Material,General,m2,15.98,15.98,15.98,15.98,1,EUR,191.95,12.01,3,3,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS MEVO-SA-KAVO-MEDX_KAKAKARI,"Bille d'arrêt en caoutchouc, diamètre 125 mm",Material,General,pièce,162.91,162.91,162.91,162.91,1,EUR,3258.21,20.0,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAVO-ME-KARI-MELI_KAMEVOSA,"Treillis métallique à double torsion en fil galvanisé avec mailles hexagonales, diamètre du fil 2,7 mm, taille des mailles 80 x 100 mm",Material,General,m2,5.92,5.92,5.92,5.92,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS MEPU-ME-KASA-KAPU_KAMEKARI,"Colle à base d'époxy à deux composants, composant A",Material,General,kg,82.84,82.84,82.84,82.84,1,EUR,889.88,10.7467,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,RENFORCEMENT DES CONSTRUCTIONS EN BÉTON ARMÉ MEPU-ME-KASA-KAPU_KAMEKATO,"Colle à base d'époxy à deux composants, composant B",Material,General,kg,82.84,82.84,82.84,82.84,1,EUR,302.99,3.6533,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,RENFORCEMENT DES CONSTRUCTIONS EN BÉTON ARMÉ MEPU-ME-KASA-KAPU_KAMEKAPU,"Colle à base d'époxy à deux composants pour lamelles et tiges composites, composant A",Material,General,kg,55.41,55.41,55.41,55.41,1,EUR,678.8,12.25,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,RENFORCEMENT DES CONSTRUCTIONS EN BÉTON ARMÉ MEPU-ME-KASA-KAPU_KAMEKASA,"Colle à base d'époxy à deux composants pour lamelles et tiges composites, composant B",Material,General,kg,55.41,55.41,55.41,55.41,1,EUR,678.8,12.25,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,RENFORCEMENT DES CONSTRUCTIONS EN BÉTON ARMÉ MEPU-PU-KAME-KADX_KANEKAME,"Apprêt à deux composants à base d'époxy pour matériaux composites, composant A",Material,General,kg,64.98,64.98,64.98,64.98,1,EUR,78.46,1.2033,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,RENFORCEMENT DES CONSTRUCTIONS EN BÉTON ARMÉ MEPU-PU-KAME-KADX_KANEKARI,"Apprêt à deux composants à base d'époxy pour matériaux composites, composant B",Material,General,kg,64.98,64.98,64.98,64.98,1,EUR,35.25,0.5467,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,RENFORCEMENT DES CONSTRUCTIONS EN BÉTON ARMÉ MEVO-ME-MEKA-KAVO,Robinet pour urinoir,Abstract Material,General,pièce,8.81,8.81,8.81,8.81,1,EUR,880.99,100.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Remplacement de la robinetterie MERI-RI-KASA-KASA_KAKAMEPU,"Panneaux isolants en laine minérale à liant synthétique PPZh-200, rigidité accrue, densité 191-210 kg/m3",Material,General,m3,407.47,407.47,407.47,407.47,1,EUR,198.3,0.4867,3,3,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation d'une ceinture en bois au-dessus du socle MEME-RI-MERI-KARI,Structures de fermes,Abstract Material,Steel & Metal,m3,3.25,3.25,3.25,3.25,1,EUR,1.33,0.41,3,3,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de fermes triangulaires collées en métal et bois KASA-ME-KAVO-MEKA,Structures préfabriquées en béton armé,Abstract Material,Steel & Metal,pièce,1272.89,1272.89,1272.89,1272.89,1,EUR,1272.89,1.0,3,3,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de cadres préfabriqués en béton armé composés de deux demi-cadres MEDX-RI-KATO-KADX_KAKANERI,"Grilles de ventilation à persiennes avec régulateur de débit d'air, en acier, dimensions de l'ouverture sous la grille 200 x 200 mm",Material,General,m2,566.26,566.26,566.26,566.26,1,EUR,671.96,1.1867,3,3,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de conduits de ventilation avec ouverture manuelle individuelle des KAPU-ME-KARI-KASA_KAMETORI,"Mélanges de béton lourd (BST) sur gravier concassé, classe B15, F(1)150, W4",Material,General,m3,119.26,119.26,119.26,119.26,1,EUR,0.05,0.0,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KASA_KAKAME,Équipement pour le compactage des puits à base d'une grue sur chenilles,Equipment,General,Heures machine,36.58,36.58,36.58,36.58,1,EUR,74.14,2.0267,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KAPU-KAME_KADXRI,Hydrorotateurs (foreuses hydrauliques) sur la base d'un camion-grue sur châssis automobile d'un poids de 5 à 7 tonnes,Equipment,General,Heures machine,40.3,40.3,40.3,40.3,1,EUR,6.99,0.1733,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RIRI-ME-KARI-KATO,Colonne de contrôle et de mesure,Abstract Material,General,pièce,205.01,205.01,205.01,205.01,1,EUR,205.01,1.0,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Installation d'un poste de contrôle et de mesure (PCM) KAVO-RI-KARI-MESA_KAKAKARI,"Câble à triple torsion LK-R, structure 6x7x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 25 mm",Material,Steel & Metal,10 m,139.57,139.57,139.57,139.57,1,EUR,94.21,0.6733,3,3,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU MARIN DANS UNE ZONE AQUA,POSE DE CONDUITES EN MILIEU MARIN DANS UNE ZONE MARITIME FERMÉE DXME-RIKA-KARI_KAKAVO,"Barges non automotrices pour une utilisation en eaux fermées, capacité de charge 1 000 t",Equipment,General,Heures machine,124.53,124.53,124.53,124.53,1,EUR,1969.25,15.8133,3,3,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU MARIN DANS UNE ZONE AQUA,POSE DE CONDUITES EN MILIEU MARIN DANS UNE ZONE MARITIME FERMÉE DXME-RIME-KARI_KAMEME,"Appareils à haute pression avec moteur à combustion interne pour le nettoyage hydraulique des surfaces, débit 20 l/min, pression 100 MPa",Equipment,General,Heures machine,19.49,19.49,19.49,19.49,1,EUR,10.13,0.52,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KATO-KARI_KAMETOLI,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 159 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,65.1,65.1,65.1,65.1,1,EUR,33.03,0.5067,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS DXME-RIKA-KADX_KAMERI,Grues flottantes automotrices 100 t,Equipment,General,Heures machine,748.82,748.82,748.82,748.82,1,EUR,14674.36,19.5967,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS RITO-SA-KAME-KANE_KAKAMEPU,"Tubes en acier soudés pour gazoducs et oléoducs principaux, classe de résistance K42, diamètre extérieur 426 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,210.99,210.99,210.99,210.99,1,EUR,3934.94,18.65,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net MEPU-SA-KADX-KALI_KAMEKARI,Solvant pour matériaux polyuréthanes,Material,General,kg,8.17,8.17,8.17,8.17,1,EUR,3.81,0.4667,3,3,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy MEPU-RI-KAPU-KATO_KAKAMEME,Résine époxy-diane non durcie,Material,General,kg,27.76,27.76,27.76,27.76,1,EUR,230.41,8.3,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire MEPU-SA-KADX-KATO_KAKAKAME,Dégraissant,Material,General,kg,6.78,6.78,6.78,6.78,1,EUR,259.22,38.2433,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de RITO-TO-KANE-KAPU_KAKARIVO,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz sans filetage, légers, diamètre nominal 50 mm, épaisseur de paroi 3 mm",Material,Pipes & Fittings,m,5.78,5.78,5.78,5.78,1,EUR,294.91,51.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ALIMENTATION EN GAZ,Réparation des systèmes d'alimentation en gaz à l'intérieur des bâtiments DXME-METO-KATO_KADXME,"Machines pour l'insertion de manchons avec générateur de vapeur sur base automobile, capacité de production de vapeur 50 kg/h",Equipment,General,Heures machine,48.23,48.23,48.23,48.23,1,EUR,3913.52,81.1367,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des canalisations internes à l'aide de gaines polymères flexibles DXME-MEKA-KAPU_KASASA,"Agrégats pour l'ouverture des raccords et le traitement de la surface interne des conduites, diamètre jusqu'à 200 mm",Equipment,General,Heures machine,2.82,2.82,2.82,2.82,1,EUR,3.76,1.3333,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des systèmes d'évacuation des eaux usées internes à l'aide de manch RITO-VO-KATO-KAME_KAKATORI,"Bouchon en acier PT, diamètre nominal jusqu'à 400 mm",Material,General,pièce,128.26,128.26,128.26,128.26,1,EUR,13.47,0.1067,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Montage et démontage d'un bouchon pneumatique en caoutchouc MEME-RI-KANE-KARI_KAKASAKA,"Poutre de coffrage en contreplaqué et bois, collée, peinte, hauteur 200 mm, largeur de tablette 80 mm, épaisseur de paroi 27 mm",Material,General,m,7.56,7.56,7.56,7.56,1,EUR,3165.48,418.6567,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ RINE-ME-KARI-KATO_KAKARIRI,"Cale de fixation de rail, type « Métro » R50, allongée",Material,General,pièce,52.16,52.16,52.16,52.16,1,EUR,63603.21,1219.3333,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RITO-TO-KANE-KARI_KAKAKASA,"Tubes en acier soudés galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 40 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,7.47,7.47,7.47,7.47,1,EUR,38.32,5.1267,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment KALI-TO-KARI-KAPU,Structures de ponts ferroviaires,Abstract Material,Steel & Metal,compl,6680.75,6680.75,6680.75,6680.75,1,EUR,6680.75,1.0,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Installation par grues de structures de ponts en acier DXME-MEKA-MEME_METORI,Machines de formage pour le pressage de tuyaux en polyéthylène d'un diamètre de 400 à 500 mm,Equipment,General,Heures machine,293.68,293.68,293.68,293.68,1,EUR,3719.97,12.6667,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya KAME-LI-MESA-KAVO_KAKARISA,"Rivets en acier à tête semi-circulaire, diamètre 24 mm, longueur 120-180 mm",Material,General,t,3204.94,3204.94,3204.94,3204.94,1,EUR,14.96,0.01,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Déplacement transversal des structures en acier des ponts sur une fondation prêt KAVO-TO-KAPU-KARI_KARIKAPU,"Acier laminé à chaud rond, marques d'acier 09G2S, 12G2S, diamètre 30-195 mm",Material,General,t,1623.5,1623.5,1623.5,1623.5,1,EUR,9.2,0.01,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Déplacement transversal des structures en acier des ponts sur une fondation prêt MEDX-RI-KATO-KASA,Grilles de ventilation,Abstract Material,General,pièce,22.27,22.27,22.27,22.27,1,EUR,2227.29,100.0,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MESA-MEME_KAKARIME,"Rondelles en acier rondes, diamètre du trou M6",Material,General,kg,5.94,5.94,5.94,5.94,1,EUR,3.36,0.5667,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-VO-KARI-KANE_MEKAMEKA,"Verre flotté en feuilles M1, incolore, épaisseur nominale 4 mm",Material,General,m2,8.31,8.31,8.31,8.31,1,EUR,0.53,0.06,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Assemblage à grande échelle de dalles orthotropes MEKA-RI-KARI-KAPU_KAKARIME,"Tôles laminées à chaud en cuivre de marque M2, épaisseur 11-25 mm",Material,General,t,29423.22,29423.22,29423.22,29423.22,1,EUR,44.92,0.0,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Assemblage à grande échelle de dalles orthotropes KAPU-RI-KAME-KAME_KAKAPUNE,"Mélanges d'asphalte dense à grains fins, type A, marque I",Material,General,t,180.98,180.98,180.98,180.98,1,EUR,41.63,0.23,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CANALISATIONS D'ÉVACUATION D'EAU SUR DES FONDATIONS PRÊTES (BASES) ET CANIVEAUX ,TUBES D'ÉVACUATION DES EAUX EN MÉTAL ONDULÉ DXME-MEKA-MEME_METOKA,Machines de moulage pour le pressage de tuyaux en polyéthylène d'un diamètre de 100 à 200 mm,Equipment,General,Heures machine,186.77,186.77,186.77,186.77,1,EUR,1154.25,6.18,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya DXME-MEKA-MEME_METOME,Machines de formage pour le pressage de tuyaux en polyéthylène d'un diamètre de 200 à 350 mm,Equipment,General,Heures machine,226.7,226.7,226.7,226.7,1,EUR,2099.26,9.26,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya MEPU-RI-KAME-KASA,Composition polymère,Abstract Material,General,kg,52.36,52.36,52.36,52.36,1,EUR,13847.79,264.46,3,3,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,APPLICATION D'UN REVÊTEMENT DE FINITION LORS DE LA POSE D'UN SOL MONOLITHIQUE DA,Application d'un revêtement de surface lors de la pose d'un sol monolithique dan DXME-MERI-KASA_KAMERI,Charrues à trois corps portées,Equipment,General,Heures machine,0.28,0.28,0.28,0.28,1,EUR,0.08,0.2833,3,3,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,ENTRETIEN DES CULTURES FORESTIÈRES RITO-VO-KAPU-MERI_KAMETORI,"Té sans soudure à passage droit, pression nominale jusqu'à 16 MPa, diamètre nominal 200 mm, diamètre extérieur et épaisseur de paroi 219 x 6,0 mm",Material,General,pièce,98.98,98.98,98.98,98.98,1,EUR,59.39,0.6,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net KAME-LI-MESA-MEPU_KAMENENE,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 5 mm, longueur 35 mm",Material,General,t,3556.36,3556.36,3556.36,3556.36,1,EUR,1.48,0.0,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" RITO-TO-KATO-KARI_KAMELINE,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 325 mm, épaisseur de paroi 11 mm",Material,Pipes & Fittings,m,259.15,259.15,259.15,259.15,1,EUR,14436.46,55.7067,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RITO-VO-KAPU-KAVO_KAKANEVO,"Raccord concentrique sans soudure à souder, pression nominale 16 MPa, diamètre extérieur et épaisseur de paroi 108x6-57x4 mm",Material,General,pièce,14.92,14.92,14.92,14.92,1,EUR,29.84,2.0,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RITO-VO-KAPU-MERI_KAMEPUME,"Raccord en T sans soudure à passage droit, pression nominale jusqu'à 16 MPa, diamètre nominal 300 mm, diamètre extérieur et épaisseur de paroi 325 x 12,0 mm",Material,General,pièce,355.76,355.76,355.76,355.76,1,EUR,355.76,1.0,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RITO-VO-KAPU-MERI_KARIKAVO,"Té de transition sans soudure à souder, diamètre nominal 150 x 100 mm, diamètre extérieur et épaisseur de paroi 159 x 8,0-108 x 5,0 mm",Material,General,pièce,86.44,86.44,86.44,86.44,1,EUR,86.44,1.0,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS DXME-KARI-KASA_KAMEDX,"Installations pour l'enfoncement de pieux, force d'enfoncement 120 t",Equipment,General,Heures machine,43.01,43.01,43.01,43.01,1,EUR,30.11,0.7,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KASA_KAMEDX,"Électricité : consommation 23,1 kWh/machine-heure",Electricity,Electricity,Heures machine,2.97,2.97,2.97,2.97,1,EUR,2.08,0.7,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KASA_KARIKA,"Installations pour l'enfoncement de pieux, force d'enfoncement 240 t",Equipment,General,Heures machine,60.98,60.98,60.98,60.98,1,EUR,28.05,0.46,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KASA_KARIKA,"Électricité : consommation 24,75 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.18,3.18,3.18,3.18,1,EUR,1.46,0.46,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KASA_KAMELI,"Installations pour l'enfoncement de pieux, force d'enfoncement 360 t",Equipment,General,Heures machine,73.07,73.07,73.07,73.07,1,EUR,47.01,0.6433,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-KARI-KASA_KAMELI,"Électricité : consommation 31,35 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.03,4.03,4.03,4.03,1,EUR,2.59,0.6433,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MERI-KANE_KAKATO,"Motoculteurs, puissance jusqu'à 4 kW (5,5 ch)",Equipment,General,Heures machine,1.8,1.8,1.8,1.8,1,EUR,1.8,1.0,3,3,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,TRAVAUX DIVERS KAME-LI-KALI-MEPU_KAKASANE,Joints d'étanchéité en mousse de polyuréthane à pores ouverts pour tôles métalliques 1800 x 50 x 50 mm,Material,General,m,3.29,3.29,3.29,3.29,1,EUR,99.76,30.3333,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une toiture en tôle ondulée sur des poutres préfabriquées MEPU-SA-KAME-KAVO_KAKAKARI,Mastic thiokol U-30M,Material,General,kg,20.62,20.62,20.62,20.62,1,EUR,351.3,17.04,3,3,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,CAOUTCHOUTAGE (REVÊTEMENT AVEC DES FEUILLES DE CAOUTCHOUC ET DES MÉLANGES DE CAO,Gommage à partir de solutions KAME-LI-MESA-MERI_KAKADXKA,"Goupilles filetées en acier, diamètre du filetage M12, longueur 300 mm",Material,General,t,2018.34,2018.34,2018.34,2018.34,1,EUR,0.42,0.0,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Construction de conduits de fumée et de ventilation industriels à partir de bloc DXME-RIKA-KALI_KAKATO,Conducteurs flottants pour l'immersion de pieux tubulaires lors de travaux en eaux fermées,Equipment,General,Heures machine,53.1,53.1,53.1,53.1,1,EUR,41.77,0.7867,3,3,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS RITO-ME-KARI-KAME_KAKAKARI,"Charges en fonte pour le lestage des gazoducs et oléoducs principaux, diamètre du pipeline jusqu'à 700-1000 mm",Material,Pipes & Fittings,t,2308.47,2308.47,2308.47,2308.47,1,EUR,2539.32,1.1,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage à l'aide de charges en fonte composées de deux moitiés de conduites d KALI-PU-KAME-KAPU,Structures en acier,Abstract Material,Steel & Metal,t,4228.07,4228.07,4228.07,4228.07,1,EUR,4228.07,1.0,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS À USAGE SPÉCIAL,"CHEMINÉES D'EXTRACTION, DE VENTILATION ET DE FUMÉE, SUPPORTS DE TYPE TOUR ET POR" MEPU-PU-KAPU-MERI_KAKAMEVO,Émail EP-5116,Material,General,t,6154.11,6154.11,6154.11,6154.11,1,EUR,2069.83,0.3367,3,3,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées MERI-RI-KATO-KARI,Produits en vrac pour l'isolation thermique,Abstract Material,General,m3,82.92,82.92,82.92,82.92,1,EUR,122.44,1.4767,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements RISA-ME-KANE-MESA_MEKAMERI,"Aiguillage double, écartement 1520 mm, type de rail P50, marque 1/9, projet 1623.00.000-03",Material,General,compl,161646.29,161646.29,161646.29,161646.29,1,EUR,109919.48,0.68,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MESA-MEME_MEKASARI,"Rondelle de blocage en acier à plusieurs griffes, diamètre du trou M27",Material,General,pièce,0.25,0.25,0.25,0.25,1,EUR,37.33,151.3333,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RINE-ME-KAME-KALI_KAKAKAME,Écrou droit BM20,Material,General,pièce,3.6,3.6,3.6,3.6,1,EUR,20.43,5.6667,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE DXME-KANE-KAME_KAKALI,"Crics hydrauliques, capacité de charge jusqu'à 500 t",Equipment,General,Heures machine,0.62,0.62,0.62,0.62,1,EUR,335.14,538.6467,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE MERI-RI-KAVO-KARI,Cylindres isolants en laine minérale sur liant synthétique,Abstract Material,General,m,12.64,12.64,12.64,12.64,1,EUR,25.28,2.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Insertion d'un insert électriquement isolant dans les conduites en acier en serv MERI-ME-KAME-KATO_KAKATODX,"Film d'étanchéité sous toiture, anti-condensation, base en tissu polypropylène laminé des deux côtés avec du polypropylène, résistance à la traction longitudinale/transversale 900/800 N/50 mm, densité de surface 130 g/m2",Material,General,m2,1.35,1.35,1.35,1.35,1,EUR,155.57,115.3333,3,3,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures en tôle ondulée RITO-TO-KATO-KARI_KAMEDXKA,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 426 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,380.62,380.62,380.62,380.62,1,EUR,469.43,1.2333,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES VANNES LINÉAIRES DES OLÉODUCS RITO-SA-KAME-KADX_KAKAKAME,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K52, diamètre extérieur 720 mm, épaisseur de paroi 16 mm",Material,Pipes & Fittings,m,597.07,597.07,597.07,597.07,1,EUR,1150.36,1.9267,3,3,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES VANNES LINÉAIRES DES OLÉODUCS DXME-MEKA-MEME_MEKAVO,"Machines pour la connexion et la fermeture d'une conduite de gaz en acier en service, diamètre des tuyaux 50-80, pression jusqu'à 1,2 MPa",Equipment,General,Heures machine,38.29,38.29,38.29,38.29,1,EUR,201.9,5.2733,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-RIME-RIRI_PUSAME,Dispositifs pour fermer la section des conduites de gaz en polyéthylène d'un diamètre de 110 à 225 mm,Equipment,General,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.05,0.9333,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAPU-TO-KARI-KADX_KAVOSAKA,"Mélanges secs à haute résistance avec retrait contrôlé, modifiés par des polymères, pour remplir l'espace intertubulaire lors de la rénovation des conduites par enroulement spiralé",Material,General,kg,1.61,1.61,1.61,1.61,1,EUR,0.0,0.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Restauration des canalisations par la méthode d'enroulement spiralé avec un prof DXME-KAVO-MEKA_KASATO,"Fraiseuses routières à froid automotrices sur roues, largeur maximale de fraisage 500 mm",Equipment,General,Heures machine,125.69,125.69,125.69,125.69,1,EUR,132.82,1.0567,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,"ROUTES, TROTTOIRS",Démontage des revêtements et des supports DXME-MEKA-KAPU_KARISA,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,51.94,81.7033,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Restauration des canalisations par la méthode d'enroulement spiralé avec un prof MEVO-ME-KADX-KALI_KAMEVOPU,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 50 mm",Material,Pipes & Fittings,pièce,112.6,112.6,112.6,112.6,1,EUR,975.85,8.6667,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEVO-ME-KADX-KALI_KAMEVOLI,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 100 mm",Material,Pipes & Fittings,pièce,320.92,320.92,320.92,320.92,1,EUR,1390.65,4.3333,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " RITO-SA-KARI-KARI_KAKASAKA,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 89 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,10.78,10.78,10.78,10.78,1,EUR,43.11,4.0,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " DXME-KASA-KATO_KAKAME,"Grues à portique, capacité de charge 2x20 t",Equipment,General,Heures machine,51.46,51.46,51.46,51.46,1,EUR,167.25,3.25,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE MEPU-PU-KAME-RIKA_KAKAMERI,"Apprêt anticorrosion à base de zinc, à séchage rapide, pour la transformation de la rouille et des scories",Material,General,t,10383.96,10383.96,10383.96,10383.96,1,EUR,53.31,0.02,3,3,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques RITO-LI-KARI-KAME,Assemblages de tuyauteries en tubes électrosoudés,Abstract Material,Pipes & Fittings,t,15.48,15.48,15.48,15.48,1,EUR,0.16,0.01,3,3,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES MELI-TO-KAME-KASA,Produits en blocs réfractaires pour fours de verre,Abstract Material,General,t,1507.86,1507.86,1507.86,1507.86,1,EUR,3322.33,2.2033,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE LA PARTIE SUPÉRIEURE DES FOURS DE VERRERIE,Maçonnerie de la structure supérieure des fours à verre MELI-TO-KASA-KAME,Produits en baddeleyite-corindon pour fours de fusion du verre,Abstract Material,General,t,8.75,8.75,8.75,8.75,1,EUR,30.87,3.5267,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE LA PARTIE SUPÉRIEURE DES FOURS DE VERRERIE,Maçonnerie de la structure supérieure des fours à verre KAME-LI-MELI-KASA,Barres en carbure de silicium,Abstract Material,General,kg,6.29,6.29,6.29,6.29,1,EUR,848.62,134.8667,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Remplissage avec une masse réfractaire MELI-TO-KASA-MENE,"Produits en corindon-mullite, en mullite-silice pour la maçonnerie des réchauffeurs d'air et des conduits d'air chaud des hauts fourneaux",Abstract Material,General,t,2774.23,2774.23,2774.23,2774.23,1,EUR,5215.55,1.88,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES ÉLÉMENTS DES AGRÉGATS THERMIQUES À USAGE GÉNÉRAL,"Maçonnerie des buses des réchauffeurs d'air, des régénérateurs et des récupérate" MELI-TO-KAPU-MERI,Produits en chromite-pyrrhotite pour la maçonnerie,Abstract Material,General,t,2724.38,2724.38,2724.38,2724.38,1,EUR,7964.26,2.9233,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES ÉLÉMENTS DES AGRÉGATS THERMIQUES À USAGE GÉNÉRAL,"Maçonnerie en produits à base de chromite-périclase, de périclase et de périclas" MEPU-ME-KARI-KAPU_KAKAKARI,Colle de contact monocomposante à base de caoutchouc nitrile et de résines synthétiques pour le collage de membranes PVC de toiture,Material,Waterproofing,l,23.24,23.24,23.24,23.24,1,EUR,269.92,11.6133,3,3,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-KALI-RIRI_KAKAMERI,"Charbon de houille, marque GZ",Material,General,t,298.9,298.9,298.9,298.9,1,EUR,8.57,0.04,3,3,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Installation des blocs de charbon et des sections de sole KAVO-TO-KATO-KASA_KAKAKATO,"Fil métallique galvanisé, diamètre 5,5 mm",Material,General,t,3898.18,3898.18,3898.18,3898.18,1,EUR,5.85,0.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",APPAREILS ET MOYENS D'AUTOMATISATION INSTALLÉS SUR LES ÉQUIPEMENTS ET LES COMMUN,TRANSDUCTEURS PRIMAIRE DE NIVEAU RIKA-RI-MEKA-KAPU_KAKAKAPU,Embouts de câbles en cuivre étamés pour sertissage 16-6-6-M UHL3,Material,General,100 pièces,51.43,51.43,51.43,51.43,1,EUR,102.85,2.0,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",DISPOSITIFS DE MICROPROCESSEURS ET DE TECHNIQUES DE CALCUL,"APPAREILS SDAU, ASDU, AIS, ASUTP, PAZ" DXME-KASA-KAVO_KAKANE,"Grues sur châssis pneumatique, capacité de charge 16 t",Equipment,General,Heures machine,51.66,51.66,51.66,51.66,1,EUR,2045.6,39.6,3,3,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",DISPOSITIFS DE MICROPROCESSEURS ET DE TECHNIQUES DE CALCUL,"APPAREILS SDAU, ASDU, AIS, ASUTP, PAZ" RIME-RI-KATO-KADX,Fil,Abstract Material,General,m,0.05,0.05,0.05,0.05,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Chauffage électrique technologique du béton MEPU-RI-KANE-KALI_MEKAMETO,"Mousse polyuréthane injectable, bicomposante, élastique, hydroactive, viscosité du mélange à une température de 20 °C 100 MPa*s, densité du mélange à une température de 20 °C 1,15 kg/cm3, pour l'étanchéité et le colmatage des joints et des vides",Material,General,kg,20.46,20.46,20.46,20.46,1,EUR,6102.64,298.23,3,3,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Étanchéification des entrées de communications à travers les murs à l'aide de co MEVO-RI-KARI-KARI,Baignoires,Abstract Material,General,compl,644.67,644.67,644.67,644.67,1,EUR,25786.8,40.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" MEVO-RI-KARI-KAME,Baignoires,Abstract Material,General,compl,378.62,378.62,378.62,378.62,1,EUR,15144.78,40.0,3,3,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" RISA-RI-KAME-MERI_KAKAKASA,Manchon de serrage avec œillet KS-143,Material,General,pièce,74.58,74.58,74.58,74.58,1,EUR,17427.34,233.6767,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KADX-KATO_KATOTO,Chariots à plate-forme pour tunnels de gare,Equipment,General,Heures machine,0.11,0.11,0.11,0.11,1,EUR,0.39,3.4533,3,3,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MEPU-RI-KASA-KANE_KAKAKAME,Composition polymère-ciment,Material,General,m3,303.76,303.76,303.76,303.76,1,EUR,1434.76,7.085,3,3,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale RIPU-TO-KATO-METO_KAKAPUPU,"Tuyaux de refoulement en polyéthylène, à l'exception des conduites de gaz PE100, pour le transport de l'eau, rapport dimensionnel standard SDR17, diamètre extérieur nominal 75 mm, épaisseur de paroi 4,5 mm",Material,General,m,4.84,4.84,4.84,4.84,1,EUR,15.49,3.2,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CONSTRUCTIONS EN BÉTON ARMÉ ET EN BÉTON DES PONTS ET DES CONDUITES,FONDATIONS DE TUYAUX ET DE PILIERS DE PONTS KALI-TO-KARI-KAVO,Pièces d'appui pour structures de travées,Abstract Material,Steel & Metal,t,4662.78,4662.78,4662.78,4662.78,1,EUR,0.0,0.0,3,3,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,ÉLÉMENTS DE SOUTIEN MEPU-RI-KAME-KAME_KAKAKARI,Composition organosilicate OS-12-01,Material,General,t,8483.5,8483.5,8483.5,8483.5,1,EUR,165.99,0.02,3,3,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces en béton et enduites KAME-LI-KARI-KALI_KAKARIME,Cornière de protection en carton,Material,General,m,0.37,0.37,0.37,0.37,1,EUR,26.31,71.1333,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,"ROUTES, TROTTOIRS",Démontage des revêtements et des supports MEME-RI-KAPU-KANE_KAKANEME,"Palette en bois (euro), dimensions 1200 x 800 mm",Material,General,pièce,26.86,26.86,26.86,26.86,1,EUR,4.3,0.16,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,"ROUTES, TROTTOIRS",Démontage des revêtements et des supports DXME-METO-KAME_KARIPU,"Machines de nettoyage urbain, capacité du réservoir 340 l, puissance 80 kW (102 ch)",Equipment,General,Heures machine,51.33,51.33,51.33,51.33,1,EUR,0.51,0.01,3,3,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,"ROUTES, TROTTOIRS",Démontage des revêtements et des supports DXME-RIME-RIRI_PUMEME,Marteaux thermiques pour le traitement des roches éjectées,Equipment,General,Heures machine,8.14,8.14,8.14,8.14,1,EUR,38.96,4.785,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,"ROUTES, TROTTOIRS",Finition des surfaces d'extrémité d'une largeur supérieure à 30 mm des produits DXME-KAME-KASA_SAPUDX,"Pelles chargeuses hydrauliques à roues pneumatiques, capacité du godet d'excavation jusqu'à 0,3 m3, capacité de charge du godet frontal jusqu'à 2 t",Equipment,General,Heures machine,31.03,31.03,31.03,31.03,1,EUR,402.43,12.97,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,"ROUTES, TROTTOIRS",Démontage des revêtements et des supports MEVO-ME-KADX-KALI_KAMEVODX,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 200 mm",Material,Pipes & Fittings,pièce,1696.62,1696.62,1696.62,1696.62,1,EUR,2544.93,1.5,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEVO-ME-KADX-KALI_KAMEVORI,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 32 mm",Material,Pipes & Fittings,pièce,78.09,78.09,78.09,78.09,1,EUR,468.57,6.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEVO-ME-KADX-KALI_KAMEVOVO,"Robinet à boisseau sphérique en acier, avec poignée, raccordement à la canalisation par soudure, pression nominale 2,5 MPa, diamètre nominal 150 mm",Material,General,pièce,979.89,979.89,979.89,979.89,1,EUR,1469.83,1.5,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEVO-ME-KADX-KALI_KAMEVOME,"Robinet à boisseau sphérique en acier, avec poignée, raccordement à la tuyauterie par soudure, pression nominale 2,5 MPa, diamètre nominal 25 mm",Material,General,pièce,71.02,71.02,71.02,71.02,1,EUR,426.12,6.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " KAVO-TO-KALI-KAME_KAKATOLI,"Bandes d'acier laminées à chaud, nuances St3sp, St3ps, dimensions 30 x 4 mm",Material,General,t,1574.26,1574.26,1574.26,1574.26,1,EUR,0.7,0.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-MEKA-KANE_KAKAME,Installations pour le chauffage des joints,Equipment,General,Heures machine,8.06,8.06,8.06,8.06,1,EUR,67.74,8.4,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MEME-KAPU_KAMESANE,"Fil à souder à faible teneur en carbone sans revêtement SV-08A, SV-08GA, diamètre 4-5 mm",Material,General,t,2503.85,2503.85,2503.85,2503.85,1,EUR,142.72,0.06,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RISA-TO-MEPU-KAME_MEKAPUNE,"Écrous de boulons de voie pour la fixation des rails, diamètre M27",Material,General,t,5328.65,5328.65,5328.65,5328.65,1,EUR,58.62,0.01,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KANE-RI-KAPU-KAME_KAKAKARI,"Carreaux en pierre réfractaire résistants à l'usure, carrés et rectangulaires, épaisseur 30 mm",Material,General,m2,41.32,41.32,41.32,41.32,1,EUR,43.18,1.05,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic silicate résis KANE-RI-KAPU-KAME_KAKAKASA,"Carreaux en pierre moulée résistants aux acides et à l'usure, dimensions 180 x 115 mm, épaisseur 20 mm",Material,Chemicals,m2,268.7,268.7,268.7,268.7,1,EUR,274.08,1.02,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic silicate résis DXME-RIME-MELI_KAMETO,Pneumo-perforateurs pour le remplacement sans tranchée de tuyaux d'un diamètre de 630 à 1200 mm lors du fonctionnement à partir d'installations de compression mobiles,Equipment,General,Heures machine,11.35,11.35,11.35,11.35,1,EUR,113.47,10.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Remplacement sans tranchée des canalisations d'égout par des tuyaux en plastique MEPU-PU-KAPU-METO_KARIMEDX,"Émail phénol-formaldéhyde à trois composants, thermorésistant, pour la protection contre la corrosion des tuyaux de diverses conduites de navires",Material,General,t,8185.47,8185.47,8185.47,8185.47,1,EUR,151.43,0.02,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MEPU-PU-KAPU-KANE_KAKAKARI,Émail à base de polyéthylène chlorosulfoné dans des solvants organiques avec ajout de composants spécifiques,Material,General,t,5446.49,5446.49,5446.49,5446.49,1,EUR,73.53,0.015,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MEPU-PU-KAPU-KANE_KAKAKAPU,"Émail bitume-polymère à deux composants contenant du polyéthylène chlorosulfoné pour la protection anticorrosion des structures et dispositifs métalliques, l'étanchéité des toitures et des structures en béton armé, consommation 0,3 kg/m² pour une épaisseur de couche de 0,13 mm",Material,Steel & Metal,t,10306.39,10306.39,10306.39,10306.39,1,EUR,309.19,0.03,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MEPU-PU-KAPU-MERI_KAKAMESA,Émail EP-1294,Material,General,t,5830.82,5830.82,5830.82,5830.82,1,EUR,116.62,0.02,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MEPU-PU-KAPU-MERI_KAKAMEME,Émail EP-733,Material,General,t,6156.16,6156.16,6156.16,6156.16,1,EUR,61.56,0.01,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MEPU-PU-KAPU-MEME_KAKAMEME,Émail HS-759,Material,General,t,4981.8,4981.8,4981.8,4981.8,1,EUR,94.65,0.02,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées KAME-LI-KARI-KATO_KAKAKATO,Papier d'emballage mazouté,Material,General,t,1356.34,1356.34,1356.34,1356.34,1,EUR,0.61,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",CREUSEMENT ET REMBLAYAGE DE TRANCHÉES POUR LES CONDUITES PRINCIPALES ET INDUSTRI KADX-RI-KARI-KARI_KAKAMERI,"Latte de bordure de toiture en aluminium, dimensions 32 x 3 mm",Material,General,m,2.59,2.59,2.59,2.59,1,EUR,266.36,103.0,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de raccords en membranes PVC aux murs et aux parapets MEPU-PU-KAPU-KAPU_KAKAKAME,Émail organosilicié thermorésistant KO-88,Material,General,t,7073.82,7073.82,7073.82,7073.82,1,EUR,106.11,0.02,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées MEPU-SA-KADX-KAPU_KAMEMESA,Durcisseur amino-phénolique,Material,General,kg,6.07,6.07,6.07,6.07,1,EUR,3.34,0.55,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MEPU-PU-KAPU-MEME_KAKAKASA,Émail bicomposant à base de copolymère de chlorure de vinyle modifié par une résine époxy,Material,General,t,5121.29,5121.29,5121.29,5121.29,1,EUR,138.27,0.03,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MEPU-ME-KAPU-KARI,Colles à base de caoutchouc,Abstract Material,General,kg,12.31,12.31,12.31,12.31,1,EUR,0.31,0.025,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Autres travaux de réparation et de construction,AUTRES TRAVAUX DE RÉNOVATION ET DE CONSTRUCTION,Remplacement du joint en caoutchouc des portes étanches KAME-LI-MEDX-KANE,Joints d'étanchéité PRP,Abstract Material,General,kg,8.94,8.94,8.94,8.94,1,EUR,0.0,0.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Autres travaux de réparation et de construction,AUTRES TRAVAUX DE RÉNOVATION ET DE CONSTRUCTION,Remplacement du joint en caoutchouc des portes étanches RITO-VO-KATO-KAME_KAKATOPU,"Bouchon en acier PT, diamètre nominal jusqu'à 900 mm",Material,General,pièce,862.33,862.33,862.33,862.33,1,EUR,92.7,0.11,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Montage et démontage d'un bouchon pneumatique en caoutchouc RITO-VO-KATO-KAME_KAKATOTO,"Bouchon en acier PT, diamètre nominal jusqu'à 600 mm",Material,General,pièce,307.38,307.38,307.38,307.38,1,EUR,35.35,0.12,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Montage et démontage d'un bouchon pneumatique en caoutchouc KAME-LI-MESA-MEPU_KATOKAKA,"Vis autotaraudeuses en acier avec rondelle de pression et empreinte cruciforme, embout de perçage, diamètre 4,2 mm, longueur 19 mm",Material,General,t,6831.13,6831.13,6831.13,6831.13,1,EUR,6.49,0.0,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures en tôle ondulée KAME-VO-KAME-KAVO_KAKAKAPU,"Gravier de verre cellulaire, densité apparente 170-180 kg/m3, fraction 5-20 mm",Material,General,m3,114.1,114.1,114.1,114.1,1,EUR,20538.68,180.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D KAME-LI-MERI-KASA_KAMETOME,"Géotextile non tissé en polypropylène, aiguilleté, résistance à la traction 5,6/3,6 kN/m, densité superficielle 150 g/m2",Material,General,m2,1.29,1.29,1.29,1.29,1,EUR,2838.7,2195.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D DXME-MEDX-MEKA_KAKATO,Électricité : consommation 370 kW·h/machine-h,Electricity,Electricity,Heures machine,47.52,47.52,47.52,47.52,1,EUR,222.88,4.69,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-MEKA_KAKATO,"Stations de pompage et installations de dragage électriques fixes, débit 80 m3/h, hauteur de refoulement de la station de pompage 57 m, hauteur de refoulement de l'installation de dragage 40 m",Equipment,General,Heures machine,91.81,91.81,91.81,91.81,1,EUR,430.61,4.69,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MERI-KAVO_KAVORI,Machines de drainage sur tracteur 59 kW (80 ch),Equipment,General,Heures machine,19.68,19.68,19.68,19.68,1,EUR,14.57,0.74,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION DU SOL ET INSTALLATION DE DRAINAGES DANS LA CONSTRUCTION DE RÉSEAUX D MEPU-PU-KAME-KARI_KAKAMEPU,"Apprêt-émail acrylique anticorrosion filmogène pour la protection des surfaces métalliques, en béton et en béton armé contre les effets des rayons ultraviolets et des précipitations atmosphériques, consommation 0,20 kg/m2",Material,General,kg,10.02,10.02,10.02,10.02,1,EUR,250.5,25.0,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Protection des structures en béton et en béton armé à l'aide d'un système de rev MEPU-RI-KANE-KATO_KASAMEME,Liquide hydrophobe organosilicié à base de polymère éthylhydrosiloxane,Material,General,t,3084.1,3084.1,3084.1,3084.1,1,EUR,84.35,0.05,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Hydrophobisation des surfaces en béton KAME-LI-MEME-KASA_KAKAKAME,"Barre de soudage en vinyle, diamètre 3 mm",Material,General,t,6683.3,6683.3,6683.3,6683.3,1,EUR,106.93,0.02,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENTS ADHÉSIFS,Collage de surfaces avec du plastique polyvinylchlorure MEKA-ME-KARI-KATO,Fil d'aluminium,Abstract Material,General,t,32648.51,32648.51,32648.51,32648.51,1,EUR,1398.99,0.045,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENTS MÉTALLISÉS,Application d'un revêtement anticorrosion par pulvérisation à l'arc électrique a RITO-VO-KATO-KAPU_KATOKAKA,"Manchon de réparation en acier de marque 08Kh18N10 pour l'étanchéification des canalisations, diamètre extérieur de 108 à 118 mm, longueur 400 mm",Material,General,pièce,114.24,114.24,114.24,114.24,1,EUR,342.74,3.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des systèmes d'évacuation des eaux usées internes à l'aide de manch MEPU-PU-KARI-KADX_KASAKAME,Topcoat bicomposant polysiloxane,Material,General,l,44.67,44.67,44.67,44.67,1,EUR,102.3,2.29,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques des communications inter-ate MEPU-PU-KAME-KADX_KASAKATO,"Apprêt époxy bicomposant à séchage rapide, à durcissement polyamidique, avec ajout de phosphate de zinc",Material,General,l,48.24,48.24,48.24,48.24,1,EUR,178.95,3.71,2,2,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques des communications inter-ate DXME-RIME-METO_KAKAVO,"Électricité : consommation 0,31 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.04,0.04,0.04,0.04,1,EUR,0.24,5.995,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des systèmes de conduits de ventilation à basse température et d'év DXME-RIME-METO_KAKAVO,"Générateurs de vapeur pour la production de vapeur à basse pression, débit jusqu'à 40 kg/h",Equipment,General,Heures machine,1.16,1.16,1.16,1.16,1,EUR,6.96,5.995,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des systèmes de conduits de ventilation à basse température et d'év RITO-ME-KARI-KANE_KAKATORI,"Colliers métalliques galvanisés à deux griffes avec profil en caoutchouc pour la fixation de tuyaux, livrés avec vis sanitaire, diamètre du filetage de la vis M8, longueur de la vis 50 mm, diamètre du collier de 20 à 25 mm",Material,General,10 pièces,5.97,5.97,5.97,5.97,1,EUR,47.84,8.02,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ALIMENTATION EN GAZ,Réparation des systèmes d'alimentation en gaz à l'intérieur des bâtiments MERI-ME-KATO-KADX,Éléments complémentaires pour tôles ondulées bitumées,Abstract Material,General,pièce,7.71,7.71,7.71,7.71,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures MERI-ME-KATO-KAME,Feuilles de toiture ondulées en bitume,Abstract Material,General,m2,11.02,11.02,11.02,11.02,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures KAME-LI-MESA-KANE,Clous galvanisés avec têtes en plastique refermables,Abstract Material,General,100 pièces,5.48,5.48,5.48,5.48,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures KAME-LI-MEDX-MELI_KAKAPUPU,Cordon en caoutchouc de section rectangulaire d'une surface de section comprise entre 30 et 50 mm2,Material,General,kg,11.64,11.64,11.64,11.64,1,EUR,4.66,0.4,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures MEVO-RI-KARI-KAPU,Éviers,Abstract Material,General,compl,134.44,134.44,134.44,134.44,1,EUR,13443.86,100.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Remplacement des appareils sanitaires KASA-TO-KAME-MERI,Détails,Abstract Material,General,pièce,34.3,34.3,34.3,34.3,1,EUR,34.3,1.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,MASQUES-SERRURES,Masques-serrures d'une hauteur maximale de 250 mm KASA-TO-KARI-MERI,Détails,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,MASQUES-SERRURES,Masques-serrures d'une hauteur maximale de 250 mm KASA-TO-KAME-KANE,Détails,Abstract Material,General,pièce,32.16,32.16,32.16,32.16,1,EUR,32.16,1.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,GUIRLANDES,Guirlandes d'une longueur maximale de 750 mm DXME-KATO-KARI_KAMENE,"Électricité : consommation 59,4 kW·h/machine-heure",Electricity,Electricity,Heures machine,7.63,7.63,7.63,7.63,1,EUR,48.91,6.41,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMENE,"Ventilateurs de ventilation centrale, puissance moteur jusqu'à 200 kW",Equipment,General,Heures machine,41.58,41.58,41.58,41.58,1,EUR,266.56,6.41,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMESA,"Électricité : consommation 36,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.66,4.66,4.66,4.66,1,EUR,29.88,6.41,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMESA,"Ventilateurs de ventilation centrale, puissance moteur jusqu'à 110 kW",Equipment,General,Heures machine,15.62,15.62,15.62,15.62,1,EUR,100.11,6.41,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION KASA-TO-KARI-KANE,Détails,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,GUIRLANDES,Guirlandes d'une longueur maximale de 750 mm KASA-TO-KAME-KAPU,Détails,Abstract Material,General,pièce,66.77,66.77,66.77,66.77,1,EUR,66.77,1.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,COURONNES,Couronnes d'un diamètre jusqu'à 500 mm KASA-TO-KARI-KAPU,Détails,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,COURONNES,Couronnes d'un diamètre jusqu'à 500 mm KAME-LI-MELI-KAVO_KAKATONE,Poudre abrasive corindon,Material,General,kg,3.36,3.36,3.36,3.36,1,EUR,6.73,2.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,"Travaux de vitrerie, de pose de papier peint et de revêtement",AUTRES TRAVAUX,Polissage et ponçage des surfaces MEPU-PU-KAME-KAME,Apprêt,Abstract Material,General,t,3039.67,3039.67,3039.67,3039.67,1,EUR,19.76,0.01,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de peinture,PEINTURE DES SURFACES MÉTALLIQUES,"Peinture à l'huile de grilles métalliques, clôtures et barrières déjà peintes" DXME-RIME-RIRI_PUPUPU,"Électricité : consommation 5,94 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.76,0.76,0.76,0.76,1,EUR,28.42,37.25,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Réparation de toiture avec transformation d'un tapis multicouche en carton bitum DXME-RIME-RIRI_PUPUPU,Installations pour la préparation de la masse bitumineuse chaude,Equipment,General,Heures machine,4.85,4.85,4.85,4.85,1,EUR,180.53,37.25,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Réparation de toiture avec transformation d'un tapis multicouche en carton bitum DXME-RIME-RIRI_KAPURI,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,0.42,2.5,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Réparation de toiture avec transformation d'un tapis multicouche en carton bitum DXME-RIME-RIRI_KAPURI,Appareils pour le traitement des matériaux bitumineux,Equipment,General,Heures machine,1.54,1.54,1.54,1.54,1,EUR,3.86,2.5,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Réparation de toiture avec transformation d'un tapis multicouche en carton bitum MERI-ME-KARI-KALI,Hydroglass,Abstract Material,Glass,m2,10.47,10.47,10.47,10.47,1,EUR,1274.59,121.75,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Réparation de certaines parties de la couverture en rouleaux et remplacement des KAPU-TO-KARI-KADX_KALIVORI,"Mélanges secs d'étanchéité de surface, classe B30 (M400)",Material,General,kg,8.29,8.29,8.29,8.29,1,EUR,19016.33,2294.95,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Sols,SOLS,Installation d'une chape d'étanchéité MEPU-PU-KATO-KALI_KAKAKARI,Vernis uréique MCh-0163,Material,General,t,3922.47,3922.47,3922.47,3922.47,1,EUR,117.67,0.03,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Sols,SOLS,Revêtement des parquets avec du vernis KANE-RI-KASA-KATO_KAKAMEME,"Carrelage en grès cérame, non poli, épaisseur 8 mm",Material,General,m2,16.57,16.57,16.57,16.57,1,EUR,0.0,0.0,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Sols,SOLS,Remplacement des carreaux de céramique au sol KAME-LI-MESA-KALI_KAKADXPU,"Clous à cheville en acier galvanisé avec rondelles, diamètre 4,5 mm, longueur 60 mm",Material,General,kg,6.43,6.43,6.43,6.43,1,EUR,25.7,4.0,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale MERI-ME-KARI-MESA_KAKADXTO,"Matériau bitumineux-polymère en rouleau pour l'étanchéité des dalles en béton armé des chaussées des ponts et des routes, soudable, base en tissu polyester, flexibilité maximale à -25 °C, poids 1 m²-5,5 kg, résistance minimale 600 N, résistance à la chaleur minimale 100 °C",Material,General,m2,16.71,16.71,16.71,16.71,1,EUR,2865.97,171.5,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale RINE-ME-KARI-KALI_KAKAMEME,"Butée ferroviaire d'embouchure, type PS 53.00.00",Material,General,pièce,3779.36,3779.36,3779.36,3779.36,1,EUR,1910.2,0.505,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION DE LA VOIE EN SURFACE RILI-RI-KAME-KATO_KAKAMERI,Pince à coin d'extrémité ZKK pour réseau de contact de tramway et trolleybus (pour fil MF-85),Material,General,pièce,12.5,12.5,12.5,12.5,1,EUR,2499.66,200.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MELI-PU-KASA-KAVO,Poudres de magnésite caustiques,Abstract Material,General,t,1294.97,1294.97,1294.97,1294.97,1,EUR,958.28,0.74,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Sols,SOLS,Remplissage des nids-de-poule dans les sols DXME-KANE-KANE_KAPUPU,"Élévateurs à mât unique, capacité de charge jusqu'à 500 kg, hauteur de levage 5 m",Equipment,General,Heures machine,0.93,0.93,0.93,0.93,1,EUR,0.16,0.17,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Ouvertures,OUVERTURES,Revêtement des portes KAPU-TO-KAME-KALI_KAKARIME,"Mortier de plâtrage, à la chaux, M4",Material,General,m3,136.07,136.07,136.07,136.07,1,EUR,10.89,0.08,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Ouvertures,OUVERTURES,Réparation des châssis de fenêtres MEME-ME-KATO-KAPU,Gorbyl,Abstract Material,General,m3,117.95,117.95,117.95,117.95,1,EUR,684.12,5.8,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Planchers,PLACES,Réparation des planchers en bois avec remplacement des solives MEPU-RI-KANE-KALI_MEKAKAKA,"Gel hydrophile à deux composants à prise rapide à base d'un mélange d'acrylates et de méthacrylates pour les travaux d'injection dans les structures en béton armé, en brique et en pierre et pour la stabilisation des sols, à une température de +20 °C, densité 1,01 g/cm3, viscosité 2,6 mPa*s",Material,Steel & Metal,kg,23.48,23.48,23.48,23.48,1,EUR,1823.2,77.645,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Murs,MURS,Étanchéification des joints de dilatation et des fissures des structures en béto KAME-LI-KALI-MEDX_MEKAKAVO,"Produit nettoyant liquide pour prévenir et éliminer les dépôts de gels acryliques dans les pompes à injection, à une température de 20 °C, densité 0,76 g/cm3, viscosité 2,5 mPa*s",Material,General,kg,26.18,26.18,26.18,26.18,1,EUR,335.96,12.835,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Murs,MURS,Étanchéification des joints de dilatation et des fissures des structures en béto KAME-LI-MELI-KARI_MEKAKAKA,"Kit pour l'injection de composés polyuréthanes dans les joints, fissures, raccords de structures de construction, diamètre du tuyau d'injection 12 mm, longueur 30 m",Material,Steel & Metal,compl,204.13,204.13,204.13,204.13,1,EUR,673.63,3.3,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Fondations,FONDATIONS,Étanchéification des joints des structures en béton armé des ouvrages souterrain MEME-RI-KALI-MERI_MEKAKAKA,"Baguette (disposition) en bois, non peinte, section 10 x 10 mm",Material,General,m,0.22,0.22,0.22,0.22,1,EUR,3.77,16.85,2,2,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES EN PLASTIQUE KAPU-TO-KARI-KADX_KADXTOVO,Mélanges secs à base de ciment pour la protection anticorrosion des armatures des structures en béton armé,Material,Steel & Metal,kg,29.33,29.33,29.33,29.33,1,EUR,814.0,27.75,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Fondations,FONDATIONS,Restauration et imperméabilisation des surfaces murales en béton et en béton arm DXME-RIME-RIRI_TOTOME,"Détecteurs de tracés, profondeur de détection jusqu'à 7 m, profondeur mesurable jusqu'à 4 m",Equipment,General,Heures machine,1.36,1.36,1.36,1.36,1,EUR,0.14,0.1,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de terrassement,TRAVAUX DE TERRASSEMENT,Nettoyage mécanisé du drainage fermé DXME-MERI-KAVO_MELIME,"Machines de lavage de drains montées sur tracteur, puissance 60 kW (80 ch), sans tenir compte du tracteur, débit 150 l/min",Equipment,General,Heures machine,2.72,2.72,2.72,2.72,1,EUR,2.73,1.005,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de terrassement,TRAVAUX DE TERRASSEMENT,Nettoyage mécanisé du drainage fermé DXME-KANE-KATO_KATOLI,"Électricité : consommation 0,88 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.11,0.11,0.11,0.11,1,EUR,0.17,1.57,2,2,INSTALLATION DE L'ÉQUIPEMENT,Déplacement supplémentaire d'équipements et de ressources matérielles,MOUVEMENT DANS LES MINES DE CHARBON ET DE SCHISTE (COÛTS SUPPLÉMENTAIRES LIÉS À ,Déplacement dans les mines de charbon et de schiste DXME-KANE-KATO_KATOLI,"Treuils auxiliaires de mine avec une force de traction de 137,34 kN (14 t)",Equipment,General,Heures machine,2.43,2.43,2.43,2.43,1,EUR,3.82,1.57,2,2,INSTALLATION DE L'ÉQUIPEMENT,Déplacement supplémentaire d'équipements et de ressources matérielles,MOUVEMENT DANS LES MINES DE CHARBON ET DE SCHISTE (COÛTS SUPPLÉMENTAIRES LIÉS À ,Déplacement dans les mines de charbon et de schiste KAVO-TO-KALI-KAME_KAKASALI,"Bandes d'acier laminées à chaud, nuances d'acier St3sp, St3ps, dimensions 80 x 5 mm",Material,General,t,1688.22,1688.22,1688.22,1688.22,1,EUR,92.85,0.06,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RILI-RI-KARI-KARI,Isolateurs à fil,Abstract Material,General,pièce,40.68,40.68,40.68,40.68,1,EUR,28476.55,700.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RILI-RI-KAME-KASA,Suspensions,Abstract Material,General,pièce,52.03,52.03,52.03,52.03,1,EUR,10406.75,200.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KASA-ME-KARI-KASA_KAKAMEME,"Poutres en béton armé, volume jusqu'à 1,5 m3, béton B25, consommation d'armature de 50 à 100 kg/m3",Material,General,m3,620.6,620.6,620.6,620.6,1,EUR,748438.31,1206.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MESA-KASA_MEKAKAKA,"Écrous en acier haute résistance à tête hexagonale, classe de résistance 10.9 (11.0), avec filetage M20",Material,General,t,6858.71,6858.71,6858.71,6858.71,1,EUR,390.95,0.06,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RISA-ME-KANE-KADX_KAKAKARI,"Croisillon pour rails P50, émoussé, monobloc, marque 2/9",Material,General,pièce,16224.42,16224.42,16224.42,16224.42,1,EUR,32448.85,2.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RISA-ME-KANE-KALI_KAKAKATO,"Croisement aigu assemblé, type de rail P50, marque 2/9",Material,General,pièce,16217.96,16217.96,16217.96,16217.96,1,EUR,32435.92,2.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RISA-ME-KANE-RIME_KAKAKANE,"Connecteurs électriques pour rails de contact en cuivre à jonction par sertissage, section 120 mm2, longueur 390 mm",Material,General,100 pièces,3949.2,3949.2,3949.2,3949.2,1,EUR,236.95,0.06,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RINE-ME-KARI-KAVO_KAKAKAPU,"Sabot de dérivation de rail de contact en fibre de verre, dimensions 320 x 85 x 90 mm",Material,General,pièce,23.7,23.7,23.7,23.7,1,EUR,244.1,10.3,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL DXME-KASA-KATO_KAKARI,"Grues à console et à sas, capacité de charge 2x50 t",Equipment,General,Heures machine,116.63,116.63,116.63,116.63,1,EUR,474.7,4.07,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE KAPU-ME-KARI-KARI_KAMENENE,"Mélanges de béton lourd (BST) pour ouvrages hydrauliques sur gravier concassé, classe B30, F(1)50, W2",Material,General,m3,163.25,163.25,163.25,163.25,1,EUR,17.95,0.11,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE TRAVERSÉE EN BÉTON ARMÉ DE PONTS POUR UNE VOIE FERROVIAIRE KANE-RI-KATO-KARI_KAKARIRI,"Carreaux céramiques de façade, émaillés, lisses, colorés, épaisseur 9 mm",Material,General,m2,78.18,78.18,78.18,78.18,1,EUR,7818.42,100.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS KAME-LI-KALI-MEPU_KAKAPUME,"Joints d'étanchéité en tôle, dimensions 20 x 20 mm",Material,General,10 pièces,0.78,0.78,0.78,0.78,1,EUR,39.0,50.0,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures MEPU-PU-KAPU-METO_KARIKAVO,Émail anti-acide,Material,Chemicals,kg,3.95,3.95,3.95,3.95,1,EUR,4.74,1.2,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipement des productions agricoles,ÉQUIPEMENT DES PRODUCTIONS AGRICOLES,ÉQUIPEMENT DES FERMES POUR L'ÉLEVAGE DE VOLAILLES KAME-LI-MESA-MERI_KAKATOLI,"Goujons filetés en acier galvanisé, diamètre du filetage M10, longueur 700-1050 mm",Material,General,t,2597.65,2597.65,2597.65,2597.65,1,EUR,83.12,0.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipement des silos à grains et des entreprises de transformation des céréales,"ÉQUIPEMENT POUR LA FABRICATION DE FARINE, DE CÉRÉALES ET D'ALIMENTS COMBINÉS",Tamis KADX-RI-KARI-KARI_KAKAMEME,"Latte en aluminium pleine pour plafond, forme en S, largeur 100 mm, épaisseur 0,3 mm",Material,General,m,2.68,2.68,2.68,2.68,1,EUR,2808.77,1050.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES MEPU-PU-KATO-KASA_KAKAMEME,Vernis organosilicié thermorésistant KO-08,Material,General,t,12935.14,12935.14,12935.14,12935.14,1,EUR,48.5,0.01,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RINE-ME-KARI-KAVO_KAKAMETO,Insert métallique à 4 boulons pour rail à cadre P65,Material,General,pièce,429.24,429.24,429.24,429.24,1,EUR,203459.71,474.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MESA-KARI_KAKAPUNE,"Boulons d'ancrage avec écrou en acier à friction à calage, avec filetage extérieur M12, diamètre 20 mm, longueur 110 mm",Material,General,100 pièces,87.8,87.8,87.8,87.8,1,EUR,2.19,0.025,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE KALI-RI-KAME-KATO_KAKATORI,"Pièces d'ancrage en acier à usages divers, poids jusqu'à 4 tonnes",Material,General,t,3889.87,3889.87,3889.87,3889.87,1,EUR,38.9,0.01,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE KAVO-TO-MERI-KALI_KAKAKAME,Guides métalliques pour rail vibrant (rails),Material,General,m,3.27,3.27,3.27,3.27,1,EUR,2.51,0.77,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE MEME-ME-KARI-KAPU_KAKAKAME,"Bois rond de conifères (épicéa) non écorcé, longueur 4,5-6,5 m, diamètre 16-24 cm, qualité II-III",Material,General,m3,228.85,228.85,228.85,228.85,1,EUR,137.76,0.6,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE RINE-ME-KAME-KARI_KAKAPUME,Rondelle carrée,Material,General,pièce,0.26,0.26,0.26,0.26,1,EUR,62.28,241.5,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RINE-ME-KARI-KAPU_KAKAKADX,"Joint d'étanchéité en polyamide, type PS-65, épaisseur 4-8 mm",Material,General,pièce,0.6,0.6,0.6,0.6,1,EUR,12.51,20.8,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RIME-RI-KAME-KARI_MEKAKAKA,Fil de contact en cuivre profilé MF 100,Material,General,1000 m,25392.97,25392.97,25392.97,25392.97,1,EUR,25392.97,1.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KADX-RI-KAME-KASA_KAKASAME,"Suspensions en acier pour le montage de systèmes de plafonds suspendus, longueur 350 mm, diamètre 3 mm",Material,General,100 pièces,29.3,29.3,29.3,29.3,1,EUR,20.51,0.7,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-NE-KAME-KALI,Plaques décoratives en plâtre,Abstract Material,General,m2,48.78,48.78,48.78,48.78,1,EUR,4878.23,100.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KADX-RI-KATO-KAPU_KAKAKAME,Profilé en aluminium extrudé,Material,General,t,9747.23,9747.23,9747.23,9747.23,1,EUR,559.0,0.055,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-LI-MEKA-MESA,Tapis de revêtement avec carreaux de mosaïque en verre,Abstract Material,General,m2,64.29,64.29,64.29,64.29,1,EUR,6557.21,102.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS KAME-TO-KASA-TOVO_KAMENEME,Quartz artificiel,Material,General,kg,6.98,6.98,6.98,6.98,1,EUR,20.94,3.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT MÉCANIQUE DES INSTALLATIONS HYDRAULIQUES,ÉQUIPEMENTS ET TRAVAUX DIVERS MEPU-RI-KARI-MEME_KAKARIVO,Composition ignifuge pour augmenter la résistance au feu des systèmes d'évacuation des fumées des conduits d'aération de 60 à 180 minutes,Material,Fasteners,kg,5.22,5.22,5.22,5.22,1,EUR,14.79,2.835,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,"Équipements de ventilation, d'alimentation en eau et de chauffage" MEPU-SA-KAME-KANE_KAKAKATO,"Mastic polyuréthane monocomposant à séchage rapide et hautement élastique pour le calfeutrage et l'étanchéification des joints intérieurs et extérieurs, des raccords",Material,General,l,37.65,37.65,37.65,37.65,1,EUR,228.18,6.06,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Montage de systèmes de faux-planchers démontables à partir de panneaux de partic MEME-RI-KADX-KAVO,Panneaux de faux-planchers en aggloméré,Abstract Material,General,m2,10.44,10.44,10.44,10.44,1,EUR,1072.47,102.7,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Montage de systèmes de faux-planchers démontables à partir de panneaux de partic KAME-LI-MEDX-KAVO,Tuyaux en caoutchouc sous pression,Abstract Material,General,m,41.83,41.83,41.83,41.83,1,EUR,2314.39,55.335,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment RINE-ME-KARI-KAPU_KAKAKAPU,Joint en acier pour contre-rail à petit rayon,Material,General,pièce,1.52,1.52,1.52,1.52,1,EUR,1454.97,955.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RISA-ME-KASA-KANE,Rails de contre-rail,Abstract Material,General,t,572.76,572.76,572.76,572.76,1,EUR,12294.28,21.465,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RITO-VO-KATO-KAME_KAKAKAME,"Bouchon de transport pour tuyaux en acier non bétonnés en matériau imperméable, à usage unique, résistance au gel d'au moins -40 °C, diamètre 219 mm",Material,General,pièce,9.62,9.62,9.62,9.62,1,EUR,962.22,100.0,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire RINE-ME-KARI-KAPU_KAKARIKA,"Joint d'étanchéité en polyamide, type PS-50, épaisseur 4-8 mm",Material,General,pièce,1.18,1.18,1.18,1.18,1,EUR,194.85,164.9,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MEPU-PU-KATO-MELI_KAKAKAPU,Vernis à l'huile pour la protection anticorrosion des câbles,Material,General,t,6201.8,6201.8,6201.8,6201.8,1,EUR,10.23,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KADX-RI-KARI-KAME_KAKAKAME,Kit de profilés en acier galvanisé pour le montage de systèmes de plafonds suspendus,Material,General,m2,2.88,2.88,2.88,2.88,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-NE-KAPU-KAME_KAKAPUTO,"Panneaux acoustiques de plafond en fibre minérale, rigides, à bord droit, classe de risque d'incendie KM1, classe d'absorption acoustique C-D, épaisseur 15-17 mm",Material,General,m2,30.28,30.28,30.28,30.28,1,EUR,1605.33,53.015,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES MEME-ME-KATO-KANE_KAMEMEPU,"Planches de bois feuillu (tilleul) à chants droits, humidité naturelle, longueur 4-6,5 m, toutes largeurs, épaisseur 20-22 mm, classe II",Material,General,m3,1528.25,1528.25,1528.25,1528.25,1,EUR,1.53,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,"Équipements de signalisation, de centralisation et de verrouillage" RISA-RI-KARI-KAPU_MEKANETO,"Support en acier galvanisé pour l'installation d'un sectionneur unipolaire sur un poteau métallique du réseau de contact, largeur du profilé en U du poteau de 160 mm à 220 mm, largeur du poteau de 380 mm à 460 mm, longueur du support 2150 mm",Material,General,pièce,347.21,347.21,347.21,347.21,1,EUR,347.21,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-KANE_MEKAKASA,"Pince d'alimentation en bronze pour connecteur électrique, section des fils à connecter 70-95 mm2, dimensions 75 x 46 x 62 mm",Material,General,pièce,73.46,73.46,73.46,73.46,1,EUR,132.59,1.805,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-RIME_MEKAKAPU,"Anneau en acier galvanisé pour la fixation mobile de cordes à des fils, des isolateurs ou des structures dans une suspension de contact, diamètre 82 mm",Material,Steel & Metal,pièce,6.83,6.83,6.83,6.83,1,EUR,14.07,2.06,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-MEME_KAKAKATO,Cosses pour fils de cuivre 10 mm KS-063,Material,General,100 pièces,55.08,55.08,55.08,55.08,1,EUR,15.88,0.29,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KARI-KAVO_KAKAKALI,"Ensemble de fixation en acier des montants d'angle à la traverse avec une cale de 50 mm de largeur, diamètre de la tige du boulon-agrafe 16 mm, distance entre les axes de fixation du boulon-agrafe 110 mm",Material,General,pièce,17.79,17.79,17.79,17.79,1,EUR,266.92,15.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX DXME-KALI-KAME_KARIKA,"Stations de déchargement de conteneurs souples à usage unique (type big bag) équipées d'un palan électrique et d'un convoyeur à vis, capacité du silo 0,5 m3",Equipment,General,Heures machine,1.37,1.37,1.37,1.37,1,EUR,7.54,5.495,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MEME-KAPU_KAMETOVO,"Fil à souder cuivré SV-08G2S, diamètre 2 mm",Material,General,t,3604.74,3604.74,3604.74,3604.74,1,EUR,45.06,0.01,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KALI-TO-KARI-MEME_KAKALIME,"Échafaudages en acier pour maçons, dimensions de la plate-forme 2400 x 5500 mm, hauteur jusqu'à 1800 mm",Material,General,t,2495.0,2495.0,2495.0,2495.0,1,EUR,49.9,0.02,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Assemblage de structures de ponts en acier par suspension et semi-suspension DXME-KASA-KALI_KAKASA,"Grues sur rails, capacité de charge 125 t",Equipment,General,Heures machine,358.69,358.69,358.69,358.69,1,EUR,83488.43,232.76,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,PASSERELLES ET PONTS PIÉTONS PRÉFABRIQUÉS EN BÉTON ARMÉ,PASSERELLES POUR LA CIRCULATION AUTOMOBILE EN BÉTON ARMÉ PRÉFABRIQUÉ AU-DESSUS D MEVO-ME-KADX-KAVO_KAMEDXTO,"Robinet à boisseau sphérique en laiton à passage intégral, avec raccord fileté interne, pression nominale 4,0 MPa, diamètre nominal 40 mm",Material,General,pièce,86.07,86.07,86.07,86.07,1,EUR,1289.7,14.985,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment MEVO-TO-KAME-KAME,Têtes de raccordement et de refoulement,Abstract Material,General,pièce,4.85,4.85,4.85,4.85,1,EUR,26.85,5.535,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Injection de canaux de précontrainte dans l'enveloppe de protection du bâtiment KAME-NE-KAPU-KAME_KAKATOSA,"Panneaux acoustiques de plafond en fibre minérale, livrés avec un système de suspension en acier galvanisé, rigides, avec bordure en gradins, classe de risque d'incendie KM1, classe d'absorption acoustique A-B, épaisseur 18-20 mm",Material,General,m2,103.24,103.24,103.24,103.24,1,EUR,10633.8,103.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES RISA-RI-KARI-MEKA_KAKATOME,"Barre en acier simple pour charges à section fermée, nombre de charges 30 pièces, épaisseur de la barre 30 mm, longueur de la barre 1696 mm",Material,General,pièce,213.79,213.79,213.79,213.79,1,EUR,220.2,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-KANE_MEKARIKA,"Pince en bronze pour la fixation et le réglage de la longueur d'un fil conducteur de courant de section 16 mm2, dimensions 14 x 15 x 22 mm",Material,General,pièce,7.34,7.34,7.34,7.34,1,EUR,204.21,27.81,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RIRI-RI-KAME-KANE_KAKAKADX,Isolateurs de gréement ITO-3U1,Material,General,100 pièces,58.16,58.16,58.16,58.16,1,EUR,8.08,0.14,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RIKA-ME-KARI-MELI_KAKAKAVO,"Câble de soutien en acier inoxydable avec isolateur encastré pour la fixation du dispositif de fixation du fil de contact à une console isolée, diamètre 6 mm, longueur 1,2 m",Material,General,pièce,32.39,32.39,32.39,32.39,1,EUR,129.57,4.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RIKA-ME-KARI-MELI_KAKAKALI,"Câble de soutien en acier inoxydable avec isolateur encastré pour la fixation du dispositif de fixation de la branche ancrée avec deux fils de contact à la console isolée, diamètre 6 mm, longueur 1,2 m",Material,General,pièce,34.96,34.96,34.96,34.96,1,EUR,34.96,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-MEVO_KAKAPUSA,"Fixation supplémentaire tubulaire courbée pour consoles en acier avec pince de fixation, longueur 1,2 m",Material,General,pièce,254.59,254.59,254.59,254.59,1,EUR,47.73,0.185,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KALI-RI-KANE-KATO_KATOSAME,"Peigne (stringer) pour suspension de profilés de plafond en acier galvanisé, épaisseur de l'acier 0,6 mm",Material,General,m,7.76,7.76,7.76,7.76,1,EUR,1117.8,144.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KADX-RI-KATO-KAME_KAKAMEME,"Profilé en aluminium pour la fixation de panneaux en forme de L, épaisseur du panneau à fixer 6-8 mm, longueur 3000 mm",Material,General,pièce,8.77,8.77,8.77,8.77,1,EUR,122.93,14.015,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KADX-RI-KATO-KAME_KAKAKATO,"Profilé en aluminium pour la fixation de panneaux en forme de F, épaisseur du panneau à fixer 3-4 mm, longueur 3000 mm",Material,General,pièce,13.46,13.46,13.46,13.46,1,EUR,89.5,6.65,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KATO_KARINEME,"Profilé d'angle en acier galvanisé, couleur blanc, dimensions 23 x 21 mm, épaisseur 0,4 mm",Material,General,m,1.07,1.07,1.07,1.07,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES RISA-RI-KAME-MEVO_KAKAPUPU,"Fixation supplémentaire tubulaire courbée pour consoles en aluminium avec pince de fixation, longueur 1,2 m",Material,General,pièce,279.77,279.77,279.77,279.77,1,EUR,52.45,0.185,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-RIME_MEKAKASA,"Entretoise rigide en aluminium pour consoles, longueur 1,2 m",Material,General,pièce,179.56,179.56,179.56,179.56,1,EUR,3232.12,18.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX RISA-RI-KAME-RIME_MEKAKANE,"Entretoise rigide en acier pour consoles, longueur 1,2 m",Material,General,pièce,25.37,25.37,25.37,25.37,1,EUR,456.59,18.