category_type stringclasses 5
values | collection_code stringclasses 66
values | collection_name stringclasses 110
values | department_code stringclasses 44
values | department_name stringclasses 563
values | department_type stringclasses 3
values | section_name stringlengths 0 265 | section_type stringclasses 4
values | subsection_code stringlengths 0 16 | subsection_name stringlengths 0 882 | rate_code stringlengths 21 24 | rate_original_name stringlengths 0 672 | rate_final_name stringlengths 1 274 | rate_unit stringclasses 210
values | row_type stringclasses 7
values | is_scope bool 2
classes | is_abstract bool 2
classes | is_machine bool 2
classes | is_material bool 2
classes | work_composition_text stringlengths 0 354 | resource_code stringlengths 0 26 | resource_name stringlengths 0 401 | resource_unit stringclasses 29
values | resource_quantity float64 0 7.72M ⌀ | parameter_resource_quantity float64 0 7.72M ⌀ | resource_price_per_unit_eur_current float64 0.01 463k ⌀ | resource_cost_eur float64 0 15.4M ⌀ | price_abstract_resource_est_price_median float64 0.05 94.4k ⌀ | unit_match_rate_and_price stringclasses 3
values | materials_resource_cost_eur float64 0 1.99M ⌀ | rate_unit_copy stringclasses 210
values | total_cost_per_position float64 0.3 7.72M ⌀ | price_machinist_wages float64 1.71 561 ⌀ | price_relocation_included stringclasses 3
values | personnel_machinist_grade stringclasses 43
values | electricity_consumption_kwh_per_machine_hour float64 0.01 2.89k ⌀ | electricity_cost_per_unit float64 0 385 ⌀ | electricity_cost_total_sum float64 0 92.5k ⌀ | cost_machinist_sum float64 0 200k ⌀ | count_workers_per_unit float64 1 163k ⌀ | count_engineers_per_unit float64 1 16.9k ⌀ | count_machinists_per_unit float64 1 19.7k ⌀ | count_total_people_per_unit float64 1 163k ⌀ | labor_hours_construction_workers float64 0.02 163k ⌀ | labor_hours_machinists float64 0.01 19.7k ⌀ | labor_hours_engineers float64 0.04 16.9k ⌀ | total_labor_hours_workers_machinists float64 0.01 163k ⌀ | total_labor_hours_all_personnel float64 0.01 163k ⌀ | total_value_machinery_equipment float64 0 1.58M ⌀ | cost_of_working_hours float64 0.34 2.92M ⌀ | count_people_per_day float64 1 23.3k ⌀ | total_material_cost_per_position float64 0.02 2.33M ⌀ | personnel_machinist_code stringclasses 43
values | price_cost_without_wages float64 0.01 30.3k ⌀ | machine_class3_name stringclasses 167
values | machine_class2_name stringclasses 22
values | price_code_prefix stringclasses 896
values | price_abstract_resource_common_start stringclasses 847
values | price_abstract_resource_variable_parts stringlengths 0 33.6k | price_abstract_resource_position_count float64 1 1.57k ⌀ | price_abstract_resource_est_price_min float64 0.04 91.3k ⌀ | price_abstract_resource_est_price_max float64 0.05 463k ⌀ | price_abstract_resource_est_price_mean float64 0.05 175k ⌀ | prais_abstresurs_smetnaya_tekushchaya_razmakh stringclasses 875
values | price_abstract_resource_unit stringclasses 122
values | price_abstract_resource_group_per_unit stringclasses 647
values | price_abstract_resource_common_start_per_unit stringclasses 863
values | price_abstract_resource_variable_parts_per_unit stringclasses 924
values | prais_abstresurs_smetnaya_tekushchaya_razmakh_po_ed stringclasses 920
values | abstract_resource_tech_group stringlengths 0 16 | mass_name stringclasses 2
values | mass_value float64 1 33.3k ⌀ | mass_unit stringclasses 3
values | service_category stringclasses 2
values | service_type stringclasses 2
values | parameter_service_code stringclasses 5
values | parameter_service_unit stringclasses 3
values | parameter_service_name stringclasses 5
values | parameter_service_quantity stringclasses 485
values | service_cost_sum float64 | price_abstract_resource_est_price_all_values stringlengths 0 26.2k | total_value_abstract_resources float64 0.02 2.33M ⌀ | total_resource_cost_per_position float64 0.3 7.72M ⌀ | price_abstract_resource_est_price_all_values_per_unit stringlengths 0 32.8k |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KASACON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 5 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.SA m3 | Machine hours | 59.5 | 59.5 | 36.71 | 2,184.36 | null | null | 1000 m3 | 2,184.36 | 12.2 | 1.0 | 6.0 | null | null | null | 770.17 | 147 | null | 65 | 212 | 146.7 | 64.36 | null | 211.06 | 211.06 | 2,239.62 | 2,426.68 | 31 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 2,184.36 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KASACON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 5 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 59.5 | 59.5 | 12.2 | 726.03 | null | null | 1000 m3 | 2,184.36 | 12.2 | 1.0 | 6.0 | null | null | null | 770.17 | 147 | null | 65 | 212 | 146.7 | 64.36 | null | 211.06 | 211.06 | 2,239.62 | 2,426.68 | 31 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 2,184.36 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KASACON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 5 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 2,184.36 | null | null | null | null | 770.17 | 147 | null | 65 | 212 | 146.7 | 64.36 | null | 211.06 | 211.06 | 2,239.62 | 2,426.68 | 31 | null | null | null | null | null | null | null | null | null | 2,184.36 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KASACON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 5 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 2,184.36 | null | null | null | null | 770.17 | 147 | null | 65 | 212 | 146.7 | 64.36 | null | 211.06 | 211.06 | 2,239.62 | 2,426.68 | 31 | null | null | null | null | null | null | null | null | null | 2,184.36 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KASACON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 5 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 2,184.36 | null | null | null | null | 770.17 | 147 | null | 65 | 212 | 146.7 | 64.36 | null | 211.06 | 211.06 | 2,239.62 | 2,426.68 | 31 | null | null | null | null | null | null | null | null | null | 2,184.36 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KASACON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 5 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 2,184.36 | null | null | null | null | 770.17 | 147 | null | 65 | 212 | 146.7 | 64.36 | null | 211.06 | 211.06 | 2,239.62 | 2,426.68 | 31 | null | null | null | null | null | null | null | null | null | 2,184.36 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KANECON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 6 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.SA m3 | Machine hours | 69 | 69 | 36.71 | 2,533.12 | null | null | 1000 m3 | 2,533.12 | 12.2 | 1.0 | 6.0 | null | null | null | 841.95 | 8 | null | 69 | 77 | 7.45 | 69 | null | 76.45 | 76.45 | 2,533.12 | 120.38 | 11 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 2,533.12 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KANECON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 6 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 69 | 69 | 12.2 | 841.95 | null | null | 1000 m3 | 2,533.12 | 12.2 | 1.0 | 6.0 | null | null | null | 841.95 | 8 | null | 69 | 77 | 7.45 | 69 | null | 76.45 | 76.45 | 2,533.12 | 120.38 | 11 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 2,533.12 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KANECON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 6 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 2,533.12 | null | null | null | null | 841.95 | 8 | null | 69 | 77 | 7.45 | 69 | null | 76.45 | 76.45 | 2,533.12 | 120.38 | 11 | null | null | null | null | null | null | null | null | null | 2,533.12 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KANECON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 6 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 2,533.12 | null | null | null | null | 841.95 | 8 | null | 69 | 77 | 7.45 | 69 | null | 76.45 | 76.45 | 2,533.12 | 120.38 | 11 | null | null | null | null | null | null | null | null | null | 2,533.12 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KANECON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 6 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 2,533.12 | null | null | null | null | 841.95 | 8 | null | 69 | 77 | 7.45 | 69 | null | 76.45 | 76.45 | 2,533.12 | 120.38 | 11 | null | null | null | null | null | null | null | null | null | 2,533.12 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KANECON | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.SA (KA.SA-KA.NETO) m3, soil group: | 6 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 2,533.12 | null | null | null | null | 841.95 | 8 | null | 69 | 77 | 7.45 | 69 | null | 76.45 | 76.45 | 2,533.12 | 120.38 | 11 | null | null | null | null | null | null | null | null | null | 2,533.12 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KALI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVOPU | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.PU m3 | Machine hours | 29 | 29 | 33.01 | 957.18 | null | null | 1000 m3 | 957.18 | 10.44 | 1.0 | 5.0 | null | null | null | 302.75 | null | null | 29 | 29 | null | 29 | null | 29 | 29 | 957.18 | null | 5 | null | PU_MEKAKA_KASAKA | 25.59 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 957.18 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KALI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | 29 | 29 | 10.44 | 302.75 | null | null | 1000 m3 | 957.18 | 10.44 | 1.0 | 5.0 | null | null | null | 302.75 | null | null | 29 | 29 | null | 29 | null | 29 | 29 | 957.18 | null | 5 | null | PU_MEKAKA_KASAKA | 25.59 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 957.18 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KALI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 957.18 | null | null | null | null | 302.75 | null | null | 29 | 29 | null | 29 | null | 29 | 29 | 957.18 | null | 5 | null | null | null | null | null | null | null | null | null | 957.18 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KALI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 957.18 | null | null | null | null | 302.75 | null | null | 29 | 29 | null | 29 | null | 29 | 29 | 957.18 | null | 5 | null | null | null | null | null | null | null | null | null | 957.18 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KALI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 957.18 | null | null | null | null | 302.75 | null | null | 29 | 29 | null | 29 | null | 29 | 29 | 957.18 | null | 5 | null | null | null | null | null | null | null | null | null | 957.18 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KALI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 957.18 | null | null | null | null | 302.75 | null | null | 29 | 29 | null | 29 | null | 29 | 29 | 957.18 | null | 5 | null | null | null | null | null | null | null | null | null | 957.18 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KAVO | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVOPU | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.PU m3 | Machine hours | 37 | 37 | 33.01 | 1,221.23 | null | null | 1000 m3 | 1,221.23 | 10.44 | 1.0 | 5.0 | null | null | null | 386.26 | null | null | 37 | 37 | null | 37 | null | 37 | 37 | 1,221.23 | null | 6 | null | PU_MEKAKA_KASAKA | 25.59 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,221.23 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KAVO | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | 37 | 37 | 10.44 | 386.26 | null | null | 1000 m3 | 1,221.23 | 10.44 | 1.0 | 5.0 | null | null | null | 386.26 | null | null | 37 | 37 | null | 37 | null | 37 | 37 | 1,221.23 | null | 6 | null | PU_MEKAKA_KASAKA | 25.59 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,221.23 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KAVO | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 1,221.23 | null | null | null | null | 386.26 | null | null | 37 | 37 | null | 37 | null | 37 | 37 | 1,221.23 | null | 6 | null | null | null | null | null | null | null | null | null | 1,221.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KAVO | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 1,221.23 | null | null | null | null | 386.26 | null | null | 37 | 37 | null | 37 | null | 37 | 37 | 1,221.23 | null | 6 | null | null | null | null | null | null | null | null | null | 1,221.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KAVO | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 1,221.23 | null | null | null | null | 386.26 | null | null | 37 | 37 | null | 37 | null | 37 | 37 | 1,221.23 | null | 6 | null | null | null | null | null | null | null | null | null | 1,221.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KAVO | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 1,221.23 | null | null | null | null | 386.26 | null | null | 37 | 37 | null | 37 | null | 37 | 37 | 1,221.23 | null | 6 | null | null | null | null | null | null | null | null | null | 1,221.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KADX | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVOPU | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.PU m3 | Machine hours | 51.5 | 51.5 | 33.01 | 1,699.82 | null | null | 1000 m3 | 1,699.82 | 10.44 | 1.0 | 5.0 | null | null | null | 537.64 | null | null | 52 | 52 | null | 51.5 | null | 51.5 | 51.5 | 1,699.82 | null | 8 | null | PU_MEKAKA_KASAKA | 25.59 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,699.82 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KADX | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | 51.5 | 51.5 | 10.44 | 537.64 | null | null | 1000 m3 | 1,699.82 | 10.44 | 1.0 | 5.0 | null | null | null | 537.64 | null | null | 52 | 52 | null | 51.5 | null | 51.5 | 51.5 | 1,699.82 | null | 8 | null | PU_MEKAKA_KASAKA | 25.59 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,699.82 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KADX | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 1,699.82 | null | null | null | null | 537.64 | null | null | 52 | 52 | null | 51.5 | null | 51.5 | 51.5 | 1,699.82 | null | 8 | null | null | null | null | null | null | null | null | null | 1,699.82 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KADX | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 1,699.82 | null | null | null | null | 537.64 | null | null | 52 | 52 | null | 51.5 | null | 51.5 | 51.5 | 1,699.82 | null | 8 | null | null | null | null | null | null | null | null | null | 1,699.82 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KADX | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 1,699.82 | null | null | null | null | 537.64 | null | null | 52 | 52 | null | 51.5 | null | 51.5 | 51.5 | 1,699.82 | null | 8 | null | null | null | null | null | null | null | null | null | 1,699.82 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_KADX | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.PU (KA.TOSA-KA.PUSA) m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 1,699.82 | null | null | null | null | 537.64 | null | null | 52 | 52 | null | 51.5 | null | 51.5 | 51.5 | 1,699.82 | null | 8 | null | null | null | null | null | null | null | null | null | 1,699.82 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEKA | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MEKANE | Single-bucket diesel excavators on pneumatic wheels, bucket capacity KA.RISA