category_type stringclasses 5
values | collection_code stringclasses 66
values | collection_name stringclasses 110
values | department_code stringclasses 44
values | department_name stringclasses 563
values | department_type stringclasses 3
values | section_name stringlengths 0 265 | section_type stringclasses 4
values | subsection_code stringlengths 0 16 | subsection_name stringlengths 0 882 | rate_code stringlengths 21 24 | rate_original_name stringlengths 0 672 | rate_final_name stringlengths 1 274 | rate_unit stringclasses 210
values | row_type stringclasses 7
values | is_scope bool 2
classes | is_abstract bool 2
classes | is_machine bool 2
classes | is_material bool 2
classes | work_composition_text stringlengths 0 354 | resource_code stringlengths 0 26 | resource_name stringlengths 0 401 | resource_unit stringclasses 29
values | resource_quantity float64 0 7.72M ⌀ | parameter_resource_quantity float64 0 7.72M ⌀ | resource_price_per_unit_eur_current float64 0.01 463k ⌀ | resource_cost_eur float64 0 15.4M ⌀ | price_abstract_resource_est_price_median float64 0.05 94.4k ⌀ | unit_match_rate_and_price stringclasses 3
values | materials_resource_cost_eur float64 0 1.99M ⌀ | rate_unit_copy stringclasses 210
values | total_cost_per_position float64 0.3 7.72M ⌀ | price_machinist_wages float64 1.71 561 ⌀ | price_relocation_included stringclasses 3
values | personnel_machinist_grade stringclasses 43
values | electricity_consumption_kwh_per_machine_hour float64 0.01 2.89k ⌀ | electricity_cost_per_unit float64 0 385 ⌀ | electricity_cost_total_sum float64 0 92.5k ⌀ | cost_machinist_sum float64 0 200k ⌀ | count_workers_per_unit float64 1 163k ⌀ | count_engineers_per_unit float64 1 16.9k ⌀ | count_machinists_per_unit float64 1 19.7k ⌀ | count_total_people_per_unit float64 1 163k ⌀ | labor_hours_construction_workers float64 0.02 163k ⌀ | labor_hours_machinists float64 0.01 19.7k ⌀ | labor_hours_engineers float64 0.04 16.9k ⌀ | total_labor_hours_workers_machinists float64 0.01 163k ⌀ | total_labor_hours_all_personnel float64 0.01 163k ⌀ | total_value_machinery_equipment float64 0 1.58M ⌀ | cost_of_working_hours float64 0.34 2.92M ⌀ | count_people_per_day float64 1 23.3k ⌀ | total_material_cost_per_position float64 0.02 2.33M ⌀ | personnel_machinist_code stringclasses 43
values | price_cost_without_wages float64 0.01 30.3k ⌀ | machine_class3_name stringclasses 167
values | machine_class2_name stringclasses 22
values | price_code_prefix stringclasses 896
values | price_abstract_resource_common_start stringclasses 847
values | price_abstract_resource_variable_parts stringlengths 0 33.6k | price_abstract_resource_position_count float64 1 1.57k ⌀ | price_abstract_resource_est_price_min float64 0.04 91.3k ⌀ | price_abstract_resource_est_price_max float64 0.05 463k ⌀ | price_abstract_resource_est_price_mean float64 0.05 175k ⌀ | prais_abstresurs_smetnaya_tekushchaya_razmakh stringclasses 875
values | price_abstract_resource_unit stringclasses 122
values | price_abstract_resource_group_per_unit stringclasses 647
values | price_abstract_resource_common_start_per_unit stringclasses 863
values | price_abstract_resource_variable_parts_per_unit stringclasses 924
values | prais_abstresurs_smetnaya_tekushchaya_razmakh_po_ed stringclasses 920
values | abstract_resource_tech_group stringlengths 0 16 | mass_name stringclasses 2
values | mass_value float64 1 33.3k ⌀ | mass_unit stringclasses 3
values | service_category stringclasses 2
values | service_type stringclasses 2
values | parameter_service_code stringclasses 5
values | parameter_service_unit stringclasses 3
values | parameter_service_name stringclasses 5
values | parameter_service_quantity stringclasses 485
values | service_cost_sum float64 | price_abstract_resource_est_price_all_values stringlengths 0 26.2k | total_value_abstract_resources float64 0.02 2.33M ⌀ | total_resource_cost_per_position float64 0.3 7.72M ⌀ | price_abstract_resource_est_price_all_values_per_unit stringlengths 0 32.8k |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MERI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 6 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 6.53 | 6.53 | 33.07 | 215.95 | null | null | 1000 m3 | 13,096.56 | 12.2 | 1.0 | 6.0 | null | null | 359.28 | 281.97 | 7 | null | 20 | 27 | 6.28 | 19.59 | null | 25.87 | 25.87 | 12,991.47 | 105.09 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 13,096.56 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MERI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 6 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 6.53 | 6.53 | 12.2 | 79.68 | null | null | 1000 m3 | 13,096.56 | 12.2 | 1.0 | 6.0 | null | null | 359.28 | 281.97 | 7 | null | 20 | 27 | 6.28 | 19.59 | null | 25.87 | 25.87 | 12,991.47 | 105.09 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 13,096.56 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MERI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 6 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERINE | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 10 m3 | Machine hours | 6.53 | 6.53 | 1,956.44 | 12,775.53 | null | null | 1000 m3 | 13,096.56 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 359.28 | 281.97 | 7 | null | 20 | 27 | 6.28 | 19.59 | null | 25.87 | 25.87 | 12,991.47 | 105.09 | 4 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 13,096.56 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MERI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 6 