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KAVO-ME-KARI-KATO_KAKAVORI,"Plinthe en acier galvanisé avec revêtement polymère, dimensions 200 x 50 mm, épaisseur 0,5 mm",Material,General,m,16.57,16.57,16.57,16.57,1,EUR,35.62,2.15,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAPU-ME-KARI-KAME_KAKAKADX,"Mélanges de béton à granulométrie fine (BSM), classe B25 (M350)",Material,General,m3,161.39,161.39,161.39,161.39,1,EUR,22.03,0.135,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CANALISATIONS D'ÉVACUATION D'EAU SUR DES FONDATIONS PRÊTES (BASES) ET CANIVEAUX ,CANIVELS EN BÉTON ARMÉ POUR L'EVACUATION DES EAUX RITO-SA-KARI-KARI_KAKAVOSA,"Tubes en acier électrosoudés à joint droit, marques St2, 10, diamètre extérieur 219 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,33.09,33.09,33.09,33.09,1,EUR,3309.46,100.0,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire KAME-LI-MEME-KAPU_KAKAVOME,"Fil à souder cuivré SV-08G2S, diamètre 1,2 mm",Material,General,t,3915.02,3915.02,3915.02,3915.02,1,EUR,1449.54,0.74,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Montage des structures en acier suspendues à l'aide d'un dispositif de levage sp DXME-KANE-KAME_KAKANE,"Crics hydrauliques, capacité de charge jusqu'à 350 t, course du piston 2,1 m",Equipment,General,Heures machine,2.37,2.37,2.37,2.37,1,EUR,139.32,58.85,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Poussée de la structure du pont par glissement DXME-KALI-KASA_KAKARI,"Électricité : consommation 18,56 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.38,2.38,2.38,2.38,1,EUR,8.42,3.53,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-KALI-KASA_KAKARI,"Usines à béton automatisées, capacité 30 m3/h",Equipment,General,Heures machine,16.26,16.26,16.26,16.26,1,EUR,57.39,3.53,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-KALI-KAME_KARIKA,"Électricité : consommation 2,62 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.34,0.34,0.34,0.34,1,EUR,1.84,5.495,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KALI-RI-KANE-KAPU_KAMELITO,"Cornière de montage en acier galvanisé, dimensions 110 x 60 mm, épaisseur de l'acier 1 mm",Material,General,pièce,2.16,2.16,2.16,2.16,1,EUR,102.52,47.39,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-LI-MESA-KASA_MEKAMEKA,"Écrous hexagonaux en acier inoxydable, diamètre de filetage M8",Material,General,100 pièces,19.14,19.14,19.14,19.14,1,EUR,79.62,4.16,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-MEME_MEKAKAVO,Rondelles en acier inoxydable pour façades ventilées suspendues,Material,General,100 pièces,39.0,39.0,39.0,39.0,1,EUR,26.18,0.67,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-MEDX-KADX_KAKARI,"Stations de pompage électriques fixes, débit 140 m3/h, pression 37-52 m",Equipment,General,Heures machine,43.41,43.41,43.41,43.41,1,EUR,321.49,7.405,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-MEKA_KAKADX,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,8.43,13.255,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-MEKA_KAKADX,"Stations de pompage électriques fixes, débit 50 m3/h, pression 50 m",Equipment,General,Heures machine,1.21,1.21,1.21,1.21,1,EUR,16.09,13.255,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAVO-PU-KAME-KAME_KAKATOKA,"Boulons d'ancrage en acier pour fondations, livrés avec deux écrous M36 et rondelles M36, type 1, diamètre M36",Material,General,t,4041.79,4041.79,4041.79,4041.79,1,EUR,390.84,0.095,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MELI-KADX_MERILIKA,"Foret à pointe en alliage dur, avec queue SDS-max pour le perçage à percussion dans les matériaux durs, longueur totale 340 mm, diamètre 35 mm",Material,General,pièce,30.7,30.7,30.7,30.7,1,EUR,2.3,0.075,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KASA-RI-KARI-KAME_KAKATORI,"Blocs de béton avec découpe pour murs de sous-sols de type FBV, béton B7,5",Material,General,m3,248.76,248.76,248.76,248.76,1,EUR,537.32,2.16,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MELI-KADX_MERINEME,"Foret à pointe en alliage dur, avec queue SDS-max pour le perçage à percussion dans des matériaux durs, longueur totale 340 mm, diamètre 10 mm",Material,General,pièce,7.76,7.76,7.76,7.76,1,EUR,1.24,0.16,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MEME-KALI_KAMENEVO,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés MP-3, diamètre 4-5 mm",Material,General,t,3450.16,3450.16,3450.16,3450.16,1,EUR,862.71,0.5,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de KAME-RI-KATO-KASA_KAKARIRI,"Apprêt polymère contenant des solvants organiques et des additifs adhésifs pour la préparation de la surface des structures métalliques, en béton et en béton armé des ponts avant l'application de matériaux d'étanchéité bitume-polymère, consommation 0,10-0,35 kg/m2",Material,Steel & Metal,kg,31.62,31.62,31.62,31.62,1,EUR,1296.26,41.0,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " DXME-MEDX-KADX_KAKAME,"Électricité : consommation 7,26 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.93,0.93,0.93,0.93,1,EUR,12.36,13.255,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-KADX_KAKAME,"Stations de pompage électriques fixes, débit 80 m3/h, pression 40 m",Equipment,General,Heures machine,24.7,24.7,24.7,24.7,1,EUR,327.38,13.255,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-SA-KAME-KAVO_KAKAPUVO,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 820 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,351.97,351.97,351.97,351.97,1,EUR,17899.37,50.855,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RISA-RI-KAME-KASA_KAKAKATO,Support de fils pour isolateur de support KS-057-1,Material,General,pièce,64.1,64.1,64.1,64.1,1,EUR,132.06,2.06,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS DU RÉSEAU DE CONTACT RISA-RI-KAME-MESA_KAKAKATO,"Pistolet avec filetage 3/4"" KS-076",Material,General,pièce,4.36,4.36,4.36,4.36,1,EUR,4.49,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS DU RÉSEAU DE CONTACT RISA-RI-KAME-RIKA_KAKAMELI,"Barre articulée piston-œillet KS-1180, peinte, longueur 1600 mm",Material,General,pièce,49.23,49.23,49.23,49.23,1,EUR,50.71,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE CÂBLES SUPPLÉMENTAIRES RILI-RI-KATO-KAME_KAKAMELI,"Support de câble de mise à la terre collective, longueur 310 mm, largeur du profilé en U du montant 160-220 mm",Material,General,pièce,58.42,58.42,58.42,58.42,1,EUR,962.77,16.48,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RILI-RI-KATO-KAME_KAKAMENE,"Support d'ancrage du câble de mise à la terre collective, longueur 560 mm, largeur du profilé en U du montant 160-220 mm",Material,General,pièce,78.75,78.75,78.75,78.75,1,EUR,162.23,2.06,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RISA-RI-KAME-RIME_KAKARIME,Vis de mise à la terre KS-151,Material,General,pièce,1.77,1.77,1.77,1.77,1,EUR,1.82,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE DXME-RIME-RIRI_RIMEME,"Électricité : consommation 2,6 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.33,0.33,0.33,0.33,1,EUR,20.75,62.15,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,DRAINAGE DERRIÈRE LES APPUIS DES PONTS DXME-RIME-RIRI_RIMEME,"Mélangeurs électriques à tambour perforé, 250 l",Equipment,General,Heures machine,1.16,1.16,1.16,1.16,1,EUR,71.79,62.15,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,DRAINAGE DERRIÈRE LES APPUIS DES PONTS DXME-MELI-KAPU_RIRIPU,Brûleurs à gaz infrarouges pour le chauffage des joints de dilatation,Equipment,General,Heures machine,9.29,9.29,9.29,9.29,1,EUR,647.91,69.75,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,DRAINAGE DERRIÈRE LES APPUIS DES PONTS KARI-RI-KASA-KAPU_RIKALIVO,"Gravier de roches denses pour travaux de construction M 1200, fraction 15-20 mm",Material,General,m3,87.26,87.26,87.26,87.26,1,EUR,562.8,6.45,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,DRAINAGE DERRIÈRE LES APPUIS DES PONTS KADX-TO-KAME-KAPU_KAKASAKA,"Éléments de fixation (clips) en aluminium pour façades ventilées suspendues, dimensions 35 x 35 mm, épaisseur de l'aluminium 4 mm",Material,General,100 pièces,70.39,70.39,70.39,70.39,1,EUR,451.19,6.41,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KADX-TO-KAME-KAPU_KAKAPUVO,"Chariot en aluminium avec vis pour façades ventilées suspendues, dimensions 106 x 65 x 25 mm",Material,General,pièce,2.78,2.78,2.78,2.78,1,EUR,989.69,355.45,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MEKA-METO_KAMEKAPU,"Produit à base de solvant organique pour le nettoyage des surfaces non poreuses, température d'inflammation 12 °C, température d'application de +5 à +40 °C, incolore, densité 0,8 kg/l, temps de séchage 10 min, consommation 30-60 ml/m2",Material,General,l,42.29,42.29,42.29,42.29,1,EUR,12.88,0.305,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MEKA-METO_KAMEKARI,"Solution alcoolique pour améliorer l'adhérence des surfaces non poreuses, température d'inflammation 12 °C, température d'application de +5 à +40 °C, incolore, densité 0,8 kg/l, temps de séchage 10 min, consommation 30-60 ml/m2",Material,General,l,56.27,56.27,56.27,56.27,1,EUR,15.42,0.27,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-KANE-MEPU_KAKASANE,"Bandes autocollantes en mousse de polyuréthane double face pour vitrage structurel, section 6 x 6,4 mm",Material,Steel & Metal,m,3.3,3.3,3.3,3.3,1,EUR,1191.25,361.44,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KAPU_KAMENEME,"Bandes de montage en acier perforées galvanisées, largeur 25 mm, épaisseur 0,55 mm",Material,General,10 m,2.46,2.46,2.46,2.46,1,EUR,47.33,19.255,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KAPU_KAKAPURI,"Bandes en acier galvanisé perforées pour montage, largeur 12 mm, épaisseur 0,55 mm",Material,General,10 m,2.87,2.87,2.87,2.87,1,EUR,26.29,9.16,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-KAPU_KAKANEKA,Vis en acier inoxydable 08Kh18N10 à tête cylindrique M6x16 mm,Material,General,100 pièces,26.75,26.75,26.75,26.75,1,EUR,94.7,3.54,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RIKA-RI-KAVO-KASA_KAKAKARI,Barre en Z galvanisée,Material,General,pièce,25.73,25.73,25.73,25.73,1,EUR,145.78,5.665,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RISA-RI-KAME-RIKA_KAKARISA,"Barre à œillet forgé-fileté KS-1177, galvanisée, longueur 2000 mm",Material,General,pièce,47.33,47.33,47.33,47.33,1,EUR,195.0,4.12,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RISA-RI-KAME-RIKA_KAKAKADX,"Tige à œillet KS-1172, peinte, longueur 1000 mm",Material,General,pièce,20.67,20.67,20.67,20.67,1,EUR,127.75,6.18,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RISA-RI-KAME-MEDX_KAKAKATO,"Rondelle sphérique en fonte, type KS-072, diamètre 62 mm, diamètre du trou 24 mm, épaisseur 23 mm",Material,General,pièce,6.27,6.27,6.27,6.27,1,EUR,25.82,4.12,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RISA-RI-KAME-MEDX_KAKAKARI,"Rondelle angulaire en acier galvanisé, type KS-045, dimensions 60 x 65 x 90 mm",Material,General,pièce,12.54,12.54,12.54,12.54,1,EUR,77.47,6.18,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RIRI-RI-KAME-KAPU_KAKAKARI,Isolateurs linéaires à broches en porcelaine SHF 20-G,Material,General,100 pièces,1652.91,1652.91,1652.91,1652.91,1,EUR,629.92,0.38,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT DXME-KALI-KADX_KAMEME,"Électricité : consommation 0,9 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.12,0.12,0.12,0.12,1,EUR,0.02,0.16,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS DXME-KALI-KADX_KAMEME,"Installations de cémentation, capacité 4 m3/h",Equipment,General,Heures machine,7.59,7.59,7.59,7.59,1,EUR,1.22,0.16,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS KAVO-RI-KARI-KATO_KAKATONE,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 28 mm",Material,Steel & Metal,10 m,110.46,110.46,110.46,110.46,1,EUR,8.89,0.08,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS KASA-ME-KASA-MENE_KARITOME,"Ancrages en béton armé, volume jusqu'à 19,5 m3, consommation d'armature jusqu'à 50 kg/m3",Material,General,m3,713.66,713.66,713.66,713.66,1,EUR,9.99,0.01,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS KATO-RI-KARI-KADX_KAKAKARI,"Ciment Portland résistant aux sulfates avec additifs minéraux CEM II 42,5N SS",Material,General,t,220.43,220.43,220.43,220.43,1,EUR,24.25,0.11,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS KAME-LI-KAVO-KASA_KAKAKASA,Additif plastifiant pour ciment,Material,General,kg,5.36,5.36,5.36,5.36,1,EUR,1.18,0.22,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS MEPU-RI-KANE-KATO_MEKAKARI,Gel pour le décapage des soudures et l'élimination des traces de taches,Material,General,kg,30.38,30.38,30.38,30.38,1,EUR,27.34,0.9,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MELI-KALI_KAKAVOKA,"Disque abrasif à lamelles sur base textile, grain 40, dimensions 125 x 22 mm",Material,General,pièce,1.11,1.11,1.11,1.11,1,EUR,12.97,11.705,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MELI-KALI_KAKANEPU,"Disque de polissage en feutre, dimensions 150 x 20 x 12,7 mm",Material,General,pièce,12.49,12.49,12.49,12.49,1,EUR,264.5,21.185,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX MEPU-PU-KATO-MEME_KAKAKANE,Vernis NC-218,Material,General,t,5496.49,5496.49,5496.49,5496.49,1,EUR,63.21,0.01,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX MEPU-RI-KANE-KAME_KAKAKAPU,"Antiseptique-ignifuge pour le bois, pour les travaux extérieurs et intérieurs de traitement des bâtiments et structures en bois, densité à 20 °C 1,13-1,22 g/cm3, température de traitement de -15 à +50 °C, température d'utilisation de -50 à +80 °C",Material,Steel & Metal,kg,8.18,8.18,8.18,8.18,1,EUR,98.44,12.035,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX MEPU-RI-KAME-KAPU,"Composition époxy bicomposante contenant du bitume, de l'uréthane et du xylène pour créer une couche protectrice adhésive entre l'asphalte et le revêtement polymère",Abstract Material,General,kg,90.01,90.01,90.01,90.01,1,EUR,22250.31,247.2,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " DXME-METO-KATO_SASAVO,"Systèmes pour l'application de revêtements protecteurs à haute viscosité à base de véhicules, débit jusqu'à 8 l/min, pression de service jusqu'à 24 MPa",Equipment,General,Heures machine,22.22,22.22,22.22,22.22,1,EUR,76.45,3.44,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " DXME-RIME-KAME_KARITO,"Appareils de peinture à pulvérisation sans air avec moteur à combustion interne, débit jusqu'à 5 l/min",Equipment,General,Heures machine,1.48,1.48,1.48,1.48,1,EUR,9.98,6.765,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " KAME-LI-MELI-KATO_KAKARIKA,"Segment de type 3110 avec écrou pour ponceuse mosaïque, granulométrie 40-12, dimensions 85 x 78 x 50 mm",Material,General,pièce,4.33,4.33,4.33,4.33,1,EUR,12.98,3.0,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " MEPU-ME-KANE-KANE_MEKARINE,"Composé adhésif bicomposant à injection à base de résine époxy pour béton léger et lourd, température d'utilisation de +5 °C à +40 °C, résistance sismique 7-9 points, volume 585 ml",Material,General,pièce,82.45,82.45,82.45,82.45,1,EUR,745.34,9.04,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CLÔTURE RINE-ME-KAME-KAME_KAKAKATO,"Ancre-traction, longueur 22 m",Material,General,pièce,497.52,497.52,497.52,497.52,1,EUR,497.52,1.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX RINE-ME-KAME-KAME_KAKAKARI,"Ancrage-tirant, longueur 16 m",Material,General,pièce,361.69,361.69,361.69,361.69,1,EUR,361.69,1.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX RINE-ME-KAME-KAME_KAKAKAME,"Ancrage-tirant, longueur 12,7 m",Material,General,pièce,316.11,316.11,316.11,316.11,1,EUR,316.11,1.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX RIKA-ME-KARI-RITO_KAKATORI,Cache de sécurité KS-126,Material,General,pièce,29.74,29.74,29.74,29.74,1,EUR,30.64,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KARI-KANE_KAKAKARI,"Limiteur de charge double en acier galvanisé, type KS-152",Material,General,pièce,14.02,14.02,14.02,14.02,1,EUR,14.44,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KARI-MEKA_KAKAKANE,"Barre en acier galvanisé double, pour charges, type KS-106, dimensions 460 x 2160 mm",Material,General,pièce,215.31,215.31,215.31,215.31,1,EUR,221.77,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIKA-ME-KARI-RIKA_KAKATORI,Ensemble d'ancrage compensé combiné galvanisé,Material,General,pièce,95.35,95.35,95.35,95.35,1,EUR,98.21,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KARI-MEKA_KAKAKAPU,"Barre en acier galvanisé double, pour charges, type KS-106, dimensions 460 x 1510 mm",Material,General,pièce,78.87,78.87,78.87,78.87,1,EUR,81.23,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KARI-KANE_KAKAKAME,"Limiteur de charge double en acier peint, type KS-152",Material,General,pièce,14.02,14.02,14.02,14.02,1,EUR,14.44,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-RIKA_KAKAMEKA,"Tige à œillet KS-1172, galvanisée, longueur 1000 mm",Material,General,pièce,26.36,26.36,26.36,26.36,1,EUR,27.15,1.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEPU-SA-KAME-KALI_KAMETODX,"Colle-mastic silicone monocomposant thermorésistant pour le collage de vitrages, plage de température d'application de -40 à +150 °C, densité 1,4 kg/l, allongement relatif à la rupture 450 %, résistance à la traction 2,2 MPa",Material,General,kg,11.75,11.75,11.75,11.75,1,EUR,942.97,80.28,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RIPU-ME-KARI-KAME_KAKAMELI,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation de tuyaux, écrou de fixation M8, diamètre de 48 à 54 mm",Material,General,pièce,2.49,2.49,2.49,2.49,1,EUR,151.65,61.0,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de RIPU-TO-KATO-METO_KAKATOPU,"Tuyaux polyéthylène sous pression, à l'exception des conduites de gaz PE100, pour le transport de l'eau, rapport dimensionnel standard SDR13,6, diamètre extérieur nominal 250 mm, épaisseur de paroi 18,4 mm",Material,General,m,61.43,61.43,61.43,61.43,1,EUR,2620.99,42.665,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de MERI-RI-KAPU-KAME_KAKAKANE,"Mats cousus en fibres de basalte recouverts d'une feuille d'aluminium sur une face, densité 110 kg/m3, conductivité thermique maximale 0,032 W/(m*K), température limite de la surface isolée de -200 à +700 °C, épaisseur 16 mm",Material,General,m2,18.23,18.23,18.23,18.23,1,EUR,546.98,30.005,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de MEPU-RI-KANE-KADX_KAKASAKA,"Inhibiteur de corrosion en poudre, soluble dans l'eau, biodégradable, pour la protection des produits et structures en métaux ferreux et en aluminium, densité 0,61-0,63 kg/l",Material,Steel & Metal,kg,190.59,190.59,190.59,190.59,1,EUR,285.88,1.5,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KALI-TO-KATO-KADX,Tuyau anti-vandalisme à câbles,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KAME-LI-MELI-MEKA_KARIKAKA,"Fraise à queue de fourmilion type F, diamètre de la partie coupante 16 mm, longueur de la partie coupante 25 mm, type de dent M, diamètre de la queue 6 mm, longueur de la queue 40 mm",Material,General,pièce,35.47,35.47,35.47,35.47,1,EUR,0.71,0.02,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS MEPU-PU-KAME-RIME_KAKAKATO,"Apprêt à base d'acétate d'éthyle pigmenté pour améliorer l'adhérence des matériaux non poreux lors de la mise en place de façades ventilées, application manuelle, densité 1 kg/l, viscosité 10 MPa*s, température d'application de +5 à +35 °C, couleur noire",Material,General,kg,76.06,76.06,76.06,76.06,1,EUR,114.39,1.505,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KADX-TO-KAME-KAPU_KAKANENE,"Amplificateurs de cassettes d'angle en aluminium pour façades ventilées suspendues, dimensions 46 x 46 mm, épaisseur de l'aluminium 2 mm",Material,General,100 pièces,72.77,72.77,72.77,72.77,1,EUR,6.18,0.085,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KADX-TO-KAME-KAPU_KAKANEPU,"Cornière de fixation en aluminium pour façades ventilées suspendues, dimensions 50 x 50 x 25 mm, épaisseur de l'aluminium 4 mm",Material,General,pièce,0.55,0.55,0.55,0.55,1,EUR,296.48,541.31,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KADX-TO-KAME-KAPU_KAKASAVO,"Barre de pression en aluminium pour profilé en cassette pour façades ventilées suspendues, section 36,7 x 5 mm, épaisseur de l'aluminium 1,2 mm",Material,General,m,1.91,1.91,1.91,1.91,1,EUR,624.49,326.135,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KADX-TO-KAME-KAPU_KAKASANE,"Profilé en aluminium pour façades ventilées suspendues, section 59 x 17 mm, épaisseur de l'aluminium 1,2 mm",Material,General,m,8.44,8.44,8.44,8.44,1,EUR,3125.93,370.45,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-RIKA-MESA_KAKATO,"Électricité : consommation 62,7 kWh/machine-heure",Electricity,Electricity,Heures machine,8.05,8.05,8.05,8.05,1,EUR,21.26,2.64,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MESA_KAKATO,"Stations de pompage électriques flottantes, débit 400 m3/h, pression 71 m",Equipment,General,Heures machine,70.78,70.78,70.78,70.78,1,EUR,186.85,2.64,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MESA_KAKARI,"Électricité : consommation 21,45 kWh/machine-heure",Electricity,Electricity,Heures machine,2.75,2.75,2.75,2.75,1,EUR,14.66,5.32,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MESA_KAKARI,"Stations de pompage électriques flottantes, débit 200 m3/h, pression 63 m",Equipment,General,Heures machine,54.77,54.77,54.77,54.77,1,EUR,291.4,5.32,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-KADX_KAKAPU,"Électricité : consommation 62,7 kWh/machine-heure",Electricity,Electricity,Heures machine,8.05,8.05,8.05,8.05,1,EUR,21.26,2.64,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-KADX_KAKAPU,"Stations de pompage électriques fixes, débit 400 m3/h, pression 71 m",Equipment,General,Heures machine,236.63,236.63,236.63,236.63,1,EUR,624.69,2.64,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-KADX_KAKATO,"Électricité : consommation 21,45 kWh/machine-heure",Electricity,Electricity,Heures machine,2.75,2.75,2.75,2.75,1,EUR,14.66,5.32,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MERI-KALI_KARIRI,Semoirs à engrais (sans tracteur),Equipment,General,Heures machine,3.83,3.83,3.83,3.83,1,EUR,6.17,1.61,2,2,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"TRAVAUX PRÉPARATOIRES, TERRASSEMENT ET AGROTECHNIQUES" DXME-KAVO-MEKA_KASAME,Fraises portées sans tracteur (pour marécages),Equipment,General,Heures machine,2.15,2.15,2.15,2.15,1,EUR,13.4,6.23,2,2,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"TRAVAUX PRÉPARATOIRES, TERRASSEMENT ET AGROTECHNIQUES" DXME-MEDX-KARI_KAKAME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.43,6.815,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS DXME-MEDX-KARI_KAKAME,"Pompes à huile à engrenages, débit 1,6 m3/h",Equipment,General,Heures machine,0.21,0.21,0.21,0.21,1,EUR,1.42,6.815,2,2,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS DXME-KATO-MEDX_MESAKA,"Électricité : consommation 5,02 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,2.68,4.15,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX DXME-KATO-MEDX_MESAKA,"Presses à vulcaniser pour le raccordement de bandes transporteuses d'une largeur maximale de 800 mm, longueur de raccordement maximale de 1000 mm",Equipment,General,Heures machine,2.72,2.72,2.72,2.72,1,EUR,11.28,4.15,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX DXME-MELI-KAPU_MEVOME,"Machines électrohydrauliques pour le soudage automatique par contact bout à bout par fusion continue et fusion avec préchauffage du métal laminé, surface des sections soudées de 113 à 2000 mm2",Equipment,General,Heures machine,51.59,51.59,51.59,51.59,1,EUR,23.99,0.465,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature KAVO-ME-KARI-MELI_KAKADXME,"Treillis soudé en fil d'armature sans revêtement, diamètre du fil 4 mm, taille des mailles 100 x 100 mm",Material,General,m2,3.1,3.1,3.1,3.1,1,EUR,28.61,9.23,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ DXME-MEDX-KADX_KAKATO,"Stations de pompage électriques fixes, débit 200 m3/h, pression 50-63 m",Equipment,General,Heures machine,83.65,83.65,83.65,83.65,1,EUR,445.01,5.32,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-KADX_KAKARI,"Électricité : consommation 14,85 kWh/machine-heure",Electricity,Electricity,Heures machine,1.91,1.91,1.91,1.91,1,EUR,14.12,7.405,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RISA-RI-KAME-KANE_KAKALIPU,Pince d'ancrage moyenne et corde élastique pour câble porteur KS-048,Material,General,pièce,17.35,17.35,17.35,17.35,1,EUR,35.74,2.06,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RILI-RI-KATO-KAPU_KAKARISA,"Fixation en acier galvanisé articulée, type FA-4-25,0, longueur 2900 mm",Material,General,pièce,251.86,251.86,251.86,251.86,1,EUR,503.72,2.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT KAME-LI-MESA-MEME_MEKATOLI,"Rondelle galvanisée à fixation invisible avec capuchon décoratif galvanisé et revêtement polymère, hauteur du capuchon 4 mm, diamètre du capuchon 36 mm, hauteur de la rondelle 9 mm, diamètre du trou de la rondelle 8 mm, diamètre de la rondelle 34 mm",Material,General,pièce,1.41,1.41,1.41,1.41,1,EUR,132.34,94.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MEME-TO-KATO-MEKA_MEMELILI,"Profil décoratif (corniche), à un niveau, en fibre de verre, installation sur supports, hauteur 1000 mm",Material,General,m,271.1,271.1,271.1,271.1,1,EUR,27109.79,100.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES MEME-TO-KATO-MEKA_MEMELISA,"Profilé décoratif (corniche), à un niveau, en fibre de verre, installation sur supports, hauteur 500 mm",Material,General,m,153.92,153.92,153.92,153.92,1,EUR,15391.67,100.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MEVO-KATO,Section chauffante pour chauffage électrique des sols,Abstract Material,General,pièce,139.46,139.46,139.46,139.46,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de systèmes de chauffage électrique au sol (« plancher chauffant ») RINE-ME-KAME-KARI_KAKATOME,"Rondelles en acier hydro-isolantes en asbobitume, diamètre du trou M27",Material,General,1000 pièces,2254.21,2254.21,2254.21,2254.21,1,EUR,577.08,0.26,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ DXME-KAVO-KANE_KAKASA,"Coupeurs de joints automoteurs, profondeur de coupe maximale 500 mm, puissance 55 kW (75 ch)",Equipment,General,Heures machine,34.4,34.4,34.4,34.4,1,EUR,90.31,2.625,2,2,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,REVÊTEMENTS DXME-KAVO-MEKA_KAMEME,"Fraiseuses à moteur à combustion interne, profondeur de fraisage jusqu'à 14 mm, puissance du moteur 9 kW (12 ch)",Equipment,General,Heures machine,7.62,7.62,7.62,7.62,1,EUR,96.06,12.61,2,2,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,REVÊTEMENTS KAME-LI-MELI-MEKA_KAKALIKA,"Tambour de fraisage, diamètre du corps 240 mm, largeur du corps 360 mm",Material,General,pièce,2797.7,2797.7,2797.7,2797.7,1,EUR,507.79,0.18,2,2,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,REVÊTEMENTS KAME-LI-MEDX-MELI_KAKARIRI,"Cordon d'étanchéité en caoutchouc poreux, diamètre 20,0 mm",Material,General,t,8976.92,8976.92,8976.92,8976.92,1,EUR,179.54,0.02,2,2,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,REVÊTEMENTS RIPU-RI-KASA-KAME_KAKAKARI,"Tuyaux en chrysotile-ciment sans pression, diamètre nominal 150 mm",Material,General,m,5.58,5.58,5.58,5.58,1,EUR,568.96,102.0,2,2,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,"TÊTES DE COLLECTEURS, PUITS D'AINSIAGE FERMÉS ET CANIVEAUX" DXME-MELI-KAPU_MEVOME,"Électricité : consommation 56,76 kW·h/machine-heure",Electricity,Electricity,Heures machine,7.29,7.29,7.29,7.29,1,EUR,3.39,0.465,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature MEVO-ME-KADX-KAVO_MEKAPURI,"Robinet à boisseau sphérique en laiton, raccord fileté, diamètre nominal 20 mm",Material,General,pièce,32.23,32.23,32.23,32.23,1,EUR,66.08,2.05,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de RIKA-RI-KARI-KATO,Capots de protection,Abstract Material,General,pièce,19.69,19.69,19.69,19.69,1,EUR,1968.92,100.0,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de RITO-SA-KARI-KARI_MEMEPURI,"Tubes en acier électrosoudés à joint droit en acier de marque 20, diamètre extérieur 57 mm, épaisseur de paroi 2 mm",Material,Pipes & Fittings,m,5.34,5.34,5.34,5.34,1,EUR,79.2,14.83,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX KAME-NE-KAME-KAME_KAKAKAME,"Plaques de plâtre résistantes à l'humidité GVL, épaisseur 10 mm",Material,General,m2,9.03,9.03,9.03,9.03,1,EUR,1842.61,204.0,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes préfabriquées à partir de plaques de plâtre fibrées (GVL) KAME-NE-KAME-KAME_KAKARIME,Éléments de sol en plaques de plâtre fibrées de petit format,Material,General,m2,13.84,13.84,13.84,13.84,1,EUR,1412.03,102.0,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes préfabriquées à partir de plaques de plâtre fibrées (GVL) RILI-RI-KATO-KAPU_KAKARIPU,"Fixateur en acier peint articulé, type FA-4-25,0, longueur 2900 mm",Material,General,pièce,172.58,172.58,172.58,172.58,1,EUR,345.16,2.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEME-RI-KAVO-KAME,Panneaux en fibres de bois,Abstract Material,General,1000 m2,6096.78,5963.76,6229.8,6096.78,2,EUR,221471.02,35.55,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS MEPU-TO-KARI-KATO_KAKAKAME,"Peinture à dispersion aqueuse polyvinylacétate VD-BA-17, couleur blanche",Material,General,t,2332.7,2332.7,2332.7,2332.7,1,EUR,233.27,0.1,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES FAÇADES KAME-LI-MESA-KARI_KAKANEME,"Boulons en acier galvanisé à tête hexagonale, diamètre du filetage M6, longueur 12-50 mm",Material,General,t,3869.18,3869.18,3869.18,3869.18,1,EUR,2.9,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-RIME-KAME_KASAME,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,0.02,0.07,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,"PLÂTRAGE DE CERTAINES ZONES, CAGE D'ESCALIER ET PLATEAUX, PLÂTRAGE DÉCORATIF" RINE-ME-KAME-KATO,Lattes de pression,Abstract Material,General,t,4892.74,4892.74,4892.74,4892.74,1,EUR,4892.74,1.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ KAME-LI-MERI-KASA_MEKAMERI,"Géotextile non tissé en polypropylène, aiguilleté, thermolié, densité superficielle 400 g/m2",Material,General,m2,1.48,1.48,1.48,1.48,1,EUR,35.62,24.035,2,2,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,Pose de tapis élastomères pour l'isolation antivibratoire lors de la constructio RISA-ME-KANE-MERI,Tapis élastomères à base de polyuréthane,Abstract Material,General,m2,932.19,932.19,932.19,932.19,1,EUR,96016.08,103.0,2,2,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,Pose de tapis élastomères pour l'isolation antivibratoire lors de la constructio KAVO-ME-KARI-MELI_KAMEPUPU,"Grille tissée en fil galvanisé, diamètre du fil 0,6 mm, taille des mailles 4 x 4 mm",Material,General,m2,5.82,5.82,5.82,5.82,1,EUR,89.76,15.43,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction des murs des bâtiments et des structures des centrales nucléaires é KAME-RI-KATO-KALI_KAKARILI,Émulsion bitume-latex hydrofuge anticorrosion pulvérisable,Material,General,kg,6.82,6.82,6.82,6.82,1,EUR,3612.25,530.0,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ DXME-RIME-KAME_KASAME,Racloirs électriques automatiques,Equipment,General,Heures machine,1.23,1.23,1.23,1.23,1,EUR,0.09,0.07,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,"PLÂTRAGE DE CERTAINES ZONES, CAGE D'ESCALIER ET PLATEAUX, PLÂTRAGE DÉCORATIF" KAPU-TO-KARI-KASA,Mélanges de plâtre,Abstract Material,General,t,453.31,453.31,453.31,453.31,1,EUR,571.17,1.26,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS RITO-VO-KATO-MEME_KAMEPURI,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 700 mm",Material,General,pièce,408.87,408.87,408.87,408.87,1,EUR,245.32,0.6,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-MEME_KAMETOSA,"Bride plate en acier soudée avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 250 mm",Material,General,pièce,75.71,75.71,75.71,75.71,1,EUR,764.72,10.1,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-MEME_KAMETOPU,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 200 mm",Material,General,pièce,51.69,51.69,51.69,51.69,1,EUR,522.11,10.1,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-MEME_KAMETOTO,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 150 mm",Material,General,pièce,37.56,37.56,37.56,37.56,1,EUR,379.32,10.1,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KASA-TO-KARI-MELI,Pièces moulées à l'unité,Abstract Material,General,pièce,20.09,20.09,20.09,20.09,1,EUR,20.09,1.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE MOULE,"Installation d'éléments en ciment (chapiteaux, bases, pommeaux, corniches, conso" KAME-NE-KATO-KAME,Carrelage tactile en polychlorure de vinyle,Abstract Material,General,m2,25.52,25.52,25.52,25.52,1,EUR,440.44,17.26,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en dalles de polychlorure de vinyle MEPU-SA-MEME-KAME,Mastic à base d'huile et de colle,Abstract Material,General,t,1038.32,1038.32,1038.32,1038.32,1,EUR,82.44,0.08,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,TRAVAUX DÉCORATIFS MEPU-SA-KAVO-KASA,Compositions décoratives texturées à base de granulés de quartz,Abstract Material,General,kg,4044.89,4044.89,4044.89,4044.89,1,EUR,1264029.67,312.5,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,TRAVAUX DÉCORATIFS KASA-ME-KASA-KAME,Poutres de fondation,Abstract Material,General,pièce,875.73,875.73,875.73,875.73,1,EUR,87572.96,100.0,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,FONDATIONS ET POUTRES DE FONDATION MEME-RI-MEME-KANE_KAKAMEPU,"Contreplaqué de bouleau recouvert d'un film des deux côtés, surface lisse des deux côtés, classe I/I, épaisseur 21 mm",Material,General,m3,1271.72,1271.72,1271.72,1271.72,1,EUR,6.11,0.01,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION À CIEL OUVERT DE STRUCTURES MONOLITHIQUES EN BÉTON ARMÉ D'OUVRAGES D'AR,Démontage du coffrage des structures monolithiques en béton armé des ouvrages d' KAME-TO-KATO-KAME_KAKAKAME,Asidol-myloft,Material,General,t,139.74,139.74,139.74,139.74,1,EUR,1.69,0.02,2,2,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,CÂBLES ET CÂBLES DE PROTECTION CONTRE LA FOUDRE VL 35-750 KV MEPU-RI-KASA-KANE_KAKAKAVO,"Composition bicomposante à base de polymère pour le renforcement des surfaces poreuses, l'hydrophobisation et la protection anticorrosion des structures en béton et en béton armé, température de traitement de +10 à +60 °C, température d'utilisation de -60 à +120 °C, densité à +20 °C de 1,05-1,08 g/cm3, consommation sur béton de 0,4-0,6 kg/m2",Material,Concrete & Cement,kg,29.06,29.06,29.06,29.06,1,EUR,915.32,31.5,2,2,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE ET DÉMONTAGE DE DALLES EN BÉTON ARMÉ POUR LE REVÊTEMENT DES VOIES DE TRAMWA,Pose et démontage des dalles en béton armé recouvrant les voies de tramway MEPU-ME-KAPU-KARI_KAKAMETO,"Colle caoutchouc, marque n° 4508",Material,General,kg,9.59,9.59,9.59,9.59,1,EUR,0.02,0.0,2,2,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE ET DÉMONTAGE DE DALLES EN BÉTON ARMÉ POUR LE REVÊTEMENT DES VOIES DE TRAMWA,Pose et démontage des dalles en béton armé recouvrant les voies de tramway KAME-RI-KATO-KATO_KAKANELI,Mastic bitume-caoutchouc isolant MBR-100,Material,General,t,926.1,926.1,926.1,926.1,1,EUR,13.89,0.02,2,2,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE ET DÉMONTAGE DE DALLES EN BÉTON ARMÉ POUR LE REVÊTEMENT DES VOIES DE TRAMWA,Pose et démontage des dalles en béton armé recouvrant les voies de tramway MEPU-RI-KARI-MERI_KAKAKAME,Retardateur de flamme à base d'eau pour l'imprégnation ignifuge des matériaux textiles,Material,General,t,4964.97,4964.97,4964.97,4964.97,1,EUR,304.85,0.06,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'HUILE MEPU-ME-KATO-KARI_KATOKAME,Colle prête à l'emploi,Material,General,kg,1.33,1.33,1.33,1.33,1,EUR,31.82,24.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'HUILE MEPU-PU-KATO-KANE,Vernis,Abstract Material,General,t,6446.03,6446.03,6446.03,6446.03,1,EUR,102.5,0.015,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PEINTURE,PEINTURE À L'HUILE RITO-VO-KATO-KALI_KAKAMEPU,"Raccords à emboîtement, diamètre nominal 700 mm",Material,General,compl,392.49,392.49,392.49,392.49,1,EUR,6476.04,16.5,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-KALI_KAKAMETO,"Raccords à emboîtement, diamètre nominal 600 mm",Material,General,compl,356.57,356.57,356.57,356.57,1,EUR,5170.3,14.5,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-KALI_KAKAMERI,"Raccords à emboîtement, diamètre nominal 500 mm",Material,General,compl,322.03,322.03,322.03,322.03,1,EUR,4025.44,12.5,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-KALI_KAKAMEME,"Raccords à emboîtement, diamètre nominal 400 mm",Material,General,compl,241.54,241.54,241.54,241.54,1,EUR,2717.36,11.25,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-KALI_KAKAKAME,"Raccord rapide, diamètre nominal 400 mm",Material,General,compl,59.71,59.71,59.71,59.71,1,EUR,635.91,10.65,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-SA-KAME-KAVO_KAKANEKA,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 920 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,673.88,673.88,673.88,673.88,1,EUR,34266.62,50.85,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-MEME_KAMEPUTO,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 800 mm",Material,General,pièce,505.12,505.12,505.12,505.12,1,EUR,303.07,0.6,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RISA-ME-KANE-KAPU_KAKAKAME,"Feuille de fibre technique, épaisseur 2,5 mm",Material,General,kg,19.32,19.32,19.32,19.32,1,EUR,11.91,0.615,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ","ÉQUIPEMENT DE SIGNALISATION, DE CENTRALISATION ET DE BLOCAGE POUR LES CHEMINS DE","MÉCANISATION, AUTOMATISATION DES TRIEUS" KADX-TO-KAME-KAME_MEKAMEKA,"Support en aluminium avec revêtement anodisé pour la fixation d'une main courante-pare-chocs pour la finition intérieure des murs, dimensions 60 x 50 x 47 mm",Material,General,pièce,23.83,23.83,23.83,23.83,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation d'un système de protection des murs et des angles (butoirs) MEME-TO-KATO-MESA_MEKARILI,"Support en PVC pour la fixation d'une main courante-pare-chocs pour la finition intérieure des murs, dimensions 85 x 48 x 46 mm, épaisseur 2,5 mm",Material,General,pièce,6.76,6.76,6.76,6.76,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation d'un système de protection des murs et des angles (butoirs) DXME-MEME-KARI_KAKAME,Appareils de graissage à câble,Equipment,General,Heures machine,1.82,1.82,1.82,1.82,1,EUR,3.5,1.92,2,2,TRAVAUX DE CONSTRUCTION,Lignes électriques,LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 35 À 1150 KV,CÂBLES ET CÂBLES DE PROTECTION CONTRE LA FOUDRE VL 35-750 KV KAME-LI-KALI-MERI_KAKARINE,"Film polyéthylène avec nervures d'ancrage, épaisseur 1,6 mm",Material,General,m2,16.62,16.62,16.62,16.62,1,EUR,1745.34,105.0,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Construction d'une dalle de fondation sous les bâtiments du bâtiment réacteur d' DXME-KATO-KASA_KALIPU,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 3,0 m, longueur de passage de 200 m à 500 m",Equipment,General,Heures machine,1841.72,1841.72,1841.72,1841.72,1,EUR,461812.3,250.75,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KALITO,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 3,0 m, longueur de forage jusqu'à 200 m",Equipment,General,Heures machine,1731.3,1731.3,1731.3,1731.3,1,EUR,434123.16,250.75,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAPU-ME-KARI-KASA_KAMEPURI,"Mélanges de béton lourd (BST) sur gravier concassé, classe B22,5, F(1)150, W4",Material,General,m3,128.03,128.03,128.03,128.03,1,EUR,20.43,0.16,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,MURS ET CLOISONS MEME-ME-KATO-KANE_KAMERIKA,"Planches équarries de conifères, sèches, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 30-40 mm, classe II",Material,General,m3,574.51,574.51,574.51,574.51,1,EUR,138.76,0.48,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KALINE,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 3,0 m, longueur de forage de 1 000 m à 1 500 m",Equipment,General,Heures machine,2064.28,2064.28,2064.28,2064.28,1,EUR,517618.09,250.75,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KATO-KASA_KALISA,"Complexes de microtunnelage, diamètre extérieur maximal du tube (revêtement) 3,0 m, longueur de forage de 500 m à 1 000 m",Equipment,General,Heures machine,1952.69,1952.69,1952.69,1952.69,1,EUR,489636.65,250.75,2,2,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES MEPU-TO-KARI-KATO,Peintures à dispersion aqueuse à base de polyvinylacétate,Abstract Material,General,t,2326.51,2326.51,2326.51,2326.51,1,EUR,43.51,0.02,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Collage de papier peint en verre sur les murs avec peinture au polyvinylacétate MEPU-ME-KATO-KARI,Colle pour papier peint en fibre de verre,Abstract Material,General,kg,1.59,1.59,1.59,1.59,1,EUR,43.65,27.5,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Collage de papier peint en verre sur les murs avec peinture au polyvinylacétate KAME-NE-KARI-KARI,Papier peint en fibre de verre,Abstract Material,General,m2,20.12,20.12,20.12,20.12,1,EUR,2112.22,105.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Collage de papier peint en verre sur les murs avec peinture au polyvinylacétate KAME-LI-RIKA-KAVO,Textiles et matières textiles,Abstract Material,General,m2,2.71,2.71,2.71,2.71,1,EUR,281.93,104.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Collage de tissus KAME-NE-KARI-KATO,Lincrust,Abstract Material,General,m2,9.39,9.39,9.39,9.39,1,EUR,1051.58,112.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Pose de papier peint MEVO-RI-KANE-KADX_MEKAKAKA,"Récipients en plastique pour le mélange, volume 0,385 l",Material,General,1000 pièces,428.16,428.16,428.16,428.16,1,EUR,5.14,0.01,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Application de revêtements protecteurs multicomposants KAME-LI-KANE-METO_KAKAKATO,"Écran pare-eau en polyéthylène, épaisseur jusqu'à 2 mm",Material,General,kg,20.97,20.97,20.97,20.97,1,EUR,73.08,3.485,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTION D'ENTREPRISES DE STOCKAGE ET DE TRANSFORMATION DE CÉRÉALES,Montage de structures pour les installations de stockage et de transformation du RIKA-TO-KATO-KAPU,Luminaires à lampes fluorescentes ou à lampes à vapeur de mercure,Abstract Material,General,pièce,170.16,170.16,170.16,170.16,1,EUR,17015.84,100.0,2,2,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" RIKA-TO-KATO-KATO,Luminaires à incandescence,Abstract Material,General,pièce,14.19,14.19,14.19,14.19,1,EUR,1419.5,100.0,2,2,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" MEPU-PU-KARI-KARI_KAMEKATO,"Peinture organosiliciée à trois composants pour revêtement protecteur, composant C (diluant)",Material,General,kg,31.28,31.28,31.28,31.28,1,EUR,87.9,2.81,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Application de revêtements protecteurs multicomposants MEPU-PU-KARI-KARI_KAMEKARI,"Peinture organosiliciée à trois composants pour revêtement protecteur, composant B (durcisseur)",Material,General,kg,2777.85,2777.85,2777.85,2777.85,1,EUR,777.8,0.28,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Application de revêtements protecteurs multicomposants MEPU-PU-KARI-KARI_KAMEKAME,"Peinture organosiliciée à trois composants pour revêtement protecteur, composant A (base)",Material,General,kg,1796.92,1796.92,1796.92,1796.92,1,EUR,5049.34,2.81,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Application de revêtements protecteurs multicomposants MEPU-PU-KAME-KARI_KARIMESA,"Apprêt à trois composants pour revêtement protecteur, composant C (diluant)",Material,General,kg,20.35,20.35,20.35,20.35,1,EUR,62.57,3.075,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Application de revêtements protecteurs multicomposants MEPU-PU-KAME-KARI_KARIMEPU,"Apprêt à trois composants pour revêtement protecteur, composant B (durcisseur)",Material,General,kg,2005.7,2005.7,2005.7,2005.7,1,EUR,1303.7,0.65,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Application de revêtements protecteurs multicomposants MEPU-PU-KAME-KARI_KARIMETO,"Apprêt à trois composants pour revêtement protecteur, composant A (base)",Material,General,kg,463.84,463.84,463.84,463.84,1,EUR,2040.88,4.4,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Application de revêtements protecteurs multicomposants MEME-TO-KATO-KADX_MEKAMERI,"Support en polyamide pour fixation murale d'une main courante de 50 mm de diamètre avec une base en aluminium de 2,2 mm d'épaisseur, un profilé en PVC de 2 mm d'épaisseur, dimensions 75 x 61 x 50 mm",Material,General,pièce,18.8,18.8,18.8,18.8,1,EUR,3947.73,210.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation d'un système de protection des murs et des angles (butoirs) MEME-TO-KATO-KADX_MEKAMEKA,"Anneau de protection des joints en polyamide pour main courante de 50 mm de diamètre avec base en aluminium de 2,2 mm d'épaisseur, profilé PVC de 2 mm d'épaisseur, diamètre extérieur 56 mm, largeur 16 mm, épaisseur 3 mm",Material,General,pièce,8.0,8.0,8.0,8.0,1,EUR,240.13,30.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation d'un système de protection des murs et des angles (butoirs) MEME-TO-KATO-KADX_MEKAKAPU,"Élément d'extrémité rond en polyamide pour main courante de 50 mm de diamètre avec base en aluminium de 2,2 mm d'épaisseur, profilé PVC de 2 mm d'épaisseur, dimensions 50 x 33 mm, épaisseur 4 mm",Material,General,pièce,10.68,10.68,10.68,10.68,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation d'un système de protection des murs et des angles (butoirs) MEME-TO-KATO-KADX_MEKAKARI,"Élément de finition latéral en polyamide pour main courante de 50 mm de diamètre avec base en aluminium de 2,2 mm d'épaisseur, profilé en PVC de 2 mm d'épaisseur, dimensions 80 x 110 x 50 mm",Material,General,pièce,23.64,23.64,23.64,23.64,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation d'un système de protection des murs et des angles (butoirs) RITO-VO-KASA-KASA_KAKAMERI,"Manchon coulissant en fonte, diamètre nominal 100 mm",Material,General,pièce,15.52,15.52,15.52,15.52,1,EUR,85.39,5.5,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN FONTE,Pose dans les tranchées de canalisations en fonte pour égouts RITO-VO-KASA-KASA_KAKAMEME,"Manchon en fonte à emboîter, diamètre nominal 50 mm",Material,General,pièce,6.23,6.23,6.23,6.23,1,EUR,34.26,5.5,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN FONTE,Pose dans les tranchées de canalisations en fonte pour égouts KADX-RI-KARI-KARI,Plafonds suspendus à rails en profilés d'aluminium,Abstract Material,General,m2,39.8,39.8,39.8,39.8,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX RIRI-RI-KARI-MEME_KAKARIME,"Boulons d'ancrage en acier pour fondations, type 2, version 1, diamètre du filetage M16, longueur 710 mm",Material,General,t,2631.55,2631.55,2631.55,2631.55,1,EUR,8.48,0.0,2,2,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX KATO-ME-KAME-KAME_KAKAKAPU,Plâtre de construction G-5,Material,General,t,205.03,205.03,205.03,205.03,1,EUR,0.41,0.0,2,2,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",TRAITEMENT ACOUSTIQUE DES LOCAUX RITO-TO-KASA-KAME_KAKAMETO,"Tubes en acier sans soudure, formés à froid, en acier résistant à la corrosion, nuance 12Kh18N10T, diamètre extérieur 25 mm, épaisseur de paroi 3,0 mm",Material,Pipes & Fittings,m,25.8,25.8,25.8,25.8,1,EUR,180.96,7.015,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" KALI-RI-KANE-KATO_KASASAME,"Profilé en aluminium de pression avec deux joints en caoutchouc pour la fixation supérieure du polycarbonate, largeur 60 mm",Material,General,m,6.12,6.12,6.12,6.12,1,EUR,594.64,97.1,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Revêtement en polycarbonate de structures métalliques KAME-LI-MESA-MEME_MEKAKAKA,"Rondelles thermiques en polycarbonate pour la fixation du polycarbonate sur des structures métalliques, diamètre 40 mm, hauteur 4 mm",Material,Steel & Metal,100 pièces,25.76,25.76,25.76,25.76,1,EUR,42.43,1.65,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Revêtement en polycarbonate de structures métalliques KAME-LI-KANE-KAME_MEKAMEKA,"Bandes d'étanchéité continues en tissu non tissé, avec une couche adhésive sur une face, pour polycarbonate alvéolaire, largeur 25 mm",Material,General,10 m,4.2,4.2,4.2,4.2,1,EUR,5.42,1.29,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Revêtement en polycarbonate de structures métalliques KAME-LI-KANE-KAME_MEKAKAVO,"Bandes d'étanchéité perforées en tissu non tissé, avec une couche adhésive sur une face, pour polycarbonate alvéolaire, largeur 25 mm",Material,General,10 m,8.48,8.48,8.48,8.48,1,EUR,10.93,1.29,2,2,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Revêtement en polycarbonate de structures métalliques DXME-KADX-MERI_MEMEME,"Raboteuses ferroviaires non automotrices, portée maximale de l'aile à partir de l'axe de la voie 7,8 m",Equipment,General,Heures machine,244.64,244.64,244.64,244.64,1,EUR,654.4,2.675,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES DXME-KASA-KADX_KAMEVO,"Grues sur châssis spécial de type automobile, capacité de charge 150 t",Equipment,General,Heures machine,295.93,295.93,295.93,295.93,1,EUR,621.45,2.1,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ RITO-VO-KAPU-KANE_KAMEMEVO,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 400 mm, diamètre extérieur 426 mm, épaisseur de paroi 10 mm",Material,General,pièce,576.62,576.62,576.62,576.62,1,EUR,1499.22,2.6,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac DXME-MEDX-MERI_KARIRI,"Électricité : consommation 4,51 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.58,0.58,0.58,0.58,1,EUR,4.25,7.345,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements des entreprises de métallurgie des métaux non ferreux,ÉQUIPEMENT À USAGE GÉNÉRAL,FOURS ET INSTALLATIONS DE CHAUFFAGE DXME-MEDX-MERI_KARIRI,Pompes à vide 8 m3/min,Equipment,General,Heures machine,3.21,3.21,3.21,3.21,1,EUR,23.59,7.345,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements des entreprises de métallurgie des métaux non ferreux,ÉQUIPEMENT À USAGE GÉNÉRAL,FOURS ET INSTALLATIONS DE CHAUFFAGE MENE-RI-KAME-KATO_KAKAKAME,"Mélange tourbe-sable (70 % de tourbe, 30 % de sable)",Material,General,m3,33.31,33.31,33.31,33.31,1,EUR,6412.96,192.5,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-KANE-KASA_KANERI,"Chargeuses frontales universelles à roues pneumatiques, capacité de charge jusqu'à 1 t, avec roue vibrante, profondeur maximale jusqu'à 420 mm, largeur 50, 100, 150 mm",Equipment,General,Heures machine,24.67,24.67,24.67,24.67,1,EUR,21.47,0.87,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES RITO-SA-KARI-KARI_KAKASAPU,"Tubes en acier électrosoudés à soudure droite en acier de marques St2, 10, diamètre extérieur 108 mm, épaisseur de paroi 3,0 mm",Material,Pipes & Fittings,m,10.19,10.19,10.19,10.19,1,EUR,57.07,5.6,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier RITO-SA-KARI-KARI_KAKAPUVO,"Tubes en acier électrosoudés à soudure droite en acier des nuances St2, 10, diamètre extérieur 89 mm, épaisseur de paroi 3,0 mm",Material,Pipes & Fittings,m,9.94,9.94,9.94,9.94,1,EUR,55.68,5.6,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier MEME-ME-KAME-KASA,Planches de parquet,Abstract Material,General,m2,71.75,71.75,71.75,71.75,1,EUR,7389.82,103.0,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en parquet, parquet mosaïque, parquet massif sans veines" MEPU-PU-KAME-MELI_KAKAKAPU,"Apprêt monocomposant à base de polyuréthane chargé de zinc, durcissant à l'humidité de l'air, pour une protection anticorrosion durable du métal",Material,General,kg,14.59,14.59,14.59,14.59,1,EUR,248.49,17.03,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" KAVO-TO-KALI-KAME_KAKANEME,"Bandes d'acier laminées à chaud, nuances St3sp, St3ps, dimensions 120 x 6 mm",Material,General,t,1688.22,1688.22,1688.22,1688.22,1,EUR,463.16,0.275,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","BLOCS VOLUMINEUX, CABINES SANITAIRES, CAGES D'ASCENSEUR ET BLOCS DE VENTILATION" DXME-KALI-KASA_KAKATO,"Électricité : consommation 35,02 kWh/machine-heure",Electricity,Electricity,Heures machine,4.5,4.5,4.5,4.5,1,EUR,13.56,3.015,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation du béton dans des usines automatisées sur site DXME-KALI-KASA_KAKATO,"Usines à béton automatisées, capacité 60 m3/h",Equipment,General,Heures machine,22.82,22.82,22.82,22.82,1,EUR,68.81,3.015,2,2,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation du béton dans des usines automatisées sur site RIRI-RI-KARI-MEDX_MEKARIME,Mise à la terre portable pour RU d'une tension maximale de 1 kV,Material,General,pièce,63.75,63.75,63.75,63.75,1,EUR,175.95,2.76,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",OPOR MEME-ME-KAME-MENE_KAKAKARI,"Dalles en bois pour parquets, imprégnées d'antiseptiques huileux, type 1, 2, hauteur 60, 80 mm",Material,General,m3,900.5,900.5,900.5,900.5,1,EUR,5457.01,6.06,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à partir de dalles à bords droits sur une couche inte KAVO-ME-KARI-KADX_KAKAKATO,"Carreaux en fonte carrés pour sols, dimensions 300 x 300 mm, épaisseur 25 mm",Material,General,t,3338.01,3338.01,3338.01,3338.01,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à partir de dalles en fonte DXME-MERI-KALI_KAKAME,Machines pour l'ensemencement des talus des routes et des voies ferrées,Equipment,General,Heures machine,27.33,27.33,27.33,27.33,1,EUR,19.0,0.695,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-LI-MEME-KAPU_KAKAPUME,"Fil à souder SV-08X19N10G2B, diamètre 1,6 mm",Material,General,kg,16.56,16.56,16.56,16.56,1,EUR,4.29,0.26,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) MEPU-PU-KAME-KAVO_KAKAKATO,"Apprêt pigmenté au dioxyde de titane, marque A-01",Material,General,t,9032.61,9032.61,9032.61,9032.61,1,EUR,1210.37,0.135,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements sans joints d'une épaisseur de 5 mm MEPU-RI-KAPU-KAPU_KATOKAPU,Résine polyamide,Material,General,kg,5.05,5.05,5.05,5.05,1,EUR,500.07,99.1,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements sans joints d'une épaisseur de 5 mm RIPU-TO-KARI-KARI,Tuyaux d'égout sans pression en polypropylène,Abstract Material,General,m,7.27,7.27,7.27,7.27,1,EUR,726.01,99.8,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de canalisations d'égouts internes à partir de tuyaux en polypropylène MERI-ME-KARI-MEME,Membranes en polypropylène (film pare-vapeur),Abstract Material,Waterproofing,m2,13.62,1.56,25.68,13.62,2,EUR,1487.37,111.93,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-MEKA_KAKAKAVO,"Vis pour la fixation de la planche de raccordement à la cheminée et au mur, fournies avec une cheville thermorésistante, longueur 40 mm",Material,General,100 pièces,32.2,32.2,32.2,32.2,1,EUR,112.21,3.485,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-KARI_MEMEKAKA,"Bande de raccordement en acier galvanisé pour la pose de toitures, avec revêtement polymère, dimensions 150 x 250 mm",Material,General,m,17.5,17.5,17.5,17.5,1,EUR,968.72,55.355,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-MEKA_KAKAKALI,"Agrafe pour la fixation du tablier de gouttière, peinte",Material,General,pièce,1.21,1.21,1.21,1.21,1,EUR,537.3,445.0,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable RIKA-RI-KALI-KAPU,Couvercles pour bac non perforé,Abstract Material,General,pièce,47.55,41.73,53.36,47.55,2,EUR,336.29,6.665,2,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES MERI-RI-KAPU-MERI_KAKANERI,"Sacs cousus en laine minérale dans une enveloppe en treillis métallique tissé à mailles carrées, marque 200, épaisseur de la couche de laine minérale 120 mm",Material,General,m3,218.83,218.83,218.83,218.83,1,EUR,214.45,0.98,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS MEVO-RI-KAVO-KAVO,Filtres à mailles en laiton,Abstract Material,General,pièce,50.06,50.06,50.06,50.06,1,EUR,5005.84,100.0,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation d'un compteur d'eau dans un appartement RITO-TO-KATO-KARI_KAMEMEDX,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de marques 10, 20, 35, diamètre extérieur 133 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,90.65,90.65,90.65,90.65,1,EUR,11332.67,125.015,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) MELI-PU-KASA-MEKA_KAKAMERI,"Poudre de periclase fondue, marque PPL-95",Material,General,t,4610.99,4610.99,4610.99,4610.99,1,EUR,2512.99,0.545,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en xylolite et en polyvinylacétate RITO-TO-KANE-KARI_KAKAKATO,"Tubes en acier soudés galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 25 mm, épaisseur de paroi 3,2 mm",Material,Pipes & Fittings,m,4.71,4.71,4.71,4.71,1,EUR,0.99,0.21,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de chauffage et d'alimentation en ea RITO-TO-KANE-KARI_KAKAKARI,"Tubes en acier soudés galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 20 mm, épaisseur de paroi 2,8 mm",Material,Pipes & Fittings,m,3.4,3.4,3.4,3.4,1,EUR,0.95,0.28,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de chauffage et d'alimentation en ea MEVO-SA-KAVO-MEVO_KAMERIME,"Embouts 1/2""",Material,General,100 pièces,77.27,77.27,77.27,77.27,1,EUR,1545.43,20.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,"CONDUITES EN TUBES PLASTIQUES ET CÂBLES PNEUMATIQUES, BOÎTIERS DE RACCORDEMENT P" RITO-VO-KATO-KAME_KAKARIRI,"Bouchons en acier pour tuyaux, diamètre nominal 20 mm",Material,General,10 pièces,45.05,45.05,45.05,45.05,1,EUR,225.27,5.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER ALLIÉ ET RÉSISTANT À LA CORROSION RITO-VO-KATO-KAME_KAKARIME,"Bouchons en acier pour tuyaux, diamètre nominal 10 mm",Material,General,10 pièces,36.29,36.29,36.29,36.29,1,EUR,181.44,5.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER ALLIÉ ET RÉSISTANT À LA CORROSION MERI-RI-KALI-KASA_KAKAPUPU,"Tubes isolants en polyéthylène expansé, diamètre intérieur 30 mm, épaisseur 9 mm",Material,Pipes & Fittings,100 m,58.68,58.68,58.68,58.68,1,EUR,57.27,0.975,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Étanchéification des entrées de communications à travers les murs à l'aide de co KAPU-TO-KARI-KADX_MEKASANE,"Mélanges secs sans retrait, à prise rapide, pour la restauration, l'étanchéité et la réparation des revêtements en béton, avec une charge de 3 mm, M500",Material,General,kg,1.23,1.23,1.23,1.23,1,EUR,217.57,177.08,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Étanchéification des entrées de communications à travers les murs à l'aide de co RIRI-RI-KARI-MEVO_KAKAKASA,Traverse en acier à 2 tiges,Material,General,pièce,42.65,42.65,42.65,42.65,1,EUR,42.65,1.0,2,2,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE SUPPORT RIRI-RI-KARI-RITO_KAMEKAME,Cache pour le croisement des fils des circuits téléphoniques ND avec quatre tiges ShT-20 MS,Material,General,pièce,16.69,16.69,16.69,16.69,1,EUR,16.69,1.0,2,2,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,"CROISEMENT DE CÂBLES, ÉQUIPEMENT DE PÔLES DE CONTRÔLE, INSTALLATION DE PLATES-FO" RIRI-RI-KARI-KADX_KAKATORI,Crochet de suspension pour la fixation des isolateurs des lignes aériennes de communication KPD-20,Material,General,pièce,5.76,5.76,5.76,5.76,1,EUR,5.76,1.0,2,2,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,"CROISEMENT DE CÂBLES, ÉQUIPEMENT DE PÔLES DE CONTRÔLE, INSTALLATION DE PLATES-FO" KASA-ME-KALI-MERI,Garde-corps de loggias et balcons,Abstract Material,General,pièce,733.58,733.58,733.58,733.58,1,EUR,73358.41,100.0,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","DALLES DE LOGGIAS, BALCONS, AUVENTS, PARAPETS, MURS, BARRIÈRES ET PETITES CONSTR" RITO-VO-KASA-KAME_KAKAMEME,"Bouchon en fonte, diamètre nominal 50 mm",Material,General,pièce,5.89,5.89,5.89,5.89,1,EUR,6.3,1.07,2,2,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de canalisations d'égouts MEPU-PU-KARI-KAPU_KAMELITO,"Peinture à l'huile MA-15, ocre",Material,General,t,2876.39,2876.39,2876.39,2876.39,1,EUR,13.09,0.01,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en xylolite et en polyvinylacétate RIPU-ME-KARI-KAME_KAKAMERI,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation de tuyaux, écrou de fixation M8, diamètre de 15 à 19 mm",Material,General,pièce,1.84,1.84,1.84,1.84,1,EUR,1073.8,584.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER CARBONÉ ET FAIBLEMENT ALLIÉ RITO-VO-KATO-KAME_KAKARIPU,"Bouchons en acier pour tuyaux, diamètre nominal 50 mm",Material,General,10 pièces,88.91,88.91,88.91,88.91,1,EUR,444.56,5.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER CARBONÉ ET FAIBLEMENT ALLIÉ RITO-VO-KATO-KAME_KAKARITO,"Bouchons en acier pour tuyaux, diamètre nominal 25 mm",Material,General,10 pièces,50.9,50.9,50.9,50.9,1,EUR,254.48,5.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER CARBONÉ ET FAIBLEMENT ALLIÉ RITO-VO-KAME-RIRI_KAKAMENE,"Équerres universelles en laiton avec filetage intérieur, taille du filetage 1""",Material,General,10 pièces,117.33,117.33,117.33,117.33,1,EUR,2992.01,25.5,2,2,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER CARBONÉ ET FAIBLEMENT ALLIÉ DXME-METO-KARI_KAKARI,"Lame à neige à vis sans fin pour voiture, puissance 180 kW (250 ch)",Equipment,General,Heures machine,60.52,60.52,60.52,60.52,1,EUR,20.88,0.345,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX MEVO-RI-KARI-KALI,Plateaux de douche,Abstract Material,General,compl,109.79,109.79,109.79,109.79,1,EUR,1097.88,10.0,2,2,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" MEPU-ME-KANE-KAPU_KAKAMEVO,"Colle, marque KhVK-2A",Material,General,kg,12.88,12.88,12.88,12.88,1,EUR,0.0,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",DISPOSITIFS DE MICROPROCESSEURS ET DE TECHNIQUES DE CALCUL,DÉCOUPAGE DE CÂBLES ET DE FILS EN CONNECTEURS MEKA-PU-KAME-KAME_KAKAKAME,Soudures POSK 50-18,Material,General,kg,60.29,60.29,60.29,60.29,1,EUR,0.1,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",DISPOSITIFS DE MICROPROCESSEURS ET DE TECHNIQUES DE CALCUL,DÉCOUPAGE DE CÂBLES ET DE FILS EN CONNECTEURS RIKA-RI-KATO-RINE_KAKAVOME,Cornière perforée K236,Material,General,pièce,9.12,9.12,9.12,9.12,1,EUR,18.23,2.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",APPAREILS ET MOYENS D'AUTOMATISATION INSTALLÉS SUR LES ÉQUIPEMENTS ET LES COMMUN,TRANSDUCTEURS PRIMAIRE DE NIVEAU MEVO-RI-KANE-MEME_KAKARIRI,"Tuyau d'évacuation en acier galvanisé, diamètre 32 mm, épaisseur de paroi 3,2 mm, longueur 3000 mm",Material,General,pièce,26.42,26.42,26.42,26.42,1,EUR,264.22,10.0,2,2,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" MEVO-ME-MEKA-MEME_KAKAKATO,"Robinet de chasse horizontal, avec alimentation en eau murale de 25 mm de diamètre, raccord de 32 mm",Material,General,pièce,123.55,123.55,123.55,123.55,1,EUR,1235.45,10.0,2,2,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" MEVO-SA-KADX-KATO,"Sèche-serviettes en acier inoxydable de type P, M, MP",Abstract Material,General,pièce,24.04,24.04,24.04,24.04,1,EUR,240.4,10.0,2,2,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de sèche-serviettes, de mitigeurs, d'ensembles de toilettes" MEVO-RI-KANE-KAPU,Ensemble de toilette,Abstract Material,General,pièce,12.06,12.06,12.06,12.06,1,EUR,120.57,10.0,2,2,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de sèche-serviettes, de mitigeurs, d'ensembles de toilettes" KALI-RI-KANE-KARI,Trappes d'inspection,Abstract Material,General,pièce,34.08,34.08,34.08,34.08,1,EUR,3407.91,100.0,2,2,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de trappes sanitaires (d'inspection), d'écrans sous baignoire" KAVO-ME-KARI-KATO_KAKARIME,"Gouttière de fenêtre en acier galvanisé avec revêtement polymère, rebord de fixation 20 mm, largeur de gouttière 250 mm, capuchon de 20 x 20 mm, épaisseur de l'acier 0,5 mm",Material,General,m,11.13,11.13,11.13,11.13,1,EUR,588.16,52.83,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable KAME-LI-MESA-MEPU_KAKALITO,"Vis autotaraudeuses en acier peintes pour toiture, à tête hexagonale et rondelle, pointe de forage, diamètre 4,8 mm, longueur 50 mm",Material,General,t,10593.4,10593.4,10593.4,10593.4,1,EUR,35.17,0.0,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-KALI_MEKARINE,"Éléments faîtiers d'extrémité (fixations) en PVC pour tuiles en ciment-sable, hauteur 260 mm, longueur de saillie 75 mm",Material,General,10 pièces,380.1,380.1,380.1,380.1,1,EUR,798.22,2.1,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-KALI_MEKAKAKA,"Élément aérodynamique en PVC pour tuiles en ciment-sable, section de ventilation 380 cm2/m",Material,General,pièce,26.49,26.49,26.49,26.49,1,EUR,1364.19,51.5,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable RINE-ME-KARI-KARI_KAKARISA,"Kit de jonction isolante pour rails de type P65 avec deux semelles, une cale, des boulons avec écrous et rondelles",Material,General,compl,262.88,262.88,262.88,262.88,1,EUR,262.88,1.0,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX RIKA-SA-KASA-KATO_KAKAKAME,"Parafoudre commandé, tension de service 5-10 kV, durée de vie 50 000 déclenchements, dimensions 120 x 120 x 250 mm",Material,General,pièce,2290.39,2290.39,2290.39,2290.39,1,EUR,9.16,0.01,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX DXME-MEPU-KASA_KAPURI,"Chariots roulants pour le transport de chambres thermiques et de tambours à câbles d'un poids maximal de 4,5 t",Equipment,General,Heures machine,1.02,1.02,1.02,1.02,1,EUR,0.14,0.14,2,2,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,TRANSPORT DE MATÉRIAUX LINÉAUX MEVO-ME-MEKA-KASA_KAKARIME,"Vanne à flotteur en plastique, diamètre nominal 25 mm",Material,General,pièce,2.73,2.73,2.73,2.73,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,Installation de réservoirs métalliques pour l'eau MEVO-SA-KARI-KAME,Réservoir métallique,Abstract Material,General,pièce,1022.87,1022.87,1022.87,1022.87,1,EUR,10228.72,10.0,2,2,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,Installation de réservoirs métalliques pour l'eau MEVO-RI-KARI-KANE,Éviers en fonte émaillée,Abstract Material,General,compl,172.67,172.67,172.67,172.67,1,EUR,1726.72,10.0,2,2,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,Installation d'éviers et de lavabos KAME-LI-MESA-KATO_KAKATODX,"Boulons en acier galvanisé à tête hexagonale et écrou hexagonal galvanisé, diamètre du filetage du boulon et de l'écrou M42, longueur du boulon 60-300 mm",Material,General,kg,7.03,7.03,7.03,7.03,1,EUR,845.26,120.2,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",APPAREILS ET MOYENS D'AUTOMATISATION INSTALLÉS SUR LES ÉQUIPEMENTS ET LES COMMUN,DISPOSITIFS DE RÉDUCTION KAME-LI-MESA-MERI_KAKAPUNE,"Goujons filetés en acier galvanisé, diamètre du filetage M16, longueur 300 mm",Material,General,t,3586.35,3586.35,3586.35,3586.35,1,EUR,14.35,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",STRUCTURES POUR L'INSTALLATION D'APPAREILS ET DE MOYENS D'AUTOMATISATION,Structures pour l'installation de mécanismes d'exécution KAVO-TO-KASA-KATO_KAKAKAME,"Tôle de toiture en acier, couleur noire, épaisseur 0,7 mm",Material,General,t,1572.03,1572.03,1572.03,1572.03,1,EUR,881.91,0.56,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"ALARME ÉLECTRIQUE, ALARME INCENDIE, ALARME D'APPEL ET SIGNALISATION À DISTANCE",ÉLECTRIFICATION KAVO-ME-KARI-KATO_KAKAMEME,"Bande de raccordement en acier galvanisé, dimensions 250 x 147 x 2000 mm, épaisseur 0,5 mm",Material,General,kg,9.3,9.3,9.3,9.3,1,EUR,0.46,0.05,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS RISA-ME-KANE-MEME_KAKANEME,Moule pour le soudage aluminothermique des rails,Material,General,compl,66.64,66.64,66.64,66.64,1,EUR,6796.82,102.0,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS RISA-ME-KANE-MEME_KAKASAME,"Creuset réactif réutilisable pour le soudage aluminothermique des rails, type TR-1M, dimensions 245 x 280 x 245 mm",Material,General,pièce,160.41,160.41,160.41,160.41,1,EUR,328.84,2.05,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS RISA-ME-KANE-MEME_KAKAPUME,"Allumettes d'allumage pour le soudage aluminothermique des rails, type SZ-1",Material,General,100 pièces,462.73,462.73,462.73,462.73,1,EUR,235.99,0.51,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS RIKA-SA-KASA-KARI_KAKAKAME,"Électrode de terre avec câble de 22 m de long, tension de service 5-10 kV, dimensions de la douille 60 x 430 mm",Material,General,pièce,1561.0,1561.0,1561.0,1561.0,1,EUR,103.96,0.065,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX RIKA-SA-KASA-KAME_KAKAKAME,"Condensateur à impulsions, tension nominale 5 kV, capacité 200 µF, matériau du boîtier : acier, hauteur avec bornes 673 mm, UHL4",Material,General,pièce,3243.98,3243.98,3243.98,3243.98,1,EUR,172.58,0.055,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX DXME-RIME-MEME_KAKARI,"Moteurs à essence portatifs, diamètre de la foreuse de plus de 200 mm à 400 mm, puissance du moteur jusqu'à 3,7 kW (5 ch)",Equipment,General,Heures machine,1.71,1.71,1.71,1.71,1,EUR,4.57,2.68,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX DXME-KADX-KALI_SAKAME,"Wagons-trémies, capacité de caisse jusqu'à 41 m3, capacité de charge jusqu'à 71 t",Equipment,General,Heures machine,11.57,11.57,11.57,11.57,1,EUR,6.41,0.555,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX DXME-KADX-KALI_SAKASA,"Machines de traitement (recyclage) du ballast concassé pour la remise en état de la plate-forme principale lors de la reconstruction (modernisation) de la voie, capacité de 300 à 500 m3/h, profondeur de coupe jusqu'à 1200 mm, automotrices",Equipment,General,Heures machine,6460.42,6460.42,6460.42,6460.42,1,EUR,205958.16,31.88,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST KARI-RI-KAPU-KATO_KAKAKATO,Mélange naturel de sable et de gravier,Material,General,m3,31.19,31.19,31.19,31.19,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,NETTOYAGE EN PROFONDEUR OU REMPLACEMENT DU BALLAST KARI-RI-KASA-KATO_KAKAKAME,"Gravier andésitique ordinaire, fraction 0-70 mm",Material,General,m3,473.37,473.37,473.37,473.37,1,EUR,572.77,1.21,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en béton résistant aux acides et à la chaleur DXME-METO-KARI_KAKAME,"Lame chasse-neige à charrue, largeur de travail 3 m",Equipment,General,Heures machine,0.77,0.77,0.77,0.77,1,EUR,0.1,0.13,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX RIME-RI-KATO-KASA_KAKASAPU,Câble d'alimentation avec conducteurs en cuivre PuV 1x16-450,Material,General,1000 m,3949.87,3949.87,3949.87,3949.87,1,EUR,19.75,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIME-RI-KATO-KASA_KAKASATO,Câble d'alimentation avec conducteurs en cuivre PuV 1x10-450,Material,General,1000 m,2451.5,2451.5,2451.5,2451.5,1,EUR,24.51,0.01,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES DXME-MERI-KAVO_KAVOME,Machines à ramasser les pierres,Equipment,General,Heures machine,3.98,3.98,3.98,3.98,1,EUR,18.62,4.68,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-MERI-KAVO_METOME,Ramasseuses de petits résidus forestiers,Equipment,General,Heures machine,17.58,17.58,17.58,17.58,1,EUR,48.25,2.745,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS KAPU-TO-KARI-KADX_KAVOMEME,"Mélanges secs pour la construction, l'étanchéité, la pénétration",Material,General,kg,6.88,6.88,6.88,6.88,1,EUR,438.87,63.8,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Imperméabilisation des murs et des fondations MEPU-PU-KATO-MEPU_KAKAMEME,"Solution de résine crésol-formaldéhyde, de polyvinylbutyral et de monoglycéride d'huile de lin dans un mélange d'alcool éthylique et de cyclohexanone, pour le revêtement de produits métalliques afin de les protéger contre la corrosion",Material,General,t,10361.9,10361.9,10361.9,10361.9,1,EUR,19.69,0.0,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS DE RÉSEAUX THERMIQUES,Dispositif de canaux infranchissables KAME-LI-KALI-RIDX_KAMEVOME,"Buses de pulvérisation en plastique, diamètre 28 mm",Material,General,1000 pièces,520.81,520.81,520.81,520.81,1,EUR,53.38,0.1,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Installation de buses d'arrosage en plastique pour les systèmes d'arrosage des t RISA-ME-KANE-MEME_KAKATOME,"Mélange de moulage pour soudage aluminothermique, type OMZ",Material,General,kg,4.47,4.47,4.47,4.47,1,EUR,684.26,153.0,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS RISA-ME-KANE-MEME_KAKAMEME,Buse pour le soudage aluminothermique des rails,Material,General,pièce,9.68,9.68,9.68,9.68,1,EUR,493.74,51.0,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS RISA-ME-KANE-MEME_KAKAKAME,Composant de coulée pour le soudage aluminothermique des rails par coulée intermédiaire,Material,General,compl,357.15,357.15,357.15,357.15,1,EUR,714.31,2.0,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,INSTALLATION D'UNE VOIE SANS JOINTS RISA-ME-KANE-MEVO_KAMEKANE,"Joints en caoutchouc pour fondations sous rails, type TsP-363",Material,General,1000 pièces,1600.93,1600.93,1600.93,1600.93,1,EUR,204.92,0.13,2,2,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES AIGUILLAGES KAPU-TO-KARI-KAVO,Mélanges secs de béton de polystyrène,Abstract Material,General,m3,4.98,4.98,4.98,4.98,1,EUR,6.71,1.35,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS KAME-LI-KALI-RINE_KAKARITO,"Cordon en mousse de polyéthylène pour l'isolation thermique et l'étanchéité, section ronde continue, densité 25-40 kg/m3, diamètre 6 mm",Material,General,100 m,5.57,5.57,5.57,5.57,1,EUR,5.07,0.91,2,2,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS RIRI-ME-KAME-KAME_KAKATOTO,"Boîtier de câbles, type BM2-3",Material,General,pièce,358.6,358.6,358.6,358.6,1,EUR,358.6,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS FILAIRES RIME-RI-KATO-KARI_KAKAKATO,"Câble de montage MGSHVE 2x0,50-1000",Material,General,1000 m,579.47,579.47,579.47,579.47,1,EUR,1.74,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS FILAIRES KAVO-RI-KARI-MEPU_KAKAKAME,"Câble à simple torsion TK, structure 1x19(1+6+12)+1 o.s., marque B, en fil galvanisé du groupe Zh, groupe de marquage 1570-1770 N/mm2, diamètre 6,1 mm",Material,Steel & Metal,10 m,10.98,10.98,10.98,10.98,1,EUR,13.29,1.21,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO RIRI-RI-KAME-KANE_KAKAMEME,Isolateur de levage ITO-20 U1,Material,General,pièce,1.1,1.1,1.1,1.1,1,EUR,4.41,4.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO KAVO-TO-KATO-KARI_KAKAKADX,"Fil bimétallique BSM-1, diamètre 4,0-6,0 mm",Material,General,t,15147.8,15147.8,15147.8,15147.8,1,EUR,22.95,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO ME_MEKAKA_VOKA,Charge de travail moyenne 8,Labor,Labor,heures,25.22,25.22,25.22,25.22,1,EUR,58.38,2.315,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE RIKA-RI-KAME-KADX_KAKAMEME,Manchons de protection thermorétractables KDZS pour la protection des joints soudés des câbles à fibres optiques,Material,General,1000 pièces,109.96,109.96,109.96,109.96,1,EUR,0.11,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE KAME-LI-MERI-MEME,Treillis en fibre de basalte imprégné et cousu,Abstract Material,General,m2,3.01,3.01,3.01,3.01,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BRIQUES ET EN PIERRES,"Renforcement de la maçonnerie des murs, fixation des voûtes, installation de gri" MEME-ME-KATO-KANE_KAKAVOME,"Planches de bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 20-22 mm, classe I",Material,General,m3,503.49,503.49,503.49,503.49,1,EUR,1049.77,2.085,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,SOUTÈNEMENTS PERMANENTS À CADRE POUR PUITS INCLINÉS D'OUVRAGES HORIZONTAUX ET IN MERI-ME-KARI-MEKA_KAMEDXKA,"Membrane de drainage profilée en polyéthylène haute densité (PEHD) avec couche filtrante en géotextile thermosoudé, inflammabilité G4, résistance à la compression d'au moins 580 kN/m2, hauteur des nervures 8,5 mm, épaisseur 0,8 mm",Material,Waterproofing,m2,19.37,19.37,19.37,19.37,1,EUR,2324.21,120.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Installation de systèmes de drainage KALI-RI-KANE-KANE_KAMEKAKA,Barre de pression en PVC en forme de Z pour protéger le bord supérieur de la membrane de drainage,Material,Waterproofing,100 m,553.8,553.8,553.8,553.8,1,EUR,249.21,0.45,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Installation de systèmes de drainage KAME-LI-MESA-KALI_KARIMENE,"Cheville à vis (vis) en plastique pour la fixation de membranes de drainage à l'isolant extrudé, longueur 50 mm",Material,Waterproofing,pièce,1.64,1.64,1.64,1.64,1,EUR,2131.92,1300.