# Network Deployment Guide: network_I_need_a_network_for ## Safety Checklist - [ ] Power off all equipment before installation - [ ] Verify proper grounding - [ ] Check environmental conditions (temp, humidity) - [ ] Have rollback plan ready - [ ] Document initial state ## Deployment Phases ### Phase 1: Physical Installation **Duration:** 4-6 hours **Prerequisites:** All equipment received, Rack installed, Power verified **Steps:** - [ ] Mount devices in rack following layout diagram - [ ] Connect power cables and verify PDU capacity - [ ] Install console cables for out-of-band access - [ ] Label all connections according to diagram ### Phase 2: Out-of-Band Network Setup **Duration:** 2-3 hours **Prerequisites:** Physical installation complete **Steps:** - [ ] Configure management switch with OOB VLAN - [ ] Connect console server to management network - [ ] Assign management IPs to all devices - [ ] Test SSH/console access to each device - [ ] Document all management IPs and credentials ### Phase 3: Handoff to Automation **Duration:** 30 minutes **Prerequisites:** OOB network operational, All devices reachable **Steps:** - [ ] Verify Overgrowth can reach all management IPs - [ ] Run connectivity test from automation server - [ ] Start autonomous agent deployment ## Out-of-Band Management Network ```yaml dhcp_range: 10.255.255.100-10.255.255.200 dns: - 10.255.255.1 gateway: 10.255.255.1 ntp: - 10.255.255.1 subnet: 10.255.255.0/24 vlan: 999 ``` ## Rollback Plan - Power down in reverse order of startup - Remove configurations and return to factory defaults - Restore from backup if configuration was attempted - Document what went wrong for post-mortem