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXSA | Personnel: 2 man-hours/machine-hour | Machine hours | 6.53 | 6.53 | 30.98 | 202.29 | null | null | 1000 m3 | 13,096.56 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 359.28 | 281.97 | 7 | null | 20 | 27 | 6.28 | 19.59 | null | 25.87 | 25.87 | 12,991.47 | 105.09 | 4 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 13,096.56 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MERI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 6 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERINE | Electricity: consumption PUMERI.SA kW·h/machine-hour | Machine hours | 6.53 | 6.53 | 55.02 | 359.28 | null | null | 1000 m3 | 13,096.56 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 359.28 | 281.97 | 7 | null | 20 | 27 | 6.28 | 19.59 | null | 25.87 | 25.87 | 12,991.47 | 105.09 | 4 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 13,096.56 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MERI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 6 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 13,096.56 | null | null | null | 359.28 | 281.97 | 7 | null | 20 | 27 | 6.28 | 19.59 | null | 25.87 | 25.87 | 12,991.47 | 105.09 | 4 | null | null | null | null | null | null | null | null | null | 13,096.56 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MERI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 6 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 13,096.56 | null | null | null | 359.28 | 281.97 | 7 | null | 20 | 27 | 6.28 | 19.59 | null | 25.87 | 25.87 | 12,991.47 | 105.09 | 4 | null | null | null | null | null | null | null | null | null | 13,096.56 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MERI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 6 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 13,096.56 | null | null | null | 359.28 | 281.97 | 7 | null | 20 | 27 | 6.28 | 19.59 | null | 25.87 | 25.87 | 12,991.47 | 105.09 | 4 | null | null | null | null | null | null | null | null | null | 13,096.56 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_METO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 1 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 2.06 | 2.06 | 16.16 | 33.29 | null | null | 1000 m3 | 3,564.76 | null | null | null | 91.91 | 105.23 | 3 | null | 8 | 11 | 2.06 | 7.71 | null | 9.77 | 9.77 | 3,531.47 | 33.29 | 2 | null | null | null | null | null | null | null | null | null | 3,564.76 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_METO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 2.57 | 2.57 | 33.07 | 84.99 | null | null | 1000 m3 | 3,564.76 | 12.2 | 1.0 | 6.0 | null | null | 91.91 | 105.23 | 3 | null | 8 | 11 | 2.06 | 7.71 | null | 9.77 | 9.77 | 3,531.47 | 33.29 | 2 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 3,564.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_METO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 2.57 | 2.57 | 12.2 | 31.36 | null | null | 1000 m3 | 3,564.76 | 12.2 | 1.0 | 6.0 | null | null | 91.91 | 105.23 | 3 | null | 8 | 11 | 2.06 | 7.71 | null | 9.77 | 9.77 | 3,531.47 | 33.29 | 2 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 3,564.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_METO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERISA | Single-bucket electric walking excavators with dragline working equipment, bucket capacity NE.SA m3 | Machine hours | 2.57 | 2.57 | 1,341.04 | 3,446.49 | null | null | 1000 m3 | 3,564.76 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 91.91 | 105.23 | 3 | null | 8 | 11 | 2.06 | 7.71 | null | 9.77 | 9.77 | 3,531.47 | 33.29 | 2 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 3,564.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_METO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KAVOSA | Personnel: 2 man-hours/machine-hour | Machine hours | 2.57 | 2.57 | 28.74 | 73.87 | null | null | 1000 m3 | 3,564.76 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 91.91 | 105.23 | 3 | null | 8 | 11 | 2.06 | 7.71 | null | 9.77 | 9.77 | 3,531.47 | 33.29 | 2 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 3,564.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_METO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 1 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERISA | Electricity: consumption RINEVO.METO kW·h/machine-hour | Machine hours | 2.57 | 2.57 | 35.76 | 91.91 | null | null | 1000 m3 | 3,564.76 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 91.91 | 105.23 | 3 | null | 8 | 11 | 2.06 | 7.71 | null | 9.77 | 9.77 | 3,531.47 | 33.29 | 2 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 3,564.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_METO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 3,564.76 | null | null | null | 91.91 | 105.23 | 3 | null | 8 | 11 | 2.06 | 7.71 | null | 9.77 | 9.77 | 3,531.47 | 33.29 | 2 | null | null | null | null | null | null | null | null | null | 3,564.76 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_METO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 3,564.76 | null | null | null | 91.91 | 105.23 | 3 | null | 8 | 11 | 2.06 | 7.71 | null | 9.77 | 9.77 | 3,531.47 | 33.29 | 2 | null | null | null | null | null | null | null | null | null | 3,564.76 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_METO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 3,564.76 | null | null | null | 91.91 | 105.23 | 3 | null | 8 | 11 | 2.06 | 7.71 | null | 9.77 | 9.77 | 3,531.47 | 33.29 | 