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Installation de systèmes de drainage KAVO-TO-KARI-KAME,Bandes en acier,Abstract Material,General,kg,1805.48,1805.48,1805.48,1805.48,1,EUR,11452.15,6.34,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Réalisation d'une étanchéité des murs et des fondations à l'aide de matériaux d' DXME-MEME-KAME_KAKASA,Poseurs de câbles vibrants pour la pose de câbles optiques sur tracteur d'une puissance de 132 kW (180 ch),Equipment,General,Heures machine,46.0,46.0,46.0,46.0,1,EUR,402.48,8.75,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE RIRI-RI-KARI-KANE_KAKAMEME,Consoles pour la fixation et la suspension de câbles en acier KSP-2,Material,General,100 pièces,810.75,810.75,810.75,810.75,1,EUR,14.59,0.02,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE MEVO-SA-KARI-KATO,Palettes,Abstract Material,General,pièce,181.82,181.82,181.82,181.82,1,EUR,181.82,1.0,2,2,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de plateaux métalliques pour réservoirs RIRI-ME-KAME-KAME_KAKANESA,"Boîtier téléphonique, boîtier en aluminium, 100 paires téléphoniques",Material,General,pièce,142.13,142.13,142.13,142.13,1,EUR,142.13,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIRI-ME-KAME-KAME_KAKANEPU,"Boîtier téléphonique, corps en aluminium, 50 paires téléphoniques",Material,General,pièce,75.92,75.92,75.92,75.92,1,EUR,75.92,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-RI-KADX-MEKA_KAKAMERI,"Manchon de protection pour câbles de communication, connecteur MS-35",Material,General,pièce,8.89,8.89,8.89,8.89,1,EUR,8.89,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIRI-ME-KAME-KAME_KAKASAKA,"Boîtier de câbles interurbains, boîtier en aluminium, 30 paires de fils, 2 tubes, 3 plinthes, 10 paires de prises pour câbles basse fréquence",Material,Pipes & Fittings,pièce,340.55,340.55,340.55,340.55,1,EUR,340.55,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIME-RI-KATO-KADX_KAMEKARI,"Câble téléphonique PRPVM 2x1,2",Material,General,1000 m,1019.18,1019.18,1019.18,1019.18,1,EUR,1.02,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIME-RI-KARI-KAPU_KAKAKAME,"Câble téléphonique PRPPM 2x1,2",Material,General,1000 m,721.92,721.92,721.92,721.92,1,EUR,25.51,0.07,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIKA-RI-KADX-METO_KAKAMERI,Manchon coaxial étanche au gaz,Material,General,pièce,312.75,312.75,312.75,312.75,1,EUR,312.75,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE MEVO-PU-KAME-KAVO_KAKANEME,Tuyau de raccordement,Material,General,pièce,7.22,7.22,7.22,7.22,1,EUR,14.43,2.0,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de chauffe-eau, MEVO-PU-KAME-KAVO_KAKATOME,Nettoyage pour conduit de gaz,Material,General,pièce,2.28,2.28,2.28,2.28,1,EUR,2.28,1.0,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de chauffe-eau, KAME-LI-MESA-KAME_MEMELIKA,"Ancrage au sol à enfoncement, à ouverture automatique, galvanisé, charge maximale admissible d'au moins 120 kN",Material,Concrete & Cement,pièce,353.99,353.99,353.99,353.99,1,EUR,353.99,1.0,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Installation d'ancrages de sol à ouverture automatique de type ancrage sur les p METO-RI-KAME-KATO,Blocs diabase,Abstract Material,General,m3,5.11,5.11,5.11,5.11,1,EUR,163.38,32.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES DES CONDUITES DE MINERAI AVEC DES BLOCS DE DIABASE KAVO-ME-KASA-KATO_MEKARIRI,"Collier de fixation métallique pour la fixation du tablier du conduit à déchets, largeur 60 mm, diamètre du collier 280 mm",Material,General,pièce,5.37,5.37,5.37,5.37,1,EUR,5.37,1.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ MEDX-ME-KAPU-KAME_KAKATOME,"Déflecteur cylindrique d'extraction, type TsAGI n° 3, diamètre du tuyau 280 mm",Material,General,pièce,42.86,42.86,42.86,42.86,1,EUR,42.86,1.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment MERI-RI-KATO-KAVO_KAKAKAME,"Cales (plaques) techniques isolantes en liège, épaisseur 2 mm",Material,General,m2,6.26,6.26,6.26,6.26,1,EUR,62.57,10.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CLOISONS,Installation de cloisons en plaques de plâtre et en béton léger RIPU-RI-KAPU-KAME_MEKAMERI,"Flexibles d'alimentation en eau renforcés, anti-vibrations, avec joints, diamètre 15 mm, longueur 500 mm",Material,General,compl,3.08,3.08,3.08,3.08,1,EUR,6.16,2.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ MEVO-ME-KADX-KAME_KAKAKARI,"Robinet à bouchon en fonte pour gaz, à manchon, pression nominale 0,1 MPa, diamètre nominal 32 mm",Material,General,pièce,16.82,16.82,16.82,16.82,1,EUR,16.82,1.0,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de cuisinières à gaz, RIKA-RI-KADX-MEKA_KAKAMENE,"Manchon de protection pour câbles de communication, raccord MS-85",Material,General,pièce,55.34,55.34,55.34,55.34,1,EUR,55.34,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIKA-RI-KARI-KAPU_KAKAKASA,"Capuchons universels en polyéthylène, diamètre du câble entrant 60-65 mm",Material,General,100 pièces,368.55,368.55,368.55,368.55,1,EUR,7.37,0.02,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIKA-RI-KARI-KAPU_KAKAKAPU,"Capuchons polyéthylène universels, diamètre du câble entrant 35-40 mm",Material,General,100 pièces,294.81,294.81,294.81,294.81,1,EUR,5.9,0.02,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE DXME-MEME-KAME_KAKAME,"Poseurs de câbles sur roues tractés pour la pose de câbles coaxiaux à une profondeur maximale de 1,2 m",Equipment,General,Heures machine,4.53,4.53,4.53,4.53,1,EUR,35.91,7.92,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE MEVO-ME-MEKA-METO_KAKASARI,"Robinet à passage direct à presse-étoupe 11ch8bk, raccordement à la tuyauterie par bride, pression nominale 1,0 MPa, diamètre nominal 80 mm",Material,General,pièce,372.71,372.71,372.71,372.71,1,EUR,372.71,1.0,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, MEVO-PU-KAME-KAVO_KAKAKAME,Œilleton avec obturateurs,Material,General,kg,20.57,20.57,20.57,20.57,1,EUR,15.84,0.77,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, MEVO-ME-MEKA-KAME_KARIDXME,"Robinet en bronze, diamètre nominal 15 mm",Material,General,pièce,6.45,6.45,6.45,6.45,1,EUR,6.45,1.0,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, DXME-METO-KAME_SAMEPU,"Machines de démarquage routier avec tambour de fraisage, largeur de marquage à éliminer jusqu'à 200 mm",Equipment,General,Heures machine,3.5,3.5,3.5,3.5,1,EUR,4.67,1.335,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX RIKA-RI-KAVO-KANE,Rouleaux pour l'élimination des lignes de marquage routier à l'aide de machines de démarquage automotrices,Abstract Material,General,compl,658.02,658.02,658.02,658.02,1,EUR,17.44,0.025,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX KAME-LI-METO-KAME_KAKAKAME,Déchets d'asphalte,Material,General,t,15.33,15.33,15.33,15.33,1,EUR,1009.21,65.825,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges organo-minéraux et d'enrobés bitumineux dans une install KARI-TO-KAME-KASA_KAPUTOKA,"Sable issu du concassage pour travaux de construction, classe II, M 800, moyen",Material,General,m3,37.62,37.62,37.62,37.62,1,EUR,2163.28,57.5,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges d'asphalte à partir de gravats fractionnés (gravier) pou RITO-VO-KATO-MERI_KAKAKAME,Dérivation 90° segmentée en acier galvanisé,Material,General,pièce,16.99,16.99,16.99,16.99,1,EUR,33.97,2.0,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de chauffe-eau, MELI-ME-KARI-KASA_KAKATOME,Ferraille de briques réfractaires,Material,General,t,173.01,173.01,173.01,173.01,1,EUR,147.09,1.7,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Prélèvement de gaz dans l'espace de combustion à l'aide d'un tube à impulsions, RITO-VO-KATO-MEME_KARISATO,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,0 MPa, diamètre nominal 150 mm",Material,General,pièce,35.95,35.95,35.95,35.95,1,EUR,71.91,2.0,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de diaphragmes de chambre, RITO-VO-KATO-MEME_KARISAKA,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,0 MPa, diamètre nominal 80 mm",Material,General,pièce,18.54,18.54,18.54,18.54,1,EUR,37.09,2.0,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de soupapes de sécurité, DXME-RIME-RIRI_MEVOVO,"Machines à lisser à un rotor, puissance 7 kW (9 ch)",Equipment,General,Heures machine,3.15,3.15,3.15,3.15,1,EUR,6.59,2.095,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes KAME-LI-MEDX-MEVO_KAKAKARI,Manchon de raccordement,Material,General,pièce,24.12,24.12,24.12,24.12,1,EUR,24.12,1.0,2,2,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de bouteilles de gaz liquéfié dans la cuisine, RIKA-SA-KATO-KATO_KAKAKASA,"Barre électrotechnique en aluminium, marque AD0, largeur 30 mm, épaisseur 4 mm",Material,General,kg,10.41,10.41,10.41,10.41,1,EUR,0.28,0.05,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,CROSS MEDX-ME-KARI-KAPU,Distributeurs d'air,Abstract Material,General,pièce,436.81,436.81,436.81,436.81,1,EUR,436.81,1.0,2,2,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de diffuseurs d'air destinés à l'alimentation en air KAME-LI-MEME-KASA_KAKAMEME,"Baguette de soudage en tungstène lanthané VL, diamètre 1,6-3 mm",Material,General,kg,317.02,317.02,317.02,317.02,1,EUR,16.01,0.05,2,2,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations MEDX-TO-KATO-KASA,Filtres à air cellulaires,Abstract Material,General,pièce,26.62,26.62,26.62,26.62,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations MEDX-ME-KAME-MERI,Brides rectangulaires en acier angulaire pour conduits d'air,Abstract Material,General,pièce,6.67,6.67,6.67,6.67,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations KAPU-TO-KAME-KAVO,Mortier métallo-ciment,Abstract Material,General,m3,65.03,65.03,65.03,65.03,1,EUR,66.34,1.02,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Réalisation de revêtements en béton, en béton cimenté et en béton armé" KAME-PU-KARI-KATO_KAKARINE,"Fraise à cinq rangées pour élargisseur d'installation de forage rotatif, diamètre 381 mm",Material,General,pièce,31334.63,31334.63,31334.63,31334.63,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGE DE GALERIES ASCENDANTES KAME-PU-KARI-KATO_KAKARISA,"Tête de forage à quatre rangées de couteaux pour élargisseur d'installation de forage rotatif, diamètre 381 mm",Material,General,pièce,31334.63,31334.63,31334.63,31334.63,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGE DE GALERIES ASCENDANTES RITO-TO-KANE-KAPU_KAKAMEKA,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, légers, diamètre nominal 40 mm, épaisseur de paroi 3 mm",Material,Pipes & Fittings,m,4.56,4.56,4.56,4.56,1,EUR,318.99,70.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,RENFORCEMENT SUCCESSIF DES ROCHES PAR CIMENTATION DANS LES EXPLOITATIONS HORIZON DXME-KAVO-MEME_MEPUME,"Cribles à tambour mobiles (trommels), capacité jusqu'à 100 m3/h",Equipment,General,Heures machine,84.2,84.2,84.2,84.2,1,EUR,238.28,2.83,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX MEDX-ME-KARI-KAVO,Distributeurs d'air,Abstract Material,General,pièce,612.94,612.94,612.94,612.94,1,EUR,612.94,1.0,2,2,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de diffuseurs d'air destinés à l'alimentation en air MEDX-RI-KARI-KATO,Aspirateurs,Abstract Material,General,kg,27.66,27.66,27.66,27.66,1,EUR,2765.76,100.0,2,2,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation d'aspirateurs RIKA-ME-KARI-MEVO_KAKAKAME,"Colliers de serrage pour câbles (bandages), dimensions 3,6 x 200 mm",Material,General,100 pièces,2.48,2.48,2.48,2.48,1,EUR,0.35,0.14,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DANS LES INSTALLATIONS MINIÈRES D'UNE KAME-LI-MELI-KADX_MEKAMEVO,"Foret à pointe en alliage dur, avec queue SDS-max pour le perçage à percussion dans des matériaux durs, longueur totale 340 mm, diamètre 22 mm",Material,General,pièce,14.56,14.56,14.56,14.56,1,EUR,125.27,8.605,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DES CENTRALES NUCLÉAIRES ET DES BÂTIME RIKA-RI-KADX-KAPU_KAKAMEKA,"Manchon thermorétractable de raccordement pour câbles à isolation en polyéthylène ou en papier pour une tension jusqu'à 10 kV, marque STp-10-3kh(150-240) mm2",Material,General,pièce,239.29,239.29,239.29,239.29,1,EUR,239.29,1.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DES CENTRALES NUCLÉAIRES ET DES BÂTIME DXME-KALI-KALI_KAMERI,"Électricité : consommation 0,91 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.12,0.12,0.12,0.12,1,EUR,1.0,8.56,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une étanchéité à base d'un composé polymère-ciment d'une épaisseu DXME-KALI-KALI_KAMERI,"Pompes à mortier, débit 5 m3/h",Equipment,General,Heures machine,0.67,0.67,0.67,0.67,1,EUR,5.75,8.56,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une étanchéité à base d'un composé polymère-ciment d'une épaisseu KATO-RI-KARI-KANE_KAKAKAME,"Ciment précontraint NC-5 32,5N",Material,General,t,531.39,531.39,531.39,531.39,1,EUR,887.42,1.67,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une étanchéité à base d'un composé polymère-ciment d'une épaisseu DXME-RIME-RIRI_PUPUNE,"Électricité : consommation 0,33 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.04,0.04,0.04,0.04,1,EUR,0.2,4.8,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité en film polyéthylène sur colle butyle avec protection en DXME-RIME-RIRI_PUPUNE,"Installations pour le soudage de films en polyéthylène, puissance de chauffage du coin 1 kW",Equipment,General,Heures machine,0.69,0.69,0.69,0.69,1,EUR,3.29,4.8,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité en film polyéthylène sur colle butyle avec protection en MEPU-PU-KATO-KATO_KAMEKAPU,Vernis bitumineux BT-783,Material,General,t,3604.06,3604.06,3604.06,3604.06,1,EUR,180.2,0.05,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité en film polyéthylène sur colle butyle avec protection en MEPU-RI-KANE-KARI_KAKAKAME,Caoutchouc butyle,Material,General,t,6260.26,6260.26,6260.26,6260.26,1,EUR,25.04,0.01,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité en film polyéthylène sur colle butyle avec protection en RILI-ME-KAME-KAME_KAKAKAME,Borne de serrage,Material,General,pièce,1.1,1.1,1.1,1.1,1,EUR,5.6,5.1,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,ALIMENTATION ÉLECTRIQUE DES INSTALLATIONS DE LEVAGE ET DE TRANSPORT RIKA-SA-KATO-KATO_KAKAKAME,"Barre électrotechnique en aluminium, marque AD31, largeur 20 mm, épaisseur 3 mm",Material,General,m,2.8,2.8,2.8,2.8,1,EUR,210.25,75.15,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,MACHINES ÉLECTRIQUES RIKA-ME-KARI-KANE_KAKAMEME,Cuivre pour additif,Material,General,kg,85.62,85.62,85.62,85.62,1,EUR,389.56,4.55,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,MACHINES ÉLECTRIQUES KAME-ME-KAME-KARI_KAKAMEME,"Panneau électrotechnique résistant à l'arc (ACÉID), épaisseur 6 mm",Material,General,t,478.79,478.79,478.79,478.79,1,EUR,2.88,0.01,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RAILS LOURDS DXME-RIME-MEDX_KATOKA,"Électricité : consommation 0,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.01,0.205,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RAILS LOURDS DXME-RIME-MEDX_KATOKA,Machines à entraînement électromécanique pour le déroulement de matériaux en rouleaux,Equipment,General,Heures machine,0.59,0.59,0.59,0.59,1,EUR,0.12,0.205,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RAILS LOURDS MERI-ME-KARI-KATO_KAKASATO,"Matériau en rouleau bitume-polymère pour toiture et étanchéité, soudable, base polyester, flexibilité maximale -15 °C, résistance minimale 360 N, résistance thermique minimale 120 °C",Material,General,m2,11.09,11.09,11.09,11.09,1,EUR,681.0,61.38,2,2,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,BÂTIMENTS TEMPORAIRES EN STRUCTURES PRÉFABRIQUÉES,Assemblage de bâtiments résidentiels temporaires de type conteneur KALI-RI-KALI-METO_KATOMEME,"Tirants à vis en acier pour conteneurs, diamètre de la tige 32 mm, longueur 280 mm",Material,General,100 pièces,6167.14,6167.14,6167.14,6167.14,1,EUR,123.34,0.02,2,2,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,BÂTIMENTS TEMPORAIRES EN STRUCTURES PRÉFABRIQUÉES,Assemblage de bâtiments résidentiels temporaires de type conteneur RIPU-ME-KARI-KAME_KAKARIPU,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation des tuyaux, écrou de fixation M10, diamètre de 108 à 116 mm",Material,General,pièce,5.46,5.46,5.46,5.46,1,EUR,267.31,49.0,2,2,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Pose de tuyauteries en métaux non ferreux RITO-SA-KARI-KARI_KAKATORI,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 57 mm, épaisseur de paroi 2,5 mm",Material,Pipes & Fittings,m,5.01,5.01,5.01,5.01,1,EUR,40.67,8.125,2,2,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Pose de tuyauteries en métaux non ferreux KAME-SA-KATO-KADX,Colonne de signalisation galvanisée,Abstract Material,General,pièce,146.22,146.22,146.22,146.22,1,EUR,146.22,1.0,2,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX MEPU-ME-KASA-KARI_MEKAKANE,Colle-mastic polyuréthane à deux composants,Material,General,kg,21.95,21.95,21.95,21.95,1,EUR,4.25,0.195,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-LI-MEPU-KASA_KAKAKAPU,"Feuille en polyéthylène basse pression, couleur noire, épaisseur 2 mm",Material,General,m2,13.48,13.48,13.48,13.48,1,EUR,13.07,0.97,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-VO-KAME-KAPU,Feuilles de plexiglas TOSP,Abstract Material,General,kg,207.81,207.81,207.81,207.81,1,EUR,239.88,1.155,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-MEDX-MEME_KAMESA,"Électricité : consommation 273,49 kW·h/machine-heure",Electricity,Electricity,Heures machine,35.13,35.13,35.13,35.13,1,EUR,35.13,1.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES DXME-MEDX-MEME_KAMESA,"Chauffe-eau triphasés à circulation pour le réchauffement du fluide frigorigène lors du dégel artificiel des sols, livrés avec armoire de commande, puissance 325 kW",Equipment,General,Heures machine,60.13,60.13,60.13,60.13,1,EUR,60.13,1.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES DXME-MEDX-MEME_KATOSA,"Électricité : consommation 6,6 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.85,0.85,0.85,0.85,1,EUR,0.85,1.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES DXME-MEDX-MEME_KATOSA,Postes de commande des stations de congélation en version conteneurisée,Equipment,General,Heures machine,7.9,7.9,7.9,7.9,1,EUR,7.9,1.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES DXME-MEDX-MEME_KATOTO,"Électricité : consommation 447,68 kW·h/machine-heure",Electricity,Electricity,Heures machine,57.5,57.5,57.5,57.5,1,EUR,57.5,1.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES DXME-MEDX-MEME_KATOTO,"Installations frigorifiques à saumure avec condenseurs à refroidissement par air pour la congélation du sol en version conteneurisée, puissance frigorifique 560 kW (à une température de saumure en sortie de -38 °C)",Equipment,General,Heures machine,164.06,164.06,164.06,164.06,1,EUR,164.06,1.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES KAME-TO-KASA-TOVO_KAPUDXKA,"Réfrigérant liquide à base de sels de potassium d'acides carboxyliques, température de cristallisation inférieure à -55 °C, densité à 20 °C comprise entre 1,220 et 1,360 g/cm3",Material,Chemicals,kg,20.85,20.85,20.85,20.85,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES DXME-KATO-MEDX_METOLI,"Électricité : consommation 73,92 kW·h/machine-heure",Electricity,Electricity,Heures machine,9.49,9.49,9.49,9.49,1,EUR,5290.91,557.28,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGE DE GALERIES ASCENDANTES DXME-KATO-MEDX_METOLI,"Installations de forage rotatif automotrices pour le creusement de galeries ascendantes, équipées d'un élargisseur, diamètre de forage 3,05 m",Equipment,General,Heures machine,635.4,635.4,635.4,635.4,1,EUR,354095.47,557.28,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGE DE GALERIES ASCENDANTES DXME-KATO-KANE_KAMESA,"Machines de chargement et de livraison à moteur à combustion interne sur châssis pneumatique, capacité de charge jusqu'à 15 t",Equipment,General,Heures machine,344.37,344.37,344.37,344.37,1,EUR,1239.73,3.6,2,2,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGE DE GALERIES ASCENDANTES KAME-LI-MESA-MERI_KAKAKAPU,"Vis à tête hexagonale en acier sanitaire avec filetage, diamètre du filetage M10, longueur 120 mm",Material,General,100 pièces,19.32,19.32,19.32,19.32,1,EUR,0.77,0.04,2,2,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Installation de climatiseurs et de systèmes split MERI-RI-KASA-KADX,Panneaux isolants en polystyrène expansé extrudé,Abstract Material,General,m2,50.76,50.76,50.76,50.76,1,EUR,5227.78,103.0,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation d'une isolation thermique et acoustique continue KAME-TO-KASA-TOKA_KAKAKAME,Copolymère (résine) d'acide méthacrylique et de son ester,Material,Chemicals,t,22063.16,22063.16,22063.16,22063.16,1,EUR,88.25,0.0,2,2,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Dispositif d'étanchéité RINE-ME-KARI-KALI,Butées d'extrémité,Abstract Material,General,pièce,1488.89,1488.89,1488.89,1488.89,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Bâtiments et structures temporaires démontables,VOIES DE ROULEMENT POUR GRUES À TOUR,Installation de butées d'extrémité sur les voies de roulement pour grues à tour MEPU-RI-KASA-KAME_KAMEKATO,"Dispersion aqueuse de latex synthétique et de charges inertes sans solvants, couleur bleue",Material,General,kg,13.91,13.91,13.91,13.91,1,EUR,695.53,50.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec double ossature métalli KAME-LI-KANE-KAPU_KAKAKATO,Bandes d'étanchéité pour angles et joints à base de bande maillée en polyester d'une largeur de 120 mm avec une bande d'élastomère d'étanchéité d'une largeur de 70 mm appliquée sur l'axe longitudinal,Material,General,m,3.6,3.6,3.6,3.6,1,EUR,136.7,38.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,"CLOISONS, REVÊTEMENTS MURAUX, PLAFONDS SUSPENDUS EN PLAQUES DE PLÂTRE (GKL)",Installation de cloisons en plaques de plâtre (GKL) avec double ossature métalli RIKA-RI-KAME-KASA_KAKAKAME,"Douilles de câble en cuivre 2,5 mm",Material,General,100 pièces,13.63,13.63,13.63,13.63,1,EUR,1.02,0.075,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS KAME-LI-MESA-KARI_KAKARIRI,"Boulons d'ancrage avec écrou en acier à friction, à visse, avec filetage extérieur M8, diamètre 10 mm, longueur 120 mm",Material,General,100 pièces,22.68,22.68,22.68,22.68,1,EUR,5.67,0.25,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE RIPU-RI-KASA-KATO_KAKAKARI,"Tuyaux en chrysotile-ciment sous pression, classe BT6, diamètre nominal 150 mm",Material,General,m,11.57,11.57,11.57,11.57,1,EUR,26.03,2.25,2,2,TRAVAUX DE CONSTRUCTION,Structures en terre des ouvrages hydrauliques,CONSTRUCTIONS EN TERRE DES ÉQUIPEMENTS HYDRAULIQUES,"BARRAGES, DIGUES, REMBLAIS" MERI-ME-KARI-MEKA_KAKADXLI,"Membrane pare-vapeur double couche, résistante au vent et à l'humidité, pour façades ventilées et toits en pente, G2, perméabilité à la vapeur 953 g/m2*jour, résistance 150-163 N, avec protection UV",Material,Waterproofing,m2,1.46,1.46,1.46,1.46,1,EUR,78.97,53.96,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS MEME-RI-METO-KARI,"Panneaux muraux extérieurs à ossature bois, avec remplissage isolant",Abstract Material,General,m2,3.25,3.25,3.25,3.25,1,EUR,324.96,100.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KALI-RI-KANE-KATO_KAMEVONE,"Profilé en acier galvanisé pour montants, dimensions 150 x 50 mm, épaisseur 1,0 mm",Material,General,m,5.47,5.47,5.47,5.47,1,EUR,1656.91,303.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS MERI-RI-KATO-KAPU_KAKAPUME,Thermolite,Material,General,m3,552.99,552.99,552.99,552.99,1,EUR,6939.98,12.55,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,"PLACES DE SOUS-SOL, INTER-ÉTAGES, GRENIERS ET PANNEAUX" MEVO-SA-KAVO-KARI,Ventouses pour l'air et l'eau,Abstract Material,General,compl,571.39,571.39,571.39,571.39,1,EUR,571.39,1.0,2,2,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,"SIPHONS, HYDRAULIQUES, COLONNES DE DISTRIBUTION D'EAU" KAME-LI-MESA-KATO_KAKAMELI,"Boulons en acier à tête hexagonale, livrés avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M27, longueur du boulon 50-300 mm",Material,General,t,5016.74,5016.74,5016.74,5016.74,1,EUR,150.5,0.03,2,2,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,"VANNES, CLAPETS" RIKA-RI-KADX-KARI_KAKAKAME,"Panneau de construction en pin, classe B, dimensions 40 x 600 x 1600 mm",Material,General,m3,1608.55,1608.55,1608.55,1608.55,1,EUR,32.17,0.02,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KALI-RI-KANE-KATO_KAMERIPU,"Profilé de guidage en acier galvanisé, pour sols en béton, hauteur 60 mm, épaisseur de l'acier 0,8 mm",Material,General,m,3.2,3.2,3.2,3.2,1,EUR,340.6,106.5,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAME-LI-MESA-MEPU_KAKATORI,"Vis autotaraudeuses en acier avec revêtement anticorrosion, tête fraisée et fente en croix, pointe de perçage, diamètre 3,9 mm, longueur 39 mm",Material,General,1000 pièces,58.26,58.26,58.26,58.26,1,EUR,201.06,3.45,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAME-LI-MESA-MEPU_KAKATOME,"Vis autotaraudeuses en acier avec revêtement anticorrosion, à tête fraisée et fente en croix, pointe de perçage, diamètre 3,9 mm, longueur 25 mm",Material,General,1000 pièces,34.03,34.03,34.03,34.03,1,EUR,62.17,1.83,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAME-ME-KARI-KALI_KAKAKATO,"Mélange sec de chrysotile-ciment, marque M300",Material,General,m3,2996.91,2996.91,2996.91,2996.91,1,EUR,3386.51,1.13,2,2,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,POSE DE CONDUITES ET INSTALLATION DE COLLECTEURS,TUYAUX D'ÉGOUT EN BÉTON ARMÉ ET EN BÉTON KAME-LI-KAPU-KAVO,Articles de quincaillerie,Abstract Material,General,compl,58.62,58.62,58.62,58.62,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" MEME-RI-MEPU-KAME,Blocs de portes d'armoires,Abstract Material,General,m2,3.25,3.25,3.25,3.25,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"ARMOIRES ENCASTRÉES, ÉTAGÈRES ENTRESOL, ARTICLES À L'UNITÉ" RITO-SA-KAME-KAVO_KAKATOTO,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 630 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,257.22,257.22,257.22,257.22,1,EUR,208.35,0.81,2,2,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,INSERTION DE RACCORDS DANS LES CONDUITES EXISTANTES DXME-RIME-MEVO_KAKAME,Déshumidificateurs pour entrées remplies d'huile,Equipment,General,Heures machine,0.1,0.1,0.1,0.1,1,EUR,1.71,17.84,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-TO-KAPU-KAVO_KAKARIPU,Huile isolante,Material,General,kg,1.38,1.38,1.38,1.38,1,EUR,41.31,30.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RIKA-RI-KAME-KASA_KAKAMETO,Douilles de câble en cuivre 185 mm,Material,General,100 pièces,587.19,587.19,587.19,587.19,1,EUR,18.2,0.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV MEPU-TO-KARI-KASA_KAMEKAPU,"Peinture silicate à deux composants à base de verre potassique liquide avec blanc de zinc sec, composant A (base), colorée",Material,General,t,3257.12,3257.12,3257.12,3257.12,1,EUR,36.64,0.02,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES RITO-SA-KARI-KARI_KAKADXLI,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 325 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,56.09,56.09,56.09,56.09,1,EUR,167.7,2.99,2,2,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,STRUCTURES PRÉFABRIQUÉES EN BÉTON ARMÉ DXME-METO-KATO_KAKAME,"Véhicules utilitaires équipés d'un dispositif de marquage préalable, capacité de charge jusqu'à 10 t",Equipment,General,Heures machine,23.81,23.81,23.81,23.81,1,EUR,191.94,8.06,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE MEPU-ME-KATO-KARI_KAKAKAME,Colle bitumineuse,Material,General,t,12674.09,12674.09,12674.09,12674.09,1,EUR,50.38,0.01,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,Panneaux de signalisation routière MEME-RI-MEPU-KADX,Parois d'armoires,Abstract Material,General,m2,24.89,24.89,24.89,24.89,1,EUR,2489.26,100.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"ARMOIRES ENCASTRÉES, ÉTAGÈRES ENTRESOL, ARTICLES À L'UNITÉ" KAME-LI-MESA-KAME_MEPUVOLI,"Ancrages en acier galvanisé à tête hexagonale pour charges élevées, diamètre M16, longueur 138 mm",Material,General,10 pièces,434.95,434.95,434.95,434.95,1,EUR,2117.12,4.87,2,2,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,AUTRES TRAVAUX,ÉLÉMENTS DES INSTALLATIONS D'ÉGOUT RIKA-SA-KAPU-KAPU_KAKAKAME,Pince à boulon de tension NB-2-6,Material,General,pièce,23.41,23.41,23.41,23.41,1,EUR,187.28,8.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-MESA-KATO_KAKARIME,"Boulons en acier galvanisé à tête hexagonale, livrés avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M10 (M12), longueur du boulon 16-160 mm",Material,General,t,4620.2,4620.2,4620.2,4620.2,1,EUR,27.49,0.01,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RITO-TO-KAME-KAVO,Tubes en acier,Abstract Material,Pipes & Fittings,m,5186.27,5186.27,5186.27,5186.27,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE MEKA-RI-KARI-KAPU_KAKAMERI,"Tôles laminées à chaud en cuivre de marque M2, épaisseur 5-10 mm",Material,General,t,29423.22,29423.22,29423.22,29423.22,1,EUR,79.15,0.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV KADX-PU-KATO-KAME,Blocs de fenêtres en plastique,Abstract Material,General,m2,280.04,280.04,280.04,280.04,1,EUR,28004.31,100.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES DXME-RIME-KAPU_KAKARI,"Électricité : consommation 0,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.01,0.35,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-RIME-KAPU_KAKARI,Aligneurs d'extrémités de tuyaux pour tuyaux en polyéthylène d'un diamètre de 110 à 160 mm,Equipment,General,Heures machine,3.73,3.73,3.73,3.73,1,EUR,1.31,0.35,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-MERI-KALI_KAPUME,"Machines automotrices pour la répartition du sable, des granulés de caoutchouc et le peignage du gazon artificiel, capacité de la trémie de chargement du sable 1200 kg, largeur de pulvérisation 1450 mm",Equipment,General,Heures machine,6.86,6.86,6.86,6.86,1,EUR,1.68,0.245,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en « gazon artificiel » DXME-KATO-MEME_KAKAME,"Électricité : consommation 3,53 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.45,0.45,0.45,0.45,1,EUR,10.39,22.925,2,2,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de gigantesques réservoirs sur des sites de transport fluvial DXME-KATO-MEME_KAKAME,"Chariots de cale autopropulsés, capacité de charge 75 t",Equipment,General,Heures machine,9.69,9.69,9.69,9.69,1,EUR,222.18,22.925,2,2,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de gigantesques réservoirs sur des sites de transport fluvial KAME-LI-MELI-KADX_MEMETOSA,"Foret avec pointe en alliage dur, avec queue SDS-plus pour le perçage à percussion dans des matériaux durs, longueur totale 200 mm, diamètre 18 mm",Material,General,pièce,7.34,7.34,7.34,7.34,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAME-LI-MESA-KAME_MEMENELI,"Boulon d'ancrage avec écrou en acier à friction, à visse, avec filetage extérieur M12, diamètre 16 mm, longueur 180 mm",Material,General,pièce,0.73,0.73,0.73,0.73,1,EUR,116.25,160.26,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAPU-TO-KARI-KAME_KANEKARI,"Mélanges secs à base de ciment pour le nivellement des sols, chapes, épaisseur de couche 10-30 mm, classe B20 (M250), application manuelle",Material,General,t,250.84,250.84,250.84,250.84,1,EUR,119.15,0.475,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes en acier inoxydable à tr MEME-ME-KAME-MERI_KAKAKAVO,"Planches de revêtement en bois résineux (épicéa, pin), classe AB, profil plat, épaisseur 16 mm, largeur jusqu'à 145 mm",Material,General,m3,2186.83,2186.83,2186.83,2186.83,1,EUR,2055.62,0.94,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,PLACES RITO-TO-KANE-KAPU_KAKAKADX,"Tuyaux en acier soudés non galvanisés pour conduites d'eau et de gaz avec filetage, légers, diamètre nominal 32 mm, épaisseur de paroi 2,8 mm",Material,General,m,3.84,3.84,3.84,3.84,1,EUR,42.28,11.0,2,2,INSTALLATION DE L'ÉQUIPEMENT,"Compresseurs, pompes et ventilateurs",POMPES,"POMPES À VIDE, DE MINE ET ARTÉSIENNES" DXME-KANE-KADX_KASATO,"Électricité : consommation 1,65 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.21,0.21,0.21,0.21,1,EUR,0.14,0.63,2,2,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage KAME-LI-MELI-KADX_MEKAMENE,"Foret à pointe en alliage dur, avec queue SDS-max pour le forage à percussion dans des matériaux durs, longueur totale 340 mm, diamètre 16 mm",Material,General,pièce,10.09,10.09,10.09,10.09,1,EUR,5.7,0.565,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Installation de puits métalliques sur une fondation préparée DXME-RIME-MERI_KAKATO,Cisailles manuelles à cliquet pour tuyaux en polyéthylène d'un diamètre allant jusqu'à 63 mm,Equipment,General,Heures machine,0.01,0.01,0.01,0.01,1,EUR,0.01,0.765,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE DXME-KANE-KADX_KASATO,"Élévateurs électriques non automoteurs pour diagraphie, profondeur d'exploration du puits jusqu'à 1000 m",Equipment,General,Heures machine,36.05,36.05,36.05,36.05,1,EUR,22.71,0.63,2,2,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage RIPU-TO-KASA-KARI_KARIMERI,"Bouchon en polyéthylène, PE100, rapport dimensionnel standard SDR11, diamètre extérieur nominal 110 mm",Material,General,pièce,7.17,7.17,7.17,7.17,1,EUR,1.43,0.2,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,POSE SOUTERRAINE DE CONDUITES KAME-LI-KALI-MERI_KAKAKAME,Enveloppe de protection à base de polyéthylène,Material,General,m2,9.85,9.85,9.85,9.85,1,EUR,10.83,1.1,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ISOLATION ANTICORROSION DES CONDUITES DE GAZ EN ACIER KAVO-ME-KARI-RISA_KAKAVORI,"Cale en acier en forme de T pour toiture, dimensions 100 x 400 x 4 mm, épaisseur de la bande 40 mm",Material,General,pièce,3.84,3.84,3.84,3.84,1,EUR,908.15,236.5,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de raccords en membranes PVC aux murs et aux parapets RITO-VO-KAPU-KANE_KAMEKAKA,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 250 mm, diamètre extérieur 273 mm, épaisseur de paroi 6 mm",Material,General,pièce,142.57,142.57,142.57,142.57,1,EUR,570.3,4.0,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RITO-VO-KAPU-KANE_KAKADXTO,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 200 mm, diamètre extérieur 219 mm, épaisseur de paroi 5 mm",Material,General,pièce,67.33,67.33,67.33,67.33,1,EUR,269.3,4.0,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RITO-VO-KATO-MEME_KARIKATO,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 200 mm",Material,General,pièce,54.65,54.65,54.65,54.65,1,EUR,136.62,2.5,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RITO-VO-KATO-MEME_KARIKARI,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 150 mm",Material,General,pièce,39.6,39.6,39.6,39.6,1,EUR,99.01,2.5,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RITO-VO-KATO-MEME_KARIKAKA,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 100 mm",Material,General,pièce,20.02,20.02,20.02,20.02,1,EUR,50.06,2.5,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RIPU-TO-KASA-KARI_KARIMETO,"Bouchon en polyéthylène, PE100, rapport dimensionnel standard SDR11, diamètre extérieur nominal 160 mm",Material,General,pièce,13.3,13.3,13.3,13.3,1,EUR,2.66,0.2,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,POSE SOUTERRAINE DE CONDUITES DXME-KAVO-KATO_KARIPU,"Rouleaux compresseurs automoteurs combinés vibrants, poids 3,5 t",Equipment,General,Heures machine,32.27,32.27,32.27,32.27,1,EUR,28.56,0.885,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements de chemins et trottoirs à partir de mélanges d'asphal KAPU-TO-KAME-MERI_KAKAKAME,"Mortier de maçonnerie, ciment-chaux, M10",Material,General,m3,122.56,122.56,122.56,122.56,1,EUR,1449.33,11.825,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Construction de trottoirs en dalles de béton avec remplissage des joints DXME-KAVO-MEME_SAMERI,"Kocher mobiles automoteurs, capacité de la cuve jusqu'à 0,6 m3",Equipment,General,Heures machine,32.77,32.77,32.77,32.77,1,EUR,96.35,2.94,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en béton bitumineux pour les voies et les trottoirs RIPU-RI-KASA-KARI,Tuyaux en chrysotile-ciment,Abstract Material,General,m,19.09,19.09,19.09,19.09,1,EUR,1937.71,101.5,2,2,TRAVAUX DE CONSTRUCTION,Structures en pierre des ouvrages hydrauliques,CONSTRUCTIONS EN PIERRE D'ÉQUIPEMENTS HYDRAULIQUES FLUVIALES,Pose de tuyaux de drainage perforés en chrysotile-ciment MEME-ME-KARI-KAME_KAKAKAME,"Bois rond de feuillus écorcé, longueur 3-6,5 m, diamètre 14-24 cm, classe II-III",Material,General,m3,202.64,202.64,202.64,202.64,1,EUR,69.91,0.345,2,2,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,INSTALLATIONS SUR LES SYSTÈMES D'IRRIGATION ET DE DRAINAGE,Structures en béton monolithique et en béton armé d'un volume total de 10 000 m3 RISA-ME-KANE-MEVO_KAKAMETO,Cales en caoutchouc pour traverses en béton armé pour rails R50,Material,General,1000 pièces,1325.29,1325.29,1325.29,1325.29,1,EUR,496.32,0.375,2,2,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS DE QUAIS ET DE PILoniers MARITIMES,Poutres sous-grues et voies MERI-ME-KARI-MEPU_KAKAKAME,"Feutre hydroisolant, marque waterproofing felt TG-350",Material,Waterproofing,m2,1.79,1.79,1.79,1.79,1,EUR,1.65,0.925,2,2,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Construction de la superstructure des quais d'accostage de type estacade DXME-MEPU-KASA_KATOME,"Remorques automobiles, capacité de charge jusqu'à 5 t",Equipment,General,Heures machine,2.42,2.42,2.42,2.42,1,EUR,1.57,0.65,2,2,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Recouvrement des joints verticaux entre les éléments préfabriqués en béton armé KAVO-TO-KATO-KAPU_KAKAPUME,"Fil métallique noir, diamètre 0,55 mm",Material,General,t,2679.45,2679.45,2679.45,2679.45,1,EUR,20.9,0.01,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAME-SA-KATO-KATO_KAKAVOME,"Film réfléchissant pour panneaux de signalisation sans revêtement adhésif au verso, type A",Material,General,1000 m2,13441.31,13441.31,13441.31,13441.31,1,EUR,2.02,0.0,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES DXME-KAME-KASA_KASARI,"Excavatrices-niveleuses sur châssis de type automobile, capacité du godet 0,8 m3",Equipment,General,Heures machine,74.13,74.13,74.13,74.13,1,EUR,40.77,0.55,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,BANDES DE RENFORT AUX BORDES DES REVÊTEMENTS ROUTIERS ET RENFORT DES ACCOTEMENTS,Renforcement des talus en terre après nivellement mécanisé à l'aide de matériaux MENE-TO-KARI-KARI_KAKAKARI,"Engrais organo-minéral complexe à base de tourbe, modifié par une préparation microbiologique à base de bactéries rhizosphériques",Material,General,kg,1.36,1.36,1.36,1.36,1,EUR,64.95,47.6,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,BANDES DE RENFORT AUX BORDES DES REVÊTEMENTS ROUTIERS ET RENFORT DES ACCOTEMENTS,Installation de bandes de renfort et renforcement des accotements KARI-RI-KASA-KAVO_KAKAKARI,"Gravier noir chaud, fraction 10-15 mm",Material,General,t,140.5,140.5,140.5,140.5,1,EUR,2486.9,17.7,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KARI-RI-KASA-KAVO_KAKAKAME,"Gravier noir chaud, fraction 5-10 mm",Material,General,t,140.5,140.5,140.5,140.5,1,EUR,2248.05,16.0,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KARI-RI-KASA-KAPU_RIRIDXVO,"Gravier de roches denses pour la construction routière M 1200, fraction 4-5,6 mm",Material,General,m3,99.01,99.01,99.01,99.01,1,EUR,58.41,0.59,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAVO-TO-KARI-KAME_MEKAKAVO,"Bandes en acier laminées à chaud, nuances d'acier St3sp, St3ps, épaisseur 1,4-1,8 mm, largeur 20-50 mm",Material,General,t,2210.21,2210.21,2210.21,2210.21,1,EUR,4.79,0.0,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MEPU-ME-KASA-KARI_MEKAKAVO,"Colle polyuréthane bicomposante pour gazon artificiel, consommation 0,8-1,0 kg/m2",Material,General,kg,5.36,5.36,5.36,5.36,1,EUR,990.79,184.825,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en « gazon artificiel » KAME-LI-KANE-KAPU_KAKAKADX,"Ruban en polyester pour fixer les joints des gazons artificiels, dimensions 300 x 0,43 mm",Material,General,m,2.56,2.56,2.56,2.56,1,EUR,2612.56,1020.0,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en « gazon artificiel » MEPU-PU-KAME-MELI,Apprêts polyuréthanes,Abstract Material,General,kg,53.64,53.64,53.64,53.64,1,EUR,1092.18,20.36,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Installation de revêtements pour terrains de sport et aires de jeux à partir de KAME-LI-MEDX-MEVO,Dalles en caoutchouc granulé,Abstract Material,General,m2,56.8,56.8,56.8,56.8,1,EUR,5764.73,101.5,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Installation de revêtements pour terrains de sport et aires de jeux à partir de RITO-VO-KATO-MEME_KARIKALI,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 400 mm",Material,General,pièce,136.1,136.1,136.1,136.1,1,EUR,340.25,2.5,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RITO-VO-KAPU-KANE_KAMEKANE,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 300 mm, diamètre extérieur 325 mm, épaisseur de paroi 7 mm",Material,General,pièce,159.14,159.14,159.14,159.14,1,EUR,636.56,4.0,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RITO-VO-KATO-MEME_KARIKASA,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 300 mm",Material,General,pièce,85.66,85.66,85.66,85.66,1,EUR,214.15,2.5,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RIME-ME-KANE-KADX_KAKAPULI,"Câble électrique à conducteurs en cuivre NYY 2x1,5ok-660",Material,General,1000 m,954.83,954.83,954.83,954.83,1,EUR,28.65,0.03,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES KAME-ME-KARI-KAVO_KAMEKAME,"Joints en paronite PMB, épaisseur 2 mm, diamètre 600 mm",Material,General,1000 pièces,3979.48,3979.48,3979.48,3979.48,1,EUR,25.86,0.01,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" KAME-ME-KARI-KAVO_KAMEKAKA,"Joints en paronite PMB, épaisseur 2 mm, diamètre 500 mm",Material,General,1000 pièces,2830.25,2830.25,2830.25,2830.25,1,EUR,18.39,0.01,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" MERI-ME-KATO-MEKA_KAKAKASA,"Agrafes en aluminium en forme de G pour gouttières, dimensions 200 x 150 x 40 mm",Material,General,100 pièces,90.77,90.77,90.77,90.77,1,EUR,196.51,2.165,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-MEKA_KAKAKAME,"Gouttière (arêtier) en aluminium, peinte, dimensions 1450 x 500 mm",Material,General,pièce,29.02,29.02,29.02,29.02,1,EUR,1175.45,40.5,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable KAME-LI-KANE-KATO_MEKAMEPU,"Bande en mousse avec couche autocollante pour joints de toiture et film antiadhésif, largeur 30 mm, hauteur 60 mm",Material,General,10 m,59.64,59.64,59.64,59.64,1,EUR,656.34,11.005,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable KAME-LI-KANE-KATO_MEKAKARI,"Bandes d'étanchéité autocollantes pour joints de faîtes de toiture, peintes, largeur 140 mm",Material,General,m,36.37,36.37,36.37,36.37,1,EUR,358.79,9.865,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-KADX_MEKAKAVO,"Élément de ventilation du film protecteur inférieur en PVC, dimensions 360 x 120 x 20 mm",Material,General,pièce,7.71,7.71,7.71,7.71,1,EUR,158.07,20.5,2,2,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Dispositif d'étanchéité KAVO-ME-KARI-RIKA_KAKARITO,Raccords intermédiaires 32-2/2a,Material,General,t,4721.03,4721.03,4721.03,4721.03,1,EUR,42.92,0.01,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE DÉFLECTION DES INSTALLATIONS FLUVIALES,Installation de dispositifs anti-chocs pour les installations d'amarrage fluvial KAME-LI-MESA-MEKA_KAKANESA,"Agrafe métallique de gréement, droite, type CA63, charge admissible 6,3 t",Material,General,pièce,116.64,116.64,116.64,116.64,1,EUR,117.22,1.005,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,DISPOSITIFS DE DÉFLECTION DES INSTALLATIONS FLUVIALES,Installation de dispositifs anti-chocs pour les installations d'amarrage fluvial KAVO-RI-KARI-KASA_KAKAPUPU,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 16,5 mm",Material,Steel & Metal,10 m,40.88,40.88,40.88,40.88,1,EUR,53.56,1.31,2,2,TRAVAUX DE CONSTRUCTION,Structures en bois des ouvrages hydrauliques,RYAZHI,Installation des palissades KAME-LI-MESA-MERI_KAMERIPU,"Goupilles filetées en acier, diamètre du filetage M30, longueur 250 mm",Material,General,t,2910.27,2910.27,2910.27,2910.27,1,EUR,33.18,0.02,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,AUTRES CONSTRUCTIONS MÉTALLIQUES KAME-LI-MESA-KASA_KAKAMEVO,"Écrous hexagonaux en acier, diamètre du filetage M30",Material,General,t,4043.77,4043.77,4043.77,4043.77,1,EUR,2.23,0.0,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,AUTRES CONSTRUCTIONS MÉTALLIQUES MEPU-RI-KASA-KAME_KAMEKAVO,Composition à action pénétrante pour le durcissement et le dépoussiérage des revêtements en béton,Material,General,kg,13.8,13.8,13.8,13.8,1,EUR,1621.32,117.5,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MESA-KAVO_KAKARIRI,"Rivets en acier à tête demi-ronde, diamètre 4 mm, longueur 10 mm",Material,General,t,7941.27,7941.27,7941.27,7941.27,1,EUR,1.98,0.0,2,2,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,FOYERS ET POÊLES,Maçonnerie de conduits de fumée en briques DXME-MESA-KATO_KAMENE,"Tracteurs à roues pneumatiques, puissance 220 kW (300 ch)",Equipment,General,Heures machine,54.49,54.49,54.49,54.49,1,EUR,167.28,3.07,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KARI-RI-KASA-KAVO_KAKAKATO,"Gravier noir chaud, fraction 15-20 mm",Material,General,t,140.5,140.5,140.5,140.5,1,EUR,3091.06,22.0,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MESA-KARI_KAKAPUSA,"Boulons d'ancrage avec écrou en acier à friction, à visse, avec filetage extérieur M12, diamètre 16 mm, longueur 220 mm",Material,General,100 pièces,92.25,92.25,92.25,92.25,1,EUR,20.3,0.22,2,2,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE TRANSPORT À ACTION CONTINUE,ESCALIERS MÉCANIQUES DXME-KAPU-KAME_KAMEME,"Installations de forage rotatif universelles sur chenilles, couple de 250 à 400 kNm, profondeur de forage jusqu'à 94 m",Equipment,General,Heures machine,225.98,225.98,225.98,225.98,1,EUR,213.56,0.945,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KAME-LI-MELI-MEKA_KAKATOVO,"Fraise couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 383 mm",Material,General,pièce,19456.99,19456.99,19456.99,19456.99,1,EUR,10701.35,0.55,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-KADX_MERIRIDX,"Foret guide en acier, acier de marque 40Kh, diamètre 34 mm, longueur 290 mm",Material,General,pièce,1987.1,1987.1,1987.1,1987.1,1,EUR,556.39,0.28,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-MEME_KADXSA,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 350 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,192.74,192.74,192.74,192.74,1,EUR,3887.62,20.17,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKATOLI,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 348 mm",Material,General,pièce,14760.72,14760.72,14760.72,14760.72,1,EUR,8118.4,0.55,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-KADX_MERIRIVO,"Foret guide en acier, acier de marque 40Kh, diamètre 34 mm, longueur 265 mm",Material,General,pièce,1832.2,1832.2,1832.2,1832.2,1,EUR,513.02,0.28,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-MEME_KADXPU,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 300 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,182.53,182.53,182.53,182.53,1,EUR,3374.93,18.49,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKATONE,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 293 mm",Material,General,pièce,10064.46,10064.46,10064.46,10064.46,1,EUR,5535.45,0.55,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-MEME_KADXTO,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 250 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,177.4,177.4,177.4,177.4,1,EUR,2925.32,16.49,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-RIKA-KARI_KAKAKASA,"Feutre technique à poils longs pour isolation, foncé, imprégné contre la biocorrosion, épaisseur 8-10 mm",Material,General,100 m2,1525.55,1525.55,1525.55,1525.55,1,EUR,1876.42,1.23,2,2,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES FLUVIALES,ISOLATION PAR COLLAGE DES SURFACES EN BÉTON DXME-KAVO-KAME_KARIPU,"Finisseurs à chenilles, largeur maximale de pose 7 m, vitesse de pose jusqu'à 24 m/min, capacité 600 t/h",Equipment,General,Heures machine,133.55,133.55,133.55,133.55,1,EUR,100.17,0.75,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KARI-TO-KAME-KASA_KAPUNEKA,"Sable issu du concassage pour travaux de construction, classe II, M 1000, granulométrie élevée",Material,General,m3,42.01,42.01,42.01,42.01,1,EUR,8.45,0.2,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-METO-KAME_KARIME,"Machines pour le fraisage de fissures dans les revêtements en béton bitumineux et en béton de ciment, largeur de fraisage 12-50 mm, profondeur de fraisage jusqu'à 50 mm, puissance 19 kW (25 ch)",Equipment,General,Heures machine,8.53,8.53,8.53,8.53,1,EUR,22.42,2.63,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-MEME_KASAME,"Remixeurs, largeur de travail jusqu'à 4,5 m, puissance 240 kW (326 ch)",Equipment,General,Heures machine,618.19,618.19,618.19,618.19,1,EUR,856.2,1.385,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-KAPU_KATOME,"Chauffages automoteurs pour revêtements en béton bitumineux, surface de chauffage 45 m², puissance de chauffage 2650 kW",Equipment,General,Heures machine,271.33,271.33,271.33,271.33,1,EUR,375.8,1.385,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-SA-KAME-KAME_MEKAKAKA,"Peinture pour le marquage routier, suspension de pigments et de charges dans un copolymère acrylique avec des additifs modificateurs, couleur blanche",Material,General,kg,3.65,3.65,3.65,3.65,1,EUR,0.94,0.255,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-MEME_KADXME,"Installations de thermorécupération de revêtement routier, largeur de travail jusqu'à 8,5 m, puissance 150 kW (205 ch)",Equipment,General,Heures machine,643.4,643.4,643.4,643.4,1,EUR,498.63,0.775,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MELI-MEKA_KAKATOSA,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 242 mm",Material,General,pièce,7380.48,7380.48,7380.48,7380.48,1,EUR,4059.26,0.55,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-KADX_MERIRISA,"Foret guide en acier, acier de marque 40Kh, diamètre 34 mm, longueur 185 mm",Material,General,pièce,1522.34,1522.34,1522.34,1522.34,1,EUR,426.25,0.28,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-MEME_MEKAKA,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 800 mm, pression jusqu'à 2,0 MPa",Equipment,General,Heures machine,480.19,480.19,480.19,480.19,1,EUR,17731.15,36.925,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKAPURI,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 737 mm",Material,General,pièce,39591.61,39591.61,39591.61,39591.61,1,EUR,21775.39,0.55,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-KADX_MERITOTO,"Foret guide en acier, acier de marque 40Kh, diamètre 52 mm, longueur 480 mm",Material,General,pièce,3227.28,3227.28,3227.28,3227.28,1,EUR,903.64,0.28,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-MEME_KADXDX,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 700 mm, pression jusqu'à 2,0 MPa",Equipment,General,Heures machine,455.96,455.96,455.96,455.96,1,EUR,15190.31,33.315,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKAPUME,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 635 mm",Material,General,pièce,30865.11,30865.11,30865.11,30865.11,1,EUR,16975.81,0.55,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-KADX_MERITORI,"Foret guide en acier, acier de marque 40Kh, diamètre 52 mm, longueur 430 mm",Material,General,pièce,2917.41,2917.41,2917.41,2917.41,1,EUR,816.88,0.28,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-MEME_KADXVO,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 600 mm, pression jusqu'à 2,0 MPa",Equipment,General,Heures machine,440.77,440.77,440.77,440.77,1,EUR,13309.03,30.195,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKAPUKA,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 559 mm",Material,General,pièce,27508.97,27508.97,27508.97,27508.97,1,EUR,15129.93,0.55,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-KADX_MERITOME,"Foret guide en acier, acier de marque 40Kh, diamètre 52 mm, longueur 405 mm",Material,General,pièce,2607.58,2607.58,2607.58,2607.58,1,EUR,730.12,0.28,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-MEME_KADXLI,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 500 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,224.66,224.66,224.66,224.66,1,EUR,5698.62,25.365,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-RIME-MESA_SAKAVO,"Scies à disque à essence, puissance jusqu'à 5 kW (7 ch)",Equipment,General,Heures machine,1.98,1.98,1.98,1.98,1,EUR,23.72,12.0,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Découpe des bordures DXME-KALI-KATO_KAKAVO,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.5,7.8,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de bordures naturelles en granit de type 3GP KAME-LI-MELI-MERI_KAKAKATO,"Brosse à disque en fil d'acier pour meuleuse d'angle, diamètre 150 mm",Material,General,pièce,8.51,8.51,8.51,8.51,1,EUR,1.25,0.145,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,INSTALLATIONS MINIÈRES RISA-ME-KATO-KARI_KAKAKARI,"Cales pour voies ferrées à écartement large, section 16 x 16 mm, longueur 205-280 mm",Material,General,t,2306.2,2306.2,2306.2,2306.2,1,EUR,24.21,0.01,2,2,TRAVAUX DE CONSTRUCTION,Travaux de consolidation des berges,FIXATION DES PENTES DES OUVRAGES HYDRAULIQUES FLUVIALES ET DES CANAUX,FIXATION SOUS-MARINE DES PENTES DXME-KAVO-KASA_KAPURI,"Ensembles de machines pour le bétonnage de canaux d'une profondeur maximale de 5,0 m",Equipment,General,Heures machine,237.51,237.51,237.51,237.51,1,EUR,1983.22,8.35,2,2,TRAVAUX DE CONSTRUCTION,Travaux de consolidation des berges,FIXATION DES PENTES DES OUVRAGES HYDRAULIQUES FLUVIALES ET DES CANAUX,FIXATION AVEC DU BÉTON MONOLITHIQUE ET DU BÉTON ARMÉ MEPU-PU-KAPU-MERI_KAKAMETO,Émail EP-1155,Material,General,t,7522.49,7522.49,7522.49,7522.49,1,EUR,3761.24,0.5,2,2,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES MARITIMES,REVÊTEMENT DES STRUCTURES MÉTALLIQUES DES ÉQUIPEMENTS HYDRAULIQUES AVEC DES PRIM MEPU-SA-MEKA-KARI_KAMEKAME,Séchatif fondu,Material,General,t,3267.18,3267.18,3267.18,3267.18,1,EUR,179.69,0.055,2,2,TRAVAUX DE CONSTRUCTION,Travaux d'étanchéité dans les ouvrages hydrauliques,TRAVAUX D'ÉTANCHÉITÉ DANS LES OUVRAGES HYDRAULIQUES MARITIMES,REVÊTEMENT DES STRUCTURES MÉTALLIQUES DES ÉQUIPEMENTS HYDRAULIQUES AVEC DES PRIM KARI-RI-KARI-KATO_KAKATOME,Poudre minérale activée,Material,General,t,68.0,68.0,68.0,68.0,1,EUR,108.66,1.6,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE PONTS ET DE SOUS-PONT,CONSTRUCTION DE PONTS KARI-RI-KASA-KAPU_RIKAKAVO,"Gravier issu de roches denses pour travaux de construction M 600, fraction 5(3)-10 mm",Material,General,m3,47.34,47.34,47.34,47.34,1,EUR,359.82,7.6,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,COUCHES DE BASE ET DE NIVELLEMENT DE LA FONDATION ET DU REVÊTEMENT,FONDATIONS ET REVÊTEMENTS EN MATÉRIAUX CONCASSÉS KAVO-ME-KARI-KADX,Structures en acier,Abstract Material,Steel & Metal,t,3532.7,3532.7,3532.7,3532.7,1,EUR,9185.02,2.6,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" DXME-KALI-KATO_KAKAVO,"Bétonnières gravitaires mobiles, capacité du tambour 250 l",Equipment,General,Heures machine,0.22,0.22,0.22,0.22,1,EUR,1.74,7.8,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de bordures naturelles en granit de type 3GP KASA-RI-KATO-KAPU,Pierres de bordure en béton,Abstract Material,General,m3,21.47,21.47,21.47,21.47,1,EUR,34.34,1.6,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de bordures RIPU-RI-KASA-KATO_KAKAKATO,"Tuyaux en chrysotile-ciment sous pression, classe BT6, diamètre nominal 200 mm",Material,General,m,20.29,20.29,20.29,20.29,1,EUR,89.66,4.42,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de dispositifs de déversement d'eau à partir de la chaussée à parti KAVO-RI-KARI-KATO_KAKATOKA,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1860 N/mm2, diamètre 17,5 mm",Material,Steel & Metal,10 m,47.58,47.58,47.58,47.58,1,EUR,0.23,0.01,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAVO-ME-KAME-KARI_KAKAMEME,"Structures en gabions maillés, type GSI-K, en fil galvanisé de 2,7 mm de diamètre à double torsion, avec des mailles hexagonales de 80 x 100 mm",Material,Steel & Metal,t,4185.1,4185.1,4185.1,4185.1,1,EUR,661.25,0.16,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de portiques pour tuyaux de drainage à partir de blocs de gabions e KAME-LI-MELI-MEKA_KAKATODX,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 458 mm",Material,General,pièce,24153.41,24153.41,24153.41,24153.41,1,EUR,13284.37,0.55,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-KADX_MERITOKA,"Foret guide en acier, acier de marque 40Kh, diamètre 34 mm, longueur 340 mm",Material,General,pièce,2296.93,2296.93,2296.93,2296.93,1,EUR,643.14,0.28,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MEKA-MEME_KADXNE,"Machines pour la connexion à une conduite de gaz en acier en service, diamètre des tuyaux 400 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,201.9,201.9,201.9,201.9,1,EUR,4600.31,22.785,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS DXME-MERI-KAVO_KAMEME,"Pulvérisateurs traînés, capacité du réservoir 2,2 m3",Equipment,General,Heures machine,3.13,3.13,3.13,3.13,1,EUR,62.66,20.0,2,2,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,PULVÉRISATION DES CULTURES FORESTIÈRES MENE-RI-KARI-KALI_KAMENERI,"Semences d'herbes, avoine",Material,General,kg,0.65,0.65,0.65,0.65,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,FIXATION ET BOISEMENT DES SABLE MENE-RI-KARI-KAPU,Jeunes plants,Abstract Material,General,pièce,7.99,7.99,7.99,7.99,1,EUR,798.84,100.0,2,2,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,"PLANTATION DE SEMIS, DE PLANTS, DE BOUTURES, INSTALLATION DE Tuteurs ET SEMIS DE" KADX-TO-KAPU-KATO,Structures en aluminium,Abstract Material,Steel & Metal,t,115.91,115.91,115.91,115.91,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" KAVO-TO-MEKA-KAME,Structures en acier,Abstract Material,Steel & Metal,t,57.3,57.3,57.3,57.3,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,ÉLÉMENTS DE CONSTRUCTION DES LUMINAIRES MEPU-RI-KARI-KALI,Blocs polyuréthanes ignifuges thermo-expansibles,Abstract Material,General,pièce,20.84,20.84,20.84,20.84,1,EUR,3.96,0.19,2,2,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES KARI-ME-KARI-KAME,Mélange bitume-terre,Abstract Material,General,m3,46.4,46.4,46.4,46.4,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS ORGANIQUES MEVO-SA-KAVO-MEDX_KAKAKALI,"Bille d'arrêt en caoutchouc, diamètre 350 mm",Material,General,pièce,256.94,256.94,256.94,256.94,1,EUR,2575.78,10.025,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MESA-KATO_KAMEVO,"Tracteurs à roues pneumatiques, puissance 16 kW (22 ch)",Equipment,General,Heures machine,4.17,4.17,4.17,4.17,1,EUR,10.6,2.545,2,2,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,ENTRETIEN DES CULTURES À HUILES ESSENTIELLES DXME-MERI-KATO_KAKAME,Tondeuses à gazon à moteur,Equipment,General,Heures machine,1.18,1.18,1.18,1.18,1,EUR,0.73,0.62,2,2,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,ENTRETIEN DES ESPACES VERTS (NORMES OPÉRATIONNELLES) DXME-MERI-KATO_KARIME,Faucheuses traînées,Equipment,General,Heures machine,0.5,0.5,0.5,0.5,1,EUR,0.92,1.82,2,2,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,ENTRETIEN DES ESPACES VERTS (NORMES GLOBALES) MENE-RI-KATO-KAME,Gazons prêts à l'emploi en rouleaux,Abstract Material,General,m2,6.88,6.88,6.88,6.88,1,EUR,736.63,107.0,2,2,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"AMÉNAGEMENT DE PELOUSES, DE PARTS DE FLEURS, DE JARDINS ALPINARIES ET DE ROCAIRE" DXME-MERI-KALI_KARILI,"Installations pour l'ensemencement hydraulique d'herbes vivaces sur remorque (sans tenir compte de la remorque), capacité 1100 l",Equipment,General,Heures machine,3.96,3.96,3.96,3.96,1,EUR,0.49,0.125,2,2,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"AMÉNAGEMENT DE PELOUSES, DE PARTS DE FLEURS, DE JARDINS ALPINARIES ET DE ROCAIRE" DXME-MEKA-MEME_MEKATO,"Machines pour raccordement à une conduite de gaz en polyéthylène en service, diamètre des tuyaux 160-180 mm, pression jusqu'à 0,8 MPa",Equipment,General,Heures machine,58.03,58.03,58.03,58.03,1,EUR,313.38,5.4,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEDX-MERI_KAVOTO,"Motopompes à essence, débit 105 m3/h, hauteur de refoulement 26 m, profondeur d'aspiration 8 m",Equipment,General,Heures machine,3.45,3.45,3.45,3.45,1,EUR,0.12,0.035,2,2,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"AMÉNAGEMENT DE PELOUSES, DE PARTS DE FLEURS, DE JARDINS ALPINARIES ET DE ROCAIRE" DXME-MEDX-KAVO_KAMEKA,"Électricité : consommation 3,63 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.47,0.47,0.47,0.47,1,EUR,0.08,0.09,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,TRAVAUX DE RECONSTRUCTION D'OUVRAGES HYDRAULIQUES,Renforcement des fondations des ouvrages hydrauliques par injection avec immersi DXME-MEDX-KAVO_KAMEKA,"Pompes, débit 100 m3/h, pression 25 m, puissance 11 kW",Equipment,General,Heures machine,1.18,1.18,1.18,1.18,1,EUR,0.11,0.09,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,TRAVAUX DE RECONSTRUCTION D'OUVRAGES HYDRAULIQUES,Renforcement des fondations des ouvrages hydrauliques par injection avec immersi DXME-METO-KATO_KAPUTO,"Camions-citernes sous vide pour la collecte de condensats gazeux et de pétrole, volume 10 m3",Equipment,General,Heures machine,54.56,54.56,54.56,54.56,1,EUR,131.76,2.415,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,AUTRES TRAVAUX,Nettoyage des dépôts au fond de la surface interne du réservoir pour produits pé DXME-MEDX-MERI_KASAME,"Électricité : consommation 6,11 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.78,0.78,0.78,0.78,1,EUR,2.52,3.215,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,AUTRES TRAVAUX,Nettoyage des dépôts au fond de la surface interne du réservoir de pétrole DXME-MEDX-MERI_KASAME,"Pompes axiales pour le pompage de liquides visqueux et contaminés par des impuretés en suspension, débit de 36 à 180 m3/h, pression de 30 à 20 m",Equipment,General,Heures machine,2.73,2.73,2.73,2.73,1,EUR,8.78,3.215,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,AUTRES TRAVAUX,Nettoyage des dépôts au fond de la surface interne du réservoir de pétrole MERI-RI-KATO-MESA_KAKARIME,Di-octyl phtalate,Material,General,kg,4.33,4.33,4.33,4.33,1,EUR,21.66,5.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS DXME-RIKA-MEME_KAMEME,"Pontons de déchargement, capacité de charge 5 t",Equipment,General,Heures machine,0.4,0.4,0.4,0.4,1,EUR,36.78,92.27,2,2,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" KAME-LI-MESA-KAME_KAKATOVO,"Chevilles à expansion en acier inoxydable, diamètre M6, longueur 30 mm",Material,General,100 pièces,641.88,641.88,641.88,641.88,1,EUR,11072.46,17.25,2,2,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES MENE-TO-KAME-KAME_KATONEME,Sulfate d'ammonium,Material,General,t,857.59,857.59,857.59,857.59,1,EUR,33.02,0.04,2,2,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES STRUCTURES EN BOIS DXME-MEKA-MEME_MEKADX,"Machines pour la connexion et la fermeture d'une conduite de gaz en acier en service, diamètre des tuyaux 100-125, pression jusqu'à 1,2 MPa",Equipment,General,Heures machine,39.33,39.33,39.33,39.33,1,EUR,259.38,6.595,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE MEPU-SA-KANE-KAME_KAKAKARI,Pâte polymère monocomposante hydroisolante expansive pour l'étanchéification des joints de construction et des raccords (310 ml),Material,General,pièce,55.17,55.17,55.17,55.17,1,EUR,205.77,3.73,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,AUTRES TRAVAUX,Étanchéification des joints DXME-KAME-KASA_KADXSA,"Cisailles hydrauliques pour le démantèlement de structures en béton armé, montées sur une excavatrice sur chenilles d'un poids de 35 à 50 tonnes, force de compression de 1 000 à 1 200 kN",Equipment,General,Heures machine,109.8,109.8,109.8,109.8,1,EUR,24.16,0.22,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,DÉMONTAGE DE STRUCTURES,Démontage de structures en béton armé à l'aide d'excavatrices-démolisseuses équi DXME-KARI-KAPU_KAPUTO,"Installations de forage à vis sans fin sur chenilles, diamètre de forage jusqu'à 800 mm, profondeur jusqu'à 20 m, couple de 150-250 kNm",Equipment,General,Heures machine,104.73,104.73,104.73,104.73,1,EUR,8974.17,85.685,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS KAME-PU-KARI-KATO_KAKARIME,"Porte-outil cylindrique pour trépan avec un diamètre d'emmanchement de 30/38 mm, dimensions 78 x 95 mm",Material,General,pièce,24.43,24.43,24.43,24.43,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS KAME-PU-KARI-KATO_KAKARIKA,"Foret pilote amovible pour sol rocheux pour trépan avec diamètre d'emmanchement de la queue 30/38 mm, dimensions 250 x 250 mm",Material,General,pièce,810.92,810.92,810.92,810.92,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS KAME-PU-KARI-KARI_KAKAKALI,"Trépan pour sol rocheux, rond avec pointe en carbure, diamètre de la tête du trépan 50 mm, hauteur du trépan 130-132 mm, diamètre d'emmanchement de la queue 30/38 mm, diamètre de la tête du trépan en carbure 17,5-18 mm",Material,General,pièce,35.57,35.57,35.57,35.57,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS DXME-KAME-KASA_KADXKA,"Pelles hydrauliques diesel sur chenilles avec équipement complet pour le démantèlement de structures en béton armé, longueur de la flèche 28 m, poids de la pelle 130 t",Equipment,General,Heures machine,487.35,487.35,487.35,487.35,1,EUR,1752.03,3.595,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,DÉMONTAGE DE STRUCTURES,Démontage de structures en béton armé à l'aide d'excavatrices-démolisseuses équi KAME-PU-KARI-KATO_KAKAKAPU,"Couteaux universels en acier trempé pour cisailles hydrauliques, force exercée par les lames 650 t, longueur des lames 525 mm",Material,General,compl,5797.58,5797.58,5797.58,5797.58,1,EUR,1006.47,0.175,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,DÉMONTAGE DE STRUCTURES,Démontage de structures en béton armé à l'aide d'excavatrices-démolisseuses équi KAME-PU-KAME-KANE_KAKAKARI,"Dents de travail en acier trempé, pression aux extrémités des dents 350 bars",Material,General,compl,12124.61,12124.61,12124.61,12124.61,1,EUR,2104.84,0.175,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,DÉMONTAGE DE STRUCTURES,Démontage de structures en béton armé à l'aide d'excavatrices-démolisseuses équi DXME-RIME-RIKA_KAMERI,"Installations de forage au diamant dans le béton armé, hydrauliques, diamètre de forage jusqu'à 300 mm",Equipment,General,Heures machine,3.71,3.71,3.71,3.71,1,EUR,194.44,52.355,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS KAME-TO-KAME-KANE_KAKAPURI,Graisse à base de cuivre pour raccords filetés,Material,General,l,27.53,27.53,27.53,27.53,1,EUR,13.91,0.505,2,2,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,PERÇAGE ET POINÇONNAGE DE TROUS ET D'OUVERTURES DANS LES STRUCTURES. OBSTRUCTION,PERÇAGE DE TROUS RITO-TO-KATO-KARI_KAKAMETO,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 25 mm, épaisseur de paroi 3 mm",Material,Pipes & Fittings,m,5.45,5.45,5.45,5.45,1,EUR,59.95,11.0,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES MEPU-PU-KATO-KADX_KAKAKARI,Vernis HS-724,Material,General,t,5959.16,5959.16,5959.16,5959.16,1,EUR,4.47,0.0,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES MEPU-SA-KAME-KASA,Mastics en mousse de polyuréthane,Abstract Material,General,m,14.31,14.31,14.31,14.31,1,EUR,1459.41,102.0,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MEVO-ME-KARI-KAME_KARIKANE,"Vanne parallèle à tige montante 30ch6br, raccordement à la tuyauterie par bride, pression nominale 1,0 MPa, diamètre nominal 200 mm",Material,General,pièce,740.29,740.29,740.29,740.29,1,EUR,25.91,0.035,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,"Descente des puits avec excavation du sol par hydromécanisation, à l'aide d'une " DXME-KALI-MEKA_KAKAME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.33,5.055,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs en béton armé préfabriqué pour puits de descente DXME-KALI-MEKA_KAKAME,"Installations de gunitage pneumatiques à entraînement électrique fonctionnant à partir de compresseurs mobiles, débit jusqu'à 7 m3/h",Equipment,General,Heures machine,1.71,1.71,1.71,1.71,1,EUR,8.66,5.055,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs en béton armé préfabriqué pour puits de descente KAVO-TO-KALI-KAME_KAKATOTO,"Acier laminé à chaud en bandes, nuances St3sp, St3ps, dimensions 20 x 4 mm",Material,General,t,1587.4,1587.4,1587.4,1587.4,1,EUR,1.33,0.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS RITO-ME-KAPU-KAME,Puits pour conduites souterraines,Abstract Material,General,pièce,19901.19,19901.19,19901.19,19901.19,1,EUR,19901.19,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE PUITS SOUTERRAINS,Installation de puits souterrains sur les conduites principales pour le pétrole KAME-LI-MERI-KASA_KAMENESA,"Géotextile non tissé pour la construction routière, aiguilleté, densité de surface 500 g/m2",Material,General,m2,3.34,3.34,3.34,3.34,1,EUR,201.68,60.45,2,2,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION RIME-ME-KANE-KALI,Câbles électriques pour une tension de 660 V avec conducteurs en aluminium,Abstract Material,General,1000 m,2782.65,2782.65,2782.65,2782.65,1,EUR,38.95,0.015,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KAVO-TO-KASA-KAPU_KAKAPUPU,"Tôle en acier inoxydable, nuance 12Kh18N10T, épaisseur 9-22 mm",Material,General,t,7703.56,7703.56,7703.56,7703.56,1,EUR,508.44,0.07,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,FABRICATION DE STRUCTURES MÉTALLIQUES POUR CENTRALES NUCLÉAIRES RISA-RI-KAME-KAME_KAKAMEVO,Étiquettes de marquage en plastique U134,Material,General,100 pièces,4.99,4.99,4.99,4.99,1,EUR,0.1,0.02,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KAVO-TO-KALI-KAME_KAKATOVO,"Bandes d'acier laminées à chaud, nuances St3sp, St3ps, dimensions 30 x 5 mm",Material,General,t,1798.57,1798.57,1798.57,1798.57,1,EUR,3.69,0.0,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES RIME-ME-KAVO-KASA,Câbles de contrôle,Abstract Material,General,m,7153.17,7153.17,7153.17,7153.17,1,EUR,450649.59,63.0,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KALI-RI-KAPU-KAME,Structures en acier,Abstract Material,Steel & Metal,t,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS À USAGE SPÉCIAL,"CHÂSSIS, CAPOTS, PANNEAUX ET DIVERSES CONSTRUCTIONS POUR FOURS INDUSTRIELS ET SÉ" RITO-SA-KAME-KADX_KAKAKAVO,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K52, diamètre extérieur 1020 mm, épaisseur de paroi 14 mm",Material,Pipes & Fittings,m,976.81,976.81,976.81,976.81,1,EUR,488.4,0.5,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net RITO-SA-KAME-KALI_KAKASAVO,"Tubes en acier soudés pour gazoducs et oléoducs principaux, classe de résistance K52, diamètre extérieur 820 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,704.51,704.51,704.51,704.51,1,EUR,281.81,0.4,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net RITO-SA-KAME-KALI_KAKAPUNE,"Tubes en acier soudés pour gazoducs et oléoducs principaux, classe de résistance K52, diamètre extérieur 720 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,569.16,569.16,569.16,569.16,1,EUR,199.21,0.35,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net RITO-TO-KATO-KARI_KAMEMESA,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 133 mm, épaisseur de paroi 6 mm",Material,Pipes & Fittings,m,56.16,56.16,56.16,56.16,1,EUR,31.51,0.56,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS RITO-TO-KATO-KARI_KAMEMETO,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 133 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,47.17,47.17,47.17,47.17,1,EUR,26.46,0.56,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS KAVO-RI-KARI-MESA_KAKAMEKA,"Câble à triple torsion LK-R, structure 6kh7kh19(1+6+6/6)+1 o.s., marque V, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 64,5 mm",Material,Steel & Metal,10 m,564.64,564.64,564.64,564.64,1,EUR,705.8,1.25,2,2,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU MARIN DANS UNE ZONE AQUA,POSE DE CONDUITES EN MILIEU MARIN DANS UNE ZONE MARITIME FERMÉE RIRI-RI-KARI-MEDX,Électrodes de mise à la terre anodiques,Abstract Material,General,pièce,176.06,176.06,176.06,176.06,1,EUR,176.06,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Dispositif de mise à la terre anodique superficielle KAME-RI-KAME-KARI_KAKASAME,Bitume pétrolier de construction BN-50/50,Material,General,t,875.63,875.63,875.63,875.63,1,EUR,0.88,0.