m3 | Machine hours | 38 | 38 | 26.36 | 1,001.84 | null | null | 1000 m3 | 1,001.84 | 10.44 | 1.0 | 5.0 | null | null | null | 396.7 | null | null | 38 | 38 | null | 38 | null | 38 | 38 | 1,001.84 | null | 6 | null | PU_MEKAKA_KASAKA | 21.61 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,001.84 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEKA | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | 38 | 38 | 10.44 | 396.7 | null | null | 1000 m3 | 1,001.84 | 10.44 | 1.0 | 5.0 | null | null | null | 396.7 | null | null | 38 | 38 | null | 38 | null | 38 | 38 | 1,001.84 | null | 6 | null | PU_MEKAKA_KASAKA | 21.61 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,001.84 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEKA | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 1,001.84 | null | null | null | null | 396.7 | null | null | 38 | 38 | null | 38 | null | 38 | 38 | 1,001.84 | null | 6 | null | null | null | null | null | null | null | null | null | 1,001.84 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEKA | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 1,001.84 | null | null | null | null | 396.7 | null | null | 38 | 38 | null | 38 | null | 38 | 38 | 1,001.84 | null | 6 | null | null | null | null | null | null | null | null | null | 1,001.84 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEKA | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 1,001.84 | null | null | null | null | 396.7 | null | null | 38 | 38 | null | 38 | null | 38 | 38 | 1,001.84 | null | 6 | null | null | null | null | null | null | null | null | null | 1,001.84 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEKA | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 1,001.84 | null | null | null | null | 396.7 | null | null | 38 | 38 | null | 38 | null | 38 | 38 | 1,001.84 | null | 6 | null | null | null | null | null | null | null | null | null | 1,001.84 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEME | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MEKANE | Single-bucket diesel excavators on pneumatic wheels, bucket capacity KA.RISA m3 | Machine hours | 50 | 50 | 26.36 | 1,318.21 | null | null | 1000 m3 | 1,318.21 | 10.44 | 1.0 | 5.0 | null | null | null | 521.98 | null | null | 50 | 50 | null | 50 | null | 50 | 50 | 1,318.21 | null | 8 | null | PU_MEKAKA_KASAKA | 21.61 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,318.21 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEME | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | 50 | 50 | 10.44 | 521.98 | null | null | 1000 m3 | 1,318.21 | 10.44 | 1.0 | 5.0 | null | null | null | 521.98 | null | null | 50 | 50 | null | 50 | null | 50 | 50 | 1,318.21 | null | 8 | null | PU_MEKAKA_KASAKA | 21.61 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,318.21 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEME | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 1,318.21 | null | null | null | null | 521.98 | null | null | 50 | 50 | null | 50 | null | 50 | 50 | 1,318.21 | null | 8 | null | null | null | null | null | null | null | null | null | 1,318.21 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEME | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 1,318.21 | null | null | null | null | 521.98 | null | null | 50 | 50 | null | 50 | null | 50 | 50 | 1,318.21 | null | 8 | null | null | null | null | null | null | null | null | null | 1,318.21 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEME | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 1,318.21 | null | null | null | null | 521.98 | null | null | 50 | 50 | null | 50 | null | 50 | 50 | 1,318.21 | null | 8 | null | null | null | null | null | null | null | null | null | 1,318.21 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MEME | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 1,318.21 | null | null | null | null | 521.98 | null | null | 50 | 50 | null | 50 | null | 50 | 50 | 1,318.21 | null | 8 | null | null | null | null | null | null | null | null | null | 1,318.21 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MERI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MEKANE | Single-bucket diesel excavators on pneumatic wheels, bucket capacity KA.RISA m3 | Machine hours | 67 | 67 | 26.36 | 1,766.4 | null | null | 1000 m3 | 1,766.4 | 10.44 | 1.0 | 5.0 | null | null | null | 699.45 | null | null | 67 | 67 | null | 67 | null | 67 | 67 | 1,766.4 | null | 10 | null | PU_MEKAKA_KASAKA | 21.61 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,766.4 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MERI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | 67 | 67 | 10.44 | 699.45 | null | null | 1000 m3 | 1,766.4 | 10.44 | 1.0 | 5.0 | null | null | null | 699.45 | null | null | 67 | 67 | null | 67 | null | 67 | 67 | 1,766.4 | null | 10 | null | PU_MEKAKA_KASAKA | 21.61 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,766.4 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MERI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 1,766.4 | null | null | null | null | 699.45 | null | null | 67 | 67 | null | 67 | null | 67 | 67 | 1,766.4 | null | 10 | null | null | null | null | null | null | null | null | null | 1,766.4 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MERI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 1,766.4 | null | null | null | null | 699.45 | null | null | 67 | 67 | null | 67 | null | 67 | 67 | 1,766.4 | null | 10 | null | null | null | null | null | null | null | null | null | 1,766.4 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MERI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 1,766.4 | null | null | null | null | 699.45 | null | null | 67 | 67 | null | 67 | null | 67 | 67 | 1,766.4 | null | 10 | null | null | null | null | null | null | null | null | null | 1,766.4 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKALI | Excavation of soil into spoil heaps in pits with a volume of up to 1000 m3 using excavators with bucket capacities of 0.5, 0.4, and 0.25 m3 | KAME_KAME_KAKALI_MERI | Excavation of soil into a dump in pits with a volume of up to 1000 m3 using excavators with a bucket capacity of KA.RISA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 1,766.4 | null | null | null | null | 699.45 | null | null | 67 | 67 | null | 67 | null | 67 | 67 | 1,766.4 | null | 10 | null | null | null | null | null | null | null | null | null | 1,766.4 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAMECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVONE | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.NESA m3 | Machine hours | 18 | 18 | 46.6 | 838.74 | null | null | 1000 m3 | 838.74 | 12.2 | 1.0 | 6.0 | null | null | null | 219.64 | 5 | null | 18 | 23 | 4.06 | 18 | null | 22.06 | 22.06 | 838.74 | 63.27 | 4 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 838.74 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAMECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 18 | 18 | 12.2 | 219.64 | null | null | 1000 m3 | 838.74 | 12.2 | 1.0 | 6.0 | null | null | null | 219.64 | 5 | null | 18 | 23 | 4.06 | 18 | null | 22.06 | 22.06 | 838.74 | 63.27 | 4 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 838.74 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAMECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 838.74 | null | null | null | null | 219.64 | 5 | null | 18 | 23 | 4.06 | 18 | null | 22.06 | 22.06 | 838.74 | 63.27 | 4 | null | null | null | null | null | null | null | null | null | 838.74 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAMECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 838.74 | null | null | null | null | 219.64 | 5 | null | 18 | 23 | 4.06 | 18 | null | 22.06 | 22.06 | 838.74 | 63.27 | 4 | null | null | null | null | null | null | null | null | null | 838.74 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAMECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 838.74 | null | null | null | null | 219.64 | 5 | null | 18 | 23 | 4.06 | 18 | null | 22.06 | 22.06 | 838.74 | 63.27 | 4 | null | null | null | null | null | null | null | null | null | 838.74 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAMECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 838.74 | null | null | null | null | 219.64 | 5 | null | 18 | 23 | 4.06 | 18 | null | 22.06 | 22.06 | 838.74 | 63.27 | 4 | null | null | null | null | null | null | null | null | null | 838.74 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KARICON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVONE | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.NESA m3 | Machine hours | 20.5 | 20.5 | 46.6 | 955.23 | null | null | 1000 m3 | 955.23 | 12.2 | 1.0 | 6.0 | null | null | null | 250.14 | 6 | null | 21 | 27 | 5.03 | 20.5 | null | 25.53 | 25.53 | 955.23 | 79.35 | 4 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 955.23 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KARICON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 20.5 | 20.5 | 12.2 | 250.14 | null | null | 1000 m3 | 955.23 | 12.2 | 1.0 | 6.0 | null | null | null | 250.14 | 6 | null | 21 | 27 | 5.03 | 20.5 | null | 25.53 | 25.53 | 955.23 | 79.35 | 4 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 955.23 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KARICON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 955.23 | null | null | null | null | 250.14 | 6 | null | 21 | 27 | 5.03 | 20.5 | null | 25.53 | 25.53 | 955.23 | 79.35 | 4 | null | null | null | null | null | null | null | null | null | 955.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KARICON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 955.23 | null | null | null | null | 250.14 | 6 | null | 21 | 27 | 5.03 | 20.5 | null | 25.53 | 25.53 | 955.23 | 79.35 | 4 | null | null | null | null | null | null | null | null | null | 955.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KARICON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 955.23 | null | null | null | null | 250.14 | 6 | null | 21 | 27 | 5.03 | 20.5 | null | 25.53 | 25.53 | 955.23 | 79.35 | 4 | null | null | null | null | null | null | null | null | null | 955.