2 | null | null | null | null | null | null | null | null | null | 3,564.76 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEPU | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 2 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 2.53 | 2.53 | 16.16 | 40.88 | null | null | 1000 m3 | 4,383.08 | null | null | null | 113.01 | 129.39 | 3 | null | 10 | 13 | 2.53 | 9.48 | null | 12.01 | 12.01 | 4,342.2 | 40.88 | 2 | null | null | null | null | null | null | null | null | null | 4,383.08 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEPU | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 3.16 | 3.16 | 33.07 | 104.5 | null | null | 1000 m3 | 4,383.08 | 12.2 | 1.0 | 6.0 | null | null | 113.01 | 129.39 | 3 | null | 10 | 13 | 2.53 | 9.48 | null | 12.01 | 12.01 | 4,342.2 | 40.88 | 2 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 4,383.08 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEPU | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 3.16 | 3.16 | 12.2 | 38.56 | null | null | 1000 m3 | 4,383.08 | 12.2 | 1.0 | 6.0 | null | null | 113.01 | 129.39 | 3 | null | 10 | 13 | 2.53 | 9.48 | null | 12.01 | 12.01 | 4,342.2 | 40.88 | 2 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 4,383.08 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEPU | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERISA | Single-bucket electric walking excavators with dragline working equipment, bucket capacity NE.SA m3 | Machine hours | 3.16 | 3.16 | 1,341.04 | 4,237.7 | null | null | 1000 m3 | 4,383.08 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 113.01 | 129.39 | 3 | null | 10 | 13 | 2.53 | 9.48 | null | 12.01 | 12.01 | 4,342.2 | 40.88 | 2 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 4,383.08 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEPU | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KAVOSA | Personnel: 2 man-hours/machine-hour | Machine hours | 3.16 | 3.16 | 28.74 | 90.83 | null | null | 1000 m3 | 4,383.08 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 113.01 | 129.39 | 3 | null | 10 | 13 | 2.53 | 9.48 | null | 12.01 | 12.01 | 4,342.2 | 40.88 | 2 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 4,383.08 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEPU | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 2 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERISA | Electricity: consumption RINEVO.METO kW·h/machine-hour | Machine hours | 3.16 | 3.16 | 35.76 | 113.01 | null | null | 1000 m3 | 4,383.08 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 113.01 | 129.39 | 3 | null | 10 | 13 | 2.53 | 9.48 | null | 12.01 | 12.01 | 4,342.2 | 40.88 | 2 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 4,383.08 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEPU | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 4,383.08 | null | null | null | 113.01 | 129.39 | 3 | null | 10 | 13 | 2.53 | 9.48 | null | 12.01 | 12.01 | 4,342.2 | 40.88 | 2 | null | null | null | null | null | null | null | null | null | 4,383.08 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEPU | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 4,383.08 | null | null | null | 113.01 | 129.39 | 3 | null | 10 | 13 | 2.53 | 9.48 | null | 12.01 | 12.01 | 4,342.2 | 40.88 | 2 | null | null | null | null | null | null | null | null | null | 4,383.08 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEPU | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 4,383.08 | null | null | null | 113.01 | 129.39 | 3 | null | 10 | 13 | 2.53 | 9.48 | null | 12.01 | 12.01 | 4,342.2 | 40.88 | 2 | null | null | null | null | null | null | null | null | null | 4,383.08 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MESA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 3 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 3.14 | 3.14 | 16.16 | 50.74 | null | null | 1000 m3 | 5,423.53 | null | null | null | 139.83 | 160.09 | 4 | null | 12 | 16 | 3.14 | 11.73 | null | 14.87 | 14.87 | 5,372.79 | 50.74 | 3 | null | null | null | null | null | null | null | null | null | 5,423.53 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MESA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 3.91 | 3.91 | 33.07 | 129.3 | null | null | 1000 m3 | 5,423.53 | 12.2 | 1.0 | 6.0 | null | null | 139.83 | 160.09 | 4 | null | 12 | 16 | 3.14 | 11.73 | null | 14.87 | 14.87 | 5,372.79 | 50.74 | 3 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 5,423.53 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MESA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 3.91 | 3.91 | 12.2 | 47.71 | null | null | 1000 m3 | 5,423.53 | 12.2 | 1.0 | 6.0 | null | null | 139.83 | 160.09 | 4 | null | 12 | 16 | 3.14 | 11.73 | null | 14.87 | 14.87 | 5,372.79 | 50.74 | 3 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 5,423.53 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MESA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERISA | Single-bucket electric walking excavators with dragline working equipment, bucket capacity NE.SA m3 | Machine hours | 3.91 | 3.91 | 1,341.04 | 5,243.49 | null | null | 1000 m3 | 5,423.53 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 139.83 | 160.09 | 4 | null | 12 | 16 | 3.14 | 11.73 | null | 14.87 | 14.87 | 5,372.79 | 50.74 | 3 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 5,423.53 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MESA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KAVOSA | Personnel: 2 man-hours/machine-hour | Machine hours | 3.91 | 3.91 | 28.74 | 112.38 | null | null | 1000 m3 | 5,423.53 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 139.83 | 160.09 | 4 | null | 12 | 16 | 3.14 | 11.73 | null | 14.87 | 14.87 | 5,372.79 | 50.74 | 3 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 5,423.53 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MESA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 3 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERISA | Electricity: consumption RINEVO.METO kW·h/machine-hour | Machine hours | 3.91 | 3.91 | 35.76 | 139.83 | null | null | 1000 m3 | 5,423.53 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 139.83 | 160.09 | 4 | null | 12 | 16 | 3.14 | 11.73 | null | 14.87 | 14.87 | 5,372.79 | 50.74 | 3 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 5,423.53 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MESA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 5,423.53 | null | null | null | 139.83 | 160.09 | 4 | null | 12 | 16 | 3.14 | 11.73 | null | 14.87 | 14.87 | 5,372.79 | 50.74 | 3 | null | null | null | null | null | null | null | null | null | 5,423.53 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MESA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 5,423.53 | null | null | null | 139.83 | 160.09 | 4 | null | 12 | 16 | 3.14 | 11.73 | null | 14.87 | 14.87 | 5,372.79 | 50.74 | 3 | null | null | null | null | null | null | null | null | null | 5,423.53 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MESA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 5,423.53 | null | null | null | 139.83 | 160.09 | 4 | null | 12 | 16 | 3.14 | 11.73 | null | 14.87 | 14.87 | 5,372.79 | 50.74 | 3 | null | null | null | null | null | null | null | null | null | 5,423.53 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MENE | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 4 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 4.46 | 4.46 | 16.16 | 72.07 | null | null | 1000 m3 | 7,712.14 | null | null | null | 198.84 | 227.65 | 5 | null | 17 | 22 | 4.46 | 16.68 | null | 21.14 | 21.14 | 7,640.08 | 72.07 | 4 | null | null | null | null | null | null | null | null | null | 7,712.14 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MENE | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 4 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 5.56 | 5.56 | 33.07 | 183.87 | null | null | 1000 m3 | 7,712.14 | 12.2 | 1.0 | 6.0 | null | null | 198.84 | 227.65 | 5 | null | 17 | 22 | 4.46 | 16.68 | null | 21.14 | 21.14 | 7,640.08 | 72.07 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 7,712.14 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MENE | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 4 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 5.56 | 5.56 | 12.2 | 67.84 | null | null | 1000 m3 | 7,712.14 | 12.2 | 1.0 | 6.0 | null | null | 198.84 | 227.65 | 5 | null | 17 | 22 | 4.46 | 16.68 | null | 21.14 | 21.14 | 7,640.08 | 72.07 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 7,712.14 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MENE | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 4 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERISA | Single-bucket electric walking excavators with dragline working equipment, bucket capacity NE.SA m3 | Machine hours | 5.56 | 5.56 | 1,341.04 | 7,456.21 | null | null | 1000 m3 | 7,712.14 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 198.84 | 227.65 | 5 | null | 17 | 22 | 4.46 | 16.68 | null | 21.14 | 21.14 | 7,640.08 | 72.07 | 4 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 7,712.14 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MENE | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 4 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KAVOSA | Personnel: 2 man-hours/machine-hour | Machine hours | 5.56 | 5.56 | 28.74 | 159.81 | null | null | 1000 m3 | 7,712.14 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 198.84 | 227.65 | 5 | null | 17 | 22 | 4.46 | 16.68 | null | 21.14 | 21.14 | 7,640.08 | 72.07 | 4 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 7,712.14 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MENE | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 4 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERISA | Electricity: consumption RINEVO.METO kW·h/machine-hour | Machine hours | 5.56 | 5.56 | 35.76 | 198.84 | null | null | 1000 m3 | 7,712.14 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 198.84 | 227.65 | 5 | null | 17 | 22 | 4.46 | 16.68 | null | 21.14 | 21.14 | 7,640.08 | 72.07 | 4 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 7,712.14 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MENE | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 7,712.14 | null | null | null | 198.84 | 227.65 | 5 | null | 17 | 22 | 4.46 | 16.68 | null | 21.14 | 21.14 | 7,640.08 | 72.07 | 4 | null | null | null | null | null | null | null | null | null | 7,712.14 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MENE | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 7,712.14 | null | null | null | 198.84 | 227.65 | 5 | null | 17 | 22 | 4.46 | 16.68 | null | 21.14 | 21.14 | 7,640.08 | 72.07 | 4 | null | null | null | null | null | null | null | null | null | 7,712.14 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MENE | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 7,712.14 | null | null | null | 198.84 | 227.65 | 5 | null | 17 | 22 | 4.46 | 16.68 | null | 21.14 | 21.14 | 7,640.08 | 72.07 | 4 | null | null | null | null | null | null | null | null | null | 7,712.14 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MELI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 5 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 5.11 | 5.11 | 16.16 | 82.57 | null | null | 1000 m3 | 8,835.68 | null | null | null | 227.81 | 260.82 | 6 | null | 20 | 26 | 5.11 | 19.11 | null | 24.22 | 24.22 | 8,753.11 | 82.57 | 4 | null | null | null | null | null | null | null | null | null | 8,835.68 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MELI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 5 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 6.37 | 6.37 | 33.07 | 210.65 | null | null | 1000 m3 | 8,835.68 | 12.2 | 1.0 | 6.0 | null | null | 227.81 | 260.82 | 6 | null | 20 | 26 | 5.11 | 19.11 | null | 24.22 | 24.22 | 8,753.11 | 82.57 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 8,835.68 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MELI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 5 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 6.37 | 6.37 | 12.2 | 77.73 | null | null | 1000 m3 | 8,835.68 | 12.2 | 1.0 | 6.0 | null | null | 227.81 | 260.82 | 6 | null | 20 | 26 | 5.11 | 19.11 | null | 24.22 | 24.22 | 8,753.11 | 82.57 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 8,835.68 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MELI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 5 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERISA | Single-bucket electric walking excavators with dragline working equipment, bucket capacity NE.SA m3 | Machine hours | 6.37 | 6.37 | 1,341.04 | 8,542.46 | null | null | 1000 m3 | 8,835.68 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 227.81 | 260.82 | 6 | null | 20 | 26 | 5.11 | 19.11 | null | 24.22 | 24.22 | 8,753.11 | 82.57 | 4 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 8,835.68 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MELI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 5 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KAVOSA | Personnel: 2 man-hours/machine-hour | Machine hours | 6.37 | 6.37 | 28.74 | 183.09 | null | null | 1000 m3 | 8,835.68 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 227.81 | 260.82 | 6 | null | 20 | 26 | 5.11 | 19.11 | null | 24.22 | 24.22 | 8,753.11 | 82.57 | 4 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 8,835.68 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MELI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 5 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERISA | Electricity: consumption RINEVO.METO kW·h/machine-hour | Machine hours | 6.37 | 6.37 | 35.76 | 227.81 | null | null | 1000 m3 | 8,835.68 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 227.81 | 260.82 | 6 | null | 20 | 26 | 5.11 | 19.11 | null | 24.22 | 24.22 | 8,753.11 | 82.57 | 4 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 8,835.68 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MELI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 5 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 8,835.68 | null | null | null | 227.81 | 260.82 | 6 | null | 20 | 26 | 5.11 | 19.11 | null | 24.22 | 24.22 | 8,753.11 | 82.57 | 4 | null | null | null | null | null | null | null | null | null | 8,835.68 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MELI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 5 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 8,835.68 | null | null | null | 227.81 | 260.82 | 6 | null | 20 | 26 | 5.11 | 19.11 | null | 24.22 | 24.22 | 8,753.11 | 82.57 | 4 | null | null | null | null | null | null | null | null | null | 8,835.68 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MELI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 5 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 8,835.68 | null | null | null | 227.81 | 260.82 | 6 | null | 20 | 26 | 5.11 | 19.11 | null | 24.22 | 24.22 | 8,753.11 | 82.57 | 4 | null | null | null | null | null | null | null | null | null | 8,835.68 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEVO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 6 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 6.36 | 6.36 | 16.16 | 102.77 | null | null | 1000 m3 | 10,985.76 | null | null | null | 283.24 | 324.28 | 7 | null | 24 | 31 | 6.36 | 23.76 | null | 30.12 | 30.12 | 10,882.99 | 102.77 | 5 | null | null | null | null | null | null | null | null | null | 10,985.76 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEVO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 6 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 7.92 | 7.92 | 33.07 | 261.91 | null | null | 1000 m3 | 10,985.76 | 12.2 | 1.0 | 6.0 | null | null | 283.24 | 324.28 | 7 | null | 24 | 31 | 6.36 | 23.76 | null | 30.12 | 30.12 | 10,882.99 | 102.77 | 5 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 10,985.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEVO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 6 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 7.92 | 7.92 | 12.2 | 96.64 | null | null | 1000 m3 | 10,985.76 | 12.2 | 1.0 | 6.0 | null | null | 283.24 | 324.28 | 7 | null | 24 | 31 | 6.36 | 23.76 | null | 30.12 | 30.12 | 10,882.99 | 102.77 | 5 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 10,985.