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Installation et montage de protecteurs individuels RIKA-SA-KARI-KADX,Boîtes de jonction,Abstract Material,General,pièce,31.3,31.3,31.3,31.3,1,EUR,31.3,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Installation et montage de protecteurs individuels RIKA-RI-MEKA-KATO_KAKAKATO,"Embouts de câble en cuivre, section de conducteur 6 mm2, diamètre d'ouverture 6 mm",Material,General,100 pièces,19.1,19.1,19.1,19.1,1,EUR,0.19,0.01,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE LA PROTECTION ÉLECTROCHIMIQUE DES CONDUITES,Installation d'un poste de contrôle et de mesure (PCM) RITO-SA-KAME-MEKA_KAKAMETO,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K60, diamètre extérieur 1420 mm, épaisseur de paroi 18 mm",Material,Pipes & Fittings,m,1991.12,1991.12,1991.12,1991.12,1,EUR,1393.79,0.7,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net RITO-SA-KAME-KADX_MEKAMERI,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K52, diamètre extérieur 1220 mm, épaisseur de paroi 12-14 mm",Material,Pipes & Fittings,m,969.0,969.0,969.0,969.0,1,EUR,581.4,0.6,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net DXME-MELI-KARI_KASANE,"Complexes de radiographie numérique avec détecteur statique à panneau plat pour le contrôle qualité des assemblages soudés de produits et structures métalliques, surface active 0,1 m2",Equipment,General,Heures machine,25.71,25.71,25.71,25.71,1,EUR,25.97,1.01,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" MEKA-ME-KARI-KARI_MEKAPUNE,"Feuilles d'aluminium en alliages de marques AMts, AV, épaisseur 2,5-4,5 mm",Material,General,t,10306.79,10306.79,10306.79,10306.79,1,EUR,56.69,0.01,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" KADX-PU-KATO-MEME_KAKAVOME,Rails et pièces d'encadrement en alliages d'aluminium,Material,General,t,8404.14,8404.14,8404.14,8404.14,1,EUR,64.72,0.01,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" RIKA-RI-MEKA-KATO,Embouts de câbles,Abstract Material,General,pièce,196.73,196.73,196.73,196.73,1,EUR,393.46,2.0,2,2,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KAVO-TO-MERI-KAPU_KAKAKAME,"Location de tôle perforée laminée à chaud, nuances d'acier St3ps, St3sp, largeur 500 mm, épaisseur 4 mm",Material,General,t,1789.27,1789.27,1789.27,1789.27,1,EUR,0.78,0.0,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Construction de tuyaux industriels monolithiques en béton armé KAVO-ME-KARI-RIVO_KAKAKARI,Fonte moulée L1,Material,General,t,1876.46,1876.46,1876.46,1876.46,1,EUR,163.25,0.085,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Installation des blocs de charbon et des sections de sole KAME-LI-MEME-KAME_KAKATOME,Ferrophosphore électrothermique FF20-6,Material,General,kg,1.56,1.56,1.56,1.56,1,EUR,8.29,5.3,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Installation des blocs de charbon et des sections de sole KAME-TO-KASA-TOVO_KAPUSAME,Ferrosilicium,Material,General,kg,3.65,3.65,3.65,3.65,1,EUR,27.78,7.6,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Installation des blocs de charbon et des sections de sole DXME-RIME-RIRI_PUVOME,"Pinces à vide pour verre, charge utile jusqu'à 400 kg",Equipment,General,Heures machine,0.42,0.42,0.42,0.42,1,EUR,1.84,4.37,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KALI-RI-KANE-KANE_MEKAMEKA,"Support en aluminium peint en forme de P pour façades ventilées suspendues, épaisseur 2,2 mm, dimensions 150 x 100 x 56 mm",Material,General,pièce,9.87,9.87,9.87,9.87,1,EUR,538.08,54.5,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" RITO-SA-KARI-KARI_KAKASARI,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 89 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,13.84,13.84,13.84,13.84,1,EUR,180.28,13.03,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS DXME-KARI-KATO_KAPUKA,"Marteaux hydrauliques pour battage de pieux, poids de la partie frappante 14 t, énergie de frappe 31-280 kJ, avec station hydraulique d'une puissance maximale de 515 kW (700 ch)",Equipment,General,Heures machine,735.39,735.39,735.39,735.39,1,EUR,588.31,0.8,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-TO-KATO-KARI_KAMEVOPU,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 377 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,281.23,281.23,281.23,281.23,1,EUR,50.62,0.18,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net RITO-TO-KATO-KARI_KAMEPUME,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 159 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,88.12,88.12,88.12,88.12,1,EUR,7.05,0.08,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net KALI-ME-KARI-KATO,Structures en acier des blocs de fenêtres,Abstract Material,Steel & Metal,t,3292.19,3292.19,3292.19,3292.19,1,EUR,3292.19,1.0,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KADX-RI-KAME-KAPU,Structures en aluminium,Abstract Material,Steel & Metal,t,16177.05,16177.05,16177.05,16177.05,1,EUR,3947.2,0.24,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" KAME-ME-KARI-KAVO_KAKAMEDX,"Joints en paronite PMB, épaisseur 4 mm, diamètre 80 mm",Material,General,1000 pièces,583.55,583.55,583.55,583.55,1,EUR,37.64,0.065,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" DXME-RIME-RIRI_METOME,"Électricité : consommation 12,49 kWh/machine-heure",Electricity,Electricity,Heures machine,1.6,1.6,1.6,1.6,1,EUR,1.8,1.12,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Remplissage avec une masse de fond en charbon DXME-RIME-RIRI_METOME,Concasseurs à marteaux,Equipment,General,Heures machine,4.12,4.12,4.12,4.12,1,EUR,4.62,1.12,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Remplissage avec une masse de fond en charbon MELI-PU-KAME-KARI_KAKAKATO,"Mélange réfractaire en béton aluminosilicate à base de ciment à haute teneur en alumine, sec, SMKRVTs-58",Material,General,t,2762.15,2762.15,2762.15,2762.15,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement de fours industriels en béton projeté d'une épaisseur maximale de 200 RITO-SA-KAME-KADX_KAKAMEME,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K52, diamètre extérieur 1020 mm, épaisseur de paroi 16 mm",Material,Pipes & Fittings,m,977.22,977.22,977.22,977.22,1,EUR,2091.26,2.14,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES VANNES LINÉAIRES DES OLÉODUCS RITO-ME-KARI-KATO_KAKAMETO,"Anneau de support et de guidage en acier pour tuyaux, diamètre 1400 mm",Material,General,pièce,71.97,71.97,71.97,71.97,1,EUR,371.75,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAMERI,"Anneau de support et de guidage en acier pour tuyaux, diamètre 1200 mm",Material,General,pièce,59.99,59.99,59.99,59.99,1,EUR,309.85,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAMEME,"Anneau de support et de guidage en acier pour tuyaux, diamètre 1000 mm",Material,General,pièce,55.15,55.15,55.15,55.15,1,EUR,284.84,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAMEKA,"Anneau de support et de guidage en acier pour tuyaux, diamètre 800 mm",Material,General,pièce,44.35,44.35,44.35,44.35,1,EUR,229.05,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAKADX,"Anneau de support et de guidage en acier pour tuyaux, diamètre 700 mm",Material,General,pièce,41.23,41.23,41.23,41.23,1,EUR,212.95,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT DXME-RIKA-KALI_KAKARI,Conducteurs flottants pour l'immersion de pieux-enveloppes en béton armé,Equipment,General,Heures machine,70.72,70.72,70.72,70.72,1,EUR,160.89,2.275,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU FLUVIAL À PARTIR DE BÂTIMENTS FLOTTANTS MEVO-ME-KADX-KAME_KAKAMEVO,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 700 mm",Material,General,pièce,73528.05,73528.05,73528.05,73528.05,1,EUR,73528.05,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS KALI-ME-KATO-KASA,Grilles de protection en profilés et tubes laminés à chaud et cintrés à froid,Abstract Material,Pipes & Fittings,t,13513.73,13513.73,13513.73,13513.73,1,EUR,13513.73,1.0,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MEPU-SA-KAME-KAME_KAKAMERI,"Mastic acrylique universel pour colmater les joints et les fissures, étanchéifier les joints",Material,General,l,9.71,9.71,9.71,9.71,1,EUR,29.67,3.055,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MELI-TO-KARI-MELI,Produits en chamotte légers et thermo-isolants,Abstract Material,General,t,2219.77,2219.77,2219.77,2219.77,1,EUR,2719.22,1.225,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement des conduites de gaz et d'air MELI-PU-KASA-KAPU,Masses de remplissage,Abstract Material,General,t,1462.05,1462.05,1462.05,1462.05,1,EUR,3486.99,2.385,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES ÉLÉMENTS DES AGRÉGATS THERMIQUES À USAGE GÉNÉRAL,Remplissage avec une masse réfractaire ou du béton réfractaire et obturation des MELI-TO-KARI-MENE,Produits en chamotte et en chamotte-carbure de silicium pour récupérateurs tubulaires,Abstract Material,General,t,1421.61,1421.61,1421.61,1421.61,1,EUR,1478.48,1.04,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES ÉLÉMENTS DES AGRÉGATS THERMIQUES À USAGE GÉNÉRAL,"Maçonnerie des buses des réchauffeurs d'air, des régénérateurs et des récupérate" KAME-ME-KARI-MEKA_MEKAMEVO,"Chrysotile (amiante chrysotile), groupe 5, marques 5-80, 5-70, 5-65, 5-60, 5-55, 5-50",Material,General,t,746.26,746.26,746.26,746.26,1,EUR,914.16,1.225,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Enduit d'étanchéité de la surface des chaudières KAME-LI-MELI-KAVO_KAKATOSA,Poudre abrasive au carbure de silicium,Material,General,kg,4.12,4.12,4.12,4.12,1,EUR,9337.69,2267.5,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Remplissage avec une masse réfractaire MEME-RI-MEME-KAPU,"Contreplaqué en placage de feuillus résistant à l'eau, marque FSF, classe I/II, poncé",Abstract Material,General,m3,1208.29,1208.29,1208.29,1208.29,1,EUR,0.0,0.0,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Divers travaux lors du revêtement en béton réfractaire MELI-PU-KATO-KARI_KAKAKAME,"Mortier réfractaire plastifié à base de dinas, marque MD-90",Material,General,t,621.42,621.42,621.42,621.42,1,EUR,77.67,0.125,2,2,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DE LA PARTIE SUPÉRIEURE DES FOURS DE VERRERIE,Maçonnerie de la structure supérieure des fours à verre KAME-LI-RIKA-KANE_KAKAKARI,"Ceinture de force souple à deux sangles, MSP-720 pour lest, type UBO",Material,General,pièce,15.26,15.26,15.26,15.26,1,EUR,15.26,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta DXME-MEKA-KAPU_KAMEDX,"Électricité : consommation 16,73 kWh/machine-heure",Electricity,Electricity,Heures machine,2.15,2.15,2.15,2.15,1,EUR,23.49,10.93,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION AVEC DES BANDES POLYMÈRES ET POSE DE CONDUITES DXME-MEKA-KAPU_KAMEDX,Machines pour le nettoyage et l'isolation avec des bandes polymères de tuyaux d'un diamètre de 1400 mm,Equipment,General,Heures machine,37.37,37.37,37.37,37.37,1,EUR,408.41,10.93,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION AVEC DES BANDES POLYMÈRES ET POSE DE CONDUITES DXME-KARI-KATO_KAMEME,"Marteaux hydrauliques pour battage de pieux, poids de la partie frappante 10 t, énergie de frappe 20-200 kJ, avec station hydraulique d'une puissance jusqu'à 515 kW (700 ch)",Equipment,General,Heures machine,633.55,633.55,633.55,633.55,1,EUR,205.91,0.325,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS DXME-KARI-KAME_KAKAME,"Vibrateurs à haute fréquence variables diesel, couple excentrique 0-48 kgm, force de traction jusqu'à 600 kN, force centrifuge jusqu'à 2960 kN",Equipment,General,Heures machine,510.56,510.56,510.56,510.56,1,EUR,63.82,0.125,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS MEPU-PU-KAME-KADX_KASAKAME,"Apprêt époxy modifié à deux composants, à faible teneur en composés organiques volatils et à haut pouvoir couvrant, pour la protection des structures métalliques dans les zones exposées aux vagues",Material,Steel & Metal,l,23.56,23.56,23.56,23.56,1,EUR,11.19,0.475,2,2,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS RITO-ME-KARI-KATO_KAKAKAVO,"Anneau de support et de guidage en acier pour tuyaux, diamètre 600 mm",Material,General,pièce,39.51,39.51,39.51,39.51,1,EUR,204.06,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAKALI,"Anneau de support et de guidage en acier pour tuyaux, diamètre 500 mm",Material,General,pièce,31.62,31.62,31.62,31.62,1,EUR,163.29,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAKANE,"Anneau de support et de guidage en acier pour tuyaux, diamètre 400 mm",Material,General,pièce,27.07,27.07,27.07,27.07,1,EUR,139.81,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAKASA,"Anneau de support et de guidage en acier pour tuyaux, diamètre 350 mm",Material,General,pièce,23.46,23.46,23.46,23.46,1,EUR,121.16,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAKAPU,"Anneau de support et de guidage en acier pour tuyaux, diamètre 300 mm",Material,General,pièce,22.73,22.73,22.73,22.73,1,EUR,117.39,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAKATO,"Anneau de support et de guidage en acier pour tuyaux, diamètre 200 mm",Material,General,pièce,9.72,9.72,9.72,9.72,1,EUR,50.22,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAKARI,"Anneau de support et de guidage en acier pour tuyaux, diamètre 100 mm",Material,General,pièce,5.93,5.93,5.93,5.93,1,EUR,30.62,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-ME-KARI-KATO_KAKAKAME,"Anneau de support et de guidage en acier pour tuyaux, diamètre 50 mm",Material,General,pièce,3.56,3.56,3.56,3.56,1,EUR,18.41,5.165,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT KAME-LI-KAPU-KAME,Ferrures de porte,Abstract Material,General,pièce,87.82,87.82,87.82,87.82,1,EUR,4435.01,50.5,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KALI-ME-KAME-KATO,Blocs de porte métalliques,Abstract Material,General,m2,223.67,223.67,223.67,223.67,1,EUR,223.67,1.0,2,2,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" RITO-SA-KAME-MEKA_KAKAMERI,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K60, diamètre extérieur 1220 mm, épaisseur de paroi 19,1 mm",Material,Pipes & Fittings,m,1804.33,1804.33,1804.33,1804.33,1,EUR,4952.9,2.745,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES VANNES LINÉAIRES DES OLÉODUCS DXME-MEKA-KAPU_KAMESA,Machines pour le nettoyage et l'isolation avec des bandes polymères de tuyaux d'un diamètre de 200 à 300 mm,Equipment,General,Heures machine,21.98,21.98,21.98,21.98,1,EUR,146.17,6.65,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ISOLATION ANTICORROSION ET POSE DE CONDUITES,ISOLATION AVEC DES BANDES POLYMÈRES ET POSE DE CONDUITES KASA-ME-KARI-MEKA_KAKAKAVO,Lest en béton armé de type cunéiforme UBKm pour le ballastage de tuyaux d'un diamètre de 1400 mm,Material,General,pièce,1436.4,1436.4,1436.4,1436.4,1,EUR,1436.4,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 300 à 1400 mm à l'aide de lestages KASA-ME-KARI-MEKA_KAKAKALI,Lest en béton armé de type cunéiforme UBKm pour le lestage de tuyaux d'un diamètre de 1200 mm,Material,General,pièce,964.27,964.27,964.27,964.27,1,EUR,964.27,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 300 à 1400 mm à l'aide de lestages KASA-ME-KARI-MEKA_KAKAKANE,Lest en béton armé de type cunéiforme UBKm pour le lestage de tuyaux d'un diamètre de 1000 mm,Material,General,pièce,895.09,895.09,895.09,895.09,1,EUR,895.09,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 300 à 1400 mm à l'aide de lestages KASA-ME-KARI-MEKA_KAKAKASA,Lest en béton armé de type cunéiforme UBKm pour le lestage de tuyaux d'un diamètre de 800 mm,Material,General,pièce,667.52,667.52,667.52,667.52,1,EUR,667.52,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 300 à 1400 mm à l'aide de lestages KASA-ME-KARI-MEKA_KAKAKATO,Lest en béton armé de type cunéiforme UBKm pour le lestage de tuyaux d'un diamètre de 500 mm,Material,General,pièce,448.74,448.74,448.74,448.74,1,EUR,448.74,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 300 à 1400 mm à l'aide de lestages KASA-ME-KARI-MEKA_KAKAKAME,Lest en béton armé de type cunéiforme UBKm pour le lestage de tuyaux d'un diamètre de 300 mm,Material,General,pièce,221.4,221.4,221.4,221.4,1,EUR,221.4,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 300 à 1400 mm à l'aide de lestages KAME-LI-KALI-RITO,Dispositif de lestage en tissu de type PKBU,Abstract Material,General,compl,169.32,169.32,169.32,169.32,1,EUR,169.32,1.0,2,2,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de pipelines à l'aide de dispositifs de ballastage en tissu DXME-RIKA-KAME_KAMEME,"Marteaux pneumatiques pour travaux sous-marins à partir de compresseurs mobiles, nombre de coups par minute 1350",Equipment,General,Heures machine,0.11,0.11,0.11,0.11,1,EUR,0.2,1.785,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Travaux sous-marins techniques de nettoyage des collecteurs en tunnel d'un diamè KAME-LI-MERI-MESA,Tapis polyamide anti-érosion,Abstract Material,General,m2,4.23,4.23,4.23,4.23,1,EUR,4648.88,1100.0,2,2,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXCAVATION ET REMBLAIEMENT POUR VOIES FERRÉES ET ROUTES MEVO-ME-KADX-KALI_KAMEVONE,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 80 mm",Material,Pipes & Fittings,pièce,239.07,239.07,239.07,239.07,1,EUR,1314.9,5.5,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " DXME-MERI-KARI_KAMERI,"Broyeurs de souches à essence, puissance moteur jusqu'à 11 kW (15 ch)",Equipment,General,Heures machine,4.89,4.89,4.89,4.89,1,EUR,1.46,0.3,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,VÉGÉTALISATION,Enlèvement des souches à l'aide d'un broyeur KARI-PU-KATO-KATO_KAKAKARI,"Granulats issus de la sidérurgie et de la métallurgie non ferreuse pour la construction routière M 600, fraction 5-10 mm",Material,General,m3,115.01,115.01,115.01,115.01,1,EUR,4.38,0.035,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,VÉGÉTALISATION,Réparation des allées de jardin MEPU-RI-KANE-KAME_KAMEMELI,"Désinfectant liquide à base d'hypochlorite de sodium, teneur en chlore actif 190 g/l",Material,General,l,4.47,4.47,4.47,4.47,1,EUR,82.93,18.54,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Diagnostic interne des canalisations existantes d'un diamètre de 290 à 620 mm pa KAPU-TO-KARI-MEPU_KAMEMEKA,"Composition polymère-ciment à deux composants à partir d'un mélange sec à base de ciment, de granulats minéraux, de fibres de renforcement, d'additifs modificateurs (composant A) et de polymères en dispersion aqueuse (composant B) pour la protection et l'étanchéité du béton, F300, W12, résistance à l'adhérence d'au moins 2 MPa",Material,Concrete & Cement,kg,6.13,6.13,6.13,6.13,1,EUR,806.86,131.555,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Autres travaux de réparation et de construction,AUTRES TRAVAUX DE RÉNOVATION ET DE CONSTRUCTION,Étanchéification des joints de dilatation (thermiques) dans les structures en bé MEPU-RI-KAPU-KAPU_MEKAKADX,"Résine polyuréthane monocomposante hydroactive pour l'injection, destinée à l'étanchéification des fissures et au remplissage des vides, fournie avec un catalyseur",Material,General,kg,10.59,10.59,10.59,10.59,1,EUR,1218.0,115.035,2,2,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Autres travaux de réparation et de construction,AUTRES TRAVAUX DE RÉNOVATION ET DE CONSTRUCTION,Remplissage des vides dans les structures en béton armé et arrêt de l'écoulement MEME-ME-KATO-MEKA,"Bois sciés et rabotés, non classés dans les groupes",Abstract Material,General,m3,1294.85,1294.85,1294.85,1294.85,1,EUR,7769.12,6.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,AUTRES TRAVAUX,Construction de hangars et de clôtures en bois DXME-MEDX-MERI_SARIPU,"Installations de séparation, capacité jusqu'à 240 m3/h",Equipment,General,Heures machine,68.4,68.4,68.4,68.4,1,EUR,95.75,1.4,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,AUTRES TRAVAUX,Déshydratation des boues issues du traitement des eaux de lavage et des dépôts d DXME-MEDX-MERI_SARIPU,"Électricité : consommation 7,28 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.93,0.93,0.93,0.93,1,EUR,1.31,1.4,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,AUTRES TRAVAUX,Déshydratation des boues issues du traitement des eaux de lavage et des dépôts d MEPU-PU-KAME-KAME_KAKAKANE,Apprêt GF-0163,Material,General,t,2452.58,2452.58,2452.58,2452.58,1,EUR,21.24,0.01,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques MEPU-PU-KAME-MEDX_KAKAKAPU,Apprêt KhS-068,Material,General,t,4138.46,4138.46,4138.46,4138.46,1,EUR,65.8,0.02,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques DXME-KATO-KADX_KAKATO,"Levages à benne lors du creusement d'un puits, tension statique du câble 63 kN",Equipment,General,Heures machine,131.47,131.47,131.47,131.47,1,EUR,788.84,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAMEME,Levages miniers à l'aide d'une grue à portique lors du creusement de puits de mine,Equipment,General,Heures machine,189.51,189.51,189.51,189.51,1,EUR,1326.57,7.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAMETO,Levages miniers lors du creusement de tunnels à l'aide d'une grue pivotante à flèche d'une capacité de charge de 2 t,Equipment,General,Heures machine,201.04,201.04,201.04,201.04,1,EUR,1206.26,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAMERI,Ascenseurs de mine pour le creusement de tunnels à base d'une grue pivotante à flèche d'une capacité de charge de 1 t,Equipment,General,Heures machine,161.13,161.13,161.13,161.13,1,EUR,966.8,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKASA,"Électricité : consommation 340,05 kW·h/machine-heure",Electricity,Electricity,Heures machine,43.68,43.68,43.68,43.68,1,EUR,262.06,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKASA,"Ascenseurs de mine avec cabines de transport de marchandises et de personnes pour tunnels profonds, capacité de charge 8 t et 3,5 t, tension statique des câbles 88,2 kN et 61,7 kN, profondeur du puits supérieure à 100 m",Equipment,General,Heures machine,345.64,345.64,345.64,345.64,1,EUR,2073.87,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKANE,"Électricité : consommation 132,15 kW·h/machine-heure",Electricity,Electricity,Heures machine,16.97,16.97,16.97,16.97,1,EUR,101.84,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKANE,"Ascenseurs miniers à deux cabines pour le transport de personnes et de marchandises pour tunnels profonds, capacité de charge 2 x 3,5 t, tension statique du câble 63 kN, profondeur du puits jusqu'à 100 m",Equipment,General,Heures machine,169.15,169.15,169.15,169.15,1,EUR,1014.91,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKAVO,"Ascenseurs miniers mécanisés à cage unique pour un wagonnet d'une capacité de 1,5 m3 pour tunnels de petit diamètre (marchandises)",Equipment,General,Heures machine,61.22,61.22,61.22,61.22,1,EUR,367.34,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR RITO-SA-KARI-KARI_MEMEPUPU,"Tubes en acier électrosoudés à joint droit en acier de marque 20, diamètre extérieur 57 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,10.31,10.31,10.31,10.31,1,EUR,444.84,43.16,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KAME-LI-MEME-KALI_KATOMENE,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés OZS-12, E-46, diamètre 4-5 mm",Material,General,kg,3.19,3.19,3.19,3.19,1,EUR,22.63,7.1,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RINE-ME-KARI-KARI_KAKARITO,"Cale pour joints de dilatation des rails de grue, type TS-3-7",Material,General,pièce,99.22,99.22,99.22,99.22,1,EUR,793.72,8.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION DE LA VOIE EN SURFACE KANE-ME-KARI-KAME,Produits céramiques moulés résistants aux acides,Abstract Material,Chemicals,t,1094.48,1094.48,1094.48,1094.48,1,EUR,2407.85,2.2,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,MAÇONNERIE EN BRIQUES RÉSISTANTES AUX ACIDES ET EN PIÈCES CÉRAMIQUES RÉSISTANTES,Maçonnerie en briques résistantes aux acides et en produits céramiques moulés ré KANE-RI-KASA-KAPU_KAKAKAME,"Carreaux réfractaires en graphite, résistance à la flexion/compression d'au moins 21/50 MPa, conductivité thermique 25-30 W/(m*deg), densité d'au moins 1750 kg/m3",Material,General,t,3721.45,3721.45,3721.45,3721.45,1,EUR,68.29,0.02,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DE REVÊTEMENT,Revêtement avec des matériaux résistants aux acides sur un mastic chimiquement r KAME-LI-RIKA-KANE_KAKAKAME,"Ceinture de force souple à deux sangles, MSP-530 pour lest, type UBO",Material,General,pièce,14.76,14.76,14.76,14.76,1,EUR,14.76,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta RITO-ME-KARI-KAME_KAKAKAPU,"Charges en fonte pour le lestage des gazoducs et oléoducs principaux, diamètre du pipeline jusqu'à 1400 mm",Material,Pipes & Fittings,t,2844.12,2844.12,2844.12,2844.12,1,EUR,6257.07,2.2,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage à l'aide de charges en fonte composées de deux moitiés de conduites d RITO-ME-KARI-KAME_KAKAKATO,"Lest en fonte pour le ballastage des gazoducs et oléoducs principaux, diamètre du pipeline jusqu'à 1200 mm",Material,Pipes & Fittings,t,2442.52,2442.52,2442.52,2442.52,1,EUR,4396.54,1.8,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage à l'aide de charges en fonte composées de deux moitiés de conduites d RITO-TO-MEME-KARI,Thermostabilisateurs,Abstract Material,General,pièce,384.55,384.55,384.55,384.55,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS KASA-ME-KARI-MEKA_KAKAMEPU,Lestage composé de deux blocs en béton armé de type UBO avec deux ceintures métalliques pour le lestage de tuyaux d'un diamètre de 1400 mm,Material,General,compl,691.99,691.99,691.99,691.99,1,EUR,691.99,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta KAME-LI-RIKA-KANE_KAKAKANE,"Ceinture de force souple à deux sangles, MSP-1420 pour lest, type UBO",Material,General,pièce,21.55,21.55,21.55,21.55,1,EUR,21.55,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta KASA-ME-KARI-MEKA_KAKAMETO,Lestage composé de deux blocs en béton armé de type UBO avec deux ceintures métalliques pour le ballastage de tuyaux d'un diamètre de 1200 mm,Material,General,compl,672.25,672.25,672.25,672.25,1,EUR,672.25,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta KAME-LI-RIKA-KANE_KAKAKASA,"Ceinture de force souple à deux sangles, MSP-1220 pour poids, type UBO",Material,General,pièce,19.6,19.6,19.6,19.6,1,EUR,19.6,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta MEPU-SA-KAME-KALI_MEKAKATO,"Mastic silicone ignifuge pour le colmatage des joints de raccordement des murs et des plafonds, des passages de câbles et des trous lors de la pose de conduites incombustibles soumises à des déformations pouvant atteindre 25 % pendant leur utilisation, volume 310 ml",Material,General,pièce,83.35,83.35,83.35,83.35,1,EUR,1577.83,18.93,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-MESA-MEPU_MEKASARI,"Vis autotaraudeuses en acier galvanisé avec tête hémisphérique et rondelle de pression, pointues, diamètre 4,2 mm, longueur 14 mm",Material,General,kg,3.95,3.95,3.95,3.95,1,EUR,3.99,1.01,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" RITO-ME-KARI-KASA_KAKAKARI,Dispositif d'ancrage à disque à geler,Material,General,compl,654.41,654.41,654.41,654.41,1,EUR,654.41,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Lestage de conduites d'un diamètre nominal de 1400 mm à l'aide de dispositifs d' DXME-MEDX-MERI_SAMENE,"Électricité : consommation 5,59 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.72,0.72,0.72,0.72,1,EUR,2.01,2.8,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,AUTRES TRAVAUX,Déshydratation des boues issues du traitement des eaux de lavage et des dépôts d DXME-MEKA-MEME_KAVOME,"Brise-roches hydrauliques pour le remplacement de canalisations, force de traction 175 t",Equipment,General,Heures machine,94.8,94.8,94.8,94.8,1,EUR,798.24,8.42,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Remplacement sans tranchée de tuyaux en acier par des tuyaux en polyéthylène ave RITO-ME-KATO-KAPU_KAKAVOLI,"Support mobile à collier allongé, type 3, pour conduites en acier de 50 à 1600 mm de diamètre, avec isolation, hauteur du support 150 mm, diamètre nominal 400 mm",Material,General,pièce,141.84,141.84,141.84,141.84,1,EUR,24112.92,170.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEVO-ME-KADX-KALI_KAMEDXTO,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 400 mm",Material,Pipes & Fittings,pièce,21574.84,21574.84,21574.84,21574.84,1,EUR,43149.68,2.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " RITO-ME-KATO-KAPU_KAKAVONE,"Support mobile à collier allongé, type 3, pour conduites en acier de 50 à 1600 mm de diamètre, avec isolation, hauteur du support 150 mm, diamètre nominal 350 mm",Material,General,pièce,133.95,133.95,133.95,133.95,1,EUR,22772.22,170.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEPU-SA-KAME-KATO_MEKAKATO,"Matériau polymère à trois composants pour le remplissage des extrémités des manchons lors de la réparation de canalisations à l'aide de manchons composites, contrainte maximale à la compression d'au moins 50 MPa, résistance au cisaillement d'au moins 3 MPa, module d'élasticité d'au moins 0,5 GPa",Material,General,compl,71.61,71.61,71.61,71.61,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE MELI-PU-KASA-KANE_KAKAKAME,Poudre de diatomite,Material,General,kg,2.07,2.07,2.07,2.07,1,EUR,1346.08,650.0,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES ÉLÉMENTS DES AGRÉGATS THERMIQUES À USAGE GÉNÉRAL,"Isolation de la maçonnerie des fours, chaudières, tuyauteries" MELI-PU-KASA-KAPU_KAKASAME,"Masse de remplissage en corindon mullite, marque MK-80",Material,General,t,1803.56,1803.56,1803.56,1803.56,1,EUR,4563.0,2.53,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES ÉLÉMENTS DES AGRÉGATS THERMIQUES À USAGE GÉNÉRAL,Pose de masses plastiques à remplissage KANE-ME-KARI-KARI_KAKAKAME,Briques cassées en terre cuite ordinaire,Material,General,m3,12.89,12.89,12.89,12.89,1,EUR,13.14,1.02,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES ÉLÉMENTS DES AGRÉGATS THERMIQUES À USAGE GÉNÉRAL,Remplissage avec une masse réfractaire ou du béton réfractaire et obturation des MELI-RI-KARI-KARI,Produits en dinas pour la maçonnerie des fours à l'oxygène,Abstract Material,General,t,1025.85,1025.85,1025.85,1025.85,1,EUR,1066.88,1.04,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES ÉLÉMENTS DES AGRÉGATS THERMIQUES À USAGE GÉNÉRAL,"Maçonnerie des buses des réchauffeurs d'air, des régénérateurs et des récupérate" MELI-TO-KARI-KATO,Produits en chamotte pour les réchauffeurs d'air des hauts fourneaux,Abstract Material,General,t,902.44,902.44,902.44,902.44,1,EUR,938.54,1.04,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,MAÇONNERIE DES ÉLÉMENTS DES AGRÉGATS THERMIQUES À USAGE GÉNÉRAL,"Maçonnerie des buses des réchauffeurs d'air, des régénérateurs et des récupérate" MELI-PU-KASA-MEPU,Poudre chamottée de marque PSHK,Abstract Material,General,t,649.68,649.68,649.68,649.68,1,EUR,649.68,1.0,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Enduit d'étanchéité de la surface des chaudières MELI-PU-KAPU-KARI_KAKAKAME,"Mélange réfractaire chromite, marque SKh",Material,General,t,838.29,838.29,838.29,838.29,1,EUR,2934.03,3.5,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Remplissage avec une masse réfractaire MELI-PU-KAPU-KARI_KAKAMEME,"Mélange réfractaire chromite-argile, marque SKH-3 (SKH-6)",Material,General,t,3264.28,3264.28,3264.28,3264.28,1,EUR,11424.98,3.5,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Remplissage avec une masse réfractaire MEPU-SA-KAPU-KAVO_KAKAKANE,Mastic à base de chaux et de silice,Material,General,m3,3491.59,3491.59,3491.59,3491.59,1,EUR,349.16,0.1,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Revêtement de la surface des chaudières avec des dalles KAME-LI-MEPU-KATO_KAKAKAME,Polystyrène à usage général,Material,General,t,1723.0,1723.0,1723.0,1723.0,1,EUR,1283.64,0.74,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES CHAUDIÈRES À VAPEUR,Divers travaux lors du revêtement en béton réfractaire KAVO-TO-KALI-KAME_KARIMEPU,"Bandes d'acier laminées à chaud, nuances St3sp, St3ps, dimensions 80 x 12 mm",Material,General,t,1855.81,1855.81,1855.81,1855.81,1,EUR,44.54,0.02,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-MESA-MEPU_MEKASANE,"Vis autotaraudeuses en acier galvanisé à tête fraisée et fente en croix, pointues, diamètre 5 mm, longueur 70 mm",Material,General,100 pièces,3.62,3.62,3.62,3.62,1,EUR,5.89,1.63,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-RIKA-KANE_KAKAKAPU,"Ceinture de force souple composée de deux sangles, MSP-1020 pour lest, type UBO",Material,General,pièce,19.6,19.6,19.6,19.6,1,EUR,19.6,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta KAME-LI-RIKA-KANE_KAKAKATO,"Ceinture de force souple à deux sangles, MSP-820 pour lest, type UBO",Material,General,pièce,15.26,15.26,15.26,15.26,1,EUR,15.26,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta KASA-ME-KARI-MEKA_KAKAMEME,Lestage composé de deux blocs en béton armé de type enveloppant UBO avec deux ceintures métalliques pour le lestage de tuyaux d'un diamètre de 500 mm,Material,General,compl,220.53,220.53,220.53,220.53,1,EUR,220.53,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,LESTAGE DES CONDUITES,Ballastage de conduites d'un diamètre nominal de 500 à 1400 mm à l'aide de lesta MERI-RI-KATO-KADX_KAKARIME,Fibre de verre coupée,Material,General,t,2396.42,2396.42,2396.42,2396.42,1,EUR,23.96,0.01,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MERI-ME-KARI-MEKA_METOPUVO,"Membrane d'étanchéité polymère à base de caoutchouc éthylène-propylène, renforcée de fibres polymères, épaisseur 1,2 mm",Material,Waterproofing,m2,20.82,20.82,20.82,20.82,1,EUR,265.84,12.77,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-MESA-MEPU_KAKALINE,"Vis autotaraudeuses en acier peint à tête hexagonale, assemblées avec des rondelles et des joints en caoutchouc de 16 mm de diamètre, pointe de forage, diamètre 5,5 mm, longueur 25 mm",Material,General,100 pièces,4.11,4.11,4.11,4.11,1,EUR,0.7,0.17,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-MESA-MEPU_KAKALIME,"Vis autotaraudeuses en acier peint à tête hexagonale, assemblées avec des rondelles et des joints en caoutchouc d'un diamètre de 14 mm, pointe de forage, diamètre 4,8 mm, longueur 29 mm",Material,General,100 pièces,3.83,3.83,3.83,3.83,1,EUR,2.34,0.61,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-KANE-MEPU_MEKALIPU,"Bandes d'étanchéité hydroisolantes en caoutchouc butyle, avec une couche adhésive des deux côtés, couleur noire, largeur 45 mm, épaisseur 2 mm",Material,General,10 m,6.91,6.91,6.91,6.91,1,EUR,142.73,20.66,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" RITO-SA-KAME-KADX_KAKAKARI,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K52, diamètre extérieur 820 mm, épaisseur de paroi 16 mm",Material,Pipes & Fittings,m,685.47,685.47,685.47,685.47,1,EUR,1699.96,2.48,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES VANNES LINÉAIRES DES OLÉODUCS RITO-SA-KAME-KALI_KAKATOPU,"Tubes en acier soudés pour gazoducs et oléoducs principaux, classe de résistance K52, diamètre extérieur 630 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,470.67,470.67,470.67,470.67,1,EUR,898.98,1.91,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES VANNES LINÉAIRES DES OLÉODUCS RIPU-TO-KASA-KANE_MEKARIME,Kit de réparation du revêtement isolant d'usine des tuyaux,Material,General,pièce,99.19,99.19,99.19,99.19,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-SA-KARI-KARI_KAKAVORI,"Tuyaux en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 168 mm, épaisseur de paroi 6 mm",Material,General,m,37.4,37.4,37.4,37.4,1,EUR,934.99,25.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,CONSTRUCTION DE PASSAGES SOUTERRAINS SOUS LES ROUTES,PASSAGE DES TUYAUX DE CONDUITE À TRAVERS LE CAPOT RITO-SA-KAME-KAVO_KAKALIVO,"Tubes en acier électrosoudés à joint droit et à joint spiralé, classe de résistance K38, diamètre extérieur 1220 mm, épaisseur de paroi 11 mm",Material,Pipes & Fittings,m,822.59,822.59,822.59,822.59,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS EN MILIEU MARITIME À PARTIR DE BÂTIMENTS FLOTTANTS RITO-VO-KAPU-KANE_KAKADXNE,"Dérivation à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 200 mm, diamètre extérieur 219 mm, épaisseur de paroi 8 mm",Material,General,pièce,107.99,107.99,107.99,107.99,1,EUR,107.99,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS MEVO-ME-KADX-KAME_KAKAMELI,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 500 mm",Material,General,pièce,21144.21,21144.21,21144.21,21144.21,1,EUR,21144.21,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RITO-VO-KAPU-MERI_KAMERIKA,"Té sans soudure à passage droit, pression nominale jusqu'à 16 MPa, diamètre nominal 80 mm, diamètre extérieur et épaisseur de paroi 89 x 6,0 mm",Material,General,pièce,18.99,18.99,18.99,18.99,1,EUR,18.99,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS KAME-LI-KANE-MEPU_MEKAPUNE,"Bandes d'étanchéité hydrofuges, pare-vapeur en caoutchouc butyle, doublées de toile d'un côté, avec une couche adhésive d'un côté, couleur grise, largeur 120 mm, épaisseur 1,5 mm",Material,General,m,1.24,1.24,1.24,1.24,1,EUR,90.62,73.23,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-KAPU-KAME_MEKAMEPU,"Dispositif d'ouverture d'urgence « Anti-panique », en applique, avec boîtier en aluminium et tige en acier raccourcissable jusqu'à 300 mm, longueur 840 mm",Material,General,pièce,763.09,763.09,763.09,763.09,1,EUR,7630.9,10.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-TO-KAPU-KANE_KAKAKASA,Huile pour transformateurs T-1500,Material,General,kg,3.13,3.13,3.13,3.13,1,EUR,3030.46,969.63,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,ASSEMBLAGE ET SOUDAGE DE CONDUITES SUR LE TRACÉ DANS DES CONDITIONS NORMALES,AUTRES TRAVAUX SUR LA VOIE MEVO-TO-KAME-KARI,Manchons pompiers à pression,Abstract Material,General,m,5.87,5.87,5.87,5.87,1,EUR,0.41,0.07,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL KASA-ME-KASA-MEKA,Pieux monoblocs à section carrée continue,Abstract Material,General,m3,1037.13,1037.13,1037.13,1037.13,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL RITO-SA-KAME-MEKA_KAKAMEPU,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K60, diamètre extérieur 1420 mm, épaisseur de paroi 23 mm",Material,Pipes & Fittings,m,2401.86,2401.86,2401.86,2401.86,1,EUR,2882.23,1.2,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS MEVO-ME-KADX-KAME_KAKARIME,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 1400 mm",Material,General,pièce,445701.22,445701.22,445701.22,445701.22,1,EUR,445701.22,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS MEVO-ME-KADX-KAME_KAKARIKA,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 1200 mm",Material,General,pièce,268582.17,268582.17,268582.17,268582.17,1,EUR,268582.17,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS MEVO-ME-KADX-KAME_KAKAMEDX,"Robinet à boisseau sphérique en acier pour gaz, diamètre nominal 1000 mm",Material,General,pièce,177119.05,177119.05,177119.05,177119.05,1,EUR,177119.05,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RITO-VO-KAPU-MERI_KAMEPUKA,"Raccord en T sans soudure à passage égal, pression nominale jusqu'à 16 MPa, diamètre nominal 300 mm, diamètre extérieur et épaisseur de paroi 325 x 10,0 mm",Material,General,pièce,312.42,312.42,312.42,312.42,1,EUR,312.42,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RITO-VO-KAPU-MERI_KAMETOTO,"Té sans soudure à passage droit, pression nominale jusqu'à 16 MPa, diamètre nominal 200 mm, diamètre extérieur et épaisseur de paroi 219 x 8,0 mm",Material,General,pièce,126.22,126.22,126.22,126.22,1,EUR,126.22,1.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS KALI-ME-KASA-KAME,Trappes métalliques coupe-feu (EI60),Abstract Material,General,m2,251.69,251.69,251.69,251.69,1,EUR,251.69,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,STRUCTURES DE PROTECTION DE TOITURE KALI-RI-KALI-METO_METONEKA,"Revêtement de l'îlot de sécurité de la station-service en acier inoxydable 12Kh18N10T d'une épaisseur de 2 mm, largeur 1200 mm",Material,General,m,112.62,112.62,112.62,112.62,1,EUR,11262.33,100.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,"REVÊTEMENT DE SURFACE, TRAVAUX DE SOUDAGE, POSE DE BOULONS ET AUTRES TRAVAUX" KAVO-ME-KARI-MELI_KAKARISA,"Grille en acier tissé à partir de fil résistant à la chaleur, diamètre du fil 2 mm, taille des mailles 25 x 25 mm",Material,General,m2,54.83,54.83,54.83,54.83,1,EUR,56.47,1.03,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement des réacteurs avec du béton projeté à double couche à l'aide d'un tre KAME-LI-MESA-MERI_KAKARIPU,Goupilles en acier résistant à la chaleur,Material,General,kg,4.46,4.46,4.46,4.46,1,EUR,66.84,15.0,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement des réacteurs avec du béton projeté à double couche à l'aide d'un tre KAME-LI-MESA-MEME_KAKARIPU,"Rondelles en acier réfractaire, rondes, diamètre du trou M8",Material,General,kg,222.1,222.1,222.1,222.1,1,EUR,1332.62,6.0,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,REVÊTEMENT DES AGRÉGATS THERMIQUES,Revêtement des réacteurs avec du béton projeté à double couche à l'aide d'un tre MEPU-SA-KAME-KALI_KARIKAME,"Mastic monocomposant à base de latex acrylique, pour le montage de blocs de fenêtres",Material,General,kg,3.29,3.29,3.29,3.29,1,EUR,163.85,49.76,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MEPU-SA-KAME-KATO_MEKAKAPU,"Mastic silicone bicomposant ignifuge, résistant aux rayonnements et aux solutions de décontamination",Material,General,kg,68.79,68.79,68.79,68.79,1,EUR,125.89,1.83,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" MERI-RI-KASA-KARI_KAKAKARI,"Panneaux isolants hydrophobes en laine minérale à base de roches basaltiques, groupe de combustibilité NG, densité 50 kg/m3, conductivité thermique à 10 °C inférieure à 0,034 W/(m*K), compressibilité inférieure à 10 %",Material,General,m3,115.34,115.34,115.34,115.34,1,EUR,16.15,0.14,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" KAME-LI-MESA-KAME_MESATOTO,"Vis d'ancrage en acier galvanisé à tête hexagonale, diamètre 10 mm, longueur 60 mm",Material,General,100 pièces,247.79,247.79,247.79,247.79,1,EUR,1751.85,7.07,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER MEDX-TO-KARI-KAVO,Paniers pour blocs extérieurs de climatiseurs,Abstract Material,General,pièce,138.51,138.51,138.51,138.51,1,EUR,13850.55,100.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER KAVO-TO-KASA-KATO_KAKASAKA,"Tôles laminées à froid, nuances d'acier St3sp, St3ps, largeur 1200-3000 mm, épaisseur 0,5-3,0 mm",Material,General,t,1636.09,1636.09,1636.09,1636.09,1,EUR,2.94,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER KAME-LI-MELI-KADX_MEKADXVO,"Forets hélicoïdaux à queue cylindrique en acier rapide P6M5, classe de précision A1, longueur 109 mm, diamètre 7 mm",Material,General,100 pièces,485.17,485.17,485.17,485.17,1,EUR,106.74,0.22,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER KALI-ME-KARI-KAME,Mécanismes d'ouverture pour impostes (à ouverture manuelle),Abstract Material,General,pièce,81.56,81.56,81.56,81.56,1,EUR,8156.17,100.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER DXME-RIKA-KAPU_KAMERI,Installations vibrocompacteurs flottants pour 2 zones en rade ouverte,Equipment,General,Heures machine,10.99,10.99,10.99,10.99,1,EUR,114.51,10.42,1,1,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU MARIN EN COÛTES OUVERTES,"NIVELLEMENT ET COMPACTAGE DE LITS DE PIERRES, DE GRAVIER ET DE SABLE DANS LES CO" DXME-RIKA-KAPU_KAMEME,Installations flottantes de compactage par vibration pour 2 zones dans une zone aquatique fermée,Equipment,General,Heures machine,8.8,8.8,8.8,8.8,1,EUR,91.7,10.42,1,1,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU MARIN DANS UNE ZONE AQUA,"NIVELLEMENT ET COMPACTAGE DE LITS DE PIERRES, DE GRAVIER ET DE SABLE EN MILIEU M" MEVO-SA-KAVO-KADX,Tuyaux en acier,Abstract Material,General,t,8.63,8.63,8.63,8.63,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,Construction de murs et de lames de puits monolithiques en béton armé RITO-VO-KAPU-MERI_KAMEPUNE,"Raccord en T sans soudure à passage égal, pression nominale jusqu'à 16 MPa, diamètre nominal 400 mm, diamètre extérieur et épaisseur de paroi 426 x 10,0 mm",Material,General,pièce,496.2,496.2,496.2,496.2,1,EUR,297.72,0.6,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,NETTOYAGE DE LA CAVITÉ ET ESSAI DES CONDUITES,Montage et démontage d'un nœud temporaire pour les essais pneumatiques et le net KAVO-ME-KARI-RIPU,Boîtes aux lettres,Abstract Material,General,pièce,92.33,92.33,92.33,92.33,1,EUR,92.33,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER KAME-LI-MEME-KAME_KAKARIRI,Allumette thermite,Material,General,pièce,1.66,1.66,1.66,1.66,1,EUR,1.66,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KAME-LI-KADX-KAPU_KAKASASA,Douille thermite,Material,General,pièce,49.77,49.77,49.77,49.77,1,EUR,49.77,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES MELI-PU-KASA-KASA_KAKAKAME,"Poudre de graphite, marque GII",Material,General,kg,3.99,3.99,3.99,3.99,1,EUR,0.8,0.2,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Installation des broches conductrices et des anodes MEKA-ME-KAME-KARI_KAKAKAME,Alliage d'aluminium en lingots,Material,General,t,8105.01,8105.01,8105.01,8105.01,1,EUR,24.32,0.0,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Installation des broches conductrices et des anodes KADX-TO-KAME-KAME_KAKAKAME,"Rivets en aluminium étirés, dimensions 4,8 x 16 mm",Material,General,kg,30.88,30.88,30.88,30.88,1,EUR,30.88,1.0,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,ÉLECTROLYSES POUR L'INDUSTRIE DE L'ALUMINIUM,Formage de l'anode avec alimentation électrique par le haut RITO-VO-KAPU-KANE_KAKALIME,"Dérivation à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 80 mm, diamètre extérieur 89 mm, épaisseur de paroi 6 mm",Material,General,pièce,14.16,14.16,14.16,14.16,1,EUR,70.78,5.0,1,1,TRAVAUX DE CONSTRUCTION,Conduites principales et industrielles,INSTALLATION DE RACCORDS DE ROBINETTERIE,NŒUDS DES ROBINETS LINÉAUX DES GAZODUCTS RIME-RI-KAME-KARI_KAMEPUVO,Fil non isolé pour lignes aériennes de transport d'électricité M 70,Material,General,t,31816.58,31816.58,31816.58,31816.58,1,EUR,117.72,0.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES RIKA-RI-MEKA-KAPU_KAKAKAVO,Embouts de câbles en cuivre étamé 70-10-13,Material,General,100 pièces,159.94,159.94,159.94,159.94,1,EUR,3.2,0.02,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,PROTECTION ÉLECTROCHIMIQUE DES GAZODUCTS DES VILLES ET DES VILLAGES KAME-LI-MESA-KATO_KAKAMEME,"Boulons en acier à tête hexagonale, fournis avec écrou hexagonal et rondelle plate ronde, diamètre du filetage M8, longueur du boulon 16-100 mm",Material,General,kg,4.23,4.23,4.23,4.23,1,EUR,0.55,0.13,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CLÔTURE DES BÂTIMENTS ET DES ÉQUIPEMENTS,"BLOCS DE FENÊTRES, VITRAUX, VITRINES, PORTES, PORTES COULISSANTES" DXME-KARI-KASA_KAPUKA,"Installations de battage de pieux sur chenilles avec marteau hydraulique, poids de la partie frappante jusqu'à 7 t, longueur des pieux enfoncés jusqu'à 20 m",Equipment,General,Heures machine,252.88,252.88,252.88,252.88,1,EUR,247.82,0.98,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE FORAGE RÉALISÉS À PARTIR DU SOL DXME-MEDX-MERI_KAMERI,"Installations hydromoniteur-pompes diesel fixes, débit 700 m3/h, pression 80 m",Equipment,General,Heures machine,74.72,74.72,74.72,74.72,1,EUR,473.75,6.34,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,"Descente des puits avec excavation du sol par hydromécanisation, à l'aide d'une " DXME-MEDX-MERI_KAMEME,"Installations de pompage à moteur diesel fixes, débit 400 m3/h, pression 40 m",Equipment,General,Heures machine,26.48,26.48,26.48,26.48,1,EUR,176.36,6.66,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",PUITS DE DRAINAGE,"Descente des puits avec excavation du sol par hydromécanisation, à l'aide d'une " MERI-RI-KATO-KASA_KAKAKARI,Polyol pour système de composants liquides du mélange de coulée PPU,Material,General,kg,6.01,6.01,6.01,6.01,1,EUR,202.27,33.67,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS MERI-RI-KAPU-MEKA,Matériaux isolants thermiques,Abstract Material,General,m3,113.85,113.85,113.85,113.85,1,EUR,163.95,1.44,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS KAME-LI-MEPU-KALI_MEKAKAPU,"Plastiqué PVC hydroisolant, en feuilles ou en rouleaux, épaisseur 1-5 mm",Material,General,t,8042.48,8042.48,8042.48,8042.48,1,EUR,1946.28,0.24,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION KAME-LI-MERI-KASA_KAMELIME,Géotextile aiguilleté en fibre de verre pour isolation thermique,Material,General,m2,2.18,2.18,2.18,2.18,1,EUR,449.6,206.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION MERI-RI-KATO-MEKA,Matériaux en rouleaux,Abstract Material,General,m2,1.65,1.65,1.65,1.65,1,EUR,190.9,116.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION DXME-MEKA-MEME_MEMEDX,"Dispositifs de fermeture pour l'interruption d'une conduite de gaz, diamètre des tuyaux 800 mm, pression jusqu'à 2,0 MPa",Equipment,General,Heures machine,232.04,232.04,232.04,232.04,1,EUR,10172.81,43.84,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-SA-KAME-KAME_KAKAKANE,"Tubes en acier soudés pour gazoducs et oléoducs principaux, classe de résistance K42, diamètre extérieur 168 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,26.86,26.86,26.86,26.86,1,EUR,4.57,0.17,1,1,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,RENFORCEMENT DES STRUCTURES,Renforcement des structures dans les tunnels de passage KAME-TO-KASA-RITO_KAKAVOME,"Azotate de sodium en solution, marque A, B, qualité supérieure",Material,General,t,4672.7,4672.7,4672.7,4672.7,1,EUR,46.73,0.01,1,1,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,RENFORCEMENT DES STRUCTURES,Renforcement des poutres en béton armé existantes à l'aide de cerclages en béton KAVO-RI-KARI-KADX_KAKAKARI,"Câble à double torsion LK-RO, structure 6x36(1+7+7/7+14)+1 o.s., marque B, en fil galvanisé selon le groupe Zh, groupe de marquage 1570-1770 N/mm2, diamètre 11,5 mm",Material,Steel & Metal,10 m,34.18,34.18,34.18,34.18,1,EUR,358.91,10.5,1,1,TRAVAUX DE CONSTRUCTION,Fours et tuyaux industriels,CONSTRUCTION DE CONDUITES INDUSTRIELLES,Installation de pièces métalliques de tuyaux industriels KAME-LI-MESA-KAVO_MEKAKARI,"Rivets à sertir en acier inoxydable pour façades ventilées suspendues, dimensions 4 x 8 mm",Material,General,100 pièces,8.52,8.52,8.52,8.52,1,EUR,258.29,30.3,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,TRAVAUX DIVERS,AUTRES PRODUITS EN ACIER MEVO-SA-KAVO-MEDX_KAKAMERI,"Bille d'arrêt en caoutchouc, diamètre 800 mm",Material,General,pièce,640.83,640.83,640.83,640.83,1,EUR,32.04,0.05,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEMEVO,"Dispositifs d'arrêt pour la fermeture de conduites de gaz, diamètre des tuyaux 700 mm, pression jusqu'à 2,0 MPa",Equipment,General,Heures machine,219.78,219.78,219.78,219.78,1,EUR,8742.75,39.78,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEMELI,"Dispositifs d'arrêt pour la fermeture d'une conduite de gaz, diamètre des tuyaux 600 mm, pression jusqu'à 2,0 MPa",Equipment,General,Heures machine,204.66,204.66,204.66,204.66,1,EUR,7140.74,34.89,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEMENE,"Dispositifs d'arrêt pour la fermeture d'une conduite de gaz, diamètre des tuyaux 500 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,178.44,178.44,178.44,178.44,1,EUR,5379.85,30.15,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEMESA,"Dispositifs d'arrêt pour la fermeture de conduites de gaz, diamètre des tuyaux 400 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,137.1,137.1,137.1,137.1,1,EUR,3719.61,27.13,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEMEPU,"Dispositifs d'arrêt pour la fermeture de conduites de gaz, diamètre des tuyaux 350 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,130.53,130.53,130.53,130.53,1,EUR,3170.66,24.29,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEMETO,"Dispositifs d'arrêt pour la fermeture d'une conduite de gaz, diamètre des tuyaux 300 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,123.19,123.19,123.19,123.19,1,EUR,2711.37,22.01,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEMERI,"Dispositifs d'arrêt pour la fermeture d'une conduite de gaz, diamètre des tuyaux 250 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,118.94,118.94,118.94,118.94,1,EUR,2410.89,20.27,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEMEME,"Dispositifs d'arrêt pour la fermeture de conduites de gaz, diamètre des tuyaux 200 mm, pression jusqu'à 1,6 MPa",Equipment,General,Heures machine,115.84,115.84,115.84,115.84,1,EUR,2180.05,18.82,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEMEKA,"Machines pour la connexion et la fermeture d'une conduite de gaz en acier en service, diamètre des tuyaux 150, pression jusqu'à 1,2 MPa",Equipment,General,Heures machine,50.0,50.0,50.0,50.0,1,EUR,436.04,8.72,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-MEKA_KAKAPUDX,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 142 mm",Material,General,pièce,1125.66,1125.66,1125.66,1125.66,1,EUR,619.11,0.55,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-MEKA_KAKAPUNE,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 76 mm",Material,General,pièce,367.39,367.39,367.39,367.39,1,EUR,202.07,0.55,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-MEKA_KAKAPUSA,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 64 mm",Material,General,pièce,360.85,360.85,360.85,360.85,1,EUR,198.47,0.55,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KALI-RI-KATO-KAPU_KAKAKAME,"Structures métalliques de charpentes, de bâtiments porteurs principaux à usage industriel et non industriel",Material,Steel & Metal,t,3824.9,3824.9,3824.9,3824.9,1,EUR,229.49,0.06,1,1,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,BARRIÈRES DE SÉCURITÉ TEMPORAIRES ET DISPOSITIFS UTILISÉS LORS DE LA RÉALISATION,Installation d'une barrière de protection horizontale en tôle profilée sous les KAME-PU-KAME-KATO_KAKAKAPU,"Pique en acier hautement allié traité thermiquement à forte teneur en chrome, longueur du burin 1350 mm, longueur de la pique 640 mm, diamètre de la pique 155 mm",Material,General,pièce,10152.52,10152.52,10152.52,10152.52,1,EUR,1100.53,0.11,1,1,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,DÉMONTAGE DE STRUCTURES,Démontage de structures en béton armé à l'aide d'excavatrices-démolisseuses équi DXME-METO-KATO_METOME,"Installations industrielles à vapeur mobiles, capacité de production de vapeur 2000 kg/h",Equipment,General,Heures machine,58.82,58.82,58.82,58.82,1,EUR,13.53,0.23,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",TRAVAUX DE PILOTAGE,TRAVAUX DE PILOTAGE EFFECTUÉS DANS DES SOLS GELÉS ET PERMANENTEMENT GELÉS DXME-MEKA-MEME_MEKARI,"Machines pour la raccordement à une conduite de gaz en polyéthylène en service, diamètre des tuyaux 110 mm, pression jusqu'à 0,8 MPa",Equipment,General,Heures machine,23.44,23.44,23.44,23.44,1,EUR,90.01,3.84,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-RIME-RIRI_TONEME,"Séparateurs de boues de béton, débit jusqu'à 600 l/h",Equipment,General,Heures machine,5.51,5.51,5.51,5.51,1,EUR,17.26,3.13,1,1,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,TRAVAUX DE RECONSTRUCTION D'OUVRAGES HYDRAULIQUES,Découpe au diamant à câble de structures en béton armé DXME-MEDX-MERI_KARITO,"Pompes haute pression pour cimentation par jet, débit 320 l/min, puissance 316 kW",Equipment,General,Heures machine,102.06,102.06,102.06,102.06,1,EUR,50.01,0.49,1,1,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,TRAVAUX DE RECONSTRUCTION D'OUVRAGES HYDRAULIQUES,Renforcement des fondations des ouvrages hydrauliques par injection avec immersi KAME-LI-KAVO-KASA_KAKARIME,Lignosulfonate technique liquide,Material,General,t,1249.2,1249.2,1249.2,1249.2,1,EUR,2.5,0.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de reconstruction de bâtiments et de structures,TRAVAUX DE RECONSTRUCTION D'OUVRAGES HYDRAULIQUES,Renforcement des fondations des ouvrages hydrauliques par injection avec immersi MERI-RI-KATO-MERI,Feuille d'aluminium doublée,Abstract Material,General,10 m2,23.56,23.56,23.56,23.56,1,EUR,270.97,11.5,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION KASA-RI-KARI-MEPU,Produits thermo-isolants,Abstract Material,General,m3,115.85,115.85,115.85,115.85,1,EUR,111.22,0.96,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,"ISOLATION DES SURFACES FROIDES DES CONSTRUCTIONS, DES CHAMBRES FRIGORIFIQUES À L" MERI-RI-KATO-KASA_KAKAKAPU,Isocyanate du système de composants liquides du mélange de coulée PPU,Material,General,kg,7.15,7.15,7.15,7.15,1,EUR,231.0,32.33,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,ISOLATION DES SURFACES CHAUDS DXME-MEDX-KANE_KAMEKA,"Électricité : consommation 14,85 kWh/machine-heure",Electricity,Electricity,Heures machine,1.91,1.91,1.91,1.91,1,EUR,1.43,0.75,1,1,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,",IMMERSION DE STRUCTURES MÉTALLIQUES ET EN BÉTON ARMÉ SOUS L'EAU EN MILIEU FLUVIA DXME-MEDX-KANE_KAMEKA,"Pompes submersibles pour boues, débit 600 m3/h, pression jusqu'à 10 m",Equipment,General,Heures machine,5.9,5.9,5.9,5.9,1,EUR,4.43,0.75,1,1,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,",IMMERSION DE STRUCTURES MÉTALLIQUES ET EN BÉTON ARMÉ SOUS L'EAU EN MILIEU FLUVIA RITO-SA-KAME-KAVO_KAKANEDX,"Tubes en acier électrosoudés à soudure droite et à soudure spirale, classe de résistance K38, diamètre extérieur 1020 mm, épaisseur de paroi 14 mm",Material,Pipes & Fittings,m,878.3,878.3,878.3,878.3,1,EUR,878.3,1.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de construction sous-marine (plongée),"TRAVAUX DE CONSTRUCTION SOUS-MARINE (PLONGÉE) EN MILIEU FLUVIAL (RIVIÈRES, LACS,","POSE DE CONDUITES EN MILIEU FLUVIAL (RIVIÈRES, LACS, RÉSERVOIRS)" MEME-RI-MEME-KAPU_KAKATONE,"Contreplaqué avec couches extérieures en placage de bouleau, marque FK, classe II/III, poncé, épaisseur 6-8 mm",Material,General,m3,1107.87,1107.87,1107.87,1107.87,1,EUR,75.22,0.07,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES MEPU-RI-KARI-KADX_KAKAKATO,Coussins coupe-feu d'étanchéité,Material,General,m3,2978.67,2978.67,2978.67,2978.67,1,EUR,2978.67,1.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES MEPU-SA-KADX-KALI_KAKARIME,Solvant n° 645,Material,General,t,6936.56,6936.56,6936.56,6936.56,1,EUR,238.83,0.03,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES STRUCTURES EN BOIS MEPU-SA-KADX-KAVO_KAKAKAVO,"Décapant universel à base d'émulsion aqueuse, pâteux, opaque, ne contenant pas de chlorure de méthylène ni de composés aromatiques, biodégradable, pour l'élimination des revêtements de peinture et de vernis",Material,General,kg,23.67,23.67,23.67,23.67,1,EUR,710.04,30.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES STRUCTURES MÉTALLIQUES MEPU-TO-KAME-KARI_KATOKAKA,"Apprêt acrylique à dispersion aqueuse pour la protection des surfaces en béton et en brique, pour les travaux intérieurs et extérieurs, teneur en matières non volatiles 5-12 %, densité 1,0 g/cm3, consommation 0,1-0,2 kg/m2",Material,General,l,6.12,6.12,6.12,6.12,1,EUR,110.29,18.03,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,"ISOLATION DES SURFACES FROIDES DES CONSTRUCTIONS, DES CHAMBRES FRIGORIFIQUES À L" MERI-RI-KASA-KARI,Panneaux isolants en laine minérale,Abstract Material,General,m3,276.87,276.87,276.87,276.87,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,"ISOLATION DES SURFACES FROIDES DES CONSTRUCTIONS, DES CHAMBRES FRIGORIFIQUES À L" MEPU-RI-KARI-MERI_KADXKAME,Film ignifuge,Material,General,m2,6.69,6.69,6.69,6.69,1,EUR,6.69,1.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES AUTRES STRUCTURES RITO-VO-KAPU-KAME_KAKATODX,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 400 mm, diamètre extérieur 426 mm, épaisseur de paroi 10,0 mm",Material,General,pièce,64.6,64.6,64.6,64.6,1,EUR,1292.01,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-VO-KAPU-KAME_KAKATOTO,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 300 mm, diamètre extérieur 325 mm, épaisseur de paroi 10,0 mm",Material,General,pièce,49.59,49.59,49.59,49.59,1,EUR,991.79,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-VO-KAPU-KAME_KAKATOME,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 250 mm, diamètre extérieur 273 mm, épaisseur de paroi 8,0 mm",Material,General,pièce,25.01,25.01,25.01,25.01,1,EUR,500.12,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-VO-KAPU-KAME_KAKARIDX,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 200 mm, diamètre extérieur 219 mm, épaisseur de paroi 8,0 mm",Material,General,pièce,19.29,19.29,19.29,19.29,1,EUR,385.72,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-VO-KAPU-KAME_KAKARILI,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 150 mm, diamètre extérieur 159 mm, épaisseur de paroi 4,5 mm",Material,General,pièce,5.62,5.62,5.62,5.62,1,EUR,112.45,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-VO-KAPU-KAME_KAKARISA,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 125 mm, diamètre extérieur 133 mm, épaisseur de paroi 4,0 mm",Material,General,pièce,3.82,3.82,3.82,3.82,1,EUR,76.39,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE MENE-RI-KAME-KAME_KAKATOME,Terreau de jardin,Material,General,m3,25.86,25.86,25.86,25.86,1,EUR,129.28,5.0,1,1,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,"AMÉNAGEMENT DE PELOUSES, DE PARTS DE FLEURS, DE JARDINS ALPINARIES ET DE ROCAIRE" DXME-MEKA-MEME_MEKANE,"Machines pour raccordement à une conduite de gaz en polyéthylène en service, diamètre des tuyaux 315 mm, pression jusqu'à 0,8 MPa",Equipment,General,Heures machine,105.27,105.27,105.27,105.27,1,EUR,707.43,6.72,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-MEKA_KAKANENE,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 235 mm",Material,General,pièce,7117.83,7117.83,7117.83,7117.83,1,EUR,1565.92,0.22,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEKASA,"Machines pour raccordement à une conduite de gaz en polyéthylène en service, diamètre des tuyaux 250 mm, pression jusqu'à 0,8 MPa",Equipment,General,Heures machine,92.99,92.99,92.99,92.99,1,EUR,593.27,6.38,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-MEKA_KAKANEPU,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 185 mm",Material,General,pièce,4055.7,4055.7,4055.7,4055.7,1,EUR,892.25,0.22,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-MEKA-MEME_MEKAPU,"Machines pour la dérivation dans une conduite de gaz en polyéthylène en service, diamètre des tuyaux 225 mm, pression jusqu'à 0,8 MPa",Equipment,General,Heures machine,61.96,61.96,61.96,61.96,1,EUR,362.46,5.85,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-MEKA_KAKANETO,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 175 mm",Material,General,pièce,3011.15,3011.15,3011.15,3011.15,1,EUR,662.45,0.22,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-MEKA_KAKANERI,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 140 mm",Material,General,pièce,1990.62,1990.62,1990.62,1990.62,1,EUR,437.94,0.22,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MELI-MEKA_KAKANEME,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 124 mm",Material,General,pièce,1501.71,1501.71,1501.71,1501.71,1,EUR,330.38,0.22,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RIPU-TO-KATO-METO_KATORIPU,"Tuyaux polyéthylène sous pression, à l'exception des gazoducs PE100, pour le transport de l'eau, rapport dimensionnel standard SDR26, diamètre extérieur nominal 400 mm, épaisseur de paroi 15,3 mm",Material,General,m,85.27,85.27,85.27,85.27,1,EUR,51.16,0.6,1,1,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,VÉGÉTALISATION EN CONTENEURS KAME-LI-MELI-MEKA_KAKANEKA,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 86 mm",Material,General,pièce,1093.5,1093.5,1093.5,1093.5,1,EUR,240.57,0.22,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-RIME-RIRI_RINEME,Compresseurs hydrauliques pour tuyaux de diamètre 110-225 mm,Equipment,General,Heures machine,0.57,0.57,0.57,0.57,1,EUR,0.24,0.42,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE DXME-RIME-RIRI_RINERI,Raccords mécaniques pour tuyaux de diamètre 32-63 mm,Equipment,General,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.01,0.23,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-VO-KAPU-KAME_KAKAPURI,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 500 mm, diamètre extérieur 530 mm, épaisseur de paroi 10,0 mm",Material,General,pièce,102.87,102.87,102.87,102.87,1,EUR,2057.33,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KAME-LI-MESA-KALI_MEKAMEVO,"Chevilles polypropylène à tête plate pour isolation thermique avec clou en acier galvanisé, diamètre 10 mm, longueur 140 mm",Material,General,1000 pièces,89.48,89.48,89.48,89.48,1,EUR,271.13,3.03,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION MERI-RI-KATO-MEPU_KAKAKAME,"Joint d'étanchéité élastique en bitume pour joints de dilatation, diamètre 30 mm",Material,General,m,9.18,9.18,9.18,9.18,1,EUR,954.65,104.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION MERI-ME-KARI-MESA_KAKADXME,"Matériau d'étanchéité en rouleau, bitume modifié SBS, avec couche protectrice en polypropylène des deux côtés de la bande",Material,General,m2,78.02,78.02,78.02,78.02,1,EUR,2677.48,34.32,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,TRAVAUX D'ISOLATION THERMIQUE,STRUCTURES ET FINITIONS D'ISOLATION MEME-RI-KAVO-KARI_KAKAMENE,"Panneaux de fibres de bois fabriqués selon un procédé à sec, durs, T-S, T-P, groupe A, unicolores (avec revêtement laqué, avec motif décoratif imprimé), épaisseur 3,2 mm",Material,General,1000 m2,3935.67,3935.67,3935.67,3935.67,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,"CLOISONS, PLAFONDS, SOLS, PLINTHES" KAME-LI-MESA-MEME_MEKAMEVO,"Rondelles élastiques en acier inoxydable (grover), diamètre du trou M8",Material,General,100 pièces,2.88,2.88,2.88,2.88,1,EUR,5.84,2.03,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,ÉLÉMENTS DE CONSTRUCTION DES COUVERTURES DE BÂTIMENTS MEPU-SA-KAME-KALI_MEKAKARI,"Mastic monocomposant à base de silicone, résistant au feu, pour l'étanchéification des passages de câbles et de tuyaux, des manchons de câbles, résistance thermique jusqu'à 200 °C",Material,General,kg,53.55,53.55,53.55,53.55,1,EUR,5019.86,93.75,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES MEPU-SA-KAME-KAME_KAKARIME,"Mastic acrylique ignifuge pour le colmatage des joints de raccordement des murs, des planchers, des ouvertures lors de la pose de tuyaux incombustibles soumis à des déformations pouvant atteindre 10 % pendant leur utilisation, volume 310 ml",Material,General,pièce,40.9,40.9,40.9,40.9,1,EUR,778.66,19.04,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES CÂBLES ET DES PASSAGES DE CÂBLES KAME-LI-MESA-KAPU_KAKARILI,"Vis en acier à tête demi-ronde et fente en croix, diamètre du filetage M5, longueur 40 mm",Material,General,t,4389.72,4389.72,4389.72,4389.72,1,EUR,3116.7,0.71,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,ÉLÉMENTS DE CONSTRUCTION DES BÂTIMENTS ET DES ÉQUIPEMENTS,ÉLÉMENTS DE CONSTRUCTION DES COUVERTURES DE BÂTIMENTS RIKA-RI-KADX-KARI,Systèmes d'étanchéité modulaires,Abstract Material,General,compl,69.51,69.51,69.51,69.51,1,EUR,6950.74,100.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES AUTRES STRUCTURES RIKA-RI-KAVO-KATO,Cadres en acier galvanisé pour la réalisation de passages étanches dans les murs et les planchers,Abstract Material,General,pièce,205.42,205.42,205.42,205.42,1,EUR,20542.4,100.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES AUTRES STRUCTURES MERI-RI-KAPU-KAPU_KAKAKAME,"Matelas isolants thermo-expansibles en laine minérale, sans revêtement, marque 100",Material,General,m3,125.64,125.64,125.64,125.64,1,EUR,116.47,0.93,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES AUTRES STRUCTURES MERI-RI-KATO-MEPU,Mousse FRP-1,Abstract Material,General,m3,9.18,9.18,9.18,9.18,1,EUR,917.93,100.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,COUCHES DE BASE ET DE NIVELLEMENT DE LA FONDATION ET DU REVÊTEMENT,FONDATIONS ET REVÊTEMENTS EN MATÉRIAUX CONCASSÉS MEPU-RI-KARI-KATO_KAKAMEDX,"Peinture ignifuge à base de charges thermorésistantes, gazogènes et moussantes",Material,General,kg,15.82,15.82,15.82,15.82,1,EUR,1518.37,96.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux d'isolation thermique,PROTECTION CONTRE L'INCENDIE,PROTECTION INCENDIE DES AUTRES STRUCTURES MEME-ME-KATO-MEKA_KAKAKATO,"Bois de chêne à humidité naturelle, longueur 2-4 m, épaisseur 75 mm et plus, classe I",Material,General,m3,1496.64,1496.64,1496.64,1496.64,1,EUR,1840.87,1.23,1,1,TRAVAUX DE CONSTRUCTION,Voies de halage des cales et des cales de halage,VOIES DE DÉPART DES STELLES,Dispositif de glissières de lancement pour cales DXME-KATO-MEME_KAKAVO,"Électricité : consommation 0,99 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.13,0.13,0.13,0.13,1,EUR,3.26,25.65,1,1,TRAVAUX DE CONSTRUCTION,Voies de halage des cales et des cales de halage,ROULAGE DES VOIES,Rodage de la voie DXME-KATO-MEME_KAKAVO,"Chariots de cale non automoteurs, capacité de charge 75 t",Equipment,General,Heures machine,7.69,7.69,7.69,7.69,1,EUR,197.14,25.65,1,1,TRAVAUX DE CONSTRUCTION,Voies de halage des cales et des cales de halage,ROULAGE DES VOIES,Rodage de la voie DXME-KAVO-KATO_KAKARI,"Rouleaux tractés lisses statiques, poids 8 t",Equipment,General,Heures machine,11.33,11.33,11.33,11.33,1,EUR,8.61,0.76,1,1,TRAVAUX DE CONSTRUCTION,Voies de halage des cales et des cales de halage,VOIES FERRÉES POUR LE TRANSPORT DE NAVIRES,Ballastage de la voie de la partie sous-marine KAVO-RI-KARI-KASA_KAKATONE,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 8,3 mm",Material,Steel & Metal,10 m,15.01,15.01,15.01,15.01,1,EUR,6.87,0.46,1,1,TRAVAUX DE CONSTRUCTION,Voies de halage des cales et des cales de halage,VOIES FERRÉES POUR LE TRANSPORT DE NAVIRES,Ballastage de la voie de la partie sous-marine KAVO-RI-KARI-MEME_KAKATOLI,"Câble à double torsion TK, construction 6x37(1+6+12+18)+1 o.s., marque B, en fil galvanisé du groupe Zh, groupe de marquage 1570-1770 N/mm2, diamètre 13,5 mm",Material,General,10 m,43.55,43.55,43.55,43.55,1,EUR,39.93,0.92,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"GALERIES, PASSERELLES" KAME-TO-KASA-MENE_KAKAMEME,Chlorure de calcium liquide,Material,General,t,325.25,325.25,325.25,325.25,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉE PAR DES LIANTS,FONDATIONS ET REVÊTEMENTS EN TERRE RENFORCÉS PAR DES LIANTS INORGANIQUES KASA-ME-KAME-MEKA_KAKATORI,"Goulottes télescopiques en béton armé, volume jusqu'à 1 m3, béton B22,5, consommation d'armature de 150 à 200 kg/m3",Material,General,m3,981.28,981.28,981.28,981.28,1,EUR,981.28,1.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Installation de structures de déversement à partir de la chaussée à l'aide de go RIPU-TO-KATO-KATO_KAKATODX,"Tuyaux d'évacuation des eaux pluviales en polyéthylène à double paroi profilée, SN8, diamètre 400 mm",Material,General,m,44.03,44.03,44.03,44.03,1,EUR,440.26,10.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Pose et remblayage de tuyaux en polymère ondulés pour les égouts pluviaux MENE-RI-KARI-KAVO,Graines de conifères,Abstract Material,General,kg,326.23,326.23,326.23,326.23,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,AUTRES TRAVAUX MENE-RI-KATO-KARI_KAKATOME,"Paille en rouleaux, avoine",Material,General,m3,38.17,38.17,38.17,38.17,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,FIXATION ET BOISEMENT DES SABLE DXME-MERI-KARI_KAKATO,"Débroussailleuses-ramasseuses avec tracteur, puissance 96 kW (130 ch)",Equipment,General,Heures machine,48.4,48.4,48.4,48.4,1,EUR,888.7,18.36,1,1,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",PLANTATIONS FORESTIÈRES DE PROTECTION,"TRAITEMENT PARTIEL DU SOL PAR BANDES, COUPE ET COMPACTAGE DES COUCHES, COUPE DE " RIPU-TO-KATO-METO_KASAKALI,"Tuyaux en polyéthylène sous pression, à l'exception des tuyaux de gaz PE100, pour le transport de l'eau, rapport dimensionnel standard SDR13,6, diamètre extérieur nominal 1000 mm, épaisseur de paroi 73,5 mm",Material,General,m,1000.75,1000.75,1000.75,1000.75,1,EUR,900.68,0.9,1,1,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,VÉGÉTALISATION EN CONTENEURS RIPU-TO-KATO-METO_KAKASADX,"Tuyaux en polyéthylène sous pression, à l'exception des tuyaux de gaz PE100, pour le transport de l'eau, rapport dimensionnel standard SDR17, diamètre extérieur nominal 500 mm, épaisseur de paroi 29,7 mm",Material,General,m,240.84,240.84,240.84,240.84,1,EUR,144.51,0.6,1,1,TRAVAUX DE CONSTRUCTION,"Végétalisation, plantations forestières protectrices",VÉGÉTALISATION,VÉGÉTALISATION EN CONTENEURS MESA-RI-KARI-KASA_KAKAMERI,"Colonne en béton peinte, TK-18, diamètre 390 mm, hauteur 520 mm",Material,General,pièce,123.1,123.1,123.1,123.1,1,EUR,123.1,1.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MESA-RI-KARI-KAME_KAKAKAME,"Demi-sphère en béton B-9, diamètre 500 mm, hauteur 240 mm, peinte",Material,General,pièce,58.18,58.18,58.18,58.18,1,EUR,58.18,1.