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KARICON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 955.23 | null | null | null | null | 250.14 | 6 | null | 21 | 27 | 5.03 | 20.5 | null | 25.53 | 25.53 | 955.23 | 79.35 | 4 | null | null | null | null | null | null | null | null | null | 955.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KATOCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVONE | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.NESA m3 | Machine hours | 28.5 | 28.5 | 46.6 | 1,328 | null | null | 1000 m3 | 1,328 | 12.2 | 1.0 | 6.0 | null | null | null | 347.76 | 5 | null | 29 | 34 | 4.43 | 28.5 | null | 32.93 | 32.93 | 1,328 | 71.58 | 5 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,328 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KATOCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 28.5 | 28.5 | 12.2 | 347.76 | null | null | 1000 m3 | 1,328 | 12.2 | 1.0 | 6.0 | null | null | null | 347.76 | 5 | null | 29 | 34 | 4.43 | 28.5 | null | 32.93 | 32.93 | 1,328 | 71.58 | 5 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,328 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KATOCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 1,328 | null | null | null | null | 347.76 | 5 | null | 29 | 34 | 4.43 | 28.5 | null | 32.93 | 32.93 | 1,328 | 71.58 | 5 | null | null | null | null | null | null | null | null | null | 1,328 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KATOCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 1,328 | null | null | null | null | 347.76 | 5 | null | 29 | 34 | 4.43 | 28.5 | null | 32.93 | 32.93 | 1,328 | 71.58 | 5 | null | null | null | null | null | null | null | null | null | 1,328 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KATOCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 1,328 | null | null | null | null | 347.76 | 5 | null | 29 | 34 | 4.43 | 28.5 | null | 32.93 | 32.93 | 1,328 | 71.58 | 5 | null | null | null | null | null | null | null | null | null | 1,328 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KATOCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 1,328 | null | null | null | null | 347.76 | 5 | null | 29 | 34 | 4.43 | 28.5 | null | 32.93 | 32.93 | 1,328 | 71.58 | 5 | null | null | null | null | null | null | null | null | null | 1,328 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAPUCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 4 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVONE | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.NESA m3 | Machine hours | 37 | 37 | 46.6 | 1,724.07 | null | null | 1000 m3 | 1,724.07 | 12.2 | 1.0 | 6.0 | null | null | null | 451.48 | 6 | null | 37 | 43 | 5.42 | 37 | null | 42.42 | 42.42 | 1,724.07 | 88.62 | 7 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,724.07 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAPUCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 4 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 37 | 37 | 12.2 | 451.48 | null | null | 1000 m3 | 1,724.07 | 12.2 | 1.0 | 6.0 | null | null | null | 451.48 | 6 | null | 37 | 43 | 5.42 | 37 | null | 42.42 | 42.42 | 1,724.07 | 88.62 | 7 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,724.07 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAPUCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 4 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 1,724.07 | null | null | null | null | 451.48 | 6 | null | 37 | 43 | 5.42 | 37 | null | 42.42 | 42.42 | 1,724.07 | 88.62 | 7 | null | null | null | null | null | null | null | null | null | 1,724.07 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAPUCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 4 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 1,724.07 | null | null | null | null | 451.48 | 6 | null | 37 | 43 | 5.42 | 37 | null | 42.42 | 42.42 | 1,724.07 | 88.62 | 7 | null | null | null | null | null | null | null | null | null | 1,724.07 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAPUCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 4 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 1,724.07 | null | null | null | null | 451.48 | 6 | null | 37 | 43 | 5.42 | 37 | null | 42.42 | 42.42 | 1,724.07 | 88.62 | 7 | null | null | null | null | null | null | null | null | null | 1,724.07 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAPUCON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 4 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 1,724.07 | null | null | null | null | 451.48 | 6 | null | 37 | 43 | 5.42 | 37 | null | 42.42 | 42.42 | 1,724.07 | 88.62 | 7 | null | null | null | null | null | null | null | null | null | 1,724.07 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KASACON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 5 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVONE | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.NESA m3 | Machine hours | 48 | 48 | 46.6 | 2,236.64 | null | null | 1000 m3 | 2,236.64 | 12.2 | 1.0 | 6.0 | null | null | null | 585.7 | 4 | null | 48 | 52 | 3.6 | 48 | null | 51.6 | 51.6 | 2,236.64 | 56.79 | 8 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 2,236.64 