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEVO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 6 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERISA | Single-bucket electric walking excavators with dragline working equipment, bucket capacity NE.SA m3 | Machine hours | 7.92 | 7.92 | 1,341.04 | 10,621.07 | null | null | 1000 m3 | 10,985.76 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 283.24 | 324.28 | 7 | null | 24 | 31 | 6.36 | 23.76 | null | 30.12 | 30.12 | 10,882.99 | 102.77 | 5 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 10,985.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEVO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 6 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KAVOSA | Personnel: 2 man-hours/machine-hour | Machine hours | 7.92 | 7.92 | 28.74 | 227.64 | null | null | 1000 m3 | 10,985.76 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 283.24 | 324.28 | 7 | null | 24 | 31 | 6.36 | 23.76 | null | 30.12 | 30.12 | 10,882.99 | 102.77 | 5 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 10,985.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEVO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 6 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERISA | Electricity: consumption RINEVO.METO kW·h/machine-hour | Machine hours | 7.92 | 7.92 | 35.76 | 283.24 | null | null | 1000 m3 | 10,985.76 | 28.74 | nan | 8.5 | 268.13 | 35.76 | 283.24 | 324.28 | 7 | null | 24 | 31 | 6.36 | 23.76 | null | 30.12 | 30.12 | 10,882.99 | 102.77 | 5 | null | PU_MEKAKA_KAVOSA | 971.77 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 10,985.76 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEVO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 6 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 10,985.76 | null | null | null | 283.24 | 324.28 | 7 | null | 24 | 31 | 6.36 | 23.76 | null | 30.12 | 30.12 | 10,882.99 | 102.77 | 5 | null | null | null | null | null | null | null | null | null | 10,985.76 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEVO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 6 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 10,985.76 | null | null | null | 283.24 | 324.28 | 7 | null | 24 | 31 | 6.36 | 23.76 | null | 30.12 | 30.12 | 10,882.99 | 102.77 | 5 | null | null | null | null | null | null | null | null | null | 10,985.76 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEVO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | NE.TO-NE.SA m3, soil group 6 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 10,985.76 | null | null | null | 283.24 | 324.28 | 7 | null | 24 | 31 | 6.36 | 23.76 | null | 30.12 | 30.12 | 10,882.99 | 102.77 | 5 | null | null | null | null | null | null | null | null | null | 10,985.76 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEDX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 1 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 2.45 | 2.45 | 16.16 | 39.59 | null | null | 1000 m3 | 699.45 | null | null | null | 72.01 | 119.3 | 3 | null | 10 | 13 | 2.45 | 9.15 | null | 11.6 | 11.6 | 659.86 | 39.59 | 2 | null | null | null | null | null | null | null | null | null | 699.45 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEDX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 3.05 | 3.05 | 33.07 | 100.86 | null | null | 1000 m3 | 699.45 | 12.2 | 1.0 | 6.0 | null | null | 72.01 | 119.3 | 3 | null | 10 | 13 | 2.45 | 9.15 | null | 11.6 | 11.6 | 659.86 | 39.59 | 2 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 699.45 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEDX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 3.05 | 3.05 | 12.2 | 37.22 | null | null | 1000 m3 | 699.45 | 12.2 | 1.0 | 6.0 | null | null | 72.01 | 119.3 | 3 | null | 10 | 13 | 2.45 | 9.15 | null | 11.6 | 11.6 | 659.86 | 39.59 | 2 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 699.45 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEDX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MEMEDX | Electric walking single-bucket excavators, bucket capacity 5-6 m3 | Machine hours | 3.05 | 3.05 | 183.28 | 559 | null | null | 1000 m3 | 699.45 | 26.91 | nan | 7.5 | 177 | 23.61 | 72.01 | 119.3 | 3 | null | 10 | 13 | 2.45 | 9.15 | null | 11.6 | 11.6 | 659.86 | 39.59 | 2 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 699.45 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEDX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KALISA | Personnel: 2 man-hours/machine-hour | Machine hours | 3.05 | 3.05 | 26.91 | 82.08 | null | null | 1000 m3 | 699.45 | 26.91 | nan | 7.5 | 177 | 23.61 | 72.01 | 119.3 | 3 | null | 10 | 13 | 2.45 | 9.15 | null | 11.6 | 11.6 | 659.86 | 39.59 | 2 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 699.45 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEDX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 1 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MEMEDX | Electricity: consumption 177 kWh/machine-hour | Machine hours | 3.05 | 3.05 | 23.61 | 72.01 | null | null | 1000 m3 | 699.45 | 26.91 | nan | 7.5 | 177 | 23.61 | 72.01 | 119.3 | 3 | null | 10 | 13 | 2.45 | 9.15 | null | 11.6 | 11.6 | 659.86 | 39.59 | 2 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 699.45 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEDX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 699.45 | null | null | null | 72.01 | 119.3 | 3 | null | 10 | 13 | 2.45 | 9.15 | null | 11.6 | 11.6 | 659.86 | 39.59 | 2 | null | null | null | null | null | null | null | null | null | 699.45 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEDX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 