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-METO-KAME_KATODX,"Électricité : consommation 34,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.43,4.43,4.43,4.43,1,EUR,0.8,0.18,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-METO-KAME_KATODX,"Machines de séchage, puissance 26 kW (35 ch)",Equipment,General,Heures machine,94.01,94.01,94.01,94.01,1,EUR,16.92,0.18,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-KALI_KAMENE,"Distributeurs de gravillons, capacité 65 m/min",Equipment,General,Heures machine,110.32,110.32,110.32,110.32,1,EUR,98.19,0.89,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-KAVO-MEME_KANEME,"Recycleurs-stabilisateurs de sol, largeur de fraisage 3048 mm, puissance 500 kW (680 ch)",Equipment,General,Heures machine,369.19,369.19,369.19,369.19,1,EUR,1587.51,4.3,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MELI-MEKA_KAKATOTO,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 140 mm",Material,General,pièce,1125.66,1125.66,1125.66,1125.66,1,EUR,619.11,0.55,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS RITO-VO-KAPU-KAME_KAKARITO,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 100 mm, diamètre extérieur 108 mm, épaisseur de paroi 4,0 mm",Material,General,pièce,2.29,2.29,2.29,2.29,1,EUR,45.76,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-VO-KAPU-KAME_KAKARIME,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 80 mm, diamètre extérieur 89 mm, épaisseur de paroi 3,5 mm",Material,General,pièce,1.41,1.41,1.41,1.41,1,EUR,28.27,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE RITO-VO-KAPU-KAME_KAKAMELI,"Bouchon elliptique, acier de marque 20, pression nominale 10 MPa, diamètre nominal 50 mm, diamètre extérieur 57 mm, épaisseur de paroi 3,0 mm",Material,General,pièce,0.63,0.63,0.63,0.63,1,EUR,12.63,20.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,DÉCONNEXION ET OBSTRUCTION SOUS PRESSION DES GAZODUCTS EN SERVICE KASA-ME-KAME-MEKA_KAMEKAPU,"Bac en béton armé, volume jusqu'à 1 m3, béton B22,5, consommation d'armature jusqu'à 50 kg/m3",Material,General,m3,430.53,430.53,430.53,430.53,1,EUR,430.53,1.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,DISPOSITIFS DE DRAINAGE ET D'ÉVACUATION DES EAUX,Remplacement de maillons individuels d'un bac de bordure KAVO-RI-KARI-KALI_KAKAKATO,"Câble à double torsion LK-R, structure 6x19(1+6+6/6)+1 o.s., marque 1, en fil galvanisé clair, groupe de marquage 1570-1770 N/mm2, diamètre 14 mm",Material,Steel & Metal,10 m,27.89,27.89,27.89,27.89,1,EUR,96.77,3.47,1,1,TRAVAUX DE CONSTRUCTION,Travaux de consolidation des berges,FIXATION DES PENTES DES OUVRAGES HYDRAULIQUES FLUVIALES ET DES CANAUX,FIXATION SOUS-MARINE DES PENTES MEPU-PU-KATO-KAPU,Vernis à base de houille,Abstract Material,General,t,3309.01,3309.01,3309.01,3309.01,1,EUR,1125.06,0.34,1,1,TRAVAUX DE CONSTRUCTION,Travaux de consolidation des berges,FIXATION DES PENTES DES OUVRAGES HYDRAULIQUES FLUVIALES ET DES CANAUX,FIXATION AVEC DU BÉTON MONOLITHIQUE ET DU BÉTON ARMÉ KAME-LI-MEME-KALI_KAKAKAME,"Électrodes de soudage pour le soudage des aciers fortement alliés ANV-20, diamètre 3-4 mm",Material,General,t,36477.21,36477.21,36477.21,36477.21,1,EUR,109.43,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" MEPU-SA-KAME-KALI_KAMEMELI,"Mastic monocomposant à base de silicone, neutre, sanitaire, adhérant aux surfaces non poreuses",Material,General,l,21.66,21.66,21.66,21.66,1,EUR,0.93,0.04,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" KAVO-RI-KARI-KATO_KAKARIRI,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 8,8 mm",Material,Steel & Metal,10 m,16.32,16.32,16.32,16.32,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS,"RÉSERVOIRS, RÉSERVOIRS À GAZ" MERI-ME-KAME-KASA_KAKAMELI,"Support de gouttière métallique pour systèmes de drainage, peint, diamètre 150 mm, longueur 310 mm",Material,General,pièce,9.8,9.8,9.8,9.8,1,EUR,1597.36,163.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières en PVC KAVO-RI-KARI-KATO_KAKATOME,"Câble à double torsion LK-O, structure 6x19(1+9+9)+1 o.s., marque B, en fil sans revêtement, groupe de marquage 1570-1770 N/mm2, diamètre 19,5 mm",Material,Steel & Metal,10 m,54.08,54.08,54.08,54.08,1,EUR,1660.33,30.7,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE LEVAGE ET DE TRANSPORT À ACTION INTERMITTENTE,GRUES DE TRANSFERT RITO-SA-KAME-KAVO_KAKAPUME,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 720 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,344.9,344.9,344.9,344.9,1,EUR,3828.43,11.1,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS RITO-SA-KARI-KARI_KAKAVONE,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 219 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,36.89,36.89,36.89,36.89,1,EUR,206.57,5.6,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS RIME-ME-KANE-KALI_KAKARIVO,Câble électrique avec conducteurs en aluminium NAYY 2x4ok(N)-660,Material,General,1000 m,863.71,863.71,863.71,863.71,1,EUR,4.75,0.01,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES KAME-LI-MELI-MEKA_KAKATORI,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque 09G2S, diamètre 121 mm",Material,General,pièce,824.43,824.43,824.43,824.43,1,EUR,453.44,0.55,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKATOME,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 95 mm",Material,General,pièce,354.27,354.27,354.27,354.27,1,EUR,194.85,0.55,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKATOKA,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 70 mm",Material,General,pièce,360.85,360.85,360.85,360.85,1,EUR,198.47,0.55,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKARIDX,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 60 mm",Material,General,pièce,341.15,341.15,341.15,341.15,1,EUR,187.63,0.55,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-MELI-MEKA_KAKARIVO,"Fraise à couronne en acier pour raccordement à une canalisation, acier de marque R6M5F3, diamètre 46 mm",Material,General,pièce,282.12,282.12,282.12,282.12,1,EUR,155.17,0.55,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS MEPU-RI-KARI-KATO_KAKAMESA,"Peinture ignifuge à base d'eau pour augmenter la résistance au feu des structures en acier jusqu'à 90 minutes, densité 1,28 g/cm3, consommation 1,8 kg/m2 pour une épaisseur de revêtement de 1 mm",Material,Steel & Metal,kg,18.32,18.32,18.32,18.32,1,EUR,8499.52,464.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR MEPU-SA-KADX-KAPU_KAMERIME,Durcisseur pour résines époxy,Material,General,kg,22.84,22.84,22.84,22.84,1,EUR,22.84,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS DE CENTRALES NUCLÉAIRES,STRUCTURES MÉTALLIQUES DES BÂTIMENTS ET DES INSTALLATIONS DES CENTRALES NUCLÉAIR RITO-SA-KAME-KAVO_KAKANEPU,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 1020 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,504.89,504.89,504.89,504.89,1,EUR,5604.26,11.1,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS RITO-SA-KAME-KAVO_KAKASANE,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 920 mm, épaisseur de paroi 8 mm",Material,Pipes & Fittings,m,451.23,451.23,451.23,451.23,1,EUR,5008.67,11.1,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,RACCORDEMENT SOUS PRESSION AUX GAZODUCTS EN ACIER EXISTANTS KAME-LI-KANE-KADX,Bandes de raccordement bitume-polymère,Abstract Material,General,m,1.14,1.14,1.14,1.14,1,EUR,113.92,100.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,REVÊTEMENTS ROUTIERS RIGIDES DXME-KAVO-KATO_KAPULI,"Rouleaux compresseurs automoteurs à pneus statiques, poids 12 t",Equipment,General,Heures machine,46.48,46.48,46.48,46.48,1,EUR,120.39,2.59,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MEVO-SA-KAVO-METO,Tube de contrôle,Abstract Material,Pipes & Fittings,compl,0.64,0.64,0.64,0.64,1,EUR,0.64,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES DXME-KAVO-KAPU_KAPUME,"Chauffages pour revêtement en béton bitumineux, préliminaires",Equipment,General,Heures machine,1443.39,1443.39,1443.39,1443.39,1,EUR,4070.36,2.82,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KALI-RI-KAME-KAME_KAKAMETO,Rails de grue KR70,Material,General,t,4220.39,4220.39,4220.39,4220.39,1,EUR,2743.25,0.65,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,STRUCTURES MÉTALLIQUES D'INSTALLATIONS MARITIMES KAVO-PU-KATO-KARI_KAKAKAVO,"Acier d'armature laminé à chaud lisse, classe A-I, diamètre 25-28 mm",Material,General,t,1475.06,1475.06,1475.06,1475.06,1,EUR,11.8,0.01,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,AUTRES CONSTRUCTIONS MÉTALLIQUES MESA-RI-KARI-KASA,Poteaux et traverses,Abstract Material,General,pièce,123.1,123.1,123.1,123.1,1,EUR,123.1,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,AUTRES CONSTRUCTIONS MÉTALLIQUES MESA-RI-KARI-KATO,Grilles de clôture,Abstract Material,General,pièce,22.67,22.67,22.67,22.67,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques des ouvrages hydrauliques,CONSTRUCTIONS MÉTALLIQUES D'OUVRAGES HYDRAULIQUES,AUTRES CONSTRUCTIONS MÉTALLIQUES KAVO-PU-KATO-KATO_KAKARIPU,"Acier d'armature laminé à chaud à profil périodique, classe A-II, diamètre 16-18 mm",Material,General,t,1421.44,1421.44,1421.44,1421.44,1,EUR,412.22,0.29,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,ÉCHAFAUDAGES EXTÉRIEURS ET INTÉRIEURS,Fabrication de pièces en acier pour échafaudages suspendus KAME-LI-MEPU-KALI_KAMEKAPU,Stabilisateur de sol,Material,General,l,16.29,16.29,16.29,16.29,1,EUR,98.73,6.06,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES RITO-VO-KATO-KAPU_KAMENENE,"Manchon droit en acier, diamètre nominal 50 mm",Material,General,pièce,1.75,1.75,1.75,1.75,1,EUR,1.75,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES MEVO-ME-MEKA-METO_KAKAKARI,"Robinet à passage direct à tension 11ch3bk, raccordement à la canalisation par manchon, pression nominale 0,1 MPa, diamètre nominal 50 mm",Material,General,pièce,32.62,32.62,32.62,32.62,1,EUR,32.62,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES RITO-VO-KATO-KAPU_KAMENETO,"Manchon droit en acier, diamètre nominal 25 mm",Material,General,pièce,0.68,0.68,0.68,0.68,1,EUR,0.68,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES MEVO-ME-MEKA-METO_KAKAKASA,"Robinet à passage direct en laiton 11B1bk, raccordement à la canalisation par manchon, pression nominale 0,6 MPa, diamètre nominal 25 mm",Material,General,pièce,8.58,8.58,8.58,8.58,1,EUR,8.58,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,AUTRES DISPOSITIFS SUR LES RÉSEAUX DE GAZODUCTES RITO-TO-KAVO-KAME,Tubes carrés en acier,Abstract Material,Pipes & Fittings,t,1511.32,1511.32,1511.32,1511.32,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures métalliques de construction,CONSTRUCTIONS POUR LA CONSTRUCTION DE CONDUITES PRINCIPALES ET INDUSTRIELLES,Fabrication de structures métalliques KAVO-TO-KARI-KARI_MEKARIPU,"Bande en acier laminé à froid, nuance d'acier 08Yu, 08kp/ps, épaisseur 0,3-2 mm",Material,General,t,1813.18,1813.18,1813.18,1813.18,1,EUR,2.54,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Dispositif d'étanchéité MERI-ME-KAME-KASA_KAKARINE,"Collier métallique pour tuyaux pour systèmes de drainage, peint, diamètre 100 mm",Material,General,pièce,12.12,12.12,12.12,12.12,1,EUR,812.14,67.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières en PVC MERI-ME-KAME-KAPU_KAKAKALI,"Coude de tuyau 67° en PVC pour systèmes de drainage, diamètre 100 mm",Material,General,pièce,6.77,6.77,6.77,6.77,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières en PVC MEVO-PU-KAME-KADX_KAKAKASA,"Entrée en acier en forme de G pour conduite de gaz en polyéthylène à basse, moyenne et haute pression, sans boîtier, avec revêtement protecteur, diamètre 110 mm",Material,General,pièce,247.3,247.3,247.3,247.3,1,EUR,247.3,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEVO-PU-KAME-KADX_KAKAKAPU,"Entrée en acier en forme de G pour conduite de gaz en polyéthylène à basse, moyenne et haute pression, sans boîtier, avec revêtement protecteur, diamètre 90 mm",Material,General,pièce,146.66,146.66,146.66,146.66,1,EUR,146.66,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEVO-PU-KAME-KADX_KAKAKARI,"Entrée en acier en forme de G pour gazoduc en polyéthylène à basse, moyenne et haute pression, sans gaine, avec revêtement protecteur, diamètre 40 mm",Material,General,pièce,56.12,56.12,56.12,56.12,1,EUR,56.12,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEVO-PU-KAME-KADX_KAKAKAME,"Entrée en acier en forme de G pour gazoduc en polyéthylène à basse, moyenne et haute pression, sans boîtier, avec revêtement protecteur, diamètre 32 mm",Material,General,pièce,45.84,45.84,45.84,45.84,1,EUR,45.84,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS RITO-SA-KARI-KARI_KAKADXSA,"Tubes en acier électrosoudés à soudure droite en acier des nuances St2, 10, diamètre extérieur 273 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,74.34,74.34,74.34,74.34,1,EUR,6765.36,91.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES KAME-LI-MEME-KALI_KARIPUTO,"Électrodes de soudage pour le soudage des aciers réfractaires austénitiques de classe TsT-26, diamètre 3 mm",Material,General,kg,18.3,18.3,18.3,18.3,1,EUR,0.73,0.04,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,CHAUDIÈRES À VAPEUR ET À EAU CHAUDE FIXES,ÉLÉMENTS DE CHAUDIÈRES À VAPEUR FIXES RITO-TO-KATO-KARI_KAKANEDX,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de marques 10, 20, 35, diamètre extérieur 102 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,33.27,33.27,33.27,33.27,1,EUR,5.79,0.17,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement de levage et de transport,MÉCANISMES DE TRANSPORT À ACTION CONTINUE,ESCALIERS MÉCANIQUES RITO-VO-KATO-MEME_KARIMEKA,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 600 mm",Material,General,pièce,281.81,281.81,281.81,281.81,1,EUR,845.44,3.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" RITO-VO-KATO-MEME_KARIKADX,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 500 mm",Material,General,pièce,167.85,167.85,167.85,167.85,1,EUR,503.56,3.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" RITO-VO-KAPU-KANE_KAKALIVO,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 125 mm, diamètre extérieur 133 mm, épaisseur de paroi 4 mm",Material,General,pièce,22.16,22.16,22.16,22.16,1,EUR,44.32,2.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" RITO-VO-KAPU-KANE_KAKANENE,"Coude à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 65 mm, diamètre extérieur 76 mm, épaisseur de paroi 3,5 mm",Material,General,pièce,4.67,4.67,4.67,4.67,1,EUR,9.35,2.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,"INSTALLATION DE COLLECTEURS DE CONDENSAT, DE CLAPETS ANTI-RETOUR ET DE COMPENSAT" MEVO-PU-KAME-KADX_KAKARIPU,"Entrée en polyéthylène avec coude libre pour conduite de gaz en polyéthylène à basse pression, avec étui, avec revêtement protecteur, diamètre 63 mm",Material,General,pièce,82.52,82.52,82.52,82.52,1,EUR,82.52,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEVO-PU-KAME-KADX_KAKARITO,"Entrée en polyéthylène avec courbure libre pour conduite de gaz en polyéthylène à basse pression, avec boîtier, avec revêtement protecteur, diamètre 32 mm",Material,General,pièce,45.85,45.85,45.85,45.85,1,EUR,45.85,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEVO-PU-KAME-KADX_KAKARIME,"Entrée en polyéthylène droite pour conduite de gaz en polyéthylène à basse, moyenne et haute pression, avec boîtier, revêtement protecteur, diamètre 160 mm",Material,General,pièce,432.64,432.64,432.64,432.64,1,EUR,432.64,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEVO-PU-KAME-KADX_KAKARIKA,"Entrée en polyéthylène droite pour conduite de gaz en polyéthylène à basse, moyenne et haute pression, avec boîtier, revêtement protecteur, diamètre 110 mm",Material,General,pièce,224.83,224.83,224.83,224.83,1,EUR,224.83,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS KAME-LI-KANE-MEME_MEKAMEKA,"Matériau universel autocollant pour la réalisation de faîtes et de crêtes en plastique en rouleau, renforcé d'un treillis en aluminium, largeur 280 mm",Material,General,m,13.97,13.97,13.97,13.97,1,EUR,1536.66,110.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable DXME-KAVO-MEME_KANETO,"Recycleurs-stabilisateurs de sol portés, largeur de fraisage jusqu'à 2500 mm",Equipment,General,Heures machine,63.79,63.79,63.79,63.79,1,EUR,50.4,0.79,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES DXME-MELI-KAPU_KAVOKA,"Électricité : consommation 0,4 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.37,7.23,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES D'UN VOLUME DE BÉTON INFÉRIEUR À 100,ALIMENTATION ET POSE DU MÉLANGE DE BÉTON DANS LES BLOCS DE CONSTRUCTIONS EN BÉTO DXME-MELI-KAPU_KAVOKA,"Appareils pour le soudage bout à bout de languettes d'étanchéité en matériaux thermoplastiques, puissance 1,2 kW",Equipment,General,Heures machine,0.29,0.29,0.29,0.29,1,EUR,2.12,7.23,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES D'UN VOLUME DE BÉTON INFÉRIEUR À 100,ALIMENTATION ET POSE DU MÉLANGE DE BÉTON DANS LES BLOCS DE CONSTRUCTIONS EN BÉTO KAVO-TO-KAPU-KARI_KAKAKAPU,"Location d'acier laminé à chaud carré, marques d'acier St3sp, St3ps, côté du carré 52-70 mm",Material,General,t,1731.73,1731.73,1731.73,1731.73,1,EUR,2857.35,1.65,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS DE QUAIS ET DE PILoniers MARITIMES,QUAIS ET PILOTIS EN COQUES DE GRAND DIAMÈTRE RIPU-RI-KANE-KAPU_KAKAKASA,"Manchon en chrysotile-ciment pour tuyaux sans pression BNM, diamètre nominal 300 mm",Material,General,pièce,10.58,10.58,10.58,10.58,1,EUR,268.67,25.4,1,1,TRAVAUX DE CONSTRUCTION,Structures en pierre des ouvrages hydrauliques,CONSTRUCTIONS EN PIERRE D'ÉQUIPEMENTS HYDRAULIQUES FLUVIALES,Pose de tuyaux de drainage perforés en chrysotile-ciment KAME-LI-MERI-KADX,Géogrilles extrudées,Abstract Material,General,m2,9.02,9.02,9.02,9.02,1,EUR,965.55,107.03,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MESA-KALI_KAKADXME,"Clous à tête plate en acier galvanisé avec rondelles, diamètre 4,5 mm, longueur 30-50 mm",Material,General,kg,6.43,6.43,6.43,6.43,1,EUR,2.58,0.4,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-RI-KATO-KALI_KAKARINE,Émulsion bitumineuse cationique EBDK M,Material,General,t,592.79,592.79,592.79,592.79,1,EUR,193.75,0.33,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES MEPU-SA-KAME-KANE_KAMEKAME,"Mastic polyuréthane monocomposant à durcissement rapide pour le collage de montage et la fabrication de vitrages isolants, volume 600 ml",Material,General,pièce,9.27,9.27,9.27,9.27,1,EUR,366.92,39.6,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KAME-LI-MELI-KANE_KAKAMEVO,"Disque diamanté segmenté, diamètre 1600 mm, segment 4,4 x 10 x 40 mm",Material,General,pièce,4824.53,4824.53,4824.53,4824.53,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,CONSTRUCTION DE FONDATIONS ET DE REVÊTEMENTS,VÊTEMENTS DE ROUTE NON RIGIDES KARI-RI-KAME-KAME,Galets décoratifs,Abstract Material,General,kg,0.26,0.26,0.26,0.26,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement d'allées et d'aires de jeux dans les jardins KARI-RI-KAME-KAME_MEKAPUKA,"Galets de rivière roulés, fraction 120-200 mm",Material,General,kg,0.31,0.31,0.31,0.31,1,EUR,202.43,661.5,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement d'allées et d'aires de jeux dans les jardins MEVO-PU-KAME-KADX_KAKAMEVO,"Entrée en polyéthylène droite pour conduite de gaz en polyéthylène à basse, moyenne et haute pression, avec boîtier, revêtement protecteur, diamètre 63 mm",Material,General,pièce,93.96,93.96,93.96,93.96,1,EUR,93.96,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEVO-PU-KAME-KADX_KAKAMELI,"Entrée en polyéthylène droite pour gazoduc en polyéthylène à basse, moyenne et haute pression, avec boîtier, avec revêtement protecteur, diamètre 32 mm",Material,General,pièce,59.78,59.78,59.78,59.78,1,EUR,59.78,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEVO-PU-KAME-KADX_KAKAKALI,"Entrée en acier en forme de G pour conduite de gaz en polyéthylène à basse, moyenne et haute pression, sans boîtier, avec revêtement protecteur, diamètre 225 mm",Material,General,pièce,792.62,792.62,792.62,792.62,1,EUR,792.62,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS MEVO-PU-KAME-KADX_KAKAKANE,"Entrée en acier en forme de G pour gazoduc en polyéthylène à basse, moyenne et haute pression, sans boîtier, avec revêtement protecteur, diamètre 160 mm",Material,General,pièce,495.2,495.2,495.2,495.2,1,EUR,495.2,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS DXME-RIME-KAPU_KAKAME,Aligneurs d'extrémités de tuyaux pour tuyaux en polyéthylène d'un diamètre de 32 à 63 mm,Equipment,General,Heures machine,3.27,3.27,3.27,3.27,1,EUR,0.65,0.2,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE RIPU-ME-KAME-KANE_MEPURIRI,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 1420 mm, diamètre extérieur de l'isolation 1600 mm",Material,General,compl,375.86,375.86,375.86,375.86,1,EUR,3758.64,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE KAME-TO-KASA-MENE_KAKAKAME,Babbitt au calcium,Material,General,t,11118.13,11118.13,11118.13,11118.13,1,EUR,1.11,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements thermiques,AGREGATS A VAPEUR ET A GAZ,TURBINES À VAPEUR FIXES ET INSTALLATIONS À TURBINE À GAZ FIXES KAME-LI-KADX-KAPU_KAKALIME,"Répéteur de détonation universel pour la réception et la transmission de détonations entre les sections des systèmes de perforation, masse d'explosif 0,75 g",Material,General,pièce,16.34,16.34,16.34,16.34,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage KAME-LI-KADX-KAPU_KAKANEDX,Cartouche explosive PVP-N,Material,General,pièce,40.84,40.84,40.84,40.84,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage KAME-LI-KADX-KATO_KAKATOME,Cordon détonant DSHTV-150/800,Material,General,m,9.85,9.85,9.85,9.85,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage RIME-RI-KATO-KARI,Fil MGLF,Abstract Material,General,1000 m,340.82,340.82,340.82,340.82,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage KAME-LI-MESA-KAPU,Vis,Abstract Material,General,pièce,83.27,83.27,83.27,83.27,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Forages,AUTRES TRAVAUX ET TRAVAUX SPÉCIAUX,Perforation des colonnes de gel et des colonnes de tubage MEPU-RI-KARI-MERI_MERIKAME,Composition de protection contre la lumière,Material,General,t,9861.59,9861.59,9861.59,9861.59,1,EUR,7.89,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de raccords à partir de 2 couches de mastic bitume-polymère avec des MERI-ME-KATO-MEKA_KAKAKANE,"Pinces de raccordement en forme de G en acier galvanisé pour grille pare-neige, longueur 52 mm, section 20 x 20 mm",Material,General,10 pièces,11.61,11.61,11.61,11.61,1,EUR,11.84,1.02,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une toiture en tuiles de ciment-sable sur une charpente en profil MEME-RI-METO-KAME,Panneaux de revêtement,Abstract Material,General,m2,3.25,3.25,3.25,3.25,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"CONSTRUCTIONS DE COUVERTURES DE TOITURE, CHATRIERS" KAVO-TO-KADX-KASA_KAKAKAME,"Tôle galvanisée avec membrane homogène laminée, dimensions 2000 x 1000 x 1,4 mm",Material,Waterproofing,kg,9.61,9.61,9.61,9.61,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de raccords en membranes PVC aux murs et aux parapets RITO-VO-KATO-MEME_KARIKAPU,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 250 mm",Material,General,pièce,69.31,69.31,69.31,69.31,1,EUR,138.62,2.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RITO-VO-KATO-MEME_KAMEDXDX,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 80 mm",Material,General,pièce,16.36,16.36,16.36,16.36,1,EUR,32.71,2.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ RITO-VO-KATO-MEME_KAMEDXLI,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 0,6 MPa, diamètre nominal 50 mm",Material,General,pièce,12.2,12.2,12.2,12.2,1,EUR,24.4,2.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,INSTALLATION DE ROBINETS ET DE VANNES EN ACIER SUR LES CONDUITES DE GAZ MEVO-PU-KAME-KADX_KAKAMEDX,"Entrée en polyéthylène droite pour conduite de gaz en polyéthylène à basse, moyenne et haute pression, avec boîtier, revêtement protecteur, diamètre 90 mm",Material,General,pièce,161.73,161.73,161.73,161.73,1,EUR,161.73,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ENTRÉES DE CONDUITES DE GAZ DANS LES BÂTIMENTS RIPU-ME-KAME-KANE_MEPUMEKA,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 630 mm, diamètre extérieur de l'isolation 800 mm",Material,General,compl,183.31,183.31,183.31,183.31,1,EUR,1833.06,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_MEPUKAVO,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 530 mm, diamètre extérieur de l'isolation 710 mm",Material,General,compl,152.97,152.97,152.97,152.97,1,EUR,1529.71,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_MEPUKANE,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 426 mm, diamètre extérieur de l'isolation 560 mm",Material,General,compl,104.95,104.95,104.95,104.95,1,EUR,1049.54,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_MEPUKAPU,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 325 mm, diamètre extérieur de l'isolation 450 mm",Material,General,compl,76.43,76.43,76.43,76.43,1,EUR,764.3,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_MEPUKARI,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 273 mm, diamètre extérieur de l'isolation 400 mm",Material,General,compl,67.19,67.19,67.19,67.19,1,EUR,671.89,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE MENE-TO-KARI-KATO_KAKAKARI,Engrais boromagnésique,Material,General,t,1385.58,1385.58,1385.58,1385.58,1,EUR,47.11,0.03,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,BANDES DE RENFORT AUX BORDES DES REVÊTEMENTS ROUTIERS ET RENFORT DES ACCOTEMENTS,Installation de bandes de renfort et renforcement des accotements DXME-RIME-KAME_KALIME,"Électricité : consommation 2,2 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.28,0.28,0.28,0.28,1,EUR,0.73,2.6,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en polyuréthane coulé pour terrains de sport et piste DXME-RIME-KAME_KALIME,"Pulvérisateurs électriques pour la pose de revêtements à base de granulés de caoutchouc, capacité du réservoir 120 l, rendement 15 kg/min",Equipment,General,Heures machine,1.59,1.59,1.59,1.59,1,EUR,4.12,2.6,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en polyuréthane coulé pour terrains de sport et piste KAME-LI-MERI-KASA_MEKATOKA,"Bande de marquage non tissée pour revêtements de sol artificiels, largeur 100 mm, hauteur des poils 10-60 mm",Material,General,m2,24.73,24.73,24.73,24.73,1,EUR,2522.35,102.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,ALLÉES ET TROTTOIRS,Aménagement de revêtements en « gazon artificiel » DXME-MEDX-KALI_KAKATO,"Électricité : consommation 9,9 kWh/machine-heure",Electricity,Electricity,Heures machine,1.27,1.27,1.27,1.27,1,EUR,31.18,24.52,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de gigantesques réservoirs sur des sites de transport fluvial DXME-MEDX-KALI_KAKATO,"Pompes pour réseau de saumure et de refroidissement à eau des stations de congélation, débit 160 m3/h, pression 20 m",Equipment,General,Heures machine,2.34,2.34,2.34,2.34,1,EUR,57.32,24.52,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de gigantesques réservoirs sur des sites de transport fluvial KAVO-RI-KARI-KASA_KAKAPULI,"Câble à double torsion LK-R, structure 6kh19(1+6+6/6)+1 o.s., marque V, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 21 mm",Material,Steel & Metal,10 m,62.38,62.38,62.38,62.38,1,EUR,74.86,1.2,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'INSTALLATIONS DE TRANSPORT FLUVIAL,Installation de gigantesques réservoirs sur des sites de transport fluvial KAVO-ME-KASA-KATO_KAKALIME,"Bride de déchargement en acier pour goulotte à déchets de type « sandwich », diamètre 630 mm, hauteur 150 mm, épaisseur de l'acier 6 mm",Material,Aggregates,pièce,100.92,100.92,100.92,100.92,1,EUR,100.92,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes en acier inoxydable à tr KAVO-ME-KASA-KATO_KAKANEME,"Tuyau en acier galvanisé pour la ventilation du conduit à déchets, diamètre extérieur 300 mm, épaisseur de l'acier 0,8 mm",Material,General,m,17.28,17.28,17.28,17.28,1,EUR,101.98,5.9,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes en acier inoxydable à tr RIME-ME-KANE-KADX_KAMEMEDX,"Câble électrique à conducteurs en cuivre NYYng(A) 5x2,5ok(N, PE)-660",Material,General,1000 m,3400.11,3400.11,3400.11,3400.11,1,EUR,10.2,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un conduit à déchets avec un tube en acier résistant à la corrosi DXME-RIME-KAPU_KAKAME,"Électricité : consommation 0,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.01,0.2,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,GAZODUCTS DES VILLES ET DES VILLAGES,ASSEMBLAGE ET SOUDAGE DE CONDUITES DE GAZ À PARTIR DE TUBES EN POLYÉTHYLÈNE RIPU-ME-KAME-KANE_METOVOKA,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 920 mm, diamètre extérieur de l'isolation 1100 mm",Material,General,compl,183.78,183.78,183.78,183.78,1,EUR,1837.78,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOLIVO,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 820 mm, diamètre extérieur de l'isolation 1000 mm",Material,General,compl,166.81,166.81,166.81,166.81,1,EUR,1668.06,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOLINE,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 720 mm, diamètre extérieur de l'isolation 900 mm",Material,General,compl,149.83,149.83,149.83,149.83,1,EUR,1498.29,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOLIPU,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 630 mm, diamètre extérieur de l'isolation 800 mm",Material,General,compl,129.71,129.71,129.71,129.71,1,EUR,1297.11,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOLIRI,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 530 mm, diamètre extérieur de l'isolation 710 mm",Material,General,compl,117.58,117.58,117.58,117.58,1,EUR,1175.8,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOLIKA,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 426 mm, diamètre extérieur de l'isolation 560 mm",Material,General,compl,82.79,82.79,82.79,82.79,1,EUR,827.94,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RITO-TO-KATO-KARI_KAMENENE,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 273 mm, épaisseur de paroi 11 mm",Material,Pipes & Fittings,m,216.61,216.61,216.61,216.61,1,EUR,1559.62,7.2,1,1,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-RIME-RIRI_PUTOME,"Électricité : consommation 9,41 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.21,1.21,1.21,1.21,1,EUR,173.95,144.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV DXME-RIME-RIRI_PUTOME,"Installations pour la mise sous vide et le séchage de l'isolation solide des transformateurs de puissance, puissance 21 kW, surface de condensation d'au moins 6,1 m2",Equipment,General,Heures machine,18.95,18.95,18.95,18.95,1,EUR,2729.47,144.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV KAME-TO-KATO-KAVO_KAKARIME,Dioxyde de carbone,Material,General,kg,1.4,1.4,1.4,1.4,1,EUR,870.0,620.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION OUVERTS 6-750 KV KAME-NE-KAME-KADX_KAKARIRI,"Plaques fibrées monocouches sur ciment gris, densité 300 kg/m3, épaisseur 75 mm",Material,General,m2,19.42,19.42,19.42,19.42,1,EUR,1606.07,82.7,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"MURS, CLOISONS" RIPU-ME-KAME-KANE_MEPURIKA,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 1220 mm, diamètre extérieur de l'isolation 1425 mm",Material,General,compl,327.34,327.34,327.34,327.34,1,EUR,3273.42,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_MEPUMEVO,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 1020 mm, diamètre extérieur de l'isolation 1200 mm",Material,General,compl,278.77,278.77,278.77,278.77,1,EUR,2787.74,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_MEPUMENE,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 920 mm, diamètre extérieur de l'isolation 1100 mm",Material,General,compl,254.49,254.49,254.49,254.49,1,EUR,2544.9,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_MEPUMEPU,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 820 mm, diamètre extérieur de l'isolation 1000 mm",Material,General,compl,230.23,230.23,230.23,230.23,1,EUR,2302.29,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_MEPUMERI,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 720 mm, diamètre extérieur de l'isolation 900 mm",Material,General,compl,205.92,205.92,205.92,205.92,1,EUR,2059.23,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METONEPU,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 273 mm, diamètre extérieur de l'isolation 400 mm",Material,General,compl,56.75,56.75,56.75,56.75,1,EUR,567.46,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METONERI,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 219 mm, diamètre extérieur de l'isolation 315 mm",Material,General,compl,32.24,32.24,32.24,32.24,1,EUR,322.42,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METONEKA,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 159 mm, diamètre extérieur de l'isolation 250 mm",Material,General,compl,25.86,25.86,25.86,25.86,1,EUR,258.64,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOSAVO,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 133 mm, diamètre extérieur de l'isolation 225 mm",Material,General,compl,23.8,23.8,23.8,23.8,1,EUR,238.04,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE MEME-TO-KATO-METO,Cornière en PVC,Abstract Material,General,m,9.47,9.47,9.47,9.47,1,EUR,946.78,100.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES MEME-TO-KARI-KAME,Blocs de fenêtres en plastique,Abstract Material,General,m2,135.11,135.11,135.11,135.11,1,EUR,13511.01,100.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,FENÊTRES RIPU-ME-KAME-KANE_MEPUKAKA,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 219 mm, diamètre extérieur de l'isolation 315 mm",Material,General,compl,35.51,35.51,35.51,35.51,1,EUR,355.1,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METODXVO,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 159 mm, diamètre extérieur de l'isolation 250 mm",Material,General,compl,28.23,28.23,28.23,28.23,1,EUR,282.25,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METODXNE,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 133 mm, diamètre extérieur de l'isolation 225 mm",Material,General,compl,25.26,25.26,25.26,25.26,1,EUR,252.63,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METODXPU,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 108 mm, diamètre extérieur de l'isolation 200 mm",Material,General,compl,22.37,22.37,22.37,22.37,1,EUR,223.67,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METODXRI,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 89 mm, diamètre extérieur de l'isolation 180 mm",Material,General,compl,20.09,20.09,20.09,20.09,1,EUR,200.94,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METODXKA,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane, avec enveloppe galvanisée, diamètre extérieur du tuyau 76 mm, diamètre extérieur de l'isolation 160 mm",Material,General,compl,16.23,16.23,16.23,16.23,1,EUR,162.27,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOVOVO,"Kit pour l'isolation des joints soudés de tuyaux en acier avec isolation thermique en coques de mousse de polyuréthane, avec gaine galvanisée, diamètre extérieur du tuyau 57 mm, diamètre extérieur de l'isolation 140 mm",Material,General,compl,14.2,14.2,14.2,14.2,1,EUR,141.99,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOVONE,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 1420 mm, diamètre extérieur de l'isolation 1600 mm",Material,General,compl,268.63,268.63,268.63,268.63,1,EUR,2686.3,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOVOPU,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 1220 mm, diamètre extérieur de l'isolation 1425 mm",Material,General,compl,254.44,254.44,254.44,254.44,1,EUR,2544.44,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOVORI,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 1020 mm, diamètre extérieur de l'isolation 1200 mm",Material,General,compl,200.74,200.74,200.74,200.74,1,EUR,2007.45,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE MEME-RI-KASA-KAPU,Caissons de portails en bois,Abstract Material,General,m,2.94,2.94,2.94,2.94,1,EUR,243.92,83.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" KAVO-TO-KAVO-KARI_KAKAPUNE,"Cornière en acier laminée à chaud à ailes égales, nuances d'acier St3sp, St3ps, largeur des ailes 220-250 mm, épaisseur des ailes 14-35 mm",Material,General,t,1454.12,1454.12,1454.12,1454.12,1,EUR,1454.12,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV DXME-KANE-KATO_KAMEME,"Treuils hydrauliques sur remorque pour le tirage de câbles, force de traction 5 t",Equipment,General,Heures machine,17.86,17.86,17.86,17.86,1,EUR,52.87,2.96,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RIPU-ME-KAME-KANE_METOSANE,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 108 mm, diamètre extérieur de l'isolation 200 mm",Material,General,compl,21.3,21.3,21.3,21.3,1,EUR,212.99,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOSAPU,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 89 mm, diamètre extérieur de l'isolation 180 mm",Material,General,compl,19.6,19.6,19.6,19.6,1,EUR,195.99,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOSARI,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 76 mm, diamètre extérieur de l'isolation 160 mm",Material,General,compl,16.8,16.8,16.8,16.8,1,EUR,168.04,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RIPU-ME-KAME-KANE_METOSAKA,"Kit pour l'isolation des joints soudés de tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 57 mm, diamètre extérieur de l'isolation 140 mm",Material,General,compl,14.81,14.81,14.81,14.81,1,EUR,148.11,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE RITO-VO-KAPU-KADX_KAKAKARI,"Fusible thermorétractable, diamètre 40/75, 40/90, 50/90 mm",Material,General,pièce,56.24,56.24,56.24,56.24,1,EUR,562.36,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE MERI-RI-KATO-KANE_KAKAMEKA,"Plaque de verrouillage en polyéthylène renforcée d'un treillis en fibre de verre, avec couche adhésive, dimensions 350 x 100 x 1,4 mm",Material,General,pièce,2.31,2.31,2.31,2.31,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE KAME-LI-KANE-MEKA_KAKARISA,"Bandes thermorétractables à base de polyéthylène pour l'isolation des tuyaux, largeur 350 mm, épaisseur 2 mm",Material,General,m,20.22,20.22,20.22,20.22,1,EUR,21.23,1.05,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE DXME-KAPU-KAME_KALISA,"Électricité : consommation 18,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.37,2.37,2.37,2.37,1,EUR,3.44,1.45,1,1,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE DXME-KAPU-KAME_KALISA,Installations pour la réalisation de puits de drainage radiaux,Equipment,General,Heures machine,22.83,22.83,22.83,22.83,1,EUR,33.11,1.45,1,1,TRAVAUX DE CONSTRUCTION,Forages,FORAGE DE PUITS,AUTRES TYPES DE FORAGE KAME-LI-MESA-KALI_KAKATOME,Chevilles d'expansion en acier avec écrou,Material,General,100 pièces,7.67,7.67,7.67,7.67,1,EUR,6.13,0.8,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV RIKA-SA-KAPU-KATO_KAKAKARI,Pinces à assembler ZN24-4P25,Material,General,100 pièces,26.81,26.81,26.81,26.81,1,EUR,27.34,1.02,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV KAME-LI-KARI-MEKA_KAKAKAVO,"Papier filtre, marque F, densité 75 g/m2",Material,General,m2,0.67,0.67,0.67,0.67,1,EUR,8.7,13.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,DISPOSITIFS DE DISTRIBUTION ET SOUS-STATIONS,DISPOSITIFS DE DISTRIBUTION FERMÉS 3-20 KV RIPU-ME-KAME-KANE_METONEVO,"Kit pour l'isolation des joints soudés des tuyaux en acier avec isolation thermique en mousse de polyuréthane dans une enveloppe galvanisée, diamètre extérieur du tuyau 325 mm, diamètre extérieur de l'isolation 450 mm",Material,General,compl,63.91,63.91,63.91,63.91,1,EUR,639.1,10.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage et gazoducs - réseaux extérieurs,CHAUFFAGE - RÉSEAUX EXTÉRIEURS,POSE DE TUYAUX DE RÉSEAUX DE CHAUFFAGE AVEC ISOLATION THERMIQUE EN POLYURÉTHANE KAPU-ME-KARI-KASA_KAMETONE,"Mélanges de béton lourd (BST) sur gravier concassé, classe B20, F(1)100, W4",Material,General,m3,123.71,123.71,123.71,123.71,1,EUR,0.1,0.0,1,1,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,AUTRES TRAVAUX,TRAPPES KAPU-ME-KARI-KASA_KAMERINE,"Mélanges de béton lourd (BST) sur gravier concassé, classe B12,5, F(1)100, W2",Material,General,m3,114.04,114.04,114.04,114.04,1,EUR,7.41,0.06,1,1,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,AUTRES TRAVAUX,RACCORDEMENT DES CONDUITES D'ÉGOUT AU RÉSEAU EXISTANT MEDX-ME-KAME-MEME_MEKAPUKA,"Collier à démontage rapide en acier galvanisé avec caoutchouc microporeux, diamètre 315 mm",Material,General,pièce,7.5,7.5,7.5,7.5,1,EUR,7.5,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un conduit à déchets avec un tube en acier résistant à la corrosi KAVO-ME-KASA-KANE_KAKAKARI,"Tête en acier pour système de nettoyage, rinçage, désinfection et extinction d'incendie pour le conduit à déchets, diamètre de la tête 550 mm, longueur 1470 mm, épaisseur de l'acier 1,5 mm",Material,General,pièce,728.65,728.65,728.65,728.65,1,EUR,728.65,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un conduit à déchets avec un tube en acier résistant à la corrosi KAVO-ME-KASA-KASA_KAKAKAME,"Support en acier pour conduit à déchets avec joint en caoutchouc, diamètre du support 630 mm, hauteur du support 500 mm, épaisseur de l'acier 6 mm",Material,General,pièce,91.42,91.42,91.42,91.42,1,EUR,91.42,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un conduit à déchets avec un tube en acier résistant à la corrosi RITO-VO-KASA-KASA_KAKASANE,"Manchons droits courts en fonte malléable avec filetage cylindrique, diamètre nominal 50 mm",Material,General,10 pièces,18.66,18.66,18.66,18.66,1,EUR,44.78,2.4,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS RITO-SA-KARI-KARI_KAKANETO,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 114 mm, épaisseur de paroi 5 mm",Material,Pipes & Fittings,m,15.68,15.68,15.68,15.68,1,EUR,9.88,0.63,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS RITO-VO-KASA-KASA_KAKASATO,"Manchons droits courts en fonte malléable avec filetage cylindrique, diamètre nominal 25 mm",Material,General,10 pièces,8.49,8.49,8.49,8.49,1,EUR,21.22,2.5,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS RITO-VO-KASA-KATO_KAKAKATO,"Contre-écrous en fonte malléable avec filetage cylindrique, diamètre nominal 25 mm",Material,General,10 pièces,6.24,6.24,6.24,6.24,1,EUR,18.73,3.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,INSTALLATION DE SYSTÈMES DE REFROIDISSEMENT DU BÉTON DANS LES CONSTRUCTIONS KAME-SA-KAME-KATO_MEKARIKA,"Billes de verre réfléchissantes pour saupoudrage de peintures de marquage, fraction 100-600 µm",Material,General,t,1321.08,1321.08,1321.08,1321.08,1,EUR,52.84,0.04,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE MEPU-PU-KAME-KAVO_KAKAKAME,Apprêt B-KF-093,Material,General,t,5625.24,5625.24,5625.24,5625.24,1,EUR,108.85,0.02,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,Panneaux de signalisation routière KASA-ME-KARI-KALI_KAMEMERI,"Poteaux de signalisation en béton armé, volume jusqu'à 0,03 m3, béton B30, consommation d'armature de 400 à 450 kg/m3",Material,General,m3,1007.97,1007.97,1007.97,1007.97,1,EUR,7.26,0.01,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAME-SA-KATO-KANE_KAKAMETO,"Poteau de signalisation routier métallique à un drapeau, dimensions 1500 x 120 x 20 mm",Material,General,pièce,11.34,11.34,11.34,11.34,1,EUR,113.37,10.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,BARRIÈRES DE SÉCURITÉ ROUTIÈRES KAME-SA-KATO-KAVO_KAKARIME,Réflecteur routier KD4,Material,General,pièce,3.26,3.26,3.26,3.26,1,EUR,81.51,25.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE MEME-TO-KAME-KATO,Portes de balcon en profilés de polychlorure de vinyle,Abstract Material,General,m2,275.85,275.85,275.85,275.85,1,EUR,27584.91,100.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" KAME-VO-KARI-KANE_MEKAKADX,"Verre flotté en feuilles M1, incolore, épaisseur nominale 2 mm",Material,General,m2,6.82,6.82,6.82,6.82,1,EUR,88.01,12.9,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"PORTES, PORTES COULISSANTES" MEVO-TO-KAME-KAME_KAKAKARI,"Tête de raccordement à tourillon, GTs-50",Material,General,pièce,3.2,3.2,3.2,3.2,1,EUR,3.2,1.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Installation de robinets d'eau publics MEVO-ME-MEKA-METO_KAKASAKA,"Robinet à passage droit à presse-étoupe 11ch8bk, raccordement à la canalisation par bride, pression nominale 1,0 MPa, diamètre nominal 50 mm",Material,General,pièce,149.28,149.28,149.28,149.28,1,EUR,149.28,1.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Installation de robinets d'eau publics MEVO-ME-KANE-KADX_KAKAKARI,"Robinet à trois voies à presse-étoupe 11ch18bk, raccordement à la canalisation par bride, pression nominale 0,6 MPa, diamètre nominal 40 mm",Material,General,pièce,47.13,47.13,47.13,47.13,1,EUR,47.13,1.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,PUITS D'ALIMENTATION EN EAU,Installation de robinets d'eau publics MEVO-ME-KAVO-KANE_KAKAKAME,"Colonne d'eau à éjecteur, hauteur de la partie aérienne 900 mm",Material,General,pièce,125.63,125.63,125.63,125.63,1,EUR,125.63,1.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,"SIPHONS, HYDRAULIQUES, COLONNES DE DISTRIBUTION D'EAU" KARI-RI-KASA-KAPU_RIKAVONE,"Gravier de roches denses pour travaux de construction M 400, fraction 20-40 mm",Material,General,m3,42.4,42.4,42.4,42.4,1,EUR,11.03,0.26,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,"SIPHONS, HYDRAULIQUES, COLONNES DE DISTRIBUTION D'EAU" MEVO-ME-MEKA-KAPU_KAKAMEME,"Hydrant d'incendie souterrain, pression nominale 1,0 MPa, diamètre nominal 125 mm, hauteur 2500 mm",Material,General,pièce,247.52,247.52,247.52,247.52,1,EUR,247.52,1.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,"SIPHONS, HYDRAULIQUES, COLONNES DE DISTRIBUTION D'EAU" KAME-LI-KANE-MERI_KAKAKASA,"Bandes isolantes thermosoudables, largeur 50 mm, épaisseur 0,3 mm",Material,General,100 m,41.72,41.72,41.72,41.72,1,EUR,0.13,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV KAME-LI-KARI-MEKA_KAKARIME,Carton filtrant,Material,General,kg,7.06,7.06,7.06,7.06,1,EUR,35.28,5.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,LIGNES DE CÂBLES JUSQU'À 500 KV RITO-SA-KARI-KARI_KAKAPUTO,"Tuyaux en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 83 mm, épaisseur de paroi 4 mm",Material,General,m,9.31,9.31,9.31,9.31,1,EUR,3.73,0.4,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,INSERTION DE RACCORDS DANS LES CONDUITES EXISTANTES KASA-ME-KAME-MEME,Panneaux de fond,Abstract Material,General,pièce,596.77,596.77,596.77,596.77,1,EUR,596.77,1.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,AUTRES TRAVAUX,TRAVAUX CONNEXES MEPU-RI-KANE-KAME_KARIKAME,"Composition à deux composants pour éclaircir le bois foncé et les matériaux à base de bois, consommation de blanchissant 170-200 g/m2",Material,General,kg,5.13,5.13,5.13,5.13,1,EUR,224.38,43.7,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,ANTISEPTIQUE DES CONSTRUCTIONS MEME-ME-KATO-KAPU_KAKAKARI,"Bois de conifères, longueur 0,8-2 m",Material,General,m3,127.06,127.06,127.06,127.06,1,EUR,825.88,6.5,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,AUTRES CONSTRUCTIONS KAME-LI-KAPU-KAPU_MEKAKAKA,Serrure de meuble galvanisée à encastrer avec mécanisme à cylindre pour portes et façades en bois,Material,General,pièce,1.83,1.83,1.83,1.83,1,EUR,18.3,10.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"ARMOIRES ENCASTRÉES, ÉTAGÈRES ENTRESOL, ARTICLES À L'UNITÉ" MEME-RI-MEME-KALI_KAKAKAME,Placage en bois dur,Material,General,m2,14.83,14.83,14.83,14.83,1,EUR,99.49,6.71,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"ARMOIRES ENCASTRÉES, ÉTAGÈRES ENTRESOL, ARTICLES À L'UNITÉ" MEME-RI-KADX-KAME,Plaques de revêtement,Abstract Material,General,m2,888.48,888.48,888.48,888.48,1,EUR,95956.15,108.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,CONSTRUCTIONS EN BOIS,"ARMOIRES ENCASTRÉES, ÉTAGÈRES ENTRESOL, ARTICLES À L'UNITÉ" KAME-LI-MELI-KADX_MEMESARI,"Foret diamanté annulaire à grande vitesse pour béton armé avec queue à démontage rapide pour forage sur banc en mode humide, soudure laser des segments, longueur 430 mm, diamètre 25 mm",Material,General,pièce,202.03,202.03,202.03,202.03,1,EUR,324.06,1.6,1,1,TRAVAUX DE CONSTRUCTION,Égouts - réseaux extérieurs,AUTRES TRAVAUX,ÉLÉMENTS DES INSTALLATIONS D'ÉGOUT DXME-KATO-KADX_KAMELI,"Complexes de cuves de forage, capacité des cuves 5 m3, capacité de charge jusqu'à 10 t",Equipment,General,Heures machine,22.32,22.32,22.32,22.32,1,EUR,133.92,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KANE-KATO_MEKATO,"Électricité : consommation 0,53 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.07,0.07,0.07,0.07,1,EUR,0.41,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KANE-KATO_MEKATO,"Treuils mobiles pour échelle de sauvetage avec compartiment, tension statique du câble 63 kN (6,3 t)",Equipment,General,Heures machine,28.37,28.37,28.37,28.37,1,EUR,170.21,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR RIKA-PU-KARI-KASA_KAMEKASA,"Fusible à basse tension dans un boîtier, dimensions 18 x 65 mm, tension alternative nominale 400 V, courant nominal 2-10 A",Material,General,pièce,8.43,8.43,8.43,8.43,1,EUR,8.43,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR RIKA-RI-KADX-KAVO_KAKATOPU,"Manchon thermorétractable d'extrémité pour installation extérieure pour câble d'alimentation à 4 conducteurs avec isolation en plastique et armure, sans embouts, tension alternative nominale jusqu'à 1 kV, sections des conducteurs de câbles 16-25 mm2, 4PKNtpB-1-16-25",Material,General,pièce,27.5,27.5,27.5,27.5,1,EUR,55.01,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR RIKA-ME-KAME-KATO_KAKAKALI,"Blocs de jonction pour réseaux d'éclairage public, nombre de blocs 4, tension jusqu'à 1 kV",Material,General,compl,30.27,30.27,30.27,30.27,1,EUR,30.27,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR RIKA-RI-KAME-KASA_KAKAKAVO,Douilles de câble en cuivre 50 mm,Material,General,100 pièces,109.2,109.2,109.2,109.2,1,EUR,3.28,0.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR RIKA-RI-KAME-KASA_KAKAKANE,Douilles de câble en cuivre 25 mm,Material,General,100 pièces,76.14,76.14,76.14,76.14,1,EUR,2.28,0.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR RIKA-RI-KAME-KASA_KAKAKAPU,Douilles de câble en cuivre 10 mm,Material,General,100 pièces,38.2,38.2,38.2,38.2,1,EUR,1.15,0.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR KAPU-ME-KAME-KAME_KAKAKARI,"Mélanges de béton léger (BSL) sur agrégats poreux, densité moyenne D800-D1400 kg/m3, classe B3,5 (M50)",Material,General,m3,121.58,121.58,121.58,121.58,1,EUR,3.65,0.03,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAME-LI-MEDX-KARI_KAMEKARI,"Bagues d'étanchéité en caoutchouc pour raccords à manchon de tuyaux en chrysotile-ciment, type KCHM, diamètre nominal 500 mm",Material,General,kg,5.43,5.43,5.43,5.43,1,EUR,1183.74,218.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT KAME-LI-MEDX-KARI_KAMEKAME,"Bagues d'étanchéité en caoutchouc pour raccords à manchon de tuyaux en chrysotile-ciment, type KCHM, diamètre nominal 400 mm",Material,General,kg,4.8,4.8,4.8,4.8,1,EUR,859.58,179.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT KAME-LI-MEDX-KARI_KAMEMEKA,"Bagues d'étanchéité en caoutchouc pour raccords à manchon de tuyaux en chrysotile-ciment, type KCHM, diamètre nominal 350 mm",Material,General,kg,6.35,6.35,6.35,6.35,1,EUR,1002.58,158.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIPU-TO-KASA-KASA,Pièces moulées,Abstract Material,General,pièce,52.46,52.46,52.46,52.46,1,EUR,524.56,10.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,INSTALLATION DE ROBINETTERIE,PIÈCES MOULEES MEME-RI-KAVO-KARI_KAKAKADX,"Panneaux de fibres de bois fabriqués selon un procédé à sec, durs T-S, groupe A, épaisseur 4 mm",Material,General,1000 m2,1843.38,1843.38,1843.38,1843.38,1,EUR,3.04,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS KAPU-TO-KARI-KADX_MEKAKASA,"Mélanges secs à base de ciment pour le masticage continu en couche mince des revêtements en plaques, couleur blanche",Material,General,kg,2.65,2.65,2.65,2.65,1,EUR,955.87,361.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en bois,ASSEMBLAGE DE BÂTIMENTS RÉSIDENTIELS ET PUBLICS À PARTIR DE PIÈCES FABRIQUÉES EN,MURS EXTÉRIEURS ET INTÉRIEURS RIKA-ME-KARI-MEVO_MEMEKAKA,"Colliers de serrage en nylon pour câbles, dimensions 4,8 x 300 mm",Material,General,100 pièces,3.54,3.54,3.54,3.54,1,EUR,7.09,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR RIKA-SA-KARI-KANE_KAKAPURI,Boîtes de dérivation U-995,Material,General,10 pièces,35.83,35.83,35.83,35.83,1,EUR,0.14,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR RIKA-RI-KADX-KASA_KAKAKAME,"Raccords « tube-boîte » pour tubes ondulés ou rigides lisses de 25 mm de diamètre, classe de protection IP65",Material,Pipes & Fittings,10 pièces,20.37,20.37,20.37,20.37,1,EUR,1.69,0.08,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR RIKA-SA-KARI-KAPU_KAKAKAVO,"Boîtes de dérivation avec entrées de câbles (6 sorties, diamètre 20 mm), dimensions 80 x 80 x 40 mm, couleur grise",Material,General,10 pièces,15.17,15.17,15.17,15.17,1,EUR,1.52,0.1,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR RIKA-SA-KATO-KATO_KAKAMERI,"Barre de mise à la terre en laiton à vis sans isolateur, trous de fixation sur les bords, nombre de connexions 12, dimensions 90 x 6 x 9 mm",Material,General,pièce,2.72,2.72,2.72,2.72,1,EUR,2.72,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR KAME-SA-KARI-KATO_KAKAKARI,"Panneau de protection en plastique pour barrières métalliques, longueur 1,33 m, couleur noire",Material,General,pièce,34.6,34.6,34.6,34.6,1,EUR,865.1,25.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-SA-KARI-KATO_KAKAKAME,"Panneau de protection en plastique pour barrières métalliques, longueur 2,66 m, couleur blanche",Material,General,pièce,69.21,69.21,69.21,69.21,1,EUR,1730.22,25.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-SA-KATO-MEME_KAKAMERI,"Fixation à ancrage pour l'installation d'un écran anti-éblouissement en polymère en forme de plaque sur une barrière en béton, livré avec quincaillerie",Material,General,pièce,8.29,8.29,8.29,8.29,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-SA-KATO-MEME_KAKAMEKA,"Fixation pour l'installation d'écrans anti-éblouissants en polymère à lamelles sur une barrière en béton, avec support et quincaillerie, espacement entre les écrans 660 mm",Material,Concrete & Cement,m,33.83,33.83,33.83,33.83,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-SA-KATO-MEME_KAKAKAVO,"Fixation pour l'installation d'écrans anti-éblouissants en polymère à lamelles sur une barrière métallique, livrée avec une partie d'appui et des fixations, espacement entre les écrans 660 mm",Material,Concrete & Cement,m,8.21,8.21,8.21,8.21,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE KAME-SA-KATO-KAVO_KAKARIRI,Réflecteur routier KD3,Material,General,pièce,8.47,8.47,8.47,8.47,1,EUR,8.47,1.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-MEPU-KALI_KATOME,Machines pour le transport interne du béton,Equipment,General,Heures machine,45.11,45.11,45.11,45.11,1,EUR,82.56,1.83,1,1,TRAVAUX DE CONSTRUCTION,Structures en béton et en béton armé des ouvrages hydrauliques,CONSTRUCTIONS D'OBSTACLES HYDROÉNERGÉTIQUES AVEC UN VOLUME DE BÉTON DE PLUS DE 1,FOURNITURE ET MISE EN PLACE DU MÉLANGE DE BÉTON DANS LES BLOCS DE CONSTRUCTIONS DXME-RIME-MEVO_KAPUME,Électricité : consommation 198 kW·h/machine-heure,Electricity,Electricity,Heures machine,25.43,25.43,25.43,25.43,1,EUR,152.59,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,CHAUFFAGE DXME-RIME-MEVO_KAPUME,"Électrocalorifères à air pour mines, équipés d'un dispositif de commande à thyristors, nombre de sections 2, puissance d'une section 300 kW",Equipment,General,Heures machine,64.96,64.96,64.96,64.96,1,EUR,389.75,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,CHAUFFAGE DXME-MEDX-MERI_KALIME,"Turbopompes de fond, débit jusqu'à 25 m3/h, hauteur de refoulement jusqu'à 40 m, fonctionnant à partir de stations de compression fixes",Equipment,General,Heures machine,1.31,1.31,1.31,1.31,1,EUR,7.89,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,MARÉE DXME-KATO-KADX_KAMELI,"Électricité : consommation 0,26 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.03,0.03,0.03,0.03,1,EUR,0.2,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR KAME-RI-KATO-KATO_KAMESANE,"Mastic bitume-latex d'étanchéité, pour toiture, consommation 2,0 kg/m² pour une épaisseur de couche de 1,0 mm",Material,General,t,1930.37,1930.37,1930.37,1930.37,1,EUR,3.86,0.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de couches de fondation KAME-LI-MEDX-KARI_KAMEKAKA,"Bagues d'étanchéité en caoutchouc pour raccords à manchon de tuyaux en chrysotile-ciment, type KCHM, diamètre nominal 300 mm",Material,General,kg,7.89,7.89,7.89,7.89,1,EUR,1017.52,129.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT KAME-LI-MEDX-KARI_KAKADXDX,"Joints d'étanchéité en caoutchouc pour raccords à manchon de tuyaux en chrysotile-ciment, type KCHM, diamètre nominal 250 mm",Material,General,kg,8.14,8.14,8.14,8.14,1,EUR,895.51,110.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT KAME-LI-MEDX-KARI_KAKADXVO,"Joints d'étanchéité en caoutchouc pour raccords à manchon de tuyaux en chrysotile-ciment, type KCHM, diamètre nominal 200 mm",Material,General,kg,13.03,13.03,13.03,13.03,1,EUR,1172.44,90.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT KAME-LI-MEDX-KARI_KAKADXLI,"Joints d'étanchéité en caoutchouc pour raccords à manchon de tuyaux en chrysotile-ciment, type KCHM, diamètre nominal 150 mm",Material,General,kg,9.03,9.03,9.03,9.03,1,EUR,740.27,82.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT KAME-LI-MEDX-KARI_KAKADXNE,"Bagues d'étanchéité en caoutchouc pour raccordement par manchon des joints des tuyaux en chrysotile-ciment, type KCHM, diamètre nominal 100 mm",Material,General,kg,7.76,7.76,7.76,7.76,1,EUR,527.87,68.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIPU-RI-KANE-KAPU_KAKARINE,"Manchon en chrysotile-ciment pour tuyaux de refoulement SAM 9, diamètre nominal 500 mm",Material,General,pièce,29.6,29.6,29.6,29.6,1,EUR,7459.58,252.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIPU-RI-KANE-KAPU_KAKARISA,"Manchon en chrysotile-ciment pour tuyaux de refoulement SAM 9, diamètre nominal 400 mm",Material,General,pièce,16.67,16.67,16.67,16.67,1,EUR,4200.72,252.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIPU-RI-KANE-KAPU_KAKARIPU,"Manchon en chrysotile-ciment pour tuyaux de refoulement SAM 9, diamètre nominal 350 mm",Material,General,pièce,15.01,15.01,15.01,15.01,1,EUR,3782.59,252.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIPU-RI-KANE-KAPU_KAKARITO,"Manchon en chrysotile-ciment pour tuyaux de refoulement SAM 9, diamètre nominal 300 mm",Material,General,pièce,12.93,12.93,12.93,12.93,1,EUR,3257.5,252.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIPU-RI-KANE-KAPU_KAKARIRI,"Manchon en chrysotile-ciment pour tuyaux de refoulement SAM 9, diamètre nominal 250 mm",Material,General,pièce,10.09,10.09,10.09,10.09,1,EUR,2543.51,252.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIPU-RI-KANE-KAPU_KAKARIME,"Manchon en chrysotile-ciment pour tuyaux de refoulement SAM 9, diamètre nominal 200 mm",Material,General,pièce,7.99,7.99,7.99,7.99,1,EUR,2013.38,252.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIPU-RI-KANE-KAPU_KAKARIKA,"Manchon en chrysotile-ciment pour tuyaux de refoulement SAM 9, diamètre nominal 150 mm",Material,General,pièce,5.91,5.91,5.91,5.91,1,EUR,1488.68,252.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIPU-RI-KANE-KAPU_KAKAMEDX,"Manchon en chrysotile-ciment pour tuyaux de refoulement SAM 9, diamètre nominal 100 mm",Material,General,pièce,5.01,5.01,5.01,5.01,1,EUR,1261.96,252.0,1,1,TRAVAUX DE CONSTRUCTION,Réseaux extérieurs d'alimentation en eau,POSE DE CONDUITES,TUYAUX EN CHRYSOTILCIMENT RIKA-RI-KARI-KAME_KAKAMEME,"Douilles en polypropylène, diamètre 17 mm",Material,General,1000 pièces,46.99,46.99,46.99,46.99,1,EUR,0.57,0.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS RIKA-RI-KADX-KARI_MEKATOTO,"Joint d'étanchéité thermorétractable pour passages de câbles, diamètre avant rétraction 130 mm, diamètre après rétraction 28 mm",Material,General,pièce,5.84,5.84,5.84,5.84,1,EUR,583.77,100.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,ÉCLAIRAGE ÉLECTRIQUE EXTÉRIEUR DXME-KANE-KATO_MEKASA,"Électricité : consommation 0,39 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.3,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KANE-KATO_MEKASA,"Treuils mobiles de forage avec local, tension statique du câble 100 kN (10 t), capacité du câble 1500 m",Equipment,General,Heures machine,30.24,30.24,30.24,30.24,1,EUR,181.44,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-MEDX_MEPUKA,Étagères de creusement à six étages pour le creusement d'un puits de mine d'un diamètre intérieur de 8 m,Equipment,General,Heures machine,195.88,195.88,195.88,195.88,1,EUR,1175.27,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-MEDX_KAMETO,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,3.81,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-MEDX_KAMETO,Plates-formes de montage antidéflagrantes pour la construction d'un soutènement en béton tubé d'un puits vertical d'un diamètre intérieur de 8 m,Equipment,General,Heures machine,106.45,106.45,106.45,106.45,1,EUR,638.72,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAMEDX,"Électricité : consommation 827,48 kWh/machine-heure",Electricity,Electricity,Heures machine,106.28,106.28,106.28,106.28,1,EUR,637.69,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAMEDX,"Machines de levage minières pour le transport de personnes, à tambour unique et à une extrémité, tension statique du câble jusqu'à 370 kN, vitesse de levage jusqu'à 12 m/s, hauteur de levage jusqu'à 1600 m",Equipment,General,Heures machine,567.46,567.46,567.46,567.46,1,EUR,3404.78,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KARIME,"Électricité : consommation 825,17 kW·h/machine-heure",Electricity,Electricity,Heures machine,105.98,105.98,105.98,105.98,1,EUR,635.91,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KARIME,"Machines de levage mobiles pour le creusement de galeries, tension statique du câble jusqu'à 350 kN, vitesse de levage jusqu'à 12 m/s, hauteur de levage jusqu'à 2000 m",Equipment,General,Heures machine,516.15,516.15,516.15,516.15,1,EUR,3096.88,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR RIPU-TO-KATO-METO_KAKARINE,"Tubes polyéthylène sous pression, à l'exception des gazoducs PE100, pour le transport de l'eau, rapport dimensionnel standard SDR13,6, diamètre extérieur nominal 90 mm, épaisseur de paroi 6,7 mm",Material,Pipes & Fittings,m,8.27,8.27,8.27,8.27,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE FORAGE EXÉCUTÉS À L'AIDE DE MÉTHODES SPÉCIALES,GEL ARTIFICIEL ET DÉGEL DES ROCHES RILI-RI-KAME-KAVO_KAKAKARI,"Collier en acier galvanisé, diamètre 76 mm",Material,General,pièce,9.75,9.75,9.75,9.75,1,EUR,1949.65,200.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX KAVO-ME-KARI-MENE_KAKANELI,"Pieu en acier vissé conique-spiralé avec embout moulé sans tête, galvanisé, diamètre du fût 89 mm, épaisseur de la paroi 3 mm, longueur 1500 mm",Material,General,pièce,62.85,62.85,62.85,62.85,1,EUR,6285.21,100.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX RITO-VO-KAME-MESA,Répartiteur,Abstract Material,General,compl,48.09,48.09,48.09,48.09,1,EUR,240.43,5.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CLIMATISEURS,Pose de tuyauteries en métaux non ferreux RIKA-RI-KAME-KASA_KAKAMERI,Douilles de câble en cuivre 150 mm,Material,General,100 pièces,505.12,505.12,505.12,505.12,1,EUR,25.26,0.05,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS RIKA-RI-KARI-KAME_KAKAMETO,"Douilles en polypropylène, diamètre 28 mm",Material,General,1000 pièces,73.49,73.49,73.49,73.49,1,EUR,0.9,0.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS RIKA-RI-KAME-KASA_KAKAKASA,Douilles de câble en cuivre 16 mm,Material,General,100 pièces,40.94,40.94,40.94,40.94,1,EUR,2.05,0.05,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE CÂBLAGE DANS LES BÂTIMENTS ET LES INSTALLATIONS KAME-LI-MEDX-MEVO_KAKAKAME,Manchon flexible étanche,Material,General,pièce,5.88,5.88,5.88,5.88,1,EUR,5.88,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,VENTILATEURS,Installation d'agrégats de ventilation et de dépoussiérage RIRI-RI-KARI-MEKA,Trappes étanches,Abstract Material,General,pièce,117.15,117.15,117.15,117.15,1,EUR,117.15,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de portes et trappes étanches MEDX-RI-KARI-KAPU_KAKAKAME,Hottes d'extraction au-dessus des équipements en tôle laminée à chaud et en acier de section,Material,General,m2,53.77,53.77,53.77,53.77,1,EUR,53.77,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de parapluies au-dessus des équipements KAVO-TO-KARI-KAME_KAKAKAME,"Bandes en acier laminées à chaud, nuances d'acier St3sp, St3ps, épaisseur 1,8-2,0 mm, largeur 20-22 mm",Material,General,t,1361.98,1361.98,1361.98,1361.98,1,EUR,1.91,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES CÂBLÉES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES DESTINÉES A,ÉQUIPEMENT ÉLECTRIQUE DANS LES EXPLOITATIONS MINIÈRES RIKA-RI-KADX-KAPU_KAKAKANE,"Manchon thermorétractable de raccordement pour câble à isolation en polyéthylène ou en papier pour une tension jusqu'à 1 kV, marque STp-1-3x(70-120) mm2",Material,General,pièce,126.44,126.44,126.44,126.44,1,EUR,126.44,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,LIGNES DE CÂBLES ET ÉQUIPEMENT ÉLECTRIQUE POUR INSTALLATIONS SPÉCIALES,LIGNES CÂBLÉES ET ÉQUIPEMENTS ÉLECTRIQUES DES CENTRALES NUCLÉAIRES ET DES BÂTIME KAME-LI-MELI-KADX_MEPUNEKA,"Foret avec pointe en alliage dur en forme de lance à deux arêtes, avec queue cylindrique, pour percer des trous dans le verre et la céramique, longueur totale 70 mm, diamètre 6 mm",Material,General,pièce,2.01,2.01,2.01,2.01,1,EUR,2.42,1.2,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,"APPAREILS D'ÉCLAIRAGE, DE CHAUFFAGE, DE PROTECTION ET DE COMPTAGE" KAME-LI-MESA-MEPU_KAMESARI,"Vis autotaraudeuses en acier à tête fraisée et fente en croix, pointues, diamètre 4,8 mm, longueur 70 mm",Material,General,100 pièces,11.06,11.06,11.06,11.06,1,EUR,4.42,0.4,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,"APPAREILS D'ÉCLAIRAGE, DE CHAUFFAGE, DE PROTECTION ET DE COMPTAGE" RIKA-SA-KAPU-MEME_KAKAMERI,"Pinces KL-2,5 lustrées",Material,General,100 pièces,39.2,39.2,39.2,39.2,1,EUR,79.96,2.04,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,"APPAREILS D'ÉCLAIRAGE, DE CHAUFFAGE, DE PROTECTION ET DE COMPTAGE" RIKA-ME-KARI-MEKA_KAKATORI,Suspensions pour câbles PSK 10-20,Material,General,100 pièces,1269.58,1269.58,1269.58,1269.58,1,EUR,154.89,0.12,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,INSTALLATIONS ÉLECTRIQUES DE PUISSANCE ET D'ÉCLAIRAGE,ALIMENTATION ÉLECTRIQUE DES INSTALLATIONS DE LEVAGE ET DE TRANSPORT KAVO-TO-KALI-KAME_KAKASATO,"Bandes d'acier laminées à chaud, nuances St3sp, St3ps, dimensions 50 x 6 mm",Material,General,t,1688.22,1688.22,1688.22,1688.22,1,EUR,6.75,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Installations électrotechniques,CANALISATION D'ÉLECTRICITÉ ET RÉSEAUX ÉLECTRIQUES,RÉSEAUX DE MISE À LA TERRE DES INSTALLATIONS ÉLECTROTECHNIQUES DXME-KAVO-MEKA_KASAKA,Fraises rapportées pour la mise en place de bandes antibruit,Equipment,General,Heures machine,4.01,4.01,4.01,4.01,1,EUR,30.5,7.61,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-METO-KAME_KARIRI,"Machines de marquage automotrices pour l'application de thermoplastique, largeur de la ligne appliquée 50-400 mm, capacité du réservoir de thermoplastique 135 kg, débit 2,3 l/min",Equipment,General,Heures machine,12.33,12.33,12.33,12.33,1,EUR,30.08,2.44,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,MARQUAGE DXME-KANE-KATO_MEKAME,"Électricité : consommation 3,17 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.41,0.41,0.41,0.41,1,EUR,2.44,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KANE-KATO_MEKAME,"Treuils mobiles de forage avec compartiment, tension statique du câble 600 kN (60 t), capacité du câble 2700 m",Equipment,General,Heures machine,110.6,110.6,110.6,110.6,1,EUR,663.61,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KANE-KATO_MEKALI,"Électricité : consommation 1,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,1.0,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KANE-KATO_MEKALI,"Treuils mobiles de forage avec local, tension statique du câble 250 kN (25 t), capacité du câble 1500 m",Equipment,General,Heures machine,56.82,56.82,56.82,56.82,1,EUR,340.89,6.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,PROCESSUS DE MAINTENANCE,ASCENSEUR MEDX-RI-KATO-KADX_KAKANEME,"Grilles de ventilation à persiennes pour l'entrée et la sortie d'air avec bloc de régulation du débit d'air, en acier, dimensions de l'ouverture de construction sous la grille 400 x 100 mm",Material,General,m2,635.41,635.41,635.41,635.41,1,EUR,25.42,0.04,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEDX-RI-KATO-KADX_KAKANEKA,"Grilles de ventilation à persiennes avec régulateur de débit d'air, en acier, dimensions de l'ouverture sous la grille 200 x 100 mm",Material,General,m2,952.97,952.97,952.97,952.97,1,EUR,19.06,0.02,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEDX-RI-KATO-KASA_KAKAPURI,"Grille en acier non réglable, dimensions 252 x 252 mm",Material,General,m2,200.14,200.14,200.14,200.14,1,EUR,12.01,0.06,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEDX-RI-KATO-KASA_KAKAPUME,"Grille en acier non réglable, dimensions 200 x 200 mm",Material,General,m2,242.5,242.5,242.5,242.5,1,EUR,9.7,0.04,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEDX-RI-KATO-KADX_KAKARIRI,"Grille en acier à lamelles fixes à une section, dimensions 150 x 580 mm",Material,General,m2,351.65,351.65,351.65,351.65,1,EUR,31.65,0.09,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEDX-RI-KATO-KADX_KAKARIME,"Grille en acier à lamelles fixes à une section, dimensions 150 x 490 mm",Material,General,m2,359.03,359.03,359.03,359.03,1,EUR,25.13,0.07,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEDX-RI-KATO-KALI,Grille de ventilation en plastique,Abstract Material,General,pièce,17.06,17.06,17.06,17.06,1,EUR,1706.42,100.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles MEDX-ME-KARI-KASA,Distributeurs d'air,Abstract Material,General,pièce,26.94,26.94,26.94,26.94,1,EUR,26.94,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de diffuseurs d'air destinés à l'alimentation en air RIME-ME-KASA-KAPU_KAKAKAVO,"Câble électrique à conducteurs en cuivre VRG 2kh1,5(ozh)-660",Material,General,1000 m,1619.46,1619.46,1619.46,1619.46,1,EUR,0.49,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES RIKA-SA-KARI-KANE_KAKATOKA,Boîtes de dérivation U-994,Material,General,10 pièces,20.94,20.94,20.94,20.94,1,EUR,2.09,0.1,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES RIKA-PU-KATO-KALI_KAKAMEDX,Prises de courant RSH-Ts-2SD,Material,General,100 pièces,51.37,51.37,51.37,51.37,1,EUR,0.1,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES RIKA-TO-KARI-KAVO_KAKAKAVO,"Lampes fluorescentes à mercure à basse pression à usage général, culot G13, puissance 65 W",Material,General,10 pièces,49.03,49.03,49.03,49.03,1,EUR,0.98,0.02,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES RIKA-RI-MERI-KARI_KAKAKAME,Tube TLV-1 mm (avec imprégnation PVC 1500 V),Material,Pipes & Fittings,kg,36.1,36.1,36.1,36.1,1,EUR,0.18,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES MEPU-PU-KATO-MELI_KAKAMEKA,Vernis à la gomme laque,Material,General,kg,112.66,112.66,112.66,112.66,1,EUR,11.27,0.1,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE URBAINE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES MEVO-RI-KAVO-MEKA,Filtres aérosols,Abstract Material,General,m2,24.04,24.04,24.04,24.04,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,DISPOSITIFS DE FILTRATION,Installation de filtres KAME-LI-MESA-KAME_KAKATOLI,"Cheville à frapper en laiton, diamètre du filetage intérieur M10, diamètre 12 mm, longueur 40 mm",Material,General,pièce,0.57,0.57,0.57,0.57,1,EUR,1.15,2.