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KASACON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 5 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 48 | 48 | 12.2 | 585.7 | null | null | 1000 m3 | 2,236.64 | 12.2 | 1.0 | 6.0 | null | null | null | 585.7 | 4 | null | 48 | 52 | 3.6 | 48 | null | 51.6 | 51.6 | 2,236.64 | 56.79 | 8 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 2,236.64 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KASACON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 5 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 2,236.64 | null | null | null | null | 585.7 | 4 | null | 48 | 52 | 3.6 | 48 | null | 51.6 | 51.6 | 2,236.64 | 56.79 | 8 | null | null | null | null | null | null | null | null | null | 2,236.64 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KASACON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 5 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 2,236.64 | null | null | null | null | 585.7 | 4 | null | 48 | 52 | 3.6 | 48 | null | 51.6 | 51.6 | 2,236.64 | 56.79 | 8 | null | null | null | null | null | null | null | null | null | 2,236.64 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KASACON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 5 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 2,236.64 | null | null | null | null | 585.7 | 4 | null | 48 | 52 | 3.6 | 48 | null | 51.6 | 51.6 | 2,236.64 | 56.79 | 8 | null | null | null | null | null | null | null | null | null | 2,236.64 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KASACON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 5 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 2,236.64 | null | null | null | null | 585.7 | 4 | null | 48 | 52 | 3.6 | 48 | null | 51.6 | 51.6 | 2,236.64 | 56.79 | 8 | null | null | null | null | null | null | null | null | null | 2,236.64 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KANECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 6 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVONE | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.NESA m3 | Machine hours | 58 | 58 | 46.6 | 2,702.6 | null | null | 1000 m3 | 2,702.6 | 12.2 | 1.0 | 6.0 | null | null | null | 707.72 | 5 | null | 58 | 63 | 4.59 | 58 | null | 62.59 | 62.59 | 2,702.6 | 73.29 | 9 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 2,702.6 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KANECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 6 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 58 | 58 | 12.2 | 707.72 | null | null | 1000 m3 | 2,702.6 | 12.2 | 1.0 | 6.0 | null | null | null | 707.72 | 5 | null | 58 | 63 | 4.59 | 58 | null | 62.59 | 62.59 | 2,702.6 | 73.29 | 9 | null | PU_MEKAKA_KANEKA | 35.84 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 2,702.6 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KANECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 6 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 2,702.6 | null | null | null | null | 707.72 | 5 | null | 58 | 63 | 4.59 | 58 | null | 62.59 | 62.59 | 2,702.6 | 73.29 | 9 | null | null | null | null | null | null | null | null | null | 2,702.6 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KANECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 6 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 2,702.6 | null | null | null | null | 707.72 | 5 | null | 58 | 63 | 4.59 | 58 | null | 62.59 | 62.59 | 2,702.6 | 73.29 | 9 | null | null | null | null | null | null | null | null | null | 2,702.6 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KANECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 6 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 2,702.6 | null | null | null | null | 707.72 | 5 | null | 58 | 63 | 4.59 | 58 | null | 62.59 | 62.59 | 2,702.6 | 73.29 | 9 | null | null | null | null | null | null | null | null | null | 2,702.6 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KANECON | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with a bucket capacity of KA.NESA m3, soil group: | 6 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 2,702.6 | null | null | null | null | 707.72 | 5 | null | 58 | 63 | 4.59 | 58 | null | 62.59 | 62.59 | 2,702.6 | 73.29 | 9 | null | null | null | null | null | null | null | null | null | 2,702.6 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KALI | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.SA m3 | Machine hours | 22 | 22 | 36.71 | 807.66 | null | null | 1000 m3 | 807.66 | 12.2 | 1.0 | 6.0 | null | null | null | 268.45 | null | null | 22 | 22 | null | 22 | null | 22 | 22 | 807.66 | null | 4 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 807.66 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KALI | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 22 | 22 | 12.2 | 268.45 | null | null | 1000 m3 | 807.66 | 12.2 | 1.0 | 6.0 | null | null | null | 268.45 | null | null | 22 | 22 | null | 22 | null | 22 | 22 | 807.66 | null | 4 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 807.66 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KALI | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 807.66 | null | null | null | null | 268.45 | null | null | 22 | 22 | null | 22 | null | 22 | 22 | 807.66 | null | 4 | null | null | null | null | null | null | null | null | null | 807.66 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KALI | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 807.66 | null | null | null | null | 268.45 | null | null | 22 | 22 | null | 22 | null | 22 | 22 | 807.66 | null | 4 | null | null | null | null | null | null | null | null | null | 807.66 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KALI | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 807.66 | null | null | null | null | 268.45 | null | null | 22 | 22 | null | 22 | null | 22 | 22 | 807.66 | null | 4 | null | null | null | null | null | null | null | null | null | 807.66 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KALI | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 1 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 807.66 | null | null | null | null | 268.45 | null | null | 22 | 22 | null | 22 | null | 22 | 22 | 807.66 | null | 4 | null | null | null | null | null | null | null | null | null | 807.66 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.SA m3 | Machine hours | 27.5 | 27.5 | 36.71 | 1,009.58 | null | null | 1000 m3 | 1,009.58 | 12.2 | 1.0 | 6.0 | null | null | null | 335.56 | null | null | 28 | 28 | null | 27.5 | null | 27.5 | 27.5 | 1,009.58 | null | 4 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,009.58 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 27.5 | 27.5 | 12.2 | 335.56 | null | null | 1000 m3 | 1,009.58 | 12.2 | 1.0 | 6.0 | null | null | null | 335.56 | null | null | 28 | 28 | null | 27.5 | null | 27.5 | 27.5 | 1,009.58 | null | 4 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,009.58 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 1,009.58 | null | null | null | null | 335.56 | null | null | 28 | 28 | null | 27.5 | null | 27.5 | 27.5 | 1,009.58 | null | 4 | null | null | null | null | null | null | null | null | null | 1,009.58 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 1,009.58 | null | null | null | null | 335.56 | null | null | 28 | 28 | null | 27.5 | null | 27.5 | 27.5 | 1,009.58 | null | 4 | null | null | null | null | null | null | null | null | null | 1,009.58 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Moving the excavator within the work area. | null | null | null | null | null | null | 1000 m3 | 1,009.58 | null | null | null | null | 335.56 | null | null | 28 | 28 | null | 27.5 | null | 27.5 | 27.5 | 1,009.58 | null | 4 | null | null | null | null | null | null | null | null | null | 1,009.58 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 2 | 1000 m3 | Scope of work | true | false | false | false | Construction of entrances to the excavation pit (if necessary). | null | null | null | null | null | null | 1000 m3 | 1,009.58 | null | null | null | null | 335.56 | null | null | 28 | 28 | null | 27.5 | null | 27.5 | 27.5 | 1,009.58 | null | 4 | null | null | null | null | null | null | null | null | null | 1,009.58 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KADX | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity KA.SA m3 | Machine hours | 34.5 | 34.5 | 36.71 | 1,266.56 | null | null | 1000 m3 | 1,266.56 | 12.2 | 1.0 | 6.0 | null | null | null | 420.97 | null | null | 35 | 35 | null | 34.5 | null | 34.5 | 34.5 | 1,266.56 | null | 5 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,266.56 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KADX | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 34.5 | 34.5 | 12.2 | 420.97 | null | null | 1000 m3 | 1,266.56 | 12.2 | 1.0 | 6.0 | null | null | null | 420.97 | null | null | 35 | 35 | null | 34.5 | null | 34.5 | 34.5 | 1,266.56 | null | 5 | null | PU_MEKAKA_KANEKA | 28.46 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 1,266.56 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KADX | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Excavating soil in pits according to dimensions and markings. | null | null | null | null | null | null | 1000 m3 | 1,266.56 | null | null | null | null | 420.97 | null | null | 35 | 35 | null | 34.5 | null | 34.5 | 34.5 | 1,266.56 | null | 5 | null | null | null | null | null | null | null | null | null | 1,266.56 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAVO | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3 using excavators with bucket capacities of 0.65 and 0.5 m3 | KAME_KAME_KAKAVO_KADX | Excavation of soil into a dump in pits with a volume of 1000 to 3000 m3, using excavators with a bucket capacity of KA.SA m3, soil group: | 3 | 1000 m3 | Scope of work | true | false | false | false | Processing of excavation slopes to design specifications. | null | null | null | null | null | null | 1000 m3 | 1,266.56 | null | null | null | null | 420.97 | null | null | 35 | 35 | null | 34.5 | null | 34.5 | 34.5 | 1,266.56 | null | 5 | null | null | null | null | null | null | null | null | null | 1,266.56 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.