699.45 | null | null | null | 72.01 | 119.3 | 3 | null | 10 | 13 | 2.45 | 9.15 | null | 11.6 | 11.6 | 659.86 | 39.59 | 2 | null | null | null | null | null | null | null | null | null | 699.45 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEDX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 699.45 | null | null | null | 72.01 | 119.3 | 3 | null | 10 | 13 | 2.45 | 9.15 | null | 11.6 | 11.6 | 659.86 | 39.59 | 2 | null | null | null | null | null | null | null | null | null | 699.45 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 2 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 3.01 | 3.01 | 16.16 | 48.64 | null | null | 1000 m3 | 857.78 | null | null | null | 88.29 | 146.29 | 4 | null | 12 | 16 | 3.01 | 11.22 | null | 14.23 | 14.23 | 809.14 | 48.64 | 3 | null | null | null | null | null | null | null | null | null | 857.78 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 3.74 | 3.74 | 33.07 | 123.68 | null | null | 1000 m3 | 857.78 | 12.2 | 1.0 | 6.0 | null | null | 88.29 | 146.29 | 4 | null | 12 | 16 | 3.01 | 11.22 | null | 14.23 | 14.23 | 809.14 | 48.64 | 3 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 857.78 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 3.74 | 3.74 | 12.2 | 45.64 | null | null | 1000 m3 | 857.78 | 12.2 | 1.0 | 6.0 | null | null | 88.29 | 146.29 | 4 | null | 12 | 16 | 3.01 | 11.22 | null | 14.23 | 14.23 | 809.14 | 48.64 | 3 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 857.78 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MEMEDX | Electric walking single-bucket excavators, bucket capacity 5-6 m3 | Machine hours | 3.74 | 3.74 | 183.28 | 685.46 | null | null | 1000 m3 | 857.78 | 26.91 | nan | 7.5 | 177 | 23.61 | 88.29 | 146.29 | 4 | null | 12 | 16 | 3.01 | 11.22 | null | 14.23 | 14.23 | 809.14 | 48.64 | 3 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 857.78 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KALISA | Personnel: 2 man-hours/machine-hour | Machine hours | 3.74 | 3.74 | 26.91 | 100.65 | null | null | 1000 m3 | 857.78 | 26.91 | nan | 7.5 | 177 | 23.61 | 88.29 | 146.29 | 4 | null | 12 | 16 | 3.01 | 11.22 | null | 14.23 | 14.23 | 809.14 | 48.64 | 3 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 857.78 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 2 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MEMEDX | Electricity: consumption 177 kWh/machine-hour | Machine hours | 3.74 | 3.74 | 23.61 | 88.29 | null | null | 1000 m3 | 857.78 | 26.91 | nan | 7.5 | 177 | 23.61 | 88.29 | 146.29 | 4 | null | 12 | 16 | 3.01 | 11.22 | null | 14.23 | 14.23 | 809.14 | 48.64 | 3 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 857.78 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 857.78 | null | null | null | 88.29 | 146.29 | 4 | null | 12 | 16 | 3.01 | 11.22 | null | 14.23 | 14.23 | 809.14 | 48.64 | 3 | null | null | null | null | null | null | null | null | null | 857.78 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 857.78 | null | null | null | 88.29 | 146.29 | 4 | null | 12 | 16 | 3.01 | 11.22 | null | 14.23 | 14.23 | 809.14 | 48.64 | 3 | null | null | null | null | null | null | null | null | null | 857.78 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 857.78 | null | null | null | 88.29 | 146.29 | 4 | null | 12 | 16 | 3.01 | 11.22 | null | 14.23 | 14.23 | 809.14 | 48.64 | 3 | null | null | null | null | null | null | null | null | null | 857.78 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 3 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 3.69 | 3.69 | 16.16 | 59.63 | null | null | 1000 m3 | 1,054.83 | null | null | null | 108.6 | 179.92 | 4 | null | 14 | 18 | 3.69 | 13.8 | null | 17.49 | 17.49 | 995.2 | 59.63 | 3 | null | null | null | null | null | null | null | null | null | 1,054.83 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 4.6 | 4.6 | 33.07 | 152.12 | null | null | 1000 m3 | 1,054.83 | 12.2 | 1.0 | 6.0 | null | null | 108.6 | 179.92 | 4 | null | 14 | 18 | 3.69 | 13.8 | null | 17.49 | 17.49 | 995.2 | 59.63 | 3 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 1,054.83 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 4.6 | 4.6 | 12.2 | 56.13 | null | null | 1000 m3 | 1,054.83 | 12.2 | 1.0 | 6.0 | null | null | 108.6 | 179.92 | 4 | null | 14 | 18 | 3.69 | 13.8 | null | 17.49 | 17.49 | 995.2 | 59.63 | 3 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 1,054.83 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MEMEDX | Electric walking single-bucket excavators, bucket capacity 5-6 m3 | Machine hours | 4.6 | 4.6 | 183.28 | 843.08 | null | null | 1000 m3 | 1,054.83 | 26.91 | nan | 7.5 | 177 | 23.61 | 108.6 | 179.92 | 4 | null | 14 | 18 | 3.69 | 13.8 | null | 17.49 | 17.49 | 995.2 | 59.63 | 3 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,054.83 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KALISA | Personnel: 2 man-hours/machine-hour | Machine hours | 4.6 | 4.6 | 26.91 | 123.8 | null | null | 1000 m3 | 1,054.83 | 26.91 | nan | 7.5 | 177 | 23.61 | 108.6 | 179.92 | 4 | null | 14 | 18 | 3.69 | 13.8 | null | 17.49 | 17.49 | 995.2 | 59.63 | 3 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,054.83 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 3 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MEMEDX | Electricity: consumption 177 kWh/machine-hour | Machine hours | 4.6 | 4.6 | 23.61 | 108.6 | null | null | 1000 m3 | 1,054.83 | 26.91 | nan | 7.5 | 177 | 23.61 | 108.6 | 179.92 | 4 | null | 14 | 18 | 