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,VENTILATEURS,Installation de ventilateurs de gaine MEDX-RI-KATO-KAPU_KAKAKARI,"Grille à fentes réglable en acier galvanisé, dimensions 200 x 200 mm",Material,General,m2,131.89,131.89,131.89,131.89,1,EUR,5.28,0.04,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEDX-RI-KATO-KAPU_KAKAKAME,"Grille à fentes réglable en acier galvanisé, dimensions 150 x 150 mm",Material,General,m2,168.78,168.78,168.78,168.78,1,EUR,3.38,0.02,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEDX-RI-KATO-KADX_KAKANEPU,"Grilles de ventilation à persiennes pour l'entrée et la sortie d'air avec régulateur de débit d'air, en acier, dimensions de l'ouverture de construction sous la grille 600 x 200 mm",Material,General,m2,330.57,330.57,330.57,330.57,1,EUR,39.67,0.12,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEDX-RI-KATO-KADX_KAKANETO,"Grilles de ventilation à persiennes pour l'entrée et la sortie d'air avec régulateur de débit d'air, en acier, dimensions de l'ouverture de construction sous la grille 400 x 200 mm",Material,General,m2,392.02,392.02,392.02,392.02,1,EUR,31.36,0.08,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de grilles à lamelles en acier MEVO-ME-KARI-KAME_KAMETOPU,"Vanne à coin avec tige télescopique 30s76, raccordement à la canalisation par bride, pression nominale 6,4 MPa, diamètre nominal 150 mm",Material,General,pièce,2301.69,2301.69,2301.69,2301.69,1,EUR,0.92,0.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES KAME-PU-KATO-KANE_KATOKAKA,"Système d'étanchéité pour tige de forage d'un diamètre de 63,5-89 mm, livré avec une bobine à glissière, diamètre de la bride d'appui 380 mm, hauteur du système d'étanchéité 700 mm, longueur du système d'étanchéité 610 mm",Material,General,compl,55818.1,55818.1,55818.1,55818.1,1,EUR,72.56,0.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FORAGES TECHNIQUES DANS LES EXPLOITATIONS MINIÈRES KAME-PU-KATO-KAME_KAKARIME,"Poudre (poudre d'argile) bentonite pour la préparation de boues de forage, rendement de la boue 8,0-11,0 m3/t",Material,General,t,364.01,364.01,364.01,364.01,1,EUR,1113.86,3.06,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"STATIONS DE MESURE, REVÊTEMENT DES EXHAUSTIONS, BARRIÈRES DE SCHISTE ET D'EAU, P" DXME-MEPU-KAME_KAKALI,"Bétonnières automotrices pour mines, volume du tambour jusqu'à 3 m3",Equipment,General,Heures machine,59.81,59.81,59.81,59.81,1,EUR,3193.6,53.4,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"FONDATIONS SOUS LES MURS ET ÉQUIPEMENTS, CONDUITS DE CÂBLES, TRAVERSES ET PUITS " DXME-KAVO-KAVO_KAMEME,"Installations pour la préparation d'émulsion bitumineuse, capacité jusqu'à 3 t/h",Equipment,General,Heures machine,15.77,15.77,15.77,15.77,1,EUR,5.2,0.33,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de liants bitumineux et d'émulsions KASA-ME-KAVO-MEPU_KAMEVORI,"Demi-anneaux en béton armé, volume jusqu'à 0,5 m3, béton B15, consommation d'armature de 100 à 150 kg/m3",Material,General,m3,1014.98,1014.98,1014.98,1014.98,1,EUR,41827.17,41.21,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX KASA-ME-KAVO-KANE_KAMEMESA,"Panneaux muraux en béton armé pour la construction d'infrastructures de transport, volume jusqu'à 0,8 m3, béton B15, consommation d'armature de 50 à 100 kg/m3",Material,Steel & Metal,m3,956.1,956.1,956.1,956.1,1,EUR,21435.82,22.42,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX KASA-ME-KAVO-KANE_KAMEMEPU,"Dalles en béton armé pour la construction d'infrastructures de transport, volume jusqu'à 1,4 m3, béton B15, consommation d'armature de 50 à 100 kg/m3",Material,Steel & Metal,m3,707.35,707.35,707.35,707.35,1,EUR,25726.5,36.37,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX DXME-METO-KAME_KAVOME,"Machines pour l'élimination des marquages routiers par méthode hydraulique sur châssis de type automobile, volume du réservoir d'eau 12 m3, volume du réservoir pour déchets 6 m3",Equipment,General,Heures machine,225.11,225.11,225.11,225.11,1,EUR,40.52,0.18,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX DXME-KALI-KAME_KAKATO,"Bennes, capacité 4 m3",Equipment,General,Heures machine,0.12,0.12,0.12,0.12,1,EUR,0.08,0.68,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX MERI-RI-KASA-KANE_KAKATORI,"Panneaux isolants en polystyrène expansé, type T, PPS15",Material,General,m3,142.0,142.0,142.0,142.0,1,EUR,0.14,0.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX KAPU-TO-KARI-KAPU_KATOKAME,"Mélanges secs de béton de réparation thixotropes, classe B60 (M800), F400, W16, sans retrait, à prise rapide",Material,General,kg,1.42,1.42,1.42,1.42,1,EUR,474.31,334.76,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX MEVO-SA-KAVO-MEVO_KAMENEME,"Support pour chauffe-eau, ouvert, dimensions 310 x 870 x 310 mm",Material,General,pièce,20.13,20.13,20.13,20.13,1,EUR,20.13,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de chauffe-eau, RIME-RI-KATO-KADX_KAMEKAPU,Câble électrique PRGN 1x4-660,Material,General,1000 m,1061.52,1061.52,1061.52,1061.52,1,EUR,4.25,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"COMMUNICATIONS RADIO, RADIODIFFUSION, RADIO et TÉLÉVISION",NOEUDS DE RADIOTRANSMISSION RITO-VO-KATO-MEME_KARINETO,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,6 MPa, diamètre nominal 15 mm",Material,General,pièce,4.63,4.63,4.63,4.63,1,EUR,4.63,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Prélèvement de gaz dans l'espace de combustion à l'aide d'un tube à impulsions, MEVO-ME-MEKA-KAME_KAKATOME,"Vanne à passage direct 15kch18r, raccordement à la canalisation par manchon, pression nominale 1,6 MPa, diamètre nominal 15 mm",Material,General,pièce,10.66,10.66,10.66,10.66,1,EUR,10.66,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Prélèvement de gaz dans la canalisation avec installation d'un ventilateur, RITO-VO-KAPU-METO_KAKAKAME,"Coude fileté à passage droit, diamètre nominal 20 mm",Material,General,pièce,130.32,130.32,130.32,130.32,1,EUR,130.32,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Dispositif d'installation pour la réduction de la pression du gaz, RITO-VO-KATO-MEME_KANEMELI,"Bride plate en acier à souder, nuance d'acier 20 et 25, pression nominale 0,1 et 0,25 MPa, diamètre nominal 50 mm",Material,General,pièce,6.06,6.06,6.06,6.06,1,EUR,6.06,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Dispositif d'installation pour la réduction de la pression du gaz, KAME-LI-KANE-KADX_MEKAKAKA,"Bandes en mousse de polyéthylène, amortisseurs pour compenser la dilatation thermique de la chape en ciment, largeur 100 mm, épaisseur 10 mm",Material,General,100 m,191.05,191.05,191.05,191.05,1,EUR,162.4,0.85,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de chapes MEVO-PU-KAME-KAME_KAKAMEPU,"Bouteille pour gaz liquéfiés, pression de service jusqu'à 1,6 MPa, volume 50 l",Material,General,pièce,119.46,119.46,119.46,119.46,1,EUR,119.46,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de bouteilles de gaz liquéfié dans la cuisine, RITO-VO-KATO-KAME_KAKAMERI,"Bouchon en acier sans soudure à souder, diamètre nominal 100 mm",Material,General,pièce,4.35,4.35,4.35,4.35,1,EUR,4.35,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Coupe d'une conduite de gaz interne en service, RITO-VO-KATO-KAME_KAKAMEME,"Bouchon en acier sans soudure à souder, diamètre nominal 50 mm",Material,General,pièce,1.17,1.17,1.17,1.17,1,EUR,1.17,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Coupe d'une conduite de gaz interne en service, RITO-VO-KATO-MEME_KARILIPU,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,6 MPa, diamètre nominal 200 mm",Material,General,pièce,57.25,57.25,57.25,57.25,1,EUR,114.5,2.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,"Installation de vannes hydrauliques, de boucliers pour les appareils de contrôle", RITO-VO-KATO-MEME_KARILITO,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 1,6 MPa, diamètre nominal 150 mm",Material,General,pièce,41.89,41.89,41.89,41.89,1,EUR,83.79,2.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,"Installation de vannes hydrauliques, de boucliers pour les appareils de contrôle", RIRI-ME-KARI-KARI_KAKAKAME,Kit de fixation au bâtiment KZ-8,Material,General,compl,33.3,33.3,33.3,33.3,1,EUR,0.09,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES DE PETITE CAPACITÉ RIME-RI-KARI-KATO_KAKAKAME,"Câble croisé de station avec isolation en plastique polyvinylchlorure, marque PKSV-2, à deux conducteurs",Material,General,1000 m,109.69,109.69,109.69,109.69,1,EUR,30.71,0.28,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,TÉLÉPHONIE LOCALE,STATIONS TÉLÉPHONIQUES AUTOMATIQUES DE PETITE CAPACITÉ RITO-TO-KADX-KAME,Tubes électrosoudés en acier résistant à la corrosion,Abstract Material,Pipes & Fittings,10 m,113.84,113.84,113.84,113.84,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,CONDUITS D'AIR MÉTALLIQUES,Pose de conduits d'air en acier résistant à la corrosion dans des installations MEVO-ME-KAPU-KALI,Clapets à clapet,Abstract Material,General,pièce,35.42,35.42,35.42,35.42,1,EUR,35.42,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ventilation et climatisation,ÉLÉMENTS DE CONSTRUCTION POUR L'INSTALLATION DE SYSTÈMES DE VENTILATION ET DE CL,Installation de vannes RITO-PU-KAME-KASA_KAKAKAME,"Tuyaux en acier isolés, diamètre 50 mm",Material,General,m,12.69,12.69,12.69,12.69,1,EUR,25.76,2.03,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Dispositif d'installation pour la réduction de la pression du gaz, RITO-VO-KATO-KASA_KAKAKAPU,"Raccord en acier, diamètre nominal 32 mm",Material,General,pièce,0.94,0.94,0.94,0.94,1,EUR,0.94,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, RITO-VO-KATO-MEME_KARIDXRI,"Bride plate en acier à souder, nuance d'acier 20, plage de température d'utilisation de -30 °C à +300 °C, pression nominale 2,5 MPa, diamètre nominal 125 mm",Material,General,pièce,58.87,58.87,58.87,58.87,1,EUR,117.73,2.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, MEVO-ME-KARI-KAME_KARIKAPU,"Vanne parallèle à tige montante 30ch6br, raccordement à la tuyauterie par bride, pression nominale 1,0 MPa, diamètre nominal 125 mm",Material,General,pièce,365.82,365.82,365.82,365.82,1,EUR,365.82,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation d'appareils à brûleur à gaz, KAME-SA-KARI-KAPU,Panneaux antibruit,Abstract Material,General,m2,129.78,129.78,129.78,129.78,1,EUR,12977.67,100.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,AMÉNAGEMENT DES ROUTES,AUTRES TRAVAUX DXME-KAVO-KASA_KAPUSA,"Électricité : consommation 3,63 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.47,0.47,0.47,0.47,1,EUR,16.28,34.92,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"FONDATIONS SOUS LES MURS ET ÉQUIPEMENTS, CONDUITS DE CÂBLES, TRAVERSES ET PUITS " DXME-KAVO-KASA_KAPUSA,"Complexes de pose de béton pour la pose mécanisée de mélange de béton derrière un coffrage dans des galeries minières d'une section d'au moins 8,4 m2, débit jusqu'à 5 m3/h, volume de la trémie 0,5 m3",Equipment,General,Heures machine,10.63,10.63,10.63,10.63,1,EUR,371.22,34.92,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"FONDATIONS SOUS LES MURS ET ÉQUIPEMENTS, CONDUITS DE CÂBLES, TRAVERSES ET PUITS " DXME-KARI-KASA_KAMEVO,"Électricité : consommation 29,7 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.81,3.81,3.81,3.81,1,EUR,3.81,1.0,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Transformation des propriétés des sols faiblement portants et saturés d'eau par DXME-KARI-KASA_KAMEVO,"Installations pour l'enfoncement de pieux, force d'enfoncement 320 t",Equipment,General,Heures machine,68.36,68.36,68.36,68.36,1,EUR,68.36,1.0,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Transformation des propriétés des sols faiblement portants et saturés d'eau par RISA-ME-KASA-KAPU_MEKAKANE,"Rails de chemin de fer, type R33",Material,General,t,4211.18,4211.18,4211.18,4211.18,1,EUR,282149.33,67.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,"VOIES FERRÉES PERMANENTES, AIGUILLAGES, DÉVIEURS" KARI-PU-KATO-KATO_KAKAMESA,"Granulats issus de la sidérurgie noire et non ferreuse pour la construction routière M 1200, fraction 20-40 mm",Material,General,m3,115.01,115.01,115.01,115.01,1,EUR,10040.3,87.3,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges organo-minéraux et d'enrobés bitumineux dans une install KARI-RI-KASA-KAPU_RIKANEPU,"Gravier provenant de roches denses pour travaux de construction M 1400, fraction 10-20 mm",Material,General,m3,87.26,87.26,87.26,87.26,1,EUR,3870.68,44.36,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges organo-minéraux et d'enrobés bitumineux dans une install KAME-LI-RIKA-KAVO_KAKANERI,Fibre de cellulose pour mélange bitumineux à base de gravillons et de mastic,Material,General,t,1087.95,1087.95,1087.95,1087.95,1,EUR,380.78,0.35,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges bitumineux polymères KAME-LI-KAVO-KASA_KAKAMERI,Additif salin pour mélange d'asphalte,Material,General,t,646.94,646.94,646.94,646.94,1,EUR,3234.72,5.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de mélanges bitumineux polymères KAME-TO-KASA-TOVO_KATOVOME,Thermoplastique divinylstyrène,Material,General,t,3823.91,3823.91,3823.91,3823.91,1,EUR,19119.53,5.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de liants polymères-bitumineux KAME-TO-KAPU-KATO,Huile,Abstract Material,General,l,2.58,2.58,2.58,2.58,1,EUR,38695.84,15000.0,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de liants polymères-bitumineux MEDX-TO-KARI-KALI_KAKATOSA,"Vanne à guillotine ronde en tôle galvanisée et en acier de qualité, diamètre 160 mm",Material,General,pièce,22.08,22.08,22.08,22.08,1,EUR,22.08,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de cuisinières à gaz, MEVO-PU-KAME-KAVO_KAKALIME,Nettoyage en acier,Material,General,pièce,2.38,2.38,2.38,2.38,1,EUR,2.38,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de cuisinières à gaz, DXME-KAVO-KAVO_KAMEME,"Électricité : consommation 23,1 kWh/machine-heure",Electricity,Electricity,Heures machine,2.97,2.97,2.97,2.97,1,EUR,0.98,0.33,1,1,TRAVAUX DE CONSTRUCTION,Routes automobiles,PRÉPARATION DES MATÉRIAUX,Préparation de liants bitumineux et d'émulsions KAME-LI-MESA-MEME_MEKARIKA,"Rondelles à ressort en acier galvanisé (grover), diamètre du trou M20",Material,General,t,5625.53,5625.53,5625.53,5625.53,1,EUR,0.56,0.0,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Tête de colonne de gel RITO-VO-KATO-KADX,Tête de colonne de congélation incluse,Abstract Material,General,pièce,119.25,119.25,119.25,119.25,1,EUR,15.5,0.13,1,1,TRAVAUX DE CONSTRUCTION,"Travaux de battage, puits de forage, consolidation des sols",FIXATION DES SOLS,Tête de colonne de gel KAVO-ME-KASA-KATO_MEKAMEVO,"Collier de fixation métallique pour raccorder les tuyaux du conduit à déchets, largeur 60 mm, diamètre du collier 425-440 mm",Material,General,pièce,8.6,8.6,8.6,8.6,1,EUR,137.54,16.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ KAVO-ME-KASA-KAPU,Poubelles,Abstract Material,General,pièce,343.5,343.5,343.5,343.5,1,EUR,343.5,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ KAVO-ME-KARI-RISA_KAKADXME,"Support coulissant en acier, largeur 280 mm, hauteur 340 mm, diamètre de la canalisation 377 mm",Material,General,kg,6.48,6.48,6.48,6.48,1,EUR,557.71,86.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment KASA-RI-KARI-MEKA,Blocs de polystyrène expansé pour murs,Abstract Material,General,m3,278.07,278.07,278.07,278.07,1,EUR,274.18,0.99,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONSTRUCTIONS EN BLOCS LÉGERS ET EN PIERRES,Maçonnerie de murs autoportants en blocs de béton polystyrène RIME-ME-KANE-KALI_MEPURITO,"Câble électrique avec conducteurs en aluminium NAYYng(A) 3x4+1x2,5-660",Material,General,1000 m,1365.87,1365.87,1365.87,1365.87,1,EUR,20.49,0.02,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,CONDUITS À DÉCHETS,Installation d'un vide-ordures avec un conduit en tubes de chrysotile-ciment équ DXME-KADX-MERI_KAMEME,Supports de voie spéciaux,Equipment,General,Heures machine,0.41,0.41,0.41,0.41,1,EUR,55.07,133.33,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KAVO-KASA_KAKAME,"Électricité : consommation 0,54 kWh/machine-heure",Electricity,Electricity,Heures machine,0.07,0.07,0.07,0.07,1,EUR,22.38,322.35,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE MEVO-PU-KAME-KAVO_KAKARIME,Tuyau conique,Material,General,pièce,11.33,11.33,11.33,11.33,1,EUR,11.33,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de cuisinières à gaz, MEVO-ME-MEKA-KADX_KAKAMEME,Robinet en laiton pour purge d'air,Material,General,pièce,1.07,1.07,1.07,1.07,1,EUR,1.07,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CONTRÔLE ET DE MESURE ET ROBINETS À AIR,Installation d'appareils de contrôle et de mesure et de robinets d'air MEVO-ME-MEME-KANE_KAKAKAME,"Indicateur de niveau de type robinet 12s17bk n° 2, avec verre indicateur de niveau, pression nominale 3,9 MPa",Material,General,compl,207.41,207.41,207.41,207.41,1,EUR,207.41,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CONTRÔLE ET DE MESURE ET ROBINETS À AIR,Installation d'appareils de contrôle et de mesure et de robinets d'air RIPU-RI-KATO-KAPU_KAKAKAME,"Collecteur d'aspiration, diamètre 168 mm",Material,General,m,54.84,54.84,54.84,54.84,1,EUR,548.4,10.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",DRAINAGE MEDX-ME-KATO-KAME_KAKAKATO,"Collecteur d'air en tubes d'acier sans soudure et soudés, horizontal et vertical, diamètre extérieur du corps 108 mm",Material,Pipes & Fittings,pièce,98.36,98.36,98.36,98.36,1,EUR,98.36,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEDX-ME-KATO-KAME_KAKAKARI,"Collecteur d'air en tubes d'acier sans soudure et soudés, horizontal et vertical, diamètre extérieur du corps 89 mm",Material,Pipes & Fittings,pièce,83.42,83.42,83.42,83.42,1,EUR,83.42,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEDX-ME-KATO-KAME_KAKAKAME,"Collecteur d'air en tubes en acier sans soudure et soudés, horizontal et vertical, diamètre extérieur du corps 76 mm",Material,Pipes & Fittings,pièce,79.94,79.94,79.94,79.94,1,EUR,79.94,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEVO-SA-KALI-KAME_KAKAKADX,"Réservoir en acier à condensation, sans indicateur de niveau d'eau, capacité 2010-3000 l",Material,General,pièce,3266.82,3266.82,3266.82,3266.82,1,EUR,3266.82,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de réservoirs de condensation MEVO-SA-KALI-KAME_KAKAKAVO,"Réservoir en acier à condensation, sans indicateur de niveau d'eau, capacité 1500-2000 l",Material,General,pièce,2745.9,2745.9,2745.9,2745.9,1,EUR,2745.9,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de réservoirs de condensation RIRI-RI-KARI-KANE_KAKAKASA,"Consoles en fonte pour puits de câbles et puits de communication, dimensions 654 x 60 x 100 mm",Material,General,100 pièces,3355.61,3355.61,3355.61,3355.61,1,EUR,33.56,0.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIRI-RI-KARI-KANE_KAKAKAPU,"Consoles en fonte pour puits de câbles et puits de communication, dimensions 433 x 60 x 65 mm",Material,General,100 pièces,2278.53,2278.53,2278.53,2278.53,1,EUR,22.79,0.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIRI-RI-KARI-KANE_KAKAKARI,"Consoles en fonte pour puits de câbles et puits de communication, dimensions 217 x 60 x 65 mm",Material,General,100 pièces,990.2,990.2,990.2,990.2,1,EUR,9.9,0.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE DXME-MERI-KAVO_SAMEPU,"Broyeurs automoteurs sur chenilles, puissance 184 kW (250 ch)",Equipment,General,Heures machine,111.63,111.63,111.63,111.63,1,EUR,783.65,7.02,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS RIKA-RI-KARI-KAME_KAKAMEVO,"Douilles conductrices, dimensions 10 x 4,8 x 16 mm",Material,General,1000 pièces,373.15,373.15,373.15,373.15,1,EUR,0.75,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIKA-ME-KARI-RITO_KAMELITO,"Poteau de mesure en béton armé, dimensions 1100 x 240 x 120 mm",Material,General,pièce,16.5,16.5,16.5,16.5,1,EUR,16.5,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIRI-ME-KAME-KAME_KAKASAME,"Boîtier de câbles interurbains, boîtier en aluminium, 30 paires de fils, 2 tubes, 3 plinthes, 10 paires de prises pour câbles haute fréquence",Material,Pipes & Fittings,pièce,332.2,332.2,332.2,332.2,1,EUR,332.2,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE MEVO-PU-KAME-KATO_KAKAKAME,"Protecteur en magnésium, longueur 700 mm, diamètre 200 mm",Material,General,pièce,180.67,180.67,180.67,180.67,1,EUR,180.67,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIKA-RI-KADX-MERI_KAKALIRI,Manchon de raccordement étanche au gaz pour câble de capacité 7x4,Material,General,pièce,215.37,215.37,215.37,215.37,1,EUR,215.37,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE RIKA-RI-KADX-MERI_KAKALIME,Manchon étanche au gaz pour câble de capacité 4x4,Material,General,pièce,171.22,171.22,171.22,171.22,1,EUR,171.22,1.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION INTERURBAINES PAR CÂBLE MEVO-ME-KADX-KAME_KAKAKAME,"Robinet à boisseau sphérique en laiton, à manchon, avec poignée, pression nominale 1,6 MPa, diamètre nominal 20 mm",Material,General,pièce,7.3,7.3,7.3,7.3,1,EUR,7.3,1.0,1,1,TRAVAUX DE CONSTRUCTION,Alimentation en gaz - installations intérieures,Installation de chauffe-eau, RIKA-ME-KARI-KATO_KAKAKATO,Plinthes de raccordement pour 30 paires,Material,General,100 pièces,14631.55,14631.55,14631.55,14631.55,1,EUR,292.63,0.02,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-ME-KARI-KATO_KAKAKARI,Plinthes de raccordement pour 20 paires,Material,General,100 pièces,11699.8,11699.8,11699.8,11699.8,1,EUR,234.0,0.02,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-ME-KARI-KATO_KAKAKAME,Plinthes de raccordement pour 10 paires,Material,General,100 pièces,9716.87,9716.87,9716.87,9716.87,1,EUR,194.34,0.02,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE MEME-RI-KAPU-KAPU_KAKAKAPU,"Bouchons en bois résineux (épicéa, pin) pour trous, diamètre 50 mm",Material,General,100 pièces,25.64,25.64,25.64,25.64,1,EUR,51.28,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIRI-RI-KAME-KAPU_KAKAMEPU,Isolateurs linéaires à broches TF-12,Material,General,100 pièces,216.06,216.06,216.06,216.06,1,EUR,64.82,0.3,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIME-RI-KARI-KAPU_KAKAKARI,"Câble de transmission PTVZh 2kh1,2",Material,General,1000 m,151.98,151.98,151.98,151.98,1,EUR,0.91,0.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-SA-KAPU-MEKA_KAKAKAME,"Pinces à platine PS-1-1 (5,5-8,6 mm)",Material,General,100 pièces,136.87,136.87,136.87,136.87,1,EUR,2.74,0.02,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-SA-KARI-KANE_KAKAPUPU,Boîtes de dérivation UK-2,Material,General,10 pièces,2.71,2.71,2.71,2.71,1,EUR,0.27,0.1,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIKA-RI-KAVO-KATO_KAKAMEPU,Kits de matériaux de montage pour dispositifs de protection des abonnés,Material,General,100 pièces,459.82,459.82,459.82,459.82,1,EUR,4.6,0.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE MEDX-ME-KARI-KAME,Purgeurs d'air,Abstract Material,General,pièce,362.01,362.01,362.01,362.01,1,EUR,362.01,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEDX-ME-KATO-KAME_KAKAKADX,"Collecteur d'air en tubes d'acier sans soudure et soudés, horizontal et vertical, diamètre extérieur du corps 426 mm",Material,Pipes & Fittings,pièce,450.02,450.02,450.02,450.02,1,EUR,450.02,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEDX-ME-KATO-KAME_KAKAKAVO,"Collecteur d'air en tubes d'acier sans soudure et soudés, horizontal et vertical, diamètre extérieur du corps 325 mm",Material,Pipes & Fittings,pièce,276.28,276.28,276.28,276.28,1,EUR,276.28,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEDX-ME-KATO-KAME_KAKAKALI,"Collecteur d'air en tubes d'acier sans soudure et soudés, horizontal et vertical, diamètre extérieur du corps 273 mm",Material,Pipes & Fittings,pièce,207.82,207.82,207.82,207.82,1,EUR,207.82,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEDX-ME-KATO-KAME_KAKAKANE,"Collecteur d'air en tubes d'acier sans soudure et soudés, horizontal et vertical, diamètre extérieur du corps 219 mm",Material,Pipes & Fittings,pièce,170.24,170.24,170.24,170.24,1,EUR,170.24,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEDX-ME-KATO-KAME_KAKAKASA,"Collecteur d'air en tubes d'acier sans soudure et soudés, horizontal et vertical, diamètre extérieur du corps 159 mm",Material,Pipes & Fittings,pièce,117.45,117.45,117.45,117.45,1,EUR,117.45,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEDX-ME-KATO-KAME_KAKAKAPU,"Collecteur d'air en tubes d'acier sans soudure et soudés, horizontal et vertical, diamètre extérieur du corps 133 mm",Material,Pipes & Fittings,pièce,104.76,104.76,104.76,104.76,1,EUR,104.76,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,DISPOSITIFS D'ENTRÉE DES SYSTÈMES,Installation de collecteurs d'air et de purgeurs d'air MEVO-SA-KAME-KAME_KAKAMERI,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 2000 l",Material,Waterproofing,pièce,7035.03,7035.03,7035.03,7035.03,1,EUR,7035.03,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAMEME,"Réservoir à membrane en acier pour le chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 1500 l",Material,Waterproofing,pièce,4932.4,4932.4,4932.4,4932.4,1,EUR,4932.4,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion DXME-MEME-KARI_KATOTO,Installations mobiles pour le montage de structures porteuses de câbles pour micro-canalisations d'égouts sur la surface intérieure de canalisations et de collecteurs d'égouts d'un diamètre de 250 à 900 mm,Equipment,General,Heures machine,231.67,231.67,231.67,231.67,1,EUR,1278.82,5.52,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE KAME-LI-MESA-KAME_MEMETOTO,"Vis d'ancrage en acier galvanisé à tête hexagonale, diamètre 6 mm, longueur 40 mm",Material,General,100 pièces,100.74,100.74,100.74,100.74,1,EUR,202.48,2.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE DXME-KAVO-KASA_KAKAME,"Unités de distribution de béton sur les voies ferrées, volume de la trémie de dosage 2 m3",Equipment,General,Heures machine,35.36,35.36,35.36,35.36,1,EUR,11397.08,322.35,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KALI-MEME_SAKAVO,"Électricité : consommation 7,12 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.91,0.91,0.91,0.91,1,EUR,566.52,619.19,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KALI-MEME_SAKAVO,"Trémies à béton avec dispositif de levage hydraulique, capacité 9 m3",Equipment,General,Heures machine,19.29,19.29,19.29,19.29,1,EUR,11943.53,619.19,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KATO-MEME_SAKANE,"Chariots pour le transport d'éléments de superstructure de voie, capacité de charge 0,9 t",Equipment,General,Heures machine,3.38,3.38,3.38,3.38,1,EUR,15145.5,4487.33,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE RISA-ME-KANE-KASA,Compensateurs,Abstract Material,General,t,16077.06,16077.06,16077.06,16077.06,1,EUR,4662.35,0.29,1,1,TRAVAUX DE CONSTRUCTION,Travaux de creusement de galeries,TRAVAUX DE PERÇAGE DE TUNNELS RÉALISÉS DE MANIÈRE CONVENTIONNELLE,FIXATIONS PERMANENTES DES PUITS VERTICAUX ET DES PUITS DE SECTEUR CIRCULAIRE ET KALI-RI-KANE-KANE_MEKATOKA,"Profilé (planche) en PVC pour la fixation de la membrane de drainage sur le bord supérieur, avec des trous de fixation de 6 mm de diamètre, largeur 105 mm",Material,Waterproofing,100 m,457.54,457.54,457.54,457.54,1,EUR,91.51,0.2,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Installation de systèmes de drainage KAME-LI-MESA-KALI_KARISAKA,"Cheville auto-adhésive en polyamide pour la fixation de membranes d'étanchéité, dimensions de la surface d'appui 40 x 40 mm, longueur de la cheville 35 mm",Material,Waterproofing,pièce,2.75,2.75,2.75,2.75,1,EUR,1099.52,400.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Installation de systèmes de drainage MERI-ME-KARI-MEKA_KAMEVODX,"Membrane de drainage profilée en polyéthylène haute densité (PEHD), inflammabilité G4, résistance à la compression d'au moins 200 kN/m2, hauteur des nervures 20 mm, épaisseur 1 mm",Material,Waterproofing,m2,35.9,35.9,35.9,35.9,1,EUR,4308.4,120.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Installation de systèmes de drainage DXME-KADX-MERI_METOME,Dispositifs de levage pour voies ferrées,Equipment,General,Heures machine,35.29,35.29,35.29,35.29,1,EUR,1834.89,52.0,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-MERI_MERIME,Traverses pour la pose de demi-traverses sur les voies ferrées,Equipment,General,Heures machine,0.16,0.16,0.16,0.16,1,EUR,6.95,44.0,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-MEME-KARI_KADXME,Installations pour la pose pneumatique de câbles à fibres optiques,Equipment,General,Heures machine,2.87,2.87,2.87,2.87,1,EUR,22.49,7.83,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION PAR CÂBLE À FIBRE OPTIQUE MEPU-ME-KASA-KASA_KAKAKARI,"Colle-mastic organosilicié, marque Elacil 137-352",Material,General,kg,68.46,68.46,68.46,68.46,1,EUR,102.7,1.5,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,LIGNES DE COMMUNICATION,LIGNES DE COMMUNICATION URBAINES PAR CÂBLE RIME-RI-KARI-KAME_KAKARISA,"Fil d'antenne MG, section 10 mm2",Material,General,1000 m,2931.57,2931.57,2931.57,2931.57,1,EUR,131.92,0.04,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO RILI-RI-KAME-KAVO_MEKAKALI,"Collier pour l'ancrage du câble de mise à la terre collective, diamètre 380 mm",Material,General,pièce,51.99,51.99,51.99,51.99,1,EUR,103.98,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS RADIO MEVO-SA-KALI-KAME_KAKAKANE,"Réservoir en acier à condensation, sans indicateur de niveau d'eau, capacité 1260-1500 l",Material,General,pièce,2265.96,2265.96,2265.96,2265.96,1,EUR,2265.96,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de réservoirs de condensation MEVO-SA-KALI-KAME_KAKAKALI,"Réservoir en acier à condensation, sans indicateur de niveau d'eau, capacité 1010-1250 l",Material,General,pièce,2086.12,2086.12,2086.12,2086.12,1,EUR,2086.12,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de réservoirs de condensation MEVO-SA-KALI-KAME_KAKAKASA,"Réservoir en acier à condensation, sans indicateur de niveau d'eau, capacité 810-1000 l",Material,General,pièce,1723.18,1723.18,1723.18,1723.18,1,EUR,1723.18,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de réservoirs de condensation MEVO-SA-KALI-KAME_KAKAKAPU,"Réservoir en acier à condensation, sans indicateur de niveau d'eau, capacité 610-800 l",Material,General,pièce,1520.73,1520.73,1520.73,1520.73,1,EUR,1520.73,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de réservoirs de condensation MEVO-SA-KALI-KAME_KAKAKATO,"Réservoir en acier à condensation, sans indicateur de niveau d'eau, capacité 410-600 l",Material,General,pièce,1267.7,1267.7,1267.7,1267.7,1,EUR,1267.7,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de réservoirs de condensation MEVO-SA-KALI-KAME_KAKAKARI,"Réservoir en acier à condensation, sans indicateur de niveau d'eau, capacité 310-400 l",Material,General,pièce,915.59,915.59,915.59,915.59,1,EUR,915.59,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de réservoirs de condensation MEVO-SA-KALI-KAME_KAKAKAME,"Réservoir de condensation en acier, sans indicateur de niveau d'eau, capacité jusqu'à 300 l",Material,General,pièce,850.12,850.12,850.12,850.12,1,EUR,850.12,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de réservoirs de condensation MEVO-SA-KAME-KAPU_KAKAKATO,"Réservoir d'expansion en acier pour chauffage, pression 0,6-1,0 MPa, capacité jusqu'à 2000 l",Material,General,pièce,7035.66,7035.66,7035.66,7035.66,1,EUR,7035.66,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAPU_KAKAKARI,"Réservoir d'expansion en acier pour chauffage, pression 0,6-1,0 MPa, capacité jusqu'à 1500 l",Material,General,pièce,4351.93,4351.93,4351.93,4351.93,1,EUR,4351.93,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAPU_KAKAKAME,"Réservoir d'expansion en acier pour le chauffage, pression 0,6-1,0 MPa, capacité jusqu'à 1000 l",Material,General,pièce,2949.13,2949.13,2949.13,2949.13,1,EUR,2949.13,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAMENE,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 4000 l",Material,Waterproofing,pièce,14979.17,14979.17,14979.17,14979.17,1,EUR,14979.17,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAMESA,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 3500 l",Material,Waterproofing,pièce,13468.2,13468.2,13468.2,13468.2,1,EUR,13468.2,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAMEPU,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 3000 l",Material,Waterproofing,pièce,10818.12,10818.12,10818.12,10818.12,1,EUR,10818.12,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAMETO,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 2500 l",Material,Waterproofing,pièce,10007.01,10007.01,10007.01,10007.01,1,EUR,10007.01,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAKATO,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 300 l",Material,Waterproofing,pièce,498.07,498.07,498.07,498.07,1,EUR,498.07,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAKARI,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 200 l",Material,Waterproofing,pièce,410.02,410.02,410.02,410.02,1,EUR,410.02,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAKAVO,"Réservoir à membrane en acier pour le chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 150 l",Material,Waterproofing,pièce,224.63,224.63,224.63,224.63,1,EUR,224.63,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAKAME,"Réservoir à membrane en acier pour le chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 100 l",Material,Waterproofing,pièce,184.75,184.75,184.75,184.75,1,EUR,184.75,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion DXME-KADX-MERI_KADXRI,"Systèmes de voie pour le réglage de la fondation continue sous les rails, plage de réglage vertical jusqu'à 25 mm, plage de réglage horizontal jusqu'à 27 mm",Equipment,General,Heures machine,43.86,43.86,43.86,43.86,1,EUR,4320.52,98.5,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-KADX-MERI_KADXME,"Systèmes de géodésie et de levés topographiques pour le positionnement de la voie dans la position prévue, précision jusqu'à 0,3 mm",Equipment,General,Heures machine,15.21,15.21,15.21,15.21,1,EUR,2121.48,139.5,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE ET DÉMONTAGE DE LA VOIE DXME-RIME-MEVO_KAVOME,"Électricité : consommation 13,2 kWh/machine-heure",Electricity,Electricity,Heures machine,1.7,1.7,1.7,1.7,1,EUR,3.05,1.8,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Chauffage électrique technologique du béton KAPU-TO-KARI-KADX_KADXPUPU,"Mélanges secs d'étanchéité à base de ciment avec teneur en sable de quartz pour l'étanchéité des fissures, joints, raccords de structures en béton et en béton armé, classe B30 (M400), F400, W6-W14, consommation 1,5 kg/m",Material,Steel & Metal,kg,10.13,10.13,10.13,10.13,1,EUR,1550.39,153.0,1,1,TRAVAUX DE CONSTRUCTION,Structures en briques et en blocs,"CONSTRUCTIONS EN PIERRES BRUTES, ÉTANCHÉITÉ ET BASES POUR FONDATIONS",Imperméabilisation des murs et des fondations RISA-ME-KAME-KATO_KAKAKARI,"Bois de conifères imprégné, pour ponts, largeur 200-240 mm, épaisseur 240-300 mm, longueur 3250-4200 mm",Material,General,m3,718.42,718.42,718.42,718.42,1,EUR,416.69,0.58,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE DE VOIES SUR LES PONTS RISA-ME-KANE-MELI,Dispositifs d'égalisation,Abstract Material,General,compl,21.77,21.77,21.77,21.77,1,EUR,21.77,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,POSE DE VOIES SUR LES PONTS KAME-LI-MEDX-MELI_KAKAPUNE,Cordon en caoutchouc de section rectangulaire avec une section supérieure à 100 mm2,Material,General,kg,11.96,11.96,11.96,11.96,1,EUR,448.37,37.5,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTIONS EN CHRYSOTILCIMENT,Installation de cloisons de 3 m de hauteur en panneaux extrudés en amiante-cimen MEME-RI-KAPU-KARI,Fils en chêne,Abstract Material,General,m,31.69,31.69,31.69,31.69,1,EUR,3327.92,105.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de veines DXME-MERI-KASA_KAKARI,"Machines de préparation en profondeur des champs sur tracteur, puissance 103 kW (140 ch)",Equipment,General,Heures machine,40.55,40.55,40.55,40.55,1,EUR,904.18,22.3,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-MERI-KASA_KAKAME,"Machines de préparation en profondeur des champs sur tracteur, puissance 79 kW (108 ch)",Equipment,General,Heures machine,28.29,28.29,28.29,28.29,1,EUR,707.23,25.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS DXME-MERI-KARI_KAMEME,Débroussailleuses rotatives (sans tracteur),Equipment,General,Heures machine,5.31,5.31,5.31,5.31,1,EUR,10.52,1.98,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX PRÉPARATOIRES LIÉS À L'ABATTAGE DES ARBRES ET AU DÉFRICHAGE DES TERRAINS RIKA-RI-KADX-KAME_KAKARIME,Masse de remplissage pour câbles de communication MKS-M,Material,General,kg,22.31,22.31,22.31,22.31,1,EUR,40.17,1.8,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS FILAIRES MEVO-SA-MEME-KAME_KAKAKATO,"Registres de chauffage en tubes d'acier non galvanisés pour conduites d'eau et de gaz, diamètre du filetage 32 mm",Material,Pipes & Fittings,m,91.87,91.87,91.87,91.87,1,EUR,9187.06,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier MEVO-SA-MEME-KAME_KAKAKARI,"Registres de chauffage en tubes d'acier non galvanisés pour conduites d'eau et de gaz, diamètre du filetage 25 mm",Material,Pipes & Fittings,m,71.05,71.05,71.05,71.05,1,EUR,7104.71,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier MEVO-SA-MEME-KAME_KAKAKAME,"Registres de chauffage en tubes d'acier non galvanisés pour conduites d'eau et de gaz, diamètre du filetage 20 mm",Material,Pipes & Fittings,m,50.6,50.6,50.6,50.6,1,EUR,5060.1,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier MEVO-SA-KANE-KARI,Convecteurs avec fixations,Abstract Material,General,kW,145.73,145.73,145.73,145.73,1,EUR,14573.41,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de convecteurs RIRI-RI-KARI-KAVO_KAKAPUME,"Support en acier pour l'installation de goulottes et la pose de câbles dans celles-ci sur les ponts, poids 24 kg, longueur 1350 mm",Material,General,pièce,103.51,103.51,103.51,103.51,1,EUR,10454.27,101.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIRI-RI-KARI-KAVO_KAKAPURI,"Support en acier pour la fixation du câble et la suspension des câbles sur les ponts, poids 45 kg, longueur 1300 mm",Material,General,pièce,185.96,185.96,185.96,185.96,1,EUR,371.91,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES KAVO-RI-KARI-KATO_KAKAKAME,"Câble à double torsion LK-O, structure 6x7(1+6)+1x7(1+6), marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 10 mm",Material,Steel & Metal,10 m,17.29,17.29,17.29,17.29,1,EUR,183.23,10.6,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIRI-RI-KARI-MEPU_KAKARIME,"Fil d'acier galvanisé pour lignes aériennes de communication, classes 1, 2, diamètre 1,2 mm",Material,General,t,4882.49,4882.49,4882.49,4882.49,1,EUR,0.0,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,LIGNES DE COMMUNICATION CÂBLÉES RIME-RI-KATO-KASA_KAKASAME,Câble d'alimentation avec conducteurs en cuivre PuV 1x6-450,Material,General,1000 m,1494.34,1494.34,1494.34,1494.34,1,EUR,22.42,0.02,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS FILAIRES RIME-RI-KARI-KASA_KAMEKAME,"Câble téléphonique de distribution à une paire avec conducteurs en cuivre et isolation en polychlorure de vinyle, marque TRV, diamètre 0,5 mm",Material,General,1000 m,78.11,78.11,78.11,78.11,1,EUR,1.17,0.02,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,COMMUNICATIONS DE SERVICE DANS LES TRANSPORTS FERROVIAIRES,COMMUNICATIONS FILAIRES MEVO-SA-KAME-KAME_KAKAMEKA,"Réservoir à membrane en acier pour le chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 1200 l",Material,Waterproofing,pièce,4350.17,4350.17,4350.17,4350.17,1,EUR,4350.17,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAKADX,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 1000 l",Material,Waterproofing,pièce,2948.22,2948.22,2948.22,2948.22,1,EUR,2948.22,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAKALI,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 800 l",Material,Waterproofing,pièce,1968.87,1968.87,1968.87,1968.87,1,EUR,1968.87,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAKANE,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 600 l",Material,Waterproofing,pièce,1151.36,1151.36,1151.36,1151.36,1,EUR,1151.36,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAKASA,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 500 l",Material,Waterproofing,pièce,798.99,798.99,798.99,798.99,1,EUR,798.99,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion MEVO-SA-KAME-KAME_KAKAKAPU,"Réservoir à membrane en acier pour chauffage, pression 0,5-1,0 MPa, capacité jusqu'à 400 l",Material,Waterproofing,pièce,719.27,719.27,719.27,719.27,1,EUR,719.27,1.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,RÉSERVOIRS D'EXPANSION ET DE CONDENSATION,Installation de vases d'expansion KAME-LI-MESA-KANE_KAKANETO,"Clous de finition en acier, diamètre 1,2 mm, longueur 25 mm",Material,General,t,2727.07,2727.07,2727.07,2727.07,1,EUR,0.79,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"ALARME ÉLECTRIQUE, ALARME INCENDIE, ALARME D'APPEL ET SIGNALISATION À DISTANCE",ALARME ÉLECTRIQUE ET ALARME INCENDIE MEKA-RI-KARI-KAME_KAMENEME,"Bandes en laiton, rigides, marque L68, largeur 10-18 mm, épaisseur 0,05 mm",Material,General,t,43440.19,43440.19,43440.19,43440.19,1,EUR,4.34,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,"ALARME ÉLECTRIQUE, ALARME INCENDIE, ALARME D'APPEL ET SIGNALISATION À DISTANCE",ALARME ÉLECTRIQUE ET ALARME INCENDIE KAVO-ME-KARI-KASA_KAKAKARI,"Filets (bandes) en aluminium pour revêtements mosaïques, dimensions 2 x 12 mm",Material,General,m,2.15,2.15,2.15,2.15,1,EUR,225.62,105.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de veines KAVO-ME-KARI-KASA_KAKAKAPU,"Filets en laiton pour revêtements mosaïques, dimensions 3 x 10 mm",Material,General,m,11.45,11.45,11.45,11.45,1,EUR,1202.26,105.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de veines KAME-LI-KANE-MEPU_KAKAKAME,"Bandes autocollantes d'étanchéité, ondulées, avec treillis en aluminium pour l'étanchéification des joints et des raccords, épaisseur de l'aluminium 0,14 mm, avec couche adhésive en caoutchouc butyle d'une épaisseur de 1 mm, largeur 300 mm",Material,General,m,16.89,16.89,16.89,16.89,1,EUR,44.42,2.63,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES",JOINTS DE DÉFORMATION ET ÉTANCHÉITÉ DES JOINTS DXME-RIME-MEVO_KAVOME,"Stations de chauffage du béton, tension d'alimentation 380 V, tension de service comprise entre 35 et 80 V, puissance jusqu'à 40 kW",Equipment,General,Heures machine,3.45,3.45,3.45,3.45,1,EUR,6.22,1.8,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Chauffage électrique technologique du béton KAPU-TO-KARI-MEME_KAKAMENE,"Mélanges secs à base de ciment (béton de sable), classe B15 (M200)",Material,General,t,146.03,146.03,146.03,146.03,1,EUR,297.91,2.04,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,AUTRES TRAVAUX,Installation d'un système de joints de dilatation à partir de structures profilé KAME-LI-MESA-MERI_KAKASANE,"Goujons filetés en acier galvanisé, diamètre du filetage M20, longueur 1100-2000 mm",Material,General,t,3776.07,3776.07,3776.07,3776.07,1,EUR,211.46,0.06,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,"Poutres, ceintures, linteaux, traverses",Construction de poutres et de linteaux DXME-KADX-MEKA_KAMEME,Trains de meulage de rails,Equipment,General,Heures machine,628.79,628.79,628.79,628.79,1,EUR,333.26,0.53,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX RISA-ME-KATO-KATO,Antivols à ressort,Abstract Material,General,t,4496.29,4496.29,4496.29,4496.29,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX MEVO-ME-MEKA-KALI,Vannes thermostatiques,Abstract Material,General,pièce,58.77,58.77,58.77,58.77,1,EUR,5877.37,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de vannes thermostatiques sur les appareils de chauffage MEVO-SA-MEME-KARI_KAKAKAPU,"Radiateurs à partir de tubes électrosoudés en acier, diamètre des tubes 108 mm",Material,Pipes & Fittings,m,34.68,34.68,34.68,34.68,1,EUR,3467.5,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier MEVO-SA-MEME-KARI_KAKAKATO,"Radiateurs à partir de tubes électrosoudés en acier, diamètre des tubes 89 mm",Material,Pipes & Fittings,m,30.78,30.78,30.78,30.78,1,EUR,3077.8,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier MEVO-SA-MEME-KARI_KAKAKARI,"Registres de chauffage en tubes électrosoudés en acier, diamètre des tubes 76 mm",Material,Pipes & Fittings,m,27.69,27.69,27.69,27.69,1,EUR,2768.95,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier MEVO-SA-MEME-KARI_KAKAKAME,"Registres de chauffage en tubes électrosoudés en acier, diamètre des tubes 57 mm",Material,Pipes & Fittings,m,23.06,23.06,23.06,23.06,1,EUR,2306.4,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier MEVO-SA-MEME-KAME_KAKAKAPU,"Registres de chauffage en tubes d'acier non galvanisés pour conduites d'eau et de gaz, diamètre du filetage 40 mm",Material,Pipes & Fittings,m,106.14,106.14,106.14,106.14,1,EUR,10613.9,100.0,1,1,TRAVAUX DE CONSTRUCTION,Chauffage - installations internes,APPAREILS DE CHAUFFAGE,Installation de registres en tubes d'acier RIPU-TO-KAME-KARI_MEKAKARI,"Joint d'étanchéité en caoutchouc pour tuyaux d'égout en PVC, diamètre 110 mm",Material,General,pièce,0.3,0.3,0.3,0.3,1,EUR,3.01,10.0,1,1,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" KAME-LI-KANE-KATO_MEKAKAKA,"Bandes de ventilation en PVC pour toiture, largeur 100 mm",Material,General,m,2.42,2.42,2.42,2.42,1,EUR,24.16,10.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable RIKA-RI-KAVO-KALI,Agrafes peintes pour la fixation du tablier-gouttière du système d'évacuation des eaux pluviales des tuiles en ciment-sable,Abstract Material,General,pièce,9.29,9.29,9.29,9.29,1,EUR,3716.87,400.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable DXME-RIME-RIRI_RISAME,"Électricité : consommation 0,99 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.13,0.13,0.13,0.13,1,EUR,0.23,1.78,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES ÉLÉMENTS DE LA SUPERSTRUCTURE DE LA VOIE DXME-RIME-RIRI_RISAME,"Générateurs de mousse à basse pression, débit jusqu'à 10 kg/min",Equipment,General,Heures machine,0.82,0.82,0.82,0.82,1,EUR,1.45,1.78,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,REMPLACEMENT DES ÉLÉMENTS DE LA SUPERSTRUCTURE DE LA VOIE RISA-TO-MEKA-KAME_METOTOKA,"Joint de raccordement ferroviaire en acier, type de rail P65, longueur en position moyenne 12 500 mm",Material,General,compl,33547.03,33547.03,33547.03,33547.03,1,EUR,67094.05,2.0,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,STRUCTURE SUPÉRIEURE DES VOIES FERRÉES À ÉCARTEMENT DE 1520 MM,AUTRES TYPES DE TRAVAUX KAVO-ME-KARI-METO,Manchons métalliques non étanches,Abstract Material,General,m,2.06,2.06,2.06,2.06,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,STRUCTURES CONSTRUITES À L'AIDE D'UN COFFRAGE GLISSANT,Construction de murs de silos d'un diamètre de 30 m pour le stockage du sucre KAME-LI-KAPU-MEKA_KAKAKAME,"Poignée-étrier en alliage d'aluminium anodisé, longueur 160 mm",Material,General,pièce,2.58,2.58,2.58,2.58,1,EUR,5.15,2.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE SUPPORT KAME-LI-KAPU-KATO_KAKAKAME,Loquet à recouvrement,Material,General,pièce,1.04,1.04,1.04,1.04,1,EUR,1.04,1.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE SUPPORT RIRI-RI-KARI-MELI_KAKAKARI,"Support téléphonique avec traverses, pièces forgées et boulons de fixation, dix paires",Material,General,pièce,83.12,83.12,83.12,83.12,1,EUR,83.12,1.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE SUPPORT MEVO-RI-KANE-KAVO_KAKAMEME,"Raccords flexibles renforcés en caoutchouc, diamètre 15 mm, longueur 300 mm",Material,General,10 pièces,18.83,18.83,18.83,18.83,1,EUR,1.88,0.1,1,1,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de toilettes suspendues, urinoirs avec installations de type cadre " MEVO-RI-KANE-MERI_KAKAPUME,"Fontaine à boire métallique sur pied avec commande à pédale et bec verseur, siphon à bouteille avec sortie sans cuvette, diamètre de la cuvette 210 mm, hauteur 840 mm",Material,General,pièce,195.84,195.84,195.84,195.84,1,EUR,1958.42,10.0,1,1,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,Installation de fontaines à boire au sol à commande à pédale MEVO-RI-KARI-KASA,Éviers en acier émaillé,Abstract Material,General,compl,55.67,55.67,55.67,55.67,1,EUR,556.68,10.0,1,1,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,Installation d'éviers et de lavabos MEVO-RI-KANE-MEME,Éviers d'hôpital,Abstract Material,General,compl,487.49,487.49,487.49,487.49,1,EUR,4874.92,10.0,1,1,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de cuvettes de WC, cuvettes au sol, siphons d'hôpital" KAME-LI-MESA-MERI_KAKAPUKA,"Goujons en acier galvanisé filetés, diamètre du filetage M12, longueur 300 mm",Material,General,t,3093.06,3093.06,3093.06,3093.06,1,EUR,9.28,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",STRUCTURES POUR L'INSTALLATION D'APPAREILS ET DE MOYENS D'AUTOMATISATION,Structures pour l'installation de mécanismes d'exécution KAME-SA-KAME-KARI_KAKANERI,"Plastique à froid pour marquage routier, couleur blanche",Material,General,kg,4.78,4.78,4.78,4.78,1,EUR,9.57,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements de communication,SYSTÈMES DE SOUTIEN HYDRO-MÉTÉOROLOGIQUE SPÉCIALISÉ POUR L'ENTRETIEN DES ROUTES,Stations météorologiques routières automatiques RIRI-RI-KARI-MENE_KAKAKAPU,Support pour lignes de réseau de diffusion filaire RS-II-ME.NE,Material,General,pièce,392.12,392.12,392.12,392.12,1,EUR,392.12,1.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE SUPPORT RITO-VO-KASA-MERI_KAMERITO,"Té 60° oblique en fonte malléable, diamètre nominal 100 x 100 mm",Material,General,pièce,32.55,32.55,32.55,32.55,1,EUR,32.55,1.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de canalisations d'égouts RITO-VO-KASA-KAME_KAKAMERI,"Bouchon en fonte, diamètre nominal 100 mm",Material,General,pièce,22.1,22.1,22.1,22.1,1,EUR,22.1,1.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de canalisations d'égouts KAME-TO-KASA-TOVO_KARIVOME,Naphthenate de cobalt,Material,General,kg,13.8,13.8,13.8,13.8,1,EUR,26.23,1.9,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements sans joints d'une épaisseur de 5 mm KAME-TO-KASA-TOVO_KAKAVOME,Hydroperoxyde d'isopropylbenzène technique,Material,General,t,1940.28,1940.28,1940.28,1940.28,1,EUR,1.36,0.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements sans joints d'une épaisseur de 5 mm KAME-TO-KASA-RILI_KAKAKAME,"Oligoétheracrylate MGF-9, catégorie I",Material,General,t,26200.42,26200.42,26200.42,26200.42,1,EUR,2908.25,0.11,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements sans joints d'une épaisseur de 5 mm KARI-RI-KASA-KATO_KAKAMEME,"Gravier andésitique fractionné n° 1, fraction 10-15 mm",Material,General,m3,479.04,479.04,479.04,479.04,1,EUR,665.87,1.39,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en polyvinylacétate-béton de ciment d'une épaisseur d RITO-VO-KATO-KATO_KAKAMERI,"Contre-écrous pour tuyauteries en tubes d'eau et de gaz, diamètre nominal 50 mm",Material,Pipes & Fittings,10 pièces,9.73,9.73,9.73,9.73,1,EUR,248.03,25.5,1,1,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER CARBONÉ ET FAIBLEMENT ALLIÉ RITO-VO-KATO-KATO_KAKAMEME,"Contre-écrous pour tuyauteries en tubes d'eau et de gaz, diamètre nominal 25 mm",Material,Pipes & Fittings,10 pièces,3.88,3.88,3.88,3.88,1,EUR,98.81,25.5,1,1,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES DES SYSTÈMES D'AUTOMATISATION,CONDUITES EN TUBES D'ACIER CARBONÉ ET FAIBLEMENT ALLIÉ KAVO-TO-MEME-KAME_KAKATOME,"Cornière perforée ShP, nuances d'acier St3ps, St3sp, dimensions 32kh16 mm",Material,General,m,3.74,3.74,3.74,3.74,1,EUR,37.41,10.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",ÉQUIPEMENTS ET DISPOSITIFS AUXILIAIRES,Équipements auxiliaires et dispositifs auxiliaires MEVO-RI-KAME-KAME,Bidet semi-porcelaine,Abstract Material,General,compl,222.29,222.29,222.29,222.29,1,EUR,2222.89,10.0,1,1,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" KAME-LI-MESA-MEPU_KAMELIRI,"Vis autotaraudeuses en acier à tête demi-ronde et fente droite, pointues, diamètre 6 mm, longueur 80 mm",Material,General,t,3368.92,3368.92,3368.92,3368.92,1,EUR,2.02,0.0,1,1,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" MEVO-RI-KAME-KARI,Baignoires,Abstract Material,General,compl,537.31,537.31,537.31,537.31,1,EUR,5373.11,10.0,1,1,TRAVAUX DE CONSTRUCTION,Eau et égouts - installations intérieures,ADDUCTION D'EAU ET ÉGOUTS - INSTALLATIONS INTÉRIEURES,"Installation de baignoires, lavabos, bidets, receveurs de douche, cabines de dou" RITO-VO-KAPU-KARI,Collecteurs de distribution,Abstract Material,General,compl,766.03,766.03,766.03,766.03,1,EUR,7660.3,10.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,AUTRES TRAVAUX,Installation d'un collecteur de distribution pour les systèmes de chauffage et d KAME-LI-MESA-MEME_KAKASATO,"Rondelles en acier galvanisé rondes, diamètre du trou M30",Material,General,kg,5.87,5.87,5.87,5.87,1,EUR,0.53,0.09,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",APPAREILS ET MOYENS D'AUTOMATISATION INSTALLÉS SUR LES ÉQUIPEMENTS ET LES COMMUN,ORGANES DE RÉGULATION KAME-LI-MESA-KARI_KAKANEVO,"Boulons en acier galvanisé à tête hexagonale, diamètre du filetage M27 (M30), longueur 70-240 mm",Material,General,t,3736.74,3736.74,3736.74,3736.74,1,EUR,37.37,0.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Appareils, moyens d'automatisation et de calcul",APPAREILS ET MOYENS D'AUTOMATISATION INSTALLÉS SUR LES ÉQUIPEMENTS ET LES COMMUN,ORGANES DE RÉGULATION RIPU-ME-KARI-KAME_KAKARIKA,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation de tuyaux, écrou de fixation M8, diamètre de 68 à 73 mm",Material,General,pièce,4.31,4.31,4.31,4.31,1,EUR,137.89,32.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES ET ROBINETTERIE DES INSTALLATIONS D'EXTINCTION AUTOMATIQUE D'INCENDI,"Dispositif de tuyauteries en tubes et raccords en polypropylène ignifugés, renfo" RIPU-ME-KARI-KAME_KAKAMENE,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation de tuyaux, écrou de fixation M8, diamètre de 40 à 45 mm",Material,General,pièce,2.21,2.21,2.21,2.21,1,EUR,139.42,63.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES ET ROBINETTERIE DES INSTALLATIONS D'EXTINCTION AUTOMATIQUE D'INCENDI,"Dispositif de tuyauteries en tubes et raccords en polypropylène ignifugés, renfo" RIPU-ME-KARI-KAME_KAKAMEPU,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation de tuyaux, écrou de fixation M8, diamètre de 25 à 30 mm",Material,General,pièce,2.13,2.13,2.13,2.13,1,EUR,134.46,63.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES ET ROBINETTERIE DES INSTALLATIONS D'EXTINCTION AUTOMATIQUE D'INCENDI,"Dispositif de tuyauteries en tubes et raccords en polypropylène ignifugés, renfo" MEPU-RI-KASA-KASA_KAKAKAVO,"Composé d'étanchéité à deux composants à base de ciment avec émulsion polymère pour la protection des surfaces en béton et en brique, F600, W20, consommation 1,2-1,7 kg/m2 pour une épaisseur de couche de 1 mm",Material,General,kg,6.08,6.08,6.08,6.08,1,EUR,834.67,137.39,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Étanchéification des entrées de communications à travers les murs à l'aide de co KAME-LI-KANE-KARI_KAKAMEKA,"Profilé gonflant en caoutchouc hydrophile pour l'étanchéité et l'isolation hydraulique des joints et raccords dans les structures en béton, dimensions 20 x 4 mm",Material,Steel & Metal,m,7.56,7.56,7.56,7.56,1,EUR,659.29,87.18,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Étanchéification des entrées de communications à travers les murs à l'aide de co RIRI-RI-KARI-MELI_KAKAKAPU,"Support téléphonique avec traverses, pièces forgées et boulons de fixation, six paires",Material,General,pièce,47.99,47.99,47.99,47.99,1,EUR,47.99,1.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE SUPPORT RIRI-RI-KARI-MELI_KAKAKAME,"Support téléphonique avec traverses, pièces forgées et boulons de fixation, double",Material,General,pièce,31.31,31.31,31.31,31.31,1,EUR,31.31,1.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE SUPPORT RIRI-RI-KARI-MELI_KAKAKATO,"Support téléphonique avec traverses, pièces forgées et boulons de fixation, à une paire",Material,General,pièce,25.03,25.03,25.03,25.03,1,EUR,25.03,1.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE SUPPORT DXME-KANE-KADX_KADXME,"Électricité : consommation 1,47 kWh/machine-heure",Electricity,Electricity,Heures machine,0.19,0.19,0.19,0.19,1,EUR,8.41,44.66,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Construction de l'enveloppe des tours de refroidissement d'une hauteur maximale DXME-KANE-KADX_KADXME,Coffrage coulissant pour la construction d'enveloppes en béton armé pour tours de refroidissement,Equipment,General,Heures machine,848.06,848.06,848.06,848.06,1,EUR,37874.25,44.66,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Construction de l'enveloppe des tours de refroidissement d'une hauteur maximale RIPU-TO-KARI-KARI_KAKAKAPU,"Tuyaux en polypropylène pour systèmes d'évacuation des eaux, diamètre 110 mm",Material,General,m,10.3,10.3,10.3,10.3,1,EUR,6539.77,635.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Bétonnage de l'anneau de support inférieur de l'enveloppe en béton armé d'une to KARI-RI-KARI-KAME_KAKAKAME,Anthracite concassé pour le remplissage du filtre,Material,General,t,512.0,512.0,512.0,512.0,1,EUR,97280.91,190.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Chargement des filtres dans les réservoirs DXME-RIME-RIRI_MEDXME,"Électricité : consommation 12,11 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.56,1.56,1.56,1.56,1,EUR,11.15,7.17,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Enroulement d'acier d'armature sur les parois des réservoirs DXME-RIME-RIRI_MEDXME,Machines à enrouler les armatures pour réservoirs jusqu'à 10 000 m3,Equipment,General,Heures machine,12.97,12.97,12.97,12.97,1,EUR,93.02,7.17,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,EXÉCUTION D'AUTRES TRAVAUX DANS DES INSTALLATIONS DE STOCKAGE,Enroulement d'acier d'armature sur les parois des réservoirs KAME-LI-KANE-KAME_KAKAKAPU,"Bandes d'étanchéité hydrofuges, pare-vapeur en caoutchouc butyle, doublées d'un matériau non tissé d'un côté, avec une couche adhésive d'un côté et un revêtement antiadhésif de l'autre, couleur beige, largeur 70 mm, épaisseur 2 mm",Material,General,m,0.42,0.42,0.42,0.42,1,EUR,45.49,107.2,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE CONDUITES D'EAU ET DE CANALISATIONS,Installation d'une collerette en béton armé sur une canalisation RIRI-RI-KARI-MENE_KAKAKANE,Support pour lignes de réseau de diffusion filaire RS-III-TO.NE,Material,General,pièce,845.58,845.58,845.58,845.58,1,EUR,845.58,1.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,POTEAUX DE LIGNES DE SUPPORT RIME-ME-KASA-KAME_KAKAMESA,Câble flexible de puissance avec conducteurs en cuivre H07RN-F 1x16-660,Material,General,1000 m,5091.45,5091.45,5091.45,5091.45,1,EUR,1.02,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DIVERS TRAVAUX LIÉS À L'INSTALLATION DE TUYAUTERIES,Traitement thermique des joints soudés des pipelines KARI-RI-KAPU-KATO_KAKAMESA,Mélange sable-gravier enrichi avec une teneur en gravier de 65 à 75 %,Material,General,m3,46.96,46.96,46.96,46.96,1,EUR,18415.91,392.15,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE DXME-RIME-RIRI_MEPUME,"Électricité : consommation 0,73 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.09,0.09,0.09,0.09,1,EUR,0.1,1.05,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX MEPU-SA-KATO-KAME_KAKAMERI,"Peinture polyvinylbutyral en poudre pour la protection contre la corrosion et la décoration des surfaces P-VL-212, colorée",Material,General,t,7864.0,7864.0,7864.0,7864.0,1,EUR,597.66,0.08,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en xylolite et en polyvinylacétate KAME-LI-KALI-KATO_KAKAMEME,Cire polyéthylène oxydée,Material,General,kg,9.77,9.77,9.77,9.77,1,EUR,9.77,1.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en xylolite et en polyvinylacétate RITO-TO-KATO-KARI_KAKANEME,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 89 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,25.52,25.52,25.52,25.52,1,EUR,10.21,0.4,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de chauffage et d'alimentation en ea RITO-TO-KANE-KARI_KAKAKAPU,"Tubes en acier soudés galvanisés pour conduites d'eau et de gaz avec filetage, ordinaires, diamètre nominal 32 mm, épaisseur de paroi 3,2 mm",Material,Pipes & Fittings,m,6.09,6.09,6.09,6.09,1,EUR,2.44,0.4,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Raccordement aux réseaux internes existants de chauffage et d'alimentation en ea MEVO-TO-KAME-KATO_KAKAKATO,"Tuyaux d'arrosage, diamètre 40 mm",Material,General,m,12.84,12.84,12.84,12.84,1,EUR,256.8,20.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-TO-KAME-KAME_KAKASATO,"Tête pour tuyaux d'incendie, raccord de tuyau sous pression GR, pression 1,2 MPa, diamètre 40 mm",Material,General,pièce,5.98,5.98,5.98,5.98,1,EUR,11.97,2.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-ME-MEKA-KAME_KAKATOSA,"Vanne à passage direct 15kch18r, raccordement à la canalisation par manchon, pression nominale 1,6 MPa, diamètre nominal 40 mm",Material,General,pièce,31.98,31.98,31.98,31.98,1,EUR,31.98,1.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-TO-KAME-KATO_KAKAKARI,"Tuyaux d'arrosage, diamètre 32 mm",Material,General,m,10.7,10.7,10.7,10.7,1,EUR,214.02,20.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-TO-KAME-KAME_KAKASARI,"Tête de raccordement pour tuyaux d'arrosage, diamètre 32 mm",Material,General,pièce,5.23,5.23,5.23,5.23,1,EUR,10.45,2.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-ME-MEKA-KAME_KAKATOPU,"Vanne à passage direct 15kch18r, raccordement à la canalisation par manchon, pression nominale 1,6 MPa, diamètre nominal 32 mm",Material,General,pièce,22.75,22.75,22.75,22.75,1,EUR,22.75,1.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets DXME-RIME-RIRI_MEPUME,Brise-béton (marteaux hydrauliques) à entraînement hydraulique,Equipment,General,Heures machine,9.37,9.37,9.37,9.37,1,EUR,9.84,1.05,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",EXPLOITATION DE SOLS PERMANENTEMENT GELÉS ET ROCHEUX KAVO-TO-MERI-KANE_KAKAMEME,Acier allié,Material,General,kg,2.23,2.23,2.23,2.23,1,EUR,245.84,110.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,DISPOSITIFS D'ENFONCEMENT ET DE SÉLECTION DES SYSTÈMES D'AUTOMATISATION,DISPOSITIFS D'ANCRAGE POUR SYSTÈMES D'AUTOMATISATION RIPU-ME-KARI-KAME_KAKARIRI,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation de tuyaux, écrou de fixation M8, diamètre de 80 à 86 mm",Material,General,pièce,4.66,4.66,4.66,4.66,1,EUR,149.27,32.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Conduites technologiques,TUYAUTERIES ET ROBINETTERIE DES INSTALLATIONS D'EXTINCTION AUTOMATIQUE D'INCENDI,"Dispositif de tuyauteries en tubes et raccords en polypropylène ignifugés, renfo" MEVO-TO-KAME-KAME_KAKASAME,"Raccord pour tuyaux d'incendie, raccord de pression GR, pression 1,2 MPa, diamètre 25 mm",Material,General,pièce,4.48,4.48,4.48,4.48,1,EUR,8.95,2.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-ME-MEKA-KAME_KAKATOTO,"Vanne à passage direct 15kch18r, raccordement à la canalisation par manchon, pression nominale 1,6 MPa, diamètre nominal 25 mm",Material,General,pièce,16.35,16.35,16.35,16.35,1,EUR,16.35,1.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-TO-KAME-KAPU_MEKAKARI,"Lance à incendie manuelle, diamètre 50 mm",Material,General,pièce,6.17,6.17,6.17,6.17,1,EUR,6.17,1.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-TO-KAME-KARI_MEKAKASA,"Tuyau d'incendie à pression avec armature en fibres chimiques ou naturelles pour robinets d'incendie sans raccords RPK-50-1,0",Material,General,m,1.66,1.66,1.66,1.66,1,EUR,16.55,10.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-TO-KAME-KAME_KAKAPUME,"Tête pour tuyau d'incendie, raccord de tuyau sous pression GR, pression 1,2 MPa, diamètre 50 mm",Material,General,pièce,2.88,2.88,2.88,2.88,1,EUR,8.65,3.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEVO-ME-MEKA-KARI_KAKAKARI,"Vanne incendie 50-10 pour eau, pression nominale 1,0 MPa, diamètre nominal 50 mm",Material,General,pièce,34.25,34.25,34.25,34.25,1,EUR,34.25,1.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets RITO-TO-KATO-KARI_KAMEVOLI,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 426 mm, épaisseur de paroi 9 mm",Material,Pipes & Fittings,m,287.57,287.57,287.57,287.57,1,EUR,744.8,2.59,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,COMPOSANTS DE COMPTEURS D'EAU ET COMPTEURS D'EAU (COMPTEURS),Installation de compteurs d'eau avec fabrication de la tuyauterie sur le lieu de KAME-LI-MESA-MERI_KAMEMENE,"Goujons filetés en acier, diamètre du filetage M24, longueur 500 mm",Material,General,t,2426.5,2426.5,2426.5,2426.5,1,EUR,0.0,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) KAME-TO-KASA-TOVO_KARILIME,Monoéthanolamine,Material,General,kg,4.08,4.08,4.08,4.08,1,EUR,3.67,0.9,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) MEPU-RI-KANE-KADX_KASAKAME,Silica gel granulé,Material,General,t,5826.33,5826.33,5826.33,5826.33,1,EUR,11.65,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) KAME-LI-MEME-KALI_KARISAKA,"Électrodes de soudage pour le soudage d'aciers hautement alliés résistants à la corrosion, revêtement résistant à la corrosion sur la surface d'aciers perlitiques EA-898/21B, diamètre 4 mm",Material,General,kg,21.03,21.03,21.03,21.03,1,EUR,96.75,4.6,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) KAME-LI-MEME-KALI_KAMELIDX,"Électrodes de soudage pour le soudage des aciers hautement alliés résistants à la chaleur PT-30, diamètre 3 mm",Material,General,kg,11.72,11.72,11.72,11.72,1,EUR,237.14,20.23,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) KAME-LI-MEME-KALI_KAMENEME,"Électrodes de soudage pour le soudage des aciers fortement alliés ZIO-8, diamètre 3-5 mm",Material,General,kg,20.54,20.54,20.54,20.54,1,EUR,83.17,4.05,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) KAME-LI-KALI-RISA_KAKAKAME,"Cérésine, marque 65",Material,General,t,6657.5,6657.5,6657.5,6657.5,1,EUR,0.0,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR À EAU-HYDROGÈNE (VVER) KAVO-ME-KAME-KAME,Structures en gabions,Abstract Material,Steel & Metal,pièce,4602.94,4602.94,4602.94,4602.94,1,EUR,383563.11,83.33,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KAME-LI-MERI-KARI,Géomats bentonitiques,Abstract Material,General,m2,5.76,5.76,5.76,5.76,1,EUR,1220.88,211.92,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",RENFORCEMENT DES PENTES DES OUVRAGES EN TERRE KANE-RI-KARI-KAME_KAKAKARI,"Tapis en carreaux de céramique non émaillés pour sols, lisses, colorés, épaisseur 4-6 mm",Material,General,m2,21.81,21.81,21.81,21.81,1,EUR,2203.1,101.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mortier de ciment à partir de carreaux MEPU-RI-KAPU-KAPU_KATOKANE,Résine furanique-époxy,Material,General,kg,2.11,2.11,2.11,2.11,1,EUR,1102.59,522.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements d'une épaisseur de 10 mm à partir d'un mortier polymè MEPU-RI-KANE-KAPU_KAKAMETO,"Caoutchouc oligobutadiène à faible poids moléculaire, teneur en eau maximale de 0,3 % en masse",Material,General,t,49082.3,49082.3,49082.3,49082.3,1,EUR,3828.42,0.08,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements sans joints d'une épaisseur de 5 mm KAME-LI-MEDX-KARI_KAKASARI,"Joints toriques en caoutchouc pour tuyaux en polypropylène, diamètre 110 mm",Material,General,100 pièces,56.03,56.03,56.03,56.03,1,EUR,6.72,0.12,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de canalisations d'égouts internes à partir de tuyaux en polypropylène KAME-LI-MEDX-KARI_KAKASAME,"Joints d'étanchéité en caoutchouc pour tuyaux en polypropylène, diamètre 50 mm",Material,General,100 pièces,22.34,22.34,22.34,22.34,1,EUR,2.68,0.12,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,CONDUITES EN TUBES PLASTIQUES,Pose de canalisations d'égouts internes à partir de tuyaux en polypropylène MERI-ME-KATO-MEKA_KAKAKATO,"Pinces anti-vent en acier galvanisé pour tuiles ordinaires, longueur totale 83 mm, largeur de la plaque 15 mm, longueur de la plaque 30 mm",Material,General,100 pièces,42.71,42.71,42.71,42.71,1,EUR,84.99,1.99,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une toiture en tuiles de ciment-sable sur une charpente en profil KAME-LI-KANE-MEPU_MEKATOKA,"Bandes autocollantes en caoutchouc synthétique et treillis aluminium pour l'étanchéification des joints et des raccords de toitures en tuiles en ciment et sable, couleur marron, largeur 280 mm",Material,General,m,47.0,47.0,47.0,47.0,1,EUR,204.92,4.36,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une toiture en tuiles de ciment-sable sur une charpente en profil KAME-LI-KANE-MEKA,Bandes d'étanchéité (autocollantes en caoutchouc butyle),Abstract Material,General,m,9.84,9.84,9.84,9.84,1,EUR,1023.45,104.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KATO-KALI_MEKAKAPU,"Élément aérodynamique en PVC pour tuiles en ciment et sable, section de ventilation 200 cm2/m",Material,General,m,9.69,9.69,9.69,9.69,1,EUR,979.17,101.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable MERI-ME-KAME-KAPU_KAKAMELI,"Tabatière en PVC pour systèmes de drainage, largeur 150 mm",Material,General,m,14.01,14.01,14.01,14.01,1,EUR,1471.32,105.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'éléments sur une toiture en pente en tuiles de ciment-sable RIKA-RI-KANE-KARI_KAKAKARI,"Support en acier pour la fixation d'un chemin de câbles au plafond, largeur 100 mm, hauteur 350 mm",Material,General,pièce,7.53,7.53,7.53,7.53,1,EUR,48.65,6.46,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES RIKA-ME-KAME-KAPU_KAKAKASA,"Pince pour goulotte de câbles, galvanisée, dimensions 150 x 100 mm",Material,General,pièce,4.09,4.09,4.09,4.09,1,EUR,26.4,6.46,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES KAME-LI-MESA-MERI_KAKATOTO,"Goupilles filetées en acier galvanisé, diamètre du filetage M10, longueur 300 mm",Material,General,t,3514.05,3514.05,3514.05,3514.05,1,EUR,4.08,0.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES RIKA-RI-KATO-RINE,Plaque de raccordement,Abstract Material,General,pièce,3.82,3.82,3.82,3.82,1,EUR,23.91,6.26,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision",INSTALLATIONS DE TÉLÉCOMMUNICATIONS FILAIRES,CANALISATION DE CÂBLES RISA-RI-KARI-KALI,Traverses en acier,Abstract Material,General,pièce,246.98,246.98,246.98,246.98,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,STRUCTURES DU RÉSEAU DE CONTACT MEVO-TO-KAME-KATO_KAKAKAME,"Tuyaux d'arrosage, diamètre 25 mm",Material,General,m,3.71,3.71,3.71,3.71,1,EUR,74.24,20.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,INSTALLATION DE ROBINETTERIE SANITAIRE ET ESSAIS HYDRAULIQUES DES SYSTÈMES,Installation de robinets MEME-ME-KAME-KAPU_KAKARINE,"Planches pour revêtement de sol à rainure et languette en bois résineux, épaisseur 35 mm, largeur sans crête 100-140 mm",Material,General,m3,822.27,822.27,822.27,822.27,1,EUR,3050.63,3.71,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements en planches et en lattes DXME-KALI-KASA_KAKAPU,"Électricité : consommation 68,06 kW·h/machine-h",Electricity,Electricity,Heures machine,8.74,8.74,8.74,8.74,1,EUR,10.49,1.2,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation du béton dans des usines automatisées sur site DXME-KALI-KASA_KAKAPU,"Usines à béton automatisées, capacité de production 120 m3/h",Equipment,General,Heures machine,39.76,39.76,39.76,39.76,1,EUR,47.71,1.2,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation du béton dans des usines automatisées sur site DXME-KALI-KATO_KAMEPU,"Électricité : consommation 12,38 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.59,1.59,1.59,1.59,1,EUR,81.09,51.02,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation d'un mélange sec de ciment et de sable DXME-KALI-KATO_KAMEPU,"Bétonnières à action forcée fixes, capacité de la trémie 1000 l",Equipment,General,Heures machine,4.7,4.7,4.7,4.7,1,EUR,239.55,51.02,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,PRÉPARATION DE BÉTONS ET DE MORTIERS SUR CHANTIER,Préparation d'un mélange sec de ciment et de sable MEKA-TO-KAME-KAME_KAKANEME,"Bandes en bronze de marque BrOF6,5-0,15, rigides, précision normale, largeur 10-19 mm, épaisseur 0,4-0,7 mm",Material,General,t,37547.08,37547.08,37547.08,37547.08,1,EUR,1501.88,0.04,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX MEKA-RI-KARI-KASA,Feuilles de cuivre laminées à froid,Abstract Material,General,t,30545.49,30545.49,30545.49,30545.49,1,EUR,3054.55,0.1,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX RIKA-SA-KATO-KATO_MEKAKAKA,"Barres à section rectangulaire en cuivre de marque M2, largeur 25 mm, épaisseur 2 mm",Material,General,t,17132.18,17132.18,17132.18,17132.18,1,EUR,856.61,0.05,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX RIKA-ME-KAME-KAVO_KAKAMEDX,Pinces de dérivation avec fils de dérivation d'une section de 16-95 mm2,Material,General,100 pièces,521.16,521.16,521.16,521.16,1,EUR,20.85,0.04,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RIME-ME-KAPU-KALI,Câbles de communication,Abstract Material,General,1000 m,32794.22,32794.22,32794.22,32794.22,1,EUR,4919.13,0.15,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,ÉLECTRIFICATION DES CHEMINS DE FER,CONSTRUCTIONS DES SOUS-STATIONS DE TRACTION RISA-RI-KARI-KAPU_KAKAKATO,"Kit de suspension intermédiaire pour la suspension de câbles autoportants d'une section de 16 à 95 mm2, charge maximale 12 à 20 kN, comprenant un support en alliage d'aluminium hautement résistant à la corrosion et une suspension en plastique",Material,General,compl,19.71,19.71,19.71,19.71,1,EUR,453.3,23.0,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RISA-RI-KARI-KAPU_KAKAKARI,"Pince d'ancrage pour la suspension de câbles autoportants d'une section de 11 à 15 mm2, charge de rupture minimale 15 kN, dimensions du corps en aluminium de la pince sans câble en acier ni cales 112 x 28 x 63 mm, longueur des cales 165 mm, longueur de la boucle 290 mm",Material,General,compl,10.57,10.57,10.57,10.57,1,EUR,31.72,3.0,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES KAME-LI-KANE-KAVO_KAKAKADX,"Rubans de signalisation en polyéthylène haute pression « NE PAS CREUSER, CÂBLE EN DESSOUS », fond orange, inscription noire, largeur 50 mm, épaisseur 0,2 mm",Material,General,100 m,10.51,10.51,10.51,10.51,1,EUR,107.76,10.25,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"AUTRES TYPES DE TRAVAUX DE TERRASSEMENT, TRAVAUX PRÉPARATOIRES, CONNEXES ET DE R",TRAVAUX CONNEXES KAME-LI-MEME-KAPU_KAKASATO,"Fil à souder SV-08X20N9, diamètre 2 mm",Material,General,kg,14.49,14.49,14.49,14.49,1,EUR,4.13,0.28,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,"ÉQUIPEMENT DES SYSTÈMES AUXILIAIRES DES INSTALLATIONS DE RÉACTEURS, DE TRAITEMEN",Équipement d'installation de bitumage RITO-SA-KARI-KARI_KAKATOME,"Tubes en acier électrosoudés à joint droit en acier de marque St2, 10, diamètre extérieur 48 mm, épaisseur de paroi 3,0 mm",Material,Pipes & Fittings,m,4.27,4.27,4.27,4.27,1,EUR,0.45,0.11,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements des centrales nucléaires,INSTALLATIONS NUCLÉAIRES DE PRODUCTION DE VAPEUR,ÉQUIPEMENT AVEC RÉACTEUR ÉNERGÉTIQUE À GRANDE PUISSANCE À CANAL BOILANT (RBMK) KANE-RI-KARI-KAME_KAKAVOME,"Carrelage céramique pour sols, émaillé, en relief, décoré par sérigraphie, avec motif multicolore, épaisseur 11 mm",Material,General,m2,18.91,18.91,18.91,18.91,1,EUR,1929.19,102.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements à base de mortier de ciment à partir de carreaux KAME-LI-KALI-MEPU_MEKAKARI,"Joint d'étanchéité en caoutchouc pour profilés en aluminium, largeur 60 mm",Material,General,m,2.55,2.55,2.55,2.55,1,EUR,250.44,98.1,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Revêtement en polycarbonate de structures métalliques KALI-RI-KANE-KATO_KASASAKA,"Profilé en aluminium en forme de T, porteur avec deux joints en caoutchouc pour la fixation inférieure du polycarbonate, hauteur 18 mm, largeur 60 mm",Material,General,m,7.45,7.45,7.45,7.45,1,EUR,722.93,97.1,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Revêtement en polycarbonate de structures métalliques KAME-NE-KAPU-KATO,Plinthes pour plafonds,Abstract Material,General,m,0.78,0.78,0.78,0.78,1,EUR,79.3,101.5,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Installation de corniches décoratives en polystyrène pour la finition intérieure DXME-KASA-KADX_KAMERI,"Grues sur châssis spécial de type automobile, capacité de charge 350 t",Equipment,General,Heures machine,625.72,625.72,625.72,625.72,1,EUR,1476.7,2.36,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ RITO-VO-KASA-KASA_KAKAMETO,"Manchon coulissant en fonte, diamètre nominal 150 mm",Material,General,pièce,27.18,27.18,27.18,27.18,1,EUR,271.79,10.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN FONTE,Pose dans les tranchées de canalisations en fonte pour égouts MEME-RI-KAPU-KANE_KAKAVOME,"Languette (tenon) en bois, dimensions 8 x 40 mm",Material,General,pièce,0.04,0.04,0.04,0.04,1,EUR,21.61,610.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en panneaux de parquet, en lattes de bois et en panneaux de " MEME-TO-KATO-KAVO_KAKAKAPU,"Sous-couche en polyéthylène expansé pour parquet et stratifié, épaisseur 2 mm",Material,General,10 m2,3.61,3.61,3.61,3.61,1,EUR,37.87,10.5,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en parquet, parquet mosaïque, parquet massif sans veines" MEME-RI-KATO-KARI,Revêtement de sol stratifié (laminé),Abstract Material,General,m2,17.64,17.64,17.64,17.64,1,EUR,1808.6,102.5,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en parquet, parquet mosaïque, parquet massif sans veines" RITO-SA-KARI-KARI_KAMEKAVO,"Tubes en acier électrosoudés à soudure droite en acier des nuances St2, 10, diamètre extérieur 377 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,111.61,111.61,111.61,111.61,1,EUR,10491.54,94.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en eau à partir de tuyaux en ac RITO-VO-KAPU-KANE_KAMEKAME,"Coudes à 90° avec un rayon de courbure R=1,5 Du pour une pression jusqu'à 16 MPa, diamètre nominal 250 mm, diamètre extérieur 273 mm, épaisseur de paroi 7 mm",Material,General,pièce,166.35,166.35,166.35,166.35,1,EUR,1829.81,11.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en eau à partir de tuyaux en ac RITO-TO-KATO-KARI_KAMEVOVO,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 426 mm, épaisseur de paroi 10 mm",Material,Pipes & Fittings,m,318.8,318.8,318.8,318.8,1,EUR,30285.94,95.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac RITO-TO-KATO-KARI_KAMEVOTO,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuance 10, 20, 35, diamètre extérieur 377 mm, épaisseur de paroi 9 mm",Material,Pipes & Fittings,m,253.79,253.79,253.79,253.79,1,EUR,23856.62,94.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Pose de conduites de chauffage et d'alimentation en gaz à partir de tuyaux en ac DXME-KASA-KADX_KAMENE,"Grues sur châssis spécial de type automobile, capacité de charge 95 t",Equipment,General,Heures machine,242.7,242.7,242.7,242.7,1,EUR,381.05,1.57,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ DXME-KASA-KAPU_KARIDX,"Électricité : consommation 82,5 kWh/machine-heure",Electricity,Electricity,Heures machine,10.6,10.6,10.6,10.6,1,EUR,6271.1,591.82,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements pour les entreprises de métallurgie noire,ÉQUIPEMENT POUR LA PRODUCTION D'ACIER,ÉQUIPEMENT DES ATELIERS DE CONVERSION DXME-KASA-KAPU_KARIDX,"Ponts roulants électriques spéciaux, capacité de charge 500 t",Equipment,General,Heures machine,1003.06,1003.06,1003.06,1003.06,1,EUR,593630.5,591.82,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipements pour les entreprises de métallurgie noire,ÉQUIPEMENT POUR LA PRODUCTION D'ACIER,ÉQUIPEMENT DES ATELIERS DE CONVERSION RITO-SA-KARI-KARI_KAKALIME,"Tubes en acier électrosoudés à soudure droite en acier des nuances St2, 10, diamètre extérieur 159 mm, épaisseur de paroi 3,5 mm",Material,Pipes & Fittings,m,23.49,23.49,23.49,23.49,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN TUBES D'ACIER,Fabrication de manchons en acier RITO-TO-KATO-KARI_KAKANELI,"Tubes en acier sans soudure, formés à chaud, avec chanfrein retiré, en acier de nuances 10, 20, 35, diamètre extérieur 89 mm, épaisseur de paroi 7 mm",Material,Pipes & Fittings,m,46.3,46.3,46.3,46.3,1,EUR,18.52,0.4,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI EN BLOCS AGRÉGÉS DXME-KASA-KANE_KARILI,"Grues sur chenilles, capacité de levage 750 t",Equipment,General,Heures machine,1116.67,1116.67,1116.67,1116.67,1,EUR,5806.68,5.2,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT FOURNI ASSEMBLÉ MEME-RI-MEKA-KAME,Parquet mosaïque,Abstract Material,General,m2,176.74,176.74,176.74,176.74,1,EUR,18027.77,102.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,"Pose de revêtements en parquet, parquet mosaïque, parquet massif sans veines" RISA-RI-KARI-KAPU_KAKAKAME,"Pince d'ancrage pour la fixation de câbles d'une section comprise entre 50 et 70 mm2, charge maximale 15 kN",Material,General,compl,10.26,10.26,10.26,10.26,1,EUR,30.78,3.0,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RIME-RI-KAME-KARI_KAMEPUTO,Fil non isolé pour lignes aériennes de transport d'électricité M 10,Material,General,t,28427.21,28427.21,28427.21,28427.21,1,EUR,187.62,0.01,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RIKA-RI-KARI-KAPU_KAKAKAME,Capuchons étanches pour la protection des conducteurs d'une section comprise entre 6 et 35 mm2,Material,General,100 pièces,55.98,55.98,55.98,55.98,1,EUR,0.56,0.01,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RIKA-ME-KARI-KALI_KAKAKASA,"Cosses isolées en aluminium avec borne en cuivre, section 54 mm2",Material,General,100 pièces,968.58,968.58,968.58,968.58,1,EUR,9.69,0.01,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RIKA-ME-KARI-KALI_KAKAKAPU,"Cosses isolées en aluminium avec borne en cuivre, gamme de sections 50 mm2",Material,General,100 pièces,968.58,968.58,968.58,968.58,1,EUR,9.69,0.01,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RIKA-ME-KAME-MESA_KAKAMERI,"Bornes de connexion isolées, section 54,6 mm2",Material,General,100 pièces,530.99,530.99,530.99,530.99,1,EUR,5.31,0.01,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RIKA-ME-KAME-MESA_KAKAMEME,"Bornes de connexion isolées, section 50 mm2",Material,General,100 pièces,304.32,304.32,304.32,304.32,1,EUR,9.13,0.03,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES RIKA-ME-KAME-KAVO_KAKARIKA,Bornes de dérivation avec fils de dérivation d'une section de 4-35 mm2,Material,General,100 pièces,314.0,314.0,314.0,314.0,1,EUR,263.76,0.84,1,1,TRAVAUX DE CONSTRUCTION,Chemins de fer,"SIGNALISATION, CENTRALISATION ET BLOCAGE DES CHEMINS DE FER",SUSPENSION DES CÂBLES MEPU-PU-KAPU-MERI_MEKAKAVO,"Émail époxy EP-773, toutes couleurs",Material,General,kg,7.32,7.32,7.32,7.32,1,EUR,21.96,3.0,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX MEKA-RI-KARI-KARI_KAKALINE,"Bandes à usage général en cuivre de marques M2 et M3, rigides, précision normale, largeur 50-300 mm, épaisseur 0,05-1,0 mm",Material,General,t,30674.86,30674.86,30674.86,30674.86,1,EUR,2147.24,0.07,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",ÉCRANAGE DES LOCAUX KALI-RI-KANE-KANE_KAMEMEKA,"Support en L en acier inoxydable pour main courante de 50,8 mm de diamètre, diamètre du support 12 mm, dimensions 150 x 50 mm",Material,General,pièce,4.44,4.44,4.44,4.44,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","PALIERS D'ESCALIER, MARCHES ET GARDE-CORPS" MEME-RI-KARI-KAPU,Blocs de portes de service difficilement inflammables,Abstract Material,General,m2,87.52,87.52,87.52,87.52,1,EUR,17.5,0.2,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,PASSAGE DE PUITS RITO-NE-KAME-KAME_KAKAKAME,"Tuyaux en fonte pour égouts, longueur 2 m, diamètre nominal 50 mm, épaisseur de paroi 4 mm",Material,General,m,12.6,12.6,12.6,12.6,1,EUR,1260.38,100.0,1,1,TRAVAUX DE CONSTRUCTION,Canalisations internes,TUYAUTERIES EN FONTE,Pose dans les tranchées de canalisations en fonte pour égouts KAME-LI-MEME-KALI_KAKAKASA,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés ANO-21, diamètre 4 mm",Material,General,kg,4.07,4.07,4.07,4.07,1,EUR,22.39,5.5,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT POUR CERTAINES PRODUCTIONS DE L'INDUSTRIE CHIMIQUE,ÉQUIPEMENT POUR LA PRODUCTION D'AMMONIAC MEPU-SA-MEME-KATO,Mastics à base de plâtre,Abstract Material,General,kg,1.36,1.36,1.36,1.36,1,EUR,107.0,78.75,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,Préparation des surfaces des cloisons à rainures et languettes pour la peinture MEME-ME-KATO-KANE_KAKASAME,"Planche de chêne rabotée, longueur 2-3 m, largeur 100-300 mm, épaisseur 35 mm et plus, classe I",Material,General,m3,2157.26,2157.26,2157.26,2157.26,1,EUR,1272.79,0.59,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTION D'ENTREPRISES DE STOCKAGE ET DE TRANSFORMATION DE CÉRÉALES,Montage de structures pour les installations de stockage et de transformation du KAME-LI-MESA-MERI_KAMEMERI,"Goujons filetés en acier, diamètre du filetage M22, longueur 1100-2000 mm",Material,General,t,2269.15,2269.15,2269.15,2269.15,1,EUR,0.54,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,CONSTRUCTION D'ENTREPRISES DE STOCKAGE ET DE TRANSFORMATION DE CÉRÉALES,Montage de structures pour les installations de stockage et de transformation du MERI-RI-KAPU-MERI_KAKARIRI,"Matelas en laine minérale à couches verticales, composés de plaques souples à liant synthétique, recouverts de carton bitumé, marque 75, épaisseur 50 mm",Material,General,m3,150.51,150.51,150.51,150.51,1,EUR,481.64,3.2,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,TRAVAUX SUPPLÉMENTAIRES DANS LES ZONES À SEISMICITÉ DE 7 À 9 DEGRÉS DXME-KARI-KAPU_KATOSA,"Installations de forage pour le forage de puits sous pieux à la tarière sur châssis automobile, d'une profondeur maximale de 20 m et d'un diamètre maximal de 800 mm",Equipment,General,Heures machine,81.55,81.55,81.55,81.55,1,EUR,4824.63,59.16,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" KAVO-TO-KATO-KAPU_MEKALIKA,Fil d'acier clair pour toiture,Material,General,t,2043.94,2043.94,2043.94,2043.94,1,EUR,1.02,0.0,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,"BÂTIMENTS RÉSIDENTIELS, PUBLICS ET ADMINISTRATIFS DES ENTREPRISES INDUSTRIELLES","Poutres, traverses, lisses" KAVO-RI-KARI-KAPU,Câbles à double torsion LK-O galvanisés,Abstract Material,General,10 m,31.32,31.32,31.32,31.32,1,EUR,7.39,0.24,1,1,TRAVAUX DE CONSTRUCTION,"Installations de communication, de radiodiffusion et de télévision","INSTALLATIONS DE TÉLÉCOMMUNICATIONS, DE RADIODIFFUSION ET DE TÉLÉVISION",POTEAUX EN ACIER POUR ANTENNES SUR LES TOITS DES BÂTIMENTS KALI-PU-KATO-MERI,Support d'éclairage extérieur composite avec raccord à bride,Abstract Material,General,pièce,1943.44,1943.44,1943.44,1943.44,1,EUR,1943.44,1.0,1,1,TRAVAUX DE CONSTRUCTION,Lignes électriques,POTEAUX DU RÉSEAU DE CONTACT DU TRANSPORT ÉLECTRIQUE URBAIN ET DE L'ÉCLAIRAGE PU,POTEAUX D'ÉCLAIRAGE PUBLIC URBAIN KALI-RI-KARI-KAME,Élément de fondation encastré,Abstract Material,General,pièce,506.64,506.64,506.64,506.64,1,EUR,506.64,1.0,1,1,TRAVAUX DE CONSTRUCTION,Lignes électriques,POTEAUX DU RÉSEAU DE CONTACT DU TRANSPORT ÉLECTRIQUE URBAIN ET DE L'ÉCLAIRAGE PU,POTEAUX D'ÉCLAIRAGE PUBLIC URBAIN RIRI-RI-KARI-RIRI_KAKAKAME,Connecteurs ovales pour fils d'une section maximale de 35 mm,Material,General,100 pièces,2119.1,2119.1,2119.1,2119.1,1,EUR,33.91,0.02,1,1,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" RIKA-SA-KAPU-MEME_KAKARIRI,Pinces K-SF-1,Material,General,pièce,19.96,19.96,19.96,19.96,1,EUR,119.78,6.0,1,1,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" KASA-ME-KARI-KAME_KAKAMETO,"Ancrages cylindriques en béton armé, béton B15, consommation d'armature de 50 à 100 kg/m3",Material,General,m3,626.04,626.04,626.04,626.04,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Lignes électriques,"LIGNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV ET SOUS-STATIONS DE TRANSFORMA","LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRICITÉ DE 0,38 À 35 KV" KAVO-PU-KATO-KATO_KAKARILI,"Acier d'armature laminé à chaud à profil périodique, classe A-II, diamètre 32-40 mm",Material,General,t,1367.31,1367.31,1367.31,1367.31,1,EUR,1066.5,0.78,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,SILOS PRÉFABRIQUÉS ET MONOLITHIQUES ET SILOS POUR LE STOCKAGE DE MATÉRIAUX EN VR MEME-ME-KATO-KASA_KAKANERI,"Planches non sciées en bois résineux, humidité naturelle, longueur 2-6,5 m, largeur 100-250, épaisseur 25 mm, classe IV",Material,General,m3,469.47,469.47,469.47,469.47,1,EUR,244.12,0.52,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" MERI-RI-KALI-KASA_KAKATOKA,"Tubes thermo-isolants en polyéthylène expansé, diamètre intérieur 18 mm, épaisseur 20 mm",Material,Pipes & Fittings,100 m,150.83,150.83,150.83,150.83,1,EUR,1.66,0.01,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT À USAGE GÉNÉRAL,ÉQUIPEMENT POUR STATIONS-SERVICE KAVO-TO-KATO-KANE_KAKAMEME,"Fil barbelé simple cannelé galvanisé, dimensions 2,8 x 2,3 mm",Material,General,t,2822.13,2822.13,2822.13,2822.13,1,EUR,169.33,0.06,1,1,TRAVAUX DE CONSTRUCTION,Structures préfabriquées en béton et en béton armé,BÂTIMENTS ET INSTALLATIONS INDUSTRIELS,"CLÔTURES, PORTES ET PORTILLONS" DXME-RIME-RIRI_MEDXSA,Machines pneumatiques fonctionnant à partir de compresseurs mobiles pour enfoncer dans le sol à n'importe quel angle d'inclinaison par rapport à l'horizontale et extraire des tiges d'un diamètre de 12 à 25 mm et d'une longueur de 2 à 15 m,Equipment,General,Heures machine,2.24,2.24,2.24,2.24,1,EUR,0.72,0.32,1,1,TRAVAUX DE CONSTRUCTION,Lignes électriques,AUTRES TYPES DE TRAVAUX CONNEXES SUR LES LIGNES AÉRIENNES DE TRANSPORT D'ÉLECTRI,Enfoncement des conducteurs de mise à la terre verticaux des lignes électriques MERI-RI-KASA-KANE_KAKATONE,"Plaques de polystyrène expansé pour l'isolation thermique, type T, PPS35",Material,General,m3,259.01,259.01,259.01,259.01,1,EUR,29.53,0.11,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE INVENTORIÉ (ALIMENTATION EN BÉTON DANS D,Construction de murs en béton armé MEME-ME-KATO-KANE_KAMEMENE,"Planche équarrie en bois résineux, sèche, longueur 2-6,5 m, largeur 100-250 mm, épaisseur 25 mm, classe II",Material,General,m3,574.51,574.51,574.51,574.51,1,EUR,344.7,0.6,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-LI-MELI-KADX_MERIPURI,"Foret à pointe en alliage dur, avec queue SDS-max pour le forage à percussion dans les matériaux durs, longueur totale 320 mm, diamètre 14 mm",Material,General,pièce,14.68,14.68,14.68,14.68,1,EUR,17.62,1.2,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-LI-MELI-KADX_MEMELIKA,"Foret diamanté annulaire à grande vitesse pour béton armé avec queue à démontage rapide pour le forage sur banc en mode humide, soudure laser des segments, longueur 430 mm, diamètre 102 mm",Material,General,pièce,449.03,449.03,449.03,449.03,1,EUR,10363.52,23.08,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-LI-MELI-KANE_MEKARIVO,"Disque diamanté pour scies murales, diamètre 1600 mm",Material,General,pièce,3447.96,3447.96,3447.96,3447.96,1,EUR,13309.14,3.86,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-LI-MESA-KARI_KAKAPULI,"Boulons d'ancrage avec écrou en acier à friction à calage, avec filetage extérieur M12, diamètre 20 mm, longueur 150 mm",Material,General,100 pièces,125.12,125.12,125.12,125.12,1,EUR,180.18,1.44,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES KAME-LI-KANE-MEKA_KAKARIME,"Bandes thermoscellantes pour l'étanchéité, avec une couche adhésive sur une face, couleur noire, largeur 20 mm, épaisseur 2 mm",Material,General,10 m,20.72,20.72,20.72,20.72,1,EUR,207.21,10.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,AUTRES TRAVAUX,"Étanchéification des portes coupe-feu, des portails, des clapets anti-fumée, des" MEPU-TO-KAME-KAME_MEKAKARI,Apprêt à pénétration profonde pour travaux intérieurs et extérieurs à base d'une dispersion aqueuse de latex de haute qualité avec ajout de pigments et d'additifs spéciaux,Material,General,t,2008.94,2008.94,2008.94,2008.94,1,EUR,40.18,0.02,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Pose de papier peint KAME-LI-RIKA-KAVO_KAMESAME,"Ruban, largeur 20 mm",Material,General,m,1.91,1.91,1.91,1.91,1,EUR,1530.81,800.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Pose de papier peint KAME-LI-MESA-KANE_KAKAPUME,"Clous en acier galvanisé pour papier peint, diamètre 1,6 mm, longueur 12 mm",Material,General,t,2444.55,2444.55,2444.55,2444.55,1,EUR,10.51,0.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE POSE DE PAPIER PEINT,Pose de papier peint KAME-VO-KARI-KANE_MEKARIME,"Verre flotté en feuilles M4, incolore, épaisseur nominale 5 mm",Material,General,m2,12.3,12.3,12.3,12.3,1,EUR,1303.49,106.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE VITRERIE,"VITRAGE DES CHÂSSIS DE FENÊTRES EN BOIS, DES CHÂSSIS, DES PANNEAUX DE PORTES ET " DXME-KANE-KATO_KATORI,"Treuils auxiliaires de mine avec une force de traction de 8,83 kN (0,9 t)",Equipment,General,Heures machine,0.29,0.29,0.29,0.29,1,EUR,2.01,6.95,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie charbonnière et tourbière,ÉQUIPEMENT MINIER,ÉQUIPEMENT POUR INSTALLATIONS DE VENTILATION DE MINE RIKA-RI-MEKA-KAME_KAKARIME,Embout boulonné en aluminium NB-10/25,Material,General,100 pièces,254.5,254.5,254.5,254.5,1,EUR,83.99,0.33,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie charbonnière et tourbière,ÉQUIPEMENT MINIER,ÉQUIPEMENT POUR LE TRANSPORT SOUTERRAIN RITO-TO-KATO-KARI_KAMELILI,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 325 mm, épaisseur de paroi 12 mm",Material,Pipes & Fittings,m,281.37,281.37,281.37,281.37,1,EUR,56.27,0.2,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des entreprises de l'industrie chimique et pétrolière,ÉQUIPEMENT POUR CERTAINES PRODUCTIONS DE L'INDUSTRIE CHIMIQUE,"ÉQUIPEMENT DES ENTREPRISES DE PRODUCTION D'ACIDES, DE SELS ET D'ENGRAIS MINÉRAUX" MEME-TO-KATO-MEPU_KAKATOME,"Angles pour plinthes en PVC, hauteur 48 mm",Material,General,100 pièces,37.13,37.13,37.13,37.13,1,EUR,5.2,0.14,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de plinthes en polychlorure de vinyle MEME-TO-KATO-MEPU_KAKARIME,"Raccords pour plinthes en PVC, hauteur 48 mm",Material,General,100 pièces,42.18,42.18,42.18,42.18,1,EUR,16.87,0.4,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de plinthes en polychlorure de vinyle MEME-TO-KATO-MEPU_KAKAKAME,"Bouchons d'extrémité pour plinthes en PVC, hauteur 48 mm",Material,General,100 pièces,52.86,52.86,52.86,52.86,1,EUR,8.46,0.16,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de plinthes en polychlorure de vinyle RINE-ME-KAME-KATO_KAKAMEME,"Barres de pression en acier, longueur 3000 mm, largeur 31 mm, épaisseur 1,5 mm",Material,General,t,4892.74,4892.74,4892.74,4892.74,1,EUR,1761.39,0.36,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE GALERIES INCLINÉES ET VERTICALES RIPU-TO-KAME-KANE_KAKAPUTO,"Tuyaux en PVC, diamètre nominal 25 mm",Material,General,m,0.89,0.89,0.89,0.89,1,EUR,122.67,138.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,ÉRECTION DE STRUCTURES DANS UN COFFRAGE À PETITS PANNEAUX,Construction de paliers d'escalier monolithiques dans un coffrage à panneaux fin DXME-KADX-METO_KAKAME,Complexes mobiles de soudage de rails,Equipment,General,Heures machine,466.5,466.5,466.5,466.5,1,EUR,21473.15,46.03,1,1,TRAVAUX DE CONSTRUCTION,Voies de tramway,ASSEMBLAGE ET SOUDAGE DES JOINTS,Assemblage des joints de la ligne à l'aide de boulons et soudure RISA-ME-KANE-KASA_KAKAKAME,"Compensateur thermique pour rail P65, type 1050.00.000",Material,General,compl,16077.06,16077.06,16077.06,16077.06,1,EUR,16077.06,1.0,1,1,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE ET DÉMONTAGE DE COMPENSATEURS THERMIQUES,Pose et démontage de compensateurs thermiques DXME-KALI-KALI_KAMEPU,"Électricité : consommation 4,15 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.53,0.53,0.53,0.53,1,EUR,47.53,89.18,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION DXME-KALI-KALI_KAMEPU,"Pompes à mortier, débit 16 m3/h",Equipment,General,Heures machine,3.22,3.22,3.22,3.22,1,EUR,287.41,89.18,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION KASA-ME-KAVO-KAVO,Inserts en béton armé,Abstract Material,General,m3,549.9,549.9,549.9,549.9,1,EUR,1006.32,1.83,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION MERI-RI-KAPU-KANE_KAKAMELI,"Mats thermo-isolants en laine minérale à base de roches basaltiques, recouverts d'un treillis métallique et d'une feuille d'aluminium renforcée, groupe de combustibilité G1, densité 105 kg/m3, conductivité thermique à 50/500 °C ne dépassant pas 0,039/0,132 W/(m*K), température maximale d'utilisation +660 °C, épaisseur 100 mm",Material,General,m3,466.75,466.75,466.75,466.75,1,EUR,19.65,0.04,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Bétonnage des structures du puits du réacteur MERI-RI-KAPU-KANE_KAKAMETO,"Matelas isolants thermo-isolants en laine minérale à base de roches basaltiques, recouverts d'un treillis métallique et renforcés d'une feuille d'aluminium, groupe de combustibilité G1, densité 105 kg/m3, conductivité thermique à 50/500 °C ne dépassant pas 0,039/0,132 W/(m*K), température maximale d'utilisation +660 °C, épaisseur 50 mm",Material,General,m3,456.97,456.97,456.97,456.97,1,EUR,9.6,0.02,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Bétonnage des structures du puits du réacteur KAME-LI-MERI-MENE_KAKARIME,"Géotextile non tissé en fibre de polyester, aiguilleté, densité superficielle 100 g/m2",Material,General,m2,0.76,0.76,0.76,0.76,1,EUR,4.11,5.38,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Bétonnage des structures du puits du réacteur DXME-RIKA-MERI_KASARI,Dragues multifonctionnelles automotrices avec fraiseuse d'une capacité de 400 m3/h (40 m3/h) pour la boue (terre),Equipment,General,Heures machine,125.3,125.3,125.3,125.3,1,EUR,3700.01,29.53,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MERI_KASAME,"Dragues multifonctionnelles automotrices avec godet inversé d'une capacité de 0,4 m3",Equipment,General,Heures machine,70.17,70.17,70.17,70.17,1,EUR,2545.79,36.28,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RITO-VO-KATO-MEME_KAMEPUPU,"Bride plate en acier à souder avec saillie de raccordement, nuance d'acier 20, pression nominale 1 MPa, diamètre nominal 900 mm",Material,General,pièce,609.19,609.19,609.19,609.19,1,EUR,365.51,0.6,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-NE-KAPU-KAPU,Panneaux modulaires pour plafond porteur exploitable avec kit de fixation pour salles blanches,Abstract Material,General,compl,58.62,58.62,58.62,58.62,1,EUR,3634.3,62.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-LI-KALI-KATO,Cire protectrice,Abstract Material,General,kg,9.77,9.77,9.77,9.77,1,EUR,97.69,10.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,"PLÂTRAGE DE CERTAINES ZONES, CAGE D'ESCALIER ET PLATEAUX, PLÂTRAGE DÉCORATIF" KAVO-PU-KATO-KATO_KAKAKAVO,"Barres d'armature pour structures en béton armé, classe A500C, diamètre 20 mm",Material,Steel & Metal,t,1281.71,1281.71,1281.71,1281.71,1,EUR,717.76,0.56,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Installation et bétonnage de blocs armés pour les structures du bâtiment réacteu KAME-LI-MEME-KALI_KARIDXPU,"Électrodes de soudage pour le soudage des aciers faiblement alliés et carbonés UONI 13/55K, diamètre 4-5 mm",Material,General,kg,3.8,3.8,3.8,3.8,1,EUR,3.23,0.85,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RIPU-RI-KATO-KAME_KATOKAME,"Joint d'étanchéité pour tuyau à béton, diamètre 125 mm",Material,General,pièce,4.67,4.67,4.67,4.67,1,EUR,31.08,6.66,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RIPU-RI-KATO-KAME_KAMEKAME,"Coude de tuyau à béton à 90°, diamètre 125 mm, rayon de courbure 1000 mm",Material,General,pièce,192.17,192.17,192.17,192.17,1,EUR,13.45,0.07,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF DE FINITION RILI-ME-KARI-KARI_MEKAKARI,"Rails tramways à gorge, type RT60, RT62",Material,General,m,199.87,199.87,199.87,199.87,1,EUR,415735.98,2080.0,1,1,TRAVAUX DE CONSTRUCTION,Voies de tramway,POSE DE VOIES AVEC RAILS DE TRAMWAY ET DE CHEMIN DE FER SUR DES TRAVERSES EN BOI,Pose de la voie par éléments séparés RIPU-RI-KANE-KAPU_KAKAKARI,"Manchon en chrysotile-ciment pour tuyaux sans pression BNM, diamètre nominal 150 mm",Material,General,pièce,3.77,3.77,3.77,3.77,1,EUR,128.25,34.0,1,1,TRAVAUX DE CONSTRUCTION,Voies de tramway,DISPOSITIF DE DRAINAGE DES VOIES,Installation d'un drainage routier à partir de tuyaux en chrysotile-ciment RIPU-RI-KASA-KATO_KAKAMESA,"Tuyaux en chrysotile-ciment sous pression, classe BT9, diamètre nominal 400 mm",Material,General,m,59.51,59.51,59.51,59.51,1,EUR,35.71,0.6,1,1,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,TRAVAUX DE CONSTRUCTION POUR LES COMMUNICATIONS D'INGÉNIERIE DE L'AÉROPORT KAME-LI-MESA-MERI_KAMEKASA,"Goujons filetés en acier, diamètre du filetage M20, longueur 600, 700-1050 mm",Material,General,t,2440.05,2440.05,2440.05,2440.05,1,EUR,214.72,0.09,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Fabrication de blocs d'armature KAME-LI-MESA-MEME_MEKAKAPU,"Rondelles en saviline pour l'étanchéification des raccords boulonnés des tubages en fonte, diamètre du trou M27",Material,General,1000 pièces,568.8,568.8,568.8,568.8,1,EUR,1723.47,3.03,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ RITO-VO-KATO-KASA_KAKAKATO,"Raccord en acier, diamètre nominal 25 mm",Material,General,pièce,0.59,0.59,0.59,0.59,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ MEVO-ME-KADX-KANE_KAKARITO,"Robinet à boisseau sphérique 11B27p1, raccordement à la canalisation par manchon, pression nominale 1,6 MPa, diamètre nominal 25 mm",Material,General,pièce,12.33,12.33,12.33,12.33,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,DISPOSITIF D'ÉTANCHÉITÉ KAME-LI-RIKA-KARI,Matériaux isolants,Abstract Material,General,m2,19.52,19.52,19.52,19.52,1,EUR,2029.65,104.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,"PLÂTRAGE DE CERTAINES ZONES, CAGE D'ESCALIER ET PLATEAUX, PLÂTRAGE DÉCORATIF" KALI-RI-KANE-KATO_KARITOKA,"Profilé en acier galvanisé, angulaire, maillé, dimensions 35 x 35 mm, épaisseur 0,4 mm",Material,General,m,0.41,0.41,0.41,0.41,1,EUR,8.1,20.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS MEPU-SA-MEME-MEKA_KARIKATO,"Mastic PF-002, couleur rouge-brun",Material,General,t,4303.58,4303.58,4303.58,4303.58,1,EUR,8.61,0.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose de revêtements en relina et de moquettes MEPU-RI-KAME-KANE_KAKAKANE,"Composition (peinture) à base de zinc pour la protection du métal contre la corrosion, teneur en zinc dans le revêtement sec 90 %, épaisseur d'une couche 40-50 µm, couleur gris mat",Material,General,kg,15.56,15.56,15.56,15.56,1,EUR,0.57,0.04,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MEVO-KAPU,Film chauffant infrarouge pour sol (film thermique),Abstract Material,General,compl,116.46,116.46,116.46,116.46,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de systèmes de chauffage électrique au sol (« plancher chauffant ») KADX-RI-KATO-KARI,Profilés de recouvrement en alliages d'aluminium (seuils) avec revêtement,Abstract Material,General,m,17.98,17.98,17.98,17.98,1,EUR,1888.04,105.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Pose d'un profilé métallique (seuil) KAVO-ME-KARI-MELI_KAMEPUME,"Treillis tissé en fil galvanisé, diamètre du fil 0,4 mm, taille des mailles 2 x 2 mm",Material,General,m2,6.04,6.04,6.04,6.04,1,EUR,616.75,102.17,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Bétonnage des structures du puits du réacteur DXME-KAVO-KANE_KARIME,"Séparateur de joints et de fissures, profondeur de coupe jusqu'à 60 mm, largeur de coupe jusqu'à 23 mm",Equipment,General,Heures machine,3.4,3.4,3.4,3.4,1,EUR,22.32,6.56,1,1,TRAVAUX DE CONSTRUCTION,Aérodromes,AÉRODROMES,REVÊTEMENTS DXME-KATO-MEDX_KANEME,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,5.83,25.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX DXME-KATO-MEDX_KANEME,Basculeurs de wagonnets circulaires pour un wagonnet,Equipment,General,Heures machine,36.82,36.82,36.82,36.82,1,EUR,920.49,25.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX RIPU-TO-KATO-METO_KAKAKAPU,"Tuyaux polyéthylène sous pression, à l'exception des conduites de gaz PE100, pour le transport de l'eau, rapport dimensionnel standard SDR11, diamètre extérieur nominal 63 mm, épaisseur de paroi 5,8 mm",Material,General,m,6.12,6.12,6.12,6.12,1,EUR,2171.57,355.05,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de RITO-TO-KANE-KAME,Tubes en acier,Abstract Material,Pipes & Fittings,m,9.43,9.43,9.43,9.43,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX RILI-RI-KATO-KAPU_KAKARIKA,"Fixation en acier peinte articulée droite, type FP-1-3,0, longueur 1100 mm",Material,General,pièce,118.4,118.4,118.4,118.4,1,EUR,236.79,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEPU-SA-MEME-MEKA_KAMEKAME,Mastic polymère à dispersion aqueuse avec charges minérales,Material,General,t,1207.77,1207.77,1207.77,1207.77,1,EUR,60.39,0.05,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES SURFACES À L'INTÉRIEUR DES BÂTIMENTS KAME-VO-KAME-KATO_KAKAKAME,Granulés de verre,Material,General,t,12455.49,12455.49,12455.49,12455.49,1,EUR,2615.65,0.21,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE PLÂTRAGE,PLÂTRAGE DES FAÇADES KALI-RI-KANE-KAPU_KAMEDXKA,"Bouchon en acier à crémaillère pour profilé porteur de plafonds suspendus, dimensions 100 x 4000 mm",Material,General,pièce,12.09,12.09,12.09,12.09,1,EUR,548.93,45.4,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KAPU_KAKADXSA,"Régulateur de hauteur pour plafonds suspendus en acier, trou pour tige filetée de diamètre M10, dimensions 64 x 50 x 83 mm",Material,General,pièce,20.31,20.31,20.31,20.31,1,EUR,995.29,49.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-LI-MESA-KAME_MESASARI,"Vis d'ancrage en acier inoxydable à tête hexagonale, diamètre 6 mm, longueur 35 mm",Material,General,100 pièces,788.44,788.44,788.44,788.44,1,EUR,386.33,0.49,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-LI-KANE-MEPU_MEKANEVO,"Bandes d'étanchéité en caoutchouc butyle, avec couche adhésive des deux côtés, couleur noire, largeur 15 mm, épaisseur 1,5 mm",Material,General,10 m,2.41,2.41,2.41,2.41,1,EUR,53.12,22.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-RIKA-MESA_KAKAPU,"Stations de pompage électriques flottantes, débit 600 m3/h, pression 80 m",Equipment,General,Heures machine,90.64,90.64,90.64,90.64,1,EUR,209.39,2.31,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-KADX_KAKASA,"Électricité : consommation 69,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,8.9,8.9,8.9,8.9,1,EUR,20.56,2.31,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-KADX_KAKASA,"Stations de pompage électriques fixes, débit 600 m3/h, pression 80 m",Equipment,General,Heures machine,359.79,359.79,359.79,359.79,1,EUR,831.12,2.31,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KATO-MEKA_KAKAME,"Machines de forage pneumatiques pour le forage de puits souterrains, d'un diamètre de 105 mm et d'une profondeur maximale de 50 m",Equipment,General,Heures machine,29.19,29.19,29.19,29.19,1,EUR,65.38,2.24,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX MEME-ME-KATO-KASA_KAKAKAVO,"Planche non sciée de feuillus (bouleau), humidité naturelle, longueur 2-6,5 m, toutes largeurs, épaisseur 45 mm et plus, classe II",Material,General,m3,692.69,692.69,692.69,692.69,1,EUR,14.55,0.02,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES AUXILIAIRES,CADRES DE GUIDAGE POUR L'ENFONCEMENT DES PIEUX ET DES PIEUX-GAINES SOUS LES PILI KAVO-RI-KARI-MEPU_KAKAMEME,"Câble à simple torsion TK, structure 1x37(1+6+12+18), marque B, en fil métallique non revêtu, groupe de marquage 1570-1770 N/mm2, diamètre 20 mm",Material,Steel & Metal,10 m,73.57,73.57,73.57,73.57,1,EUR,29.43,0.4,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES AUXILIAIRES,CADRES DE GUIDAGE POUR L'ENFONCEMENT DES PIEUX ET DES PIEUX-GAINES SOUS LES PILI KALI-TO-KATO-MEKA,Connecteur de haubans jumelés,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KALI-TO-KATO-KATO,Couvercle passif,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,815.62,10.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KALI-TO-KATO-KAPU,Enveloppe active,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,815.62,10.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS RITO-TO-KATO-KARI_KAMEPUVO,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 168 mm, épaisseur de paroi 9 mm",Material,Pipes & Fittings,m,105.52,105.52,105.52,105.52,1,EUR,513.91,4.87,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,FORAGE DE TUNNELS ET DE GALERIES DXME-KARI-KARI_KARISA,Mâts de forage avec palan pour l'extraction des pieux,Equipment,General,Heures machine,2.89,2.89,2.89,2.89,1,EUR,2.51,0.87,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,FIXATION DES FOUILLES RILI-RI-KATO-KARI_KAKAKAVO,"Fixation en acier galvanisé articulée à suspension en forme de losange, type FR-1-3,0, longueur 3400 mm",Material,General,pièce,368.66,368.66,368.66,368.66,1,EUR,6075.59,16.48,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-MELI_KAKAMEKA,Œillet articulé (type USHO) KS-021,Material,General,pièce,8.42,8.42,8.42,8.42,1,EUR,4.29,0.51,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-MELI_KAKAKADX,Œillet articulé (type USHD) KS-022,Material,General,pièce,6.82,6.82,6.82,6.82,1,EUR,3.48,0.51,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RISA-RI-KAME-RIKA_KAKAMEDX,"Barre à double œillet KS-1174, galvanisée, longueur 1500 mm",Material,General,pièce,39.02,39.02,39.02,39.02,1,EUR,40.19,1.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RILI-RI-KATO-KAPU_KAKARIME,"Fixateur en acier galvanisé articulé droit, type FP-1-3,0, longueur 1100 mm",Material,General,pièce,207.3,207.3,207.3,207.3,1,EUR,414.59,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT MEPU-RI-KAME-KAPU_MEKAKAKA,"Composition époxy bicomposante pour la couche de finition dans le système de sols antistatiques coulés, sans solvants, densité de la composition 1,7 g/cm3",Material,General,t,17737.64,17737.64,17737.64,17737.64,1,EUR,4434.41,0.25,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements coulés MEPU-RI-KAME-KAPU_KAKAKADX,"Composition époxy bicomposante à pénétration accrue pour couche d'apprêt dans le système de sols coulés antistatiques, à teneur réduite en solvants, densité de la composition 1,05-1,1 g/cm3",Material,General,t,23957.97,23957.97,23957.97,23957.97,1,EUR,1197.9,0.05,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements coulés MEPU-RI-KAME-KAPU_KAKAKAPU,"Composition époxy bicomposante émulsionnée dans l'eau pour couche conductrice dans le système de sols antistatiques coulés, sans solvants, densité de la composition 1,3 g/cm3",Material,General,t,12660.63,12660.63,12660.63,12660.63,1,EUR,316.52,0.02,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements coulés MEPU-PU-KAME-KADX_KATOMEPU,"Apprêt bicomposant à base de résines époxy pour la protection des supports minéraux et la réalisation de revêtements de sol, consommation 0,3-0,4 kg/m2",Material,General,t,13495.3,13495.3,13495.3,13495.3,1,EUR,809.72,0.06,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements coulés MEPU-RI-KASA-KAPU_KAKAMEKA,"Composition bicomposante autonivelante à base de résines époxy pour la réalisation de revêtements de sol, consommation 2,0-3,0 kg/m2",Material,General,t,13516.73,13516.73,13516.73,13516.73,1,EUR,4055.02,0.3,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements coulés RITO-TO-KATO-KARI_KAKAVOPU,"Tubes en acier sans soudure, formés à chaud, chanfreinés, en acier de nuance 10, 20, 35, diamètre extérieur 114 mm, épaisseur de paroi 4 mm",Material,Pipes & Fittings,m,37.72,37.72,37.72,37.72,1,EUR,14.33,0.38,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL FERMÉE,AUTRES TRAVAUX RIPU-TO-KASA-KALI_KASASALI,"Manchon thermorétractable en polyéthylène pour raccords de tuyauterie, diamètre extérieur nominal 250 mm, longueur 500 mm",Material,General,pièce,15.59,15.59,15.59,15.59,1,EUR,51.61,3.31,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage d'armatures précontraintes du système de précontrainte de l'enceinte de KALI-TO-KATO-KAVO,Boîtier d'amortisseur interne,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KALI-TO-KATO-KALI,Amortisseur interne,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KALI-TO-KATO-KANE,Déviateur libre inférieur,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KALI-TO-KATO-KASA,Déviateur libre supérieur,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS MELI-ME-KARI-KASA_KAKASAKA,"Support céramique sur film autocollant en aluminium pour soudage, largeur du support 85 mm, longueur du support 600 mm, diamètre de la tige 9 mm",Material,General,kg,37.16,37.16,37.16,37.16,1,EUR,15.98,0.43,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KALI-TO-KATO-MERI,Tuyau de guidage supérieur,Abstract Material,General,pièce,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KALI-TO-KATO-MEME,Tube de guidage inférieur,Abstract Material,Pipes & Fittings,pièce,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KAME-LI-MEDX-METO_KAKARIME,Joint en caoutchouc pour profilé HCP,Material,General,10 m,17.51,17.51,17.51,17.51,1,EUR,3.15,0.18,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS DXME-RIKA-MESA_KAKAPU,"Électricité : consommation 69,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,8.9,8.9,8.9,8.9,1,EUR,20.56,2.31,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RISA-ME-KANE-KAPU,Fibre,Abstract Material,General,kg,19.32,19.32,19.32,19.32,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES PRÉFABRIQUÉES EN BÉTON ARMÉ KASA-ME-KATO-MERI,Poutres préfabriquées en béton armé,Abstract Material,General,m3,898.67,898.67,898.67,898.67,1,EUR,90046.35,100.2,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES PRÉFABRIQUÉES EN BÉTON ARMÉ KAVO-ME-KAME-KARI_KAKAKAME,"Structures en gabions en treillis, type GSI-M, en fil galvanisé de 2,7 mm de diamètre à double torsion, avec des mailles hexagonales de 80 x 100 mm",Material,Steel & Metal,t,4409.56,4409.56,4409.56,4409.56,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS KAME-LI-MESA-KARI_KAKATOPU,"Boulons d'ancrage avec écrou en acier à friction, à expansion, avec filetage extérieur M8, diamètre 10 mm, longueur 40 mm",Material,General,100 pièces,9.07,9.07,9.07,9.07,1,EUR,18.13,2.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MESA-KAME_MEKASAPU,"Chevilles à expansion en acier galvanisé pour béton fissuré, filetage extérieur M10, longueur 130 mm",Material,General,10 pièces,48.33,48.33,48.33,48.33,1,EUR,1261.46,26.1,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KALI-TO-KATO-KARI,Ancre passive non réglable pour câbles,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KALI-TO-KATO-KAME,Ancre câblée réglable active,Abstract Material,General,compl,81.56,81.56,81.56,81.56,1,EUR,81.56,1.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,SYSTÈME DE HAUBANS KAME-LI-MESA-KASA_KAKARILI,"Écrous hexagonaux en acier galvanisé, diamètre du filetage M24",Material,General,t,4556.78,4556.78,4556.78,4556.78,1,EUR,1357.01,0.3,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CLÔTURE KADX-PU-KARI-KAME_MEKAKAPU,"Porte battante (à bascule) à un vantail pour métro avec accessoires, profilé en acier inoxydable, remplissage en verre feuilleté trempé de 8,4 mm d'épaisseur, dimensions 2195 x 933 x 55 mm",Material,General,compl,2428.4,2428.4,2428.4,2428.4,1,EUR,2428.4,1.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-KAPU-KAME_MEKAKAKA,"Ferme-porte au sol avec broche pour portes battantes d'une largeur maximale de 1 400 mm, poids de la porte jusqu'à 300 kg",Material,General,pièce,826.28,826.28,826.28,826.28,1,EUR,826.28,1.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX MERI-RI-KAPU-MEKA_KAKAMERI,"Tapis isolants thermiques en fibre de verre ultra-fine sans liant, épaisseur 40-80 mm",Material,General,m3,113.85,113.85,113.85,113.85,1,EUR,257.31,2.26,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-KALI-RILI_MEKAKAPU,"Clavette hydrotechnique en caoutchouc universelle avec renforts pleins sur les côtés d'un diamètre de 13 mm et renfort creux au centre d'un diamètre de 23,5 mm, largeur 120 mm",Material,General,m,34.39,34.39,34.39,34.39,1,EUR,3542.3,103.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-RI-KATO-KASA_KAKAKASA,"Mastic (apprêt) bitumineux avec solvants organiques pour la préparation des surfaces en béton, en ciment-sable et métalliques avant la pose de matériaux de couverture et d'étanchéité, plage de température de -30 à +45 °C, consommation 0,2 l/m2",Material,General,kg,9.35,9.35,9.35,9.35,1,EUR,415.7,44.44,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ RISA-RI-KAME-MEVO_KAKATORI,"Fixation supplémentaire avec pince de fixation, avec support allongé",Material,General,pièce,61.06,61.06,61.06,61.06,1,EUR,122.12,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RILI-RI-KATO-KAPU_KAKARITO,"Fixation en acier peint articulée pour aiguillages aériens, type FKS-1-25, longueur 4565",Material,General,pièce,217.99,217.99,217.99,217.99,1,EUR,109.0,0.5,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RILI-RI-KATO-KAPU_KAKARIRI,"Fixation en acier galvanisé articulée pour aiguilles pneumatiques, type FKS-1-25, longueur 4565",Material,General,pièce,314.78,314.78,314.78,314.78,1,EUR,157.39,0.5,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE LA SUSPENSION À CONTACT RIKA-RI-KANE-KASA_KAKAMESA,"Support de parafoudre P-1, peint",Material,General,compl,4.3,4.3,4.3,4.3,1,EUR,4.43,1.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS DU RÉSEAU DE CONTACT RIKA-RI-KANE-KAPU_KAKAKAME,"Support de limiteur de tension pour poteaux en béton armé, peint",Material,General,compl,18.99,18.99,18.99,18.99,1,EUR,19.56,1.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS DU RÉSEAU DE CONTACT KALI-RI-KANE-KAME_MEKASAPU,"Rallonges de support en alliages d'aluminium, peintes à l'émail en poudre, pour façades ventilées suspendues, longueur 80 mm, hauteur 60 mm",Material,General,10 pièces,19.14,19.14,19.14,19.14,1,EUR,212.64,11.11,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KALI-RI-KANE-KAME_MEKASARI,"Rallonges de support en alliages d'aluminium, peintes à l'émail en poudre, pour façades ventilées suspendues, longueur 160 mm, hauteur 60 mm",Material,General,10 pièces,34.81,34.81,34.81,34.81,1,EUR,386.77,11.11,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KALI-RI-KANE-KAME_KAKAKAME,"Pince en acier inoxydable ordinaire pour plaques céramiques d'une épaisseur de 10 mm, dimensions de la pince 76 x 66 mm, épaisseur de l'acier 1,2 mm",Material,General,pièce,1.19,1.19,1.19,1.19,1,EUR,1111.73,932.85,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MESA-MEME_MEKARIRI,"Rondelles à ressort en acier galvanisé (grover), diamètre du trou M8",Material,General,t,5707.74,5707.74,5707.74,5707.74,1,EUR,2.28,0.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-RIME-MEKA_KAMEME,"Électricité : consommation 0,5 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.0,0.01,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-RIME-MEKA_KAMEME,"Marteaux électriques, puissance 1,5 kW",Equipment,General,Heures machine,0.19,0.19,0.19,0.19,1,EUR,0.0,0.01,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KARI-RI-KATO-KAME_KAKAMENE,"Pierre concassée M 1200, taille de 150 à 500 mm",Material,General,m3,85.56,85.56,85.56,85.56,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,CONSTRUCTION DE STRUCTURES EN GABIONS KARI-TO-KAME-KALI_KAKAKAVO,"Sable de quartz, fraction 1,0-2,5 mm, couleur grise",Material,General,t,481.21,481.21,481.21,481.21,1,EUR,120.3,0.25,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " KAME-LI-KAVO-KASA_KAMEKAKA,"Additif pour augmenter la vitesse de polymérisation des mastics polyuréthanes, consommation 0,08 kg/m2",Material,General,kg,76.16,76.16,76.16,76.16,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " MEPU-SA-KAPU-KANE,"Mastic polyuréthane monocomposant à application à froid pour l'étanchéité de la chaussée d'un pont, résistant aux charges des véhicules automobiles, aux rayons ultraviolets, aux milieux liquides agressifs et à la chaleur",Abstract Material,General,kg,32.33,32.33,32.33,32.33,1,EUR,6993.53,216.3,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " KAME-LI-MERI-KASA_MEKAKARI,"Géotextile non tissé en polypropylène, aiguilleté, thermolié, densité superficielle 150 g/m2",Material,General,m2,0.62,0.62,0.62,0.62,1,EUR,5.06,8.12,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " KAVO-PU-KAME-KAME_KAKARINE,"Boulons d'ancrage en acier pour fondations, livrés avec deux écrous M16 et rondelles M16, type 1, diamètre M16",Material,General,t,5303.06,5303.06,5303.06,5303.06,1,EUR,13.79,0.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KALI-RI-KANE-KATO_KATOMEME,"Profilé de départ en forme de P en acier inoxydable pour la fixation de carreaux de clinker pour façades ventilées suspendues, largeur 10,5 mm, hauteur des côtés 23 et 6,5 mm, épaisseur de l'acier 0,5 mm",Material,General,m,1.86,1.86,1.86,1.86,1,EUR,103.73,55.68,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RILI-RI-KATO-KATO_KAKAKARI,"Traverse de suspension en acier, type TM-12, longueur 2200 mm",Material,General,pièce,51.29,51.29,51.29,51.29,1,EUR,102.57,2.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DES DISPOSITIFS DE SOUTIEN ET DE MISE À LA TERRE RIKA-RI-KANE-KASA_KAKARIRI,"Support pour sectionneur KR-1, galvanisé",Material,General,compl,122.82,122.82,122.82,122.82,1,EUR,126.51,1.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS DU RÉSEAU DE CONTACT KAME-LI-MELI-KADX_METOMENE,"Foret à pointe en alliage dur, avec queue SDS-max pour le forage à percussion dans des matériaux durs, longueur totale 520 mm, diamètre 50 mm",Material,General,pièce,155.71,155.71,155.71,155.71,1,EUR,12.46,0.08,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-KATO-MEDX_MESATO,"Électricité : consommation 14,85 kWh/machine-heure",Electricity,Electricity,Heures machine,1.91,1.91,1.91,1.91,1,EUR,13.6,7.13,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-KATO-MEDX_MESATO,"Presses de vulcanisation pour le raccordement de bandes transporteuses d'une largeur maximale de 1 400 mm, longueur de raccordement maximale de 1 800 mm",Equipment,General,Heures machine,8.21,8.21,8.21,8.21,1,EUR,58.57,7.13,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAVO-PU-KAME-KAME_KAKARILI,"Boulons d'ancrage en acier pour fondations, livrés avec deux écrous M20 et rondelles M20, type 1, diamètre M20",Material,General,t,5076.76,5076.76,5076.76,5076.76,1,EUR,18.28,0.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-MELI-KADX_MERIPUSA,"Foret à pointe en alliage dur, avec queue SDS-max pour le forage à percussion dans des matériaux durs, longueur totale 320 mm, diamètre 20 mm",Material,General,pièce,18.64,18.64,18.64,18.64,1,EUR,0.19,0.01,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-KATO-MEDX_MESARI,"Électricité : consommation 9,64 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.24,1.24,1.24,1.24,1,EUR,0.15,0.12,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-KATO-MEDX_MESARI,Presses de vulcanisation pour le raccordement de bandes transporteuses d'une largeur maximale de 1 200 mm et d'une longueur maximale de 1 200 mm,Equipment,General,Heures machine,4.44,4.44,4.44,4.44,1,EUR,0.53,0.12,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAME-LI-RIME-KAME,Briquette en composite époxy-gravier pour canaux de drainage préfabriqués,Abstract Material,General,m,46.4,46.4,46.4,46.4,1,EUR,4779.13,103.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " RIPU-TO-KATO-METO_KAKAKATO,"Tuyaux de refoulement en polyéthylène, à l'exception des conduites de gaz PE100, pour le transport de l'eau, rapport dimensionnel standard SDR11, diamètre extérieur nominal 50 mm, épaisseur de paroi 4,6 mm",Material,General,m,3.76,3.76,3.76,3.76,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " KAME-RI-KATO-KALI_KAKARIPU,Émulsion bitumineuse cationique EBDK B,Material,General,t,537.54,537.54,537.54,537.54,1,EUR,2.69,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " DXME-RIKA-MERI_KAMEDX,"Propulseurs électriques flottants avec EGZU, débit 400 m3/h, pression 71 m",Equipment,General,Heures machine,251.69,251.69,251.69,251.69,1,EUR,863.28,3.43,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MERI_KAMEVO,Électricité : consommation 561 kWh/machine-heure,Electricity,Electricity,Heures machine,72.05,72.05,72.05,72.05,1,EUR,501.5,6.96,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MERI_KAMEVO,"Projectiles flottants électriques avec EGZU, débit 200 m3/h, pression 50-63 m",Equipment,General,Heures machine,173.31,173.31,173.31,173.31,1,EUR,1206.26,6.96,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION RIKA-RI-KANE-KASA_KAKAMENE,"Support de parafoudre R-1, galvanisé",Material,General,compl,6.01,6.01,6.01,6.01,1,EUR,6.19,1.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS DU RÉSEAU DE CONTACT RIKA-RI-KANE-KASA_KAKARIME,"Support de sectionneur KR-1, peint",Material,General,compl,77.44,77.44,77.44,77.44,1,EUR,79.76,1.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION D'APPAREILS DU RÉSEAU DE CONTACT KALI-RI-KANE-KANE_KAKALIRI,"Profilé en aluminium pour socle, largeur 100 mm, longueur 2500 mm",Material,General,m,3.72,3.72,3.72,3.72,1,EUR,12.12,3.26,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KANE_KAKALIME,"Profilé en aluminium pour socle, largeur 50 mm, longueur 2500 mm",Material,General,m,2.49,2.49,2.49,2.49,1,EUR,8.12,3.26,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAVO-ME-KARI-KATO_KAKASAME,"Encadrement en acier galvanisé avec revêtement polymère, dimensions 55 x 22 x 30 x 14 x 30 x 22 x 30 mm, épaisseur 0,5 mm",Material,General,m,4.64,4.64,4.64,4.64,1,EUR,2.13,0.46,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAVO-ME-KARI-KALI_KARIKAKA,"Larmier de fenêtre en acier galvanisé, peint, pour façades ventilées suspendues, épaisseur 0,5 mm",Material,General,m2,156.77,156.77,156.77,156.77,1,EUR,17280.71,110.23,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KATO_KARIDXVO,"Profilé d'angle de montage 79° en acier galvanisé avec revêtement polymère pour façades ventilées suspendues, section 40 x 40 mm, épaisseur de l'acier 1,2 mm",Material,General,m,6.43,6.43,6.43,6.43,1,EUR,1266.64,197.05,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KAME_MEMELIRI,"Diagonale de ferme d'angle en acier galvanisé avec revêtement polymère pour façades ventilées suspendues, dimensions 143 x 143 mm, épaisseur de l'acier 1,2 mm",Material,General,pièce,4.42,4.42,4.42,4.42,1,EUR,1826.23,412.84,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KAME_MEMEKANE,"Bras de support en acier galvanisé avec revêtement polymère pour façades ventilées suspendues, dimensions 40 x 40 x 150 mm, épaisseur de l'acier 1,2 mm",Material,General,pièce,1.19,1.19,1.19,1.19,1,EUR,546.68,458.72,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAVO-ME-KARI-RILI_KAKAKAPU,"Goupilles cylindriques à ressort avec fente, diamètre 10 mm, longueur 40 mm",Material,General,1000 pièces,741.17,741.17,741.17,741.17,1,EUR,366.88,0.5,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KANE_MEKASAKA,Support mural en acier galvanisé pour module de façade ventilé suspendu avec fixations,Material,General,compl,107.0,107.0,107.0,107.0,1,EUR,10699.59,100.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KANE_MEKASAME,Support en acier galvanisé pour module de façade ventilé suspendu avec fixations,Material,General,compl,86.79,86.79,86.79,86.79,1,EUR,8678.53,100.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAPU-TO-KARI-KADX_MEKAKAVO,"Mélanges secs pour enduits, renforcés, élastiques, destinés à être utilisés dans des systèmes d'isolation thermique collée",Material,General,t,1170.34,1170.34,1170.34,1170.34,1,EUR,8.19,0.01,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAPU-TO-KARI-KADX_MEKAKALI,"Mélanges secs pour béton, sable, réparation, sans retrait, à prise rapide, renforcés de fibres polymères, classe B80 (M1000), P5, F300, W16, granulométrie jusqu'à 3 mm",Material,General,t,1107.04,1107.04,1107.04,1107.04,1,EUR,7.2,0.01,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KANE_KAKALISA,"Profilé en aluminium pour socle, largeur 200 mm, longueur 2500 mm",Material,General,m,12.5,12.5,12.5,12.5,1,EUR,40.74,3.26,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-KALI_KAMETOSA,"Chevilles-clous en plastique à expansion avec tige métallique pour isolation thermique, diamètre 10 mm, longueur 300 mm",Material,General,10 pièces,5.25,5.25,5.25,5.25,1,EUR,629.58,120.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES RISA-ME-KANE-RIME_KAKAKARI,"Connecteurs électriques à rail en cuivre de type à emboîtement, longueur 200 mm, section 70 mm2",Material,General,100 pièces,583.46,583.46,583.46,583.46,1,EUR,175.04,0.3,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE CONNECTEURS INTERMÉDIAIRES EN CUIVRE RISA-ME-KANE-RIME_KAKAKAME,"Connecteurs électriques à rail en cuivre de type à jonction bout à bout, longueur 200 mm, section 50 mm2",Material,General,100 pièces,469.11,469.11,469.11,469.11,1,EUR,328.38,0.7,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",RÉSEAUX DE CONTACT SUR LES TRANSPORTS FERROVIAIRES,INSTALLATION DE CONNECTEURS INTERMÉDIAIRES EN CUIVRE KASA-ME-KAVO-KAME_KARILIME,"Bloc en béton armé pour murs de soutènement antisismiques, béton B30, consommation d'armature 46 kg/m3, dimensions 1995 x 1000 x 1250 mm",Material,General,pièce,592.88,592.88,592.88,592.88,1,EUR,59287.83,100.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,MURS DE SOUTÈNEMENT KAPU-ME-KARI-KASA_KAMESAPU,"Mélanges de béton lourd (BST) sur gravier concassé, classe B30, F(1)200, W10",Material,General,m3,139.64,139.64,139.64,139.64,1,EUR,0.42,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,GARDE-CORPS SUR LES PONTS ET LES PASSERELLES KAVO-TO-KALI-KAME_KAKASAME,"Bandes d'acier laminées à chaud, nuances d'acier St3sp, St3ps, dimensions 50 x 4 mm",Material,General,t,1535.58,1535.58,1535.58,1535.58,1,EUR,362.4,0.24,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire RISA-ME-KAME-KATO,Poutres de pont,Abstract Material,General,m3,718.42,718.42,718.42,718.42,1,EUR,517264.88,720.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,PASSAGE SOUTERRAIN POUR CHEMIN DE FER,Pose du tablier de pont ferroviaire DXME-KASA-KASA_SAKAPU,"Grues sur châssis automobile, capacité de charge 20 t",Equipment,General,Heures machine,43.21,43.21,43.21,43.21,1,EUR,0.86,0.02,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Montage des structures en acier suspendues à l'aide d'un dispositif de levage sp KAME-LI-MESA-KARI_KAKADXPU,"Boulons en acier à haute résistance avec tête hexagonale, classe de résistance 10.9 (11.0), filetage M16-24, longueur 50-200 mm",Material,General,t,4532.48,4532.48,4532.48,4532.48,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Montage des structures en acier suspendues à l'aide d'un dispositif de levage sp MEME-RI-MEME-KANE_KAKAKAME,"Contreplaqué de bouleau recouvert d'un film sur les deux faces, surface lisse des deux côtés, classe III/III, épaisseur 9 mm",Material,General,m3,1268.85,1268.85,1268.85,1268.85,1,EUR,5192.14,4.09,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,TRAVAUX D'ÉTANCHÉITÉ KALI-RI-KANE-KANE_KAKASAME,"Profilé en acier galvanisé pour la fixation des panneaux de façade ventilée, livré avec profilé horizontal et vertical, profilé décoratif",Material,General,t,3011.31,3011.31,3011.31,3011.31,1,EUR,1836.9,0.61,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KADX-RI-KATO-KAME_KAKATONE,"Profilé en aluminium pour assembler des panneaux muraux autoportants, dimensions 20 x 20 x 2 mm",Material,General,m,4.96,4.96,4.96,4.96,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES MEKA-TO-KAME-KATO,Feuilles de plomb,Abstract Material,General,kg,7.47,7.47,7.47,7.47,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KATO_KATOSASA,"Profilé de guidage en acier galvanisé, dimensions 88 x 27 mm, épaisseur de l'acier 1 mm",Material,General,m,7.09,7.09,7.09,7.09,1,EUR,1559.54,219.87,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAVO-RI-KARI-MEME_KAKATONE,"Câble à double torsion TK, structure 6x37(1+6+12+18)+1 o.s., marque B, en fil galvanisé du groupe Zh, groupe de marquage 1570-1770 N/mm2, diamètre 11,5 mm",Material,Steel & Metal,10 m,34.78,34.78,34.78,34.78,1,EUR,8.6,0.25,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,REMPLACEMENT DES CÂBLES ET TRANSFERT DES SUSPENSIONS DE CONTACT EXISTANTES ET DE RIKA-ME-KARI-RIME_KAKAKAME,"Ensemble de fixation des entretoises rigides aux fixations FO et FP 01931, longueur 2,5 m",Material,General,compl,101.42,101.42,101.42,101.42,1,EUR,1825.48,18.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,REMPLACEMENT DES CÂBLES ET TRANSFERT DES SUSPENSIONS DE CONTACT EXISTANTES ET DE KAME-LI-MESA-KALI_KAMETOPU,"Chevilles-clous en plastique à expansion avec tige métallique pour isolation thermique, diamètre 10 mm, longueur 220 mm",Material,General,10 pièces,3.32,3.32,3.32,3.32,1,EUR,398.03,120.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KALI-RI-KANE-KANE_KAKALITO,"Profilé en aluminium pour soubassement, largeur 120 mm, longueur 2500 mm",Material,General,m,5.35,5.35,5.35,5.35,1,EUR,17.44,3.26,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES KAME-LI-MESA-KALI_KAMETOTO,"Chevilles-clous en plastique à expansion avec tige métallique pour isolation thermique, diamètre 10 mm, longueur 180 mm",Material,General,10 pièces,2.72,2.72,2.72,2.72,1,EUR,326.69,120.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT EXTÉRIEUR DES FAÇADES DXME-RIME-RIRI_MEVODX,"Machines à lisser à deux rotors, puissance 14 kW (20 ch)",Equipment,General,Heures machine,8.45,8.45,8.45,8.45,1,EUR,51.51,6.1,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements renforcés (topping) pour sols en béton DXME-RIME-RIRI_MEVOLI,"Machines à finition du béton à un rotor, puissance 3 kW (4 ch)",Equipment,General,Heures machine,2.06,2.06,2.06,2.06,1,EUR,6.38,3.09,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Réalisation de revêtements renforcés (topping) pour sols en béton KALI-RI-KANE-KATO_KATOSALI,"Profilé de guidage en acier galvanisé, dimensions 52 x 25 mm, épaisseur de l'acier 1 mm",Material,General,m,5.2,5.2,5.2,5.2,1,EUR,346.45,66.67,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KATO_KATOSANE,"Profilé vertical en acier galvanisé, dimensions 88 x 50 mm, épaisseur de l'acier 1 mm",Material,General,m,8.99,8.99,8.99,8.99,1,EUR,1976.64,219.87,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KATO_KATOSARI,"Profilé de guidage en acier galvanisé pour plafonds suspendus, dimensions 60 x 27 mm, épaisseur de l'acier 0,5 mm",Material,General,m,1.31,1.31,1.31,1.31,1,EUR,102.21,78.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KATO_KATOSAKA,"Raccord à deux niveaux en acier galvanisé pour profilés de plafond, dimensions 60 x 27 mm, épaisseur de l'acier 0,7 mm",Material,General,pièce,0.27,0.27,0.27,0.27,1,EUR,33.87,125.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-NE-KAPU-KARI_KAKAMEME,"Panneaux décoratifs de plafond en fibre minérale, livrés avec un système de suspension en acier galvanisé, rigides, à bord droit, classe de risque d'incendie KM1, classe d'absorption acoustique D-E, épaisseur 12 mm",Material,General,m2,15.35,15.35,15.35,15.35,1,EUR,1534.64,100.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES MEPU-RI-KARI-MEME_KAKAKAPU,Composition ignifuge et antibactérienne pour imprégnation du bois (concentré sec),Material,General,kg,9.76,9.76,9.76,9.76,1,EUR,15.22,1.56,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KAPU_KAKALILI,"Suspension réglable en acier galvanisé, diamètre 4 mm, longueur 120-200 mm",Material,General,pièce,0.92,0.92,0.92,0.92,1,EUR,64.13,70.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KAPU_KAKASAME,"Profilé de guidage en acier galvanisé, blanc, pour systèmes de suspension apparents et semi-encastrés, dimensions 24 x 38 mm, épaisseur de l'acier 0,6 mm",Material,General,m,1.51,1.51,1.51,1.51,1,EUR,137.64,91.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KAPU_KAKARIME,Clip en acier inoxydable pour suspension de plafonds suspendus,Material,General,pièce,1.41,1.41,1.41,1.41,1,EUR,98.94,70.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KALI-RI-KANE-KATO_KAMEPURI,"Profilé transversal avec verrou en acier galvanisé pour système suspendu apparent, couleur blanc, dimensions 15 x 29 (15 x 38) mm, épaisseur de l'acier 0,6 mm",Material,General,m,1.57,1.57,1.57,1.57,1,EUR,413.75,263.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES PU_MEKAKA_KAPURI,Personnel : 5 personnes-heures/machine-heures,Operator,Operators,Heures machine,45.04,45.04,45.04,45.04,1,EUR,472.95,10.5,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MERI_KAMERI,"Dragues flottantes à moteur diesel, débit 140 m3/h, pression 37-52 m",Equipment,General,Heures machine,80.99,80.99,80.99,80.99,1,EUR,850.34,10.5,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAVO-ME-KARI-KAME_KAKAPUKA,"Entonnoir d'évacuation des eaux pluviales en fonte carré avec grille de 270 x 290 x 50 mm, dimensions de l'entonnoir 350 x 330 x 165 mm, diamètre extérieur du verre 154 mm",Material,General,pièce,111.8,111.8,111.8,111.8,1,EUR,469.57,4.2,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,"HYDRO-ISOLATION DE LA PARTIE CARROSSABLE DES PONTS, DES PILIERS DE PONTS ET DES " KASA-ME-KAVO-KAME_KARILIRI,"Bloc en béton armé pour murs de soutènement antisismiques, béton B30, consommation d'armature 42 kg/m3, dimensions 1496 x 1000 x 1250 mm",Material,General,pièce,467.36,467.36,467.36,467.36,1,EUR,46735.95,100.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,TRAVAUX DIVERS,MURS DE SOUTÈNEMENT KAME-LI-MESA-KASA_KAKARIPU,"Écrous hexagonaux en acier galvanisé, diamètre du filetage M12 (M14)",Material,General,t,3826.73,3826.73,3826.73,3826.73,1,EUR,1.53,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,"Équipements de signalisation, de centralisation et de verrouillage" RISA-RI-KARI-MEKA_KAKATOKA,"Barre en acier double pour charges en fonte à section fermée, nombre de charges 64 pièces, distance entre les centres des charges 370 mm, épaisseur de la barre 30 mm, longueur de la barre 1808 mm",Material,General,pièce,448.88,448.88,448.88,448.88,1,EUR,462.35,1.03,1,1,INSTALLATION DE L'ÉQUIPEMENT,"Équipement de signalisation, de centralisation, de verrouillage et de réseau de ",TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION DES RÉSEAUX DE CONTACT EXISTANTS SUR ,TRAVAUX DE RECONSTRUCTION ET DE RÉNOVATION EN PROFONDEUR DU RÉSEAU DE CONTACT EX KALI-RI-KANE-KATO_KAKAMEME,"Profilé d'angle en acier galvanisé, couleur chrome blanc, dimensions 22 x 22 mm, épaisseur 0,4 mm",Material,General,m,3.36,3.36,3.36,3.36,1,EUR,882.7,263.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES DXME-KATO-MEDX_MESAPU,"Électricité : consommation 18,98 kW·h/machine-heure",Electricity,Electricity,Heures machine,2.44,2.44,2.44,2.44,1,EUR,20.72,8.5,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX DXME-KATO-MEDX_MESAPU,"Presses de vulcanisation pour le raccordement de bandes transporteuses d'une largeur maximale de 1600 mm, longueur de raccordement maximale de 1800 mm",Equipment,General,Heures machine,9.8,9.8,9.8,9.8,1,EUR,83.31,8.5,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAVO-PU-KAME-KAME_KAKATOME,"Boulons d'ancrage en acier pour fondations, livrés avec deux écrous M42-48 et rondelles M42-48, type 1, diamètre M42-48",Material,General,t,3822.72,3822.72,3822.72,3822.72,1,EUR,771.81,0.2,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KAVO-PU-KAME-KAME_KAKARIVO,"Boulons d'ancrage en acier pour fondations, livrés avec deux écrous M24 et rondelles M24, type 1, diamètre M24",Material,General,t,4691.98,4691.98,4691.98,4691.98,1,EUR,57.71,0.01,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,AUTRES TRAVAUX KALI-TO-KARI-MEME_KAMERIME,"Pièce métallique de support unifiée moulée pour structures de ponts ferroviaires, routiers et urbains, longueur jusqu'à 100 m",Material,Steel & Metal,t,4592.73,4592.73,4592.73,4592.73,1,EUR,642.98,0.14,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Installation par grues de structures de ponts en acier DXME-KASA-KATO_KAKAPU,"Grues à console, capacité de charge 80 t",Equipment,General,Heures machine,173.97,173.97,173.97,173.97,1,EUR,2174.59,12.5,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PONTS EN ACIER,Installation par grues de structures de ponts en acier KAME-LI-MENE-KASA,Structures métalliques d'échafaudages,Abstract Material,Steel & Metal,t,5575.97,5575.97,5575.97,5575.97,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,CONSTRUCTION DE STRUCTURES DE VOIES EN BÉTON ARMÉ NON COUPÉES POUR LES PONTS ROU RIPU-TO-KAME-KATO_KAKAMERI,"Tuyaux lisses rigides, légers, en PVC auto-extinguible, diamètre nominal 20 mm",Material,General,m,0.65,0.65,0.65,0.65,1,EUR,3.37,5.2,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE MEVO-ME-MEKA-KAME_KAKALITO,"Vanne à passage direct 15kch33p, raccordement à la canalisation par manchon, pression nominale 1,6 MPa, diamètre nominal 20 mm",Material,General,pièce,5.93,5.93,5.93,5.93,1,EUR,15.3,2.58,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE MEPU-RI-KASA-KAME_KAMEKAPU,Composition hydrofuge (revêtement) ultra-dense protectrice,Material,General,kg,13.79,13.79,13.79,13.79,1,EUR,8687.69,630.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale MEME-RI-KAPU-KASA_KAKAKAME,"Lattes rabotées sèches de conifères (épicéa, pin), longueur 2-3 m, dimensions 8 x 18 mm",Material,General,m3,1437.87,1437.87,1437.87,1437.87,1,EUR,106.4,0.07,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-LI-MESA-KAME_MEKALIKA,"Chevilles à expansion en acier galvanisé à friction pour béton sans fissures, filetage extérieur M10, longueur 68 mm",Material,General,10 pièces,24.57,24.57,24.57,24.57,1,EUR,248.2,10.1,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de systèmes de faux-planchers démontables dans les locaux propres MEPU-ME-KARI-KAPU_KAMEKARI,Colle pour la pose de revêtements en PVC,Material,General,kg,8.95,8.95,8.95,8.95,1,EUR,241.66,27.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de revêtements hétérogènes et homogènes à base de colle avec soudur KAPU-TO-KARI-MEVO_KAMEKAKA,"Mélanges secs de colle à base de ciment pour la pose de carreaux de sol et muraux en céramique, mosaïque, pierre naturelle et grès cérame, classe C2, B1.5, F50, consommation 1,2-1,3 kg/m2 pour une épaisseur de couche de 1 mm",Material,General,t,632.5,632.5,632.5,632.5,1,EUR,0.95,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,Appareils d'éclairage KAVO-TO-KAPU-KARI_KAKALIKA,"Acier laminé à chaud carré, nuance St3sp, St3ps, côté du carré 14-50 mm",Material,General,t,1455.12,1455.12,1455.12,1455.12,1,EUR,1.46,0.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,MÉTHODE DE TRAVAIL OUVERTE,STRUCTURES MONOLITHIQUES EN BÉTON ET EN BÉTON ARMÉ MEPU-RI-KASA-KAME_KAKAKATO,Imperméabilisation par enduit,Material,General,kg,1.68,1.68,1.68,1.68,1,EUR,6539.93,3900.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale MEPU-RI-KASA-KAME_KAKAKARI,Imperméabilisation à base de mastic,Material,General,kg,8.45,8.45,8.45,8.45,1,EUR,4986.95,590.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale MEPU-RI-KASA-KAME_KAKAKAME,Imperméabilisation d'apprêt,Material,General,kg,11.11,11.11,11.11,11.11,1,EUR,1621.35,146.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale KAME-VO-KAME-KANE_KAKAKAPU,"Treillis en fibre de verre de renforcement pour façade, dimensions des mailles 4 x 4 mm, densité superficielle 160 g/m2",Material,Concrete & Cement,m2,1.13,1.13,1.13,1.13,1,EUR,33.85,30.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale KAME-RI-KATO-KALI_KAKAMEME,"Revêtement bitume-polymère à deux composants, à couche épaisse, avec remplissage en polystyrène expansé, pour une étanchéité sans joint avec propriété de recouvrement des fissures, consommation 4,0-5,0 l/m2",Material,General,kg,11.31,11.31,11.31,11.31,1,EUR,6221.93,550.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale KAVO-ME-KARI-METO_KAKAMELI,"Canaliseur en acier ondulé pour les ouvrages de construction nucléaire, diamètre intérieur 200 mm, épaisseur de bande 0,6 mm",Material,General,m,305.51,305.51,305.51,305.51,1,EUR,30551.0,100.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire RIPU-TO-KASA-KALI_KASASANE,"Manchon thermorétractable en polyéthylène pour raccords de tuyauterie, diamètre extérieur nominal 225 mm, longueur 500 mm",Material,General,pièce,12.81,12.81,12.81,12.81,1,EUR,512.47,40.