3.69 | 13.8 | null | 17.49 | 17.49 | 995.2 | 59.63 | 3 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,054.83 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 1,054.83 | null | null | null | 108.6 | 179.92 | 4 | null | 14 | 18 | 3.69 | 13.8 | null | 17.49 | 17.49 | 995.2 | 59.63 | 3 | null | null | null | null | null | null | null | null | null | 1,054.83 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 1,054.83 | null | null | null | 108.6 | 179.92 | 4 | null | 14 | 18 | 3.69 | 13.8 | null | 17.49 | 17.49 | 995.2 | 59.63 | 3 | null | null | null | null | null | null | null | null | null | 1,054.83 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 1,054.83 | null | null | null | 108.6 | 179.92 | 4 | null | 14 | 18 | 3.69 | 13.8 | null | 17.49 | 17.49 | 995.2 | 59.63 | 3 | null | null | null | null | null | null | null | null | null | 1,054.83 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIRI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 4 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 5.33 | 5.33 | 16.16 | 86.13 | null | null | 1000 m3 | 1,520.52 | null | null | null | 156.52 | 259.33 | 6 | null | 20 | 26 | 5.33 | 19.89 | null | 25.22 | 25.22 | 1,434.39 | 86.13 | 4 | null | null | null | null | null | null | null | null | null | 1,520.52 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIRI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 4 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 6.63 | 6.63 | 33.07 | 219.25 | null | null | 1000 m3 | 1,520.52 | 12.2 | 1.0 | 6.0 | null | null | 156.52 | 259.33 | 6 | null | 20 | 26 | 5.33 | 19.89 | null | 25.22 | 25.22 | 1,434.39 | 86.13 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 1,520.52 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIRI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 4 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 6.63 | 6.63 | 12.2 | 80.9 | null | null | 1000 m3 | 1,520.52 | 12.2 | 1.0 | 6.0 | null | null | 156.52 | 259.33 | 6 | null | 20 | 26 | 5.33 | 19.89 | null | 25.22 | 25.22 | 1,434.39 | 86.13 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 1,520.52 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIRI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 4 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MEMEDX | Electric walking single-bucket excavators, bucket capacity 5-6 m3 | Machine hours | 6.63 | 6.63 | 183.28 | 1,215.14 | null | null | 1000 m3 | 1,520.52 | 26.91 | nan | 7.5 | 177 | 23.61 | 156.52 | 259.33 | 6 | null | 20 | 26 | 5.33 | 19.89 | null | 25.22 | 25.22 | 1,434.39 | 86.13 | 4 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,520.52 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIRI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 4 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KALISA | Personnel: 2 man-hours/machine-hour | Machine hours | 6.63 | 6.63 | 26.91 | 178.43 | null | null | 1000 m3 | 1,520.52 | 26.91 | nan | 7.5 | 177 | 23.61 | 156.52 | 259.33 | 6 | null | 20 | 26 | 5.33 | 19.89 | null | 25.22 | 25.22 | 1,434.39 | 86.13 | 4 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,520.52 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIRI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 4 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MEMEDX | Electricity: consumption 177 kWh/machine-hour | Machine hours | 6.63 | 6.63 | 23.61 | 156.52 | null | null | 1000 m3 | 1,520.52 | 26.91 | nan | 7.5 | 177 | 23.61 | 156.52 | 259.33 | 6 | null | 20 | 26 | 5.33 | 19.89 | null | 25.22 | 25.22 | 1,434.39 | 86.13 | 4 | null | PU_MEKAKA_KALISA | 132.81 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,520.52 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIRI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 1,520.52 | null | null | null | 156.52 | 259.33 | 6 | null | 20 | 26 | 5.33 | 19.89 | null | 25.22 | 25.22 | 1,434.39 | 86.13 | 4 | null | null | null | null | null | null | null | null | null | 1,520.52 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIRI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 1,520.52 | null | null | null | 156.52 | 259.33 | 6 | null | 20 | 26 | 5.33 | 19.89 | null | 25.22 | 25.22 | 1,434.39 | 86.13 | 4 | null | null | null | null | null | null | null | null | null | 1,520.52 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RIRI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 1,520.52 | null | null | null | 156.52 | 259.33 | 6 | null | 20 | 26 | 5.33 | 19.89 | null | 25.22 | 25.22 | 1,434.39 | 86.13 | 4 | null | null | null | null | null | null | null | null | null | 1,520.52 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RITO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 5 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOSA | Worker Category 1 | hrs | 6 | 6 | 16.16 | 96.95 | null | null | 1000 m3 | 1,717.4 | null | null | null | 176.83 | 292.96 | 6 | null | 23 | 29 | 6 | 22.47 | null | 28.47 | 28.47 | 1,620.45 | 96.95 | 5 | null | null | null | null | null | null | null | null | null | 1,717.4 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_RITO | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 5-6 m3, soil group 5 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 7.49 | 7.49 | 33.07 | 247.69 | null | null | 1000 m3 | 1,717.4 | 12.2 | 1.0 | 6.0 | null | null | 176.83 | 292.96 | 6 | null | 23 | 29 | 6 | 22.47 | null | 28.47 | 28.47 | 1,620.45 | 96.95 | 5 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 1,717.4 |