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Montage des canaux et des puits d'ancrage des structures des centrales nucléaire DXME-KANE-KADX_KAPUME,"Machines pour la distribution de faisceaux d'armature, force 16 t",Equipment,General,Heures machine,32.38,32.38,32.38,32.38,1,EUR,54.07,1.67,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE RIPU-TO-KASA-METO_KAKALILI,"Raccord pivotant à 360° électrosoudé avec partie inférieure correspondante, PE100, SDR11, diamètre 110x32 mm",Material,General,pièce,67.54,67.54,67.54,67.54,1,EUR,63.48,0.94,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE RIPU-TO-KAME-KATO_KAKAMEPU,"Tuyaux lisses rigides, légers, en PVC auto-extinguible, diamètre nominal 32 mm",Material,General,m,1.3,1.3,1.3,1.3,1,EUR,1.81,1.4,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE MEPU-PU-KAPU-MEKA_KAMEMEKA,Émail polyuréthane monocomposant pour béton,Material,General,kg,14.86,14.86,14.86,14.86,1,EUR,784.72,52.8,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de sols coulés en polyuréthane MERI-RI-KATO-METO,Matériaux d'isolation thermique en rouleaux à effet réfléchissant,Abstract Material,General,m2,11.76,11.76,11.76,11.76,1,EUR,1211.54,103.0,1,1,TRAVAUX DE CONSTRUCTION,Sols,SOLS,Installation de systèmes de chauffage électrique au sol (« plancher chauffant ») MEME-RI-KADX-KALI,Panneaux de particules,Abstract Material,General,m2,37.69,37.69,37.69,37.69,1,EUR,3863.25,102.5,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-LI-MESA-METO_KAKAKAME,Goupilles,Material,General,kg,3.83,3.83,3.83,3.83,1,EUR,0.15,0.04,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,"Équipements de signalisation, de centralisation et de verrouillage" DXME-MEDX-MEKA_KAKANE,"Stations de pompage et installations de dragage électriques fixes, débit 400 m3/h, hauteur de refoulement de la station de pompage 95 m, hauteur de refoulement de l'installation de dragage 71 m",Equipment,General,Heures machine,495.41,495.41,495.41,495.41,1,EUR,911.55,1.84,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KADX-RI-KAME-KASA_KAKADXME,"Cornière décorative en aluminium, dimensions 10 x 10 mm, épaisseur 1,5 mm",Material,General,m,1.5,1.5,1.5,1.5,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES RINE-ME-KARI-KALI_KAKAMERI,"Butée tunnel en rails R-65, type PP 5-286.01.000",Material,General,pièce,20971.38,20971.38,20971.38,20971.38,1,EUR,20971.38,1.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL MEPU-SA-KATO-KAME_KAKAMENE,"Peinture en poudre pour la protection des surfaces intérieures des réfrigérateurs ménagers et des appareils électroménagers P-EP-219, P-EP-219 (ON), époxy, pigmentée, marques A, B, couleur blanche",Material,General,t,5107.4,5107.4,5107.4,5107.4,1,EUR,0.51,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE KAME-LI-KANE-KAME_KAKAKAVO,"Bandes d'étanchéité, pare-vapeur en caoutchouc butyle, doublées de non-tissé des deux côtés, avec couche adhésive des deux côtés et revêtement antiadhésif, couleur beige, largeur 100 mm, épaisseur 1,5 mm",Material,General,m,1.21,1.21,1.21,1.21,1,EUR,9.95,8.2,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE KALI-TO-KARI-MEME_KAKARIRI,"Tige d'ancrage en acier, diamètre M42, longueur 1000 mm, avec deux écrous M42 et rondelles carrées M42",Material,General,t,3386.82,3386.82,3386.82,3386.82,1,EUR,3.73,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE MEKA-TO-KAME-KASA_KAKAKARI,"Poudre de zinc, marque PTs2",Material,General,kg,8.5,8.5,8.5,8.5,1,EUR,255.11,30.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,STRUCTURES DE PASSAGE EN BÉTON ARMÉ DES PONTS,STRUCTURES DE VOIES DE ROUTE RINE-ME-KARI-KAPU_KAKAMEKA,"Cale sous sabot de rail de contact, dimensions 300 x 100 mm",Material,General,pièce,0.47,0.47,0.47,0.47,1,EUR,4.85,10.3,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL RINE-ME-KARI-KARI_KAKAKAME,"Cale composite pour joints isolés de rails de chemin de fer de type R65, avec 4 trous",Material,General,pièce,169.86,169.86,169.86,169.86,1,EUR,3499.15,20.6,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KADX-RI-KAME-KASA_KAKAKAME,"Peigne porteur en aluminium, largeur 100 mm, épaisseur 0,65 mm",Material,General,m,1.69,1.69,1.69,1.69,1,EUR,168.89,100.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KAME-NE-KAPU-KARI,Panneaux de plafond avec accessoires,Abstract Material,General,m2,60.63,60.63,60.63,60.63,1,EUR,6245.05,103.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DES SURFACES INTÉRIEURES AVEC DES MATÉRIAUX EN FEUILLES KASA-RI-KAPU-KAME,Pierres de béton de couverture,Abstract Material,General,m2,143.82,143.82,143.82,143.82,1,EUR,14381.86,100.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS KASA-RI-KARI-RIKA,Carreaux hyperpressés,Abstract Material,General,m2,20.09,20.09,20.09,20.09,1,EUR,2049.4,102.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES AVEC DES CARREAUX ARTIFICIELS KAME-LI-MESA-MERI_KAKASAME,"Goujons filetés en acier galvanisé, diamètre du filetage M20, longueur 200 mm",Material,General,t,3978.25,3978.25,3978.25,3978.25,1,EUR,5.13,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des silos à grains et des entreprises de transformation des céréales,"ÉQUIPEMENT POUR LE NETTOYAGE, LE SÉCHAGE ET LE TRAITEMENT DES CÉRÉALES",Machines pour le traitement du grain à l'eau MEKA-TO-KARI-KAME_KAKAKAME,"Babbitts en étain et en plomb en lingots, marque B16",Material,General,t,16582.32,16582.32,16582.32,16582.32,1,EUR,21.89,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des centrales hydroélectriques et des ouvrages hydrauliques,ÉQUIPEMENT MÉCANIQUE DES INSTALLATIONS HYDRAULIQUES,ÉQUIPEMENTS ET TRAVAUX DIVERS RITO-SA-KARI-KARI_MEMERINE,"Tubes en acier électrosoudés à joint droit en acier de marque 20, diamètre extérieur 45 mm, épaisseur de paroi 1,5 mm",Material,Pipes & Fittings,m,3.17,3.17,3.17,3.17,1,EUR,2.12,0.67,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des métros et des tunnels,ÉQUIPEMENTS DANS LES MÉTROPOLITAINS,Appareils d'éclairage DXME-MEDX-KAVO_KAKAVO,"Pompes, débit 50 m3/h, pression 25 m, puissance 7,5 kW",Equipment,General,Heures machine,0.8,0.8,0.8,0.8,1,EUR,0.34,0.43,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement à usage général,INSTALLATION D'ÉQUIPEMENTS SPÉCIALISÉS,INSTALLATION D'ÉQUIPEMENTS EN PLEIN AIR KAVO-TO-KAPU-KARI_KAKANESA,"Acier laminé à chaud carré, nuances St3sp, St3ps, côté du carré 6-12 mm",Material,General,t,1631.48,1631.48,1631.48,1631.48,1,EUR,0.0,0.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement à usage général,INSTALLATION DE L'ÉQUIPEMENT,INSTALLATIONS MINIÈRES RINE-ME-KARI-KASA,Rails de contact,Abstract Material,General,t,1312.94,1312.94,1312.94,1312.94,1,EUR,853.41,0.65,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION D'UNE VOIE DANS UN TUNNEL KARI-RI-KAPU-KAPU_KAMEVONE,"Mélange prêt à l'emploi de gravier et de sable, gravier M 1000, numéro de mélange C5, taille des grains 0-40 mm",Material,General,m3,46.09,46.09,46.09,46.09,1,EUR,490.84,10.65,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CONSTRUCTIONS EN BÉTON ARMÉ ET EN BÉTON DES PONTS ET DES CONDUITES,PILIERS DE PONTS SUR FONDATIONS PRÊTES MEME-ME-KATO-KASA_KAKALINE,"Planches non sciées de conifères, humidité naturelle, longueur 2-6,5 m, largeur 100-250, épaisseur 25 mm, classe II",Material,General,m3,275.0,275.0,275.0,275.0,1,EUR,550.0,2.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CONSTRUCTIONS EN BÉTON ARMÉ ET EN BÉTON DES PONTS ET DES CONDUITES,PILIERS DE PONTS SUR FONDATIONS PRÊTES KAME-LI-MESA-MEPU_KAMEVOTO,"Vis autotaraudeuses en acier oxydé à tête fraisée et fente en croix, pointues, diamètre 5 mm, longueur 45 mm",Material,General,t,4512.54,4512.54,4512.54,4512.54,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Ponts et conduites,CONSTRUCTIONS EN BÉTON ARMÉ ET EN BÉTON DES PONTS ET DES CONDUITES,FONDATIONS DE TUYAUX ET DE PILIERS DE PONTS DXME-KADX-KASA_KAMEME,"Locomotives minières diesel, force de traction (poids d'adhérence) 30 t",Equipment,General,Heures machine,89.28,89.28,89.28,89.28,1,EUR,535.69,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN KAPU-TO-KARI-KADX_KALIPUME,"Joint élastique pour la restauration et le remplissage des joints entre les carreaux d'une largeur de 4 à 16 mm, résistant à l'eau",Material,General,t,5119.07,5119.07,5119.07,5119.07,1,EUR,74.23,0.01,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES MEPU-ME-KASA-KAME,Colle,Abstract Material,General,kg,19.5,19.5,19.5,19.5,1,EUR,61.03,3.13,1,1,TRAVAUX DE CONSTRUCTION,Travaux de finition,TRAVAUX DE REVÊTEMENT,REVÊTEMENT DE SURFACES EN PIERRE NATURELLE ET EN PIERRES TAILLÉES LINÉAIRES RITO-SA-KARI-KARI_KAKANEDX,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 152 mm, épaisseur de paroi 4,5 mm",Material,Pipes & Fittings,m,22.26,22.26,22.26,22.26,1,EUR,222.56,10.0,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement des productions agricoles,MACHINES ET ÉQUIPEMENTS POUR LES INSTALLATIONS D'AMÉLIORATION AGRICOLE ET DE GES,ÉQUIPEMENT D'AMÉLIORATION DXME-RIKA-MERI_KAMEME,"Propulseurs diesel flottants, débit 80 m3/h, pression 30 m",Equipment,General,Heures machine,79.14,79.14,79.14,79.14,1,EUR,1503.67,19.0,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MEPU_KAKARI,"Stations de pompage flottantes, débit 80 m3/h, hauteur de refoulement de la station de pompage 57 m, hauteur de refoulement de la station de dragage 40 m",Equipment,General,Heures machine,82.34,82.34,82.34,82.34,1,EUR,758.37,9.21,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-MEKA_KAKARI,"Stations de pompage diesel fixes, débit 80 m3/h, hauteur de refoulement de la station de pompage 57 m, hauteur de refoulement de la station de dragage 40 m",Equipment,General,Heures machine,39.94,39.94,39.94,39.94,1,EUR,367.8,9.21,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MEPU_KAKAME,Électricité : consommation 66 kWh/machine-heure,Electricity,Electricity,Heures machine,8.48,8.48,8.48,8.48,1,EUR,15.6,1.84,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-RIKA-MEPU_KAKAME,"Stations de pompage et dragues électriques flottantes, débit 400 m3/h, hauteur de refoulement de la station de pompage 95 m, hauteur de refoulement de la drague 71 m",Equipment,General,Heures machine,113.38,113.38,113.38,113.38,1,EUR,208.62,1.84,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-MEKA_KAKANE,"Électricité : consommation 2888,8 kWh/machine-heure",Electricity,Electricity,Heures machine,371.04,371.04,371.04,371.04,1,EUR,682.71,1.84,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION KAME-LI-KAPU-KARI,Accessoires pour fenêtres,Abstract Material,General,pièce,3.52,3.52,3.52,3.52,1,EUR,351.77,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Ouvertures,OUVERTURES,Remplacement des accessoires de portes et fenêtres KAME-LI-KALI-RINE_KAKARIKA,"Cordon isolant thermique en mousse de polyéthylène, section ronde continue, densité 25-40 kg/m3, diamètre 80 mm",Material,General,100 m,92.97,92.97,92.97,92.97,1,EUR,95.76,1.03,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Murs,MURS,Réparation et restauration de l'étanchéité des joints des panneaux muraux extéri KAME-LI-KALI-RINE_KAKAMEVO,"Cordon isolant thermique en mousse de polyéthylène, section ronde continue, densité 25-40 kg/m3, diamètre 60 mm",Material,General,100 m,55.71,55.71,55.71,55.71,1,EUR,57.38,1.03,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Murs,MURS,Réparation et restauration de l'étanchéité des joints des panneaux muraux extéri KAPU-TO-KARI-KADX_MESATODX,"Mélanges secs à prise rapide avec retrait compensé à base de ciment contenant des fibres polymères pour la réparation de structures en béton et en béton armé, de type thixotrope, classe R4, F200, W16, granulométrie jusqu'à 1 mm, consommation 17,0 kg/m2",Material,Steel & Metal,kg,2.39,2.39,2.39,2.39,1,EUR,531.59,222.08,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Fondations,FONDATIONS,Injection dans les joints des tunnels et des collecteurs KAME-TO-KATO-KATO_KAKAKAME,"Acide borique technique, marque A",Material,Chemicals,t,9891.53,9891.53,9891.53,9891.53,1,EUR,208.71,0.02,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,CHAMBRES CLIMATISÉES MEVO-ME-MEKA-MENE,Arroseurs,Abstract Material,General,m,6.24,6.24,6.24,6.24,1,EUR,624.21,100.0,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES ET EN PLASTIQUE D'HIVER DXME-METO-KATO_MEPUME,"Châssis automoteurs, capacité de charge 0,9 t",Equipment,General,Heures machine,6.8,6.8,6.8,6.8,1,EUR,272.87,40.11,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES ET EN PLASTIQUE D'HIVER MENE-RI-KAME-KAME,Compost nutritif,Abstract Material,Fasteners,m3,32.77,32.77,32.77,32.77,1,EUR,3342.84,102.0,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES ET EN PLASTIQUE D'HIVER KAVO-ME-KARI-RISA_KAKANERI,"Agrafes en acier galvanisé KL2, épaisseur de fixation 6-10 mm, épaisseur 0,5 mm",Material,General,1000 pièces,553.58,553.58,553.58,553.58,1,EUR,13.06,0.02,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES EN PLASTIQUE RIPU-TO-KASA-MEVO_KAMEKAME,"Raccord pour tuyaux en polyéthylène, diamètre intérieur nominal 40 mm",Material,General,pièce,6.65,6.65,6.65,6.65,1,EUR,7.71,1.16,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER RIPU-TO-KASA-KALI_KASAKAME,"Manchon en polyéthylène, diamètre extérieur nominal 40 mm",Material,General,pièce,3.82,3.82,3.82,3.82,1,EUR,4.43,1.16,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER RIPU-TO-KASA-MEDX_KASAKAME,"Bride métallique pour tuyaux en polypropylène, pression nominale 1,0 MPa, diamètre 40 mm",Material,General,pièce,6.07,6.07,6.07,6.07,1,EUR,16.4,2.7,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER DXME-MEDX-KANE_KAMETO,"Pompes à piston manuelles pour essais hydrauliques de machines, mécanismes, conduites, récipients, chaudières, débit 1,6 l/min, pression 6,0 MPa",Equipment,General,Heures machine,0.06,0.06,0.06,0.06,1,EUR,0.99,16.32,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Fondations,FONDATIONS,Évacuation de l'eau du sous-sol DXME-MELI-KARI_KADXME,"Jauge d'épaisseur à ultrasons, plage de mesure 0,25-300 mm",Equipment,General,Heures machine,0.51,0.51,0.51,0.51,1,EUR,0.11,0.21,1,1,INSTALLATION DE L'ÉQUIPEMENT,Contrôle des assemblages soudés,CONTRÔLE DES ASSEMBLAGES SOUDÉS À L'AIDE DE MÉTHODES NON DESTRUCTIVES,Mesure de l'épaisseur du métal par ultrasons KAME-LI-KALI-METO_KAKAMETO,Poudre magnétique,Material,General,kg,6.34,6.34,6.34,6.34,1,EUR,3.17,0.5,1,1,INSTALLATION DE L'ÉQUIPEMENT,Contrôle des assemblages soudés,CONTRÔLE DES ASSEMBLAGES SOUDÉS À L'AIDE DE MÉTHODES NON DESTRUCTIVES,Contrôle magnétoscopique DXME-MEDX-KAVO_KAKAVO,"Électricité : consommation 2,48 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.32,0.32,0.32,0.32,1,EUR,0.14,0.43,1,1,INSTALLATION DE L'ÉQUIPEMENT,Équipement à usage général,INSTALLATION D'ÉQUIPEMENTS SPÉCIALISÉS,INSTALLATION D'ÉQUIPEMENTS EN PLEIN AIR DXME-RIME-RIRI_KASAME,Appareils pour l'enlèvement et le broyage de vieux revêtements bitumineux défectueux,Equipment,General,Heures machine,1.73,1.73,1.73,1.73,1,EUR,26.12,15.1,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Réparation de toiture avec transformation d'un tapis multicouche en carton bitum KAPU-TO-KARI-KADX_KAVORIVO,"Mélanges secs à base de ciment Portland hautement actif et de granulats de quartz, pour renforcer la surface des sols en béton, couleur naturelle",Material,General,kg,1.12,1.12,1.12,1.12,1,EUR,5.77,5.15,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Sols,SOLS,Réparation de revêtements de surface d'une superficie supérieure à 1 m2 MEME-ME-KAME-MEPU_KAKAMEPU,"Plinthe pour sols en bois, section 19 x 54 mm",Material,General,m,1.66,1.66,1.66,1.66,1,EUR,121.46,73.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Sols,SOLS,Réparation des sols en parquet à lames MEPU-RI-KASA-KAME_KAMEKANE,Composition hydro-isolante hautement résistante et thixotrope,Material,General,kg,1.02,1.02,1.02,1.02,1,EUR,83.55,81.9,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale MEPU-RI-KASA-KAME_KAMEKASA,Composition hydro-isolante (revêtement) polymère-ciment semi-rigide à couche mince,Material,General,kg,8.0,8.0,8.0,8.0,1,EUR,5040.12,630.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale RISA-ME-KANE-MESA_KAKAMERI,"Aiguillage simple, écartement 1520 mm, type de rail R50, marque 1/5, projet VSP 05.00.000-00/01",Material,General,compl,61337.68,61337.68,61337.68,61337.68,1,EUR,1226.75,0.02,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION DE LA VOIE EN SURFACE KAME-LI-MESA-MERI_KAKANEDX,"Goupilles filetées en acier galvanisé, diamètre du filetage M27, longueur 200 mm",Material,General,t,4023.71,4023.71,4023.71,4023.71,1,EUR,804.74,0.2,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION DE LA VOIE EN SURFACE RINE-ME-KARI-KARI_KAKARINE,"Ensemble de jonction isolante de rails de type R50 avec deux semelles, une cale, des boulons avec écrous et rondelles",Material,General,compl,248.27,248.27,248.27,248.27,1,EUR,25572.18,103.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION DE LA VOIE EN SURFACE DXME-KADX-KASA_KATOME,"Électricité : consommation 29,7 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.81,3.81,3.81,3.81,1,EUR,22.89,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN DXME-KADX-KASA_KATOME,Locomotives électriques de mine à contact,Equipment,General,Heures machine,15.8,15.8,15.8,15.8,1,EUR,94.8,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN DXME-KATO-MEDX_KALIRI,"Électricité : consommation 1,06 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.14,0.14,0.14,0.14,1,EUR,0.81,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN DXME-KATO-MEDX_KALIRI,Récupérateurs d'extrémité sur les bremberg et les pentes,Equipment,General,Heures machine,1.95,1.95,1.95,1.95,1,EUR,11.69,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN DXME-KATO-MEDX_KALIME,"Électricité : consommation 0,39 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.05,0.05,0.05,0.05,1,EUR,0.3,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN DXME-KATO-MEDX_KALIME,Récupérateurs d'extrémité,Equipment,General,Heures machine,0.45,0.45,0.45,0.45,1,EUR,2.69,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN DXME-KATO-MEDX_KAKARI,Redresseurs de puissance à silicium pour mines,Equipment,General,Heures machine,0.45,0.45,0.45,0.45,1,EUR,2.71,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN KAME-NE-KARI-KATO_KAKAKAME,Cuir artificiel d'ameublement,Material,General,m2,3.71,3.71,3.71,3.71,1,EUR,561.02,151.2,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Ouvertures,OUVERTURES,Revêtement des portes en similicuir KAME-LI-KASA-KATO_KAKAKALI,"Tissu enduit de vernis, type 445, imprégné de vernis organosilicié, collant, épaisseur 0,12 mm",Material,General,10 m2,76.59,76.59,76.59,76.59,1,EUR,0.77,0.01,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,SERRES ET ENTREPÔTS À LÉGUMES,SERRES VITRÉES D'HIVER MEME-ME-KAME-KAPU_KAKARISA,"Planches pour revêtement de sol à rainure et languette en bois résineux, épaisseur 35 mm, largeur sans crête 64-100 mm",Material,General,m3,839.78,839.78,839.78,839.78,1,EUR,3115.57,3.71,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation d'un revêtement de sol en planches dans les étables pour l'élevage MERI-RI-KATO-KAPU_KAKAKAME,Vermiculite expansée,Material,General,m3,386.16,386.16,386.16,386.16,1,EUR,397.75,1.03,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements MERI-RI-KATO-KAPU_KAKASAME,"Gravier expansé perlite, fractions 5-10 mm",Material,General,m3,54.8,54.8,54.8,54.8,1,EUR,56.45,1.03,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements KARI-RI-KAME-KASA,Gravier shungitis,Abstract Material,General,m3,46.4,46.4,46.4,46.4,1,EUR,47.79,1.03,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements KAME-VO-KAME-KAME,"Blocs en mousse de verre, pas plus de 200 kg/m3",Abstract Material,General,m3,546.4,546.4,546.4,546.4,1,EUR,10130.22,18.54,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements à l'aide de panneaux KAME-NE-KAME-KADX,Panneaux isolants,Abstract Material,General,m2,14.04,14.04,14.04,14.04,1,EUR,1446.39,103.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements à l'aide de panneaux KAME-NE-KAPU-KARI_KAKAKAME,"Panneaux décoratifs en fibres minérales pour plafonds, rigides, à bords droits, classe de risque d'incendie KM1, classe d'absorption acoustique D-E, épaisseur 12 mm",Material,General,m2,8.44,8.44,8.44,8.44,1,EUR,869.45,103.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,"Travaux de vitrerie, de pose de papier peint et de revêtement",TRAVAUX DE REVÊTEMENT,Remplacement des éléments de revêtement des plafonds MEME-TO-KATO-KAPU_KAKAKAME,"Panneau décoratif en plastique, dimensions 2700 x 250 x 8 mm",Material,General,m2,10.79,10.79,10.79,10.79,1,EUR,1111.47,103.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,"Travaux de vitrerie, de pose de papier peint et de revêtement",TRAVAUX DE REVÊTEMENT,Remplacement des éléments de revêtement des plafonds MEPU-RI-KASA-KANE_KAKAKATO,Produit à base d'une composition alcaline aqueuse pour éliminer les graffitis,Material,General,kg,10.52,10.52,10.52,10.52,1,EUR,3155.8,300.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de peinture,TRAVAUX DIVERS,Nettoyage des surfaces souillées par des salissures chimiques tenaces MEPU-RI-KASA-KANE_KAKAKARI,Composition pour nettoyer les surfaces des salissures chimiques tenaces,Material,General,l,7.81,7.81,7.81,7.81,1,EUR,195.26,25.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de peinture,TRAVAUX DIVERS,Nettoyage des surfaces souillées par des salissures chimiques tenaces KAME-LI-KAVO-KASA_KAKAKAVO,Additif polymère pour béton et mortier de ciment,Material,General,t,17280.79,17280.79,17280.79,17280.79,1,EUR,86.4,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de plâtrage,"PLÂTRAGE DE CERTAINES ZONES, CAGE D'ESCALIER ET PLATEAUX, PLÂTRAGE DÉCORATIF",Égalisation des zones endommagées à l'aide d'un mortier additionné d'un additif RITO-TO-KANE-KAME_KAKAKATO,"Tubes en acier soudés galvanisés pour conduites d'eau et de gaz avec filetage, légers, diamètre nominal 25 mm, épaisseur de paroi 2,8 mm",Material,Pipes & Fittings,m,4.18,4.18,4.18,4.18,1,EUR,430.15,103.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Installation sur le faîte du toit d'un dispositif en acier galvanisé pour la fix KAME-LI-MEDX-KANE_KAKAMEKA,Joints d'étanchéité PRP-40,Material,General,kg,8.72,8.72,8.72,8.72,1,EUR,3.09,0.35,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Installation de petits revêtements et finitions en tôle d'acier DXME-MEKA-MEME_SARITO,"Détecteurs de fuites sur surfaces planes par cartographie vectorielle, rendement jusqu'à 50 m²/h",Equipment,General,Heures machine,0.98,0.98,0.98,0.98,1,EUR,1.37,1.4,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Inspection de l'étanchéité des toitures souples DXME-RIME-RIRI_KASAME,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,3.52,15.1,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Toitures,"TOITS, COUVERTURES",Réparation de toiture avec transformation d'un tapis multicouche en carton bitum MEVO-RI-KANE-KADX,Siphons,Abstract Material,General,compl,6.32,6.32,6.32,6.32,1,EUR,632.24,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Remplacement des appareils sanitaires MEVO-ME-MEKA-KARI,Vannes d'incendie,Abstract Material,General,pièce,28.8,28.8,28.8,28.8,1,EUR,2880.11,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Remplacement de la robinetterie KASA-TO-KAME-METO,Détails,Abstract Material,General,m,36.09,36.09,36.09,36.09,1,EUR,3644.89,101.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,MÉLANGE,Mains courantes d'une largeur maximale de 250 mm KASA-TO-KARI-METO,Détails,Abstract Material,General,m,20.09,20.09,20.09,20.09,1,EUR,2029.31,101.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux de moulage,MÉLANGE,Mains courantes d'une largeur maximale de 250 mm DXME-KATO-MEDX_KAKAME,"Électricité : consommation 13,2 kWh/machine-heure",Electricity,Electricity,Heures machine,1.7,1.7,1.7,1.7,1,EUR,10.17,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN DXME-KATO-MEDX_KAKAME,"Redresseurs pour la charge des batteries, courant de sortie 20-155 A",Equipment,General,Heures machine,3.85,3.85,3.85,3.85,1,EUR,23.1,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,RECOULAGE MÉCANIQUE SOUTERRAIN DXME-KATO-KARI_KAKARI,"Électricité : consommation 8,25 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.06,1.06,1.06,1.06,1,EUR,6.36,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAKARI,"Ventilateurs de ventilation locale, puissance du moteur jusqu'à 24 kW",Equipment,General,Heures machine,2.92,2.92,2.92,2.92,1,EUR,17.54,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMEVO,"Électricité : consommation 103,95 kWh/machine-heure",Electricity,Electricity,Heures machine,13.35,13.35,13.35,13.35,1,EUR,91.06,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMEVO,"Ventilateurs de ventilation centrale, puissance du moteur jusqu'à 315 kW",Equipment,General,Heures machine,84.83,84.83,84.83,84.83,1,EUR,578.54,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMELI,"Électricité : consommation 72,6 kWh/machine-heure",Electricity,Electricity,Heures machine,9.32,9.32,9.32,9.32,1,EUR,63.59,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMELI,"Ventilateurs de ventilation centrale, puissance moteur jusqu'à 250 kW",Equipment,General,Heures machine,58.62,58.62,58.62,58.62,1,EUR,399.79,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMEPU,"Électricité : consommation 24,75 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.18,3.18,3.18,3.18,1,EUR,21.68,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMEPU,"Ventilateurs de ventilation centrale, puissance du moteur jusqu'à 75 kW",Equipment,General,Heures machine,10.6,10.6,10.6,10.6,1,EUR,72.28,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMETO,"Électricité : consommation 12,21 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.57,1.57,1.57,1.57,1,EUR,10.7,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION DXME-KATO-KARI_KAMETO,"Ventilateurs de ventilation centrale, puissance du moteur jusqu'à 40 kW",Equipment,General,Heures machine,4.9,4.9,4.9,4.9,1,EUR,33.42,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,VENTILATION RITO-ME-KARI-KANE_KAKATOME,"Colliers métalliques galvanisés à deux griffes avec profil en caoutchouc pour la fixation de tuyaux, livrés avec vis sanitaire, diamètre du filetage de la vis M8, longueur de la vis 50 mm, diamètre du collier de 12 à 15 mm",Material,General,10 pièces,5.46,5.46,5.46,5.46,1,EUR,103.68,18.98,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ALIMENTATION EN GAZ,Réparation des systèmes d'alimentation en gaz à l'intérieur des bâtiments DXME-MEDX-MERI_KADXME,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,1.13,4.84,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Nettoyage physico-chimique des réseaux d'échange thermique et d'ingénierie à bas DXME-MEDX-MERI_KADXME,"Installations pour le nettoyage physico-chimique des conduites, débit de 40 m3/h, hauteur de refoulement de 45 m, puissance jusqu'à 5,5 kW",Equipment,General,Heures machine,6.05,6.05,6.05,6.05,1,EUR,29.27,4.84,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Nettoyage physico-chimique des réseaux d'échange thermique et d'ingénierie à bas KAME-TO-KASA-MESA,Réactif complexe à base organique pour éliminer les dépôts de tartre et de corrosion,Abstract Material,General,kg,9.71,9.71,9.71,9.71,1,EUR,395.41,40.72,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Nettoyage physico-chimique des réseaux d'échange thermique et d'ingénierie à bas MEVO-SA-MEKA-KAVO_KAKAMEME,Bouchons de radiateur,Material,General,pièce,1.57,1.57,1.57,1.57,1,EUR,156.87,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Remplacement des bouchons de radiateur et installation de supports KAVO-TO-KALI-KAME_KAKATOME,"Bandes d'acier laminées à chaud, marques d'acier St3sp, St3ps, dimensions 16 x 4 mm",Material,General,t,2020.56,2020.56,2020.56,2020.56,1,EUR,153.56,0.08,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Réparation des chaudières de chauffage DXME-RIME-RIRI_RIDXME,Pistolets pneumatiques pour le nettoyage des tuyaux et des systèmes de chauffage fonctionnant à partir de compresseurs mobiles,Equipment,General,Heures machine,0.13,0.13,0.13,0.13,1,EUR,0.03,0.19,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Ensemble de travaux de nettoyage des appareils de chauffage à l'aide d'un pistol MEVO-ME-MEKA-MEPU,Robinets de radiateur,Abstract Material,General,pièce,1.31,1.31,1.31,1.31,1,EUR,130.61,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Remplacement des robinets MEVO-ME-MEKA-METO,Robinet à passage direct à bouchon,Abstract Material,General,pièce,26.34,26.34,26.34,26.34,1,EUR,2634.17,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Remplacement des robinets MEVO-ME-MEKA-KADX,Robinets,Abstract Material,General,pièce,267.63,267.63,267.63,267.63,1,EUR,26763.36,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Remplacement des robinets KAME-ME-KARI-KAVO_KAKAMENE,"Joints en paronite PMB, épaisseur 3 mm, diamètre 300 mm",Material,General,1000 pièces,3213.85,3213.85,3213.85,3213.85,1,EUR,321.38,0.1,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,CHAUFFAGE CENTRAL,Installation de bouchons MEVO-RI-KAME-KASA,Lavabos,Abstract Material,General,compl,121.86,121.86,121.86,121.86,1,EUR,12185.83,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Remplacement des appareils sanitaires MERI-ME-KATO-KATO,Tuiles bitumées en bandes,Abstract Material,General,m2,13.02,13.02,13.02,13.02,1,EUR,1354.4,104.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures MERI-ME-KATO-KAVO,Tuiles remplies de polymère,Abstract Material,General,1000 pièces,3.18,3.18,3.18,3.18,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures KASA-ME-KAME-METO_KAKALIRI,"Grilles en béton armé pour les canaux d'évacuation des déchets (plancher grillagé), béton B30, consommation d'armature 50 kg/m3",Material,General,m3,730.9,730.9,730.9,730.9,1,EUR,730.9,1.0,1,1,TRAVAUX DE CONSTRUCTION,Structures dans la construction rurale,BÂTIMENTS D'ÉLEVAGE,Installation de grilles de recouvrement des canaux d'évacuation des déchets MEVO-ME-KADX-MEME,Robinets de rinçage,Abstract Material,General,compl,3837.82,3837.82,3837.82,3837.82,1,EUR,383781.88,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ADDUCTION D'EAU ET ÉGOUTS,Remplacement des appareils sanitaires DXME-RIME-KAME_KATOME,"Électricité : consommation 4,95 kWh/machine-heure",Electricity,Electricity,Heures machine,0.64,0.64,0.64,0.64,1,EUR,0.6,0.95,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques des communications inter-ate DXME-RIME-KAME_KATOME,Chambres de peinture et de séchage,Equipment,General,Heures machine,2.23,2.23,2.23,2.23,1,EUR,2.12,0.95,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques des communications inter-ate KAVO-ME-KARI-RISA_KAKARIRI,"Granulés d'acier concassés améliorés, fraction 0,3 mm",Material,General,t,2593.81,2593.81,2593.81,2593.81,1,EUR,9.34,0.0,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques des communications inter-ate MEPU-SA-KAPU-KAPU_KAKAKARI,"Mastic bicomposant à base de résines synthétiques pour la protection anticorrosion des structures métalliques et des pipelines, à froid, consommation 0,10-0,12 kg/m2 pour une épaisseur de couche de 1,0 mm",Material,Steel & Metal,t,18088.29,18088.29,18088.29,18088.29,1,EUR,217.06,0.01,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites à l'aide de MEPU-SA-KAPU-KAPU_KAKAKAME,Mastic (composé d'apprêt) bicomposant à base de polyuréthane pour la protection de diverses structures métalliques contre la corrosion atmosphérique,Material,Steel & Metal,kg,29.48,29.48,29.48,29.48,1,EUR,442.14,15.0,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites à l'aide de DXME-RIME-KATO_KAKAME,"Appareils à jet sous pression, capacité du réservoir 2500 l, pression de service 1,2 MPa",Equipment,General,Heures machine,4.66,4.66,4.66,4.66,1,EUR,1.68,0.36,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites technologiq MEPU-SA-KADX-KANE_KAKAKARI,Diluant pour peintures,Material,General,l,15.54,15.54,15.54,15.54,1,EUR,1.27,0.08,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites technologiq MEPU-SA-KADX-KANE_KAKAKAME,Diluant anti-graffiti,Material,General,l,8.39,8.39,8.39,8.39,1,EUR,0.85,0.1,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites technologiq MEPU-PU-KAPU-MEKA_KAMEKARI,"Émail bicomposant polyuréthane-acrylique, composant B",Material,General,l,36.41,36.41,36.41,36.41,1,EUR,2.23,0.06,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites technologiq DXME-MEKA-MEME_MESAKA,Systèmes d'inspection à distance pour tuyaux d'un diamètre allant jusqu'à 400 mm,Equipment,General,Heures machine,0.35,0.35,0.35,0.35,1,EUR,0.4,1.15,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des systèmes d'évacuation des eaux usées internes à l'aide de manch RIPU-ME-KARI-KAME_KAKATOKA,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation de tuyaux, écrou de fixation M10, diamètre de 198 à 202 mm",Material,General,pièce,9.95,9.95,9.95,9.95,1,EUR,358.33,36.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des canalisations internes à l'aide de gaines polymères flexibles RIPU-ME-KARI-KAME_KAKARILI,"Collier métallique galvanisé à deux griffes avec deux fermetures rapides et profilé en caoutchouc pour la fixation des tuyaux, écrou de fixation M10, diamètre de 159 à 162 mm",Material,General,pièce,9.74,9.74,9.74,9.74,1,EUR,350.68,36.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Restauration des canalisations internes à l'aide de gaines polymères flexibles RITO-NE-KAME-KAME,Tuyaux en fonte pour égouts,Abstract Material,General,m,43.3,43.3,43.3,43.3,1,EUR,66.24,1.53,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,TRAVAUX DIVERS,Remplacement des pièces de la colonne de drainage au-dessus du toit RITO-TO-KANE-KAPU_KAKARIRI,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz sans filetage, légers, diamètre nominal 15 mm, épaisseur de paroi 2,5 mm",Material,Pipes & Fittings,m,1.93,1.93,1.93,1.93,1,EUR,0.04,0.02,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ALIMENTATION EN GAZ,Réparation des systèmes d'alimentation en gaz à l'intérieur des bâtiments KAME-LI-KAPU-MEKA_KAKATOTO,"Poignée-étrier en acier peint, longueur 100 mm",Material,General,pièce,2.56,2.56,2.56,2.56,1,EUR,4.91,1.92,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ALIMENTATION EN GAZ,Réparation des systèmes d'alimentation en gaz à l'intérieur des bâtiments RITO-ME-KARI-KANE_KAKATOPU,"Colliers métalliques galvanisés à deux griffes avec profil en caoutchouc pour la fixation de tuyaux, livrés avec vis sanitaire, diamètre du filetage de la vis M8, longueur de la vis 60 mm, diamètre du collier de 32 à 36 mm",Material,General,10 pièces,7.55,7.55,7.55,7.55,1,EUR,87.12,11.54,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux sanitaires et techniques intérieurs,ALIMENTATION EN GAZ,Réparation des systèmes d'alimentation en gaz à l'intérieur des bâtiments DXME-MEKA-MEME_MEPUKA,Expandeurs hydrauliques pour tuyaux en polymère d'un diamètre allant jusqu'à 100 mm,Equipment,General,Heures machine,0.39,0.39,0.39,0.39,1,EUR,1.2,3.04,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya RITO-ME-KARI-KATO_MEKAPUNE,"Bague d'appui en acier inoxydable, épaisseur de paroi 3 mm, longueur 150 mm, diamètre extérieur 100 mm",Material,General,pièce,227.0,227.0,227.0,227.0,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya DXME-RIME-KATO_SAMEME,"Appareils de sablage fonctionnant à partir d'installations de compression mobiles, volume jusqu'à 200 l, débit d'air jusqu'à 16 m3/min, avec embout pour le nettoyage de la surface interne des tuyaux d'un diamètre supérieur à 900 à 1500 mm",Equipment,General,Heures machine,2.05,2.05,2.05,2.05,1,EUR,69.14,33.76,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Nettoyage par sablage de la surface interne de la canalisation DXME-RIME-KATO_SAKADX,"Appareils de sablage fonctionnant à partir de compresseurs mobiles, volume jusqu'à 200 l, débit d'air jusqu'à 16 m3/min, avec embout pour le nettoyage de la surface interne des tuyaux d'un diamètre jusqu'à 200 mm",Equipment,General,Heures machine,0.34,0.34,0.34,0.34,1,EUR,2.72,7.89,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Nettoyage par sablage de la surface interne de la canalisation KAVO-ME-KARI-KANE_MEKARIKA,"Dispositif de fermeture en acier pour regards d'inspection avec mécanisme à levier et vis à trois butées, diamètre du trou d'homme 600 mm",Material,General,pièce,113.12,113.12,113.12,113.12,1,EUR,113.12,1.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Remplacement des éléments des puits et des chambres KARI-TO-KAME-KARI_MEMEPUKA,"Sable naturel pour la construction routière, classe II, moyen, tamis carrés",Material,General,m3,21.9,21.9,21.9,21.9,1,EUR,0.09,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Remplacement des éléments des puits et des chambres KAME-ME-KARI-KAVO_KAMEKANE,"Joints en paronite PMB, épaisseur 2 mm, diamètre 1400 mm",Material,General,1000 pièces,15969.38,15969.38,15969.38,15969.38,1,EUR,159.69,0.01,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Remplacement des joints sur les raccords à bride des conduites KAME-ME-KARI-KAVO_KAMEKASA,"Joints en paronite PMB, épaisseur 2 mm, diamètre 1200 mm",Material,General,1000 pièces,9193.98,9193.98,9193.98,9193.98,1,EUR,91.94,0.01,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Remplacement des joints sur les raccords à bride des conduites KAME-ME-KARI-KAVO_KAMEKAPU,"Joints en paronite PMB, épaisseur 2 mm, diamètre 1000 mm",Material,General,1000 pièces,7718.83,7718.83,7718.83,7718.83,1,EUR,77.19,0.01,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Remplacement des joints sur les raccords à bride des conduites KAME-ME-KARI-KAVO_KAMEKATO,"Joints en paronite PMB, épaisseur 2 mm, diamètre 800 mm",Material,General,1000 pièces,6260.81,6260.81,6260.81,6260.81,1,EUR,62.61,0.01,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Remplacement des joints sur les raccords à bride des conduites KAME-ME-KARI-KAVO_KAMEKARI,"Joints en paronite PMB, épaisseur 2 mm, diamètre 700 mm",Material,General,1000 pièces,5008.66,5008.66,5008.66,5008.66,1,EUR,50.09,0.01,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Remplacement des joints sur les raccords à bride des conduites KALI-RI-KALI-MERI_KAKARIVO,"Structures métalliques auxiliaires à prédominance d'acier épais ou de profilés laminés, avec ou sans trous, acier C345",Material,Steel & Metal,t,4703.31,4703.31,4703.31,4703.31,1,EUR,47.03,0.01,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Installation d'escaliers dans les chambres thermiques existantes MEME-TO-KATO-MELI,Escaliers en matériaux composites polymères,Abstract Material,General,m,122.12,122.12,122.12,122.12,1,EUR,1221.17,10.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Installation d'escaliers dans les chambres thermiques existantes KASA-ME-KAVO-KADX,Coussins d'appui en béton armé,Abstract Material,General,m3,864.14,864.14,864.14,864.14,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Remplacement des coussins en béton armé au fond des canaux sous les canalisation DXME-RIME-KATO_KARIME,"Électricité : consommation 0,89 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.11,0.11,0.11,0.11,1,EUR,0.57,4.99,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques des communications inter-ate DXME-RIME-KATO_KARIME,Chambres de grenaillage,Equipment,General,Heures machine,1.8,1.8,1.8,1.8,1,EUR,8.98,4.99,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques des communications inter-ate DXME-MEDX-KASA_KAKALI,"Pompes de drainage central pour tous les tunnels, à l'exception des tunnels de petit diamètre, débit de 200 m3/h avec une hauteur de refoulement de 190 m",Equipment,General,Heures machine,12.63,12.63,12.63,12.63,1,EUR,75.81,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKANE,"Électricité : consommation 24,75 kW·h/machine-heure",Electricity,Electricity,Heures machine,3.18,3.18,3.18,3.18,1,EUR,19.07,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKANE,"Pompes de drainage central pour tous les tunnels, à l'exception des tunnels de petit diamètre, débit de 200 m3/h avec une hauteur de refoulement de 76 m",Equipment,General,Heures machine,6.11,6.11,6.11,6.11,1,EUR,36.66,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE MEPU-PU-KAPU-MEKA_KAMEKAME,"Émail bicomposant polyuréthane-acrylique, composant A",Material,General,l,37.58,37.58,37.58,37.58,1,EUR,9.2,0.24,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites technologiq MEPU-PU-KAME-KASA_KAMEKARI,"Apprêt bicomposant à séchage rapide à base de liant époxy et de durcisseur polyamidoamine, composant B (durcisseur)",Material,General,l,41.69,41.69,41.69,41.69,1,EUR,3.65,0.09,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites technologiq MEPU-PU-KAME-KASA_KAMEKAME,"Apprêt bicomposant à séchage rapide à base de liant époxy et de durcisseur polyamidoamine, composant A (base)",Material,General,l,49.88,49.88,49.88,49.88,1,EUR,17.47,0.35,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des structures métalliques et des conduites technologiq MEPU-PU-KAPU-METO_KARIKASA,Émail bicomposant acrylique-polyuréthane à durcissement chimique,Material,General,l,36.54,36.54,36.54,36.54,1,EUR,11.0,0.3,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy MEPU-PU-KAME-KADX_KATOMEVO,"Apprêt époxy bicomposant à durcissement aminé, à séchage rapide, revêtement épais à haut pouvoir couvrant",Material,General,l,10.04,10.04,10.04,10.04,1,EUR,6.43,0.64,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy MEPU-SA-KADX-KALI_KAKAKALI,"Solvant pour améliorer l'étalement des revêtements acryliques, vinyliques et anti-salissures",Material,General,l,11.52,11.52,11.52,11.52,1,EUR,0.46,0.04,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy MEPU-PU-KAME-MESA_KAKAKAME,Apprêt monocomposant à haut poids moléculaire à base d'une matrice multipolymère inerte pour prévenir la corrosion sous l'isolation,Material,General,l,365.86,365.86,365.86,365.86,1,EUR,294.32,0.8,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy MEPU-PU-KAME-RIME_KARIMERI,Apprêt anticorrosion bicomposant phénol-époxy à haut pouvoir couvrant et haute résistance à divers produits chimiques et solvants,Material,General,l,12.15,12.15,12.15,12.15,1,EUR,7.6,0.63,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy MEPU-PU-KAME-KADX_KATOMELI,"Apprêt époxy bicomposant résistant à l'abrasion, couche supérieure à durcissement polyamine avec un résidu sec élevé",Material,General,l,10.04,10.04,10.04,10.04,1,EUR,5.5,0.55,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,PROTECTION ANTICORROSION DES STRUCTURES MÉTALLIQUES ET DES CONDUITES TECHNOLOGIQ,Protection anticorrosion des conduites technologiques à l'aide de composés époxy RITO-ME-KARI-KATO_MEKASAKA,"Anneau d'appui en acier inoxydable, épaisseur de paroi 3 mm, longueur 150 mm, diamètre extérieur 300 mm",Material,General,pièce,397.64,397.64,397.64,397.64,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya RITO-ME-KARI-KATO_MEKAPUDX,"Anneau d'appui en acier inoxydable, épaisseur de paroi 2 mm, longueur 150 mm, diamètre extérieur 230 mm",Material,General,pièce,360.82,360.82,360.82,360.82,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya RITO-ME-KARI-KATO_MEKAPUVO,"Anneau d'appui en acier inoxydable, épaisseur de paroi 2 mm, longueur 140 mm, diamètre extérieur 184 mm",Material,General,pièce,327.64,327.64,327.64,327.64,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya RITO-ME-KARI-KATO_MEKAPULI,"Anneau d'appui en acier inoxydable, épaisseur de paroi 3 mm, longueur 150 mm, diamètre extérieur 150 mm",Material,General,pièce,255.96,255.96,255.96,255.96,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya RITO-ME-KARI-KATO_MEKASARI,"Bague d'appui en acier inoxydable, épaisseur de paroi 2 mm, longueur 150 mm, diamètre extérieur 368 mm",Material,General,pièce,88.47,88.47,88.47,88.47,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya RITO-ME-KARI-KATO_MEKASAME,"Anneau d'appui en acier inoxydable, épaisseur de paroi 2 mm, longueur 150 mm, diamètre extérieur 322 mm",Material,General,pièce,434.48,434.48,434.48,434.48,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya MEPU-RI-KANE-KAVO_KAKAMEME,Mélanges secs d'apprêt à base de liant polymère-silicate pour mélange minéral silicaté à deux composants,Material,General,kg,5.82,5.82,5.82,5.82,1,EUR,9.48,1.63,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,TRAVAUX DIVERS,Protection des surfaces en béton armé des regards d'égout à l'aide de composés p DXME-MEDX-KASA_KAKATO,"Électricité : consommation 7,26 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.93,0.93,0.93,0.93,1,EUR,5.59,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKATO,"Pompes de drainage local ou intermédiaire, débit 200 m3/h",Equipment,General,Heures machine,1.91,1.91,1.91,1.91,1,EUR,11.47,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKARI,"Électricité : consommation 4,62 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.59,0.59,0.59,0.59,1,EUR,3.56,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKARI,"Pompes de drainage local ou intermédiaire, débit 100 m3/h",Equipment,General,Heures machine,1.37,1.37,1.37,1.37,1,EUR,8.21,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKAME,"Électricité : consommation 4,29 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.55,0.55,0.55,0.55,1,EUR,3.31,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKAME,"Pompes de drainage local ou intermédiaire, débit 50 m3/h",Equipment,General,Heures machine,1.09,1.09,1.09,1.09,1,EUR,6.54,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAMEKA,"Électricité : consommation 14,85 kWh/machine-heure",Electricity,Electricity,Heures machine,1.91,1.91,1.91,1.91,1,EUR,11.44,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAMEKA,"Pompes de drainage central pour tunnels de petit diamètre, débit 100 m3/h pour une hauteur de refoulement de 80 m",Equipment,General,Heures machine,3.26,3.26,3.26,3.26,1,EUR,19.59,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKADX,"Électricité : consommation 82,5 kWh/machine-heure",Electricity,Electricity,Heures machine,10.6,10.6,10.6,10.6,1,EUR,63.58,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKADX,"Pompes de drainage central pour tous les tunnels, à l'exception des tunnels de petit diamètre, débit de 250 m3/h avec une hauteur de refoulement de 190 m",Equipment,General,Heures machine,19.69,19.69,19.69,19.69,1,EUR,118.16,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKAVO,"Électricité : consommation 52,8 kW·h/machine-heure",Electricity,Electricity,Heures machine,6.78,6.78,6.78,6.78,1,EUR,40.69,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKAVO,"Pompes de drainage central pour tous les tunnels, à l'exception des tunnels de petit diamètre, débit de 250 m3/h avec une hauteur de refoulement de 75 m",Equipment,General,Heures machine,12.54,12.54,12.54,12.54,1,EUR,75.27,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKALI,"Électricité : consommation 52,8 kW·h/machine-heure",Electricity,Electricity,Heures machine,6.78,6.78,6.78,6.78,1,EUR,40.69,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE MEPU-RI-KANE-KADX_KAKAKAME,Durcisseur bitume-résine,Material,General,t,2227.32,2227.32,2227.32,2227.32,1,EUR,1.07,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une toiture avec application d'un mastic à double couche KAME-LI-MESA-MEPU_MEKAPUVO,"Vis autotaraudeuses en acier galvanisé pour toiture avec tête hexagonale et rondelle, pointe de forage, diamètre 4,8 mm, longueur 80 mm",Material,General,100 pièces,5.77,5.77,5.77,5.77,1,EUR,4.67,0.81,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une toiture en tôle ondulée sur des poutres préfabriquées MEME-ME-KATO-KANE_KAKAKAME,"Planches équarries imprégnées, humidité naturelle, longueur 4-6 m, largeur 150 mm, épaisseur 40 mm, classe II",Material,General,m3,612.25,612.25,612.25,612.25,1,EUR,900.0,1.47,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures en tôle ondulée MEME-ME-KATO-KAME_KAKAMEME,"Bois de sciage imprégné, longueur 1-3 m, largeur 40-75 mm, épaisseur 22-32 mm, classe I",Material,General,m3,746.51,746.51,746.51,746.51,1,EUR,343.39,0.46,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures en tôle ondulée KAME-LI-MESA-MEPU_KAMEKAME,"Vis autotaraudeuses en acier à tête hexagonale, rondelles pressées, joints en caoutchouc, pointe de forage, diamètre 4,8 mm, longueur 25 mm",Material,General,100 pièces,2.87,2.87,2.87,2.87,1,EUR,28.95,10.08,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures en tôle ondulée KAME-LI-MESA-KANE_KAKADXRI,"Clous en acier galvanisé, diamètre 4 mm, longueur 100 mm",Material,General,t,4169.01,4169.01,4169.01,4169.01,1,EUR,46.69,0.01,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de différents types de toitures en tôle ondulée KAME-LI-MEME-KALI_KARIKADX,"Électrodes de soudage pour le soudage des aciers résistants à la chaleur TML-3U, diamètre 5 mm",Material,General,kg,5.14,5.14,5.14,5.14,1,EUR,18.5,3.6,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ADDUCTION D'EAU PAR DES MÉ,Revêtement de la surface intérieure des canalisations avec un manchon en acier i KAME-RI-KATO-KARI_KAKAKASA,"Apprêt bitume-polymère à appliquer sur la surface extérieure des conduites souterraines en acier, consommation 0,1 kg/m2",Material,General,t,3664.27,3664.27,3664.27,3664.27,1,EUR,31073.02,8.48,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ADDUCTION D'EAU PAR DES MÉ,Revêtement de la surface intérieure des canalisations avec un manchon en acier i RITO-TO-KANE-KASA_KAKARIME,"Tubes en acier soudés non galvanisés pour conduites d'eau et de gaz, sans filetage, ordinaires, diamètre nominal 20 mm, épaisseur de paroi 2,8 mm",Material,Pipes & Fittings,m,2.45,2.45,2.45,2.45,1,EUR,14.85,6.07,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Pose d'une conduite de gaz en façade sur des immeubles d'habitation sans évacuat MEVO-SA-KAVO-MEDX_KAKAMESA,"Boule d'arrêt en caoutchouc, diamètre 1200 mm",Material,General,pièce,1032.27,1032.27,1032.27,1032.27,1,EUR,2064.55,2.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Purge au gaz du gazoduc MEVO-SA-KAVO-MEDX_KAKAMEPU,"Boule d'arrêt en caoutchouc, diamètre 1000 mm",Material,General,pièce,877.6,877.6,877.6,877.6,1,EUR,1755.2,2.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Purge au gaz du gazoduc MEVO-SA-KAVO-MEDX_KAKAMETO,"Bille d'arrêt en caoutchouc, diamètre 900 mm",Material,General,pièce,743.29,743.29,743.29,743.29,1,EUR,1486.59,2.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Purge au gaz du gazoduc RITO-ME-KARI-KATO_MEKASAPU,"Anneau d'appui en acier inoxydable, épaisseur de paroi 3 mm, longueur 150 mm, diamètre extérieur 460 mm",Material,General,pièce,306.18,306.18,306.18,306.18,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya RITO-ME-KARI-KATO_MEKASATO,"Anneau d'appui en acier inoxydable, épaisseur de paroi 3 mm, longueur 150 mm, diamètre extérieur 414 mm",Material,General,pièce,162.19,162.19,162.19,162.19,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RÉNOVATION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS,Restauration des conduites sous pression par traction dans la conduite d'un tuya DXME-MEDX-MEKA_KAKAPU,Électricité : consommation 810 kW·h/machine-heure,Electricity,Electricity,Heures machine,104.04,104.04,104.04,104.04,1,EUR,547.23,5.26,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-MEDX-MEKA_KAKAPU,"Stations de pompage et installations de dragage électriques fixes, débit 140 m3/h, hauteur de refoulement de la station de pompage 90 m, hauteur de refoulement de l'installation de dragage 37-52 m",Equipment,General,Heures machine,119.7,119.7,119.7,119.7,1,EUR,629.62,5.26,1,1,TRAVAUX DE CONSTRUCTION,Travaux de terrassement,"MÉCANISATION DU TRAVAIL DU SOL (À L'AIDE D'EXCAVATRICES, DE RÉCUPÉRATEURS, DE BU",EXPLOITATION DU SOL PAR HYDRO-MÉCANISATION DXME-KATO-KADX_KAKARI,"Ascenseurs interétagés entre les plates-formes zéro et d'accueil du chevalement, capacité de charge 5 t",Equipment,General,Heures machine,17.67,17.67,17.67,17.67,1,EUR,120.53,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKAPU,Levages lors de la construction d'une galerie inclinée,Equipment,General,Heures machine,51.83,51.83,51.83,51.83,1,EUR,310.96,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKATO,"Électricité : consommation 110,67 kW·h/machine-heure",Electricity,Electricity,Heures machine,14.21,14.21,14.21,14.21,1,EUR,85.28,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR KAME-RI-KATO-KAVO_KAKAKAME,Goudron (semi-goudron),Material,General,t,460.57,460.57,460.57,460.57,1,EUR,63.56,0.14,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation de chapes de nivellement DXME-RIME-RIRI_TORIME,"Électricité : consommation 1,72 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.22,0.22,0.22,0.22,1,EUR,0.04,0.18,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements DXME-RIME-RIRI_TORIME,"Installations de décompactage et de soufflage pour le décompactage et le transport de matériaux d'isolation thermique et acoustique fibreux et granulés, capacité jusqu'à 1100 kg/h",Equipment,General,Heures machine,1.6,1.6,1.6,1.6,1,EUR,0.29,0.18,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Isolation des revêtements MEPU-RI-KARI-MERI_KALIMEME,Pâte ignifuge intumescent à base d'émulsion aqueuse pour la protection incendie des structures métalliques,Material,Steel & Metal,t,7011.32,7011.32,7011.32,7011.32,1,EUR,4206.79,0.6,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées MEPU-SA-KADX-KALI_KAKATONE,Solvant R-60,Material,General,t,6514.52,6514.52,6514.52,6514.52,1,EUR,45.6,0.01,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées MEPU-PU-KAPU-METO_KARIMEKA,Émail à base d'une suspension de pigments dissous dans des résines phénol-formaldéhyde et polyvinylbutyral avec des solvants organiques,Material,General,t,6208.21,6208.21,6208.21,6208.21,1,EUR,142.79,0.02,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées MEPU-PU-KAPU-KADX_KAKARILI,Émail KhV-1120,Material,General,t,7398.62,7398.62,7398.62,7398.62,1,EUR,192.36,0.03,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées MEPU-PU-KAPU-KAVO_KAKAKANE,Émail PF-133,Material,General,t,3810.96,3810.96,3810.96,3810.96,1,EUR,34.3,0.01,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées RITO-TO-KATO-KAME_KAKAMELI,"Tubes sans soudure formés à chaud en acier résistant à la corrosion, marque 12Kh18N10T, diamètre extérieur 159 mm, épaisseur de paroi 6,0 mm",Material,Pipes & Fittings,m,331.96,331.96,331.96,331.96,1,EUR,331.96,1.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ADDUCTION D'EAU PAR DES MÉ,Revêtement de la surface intérieure des canalisations avec un manchon en acier i MEPU-RI-KAME-KANE_KAKAKASA,Composition de latex pour revêtement élastique anticorrosion,Material,General,kg,10.75,10.75,10.75,10.75,1,EUR,69.91,6.5,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,CAOUTCHOUTAGE (REVÊTEMENT AVEC DES FEUILLES DE CAOUTCHOUC ET DES MÉLANGES DE CAO,Gommage à partir de solutions MEPU-RI-KAME-KANE_KAKAKAME,Composition adhésive,Material,General,kg,2.99,2.99,2.99,2.99,1,EUR,1.2,0.4,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,CAOUTCHOUTAGE (REVÊTEMENT AVEC DES FEUILLES DE CAOUTCHOUC ET DES MÉLANGES DE CAO,Gommage à partir de solutions MEPU-PU-KAME-RIKA_KAKAKAME,Apprêt anticorrosion à base de zinc avec caoutchouc modifié chimiquement résistant,Material,General,t,10256.73,10256.73,10256.73,10256.73,1,EUR,205.13,0.02,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces métalliques apprêtées MERI-RI-KATO-MEME_KAKARINE,Tissu de verre de construction T-13,Material,General,m2,3.45,3.45,3.45,3.45,1,EUR,3.8,1.1,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Réalisation de raccords à partir de 2 couches de mastic bitume-polymère avec des MERI-ME-KAME-KAPU_KAKAKAPU,"Gouttière en PVC pour systèmes de drainage, diamètre 150 mm",Material,General,m,6.51,6.51,6.51,6.51,1,EUR,579.46,89.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières en PVC KAVO-RI-KARI-MENE_KAMEKARI,"Câble (corde) en acier laitonné dans une gaine en PVC, diamètre 2 mm",Material,General,kg,13.31,13.31,13.31,13.31,1,EUR,12.11,0.91,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,"Installation d'un pare-neige, mise en place d'un système de fonte de neige et d'" KAME-LI-KANE-KALI,Bande perforée en acier galvanisé,Abstract Material,General,100 m,51.68,51.68,51.68,51.68,1,EUR,1.96,0.04,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,"Installation d'un pare-neige, mise en place d'un système de fonte de neige et d'" DXME-MEDX-KASA_KAKASA,"Électricité : consommation 36,3 kW·h/machine-heure",Electricity,Electricity,Heures machine,4.66,4.66,4.66,4.66,1,EUR,27.97,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKASA,"Pompes de drainage central pour tous les tunnels, à l'exception des tunnels de petit diamètre, débit de 100 m3/h avec une hauteur de refoulement de 200 m",Equipment,General,Heures machine,8.58,8.58,8.58,8.58,1,EUR,51.49,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKAPU,"Électricité : consommation 14,85 kWh/machine-heure",Electricity,Electricity,Heures machine,1.91,1.91,1.91,1.91,1,EUR,11.44,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-MEDX-KASA_KAKAPU,"Pompes de drainage central pour tous les tunnels, à l'exception des tunnels de petit diamètre, débit de 100 m3/h avec une hauteur de refoulement de 70 m",Equipment,General,Heures machine,3.43,3.43,3.43,3.43,1,EUR,20.57,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,MARÉE DXME-KATO-MERI_KAKAME,"Électricité : consommation 1,32 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.17,0.17,0.17,0.17,1,EUR,1.02,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-MERI_KAKAME,"Pousseurs de wagonnets à action supérieure, course de poussée jusqu'à 30 m",Equipment,General,Heures machine,7.85,7.85,7.85,7.85,1,EUR,47.1,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-MERI_KAKARI,"Électricité : consommation 1,82 kW·h/machine-heure",Electricity,Electricity,Heures machine,0.23,0.23,0.23,0.23,1,EUR,1.4,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-MERI_KAKARI,"Pousseurs de wagonnets à action inférieure, course de poussée jusqu'à 3,5 m",Equipment,General,Heures machine,4.6,4.6,4.6,4.6,1,EUR,27.6,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-MEDX_KATOME,"Électricité : consommation 2,86 kWh/machine-heure",Electricity,Electricity,Heures machine,0.37,0.37,0.37,0.37,1,EUR,2.21,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-MEDX_KATOME,"Convoyeurs pour puits de mine à grande profondeur, capacité de charge 5 t",Equipment,General,Heures machine,4.71,4.71,4.71,4.71,1,EUR,28.28,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKAME,"Électricité : consommation 134,13 kWh/machine-heure",Electricity,Electricity,Heures machine,17.23,17.23,17.23,17.23,1,EUR,103.37,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKAME,"Ascenseurs miniers à double cabine pour le transport de personnes et de marchandises sur deux niveaux, capacité de charge 2 x 3,5 t, tension statique du câble 63 kN",Equipment,General,Heures machine,172.71,172.71,172.71,172.71,1,EUR,1036.28,6.0,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR DXME-KATO-KADX_KAKARI,"Électricité : consommation 11,77 kW·h/machine-heure",Electricity,Electricity,Heures machine,1.51,1.51,1.51,1.51,1,EUR,10.31,6.82,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,PROCESSUS DE MAINTENANCE,ASCENSEUR RITO-SA-KAME-KAVO_KAKADXSA,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 1420 mm, épaisseur de paroi 16 mm",Material,Pipes & Fittings,m,1389.35,1389.35,1389.35,1389.35,1,EUR,1806.15,1.3,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Assainissement de la surface interne des tuyaux en acier des réseaux d'adduction RITO-SA-KAME-KAVO_KAKAVOKA,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 1220 mm, épaisseur de paroi 14 mm",Material,Pipes & Fittings,m,1044.17,1044.17,1044.17,1044.17,1,EUR,1357.41,1.3,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Assainissement de la surface interne des tuyaux en acier des réseaux d'adduction RITO-SA-KAME-KAVO_KAKATONE,"Tubes en acier électrosoudés à soudure droite et à soudure hélicoïdale, classe de résistance K38, diamètre extérieur 630 mm, épaisseur de paroi 11 mm",Material,Pipes & Fittings,m,356.14,356.14,356.14,356.14,1,EUR,213.69,0.6,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Assainissement de la surface interne des tuyaux en acier des réseaux d'adduction RITO-SA-KARI-KARI_KAMEKATO,"Tubes en acier électrosoudés à joint droit en acier de nuance St2, 10, diamètre extérieur 325 mm, épaisseur de paroi 9 mm",Material,Pipes & Fittings,m,124.65,124.65,124.65,124.65,1,EUR,74.79,0.6,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Assainissement de la surface interne des tuyaux en acier des réseaux d'adduction DXME-METO-KATO_MEKARI,Équipement pour le montage de tuyaux ondulés lors de la rénovation de canalisations à partir d'un minibus,Equipment,General,Heures machine,29.16,29.16,29.16,29.16,1,EUR,2332.43,80.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation sans tranchée des canalisations d'égout à l'aide de tuyaux en polyéth RIPU-TO-KASA-KATO,Anneaux soudés pour tuyaux ondulés en polyéthylène,Abstract Material,General,pièce,20.95,20.95,20.95,20.95,1,EUR,209.54,10.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Rénovation sans tranchée des canalisations d'égout à l'aide de tuyaux en polyéth MEPU-PU-KAPU-MERI_KAKAKAME,Émail BEP-610,Material,General,t,11006.57,11006.57,11006.57,11006.57,1,EUR,440.26,0.04,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MEPU-PU-KATO-MEKA_KAKAKATO,"Solution de polyéthylène chlorosulfuré dans du xylène (solvant), destinée à protéger contre la corrosion les structures de construction susceptibles de se fissurer ou de se déformer.",Material,Steel & Metal,t,6970.43,6970.43,6970.43,6970.43,1,EUR,223.05,0.03,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Peinture des surfaces en béton et enduites apprêtées MEPU-PU-KAME-KADX_KAPUKASA,"Apprêt époxy, anticorrosion, universel, pour la protection contre les effets agressifs de l'environnement",Material,Steel & Metal,t,6437.27,6437.27,6437.27,6437.27,1,EUR,109.43,0.02,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques MEPU-PU-KAME-KADX_KAPURIDX,"Apprêt à base de pigments et de charges dans une solution de résine époxy avec ajout d'un plastifiant, de schiste et d'autres composants spéciaux",Material,General,t,4978.23,4978.23,4978.23,4978.23,1,EUR,74.67,0.02,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques MEPU-PU-KAME-KADX_KAPUTOKA,Apprêt bicomposant à base de résine époxy,Material,General,t,5083.44,5083.44,5083.44,5083.44,1,EUR,101.67,0.02,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques MEPU-SA-KADX-KAPU_KAMEMEPU,Durcisseur n° 3,Material,General,t,18202.46,18202.46,18202.46,18202.46,1,EUR,26.03,0.0,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques MERI-ME-KAME-KAPU_KAKAMETO,"Raccord de gouttière en PVC pour systèmes de drainage, diamètre 150 mm",Material,General,pièce,8.08,8.08,8.08,8.08,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières en PVC MERI-ME-KAME-KAPU_KAKAMERI,"Coude de gouttière 90° extérieur/intérieur en PVC pour systèmes de drainage, diamètre 150 mm",Material,General,pièce,10.8,10.8,10.8,10.8,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières en PVC MERI-ME-KAME-KAPU_KAKAMEME,"Entonnoir de réception en PVC pour systèmes de drainage, diamètre de la gouttière 150, diamètre du tuyau 100 mm",Material,General,pièce,12.86,12.86,12.86,12.86,1,EUR,167.16,13.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières en PVC MERI-ME-KAME-KAPU_KAKAMEKA,"Embout universel en PVC pour systèmes de drainage, diamètre 100 mm",Material,General,pièce,4.46,4.46,4.46,4.46,1,EUR,0.0,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'un système de gouttières en PVC KAME-LI-RIKA-KAVO_MEKAMENE,"Câble polyamide torsadé, diamètre 29 mm, groupe de charge de rupture B",Material,General,m,6.81,6.81,6.81,6.81,1,EUR,26.21,3.85,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,AUTRES TRAVAUX,Déshydratation des boues issues du traitement des eaux de lavage et des dépôts d RITO-SA-KAME-KAME,Tubes en acier,Abstract Material,Pipes & Fittings,m,33.44,33.44,33.44,33.44,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,BARRIÈRES,Remplacement de certaines parties des clôtures métalliques des terrains de sport DXME-KAVO-MEKA_KAPUME,"Fraises routières froides automotrices, largeur maximale de fraisage 350 mm",Equipment,General,Heures machine,109.97,109.97,109.97,109.97,1,EUR,6.6,0.06,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,"ROUTES, TROTTOIRS",Démontage d'un revêtement en béton bitumineux d'une épaisseur de 10 cm autour de KAME-LI-MELI-KAVO_KAKATOTO,Poudre pour le polissage du granit,Material,General,kg,51.71,51.71,51.71,51.71,1,EUR,10.34,0.2,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,"ROUTES, TROTTOIRS",Finition des surfaces d'extrémité d'une largeur supérieure à 30 mm des produits DXME-MEDX-MERI_SAMENE,"Installations pour la déshydratation des boues, capacité de production (matière sèche) jusqu'à 2,4 t/h",Equipment,General,Heures machine,54.06,54.06,54.06,54.06,1,EUR,151.35,2.8,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,AUTRES TRAVAUX,Déshydratation des boues issues du traitement des eaux de lavage et des dépôts d DXME-RIME-RIRI_RIRIME,Marteaux pneumatiques fonctionnant à partir de compresseurs mobiles,Equipment,General,Heures machine,0.24,0.24,0.24,0.24,1,EUR,0.9,3.73,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,"ROUTES, TROTTOIRS",Finition des surfaces d'extrémité d'une largeur supérieure à 30 mm des produits RIKA-PU-KATO-KANE,Prise de courant,Abstract Material,General,pièce,5.82,5.82,5.82,5.82,1,EUR,582.16,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux d'installation électrique,TRAVAUX D'ÉLECTRICITÉ,Remplacement des interrupteurs et des prises électriques RIKA-PU-KAME-KARI,Interrupteurs,Abstract Material,General,pièce,2.1,2.1,2.1,2.1,1,EUR,210.29,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux d'installation électrique,TRAVAUX D'ÉLECTRICITÉ,Remplacement des interrupteurs et des prises électriques RIKA-TO-KARI-KALI,Lampes fluorescentes,Abstract Material,General,pièce,3.77,3.77,3.77,3.77,1,EUR,376.5,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux d'installation électrique,TRAVAUX D'ÉLECTRICITÉ,Remplacement des lampes RIKA-TO-KARI-MEKA,Lampes à incandescence,Abstract Material,General,pièce,26.52,26.52,26.52,26.52,1,EUR,2652.31,100.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux d'installation électrique,TRAVAUX D'ÉLECTRICITÉ,Remplacement des lampes RITO-ME-KATO-KAPU_KAKAVOPU,"Support mobile à collier allongé, type 3, pour conduites en acier de 50 à 1600 mm de diamètre, avec isolation, hauteur du support 150 mm, diamètre nominal 250 mm",Material,General,pièce,70.19,70.19,70.19,70.19,1,EUR,11932.57,170.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEVO-ME-KADX-KALI_KAMEDXKA,"Robinet à boisseau sphérique en acier, avec poignée, raccordement à la canalisation par soudure, pression nominale 2,5 MPa, diamètre nominal 250 mm",Material,General,pièce,3930.67,3930.67,3930.67,3930.67,1,EUR,7861.34,2.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " RITO-ME-KATO-KAPU_KAKAVOTO,"Support mobile à collier allongé, type 3, pour conduites en acier de 50 à 1600 mm de diamètre, avec isolation, hauteur du support 150 mm, diamètre nominal 200 mm",Material,General,pièce,54.0,54.0,54.0,54.0,1,EUR,9179.49,170.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " RITO-ME-KATO-KAPU_KAKAVOME,"Support mobile à collier allongé, type 3, pour conduites en acier de 50 à 1600 mm de diamètre, avec isolation, hauteur du support 150 mm, diamètre nominal 150 mm",Material,General,pièce,41.81,41.81,41.81,41.81,1,EUR,7107.4,170.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " RITO-ME-KATO-KAPU_KAKALIDX,"Support mobile à collier allongé, type 3, pour conduites en acier de 50 à 1600 mm de diamètre, avec isolation, hauteur du support 150 mm, diamètre nominal 100 mm",Material,General,pièce,28.67,28.67,28.67,28.67,1,EUR,4873.25,170.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEPU-PU-KAME-KARI_KARIMERI,Apprêt acrylique AK-070,Material,General,t,5906.35,5906.35,5906.35,5906.35,1,EUR,165.38,0.03,1,1,TRAVAUX DE CONSTRUCTION,Protection des structures et équipements de construction contre la corrosion,REVÊTEMENT AVEC DES MATÉRIAUX DE PEINTURE ET DE VERNIS,Apprêt des surfaces métalliques MEVO-ME-KADX-KALI_KAMEDXRI,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 350 mm",Material,Pipes & Fittings,pièce,13482.96,13482.96,13482.96,13482.96,1,EUR,26965.92,2.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " RITO-ME-KATO-KAPU_KAKAVOSA,"Support mobile à collier allongé, type 3, pour conduites en acier de 50 à 1600 mm de diamètre, avec isolation, hauteur du support 150 mm, diamètre nominal 300 mm",Material,General,pièce,126.42,126.42,126.42,126.42,1,EUR,21491.84,170.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEVO-ME-KADX-KALI_KAMEDXME,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 300 mm",Material,Pipes & Fittings,pièce,8611.06,8611.06,8611.06,8611.06,1,EUR,17222.12,2.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " MEVO-ME-KADX-KALI_KAMEVOTO,"Robinet à boisseau sphérique en acier, avec poignée, raccordement au pipeline par soudure, pression nominale 2,5 MPa, diamètre nominal 40 mm",Material,Pipes & Fittings,pièce,99.02,99.02,99.02,99.02,1,EUR,594.14,6.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,"Remplacement des conduites en acier d'alimentation en chaleur, en eau chaude et " KAVO-TO-KASA-KATO,Tôles laminées à froid en acier au carbone,Abstract Material,General,t,1841.35,1841.35,1841.35,1841.35,1,EUR,865.43,0.47,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'auvents sur des supports métalliques avec revêtement en acier de MERI-RI-KATO-KADX,Fibre de verre,Abstract Material,General,t,2396.42,2396.42,2396.42,2396.42,1,EUR,7.91,0.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Toiture en mastic bitume-polymère KAME-LI-MESA-MEME_KAKARILI,"Rondelles en acier pour toiture, diamètre 50 mm",Material,General,100 pièces,13.95,13.95,13.95,13.95,1,EUR,13.95,1.0,1,1,TRAVAUX DE CONSTRUCTION,Toitures,TOITURES,Installation d'une fixation mécanique à l'aide de fixateurs lors de la couvertur RIKA-TO-KAME-KATO,Douille de plafond,Abstract Material,General,10 pièces,6.21,6.21,6.21,6.21,1,EUR,62.08,10.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux d'installation électrique,TRAVAUX D'ÉLECTRICITÉ,Remplacement des douilles RINE-ME-KARI-KATO,Cales,Abstract Material,General,pièce,50.48,50.48,50.48,50.48,1,EUR,79.76,1.58,1,1,TRAVAUX DE CONSTRUCTION,Tunnels et métros,DISPOSITION DE LA VOIE,CONSTRUCTION DE LA VOIE EN SURFACE MERI-ME-KARI-MEKA_KAKADXVO,"Membrane profilée d'étanchéité, G4, hauteur des picots 8 mm, résistance 300-600 N, allongement relatif à la rupture d'au moins 24-28 %",Material,Waterproofing,m2,4.99,4.99,4.99,4.99,1,EUR,574.16,115.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale KAVO-ME-KARI-KATO_KAKATOME,"Barre de fixation en acier galvanisé avec revêtement polymère, largeur 82 mm, longueur 2000 mm, épaisseur 0,5 mm",Material,General,pièce,6.12,6.12,6.12,6.12,1,EUR,195.79,32.0,1,1,TRAVAUX DE CONSTRUCTION,Structures monolithiques en béton et en béton armé,CONSTRUCTIONS DE BÂTIMENTS DE CENTRALES NUCLÉAIRES,Étanchéité de la partie souterraine des bâtiments et des structures des centrale MEPU-RI-KANE-KALI_MEKAMEPU,Floculant cationique à base de polyacrylamide pour le traitement et la déshydratation des boues d'épuration,Material,General,kg,23.59,23.59,23.59,23.59,1,EUR,0.0,0.0,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,AUTRES TRAVAUX,Déshydratation des boues issues du traitement des eaux de lavage et des dépôts d RIKA-SA-KAPU-KADX,Raccords de dérivation,Abstract Material,General,100 pièces,63.19,63.19,63.19,63.19,1,EUR,0.63,0.01,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Travaux d'installation électrique,TRAVAUX D'ÉLECTRICITÉ,Installation de compresseurs de dérivation RIKA-ME-KARI-RITO_KAMEKAME,"Plombs en plomb, diamètre 10 mm",Material,General,100 pièces,1.96,1.96,1.96,1.96,1,EUR,0.2,0.1,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Installations d'épuration KAME-LI-RIKA-KAVO_KAMENETO,Tissu filtrant en rouleau,Material,General,m2,3.23,3.23,3.23,3.23,1,EUR,42.99,13.3,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Réseaux techniques extérieurs,RECONSTRUCTION ET RÉPARATION DES RÉSEAUX EXTÉRIEURS D'ÉGOUTS À L'AIDE DE MÉTHODE,Installations d'épuration MEVO-TO-KAME-KARI_KAKARINE,"Tuyau d'incendie latexé, diamètre 150 mm",Material,General,m,13.5,13.5,13.5,13.5,1,EUR,46.16,3.42,1,1,TRAVAUX DE RÉPARATION ET DE CONSTRUCTION,Aménagement,AUTRES TRAVAUX,Déshydratation des boues issues du traitement des eaux de lavage et des dépôts d